1 !!! Addendum EXP Project No: MTA Project No: WIND Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This Addendum forms part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the information contained in the original drawings and specifications issued for the above named project to the extent referenced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Bid Form. Failure to do so may subject bidder to disqualification. GENERAL CIVIL 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, )On the Drawings 1! Reference Drawing C-100: 1.!Clarification: There are 3 existing manholes to be removed (1050 Ø). Manholes are located at approximate locations of new manholes NSANMH02, NSANMH03 and NSANMH04. 2.!Clarification: There is approximately 100m of 200mm Ø existing sanitary piping to be removed (assume PVC). Piping extends from building outlet at loading area and runs below and/or adjacent to the new sanitary line. 3.!Clarification: The required size of the new manholes are as per Detail 1/C-100. : 1.! NSANHM01 = 1050 dia. 2.! NSANMH02 = 1050 dia.. 3.! NSANMH03 = 1050 dia. 4.! NSANMH04 = 1050 dia. STRUCTURAL 1.)On the Drawings 1! Reference Drawing S-101 Ground Floor Framing Plan 1.!Add: Install 4 high concrete housekeeping pads in Electrical Room 028 for floor mount dry-type transformers TE1, T1, T2, T3. Refer to Drawing E-200 for locations. ARCHITECTURAL 1.)In the Specifications 1! Specification Section Fire Rated Glass, Doors and Frames 1.!Paragraph : Add Technical Glass Products and Pilkington Pyrostop as approved alternates. 1.)On the Drawings 1! Reference Drawing A !Detail ASK-01 details closet shelving in Don s Apartment Master Bedroom closet. 2! Reference Drawing A !Lovett!Lake!Court,!Suite!401,!Halifax,!NB!B3S!0H6!! T:! !!!!!!
2 Page 2 Addendum No: 3 Project No: WIND Project: Windsor Hall Renovations !Revise detail at counter and rolling shutter as per Detail. Note shutter opening to be 3-0 w x 3-10 high, Rolling shutter box to be recessed in ceiling. 3! Reference Drawing A !Number the following Details: 1.! Detail 7 Washroom Vanities (Elevations) 2.! Detail 8 Washroom Vanities (Sections) 3.! Detail 9 Washroom Accessories Typical Mounting Heights 2.!Detail 8: revise as per ASK-02 4! Reference Drawing A !Detail 5: Revise millwork as indicated.ask-03 5! Reference Drawing A !Detail 1: dimensions added to shelving in Rooms 032 Hockey Storage and 034 Student Storage. Note shelving construction in Hockey Storage 032 similar to Detail 1/A507, but 1-8 depth instead of 3-0 in Student Storage 034. ELECTRICAL 1) In the Specifications 1! Section Common Work Results: 1.! Clarification: Data/voice cabling shall be by this Contractor. 1.! Clarification: BMS cabling for lighting controls shall be by the Controls Contractor. 2! Section Wires and Cables V: 1.! Clarification: 0-10V dimming wire and lighting control cat 5 wiring shall be installed in accordance with Section article ! Section Panel Schedules: 1.! Clarification: Arc-fault breakers are NOT required for student room microwave circuits. 4! Section Panel boards Breaker Type: 1.! Add article 2.6 Surge Protection Devices to indicate: 1.! Provide 3 phase 347/600 V, 4 wire and ground transient voltage surge protection, complete with indicating light factory installed with panelboards or a stand-alone system connected to each panel as indicated. Refer to panel schedules for panels that require protection. Submit shop drawings with panelboard submission. 5! Section Lighting Controls: 1.! Part 2 Products: Delete WattStopper from list of acceptable manufacturers. 1! On the Drawings 1! Drawing E-300 Ground Level Plan Lighting: 1.! Clarification: Stairwells ST 1 and ST 2 install stairwell lighting controllers in accessible ceiling space in ground level corridor adjacent to stairwell. Stairwells ST 3 install stairwell lighting controller in accessible ceiling space in main floor room 113 adjacent to stairwell.
3 Page 3 Addendum No: 3 Project No: WIND Project: Windsor Hall Renovations ! General Clarifications 1! Addendum #1 Item 10.2 Clarification: Housekeeping pads for electrical equipment shall be installed by Structural. 2! Addendum #1 Item 11.1 Clarification: Lamp post shall be fed from normal power circuit GC-43 in ground floor corridor 00A. Lamp posts shall be controlled via dusk to dawn schedule from BMS. Lighting relays by division 26. Coordinate final lamp post electrical requirements with owner. Assume one (1) 20A 240 volt circuit.
4
5 10/11/2017 9:25:54 PM C:\Users\lournl\Revit Projects 2017\_Option 033e 2x CLOSET 1' - 6" 1' - 6" 2 3/4" BIRCH PLYWOOD W/ MATCHING HARDWOOD EDGE COMPLETE WITH CLEAR SATIN FINISH. 1 DON'S APARTMENT - CLOSET ASK-01 1/2" = 1'-0" exp Architects Inc. 2 ASK-01 6' - 0" 3 1/2" 5 1/4" 1' - 6" 3/4" 1' - 0" W1 2 3/4" BIRCH PLYWOOD W/ MATCHING HARDWOOD EDGE COMPLETE WITH CLEAR SATIN FINISH. 3/4" DIA METAL ROD. Ground Level 58' - 0" Project Title Dwg. Title Drawn By: WINDSOR HA RENOVATIONS 2 DETAIL 6 ASK-01 1/2" = 1'-0" REFERENCE DRAWING - A110 DON'S APARTMENT CLOSET DETAIL JCR / SJO ASK-01 exp Services Inc
6 10/11/2017 9:23:59 PM C:\Users\lournl\Revit Projects 2017\_Option 8 LIGHT, COORDINATE W/ ELECTRICAL FRAMELESS MIRROR CORIAN SOLID COUNTERTOP WITH 4" BACKSPLASH COMPLETE WITH EASED EDGE SINK, SEE MECHANICAL 2" 4" SECTION VIEW TYPICAL VANITY SINK WASHROOM VANITY'S 1" = 1'-0" 2' - 10" 4" 3' - 6" 1" 5" LIGHT, COORDINATE W/ ELECTRICAL FRAMELESS MIRROR CORIAN SOLID COUNTERTOP WITH 4" BACKSPLASH COMPLETE WITH EASED EDGE SINK, SEE MECHANICAL C4 CHANNELS, COORDINATE W/ STRUCTURAL 5 1/4" INSULATED EXPOSED PIPE 2' - 4 3/4" SECTION VIEW BARRIER FREE VANITY SINK 5" 1" 3' - 6" 4" 2' - 10" REFERENCE DRAWING - A505 exparchitects Inc. Drawn By: Scale: No. Issue Date No. Revision Date Project Title Dwg. Title JCR / SJO 1" = 1'-0" WINDSOR HA RENOVATIONS WASHROOM VANITY SECTIONS ASK-02 exp Services Inc
7 10/11/2017 9:25:55 PM C:\Users\lournl\Revit Projects 2017\_Option 7' - 6" 4" 5 1/4" CORIAN WINDOW SI C/W EASED EDGE ON TWO LAYERS OF 3/4" PLYWOOD CORIAN COUNTERTOP C/W EASED EDGE ON 3/4" PLYWOOD RESILIENT BASE 5 INTERIOR ELEVATION - LAUNDRY ASK-03 1/2" = 1'-0" exp Architects Inc. 5 1/4" 2' - 1" 2' - 10" 4" C4 CHANNEL FRAME, COORDINATE W/ STRUCTURAL Project Title Dwg. Title Drawn By: WINDSOR HA RENOVATIONS REFERENCE DRAWING - A506, DETAIL 5 LAUNDRY ROOM - COUNTER DETAILS JCP / SJO ASK-03 exp Services Inc
8 10/11/2017 9:23:59 PM C:\Users\lournl\Revit Projects 2017\_Option 8' - 0" H F C 4 1/4" 3' - 4" 2' - 2" 2' - 1 3/4" P2 P1 HOCKEY STORAGE 032 P10 7' - 7" W2 6x ' - 1 1/2" 1' - 8" 4' - 3" 1' - 8" FIXED SHELF FIXED SHELF FIXED SHELF 1' - 8" 14' - 9 1/2" 10' - 1 1/2" 4' - 0" STUDENT STORAGE 034 W2 P1 2' - 0" 18' - 3 1/4" 12' - 3 1/4" ASK-04 P9 5' - 0" A Sim P2 1' - 6 3/8" P1 6 1/4" 10' - 5" 18' - 3 1/4" 4' - 0 1/4" 3/16" = 1'-0" 1 1/2" X 2 1/2" FRONT EDGE SUPPORT H E D CONTINUOUS 1 1/2" X 2 1/2" EDGE SUPPORT SECURED TO SHELF AND SUPPORTS GLUED AND SCREWED. FINISH: PAINTED TO A EXPOSED SURFACES 4' - 0" 3/4" PLYWOOD SHELVING 2 HOCKEY STORAGE (032) & STUDENT STORAGE (034) ASK-04 1/2" = 1'-0" * NOTE: MILWORK SIMILAR ROOM 032 BUT WITH 1'- 8" SHELF DEPTH. 1 GROUND LEVEL PLAN-NEW CONSTRUCTION 1 1/2" X 2 1/2" LEDGER SECURED TO WA REFERENCE DRAWING - A507, DETAIL 1 exparchitects Inc. Drawn By: Scale: No. Issue Date No. Revision Date Project Title Dwg. Title JCR / SJO As indicated WINDSOR HA RENOVATIONS HOCKEY AND STUDENT STORAGE ASK-04 exp Services Inc
9 10/11/2017 9:24:00 PM C:\Users\lournl\Revit Projects 2017\_Option B 3 4 7/8" 2' - 5" 3 1/4" 3/8" 2 1/2" 9' - 8 1/2" 3 1 CONFERENCE OFFICE 124 3/8" = 1'-0" 2 DETAIL 1 3/4" = 1'-0" CASTING, HARDWOOD. SEE SPECIFICATION. ALUMINUM GUIDE BY SHUTTER MANUFACTURE. WINDOW JAMB,, HARDWOOD. SEE SPECIFICATION. 2 1/2" 2' - 10" 2' - 8" 6' - 2" 3 1/2" 3 1/4" 2' - 5" 3/4" P4 2" WOOD SHUTTER RECESEED IN CEILING, SEE SPECIFICATION. PROVIDE ACCESS PANEL AS REQUIRED. HARDWOOD, SEE SPECIFICATION. HARDWOOD ON 3/4" PLYWOOD. CORIAN SOLID COUNTER WITH TWO LAYERS OF 3/4" PLYWOOD. 1X4 SUPPORT ON THREE SIDES, PAINTED WHITE. Main Level 68' - 0" 3 SECTION THROUGH ROING SHUTTER 3/4" = 1'-0" REFERENCE DRAWING - A112 exparchitects Inc. Drawn By: Scale: No. Issue Date No. Revision Date Project Title Dwg. Title JCR / SJO As indicated WINDSOR HA RENOVATIONS CONFERENCE OFFICE 124 exp Services Inc
The following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationADDENDUM NO. 3, March 14, 2017 A.B.C. No
ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:
CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-12 36 00.00 20 (August 2011) --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-12 36 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More informationREVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:
b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ECOS TRW 9. Luminaire Schedule L-18D: a. Lithonia Lighting LP6FN 42TRT 6O9A MVOLT ECOS TRW b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ADEZ TRW 10. Luminaire Schedule
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationAnswer: Only to ChurchWoods, LLC.
ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationat Fiddler s Creek Offered by
at Fiddler s Creek at Fiddler s Creek hawthorne Elevation E Elevation F WWW.FIDDLERSCREEK.COM hawthorne 1 Story, 3 Bedrooms, 3 Baths, Den, 3 Car Garage Total A/C... 2,583 sq. ft. Entry...51 sq. ft. Garage...618
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More information1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated
2014-10-30 REQUEST FOR TENDER WILDLIFE HEALTH CENTRE RFT # 47 (2014-09) ADDENDUM # 4 This addendum shall be incorporated into, and form part of RFT # 47 (2014-09) and take precedence over all requirements
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationKidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:
KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationPROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)
TENDER ADDENDUM PROCUREMENT SERVICES 1221 8 th St, SW Calgary, AB T2R 0L4 Telephone: (403) 817-7495 Fax: (403) 777-6008 Proposal No: 2017TEN754 Covering: DR. G. M. EGBERT SCHOOL VARIOUS UPGRADES Addendum
More informationADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.
ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationSECTION INTERIOR SIGNAGE
SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by
More informationProcurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington
More informationC. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.
12300 - MANUFACTURED CASEWORK PART 1 - GENERAL 1.01 STIPULATIONS A. The specifications sections General Conditions, Special Requirements, and General Requirements form a part of this section by this reference
More informationPREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!
PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationCompany. Signed: Date:
ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationSTEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504
ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:
ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationAddendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017
Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationTELEPHONE: (215) Addendum No. 01
THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationADDENDUM NO. 3. Ellis County Elections Building
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS
More informationCHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master
More informationProject No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt
ADDENDUM Project: Des Plaines Public Library Renovations Addendum No. 01 Project No: 13300 Date: 02 September 2015 To: The Des Plaines Public Library Issued by: Lisa Schmidt ATTN: ALL FFE BIDDERS Senior
More informationSECOND FLOOR 1159 sq. ft.
Nook 9'11" x 11'11" Great Room 12'11" x 11'11" Walk-in Closet Master 12'5" x 12'11" Half room Walk-in Closet Shelves Foyer Linen onus Room 13'5" x 12'11" D W FRONT GARAGE HOME TWO STOREY ATHROOMS 2.5 EDROOMS
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-11 42 00 (January 2008) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationAddendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:
Addendum No.: 1 Date: 3/15/216 Project: Canyon ISD City View Elementary Additions Project No.: 15-48.1 From: To: Dekker/Perich/Sabatini 5 South Taylor St., Suite 75 Amarillo, TX 7911 All Prospective Bidders
More informationSECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 062000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More information1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.
PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 51 69.10 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-08582 (August 2001) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationADDENDUM TO THE CONTRACT. for the GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION. Contract No. E16-181
ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION Contract No. E6-8 ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: May 9, 206 PREVIOUS ADDENDA:
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationAugusta. CRAFTSMAN 2,067 SQ. FT. (Elevation Shown with Optional Metal Roof Sections) 2 BEDS 2 BATHS 2 CAR GARAGE
Augusta 2 BEDS 2 BATHS 2 CAR GARAGE CRAFTSMAN 2,067 SQ. FT. (Elevation Shown with Optional Metal Roof Sections) to show specific detailing. As-Built Condition will control. Price(s) shown may not reflect
More informationSERIES 300 SINGLE HUNG WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationSoutheastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA
BUILDING THE FUTURE Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA 19107-3780 May 25, 2017 Dear Sir/Madam: Subject: Sealed Bid No. 17-00093-AMZK Enclosed please
More informationSECOND FLOOR 960 sq. ft.
Great Room 13'3" x 12'3" Flex Room 8'6" x 7'10" Bedroom 2 10'4" x 11'5" Nook 10'2" x 9'6" Bedroom 3 10'4" x 10'11" W D Laundry Mudroom DW 11'5" x 15'0" Half Ensuite Linen FRONT GARAGE DUPLEX BATHROOMS
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationCOVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS
TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL
More informationGF-1001 FF&A SPECIFICATION. Casegoods. Guestrooms: See Location Schedule. PROJECT NAME: Al Houara Conference Hotel
ITEM: Desk DESCRIPTION: Desk at Bedroom Area Desk FINISH: Dark Espresso DIMENSIONS: 1400w x 800d x 760h mm Tangier Being Developed Description: Desk is UNDER DEVELOPMENT finish to match WD-1000. Desk to
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationDIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK
DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication and installation
More informationJan H: ARCHITECTURAL WOODWORK (06410-H)
2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 064040-H: ARCHITECTURAL WOODWORK (06410-H) GENERAL In general, follow the guidelines below when designing and
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationSECTION WIREWAYS FOR RADIOLOGY EQUIPMENT
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable
More informationEXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca
Zero lot line home requires window to be removed. #10901 Half Mudroom Nook 12'11" x 9'11" 14'3" x 14'11" Foyer Zero lot line home requires window to be removed. #10901 Walk-in Closet Master edroom 15'11"
More informationINVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2
FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions
More informationwww.mountaincovehomes.com HOME FEATURES STRUCTURAL ELEMENTS Reinforced concrete monolithic foundation slab Concrete masonry block exterior walls Professionally engineered roof and floor trusses with hurricane
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationSECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or
More information12560 W. Cedar Drive Lakewood, CO Barry Himmelman President
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationAddendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:
McKee and Associates Architecture and Interior Design Addendum No. ONE Date: 10.8.18 Project: A New Office for Gaston Elementary School for The Etowah County Board of Education Gadsden, Alabama A1.1 GENERAL
More informationTO: All Recipients Date: March 20, 2015
CITY OF VALDEZ Project Title: Valdez Museum, Library, Elementary School roof replacements Project No.: 15-310-4250, 15-310-4260, 15-310-9513 Contract No.: 1214 TO: All Recipients Date: March 20, 2015 SUBJECT:
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationINCLUDED FEATURES Avalon Circle, Naples, FL Avalon-Naples.com
INCLUDED FEATURES COMMUNITY FEATURES Minutes from downtown Naples Convenient to area beaches, world-class shopping and dining at Mercato, Tin City, Fifth Avenue South, Third Street South, Waterside Shops;
More information