1 THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter Thomas Classroom Modernization Project B-0C, B-0C, B-0C of 0/ Potter Thomas Elementary School 00N. th Street This Addendum, dated February, 0, shall modify and become part of the Contract Documents for the work of this project. Any items not mentioned herein, or affected by, shall be performed strictly in accordance with the original documents.. Drawings and Specifications Revised by Narrative and by Drawing Reissue: Note drawing text deletions are shown with strikethrough, drawing text additions are shown in bold a. A0: 0,0,0,0,0,0 & NEW WORK: DETAIL IS REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. b. A00: CASEWORK SCHEDULE: The Casework Schedule is revised as follows: THE BASIS OF DESIGN CABINET SHALL BE CAMPBELL RHEA EMPIRE FULL FLUSH OVERLAY WITH SOLID WOOD EDGING. DELETE REFERENCES TO SIGNATURE STYLE CABINETS. THE BASIS OF DESIGN MODEL FOR CABINET TYPE CT IS CHANGED TO, -/ (W) X (H) X -/ (D) CABINET TYPE CT IS ADDED. BASIS OF DESIGN MODEL FOR CT SHALL BE 0, -/ (W) X (H) X -/ (D); QUANTITY OF (TWO) RUIRED. THE QUANTITIES AND TYPES OF WALL RAILS AND COAT HOOKS ARE REVISED THE ABOVE CHANGES TO THE CASEWORK SCHEDULE ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. PAGE OF

2 d. A00: WALL UIPMENT SCHEDULE: The Wall Equipment Schedule is revised as follows: DELETE ALL THE NOTES UNDER THE COMMENTS COLUMN OF THE SCHEDULE. Work in connection with Display Boards shall be conducted as follows: s SHALL BE SUPPLIED AND INSTALLED BY OTHERS UNDER THE DIRECTION OF THE SDP. PROVIDE BLOCKING FOR s AS NECESSARY AND AS INDICATED IN THE DRAWINGS. MARKERBOARDS AND S SHALL BE SUPPLIED BY THE SDP AND INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE WITH OTHER PRIME CONTRACTORS AND FIELD VERIFY FOR THE BOARDS AND ADVISE SDP OF ANY DISCREPANCY OR INTERFERENCES AFFECTING THE DESIGN INTENT. MARKERBOARD AND INSERTS SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR THE ABOVE CHANGES TO THE WALL UIPMENT SCHEDULE ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. e. A00: CASEWORK DETAIL: Delete WALL CABINET & COAT HOOK details Add WALL CABINET & WALL HOOK DETAIL and WALL CABINET & WALL HOOK DETAIL, ENLARGED THE ABOVE CHANGES TO THE CASEWORK DETAILS ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. f. A0: INTERIOR ELEVATIONS DETAILS,,,,, ARE REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. g. A0: INTERIOR ELEVATIONS DETAILS,,, ARE REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. h. A00: FINISH SCHEDULE: The Finish Schedule is revised as follows: DELETE REFERENCE TO LAMINATE FINISHES. NO LAMINATE FINISHES ARE RUIRED. PAGE OF

3 . Questions and Clarifications. Question: Will another manufacture besides Campbell Rhea be accepted? Response: Campbell Rhea is the Basis of Design manufacturer. Manufacturers providing equal products may be submitted for review. Question: Can MBE/WBE requirements be reduced to a combined goal? Response: Combined /0% Goal already included in the Bidding Documents.. Question: Please provide a spec for Electrostatic painting. Response: Specification SECTION 0: ELECTROSTATIC PAINTING is already included in the Technical Specifications.. Question: Spec 000 Visual Display,..A, Markerboard and Tackboard infills by GC, plans say by SDP. Who is responsible for them? Response: See Item (d) of this Addendum. Question: Please confirm all visual display boards supplied by SDP will be delivered to each location by the SDP. Response: Yes, Owner supplied visual display boards will be delivered to the school.. Question: Reference spec. 000 ; Owner supplied visual display units, par.. B. please provide manufacturers installation details Response: Proceed on the basis that the Owner supplied visual display units are similar in type to those listed in specification section 0 00 VISUAL DISPLAY UNITS and install in accordance with the manufacturer s instructions as described in the specifications.. Question: Reference Supplementary Conditions section, photographs. Please consider deleting this section from scope of work as it does not seem appropriate or necessary for these type of projects. Response: : Already deleted by Section 0 00 MODIFICATIONS TO THE GENERAL AND SUPPLEMENTARY CONDITIONS. Question: Is there a basement/crawlspace below the first floor in which to access floor drain piping? Or is excavation required at the floor drains? Response: First floor is slab on grade construction, there is no crawlspace or basement. PAGE OF

4 . Question: What is the difference between the meanings of the (R) Remove and the (RR) Remove and Replace tags? The work descriptions appear to be identical, with new fixtures going back where the old ones were removed in both cases Response: The work is identical. Remove existing fixtures as indicated by (R) or (RR). Provide new replacement fixtures in accordance with the Keynotes and the Fixture Schedule. END OF ADDENDUM NO. Attachment(s) Drawings A0 Rev A00-Rev A0-Rev A0-Rev PAGE OF

5 GENERAL NOTES A B TB-. TB-. TB-. TB- FIRST A0 0 TB-. TH- MB- A CB. CS CW CW TH-. CW CW CW 0A CT CB. CS TH-. CW CW CW CW CT 0A A TB-. TB- TH- A0 0 SECOND 0 MB- TB-. TB- TB-. TB-. TB- TB-. TH- A0 THIRD 0 TB-. MB- A CB. CS CW TH-. CW CW CW CW 0A CT. SURFACES NOT PREVIOUSLY FIELD PAINTED SHALL NOT BE PAINTED U.N.O AND SHALL BE PROTECTED FROM PAINT APPLIED TO ADJACENT SURFACES.. FROM EXISTING SURFACES TO REMAIN, INCLUDING THOSE ON THE INTERIOR OF CABINETS AND CLOSETS, REMOVE TAPE, ADHESIVE RESIDUE, INK RESIDUE, CRAYON RESIDUE, STAPLES AND SIMILAR SURFACE IMPERFECTIONS AND MARKS. WHERE EXISTING SURFACES ARE TO REMAIN UNPAINTED OR ARE NOT REFINISHED THOROUGHLY CLEAN THE SURFACE. SURFACES TO RECEIVE THOROUGH CLEANING SHALL INCLUDE BUT ARE NOT LIMITED TO WINDOW GLAZING, METAL WINDOW FRAMES, WALL BASE, ROOM UIPMENT AND ROOM FIXTURES AND FITTINGS.. ALL PREVIOUSLY PAINTED SURFACES INCLUDING BUT NOT LIMITED TO WALLS, CEILINGS, SOFFITS, BEAMS, COLUMNS, CLOSET INTERIORS, EXPOSED DUCTWORK, DOORS, DOOR AND WINDOW FRAMES, TRIM, AND SHELVING SYSTEMS SHALL BE REPAINTED U.N.O. SEE FINISH SCHEDULE FOR COLORS.. ALL PREVIOUSLY VARNISHED SURFACES INCLUDING BUT NOT LIMITED TO DOORS, CASEWORK, SILLS, TRIM AND SHELVING SHALL BE PREPARED AND REVARNISHED WITH CLEAR VARNISH.. WHERE DOORS AND DOOR FRAMES OCCUR BETWEEN AREAS IN THE SCOPE OF WORK AND AREAS NOT IN THE SCOPE OF WORK REFINISH BOTH SIDES.. EXISTING AND NEW PIPES, INSULATED PIPES, WIREMOLD, CONDUIT, AND SURFACE-MOUNTED JUNCTION BOXES AND THE LIKE SHALL BE PAINTED TO MATCH WALL BEYOND, SEE FINISH SCHEDULE FOR WALL COLOR.. EXISTING FLOOR TO BE PREPARED TO RECEIVE NEW SCHEDULED FLOORING. REMOVE ALL LOOSE MATERIAL AND CREATE A LEVEL SURFACE. OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 () 00-0 () 00 - (fax) SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: THE SHEWARD PARTNERSHIP, LLC t...0 f...0 PES DATE XX/XX/0XX 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t MB- TH- TB- 0A CT 0A CT MB- TH- TB- MB- TH- TB- 0A KEYNOTES CT C TB-. TB-. FIRST 0 A0 CW CW CW TH- CW CW CW CW CW TH-. CW CW CW CW A0 SECOND 0 TB-. TB-. 0 THIRD 0 A0 CW TH-. CW CW CW CW PREPARE AND ELECTROSTATICALLY PAINT UNIT VENTILATORS AND ASSOCIATED PIPE ENCLOSURES CLEAN AND REMOVE ALL LOOSE MATERIAL FROM BUILT-IN AND FREESTANDING STORAGE FURNITURE REINSTALL PREVIOUS SANITIZER DISPENSER RETAIN EXISTING ROLLER SHADE FOR EACH WINDOW IN ROOM NEW SINK AT EXISTING PLUMBING. SEE PLUMBING DRAWINGS REINSTALL PREVIOUS PAPER TOWEL AND SOAP DISPENSERS REINSTALL PREVIOUS TOILET ACCESSORIES INCLUDING SOAP DISPENSERS, PAPER TOWEL DISPENSERS, TOILET PAPER DISPENSERS, AND MIRRORS TB- TB-. CS CB. CS CB. TB-. TB-. TB- TB- TB-. TB-. CS CB. CORRIDOR 00A NEW SINK AND CASEWORK NEW CUBBIES,SEE DETIAL DRAWINGS 0 NEW STORAGE CABINET NEW VCT FLOOR TILE NEW STANDARD FOUNTAIN,SEE PLUMBING DRAWINGS D 0 & 0 NEW WORK SCALE: /" = '-0" 0 & 0 NEW WORK SCALE: /" = '-0" 0 & 0 NEW WORK SCALE: /" = '-0" NEW MIRROR REFURBISH EXISTING WOOD CASEWORK & PROVIDE NEW TOP PREPARE WALL FOR REPAINTING A PROVIDE FINISHED END PANEL TO CUBBIES/BASE CABINET WHERE EXPOSED,TYP. BID DOCUMENT SUBMISSION JANUARY, 0 0 CW TH- CW LEGEND CW WALL-MOUNTED EDUCATIONAL SURFACE MB- TB- CW CW MB-X TB-X TH-X TT-X MARKERBOARD TACK TRACK // ADDENDUM NO. DATE REVISION E TB-. TB-. AUTISTIC SUPPORT & SPECIAL EDUCATION A0 CS CB CW B TOILET B CT CT CT *X INDICATES TYPE, SEE WALL UIPMENT SCHEDULE INTERACTIVE PANEL BOARD, NIC CASEWORK SEE ELEVATIONS AND CASEWORK SCHEDULE FOR TYPES EXISTING UNIT VENTILATOR AND PIPE ENCLOSURE SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE 0,0,0,0,0,0 & NEW WORK DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK FILE NO. XXX CHECKED BY GJC F TB- TB-. GC: EC: PC: B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / NEW WORK SCALE: /" = '-0" DRAWING NO. A0 SHEET 0 OF

6 GENERAL NOTES CASEWORK SCHEDULE Type Mark Description Model Manufacturer Width Depth Height Count Comments WALL UIPMENT SCHEDULE Type Mark Description Width Height Count Comments. NEW/EXISTING INTERACTIVE PANEL BOARDS AND MOUNTING POSTS AND BRACKETS ARE PROVIDED BY OTHERS. INSTALLATION OF INTERACTIVE PANEL BOARDS AND MOUNTING HARDWARE IS BY OTHERS. OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A B C NEW PARTITION SCALE: " = '-0" A ACOUSTIC SEALANT CONCRETE BEAM BEYOND EXISTING WOODEN FRAME MTL CHANNEL /" MTL " O.C. ABUSE RESISTANT /" GWB MTL CHANNEL ACOUSTIC SEALANT SCHEDULED FLOOR FINISH C Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood M M M M M M C Student Cubby M C Student Cubby M C Base Storage Cubby M C. Base Storage Cubby 0M CB Wood Base Cabinet M CB Wood Base Cabinet CM CB. Wood Base Cabinet EM CB. Wood Base Cabinet DM Wood Filler Panel N/A CS Wood Base Cabinet M CS ADA Slanted Panel 0M CT CT Wood Tall Storage Cabinet Wood Tall Storage Cabinet 0 CW Wood Wall Case CW Wall Case 0 CW Wood Wall Case ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on 0 hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - 0" 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - 0" 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - /" ' - 0" ' - " See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - /" ' - 0" ' - " See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - " ' - " ' - 0" See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - " ' - " ' - 0" See dwgs C. on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - " ' - /" ' - 0" M-HEIGHT-".SEE DRG AT A00 Empire Maple #000 Maple Natural ' - " ' - /" ' - " M-WIDTH-" AND HEIGHT =".SEE DRG CB AT A00, Empire Maple #000 Maple Natural ' - /" ' - /" ' - " M-HEIGHT-". SEE DRG CB.AT A00, Empire Maple #000 Maple Natural ' - " ' - /" ' - " M-WIDTH-, HEIGHT=". SEE DRG CB. AT A00, Empire Maple #000 Maple Natural 0 V.I.F. See interior elevation for location.#000 Maple Natural ' - /" ' - /" ' - 0" M-HEIGHT=".SEE DRG CS AT A00, Empire Maple #000 Maple Natural ' - " ' - /" ' - " 0 M-CLEARANCE=0",TOTAL WIDTH=". SEE DRG CS AT A00,Empire Maple #000 Maple Natural ' - /" ' - 0 /" ' - 0" 0 #000 Maple Natural ' - /" ' - 0 /" ' - 0" #000 Maple Natural ' - " ' - " ' - /" SEE DRG CW AT A00, Empire Maple #000 Maple Natural ' - " ' - " ' - /" SEE DRG CW AT A00,Empire Maple #000 Maple Natural ' - 0" ' - " ' - /" SEE DRG CW AT A00, Empire Maple #000 Maple Natural INTERACTIVE PANEL BOARD ' - " SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - " SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - 0" 0 SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - " SEE WALL UIPMENT NOTE TB-. ' - 0" ' - 0" SEE WALL UIPMENT NOTE TH-. TH- TH-. TH- TH-0 TH- TH-0 ' - " ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE ' - " ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE 0' - 0" ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE 0' - 0" ' - " SEE WALL UIPMENT NOTE SPECIALTY UIPMENT SCHEDULE MARK DESCRIPTION COUNT COMMENTS E HAND SANITIZER DISPENSER EXISTING TO BE REINSTALLED T SOAP DISPENSER EXISTING TO BE REINSTALLED T TOWEL DISPENSER EXISTING TO BE REINSTALLED T STAINLESS STEEL ANGLE FRAME MIRROR " X 0" MODEL NO: ASI #000,AMERICAN SPECIALTIES. ALL DATA AND POWER CONDUIT AT TEACHING WALLS TO BE INSTALLED BELOW TEACHING WALL BOARDS. DO NOT RUN VERTICAL CONDUIT BEHIND. COORDINATE W/ ELECTRICAL DWGS.. SEE FINISH SCHEDULE FOR CASEWORK COLOR SELECTIONS. WALL UIPMENT NOTES. s SHALL BE SUPPLIED AND INSTALLED BY OTHERS UNDER THE DIRECTION OF THE SDP. PROVIDE BLOCKING FOR s AS NECESSARY AND AS INDICATED IN THE DRAWINGS.. MARKERBOARDS AND S SHALL BE SUPPLIED BY THE SDP AND INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE WITH OTHER PRIME CONTRACTORS AND FIELD VERIFY FOR THE BOARDS AND ADVISE SDP OF ANY DISCREPANCY OR INTERFERENCES AFFECTING THE DESIGN INTENT. () 00-0 () 00 - (fax) SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: THE SHEWARD PARTNERSHIP, LLC t...0 f...0 PES DATE XX/XX/0XX 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t D ' - " DATA JACK SEE ELEC. DWGS. QUAD RECEPTACLE SEE ELEC. DWGS. POWER & DATA NEW/EXISTING INTERACTIVE PANEL BOARD (BY OTHERS) ' - 0" DATA & POWER LOCATIONS TEACHING WALL DETAIL SCALE: /" = '-0" 0' - "0' - /" WALL (BY OTHERS) CONAN SCETAWL MOTORIZED WALL MOUNT (BY OTHERS) PROVIDE CONCEALED BLOCKING AS R'D FOR MOUNTING BRACKETS FLOOR FINISH AS SCHEDULED TYPICAL POST MOUNTING " " NEW RAIL AND HOOK TYP. COAT HOOK DETAIL SCALE: " = '-0" NEW " PARTICLE BOARD RAIL W/ SOLID WOOD EDGING AND MAPLE VENEER WITH STAIN FINISH #0. FASTEN W/ CONCEALED FASTENERS NEW COAT HOOK, EPCO CH0-ZBN- NEW F.R.T WD BLOCKING FASTENED TO EXISTING WALL SHIM OR PLANE AS NECESSARY TO SIT FLUSH WITH WALL 0' - " C, C. PARTIAL ELEVATION OF THE COAT HOOK RAIL 0' - " ' - " ' - 0" 0' - 0" 0' - 0" 0" " " VENEER CORE PLYWOOD TOP & SIDE PANELS (TYP.) VENEER CORE PLYWOOD SHELVES, TYP. METAL COAT HOOK CENTERED IN BACK PANEL METAL COAT HOOK ONE EACH SIDE VENEER CORE PLYWOOD BACK & END PANELS MT. TO WALL VINYL BASE WHERE EXPOSED KINDERGARTEN STUDENT CUBBY C,C ' - " CUBBY SECTION AND FRONT ELEVATION SCALE: /" = '-0" ' - /" ' - /" C CABINET INTERIOR C WALL CABINET (SEE NOTE.) BID DOCUMENT SUBMISSION JANUARY, 0 0 // ADDENDUM E ' - 0" WOODEN DOOR " WOOD VENEERED RAIL TO MATCH CABINET,TYP. COAT " A.F.F X WD BLOCKING NO. DATE REVISION SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, F ' - " ' - /" " ' - /" /" FIRST-THIRD BASE CABINET CB,CB.,CB. BACKSPLASH " WIRE PULL (TYP.) WOODEN DOOR TYPICAL CASEWORK SECTION SCALE: /" = '-0" ' - " ' - /" 0' - /" ' - /" ' - 0" BACKSPLASH FIRST-THIRD ADA SINK BASE CS CASEWORK TO ACCOMODATE SINK ' - 0" ' - /" " ' - 0 /" /" KINDERGARTEN SINK BASE CS " BACKSPLASH SINK BASE " WIRE PULL (TYP.) VINYL BASE ' - 0" ' - /" " /" ' - 0 /" " KINDERGARTEN BASE CABINET CB BACKSPLASH " WIRE PULL (TYP.) WOODEN DOOR VINYL BASE ' - " " " ' - " " WIRE PULL WALL CABINET & COAT HOOK CW, C WOOD VENEERED RAIL TO MATCH CABINET, TYP. COAT HOOK, EPCO CH0-ZBN- WOODEN LEDGER ' - 0" ' - " " BACKSPLASH VINYL BASE BASE STORAGE CUBBY C " NOTE: WOOD VENEERED CLOSURE AT THE EXPOSED BLOCKING COAT " A.F.F WALL SURFACE. FASTEN CABINETS TO ADJACENT UNITS AND TO BACKING. FASTEN WALL CABINETS THROUGH BACK, NEAR TOP AND BOTTOM, AT ENDS AND NOT LESS THAN INCHES O.C. WITH NO. 0 SCREWS OR ANCHORS, AS APPROPRATE TO SUBSTRATE, SIZED FOR -INCH PENETRATION INTO WOOD FRAMING, BLOCKING, WALL STRUCTURE OR HANGING STRIPS. WALL CABINET & WALL HOOK DETAIL ENLARGED SCALE: " = '-0" PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE CASEWORK AND UIPMENT DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: DRAWING NO. FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / A00 SHEET OF

7 OFFICE OF CAPITAL PROGRAMS ' - /" ' - " ' - 0" 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A TH- ' - " ' - 0" ' - 0" TH- ' - 0" ' - 0" ' - 0" ' - 0" ' - 0" () 00-0 () 00 - (fax) SEAL: ' - " E ' - 0" CT C. CW ' - 0" ENTRY ELEVATION - RM 0 SCALE: /" = '-0" CW CW CW CW CW C. C C. C C. C C. C C ' - " ' - " ' - " ' - " ' - " T T CS ' - " ' - " ' - " CB. ' - 0" ' - " MB- TB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - " ' - 0" TB-. LEFT ELEVATION - RM 0 SCALE: /" = '-0" TB- ' - 0" ' - " TB-. REAR ELEVATION - RM 0 SCALE: /" = '-0" TB-. PAINT UNIT VENTILATOR PT- NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: DATE XX/XX/0XX B ' - " ' - /" ' - " ' - " CB. ' - /" TH-. T T CW CW CW CW CW E C C. C C C. C C.C CS CT ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - 0" ' - 0" ' - 0" TH- MB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB- ' - " ' - 0" ' - " ' - 0" TB-. RIGHT ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB-. PAINT PIPE ENCLOSURE P- ' - 0" ' - " ' - 0" ' - 0" TB-. TB-. PAINT UNIT VENTILATOR PT- REAR ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - " THE SHEWARD PARTNERSHIP, LLC t...0 f...0 PES 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t C ' - " ' - 0" ' - /" ' - " TH-. CW CW CW CW CW C. C C C. C C. C C CT ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" T T CS ' - " ' - " ' - " ' - " ' - " 0' - " ' - " ' - /" CB. ' - " ' - 0" ' - " ' - 0" MB- ' - 0" ' - 0" TH- ' - 0" TB- ' - 0" TB-. ' - 0" TB-. PAINT PIPE ENCLOSURE P- 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" LEFT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" ' - 0" ' - " ' - 0" ' - " ' - 0" ' - 0" TB- TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- PAINT DUCT INSULATION BLACK D ' - " 0' - " ' - /" ' - " ' - " ' - " ' - " CB. T CS ' - " ' - " T ' - " TH-. CW CW CW CW CW CW C C. C C. C C. C C. C C.C. ' - " ' - " ' - " ' - " ' - " ' - 0" ' - 0" ' - /" CT E ' - 0" MB- ' - 0" ' - 0" TH- ' - 0" TB- ENTRY ELEVATION - RM 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" ' - " ' - 0" ' - " ' - 0" TB-. ' - 0" TB-. ' - " ' - 0" ' - 0" ' - 0" TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- RIGHT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" PAINT DUCT INSULATION BLACK TB- ' - 0" ' - " BID DOCUMENT SUBMISSION JANUARY, 0 0 ' - 0" E ' - " ' - /" ' - " CT ' - 0" TH-. CW CW CW CW CW C C. C C. C C. C C. C C. ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" T CS T 0' - " ' - " ' - " ' - " CB. ' - /" ' - " ' - 0" ' - " TH- MB- TB- ' - 0" ' - 0" ' - 0" ' - 0" TB-. ' - 0" TB-. ' - " ' - 0" ' - 0" ' - " ' - 0" ' - 0" TB- TEACHING WALL ELEVATION - RM 0 LEFT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" 0 SCALE: /" = '-0" TB-. PAINT UNIT VENTILATOR, GRILLE AND PIPE ENCLOSURE PT- PAINT DUCT INSULATION BLACK // ADDENDUM NO. DATE REVISION SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE INTERIOR ELEVATIONS ' - 0" F ' - " ' - " CB. ' - " ' - /" ' - 0" ' - 0" ' - 0" TH-. TH- T T CW CW CW CW CW MB- TB- CS ' - " ' - " C C C. C C. C C. ' - 0" C CT ' - " ' - " ' - " ' - " ' - " PAINT PIPE ENCLOSURE P- ' - " ' - 0" ' - " ' - 0" ' - 0" TB-. TB-. ' - " ' - 0" PAINT DUCT INSULATION BLACK ENTRY ELEVATION - RM 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" RIGHT ELEVATION - RM 0 SCALE: /" = '-0" REAR ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" ' - 0" TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- ' - 0" ' - " DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: DRAWING NO. FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / A0 SHEET OF

8 OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A ' - " E ' - " ' - /" TH-. CW CW CW CW CW ' - 0" C C. C C. C C C. C C. CT ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" T T CS ' - " ' - " ' - " ' - " 0' - " ' - " ' - /" CB. PAINT PIPE ENCLOSURE P- ' - 0" ' - 0" ' - 0" TH- MB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB- ' - " ' - 0" ' - " ' - 0" TB-. PAINT PIPE ENCLOSURE P- LEFT ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB-. ' - 0" ' - " REAR ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - 0" TB-. TB-. PAINT UNIT VENTILATOR PT- ' - 0" ' - " () 00-0 () 00 - (fax) SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: DATE XX/XX/0XX ' - 0" THE SHEWARD PARTNERSHIP, LLC t...0 f Chestnut Street Philadelphia, PA 0 B ' - 0" ' - /" TH- ' - 0" ' - 0" ' - 0" TH- ' - " ' - 0" ' - 0" ' - 0" ' - 0" PES ' - " ' - " CB. T T CW CW CW CW CW CW C C. C C. C C. C C C. C CS ' - /" ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM SCALE: /" = '-0" CT E MB- LEFT ELEVATION - RM SCALE: /" = '-0" TB- ' - 0" ' - " TB-. RIGHT ELEVATION - RM SCALE: /" = '-0" TB-. ' - 0" ' - " ' - " ' - 0" TB-. REAR ELEVATION - RM SCALE: /" = '-0" TB-. PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t ' - 0" C ' - " E ' - /" CT ' - 0" ENTRY ELEVATION - RM SCALE: /" = '-0" TH-. CW CW CW CW CW C. C C C. C C. C C. C ' - " ' - " ' - " ' - " ' - " T CS T ' - " ' - " ' - " CB ' - " 0' - /" ' - /" ' - " ' - " ' - 0" TB-. TB-. ' - 0" ' - " PAINT PIPE ENCLOSURE P- ' - 0" ' - 0" ' - 0" MB- TH- TB- 0 LEFT ELEVATION - RM SCALE: /" = '-0" RIGHT ELEVATION - RM REAR ELEVATION - RM SCALE: /" = '-0" SCALE: /" = '-0" ' - " ' - 0" ' - " ' - 0" TB- ' - 0" TB-. ' - " ' - 0" D ' - " ' - " ' - 0" ' - " ' - 0" 0' - 0" ' - 0" TH-0 ' - 0" MB- TB- ' - " 0' - " ' - /" ' - " ' - " ' - 0" TH- CW CW CW CW CW CW C. C C C. C C. C C. C C C. ' - " ' - " ' - " ' - " ' - " ' - " ' - /" ' - /" ' - /" ' - 0" CT CT CT CS T ' - " ' - " T CB ' - " ' - 0" ' - 0" TEACHING WALL ELEVATION - RM LEFT ELEVATION - RM RIGHT ELEVATION - RM REAR ELEVATION - RM SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" TB-. TB-. ' - 0" ' - " ' - 0" TB-. PAINT UNIT VENTILATOR PT- ' - 0" TB- ' - " ' - 0" BID DOCUMENT SUBMISSION JANUARY, 0 0 ' - 0" ' - 0" // ADDENDUM NO. DATE REVISION E TB-. TB- ' - 0" SCHOOL & LOCATION POTTER-THOMAS SCHOOL ' - " REAR ELEVATION RM 0 SCALE: /" = '-0" ' - " 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING INTERIOR ELEVATIONS F FIRST FLOOR 0' - 0" ' - 0" ' - " ' - 0" NEW PARTITION WALL NEW CERAMIC WALL TILE REINSTALL EXISTING MIRROR (EXCEPT FOR RESTROOM IN CLASS 0 PROVIDE NEW MIRROR) EXISTING SINK ' - 0" REINSTALL PREVOIUS SOAP AND PAPER TOWEL DISPENSER NEW CERAMIC WALL TILE ' - 0" NEW CERAMIC WALL TILE ' - 0" ' - 0" ' - " NEW PARTITION WALL NEW CERAMIC WALL TILE DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / TYPICAL RESTROOM PARTITION ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" TYPICAL RESTROOM ENTRY WALL ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" SCALE: /" = '-0" 0 TYPICAL RESTROOM REAR WALL ELEVATION RM 0,0,0 & 0 TYPICAL RESTROOM FRONT WALL ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" DRAWING NO. A0 SHEET OF

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504 ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

Architect s Supplemental Instructions (attachment to AIA Form G710)

Architect s Supplemental Instructions (attachment to AIA Form G710) Architect s Supplemental Instructions (attachment to AIA Form G70) ASI No: 0 Date: January 7, 06 Project: PR-07 Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative. ADDENDUM_04 1 page(s) I 1 project number CIN001 project name Cinemark XD12 Altoona, IA issue date December 16, 2013 venue > distribution Jeff Duffy EDC jduffy@edcweb.com Justin Couch VCC USA jcouch@vccusa.com

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements. SECTION 12356 - CASEWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

Chapter 22 - Cabinets & Vanities

Chapter 22 - Cabinets & Vanities Chapter 22 - Cabinets & Vanities Contents Chapter 22 - Cabinets & Vanities... 22-1 Timing & Prerequisites... 22-2 Cabinets... 22-3 Cabinet Layout... 22-3 Wall Cabinets... 22-4 Assemble the Wall Units...

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

WELLNESS CENTER REMODEL UNIVERSITY OF CALIFORNIA, MERCED MERCED, CALIFORNIA PROJECT NO.: 907432 C. Solid Surfacing Material: 1. Manufacturers: D. Wood: a. First Floor; Wilsonart International, Solid Surfaces,

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 062000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017 These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which

More information

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

WHITE W/OAK TRIM NATURAL MEDIUM NORTHPORT OAK

WHITE W/OAK TRIM NATURAL MEDIUM NORTHPORT OAK WHITE W/OAK TRIM NATURAL MEDIUM NORTHPORT OAK Accessories. We believe that functionality is at the heart of any great kitchen. Above are a few of the accessories available with Merillat Essentials. The

More information

SECTION MANUFACTURED CASEWORK

SECTION MANUFACTURED CASEWORK 1 GENERAL 1.1 SECTION INCLUDES SECTION 12300 MANUFACTURED CASEWORK A. Work required to complete the manufactured casework indicated by the Contract Documents, and the items necessary for its proper installation.

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

3/4" HDWD 'B' VENEER 1'-10 5/8" SEE PLANS FOR DEPTH, WIDTH, AND GEOMETRY OF BENCH PLYWD (2 LAYERS) HDWD 'B' TRIM w/ EASED EDGES 3 1/2"

3/4 HDWD 'B' VENEER 1'-10 5/8 SEE PLANS FOR DEPTH, WIDTH, AND GEOMETRY OF BENCH PLYWD (2 LAYERS) HDWD 'B' TRIM w/ EASED EDGES 3 1/2 Typical /" x /" Edgebanding SCALE: '' = ' - 0'' SCALE: '' = ' - 0'' Typical /" x /" Edgebanding SCALE: '' = ' - 0'' Typical Countertop/Desktop Edge SCALE: '' = ' - 0'' Typical Window Sill (" or Less) SCALE:

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1 Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Finish carpentry items including shop prefabricated casework and countertops..2 Hardware and attachment accessories..3 Wood Benches..4

More information

Kitchen and Bath Design Planner

Kitchen and Bath Design Planner 2017 Kitchen and Bath Design Planner How to Measure Your Kitchen or Bath for New Cabinets Measuring your space is a critical step in determining your room layout. Having accurate measurements of your kitchen

More information

ADDENDUM TO THE CONTRACT. for the GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION. Contract No. E16-181

ADDENDUM TO THE CONTRACT. for the GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION. Contract No. E16-181 ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION Contract No. E6-8 ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: May 9, 206 PREVIOUS ADDENDA:

More information

Jan H: ARCHITECTURAL WOODWORK (06410-H)

Jan H: ARCHITECTURAL WOODWORK (06410-H) 2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 064040-H: ARCHITECTURAL WOODWORK (06410-H) GENERAL In general, follow the guidelines below when designing and

More information

CABINET INSTALLATION INSTRUCTIONS

CABINET INSTALLATION INSTRUCTIONS CABINET INSTALLATION INSTRUCTIONS Please read these instructions through completely before beginning the installation. Thank you for choosing Plato Personalized Custom Cabinetry for your home. Your Plato

More information

3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern.

3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern. ADDENDUM NO. 4 TO: All Registered Bidders DATE: May 5, 2017 PROJECT: Irvine Unified School District Measure E Improvements Enclose Open Classrooms/Modernization Project CONTACT: Tim Ledesma, Milo Oostinga,

More information

SECTION 12345.1 - MODULAR STEEL LABORATORY CASEWORK 1 PART 1 PRODUCTS 1.01 MANUFACTURER A. Casework and equipment manufacturer: ALIR Systems, Inc., 245 Harrison St, Jamestown, New York, 14701. 1.02 CASEWORK

More information

C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.

C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors. 12300 - MANUFACTURED CASEWORK PART 1 - GENERAL 1.01 STIPULATIONS A. The specifications sections General Conditions, Special Requirements, and General Requirements form a part of this section by this reference

More information

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. It is preferred that all submittals to be submitted electronically in PDF format. June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition. SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.

More information

***************************************************************************************************************

*************************************************************************************************************** 06400 ARCHITECTURAL WOODWORK SPECIFIER: CSI MasterFormat 2004 number 06 40 00 PART 1 GENERAL 1.1 SUMMARY A. Provide necessary services, tools, equipment, material, and labor required to furnish and install

More information

Hilton Americas Guestroom Conversion (19th Fl.) Invitation to Bid

Hilton Americas Guestroom Conversion (19th Fl.) Invitation to Bid DATE: February 9, 28 SUBECT: Letter of Clarification #2 RE: TO: Hilton Americas Guestroom Conversion (19th Fl.) Invitation to Bid All Prospective Bidders ( HFC ) issues this Letter of Clarification regarding

More information

SECTION ARCHITECTURAL WOOD CASEWORK

SECTION ARCHITECTURAL WOOD CASEWORK SECTION 06410 - ARCHITECTURAL WOOD CASEWORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Wood cabinets for opaque finish. B. Flush wood paneling for transparent finish. C. Factory finishing. 1.02 RELATED REQUIREMENTS

More information

B. American Society for Testing and Materials (ASTM):

B. American Society for Testing and Materials (ASTM): SECTION 06400 ARCHITECTURAL WOODWORK PART 1 GENERAL 1.01 SUMMARY A. Provide necessary services, tools, equipment, material, and labor required to furnish and install millwork and cabinet work. Install

More information

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. SECTION 06200 - FINISH CARPENTRY PART 1 GENERAL 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. 1.2 RELATED SECTIONS A. Section 06100 - Rough Carpentry:

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

TOGGLER Specialty Anchors

TOGGLER Specialty Anchors TOGGLER Specialty Anchors Description All TOGGLER Specialty Anchors can be used in any material (concrete, plywood, paneling, drywall, etc.) of any thickness above their minimum grip range. All TOGGLER

More information

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant) SECTION 066030 EXTERIOR PVC PERGOLAS (IBC Compliant) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and other Contract Documents, listed in the agreement between the Owner and Contractor, apply to

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

INSTALLATION MANUAL STORAGE

INSTALLATION MANUAL STORAGE IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no

More information

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID SCOPE OF LABOR GENERAL: SUPPLY AND MANAGE TRASH AND DAILY CLEAN UP PROTECT EXISTING WOOD FLOORING, STAIRS AND DOORWAYS SUPPLY AND MAINTAIN PORTABLE TOILET FOR DURATION OF PROJECT KITCHEN: DEMO EXISTING

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance 1.00 General 1.01 Summary Music Area Casework A. This section includes the following Scope of Work as referred to in the plans: 1. Thermally Fused Laminate manufactured casework, for use in music areas,

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance

More information

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas Upcoming 222 Edgewood Crescent (Strata Lot 48) The Sequoia 226 Edgewood Crescent (Strata Lot 49) The Douglas 243 Edgewood Crescent (Strata Lot 57) The Douglas Pending 254 Edgewood Crescent (Strata Lot

More information

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC.

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC. This Product MasterSpec Section is licensed by ARCOM to Werever Products, Inc. ("Licensee"). This proprietary Product MasterSpec Section uses modified original MasterSpec text. Revisions made to the original

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

Cascade Ph: Casework Fax: Corp

Cascade Ph: Casework Fax: Corp Cascade Ph: 541-928-3750 Casework Fax: 541-928-3880 Corp email: bill.yates@cascase.com Cascade Casework Corp SPECIFICATIONS FOR PLASTIC LAMINATE FACED CASEWORK Specifications Section 12300 Section 06400

More information

Letter of Transmittal

Letter of Transmittal 3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal

More information

SECTION CUSTOM CASEWORK

SECTION CUSTOM CASEWORK PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 06 41 00 CUSTOM CASEWORK A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation Montclair, NJ 07043 ADDENDUM NO. 2 Issue Date: June 18, 2010 Request for Proposal # 898 Finley Hall Renovation Number of Pages: 14 (plus attachment) Date of Original Bidding Documents: April 28, 2010 INTENT:

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

SECTION LABORATORY CASEWORK AND EQUIPMENT

SECTION LABORATORY CASEWORK AND EQUIPMENT PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 12 35 53 LABORATORY CASEWORK AND EQUIPMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

SECTION PAINTS AND COATINGS

SECTION PAINTS AND COATINGS SECTION 09 90 00 PAINTS AND COATINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints and other coatings. 1.2 RELATED SECTIONS A. Division 05 - Metal Fabrications.

More information

Opus Cabinets with "H Storage Unit, continued

Opus Cabinets with H Storage Unit, continued 66 Health Volume 2 Casegoods Specification Guide Fascia is used to extend cabinets to the ceiling Fascia can only be used on 84"H cabinets Fascia accommodates ceiling heights of 7'6" 9'6" in 1 16" increments

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

Contents. E-Line Series (Wood Casework) K-Line Series (Wood Casework) D-Line Series (Wood Casework)

Contents. E-Line Series (Wood Casework) K-Line Series (Wood Casework) D-Line Series (Wood Casework) WOOD CABINET LINES Contents E-Line Series (Wood Casework)... 2-3 K-Line Series (Wood Casework)... 4-5 D-Line Series (Wood Casework)... 6-7 L-Line Series (Wood Casework)... 8-9 M-Line Series (MDF Casework)...

More information

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt ADDENDUM Project: Des Plaines Public Library Renovations Addendum No. 01 Project No: 13300 Date: 02 September 2015 To: The Des Plaines Public Library Issued by: Lisa Schmidt ATTN: ALL FFE BIDDERS Senior

More information

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project: McKee and Associates Architecture and Interior Design Addendum No. ONE Date: 10.8.18 Project: A New Office for Gaston Elementary School for The Etowah County Board of Education Gadsden, Alabama A1.1 GENERAL

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Closet System Installation Manual

Closet System Installation Manual Closet System Manual Thank you For choosing our Custom Closet Collection to fit all your needs Closets come fully assembled to make your project an enjoyable and satisfying experience. With quality Custom

More information