Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers

Size: px
Start display at page:

Download "Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers"

Transcription

1 Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers 1. Question: Is this project Tax Exempt in regards to materials and equipment as per PA State Act 45? Response: NO 2. Question: Drawing AE701 The Borrow Light Schedule refers to a Drawing AE208.3 in the schedule, but this drawing doesn t not exist according to the drawing list.. Response: The details are on sheet A606 which is attached. 3. Question: Interior Elevation Keynotes - On sheets AE203.1 AE211.2 have the same keynotes legend, but the drawings have numbers that go up to We need the correct legend. Response: The numbers in the ovals are equipment numbers not keynotes. 4. Question: Is the VAMC North or South of U.S. Highway 30 in Caln Township: For determining which Department of Labor wage to use, while looking at the map, it appears that the VAMC is located South of U.S. Highway 30 and North of U.S. Highway 1. Response: We are north because business Route 30 is the main highway. Rt. 30 bypass is a secondary. 5. Question: What is the correct Department of Labor Wage? Response: General Decision Number: PA /05/2013 PA26 6. Question: Specification Section lists (2) unit prices that do not appear on the bid form. Do these (2) unit prices apply to this project? Response: #1 No #2 Yes 1

2 7. Question: Drawing GI102.1 Fire Ratings General Note #1 What is the extent of new fireproofing required on this project? Specification Section says to provide new fireproofing at interior steel members & underside of steel roof decks. Please indicate on the drawings where the steel & roof deck is located that receive fireproofing. Response: Beams and Trusses above Waiting room need have existing paint shot blasted and spray fire proofed for a 2 hour rating. Beams over optometry need to have existing paint removed and prepped and painted. 8. Question: Who is responsible for providing & paying for laboratory testing services? Response: Refer to Sheet AD110.1 (Attached) 9. Question: Specification Section Is this moisture vapor emissions & alkalinity control sealer used on this project, & if so, at what location? Response: No new concrete 10. Question: Specification D Where is insulated glass used on this project? Response: First floor only. 11. Question: Drawing GI102.1 Fire Ratings General Note #1 Where is the extent of existing fireproofing that will need patched on this project? This note also says to use fireproofing compatible with the existing fireproofing. If we do have to patch fireproofing, what is the existing fireproofing material that we are to be compatible with? Response: See #7 answer 12. Question: Can USG Tuff Hide Level 5 primer be used for the level 5 application in lieu of sizing? Response: No 13. Question: Specification F says to connect to the TIP system provided as a part of Specification Section We do not have this section. Please clarify. Response: Added in previous RFI responses 2

3 14. Question: Is stair S-103 part of project 3544? Response: Stair S-103 is to be built in project # not # Question: At present there is temporary fence around project. Are we to include any exterior temporary fence? Response: Yes Temporary fencing currently installed belongs to the contractor for project # Project # to have all their own supplies and equipment. 16. Question: Drawing AE-704 Equipment # 157 purchase by GC. Unable to find spec. for this as well as quantity and location. Please clarify location and quantity. Response: CHS Hoist Solutions, Eclipse C1000 Bariatric Hoist Refer to revised drawings drawings submitted as per answers to RLS RFIs. 17. Question: Drawing AE Detail E1 shows existing windows, on walk thru all these windows are not there, how will these openings be closed up? Please clarify. Response: The windows are to be replaced in project # not # Question:. Existing Freight elevator is not shown on demo. to be removed. Who is to remove this and patch the floor? Response: Demolition of the Freight Elevator and patching of the floor to be done in project # not # Question: S131 shows supports for 3 lifts. AE207 and AE209.1 shows 2 lifts. How many lifts are there? Response: There shall be 3 lifts. Refer to Sheet AE122 Second Floor Overall Reflected Ceiling plan. There is a lift in room Procedure, room Exam #1, and room Exam # Question: S111 shows concrete slabs and knee walls for MRI ramp. S131 shows structural steel for roof. AE120 shows existing roof for ramp that was to be demoed and patched in phase 2. Will there be architectural drawings issued showing new walls, ceilings, and roofing for this area? Response: Yes, architectural drawings shall be provided. 21. Question: Steel stud framed walls must go to deck. On sheet AE301 deck height on right 3

4 side is shown as During pre-bid walkthrough field dimensions indicate the deck heights are actually between 16 and 18. Should the 3 rd floor benchmark elevation actually be 34-0? Response: Based on existing drawings, the floor heights vary by location. Verify heights in field. 22. Question: AE211.1 and AE211.2 have equipment tag numbers that are not on the schedule. Will you identify the following numbers 008,020b, 027, 053c, 068, 125, 126, 129, 131, 132, 135, 134, 137, 138, 139, 141, 144, 147, 148, 146, 149, 150, 152, 153, 069? Response: Please reference the revised schedule which will be included in the new package. 23. Question: Drawing AE701 The Borrow Light Schedule refers to a Drawing AE208.3 in the schedule, but this drawing doesn t not exist according to the drawing list. Response: The details are on sheet A606 which is attached. 24. Question: Mechanical drawings are missing. Response: Drawings are attached. 25. Question: What is the access into the AHU Room on Drawing M- 133? Is there access to get the new units into this space, or do we need to open up a wall or the roof to get the units into this space? What is the floor elevation of this mezzanine slab? Is this a new room being built under a separate contract? We did not see this room at the walk- thru. Please clarify. Response: Access to room is via a stairway located at the intersection of columns J & 15. The design intent is to break the unit down into sections that are small enough to fit through the stairs and/or the roof openings required for the intake hoods and fully assembling the unit sections, in place, in Room Alternately a wall could be left out during construction of the mezzanine to allow units to be placed in the space. This design intent does not limit the contractor s means and methods. If desired, alternate means of installation can be utilized. As a reminder, the contractor would be responsible for any cutting, patching, and repair that may be necessary if an alternate method is used. See architectural sheet AE301 for mezzanine elevation. This room is constructed as part of the Phase II project VA Project # Question: The Table of Contents lists Specification Sections Question For Proposal To Bid, Additional Bidding Information Concerning Presolicitation Notice, Instructions To Bidders, Instructions, Conditions & Notices To Offerers, Special Notice (Sales & Use Tax), Checklist For Bidders, Labor Standards Provisions, Solicitation, Offer & Award Standard Form 1442, Representations & Certifications Section, & General Conditions. We could not find these specification sections. Please provide. 4

5 Response: Disregard these sections. 27. Question: Specification mentions related specifications section Asbestos Abatement, & Lead- Based Paint Removal. We do not have these specification sections. Please verify that asbestos removal, lead paint removal & mold remediation are not part of our scope of work. Response: Specification is not part of the package. Delete all references in the specifications. 28. Question: Specification Section mentions a related Specification Sections Testing Laboratory Services & Cement & Concrete For Exterior Improvements, which we do not have. Please clarify if we should have this section, if so please provide. Response: Yes, these sections are required and are attached. 29. Question: Specification Section mentions a Specification Masonry Tuck Pointing, which we do not have. Please clarify if we should have this section, & if so please provide.. Response: Specification is not part of the package. Delete all references in the specifications. 30. Question: Specifications Section , , , , , , & all mention a Specification Section Schedule For Finishes, which we do not have. Please clarify if we should have this section, & if so, please provide. Response: Specification is not part of the package. Delete all references in the specifications. 31. Question: Specification Section mentions a Specification Section Metal Stairs, which we do not have. Please clarify if we should have this section, & if so, please provide. Response: Spec is attached. 32. Question: Specification Sections & mentions a Specification Section Roof Hatches, which we do not have. Please clarify if we should have this section, & if so, please provide. We did not see a roof hatch shown on the drawings. Response: Specification is not part of the package. Delete all references in the specifications. 33. Question: Specification Section mentions Specification Sections Built- Up Bituminous Roofing, Roof Specialties, & Metal Building Systems, which we do not have. Please clarify if we should have these sections, & if so, please provide. Response: Disregard 5

6 34. Question: Specification Section mentions a Specification Section Glazed Aluminum Curtain Walls, which we do not have. Please clarify if we should have this section & if so, please provide. We did not see new curtain wall shown on the drawings. Response: Disregard 35. Question: Specification Section mentions a Division 8 Specification Section for Power Door Operators, which we do not have. Please clarify if we should have this section, & if so, please provide. Response: Disregard 36. Question: Specification Section mentions Specification Sections Portland Cement Plastering, Veneer Plastering, & Radiation Protection, which we do not have. Please clarify if we should have these sections & if so, please provide. Response: Review SPC- 1 on interior finish schedule for plaster finish. Disregard Radiation Protection. 37. Question: Specification Section Carpet Mentions Specification Section Special Wall Surfaces (Solid Phenolic Wall Paneling) at the bottom of every page. Please clarify if we should have this section & if so, please provide. Response: Trespa is used on the project for millwork only not flooring. 38. Question: At the bottom of page 444 of 444 of the Specifications there is mention of Electric Traction Machine Room Elevators. This does not appear in the Table of Contents. Please clarify if we should have this section & if so, please provide. We did not see elevators shown in our are of work on the drawings. Response: Disregard 39. Question: Specification Sections & mentions a Specification Section Common Work Results For Fire Suppression, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification section is not part of the package. Delete the references located in specification, , page 5, section 1.2.C and specification , page 2, section Question: Specification Sections , , , , , , & mentions a Specification Section General Commissioning Requirements, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Commissioning is required. Specification section has been added. 6

7 41. Question: Specification Sections & mentions a Specification Section HVAC Water Treatment, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is not part of the package. Delete the references located in specification , page 1, section 1.2.S, specification , page 1, section 1.2.D, and specification , pp. 17, 21, & 22, sections 2.14, 3.5.A and 3.6.C. Replace products supplied in Section , HVAC WATER TREATMENT, located in specification , p 22, section 3.5.A.2 with the following, alkaline phosphate or non- phosphate detergent/surfactant/specific to remove organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, iron oxide, and like deleterious substances, with or without inhibitor, suitable for system wetted metals without deleterious effects. 42. Question: Specification Section mentions Specification Sections Mortuary Refrigerators, Water- Based Fire Suppression Systems, Sump Pums, & Communications Horizontal Cabling, which we do not have. Please clarify if we should have these sections & if so, please provide. Response: Specification sections , and are not part of this bid package. Delete references located in specification , page 5, section 1.2.A, section 1.2.D, and 1.2.F. Section has been added to the package. 43. Question: Specification Sections & mentions a Specification Section Humidity Control Equipment, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification section is not part of this bid package. Delete the references located in specification , page 2, section 1.2.CC and specification , page 5, section 1.2.N. 44. Question: Specification Sections , , , & mentions a Specification Section General Motor Requirements For HVAC & Steam Generation Equipment, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification has been added. See attachments. 45. Question: Specification Sections & mentions a Specification Section Packaged Outdoor Central- Station Air- Handling Units, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification section is not part of the bid package. Delete the reference located in specification , page 1, section 1.2.C. In addition, specification is not part of the bid package. Delete the references located in specification , page 1, section 1.2.F and page 3, section 2.1.L 7

8 46. Question: Specification Section mentions a Specification Section Low- Voltage Motor Starters, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification , page 11, sections 2.6.A and 2.7.A delete the reference. Specification , page 5, section 2.1.A.5.b replace in its entirety with the following. Variable Speed Motor Controllers: Refer to Section , COMMON WORK RESULTS FOR HVAC, 2.7 VARIABLE SPEED MOTOR CONTROLLERS. Furnish controllers with pumps and motors. In addition, VSMC shall be electronic, with adjustable frequency and voltage, three phase output, capable of driving standard NEMA B three- phase induction motors at full rated speed. The control technique shall be pulse width modulation (PWM), where the VSMC utilizes a full wave bridge design incorporating diode rectifier circuitry. Silicon controlled rectifiers or other control techniques are not acceptable. VSMC shall be capable of operating within voltage parameters of plus 10 to minus 15 percent of line voltage, and be suitably rated for the full load amps of the maximum watts (HP) within its class. Minimum efficiency shall be 95 percent at 100 percent speed and 85 percent at 50 percent speed. Specification , pp. 1, 10, 11, sections 1.2.L, 2.1.H,1, and 2.1.J delete the reference. 47. Question: Specifications Section mentions Specification Section Common Work Results For Boiler Plant & Steam Generation, which we do not have. Please clarify if we should have this section & if so please provide. Response: Specification is not part of the bid package. Replace the references found specification , page 1, section 1.2.A and specification , page 1, section 1.2.A with COMMON WORK RESULTS FOR HVAC. 48. Question: Specification Sections , , & mentions A Specification Section Earth Moving, which we do not have. This Specification Section is also listed in the Table Of Contents. Please clarify if we should have this section & if so, please provide. Response: Yes, Specification section Earth Moving is required and shall be issued. 49. Question: Specification Section mentions a Specification Section Medium- Voltage Cables, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is not part of the package. Delete all references in the specifications. 50. Question: Specification Sections & mentions a Specification Section Electrical System Protective Device Study, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is not part of the package. Delete all references in the specifications. 8

9 51. Question: Specification Sections & mentions a Specification Section TIP Structured Communications Systems Cabling, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is required and is attached. 52. Question: Specification Section mentions Specifications Sections TIP Communications Interface & Equipment Room Fittings, TIP Communications Horizontal & Vertical Cabling, /41 Master Antenna Television Equipment & Systems and/or extension, & Public Address & Mass Notification System (PA), which we do not have. Please clarify if we should have these sections & if so please provide. Response: Specifications , , , , and are not part of the package. Delete all references in the specifications. Specification has been added. See attached. 53. Question: Specification Sections & mentions a Specification Section Patient Bed Service Walls, which we do not have. Please clarify if we should have this section & is so please provide. We did not see patient bed service walls mentioned on the drawings. Response: Specification is not part of the package. Delete all references in the specifications. 54. Question: Specification Sections , , , , , , , , , & were given to us, but they are not listed in the Table Of Contents. Are these Specification Sections to be included in our Scope of Work? Please clarify our scope of work regarding the security systems. Response: The referenced sections are included in the scope of the project. 55. Question: Specification Section mentions a Specification Section Aluminum Windows, which we do not have. Please clarify if we should have this section & if so, please provide. We did not see aluminum windows mentioned on the drawings. Response: The referenced sections are included in the scope of the project. 56. Question: Specifications Sections , , , & mention a Specification Section Hydraulic Elevators, which we do not have. Please clarify if we should have this section. We did not see new elevators shown in our area of work. Response: Specification is not part of the package. Delete all references in the specifications. 57. Question: Specification Sections , , , & mention a Specification Section Signage, which we do not have. Please clarify if we should have this section & if so, please provide. Drawing AE- 705 says that this drawing is for reference only & signage is by the owner. 9

10 Response: Specification is not part of the package. Delete all references 58. Question: Specification Sections , , , & mention a Specification Section Security Access Detection, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is not part of the package. Delete all references. 59. Question: Specification Sections , , , & mention a Specification Section Intrusion Detection System, which we do not have. Please clarify if we should have this section & if so, please provide. Response: Specification is not part of the package. Delete all references. 60. Question: Specification Sections Domestic Water Pumps, Domestic Water Heat Exchangers, Air- To- Air Energy Recovery Equipment, Wireways For Radiology Equipment, Underground Electrical Construction, Low- Voltage Switchgear, Distribution Switchboards, Automatic Transfer Switches, Facility Lightning Protection, Transient- Voltage Surge Suppression, & Exterior Lighting are listed in the Table Of Contents, but we do not have these Specification Sections. Please provide. Response: None of these sections are included in this package. Remove the references from the table of contents. 61. Question: Please verify that the VA is providing the commissioning agent & we are only to assist the agent with the commissioning process as called for in the specifications. Response: Contractor is to include commissioning, including providing the commissioning agent, in the bid. 62. Question: Specification Section Facility Lightning Protection What is our scope of work pertaining to this specification section. We did not see lightning protection mentioned on the drawings. Response: Specification should be removed from the package and deleted from the TOC. 63. Question: Specification Section lists (2) unit prices that do not appear on the bid form. Do these (2) unit prices apply to this project? Response: #1 No #2 Yes 64. Question: 01/S201 mentions a vapor barrier. Is a vapor barrier required under any of the slabs or ramps? Response: A vapor barrier is not required at the exterior slabs. This note shall be deleted. 10

11 65. Question: Are we responsible for x- raying of the existing slabs before making penetrations? Response: X- raying of concrete is not required but suggested. Contractor is required for any cut or broken lines. 66. Question: Are we required to put temporary fence up while completing the new exterior concrete & steel work shown on Drawings S111 & S131? Response: Yes 67. Question: In the solicitation, 1.16 Location Of Underground Utilities Is this required when we do the new concrete work shown On Drawing S111? Response: If it requires digging. 68. Question: Do the casework contractors have to be AWI Certified for this project? Response: Yes 69. Question: Can we place our temporary office inside the fence of the contractor who is performing Phase 2? Response: No 70. Question: Is the owner providing builder s risk insurance? Response: No a different area will be designated for this contract. 71. Question: When getting demolition out of the space & stocking the space with new materials, are we able to have access within the existing construction fence put up by the Phase 2 contractor? Response: No provide all your own equipment and supplies. 72. Question: Drawing GI102 shows (4) new fire extinguishers & cabinets. We do not have a specification for these. Are these by the owner? Please clarify. Response: By contractor recessed fire extinguisher cabinet and fire extinguisher 73. Question: Drawing AD121 Demolition Note 28 Are we to grind smooth & clean structural beams above on the entire 2nd floor or just a designated area. Please clarify which structural beams need to be ground smooth & cleaned. Response: All exposed beams on east side of building 74. Question: Drawing AD121 Demolition Note D33 Are we to just patch the wall surface where Demolition D11 occurs or does this not apply to the entire 2nd floor? On the new floor plan it appears that most of these walls are getting covered up by metal studs & drywall. If there is 11

12 some remaining ceramic tile on the inside of the exterior walls, does that need to be removed? Also, at the walk- thru, there appeared to be holes below most of the windows where mechanical units were removed. Are new units filling all of these existing holes, or will some of these holes need to be filled? Please clarify our scope of work on the inside of the exterior wall. Response: All along the corridor connecting building #3 to building #1 75. Question: Drawing AD121 Demolition Note D44 Which glass windows get removed? Which steel tubes get removed? What concrete pedestals get patched? Response: All existing windows will be demolished and replaced in Phase II not III 76. Question: Drawing AD121 Demolition Note D30 between Column Lines 17 & 18 What opening are we patching the concrete roof deck for? Response: Patching an existing opening 77. Question: Drawing AD121 Demolition D31 Please provide a wall section to indicate the materials that we are to patch & match at the exterior wall. Response: Survey, match existing. 78. Question: Drawing AD121 Demolition Note D30 Please provide a section & thickness of the concrete roof deck for the areas that we are to patch. Response: Survey roof deck, match existing 79. Question: Drawing AD121 Demolition Note D4 Please provide a section & thickness of the slab for the areas that we are to patch. Response: Survey roof deck, match existing 80. Question: F5/AE203.1 there appears to be a toilet tissue dispenser that is not labeled. Please clarify. Response: there are a total of (3) toilet tissue dispensers in Women s Toilet # (assume (1) toilet tissue dispenser per toilet) 81. Question: Drawing AE120, Room shows (2) urinal screens, but A2/AE203.2 only shows (1). Please clarify the correct quantity. Response: Two Urinal screens 82. Question: On the enlarged floor plans there appears to be robe hooks on the back of doors 2-146, 2-511, & Are we to provide these? If so, is there a specification & are these the only locations where these occur? Response: Yes 12

13 83. Question: E2/AE209.1 There appears to be a grab bar that is not labeled. Please clarify. Response: TA- 6A Question: E3/AE211.2 There appears to be a 3rd grab bar that is not labeled. Please clarify. Response: TA- 6A Question: E4/AE211.2 There appears to be a paper towel dispenser that is not labeled. Please clarify. Response: TA- 3A 86. Question: E7/AE211.2 There does not appear to be a toilet tissue dispenser. Please clarify. Response: TA- 5B Question: Please provide interior elevations for Toilet Room Response: Elevations are similar to E2 / AE209.1 & E3 / AE Question: F4/AE203.1 shows a TA- 6A. This toilet accessory is not listed on G002. Please clarify what this should be. Response: Horizontal TA- 6A- C Vertical TA- 6B Question: Drawing GI002, Architectural General Notes #5 Have all the chases been coordinated between the architectural & the MEP drawings or will we have to provide additional chases that are not currently shown. Response: Contractor to coordinate subs to verify. 90. Question: Drawing GI102.1 Fire Ratings General Note #1 What is the extent of new fireproofing required on this project? Specification Section says to provide new fireproofing at interior steel members & underside of steel roof decks. Please indicate on the drawings where the steel & roof deck is located that receive fireproofing. Response: Beams and Trusses above Waiting room need have existing paint shot blasted and spray fire proofed for a 2 hour rating. Beams over optometry need to have existing paint removed and prepped and painted. 91. Question: Drawing S101 Foundation Note #3 This note says to see the geotechnical report for the extent of dewatering required? We do not have a geotechnical report. Please provide. Response: It was our direction to proceed with the design without a geotechnical report. A geo- technical report shall be obtained by the general contractor. 13

14 92. Question: Since we do not have a geotechnical report, are we not responsible for rock excavation when installing the new foundations? Response: It was our direction to proceed with the design without a geotechnical report. A geotechnical report shall be obtained by the general contractor. 93. Question: Drawing S101 Steel Notes #12 What shoring is required on this project that you are referring to in this note? Specification Section G also mentions shoring. Where does this apply on this project? Response: Steel note 12 refers to temporary shoring or bracing. It is the responsibility of the contractor for the means, methods, and safety of erection of the structural steel frame. Specification section G does not apply to this project and shall be deleted. 94. Question: Drawing S131 shows a new metal deck, but the architectural drawings do not show a new roof on top of this deck. The architectural drawings actually show an existing roof in this location. The structural details show walls, etc. being demolished. Is the existing roof being removed & if so, are we to provide new? What would the new roof be? Response: Refer to sheets AE110 & AE The existing roof is being removed and a new roof is being provided. 95. Question: Drawing GI102.1 This drawing shows this project being a Class IV ICRA project. Please provide a floor plan indicating where temporary ICRA walls are required on this project? Where should the construction entrance & ante room be located? Does the shoe coverings & protective clothing only have to be worn during demolition? Is all of these requirements actually required for this project? Response: ICRA Barrier will be installed before this project will commence due to Phase II construction. No Ante room necessary not all required. 96. Question: Do spoils from foundation excavation have to be hauled offsite or will there be location onsite where we can place them? Response: Off site 97. Question: 01/S301 says to see specifications for sub- base below pad. We did not see these specifications for the sub- base material & thickness. Please provide sub- base information for below pads, slabs, ramps, etc. Response: It was our direction to proceed with the design without a geotechnical report. A geotechnical report shall be obtained by the general contractor for recommendations on sub- base materials. 98. Question: 02/S301 says to match top of existing wall height. What is the top of existing wall height that we are matching? 14

15 Response: The existing wall shall be measured in the field. 99. Question: Drawing S111, Sections 3&7/S301 show existing walls & existing ramps between column lines 17 & 18. Does Section 10/S301 (wall & footing) extend to the right past Section 4/S301 between column lines 17 &18 at the existing ramp or is this wall & footing existing. If so, we would have to tear up the existing ramp anyway & replace it. Please clarify. Response: Yes, detail 10/S301 shall be similar between column lines 17&18. If part of the existing ramp can be salvaged, used typical detail 8/S201 to tie the new slab on grade to the existing slab on grade Question: Drawing S111, Plan Note #3 says to see the architectural drawings for dimensioned location of recesses, curbs, ledges, & extent of slab on grade. We did not see any notes on the architectural drawings addressing this entire area of construction. Please clarify. Response: Architectural drawings shall be issued showing the locations of the ramp, slab, steps, etc Question: 10/S301 says to see the architectural drawings for information on a handrail. Specification mentions handrails & aluminum railings Where is the detail of this handrail located, what specification should be used for it, & what is the total length we need to provide? Response: Refer to sheet AE Question: Drawing S111 Plan Note #7 Which concrete columns & beams are we to repair spalled concrete on since there are no beams or columns indicated? This note also says that if there are repairs required to see typical details. If required, where are the details located for repairing spalled concrete? Response: This note was meant for phase II. If any concrete needs repaired during construction, we will provide details as required Question: Drawing S111 The topping slab is indicated on Sections 4&7/S301 which would consist of an approx x6 0 area. Details 4&7/S301 appear to show a flat topping slab, but Details 6&9/S201 show a very different detail including insulation under the slab. Which detail should be used for this area of topping slab? Response: The detail used will depend on the height of topping slab required. If the height of topping slab required is greater than 5, detail 9/S201 may be used. If the topping slab is 5 or less, then detail 6/S201 shall be used. The top of existing slab will need to be surveyed in the field to determine which topping slab option is required Question: What is the height between the second floor & the deck above? Response: Height varies refer to AE301 for elevations of each level 15

16 105. Question: Drawing AE120 Architectural Floor Plan General Note #11 Is there lead lined partitions on this project, & if so, where are they located? We did not see Partition Types 43, 43A, 46, & 46A used anywhere. Response: Lead lined partitions are on first floor 106. Question: Drawing AE203.1 Room Main Waiting There are (2) #065 shown, but they are not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 107. Question: Drawing AE Break Room There is a #154 shown, but this is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 108. Question: Drawing AE203.1 Rooms & both shown a #007, but they are not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 109. Question: Drawing AE205 Rom Work Room There is a #148 shown, but this is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 110. Question: Drawing AE211.1 Room s 2-507, 2-508, & each have a #144, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 111. Question: Drawing AE211.1 Rooms 2-507, 2-508, & each have a #068, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 112. Question: Drawing AE211.1 Corridor has a #101 shown, but this item does not show up on the equipment shceulde on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 113. Question: Drawing AE211.1 Rooms & both show a #069, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 114. Question: Drawing AE211.1 Room Break shows (4) #020b, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. 16

17 Response: Refer to revised equipment schedule 115. Question: Drawing AE211.1 Room Transfusion shows #131, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 116. Question: Drawing AE211.1 Room Transfusion shows #153, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 117. Question: Drawing AE211.1 Room Transfusion shows #027, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 118. Question: Drawing AE211.1 Room Transfusion shows (2) #129, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 119. Question: Drawing AE211.1 Room Transfusion shows (2) #128, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 120. Question: Drawing AE211.1 Room Transfusion shows #145, but this item does not show up on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 121. Question: Drawing AE211.1 Rooms 2-501, 2-522, & each show a #146, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 122. Question: Drawing AE211.1 Rooms 2-501, 2-523, & each show a #151, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 123. Question: Drawing AE211.1 Rooms 2-501, 2-522, & each show a #152, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 17

18 124. Question: Drawing AE211.1 Room shows a #134, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 125. Question: Drawing AE211.1 Room shows a #125, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 126. Question: Drawing AE211.1 Room shows a #149, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 127. Question: Drawing AE211.1 Room shows a #008, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 128. Question: Drawing AE211.1 Room shows a #132, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 129. Question: Drawing AE211.1 Room shows a #150, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 130. Question: Drawing AE211.1 Room shows a #147, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 131. Question: Drawing AE211.1 Room shows a #139, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 132. Question: Drawing AE211.1 Room shows a #053c, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: : Refer to revised equipment schedule 133. Question: Drawing AE211.1 Room shows (2) #137, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. 18

19 Response: Refer to revised equipment schedule 134. Question: Drawing AE211.1 Room shows a #135, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 135. Question: Drawing AE211.1 Room shows (2) #141, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 136. Question: Drawing AE211.1 Room shows (2) #138, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 137. Question: Drawing AE211.1 Room shows a #126, but this item is not listed on the equipment schedule on Drawing AE704. Please clarify. Response: Refer to revised equipment schedule 138. Question: Drawing AE704 When an item on the equipment schedule says to be relocated by the contractor, where are we relocating it from? Response: Relocated items from Building # Question: Drawing AE704 Items 001, 059, 060a, 060b, 060c, 064, 067, 112, 119, 120, 121, 122, 133, 136, 142, 143, 155, & 156 say to be relocated by the contractor, but we did not see any of these items indicated on the drawings. Please provide the quantity of each that we are to relocate. Response: disregard 140. Question: Drawing AE704 Item #021 says that we are to furnish &*install these lockers. We did not see #021 indicated on the drawings. Please provide a quantity for these lockers. Response: disregard 141. Question: Drawing AE704 Item 034b says to be installed by the contractor, but we did not see any of these items indicated on the drawings. Please provide the quantity of each that we are to relocate. Response: disregard 142. Question: The door schedule indicates a Door T4. Where is this door located? What is the hardware type for this door? 19

20 Response: T4 by Phase II Contractor 143. Question: F3/AE203.2 shows a Note 28 which is laminate & tempered glass, but it also indicates DG- 2 which is a decorative glass. Please clarify. Response: The decorative glass is to be laminated and tempered Question: Drawing AE123 Room calls for rubber base RB- 1, but Detail D8&F8/AE608.3 shows ½ stone base to be selected by the architect at the book cases & bench in this area. Is this the only locations for the stone base in this area & what product should be used for this stone base? Response: Delete stone base, replace with rubber base, 4 H. Adjust millwork for 4 toe kick. Height of counter is not to change Question: Drawing AE203.1 At the top of the page at Column Line CW- 3 there is reference to an interior elevation D5/AE403. We do not have this drawing. Please clarify. Response: disregard 146. Question: C1, C4, & E1/AE203.2 show a #40 terra cotta sills. Please provide a section that goes through these sills? Please provide a specification for the terra cotta sills & portal. Response: See section F8/AE Question: F2/AE203.2 shows a Note 28 which is laminate & tempered glass, but it also indicates DG- 1 which is a decorative glass. Please clarify. Response: The decorative glass is to be laminated and tempered Question: Drawing AE203.1 Rooms & appear to have casework in these rooms towards the bottom of the page but there are no elevations. Please clarify. Response: Lateral File cabinets - furniture 149. Question: D5/AE205 shows a note 28 laminate & tempered glass at Corridor Drawing AE123 Note F16 shows this as DG- 3 decorative glass. Please clarify. Response: The decorative glass is to be laminated and tempered Question: D4/AE207 has a note 10 pointing at the nurses station, but says architectural concrete bench below stairs, See B5/AE402. This note does not seem to be correct & we do not have that drawing. Please clarify. Response: Ignore Note #10 20

21 151. Question: C6&C7/AE209.1 Note 51 in this detail calls for continuous sloped metal tops, but the Equipment Note 020a that is referenced calls for a flat top. Please clarify. Response: Provide sloped top 152. Question: F1/AE209.1 shows a note 28 laminate & tempered glass. Drawing AE123 shows this as Note 10 FG- 1 decorative glass. Please clarify which is correct. Response: The decorative glass is to be laminated and tempered Question: F2/AE211.2 & D1/AE211.2 appear to show a borrowed lite that does not appear on the borrowed lite schedule on Drawing AE701. Please clarify. Response: 1 6 H x 6-6 W Type 21 HM MP A CT Question: Accessioning Room Interior Elevation F1/AE211.2 shows a section D3/AE608.2 which indicates a typical section through a nurses station (solid surface, plam, AWP, etc). Is this correct since everything else in this room is metal lab cabinets & epoxy resin countertops? Response: Yes 155. Question: A4/AE211.2 have (2) sets of shelves that reference both note 29 (metal shelves) & note 2 (finish edges with plastic laminate). Is this correct? Also in this elevation there is reference to note 12 which is solid surface. Is this correct since everything else in this room is epoxy resin? Response: Ignore Note #2. Yes to Note # Question: Interior elevation keynote #34 says the metal lab casework must be by Thermo Scientific Hamilton Max Lab System or approved equal. Have any other manufacturers been approved or is this the only acceptable manufacturer? Response: Not at this time 157. Question: Drawing AE211.1 The stair between column lines 15 & 16 reference a section B6/A403. We do not have this drawing. Please clarify. Response: Refer to sheet AE Question: Drawing AE122 On the far right side of the page there is Section F5/AE607 referenced. We do not have this drawing. Please clarify. Response: Refer to sheet AE Question: Where will we be allowed to place our dumpsters? Response: Site to be determined before mobilization 21

22 160. Question: Drawing AE123, Rooms 2-251, 2-503, 2-501, 2-504, 2-506, 2-514, & show an SR- 1 floor. Should this be SRT- 1? Please clarify. Response: SRT is correct 161. Question: Drawing AE- 123, Room S- 100 Stair shows a floor SC- 1. What type of floor is this? Response: Sealed Concrete 162. Question: Drawing AE- 123, Rooms S- 100 & S- 201 Stairs Are we to provide the finishes listed in these entire stairs or just at the 2nd Floor landing? Specification mentions resilient stair treads. Are we responsible for stair treads in these (2) stair towers? Response: Yes, Finish entire stairwell. Yes, install stair treads Question: Drawing AE123 At Column Line M, between column lines 10 & 11, there is a note Expansion joint. Is this existing expansion joint, or are we to provide new expansion joint in the existing slab, new walls, & new ceilings in this location? If we are to provide new, should we use Details E5,F1,&F5/AE603? If this is not where these (3) details apply, where are they used on this project? Response: New expansion joints - yes 164. Question: Drawing AE123 at Corridor there is a note F15 that indicates decorative glass DG- 2. Drawing AE211.1 does not indicate an interior elevation at this location. Please provide an elevation to indicate the size of this decorative glass. Response: 4-0 H x AFF 165. Question: Drawing AE123 at Nurses Station there is a note F15 that indicates decorative glass DG- 2. C7/AE207 does not indicate this decorative glass. Please provide an elevation to indicate the size of this decorative glass. Response: 3-6 H x AFF 166. Question: Drawing AE123 at Corridor there is an note F16 DG- 3 decorative glass shown. Drawing AE209.1 does not give any elevations of this decorative glass. Please provide an elevation that indicates the dimensions of this decorative glass. Response: 4-0 H x AFF 167. Question: CG- 3 & HR- 3 are listed on drawing AE704, but we did not see them called out on Drawing AE123. Specification Section also call out these stainless steel corner guards. Please clarify if these are used on this project. Response: CG- 3 and HR- 3 are not in this project 22

23 168. Question: Drawing AE704 says to provide manual WT- 1 shades at all exterior windows unless noted otherwise. Drawing AE123 does indicate some WT- 2 manual shades, assuming that the rest will be the WT- 1. C2/AE603 is the only detail indicating the window blinds at exterior windows, but this is for motorized shades. What is the detail going to look like that we are going to have to provide for the mounting of the manual blinds? Please verify that motorized shades (WT- 3 & ) are not used on this project. Response: WT- 1 only See detail F1/AE404 for detail 169. Question: Are sills required at all exterior windows & if so, what material should be used? Window stools are mentioned in Specification Section A but we did not see them indicated on the drawings. Are drywall returns required at the jambs & head of all exterior windows? Response: WT- 1 only See detail F1/AE404 for detail 170. Question: Drawing AD121 The existing stairs shown at Column Line 12 & J Are we responsible to remove these stairs or they being removed in Phase 2? If we are removing them, are we responsible to infill the hole left in the slab at the 3rd floor level? Response: Yes and Yes 171. Question: Stairs S- 103 & S- 102 say that they are existing, but Stairs S- 201 & S- 100 do not. We did not see any drawings indicating new stairs, however the drawings do indicate us providing new wall around this stair. Are we responsible to provide these stairs & if so, please provide details. Response: Yes - refer to sheet AE Question: Are Details F1, F4, & C6/AE606 used on this project & if so, where are they used? Response: Registration Type 25 Hollow Metal Elevation 1. F4 Phase II not III 2. C6 Phase II not III 173. Question: Drawing AE701 There are doors shown on the door schedule that have fire rated glass, but do not show a U.L. rating. Please clarify. Response: Doors in smoke partitions do not need to be rated just tempered 174. Question: At the walk- thru, there appeared to be 4 elevated platforms on the floor on both sides of the stairs leading up to the 3rd level. Are we responsible for removing these platforms, & if so what are they made Are there holes in the floor below these platforms & if so, are we responsible to infill these holes? Please provide detail if required. Response: Yes 23

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative. ADDENDUM_04 1 page(s) I 1 project number CIN001 project name Cinemark XD12 Altoona, IA issue date December 16, 2013 venue > distribution Jeff Duffy EDC jduffy@edcweb.com Justin Couch VCC USA jcouch@vccusa.com

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4" = 1'-0"

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4 = 1'-0 KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" P P 08 /A30 KEYNOTES. ALTERNATE # RE-LAMINATE CABINET.. NEW BLINDS 3. WRAP HEAD,

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

SECTION SIGNAGE

SECTION SIGNAGE SECTION 10 14 00 SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section, apply

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

SECTION WOOD DOORS

SECTION WOOD DOORS SECTION 08211 WOOD DOORS Notice to Vendors: CANV prefers to purchase products that contain tropical wood only if they are certified according to the guidelines of the Forest Stewardship Council (FSC).

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE 231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Garneau Elementary School B3123A Edmonton Report run on: April 7, 211 4:59 PM Building Name: Address: Location: Building Id: Gross Area

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.

C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors. 12300 - MANUFACTURED CASEWORK PART 1 - GENERAL 1.01 STIPULATIONS A. The specifications sections General Conditions, Special Requirements, and General Requirements form a part of this section by this reference

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16 Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #16 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits,

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 062000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE

PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE PORTLAND COMMUNITY COLLEGE ROCK CREEK CAMPUS ELECTRICAL POWER GENERATION FEASIBILITY STUDY APPENDIX A, DETAILED (CONCEPT LEVEL) PROBABLE COST ESTIMATE September 14th, 2018 Prepared by: DAO Architecture

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT. Dr. Checks Comment Responses Review: 100% Building Package B Review Project: (G168476) Ft. Gillem, Enclave Force Protection Latest Update: 03-03-2010 8:30 am 1. 3079320 We will coordinate and add to the

More information

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 (10 14 00) SIGNAGE A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

S.NO Description Quantity Rate Amount

S.NO Description Quantity Rate Amount INTERIOR WORKS NANDIMANDALAM BRANCH S.NO Description Quantity Rate Amount 1 Full height partition with laminate finish and glass. Providing & fixing partly glazed partly paneled Dry Wall Partition with

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

Addendum No. 4 page 1

Addendum No. 4 page 1 Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the

More information

WALKS AND SIDEWALKS REQUIREMENTS:

WALKS AND SIDEWALKS REQUIREMENTS: DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

A. Submit properly identified manufacturer's literature before starting work.

A. Submit properly identified manufacturer's literature before starting work. SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage

More information

Chief Architect New Feature List

Chief Architect New Feature List SYSTEM / PERFORMANCE Chief Architect Premier X4 is available in 64 bit and 32 bit versions. The 64 bit version is more efficient in managing memory and you will see better performance on larger plan files

More information

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

Jan H: ARCHITECTURAL WOODWORK (06410-H)

Jan H: ARCHITECTURAL WOODWORK (06410-H) 2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 064040-H: ARCHITECTURAL WOODWORK (06410-H) GENERAL In general, follow the guidelines below when designing and

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

DIVISION 12 - FURNISHINGS. Section General Discussion. Introduction

DIVISION 12 - FURNISHINGS. Section General Discussion. Introduction Section 12000 - General Discussion This General Discussion Section contains material which is important to the successful fabrication and/or installation of furnishings and equipment in construction projects.

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

2013 Feeney (2/14) # B. Aluminum Railing Systems

2013 Feeney (2/14) # B. Aluminum Railing Systems 2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information