INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS

Size: px
Start display at page:

Download "INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS"

Transcription

1 FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow an opportunity for additional subcontractors to view existing conditions? A1 Q2 A2 Q3 A3 Yes, a second information meeting will be held, only those who attended the Mandatory Information Meeting on February 26, 2016 and their subcontractors will be invited. Are we to include for the cost of the Building Permit? Field Review Building Permit Application has already been issued by the City and paid for by the project. The Contractor and their subs will be responsible to apply for and pay for any building trade permits required by the project. It is state in Part B Terms and Conditions of the ITT Process that If there is a conflict between or among (i) the Specifications and (ii) the other Tender Documents, the other Tender Documents shall prevail over the Specifications and Drawings What are the other Tender Documents? The other Tender Documents are contained in the Schedules or otherwise incorporated by reference. Q4 4. Disposal of waste generated in the performance of this work a. Are we to include for disposal fees? b. Can the old pipe system be recycled at the Transfer Station? Will there be a cost or salvage value? c. Is there space for bins on site? It was mentioned at the site meeting that all waste must be weighed and presumably sorted. Please clarify. A4 a. Yes, this forms part of the cost in Line 1.01 of Schedule A-Quantities and Prices b. yes it can be recycled at the CoV Recycling Depot. However, all material must be tracked by material type and weight. It also must meet our size restrictions which can be discussed at the time of the disposal depending on the material type. City of Vancouver, Financial Services Group Supply Management 453 West 12th Avenue Vancouver, British Columbia V5Y 1V4 Canada tel: fax: website: vancouver.ca

2 Prior to award of the contract, the old system components will need to be identified for salvage, recycling or disposal in the Waste Management Plan (See Specifications). c. Very limited lay-down space is available, therefore interim storage of materials may be required until bringing bins on site is justified. Sorting will be dictated by the details contained within the Waste Management Plan to be prepared for the project. Q5 5. Where does the asbestos, lead paint and or lead dust impact this project? a. The Hazmat Investigation Report does not identify material specific to this project. The report also states This survey is not designed to be used for construction, renovation or demolition purposes. If renovation or construction activities are planned, additional intrusive investigation may be required to identify concealed hazardous materials. Please advise if we are to include abatement of hazardous materials. A5 5. Asbestos occurs in the caulking found in the concrete joints of the external walls. It is not expected that this material will be disturbed in the course of this project. Lead paint will be encountered in the existing spray system bollards. The bollards are to be removed and disposed (see Demolition Drawing P5-DEMO) following appropriate abatement procedures as required. See Detail 3 on attached Reference Drawing S10 for details regarding these bollards. All settled dust is to be identified as suspect lead-containing and tested for appropriate handling procedures. a. All settled dust is to be identified as hazardous. It is suspect lead-containing and guano-contaminated and safe work procedures are required where it is disturbed. Silica is present in concrete and coring will require safe work procedures acceptable to WorkSafe BC. Q6 A6 Q7 A7 Is X-raying of concrete slab required prior to coring for new mechanical pipes and electrical conduits? This also applies to the concrete walls that require coring. On Grid Lines 2 & 10 there is a single line of X s, are these pipe supports or some other type of support? There is no cross section thru these areas. Please clarify what type of support is required. These X s occur on the following Drawings: M101-M01, M101-M02, E101-E01, E101-E02. Although these represent pipe and conduit supports, the number and spacing is not representative of what will be required. Specification Piping Support Systems provides design, spacing and submittal requirements for all supports other than those supports on Baylines E & G found on the Structural Drawings. The following photo shows several of the supports on part of the existing spray and hose bib systems. This is an acceptable option for supporting pipes and conduit from the Page 2 of 5

3 concrete walls and columns, in accordance with Specification Piping Support Systems. Q8 A8 Q9 A9 Q10 A10 On drawing M101-M06 it states Structural supports for the air curtains shall be connected to and span between concrete walls at each side of the door openings and not from the precast concrete roof members above. Can the support be connected as well to the wall above the door headers? Yes, as long as the Contractor designs the steel wall framing above the doors for the loads and to span and connect to concrete walls each side and not to the precast concrete (precast spandrel) above. Reference Drawings A12 and S14 show the metal panels and typical details at the overhead doors. How is the bird netting fastened to the concrete beams? Can we drill or use powder actuated nailer to refasten the netting? Clips and anchors (see photo in A10 below) Drill Yes (drilled pilot hole with concrete anchor screws) Powder actuated The detail 2/4 from reference drawing S14 shows the existing concrete beam as a Precast I beam with sloped surface that the pipe support would mounted on to and Typical Pipe Support Cross-Section detail from tender drawing M101-S01 shows flat surface that the pipe supports would mount on to. Please clarify which detail is correct. If detail 2/4 on reference drawing S14 is existing please provide revised pipe support detail that will be able to mount on to a sloped surface. See both details attached for reference. The detail on tender drawing M101-S01 is correct. Attached is Girder Detail Dwg S14, an excerpt from Reference Drawing S14 that documents that the Precast I beam was Revised to Inverted T-Beam. Page 3 of 5

4 Additionally, the photo below shows this configuration: Q11 A11 Q12 A12 Q13 A13 Are the floor slab and wall thickness details on the drawings? Attached are additional Reference Drawings that provide these details. Are the fire rated walls shown on the drawings? North Bay, Lower Floor The Dungeon : If the stored material needs to be moved to allow access for demolition of the existing system, will the Contractor need to move it? Yes. PLEASE FIND BELOW, THE ATTENDANCE LIST FROM THE MANDATORY INFORMATION MEETING: 1. Parkwood Construction Ltd. 2. Enviro-Vac 3. Industra Construction Corp. 4. C3M Construction 5. Ross Morrison Electric Page 4 of 5

5 6. Houle Electric 7. Nucor Environmental Ltd. 8. Actes Environmental 9. Proactive Hazmat 10. Olympic Projects 11. Jacob Bros 12. Alexander Construction Ltd. Page 5 of 5

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2 FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Office Installation Guidelines

Office Installation Guidelines UH Structures Inc. dba Ebtech Industrial 2241 Industrial Drive Connellsville, PA 15425-6181 Telephone: 724-628-6100 Fax: 1-412-774-2429 www.ebtechindustrial.com Office Installation Guidelines INTRODUCTION

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

SECTION ROUGH CARPENTRY

SECTION ROUGH CARPENTRY SECTION 06 10 00- ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Contracting Requirements and Division 1 Specification Sections, apply

More information

Hi5 s Expert Guide to Specify afix Lecture Hall Tables

Hi5 s Expert Guide to Specify afix Lecture Hall Tables Hi5 s Expert Guide to Specify afix Lecture Hall Tables Table Tops Page 2 Table Edges Page 3 Bases Page 4 6 Modesty Panels Page 7 Power Page 8 Wire Management Page 9 ADA Tables Page 10 Finish Choices Page

More information

Appendix A Door and Window Framing Last updated 5/21/2013

Appendix A Door and Window Framing Last updated 5/21/2013 Appendix A Door and Window Framing Last updated 5/21/2013 1. First complete all previous framing for bay. Appendix A 1 Install all applicable columns, rafters, and/or eave purlins for the bay in which

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

Site Preparation Information for:

Site Preparation Information for: Site Preparation Information for: Product Series - Big Doors Product Type - MultiGlide Door Read these instructions and the Product Safety Information before starting procedure. For: MultiGlide Door Instructions/Videos

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

PS 1000 X-Scan Tips & Tricks. Quick Guide

PS 1000 X-Scan Tips & Tricks. Quick Guide PS 1000 X-Scan Tips & Tricks Quick Guide en en QUICK GUIDE Tips & tricks 1. PS 1000 X-Scan Scanning on rough surfaces When the scanner is moved over a rough surface, the distance between the scanner and

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

DOCK WEDGE - STANDARD

DOCK WEDGE - STANDARD DOCK WEDGE - STANDARD INSTALLATION INSTRUCTIONS WOOD HEADER READ ALL INSTRUCTIONS BEFORE INSTALLING SEAL. SUPER SEAL MFG. LTD. WILL NOT BE HELD RESPONSIBLE FOR IMPROPER INSTALLATION OF ANCHORING DEVICES,

More information

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

General Layout. Eng. Maha Moddather

General Layout. Eng. Maha Moddather General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension

More information

Table of Contents. Revised: August 30, User Guide... i. Introduction Due Diligence Health & Safety Policy...

Table of Contents. Revised: August 30, User Guide... i. Introduction Due Diligence Health & Safety Policy... City of Vancouver Transfer & Landfill Operations Occupational Health and Safety Program Table of Contents Revised: August 30, 2012 User Guide... i Introduction... 1 Due Diligence... 2 1.0 Health & Safety

More information

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

Connectors for Cold-Formed Steel Curtain-Wall Construction

Connectors for Cold-Formed Steel Curtain-Wall Construction The expiration date of this document has been extended until 2/3/3. Introducing Connectors for Cold-Formed Steel Curtain-Wall Construction Code Listed: IAPMO ES ER-238 (800) 999-5099 www.strongtie.com

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height 1. SAFETY INSTRUCTIONS INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 3 x 3 x 2.1m MODEL No: GSS3030G Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used

More information

INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 1.5 x 0.8 x1.5m

INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 1.5 x 0.8 x1.5m INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 1.5 x 0.8 x1.5m MODEL NO: GSS150815G Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

PRODUCT NAME DOUBLE CARPORT + SHED REFERENCE NUMBER 1

PRODUCT NAME DOUBLE CARPORT + SHED REFERENCE NUMBER 1 PRODUCT NAME REFERENCE NUMBER 1 DOUBLE CARPORT + SHED IMPORTANT (Read carefully before starting)! - The following instructions include both pictures (indicating every part by the digits see part list above)

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system. www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for all Quaker products with nail fins New

More information

This Call for Qualifications does not require the preparation of a design proposal.

This Call for Qualifications does not require the preparation of a design proposal. EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

SECTION Display Case Door Series 1301-CM

SECTION Display Case Door Series 1301-CM 1 SECTION 12 3559 Display Case Door Series 1301-CM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Display Case Glass Doors. 2. Sidelites. B. Related work in other sections: 1. 08 8000- Glazing

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

Modular Gazebo Kit Series GardenHouse 12

Modular Gazebo Kit Series GardenHouse 12 Octagonal CUPOLA screened with louvers and light fixture Modular Gazebo Kit Series GardenHouse 12 with DOUBLE-TIERED Roof Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or

More information

STACKING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal

More information

PRODUCT NAME RENNES REFERENCE NUMBER 1

PRODUCT NAME RENNES REFERENCE NUMBER 1 PRODUCT NAME REFERENCE NUMBER RENNES 1 IMPORTANT (Read carefully before starting)! - The following instructions include both pictures (indicating every part by the digits see part list above) and illustrations.

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Clopay Models 835/837 Sliding Door System Installation Guide

Clopay Models 835/837 Sliding Door System Installation Guide Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1 WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.

More information

Architect. Architect.

Architect. Architect. The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which

More information

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete. REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction

More information

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds Assembly and Installation Instructions 1. GENERAL 1.1 Product Description Wings is a decorative ceiling element consisting of a 10 foot long

More information

B. See Division 05 Section "Pipe and Tube Railings" for metal pipe and tube railings.

B. See Division 05 Section Pipe and Tube Railings for metal pipe and tube railings. SECTION 055000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following, applicable: 1. Miscellaneous steel framing and supports. 2. Prefabricated building columns. 3. Shelf

More information

MM22 Enclosure Mount C228M-B (4/14)

MM22 Enclosure Mount C228M-B (4/14) I N S T A L L A T I O N MM22 Enclosure Mount C228M-B (4/14) Important Safety Instructions 1. Installation and servicing should be done only by qualified service personnel and conform to all local codes.

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

POST FRAME CONSTRUCTION MANUAL

POST FRAME CONSTRUCTION MANUAL POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade

More information

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete

More information

Adjustable Countertop Installation

Adjustable Countertop Installation Adjustable Countertop Installation Applies to Models: A1, A2, A3, A4, A5, & A6 Required Tools: Stud Finder, Level 1/4 deep well socket, Screwdrivers, Tape Measure, Drill and Drill Bits Language of origin:

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m INSTRUCTIONS FOR: GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m MODEL NO: GSS2323G Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these instructions,

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

Cabonyx Installation Manual

Cabonyx Installation Manual Cabonyx Installation Manual Content Deck-Nyx and Plan-Nyx Installation Page 1 Flooring Products Page 1 Accessories Page 1 Installation Tools Page 2 Preparing Sub-structure Page 2 Installation Page 4 Cautions

More information

Grand Garden Chalet 6X3 Assembly Manual - Costco

Grand Garden Chalet 6X3 Assembly Manual - Costco Revision #16 March 22nd, 2013 Grand Garden Chalet 6X3 Assembly Manual - Costco Thank you for purchasing a Grand Garden Chalet. Please take the time to identify all the parts prior to assembly. Please use

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 06 1053 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Division 01 Specification

More information

Merrick Pet Care New Distribution Center Hereford, Texas

Merrick Pet Care New Distribution Center Hereford, Texas Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,

More information

COMPILATION OF TENDER DOCUMENTS

COMPILATION OF TENDER DOCUMENTS COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to

More information

ASSEMBLY, INSTALLATION AND OPERATION MANUAL

ASSEMBLY, INSTALLATION AND OPERATION MANUAL ASSEMBLY, INSTALLATION AND OPERATION MANUAL - 1-312 SOUTH HWY. 73, PO BOX 398 FALLS CITY, NE 68355-0398 800-500-9777 PO Box 398 Falls City, NE 68355 800-500-9777 Version Date 03/07/2007 P/N 94000100 Revision

More information

SECTION ROUGH CARPENTRY

SECTION ROUGH CARPENTRY SECTION 06100 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Rough Carpentry as shown and detailed on the Drawings and

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS GARDEN SHED 6X5ft B/C 9400988362649 GARDEN SHED 6X7ft B/C 9400988362656 GARDEN SHED 6X9ft B/C 9400988362663 GARDEN SHED 6X1 B/C 9400988362670 111 ft ASSEMBLY INSTRUCTIONS Product specifications may change

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

SPLIT FRAME INSTALLATION INSTRUCTIONS

SPLIT FRAME INSTALLATION INSTRUCTIONS SPLIT FRAME INSTALLATION INSTRUCTIONS Revised 2014/09/29 Guillaume Gauthier, Eng. Product Manager RECEIPT OF MERCHANDISE... 2 INSTALLATION... 2 SPLIT FRAME COMPONENTS... 3 TOOLS, HARDWARE AND PARTS...

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation Montclair, NJ 07043 ADDENDUM NO. 2 Issue Date: June 18, 2010 Request for Proposal # 898 Finley Hall Renovation Number of Pages: 14 (plus attachment) Date of Original Bidding Documents: April 28, 2010 INTENT:

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Construction Tolerances - The following tolerances apply to cast-in-place structures: 00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

Assembly Instructions

Assembly Instructions Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel

More information

HC Precast System ( 100 % Malaysia Technology With 6 IPs )

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Choose Industrialised Building System ( IBS ) for Economical Construction Industrialised Building System ( IBS ) functions as a comprehensive superstructure construction system whereby flexibility in it's

More information

IF THIS SHEET IS NOT FILLED OUT, SIGNED AND RETURNED, PRODUCTION WILL BE POSTPONED UNTIL THIS DOCUMENT IS COMPLETED AND RETURNED.

IF THIS SHEET IS NOT FILLED OUT, SIGNED AND RETURNED, PRODUCTION WILL BE POSTPONED UNTIL THIS DOCUMENT IS COMPLETED AND RETURNED. X 2/18/2015 JDF Trash Chute & Trash Compactor P.O. Box 405 939 West Quincy St. Lakeland, FL 33802/33815 Phone: 800-659-1797 Fax: 863-683-9749 www.linenchutes.com Valiant Products, Inc. Trash/Linen Chutes

More information

Das Verbündnis von Tradition und High-Tech im kanadischen Holzbau

Das Verbündnis von Tradition und High-Tech im kanadischen Holzbau Robert Malczyk, M.A.Sc., P.Eng., MBA, Principal Equilibrium Consulting Inc. Canada, Vancouver Das Verbündnis von Tradition und High-Tech im kanadischen Holzbau 1 2 Tradition and high-tech in heavy timber

More information

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR Scope of Work Vinyl Siding Labor Division 190 General Requirements 1. All Work shall be performed in accordance with manufacturer

More information

Appendix B Framing Component Installation Last updated 5/27/2013

Appendix B Framing Component Installation Last updated 5/27/2013 Appendix B Framing Component Installation Last updated 5/27/2013 Apex Brace Installation Appendix B 1 Refer to apex connection detail on the engineering plans for the location of the apex brace. Refer

More information

FITS MUSTEE 32 X 32 SHOWER RECEPTOR

FITS MUSTEE 32 X 32 SHOWER RECEPTOR MUSTEE FIBERGLASS SHOWERWALL FITS MUSTEE 32 X 32 SHOWER RECEPTOR IMPORTANT: SEE BACK PAGE FOR SHOWER DOOR (ENCLOSURE) LISTING Before you assemble and install your MODEL 732 three-piece Molded Fiberglass

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information