3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern.

Size: px
Start display at page:

Download "3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern."

Transcription

1 ADDENDUM NO. 4 TO: All Registered Bidders DATE: May 5, 2017 PROJECT: Irvine Unified School District Measure E Improvements Enclose Open Classrooms/Modernization Project CONTACT: Tim Ledesma, Milo Oostinga, Ledesma & Meyer Construction Co., Inc. This Addendum forms a part of the Contract Documents for the Project described above and shall supersede referenced sections of the original Bidding Documents. This Addendum is an integral part of said Bidding Documents and shall be acknowledged in the Contractor s Bid Proposal form. Failure to acknowledge receipt of this Addendum in the Bid may cause the Bid to be rejected. This addendum is divided into seven (7) parts: Instructions and Procedures, Public Works Bid Package, Project Specifications, Drawings, Prior Addenda, Other Documents, and Pre-Bid Questions. I. INSTRUCTIONS AND PROCEDURES 1. The following changes, omissions and/or additions to the Bid Specification shall apply to proposals made for and to the execution of the various parts of the work affected thereby, and all other conditions shall remain the same. 2. Careful note of the Addendum shall be taken by all parties of interest so that the proper allowance may be made in all computations and estimates, and all trades affected shall be fully advised in the performance of the work which will be required of them. 3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern. II. PUBLIC WORKS BID PACKET 1. Notice Calling for Bids, ATTENTION Bid Package 01 and 04 Bidders revise as follows: All work in Bid Package 04 is hereby transferred to, and becomes a part of, Bid Package 01. No Prime Bids will be accepted for Bid Package 04 and bidders wishing to bid the work of Bid Package 04 shall submit a subbid to Bid Package 01 bidders. 2. Bid Form, Clarification for Alternates. Remove the Bid Form in its entirety and replace with the Bid Form labeled Addendum 4. Alternate 2 is hereby removed and shall be included in the base bid. 3. Supplemental Conditions, Attachment A Contract Document Listing, revise as follows: Remove the Attachment A Contract Document Listing in its entirety Page 1

2 and replace with the Attachment A Contract Document Listing labeled Addendum Supplemental Conditions, Attachment C - Trade Specific Inclusions. Revise as follows: Remove the Attachment C Trade Specific Provisions in its entirety and replace with the Attachment C Trade Specific Provisions dated May 5, 2017 and labeled Addendum 4. Changes on spreadsheet are identified in BOLD ITALIC print, including revised Allowances for Bid Packages 6 and Supplemental Conditions, Attachment E Bid Schedule, revise as follows: Remove the Attachment E Bid Schedule in its entirety and replace with the Attachment E Bid Schedule labeled Addendum Supplemental Conditions, Attachment F Site Logistics Plan, revise as follows: Remove the Attachment F Site Logistics Plan in its entirety and replace with the Attachment F Site Logistics Plan dated May 5, 2017 and labeled Addendum Supplemental Conditions, Attachment L Materials Procurement Submittals. Add the attached Approved Submittals. The below submittals are provided for reference and information. Bonita Canyon ES HM Doors and Frames Door Hardware College Park ES HM Doors and Frames Door Hardware Culverdale ES HM Doors and Frames Door Hardware Greentree ES HM Doors and Frames Door Hardware Santiago Hills ES HM Doors and Frames Door Hardware Stone Creek ES HM Doors and Frames Door Hardware III. PROJECT SPECIFICATIONS - Please note - The numbering below correlates with each Architect s numbering of their respective site addendum. Bonita Canyon ES 4.2 Reference Section Architectural Wood Casework: Remove section in its entirety. 4.3 Reference Section Door Hardware: Hardware finish to be bronze. Page 2

3 4.4 Reference New Section Carpeting Carpet for patch will be provided by District, contractor to install. Contractor to provide new base. Roppe rubber 6 base to match existing. 4.5 Reference New Section Digitally Printed Vinyl Wallcovering Murals: Add attached Section in its entirety. 4.6 Reference Section Visual Display Boards: Paragraph 2.03, remove Items D and E in their entirety. 4.7 Reference New Section Fire Protection Specialties: Add attached new Section in its entirety. 4.8 Reference New Section Testing, Adjusting and Balancing for HVAC: Add attached Section in its entirety. 4.9 Reference Section Earthwork and Excavations: Paragraphs 3.09.B and 3.09.C, revise depth to be 12-inches in lieu of 2- feet. College Park ES 1.11 Specification Reference: Architectural Wood Casework. Replace specification section in its entirety with the attached Architectural Wood Casework Specification Reference: Thermal Insulation and Table of Contents Revise title of specification section to Insulation Specification Reference: Thermal Insulation Revise Section 2.03.A.2 to be the following: 2. Thickness of material to match stud size. Fill wall cavity Specification Reference: Carpet Revise Section 2.01.A. as follows: A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include the following: 1. Carpet Type 1: a. Tandus Centiva; Powerbond Applause III # b. Color and Pattern: Architect to choose from Tandus Applause III #02803 Color Spectrum. Multiple colors to be selected. 2. Carpet Type 2: a. Tandus Centiva; Powerbond Circlet # b. Color and Pattern: Architect to choose from Tandus Circlet #02888 Color Spectrum. Multiple colors to be selected. Page 3

4 1.15 Specification Reference: Visual Display Boards Revise section 2.01.A. to be the following: 1. Platinum Visual Systems, DTS series with writeanium surface, as Basis of Design for markerboards used as a projection surface. 2. Claridge Products and Equipment, Inc: Basis of Design for markerboards not used as a projection surface. 3. Polyvision Corporation (Nelson Adams): 4. Equal Specification Reference: Visual Display Boards Revise section 2.02.A.8 to be the following: 8. Joints: Not allowed. Refer to drawings for marker board sizes Specification Reference: Visual Display Boards Revise section 2.02.B to be the following: B. Marker Tray Provide one per white board. 1. Magnetic Aluminum Tray. Not integrated into frame. 2. Four inch wide Specification Reference: Visual Display Boards Revise section 2.02.C to be the following: C. Tack board and Tack Surface: Vinyl fabric covered tack surface, factory wrapped panels. 1. Manufacturer: a. Chatfield-Clarke Company, Fontana, CA. b. Claridge Products and Equipment, Inc. c. ABC School Equipment, Inc. Corona, CA. 2. Core: ½ inch thick fiberboard, comply with ASTM C208, medium density cellulose fiber insulating board. 3. Primer: No Prep and Prime, Multipurpose bonding primer, by ICI Paints Commerce, CA, or equal as recommended by adhesive manufacturer. 4. Adhesive: As recommended by manufacturer for application of fabric to core material and for application of assembled panel to wall substrate. 5. Fabric: Vinyl Koroseal, Ceres. Complying with Federal Specification CCC-W-408 A, Type II. Class A flame spread less than 15, smoke density less than 20, ASTM E84, NFPA 225. a. Panels: 4-0 wide. b. No field gluing of fabric to substrate board. Page 4

5 c. Architect to select color from manufacturer standard. 6. Trims: Fabric-covered aluminum and edge moldings and corner trims, J-Molds at top and bottom, manufacturer s standard, square butt joints with fabric-covered edges. 7. Joints: Vertical butt joints Specification Reference: Projection Screens Add the attached specification section Projection Specification Reference: Curtain Remove Specification Section in its entirety Specification Reference: Wiring Devices Revise Specification Section (Wiring Device Finishes) as follows: A. Provide wiring device finishes as described below. B. Wiring Devices Installed in Finished Spaces: Ivory with stainless steel wall plate. C. Wiring Devices Installed in unfinished spaces: Ivory with stainless steel wall plate. D. Wiring Devices Installed in Wet or Damp Locations: Ivory with specified weatherproof cover. Culverdale ES 4.2 Reference New Section Tile Carpeting: Add attached Section in its entirety Provide Roppe Burnt Umber 6 rubber base as shown on elevations Walk off mat will be only at outside entry doors - walk off mat size is roughly width of door plus 1 x 6' length (into interior). 4.3 Reference New Section Digitally Printed Vinyl Wallcovering Murals: Add attached Section in its entirety. See attached Exhibits A, B, C and D for graphics. 4.4 Reference Section Visual Display Boards: Paragraph 2.03, remove Items D and E in their entirety. 4.5 Reference New Section Fixed Tackboards: Add attached new Section in its entirety. 4.6 Reference Section Backpack Hooks: Paragraph 2.B.2, provide redwood mounting board Paragraph 2.C.1, provide 5 1/3 spacing. 4.7 Reference New Section Testing, Adjusting and Balancing for HVAC: Page 5

6 4.7.1 Add attached Section in its entirety. 4.8 Reference Section Earthwork and Excavations: Paragraphs 3.09.B and 3.09.C, revise depth to be 12-inches in lieu of 2- feet. Greentree ES 1.05 Specification Reference: Architectural Wood Casework: Remove specification section in its entirety Specification Reference: Thermal Insulation and Table of Content: Revise title of specification section to Insulation Specification Reference: Thermal Insulation: Revise Section 2.03.A.2 as follows: 2. Thickness of material to match stud size. Fill wall cavity Specification Reference: Visual Display Boards: Revise section 2.01.A. to be the following: 1. Platinum Visual Systems, DTS series with writeanium surface, as Basis of Design for markerboards used as a projection surface. 2. Claridge Products and Equipment, Inc: Basis of Design for markerboards not used as a projection surface. 3. Polyvision Corporation (Nelson Adams): 4. Equal Specification Reference: Visual Display Boards: Revise section 2.02.A.8 to be the following: 8. Joints: Not allowed. Refer to drawings for marker Specification Reference: Visual Display Boards: Revise section 2.02.B to be the following: B. Marker Tray Provide one per white board. 1. Magnetic Aluminum Tray. Not integrated into frame. 2. Four inch wide Specification Reference: Visual Display Boards: Revise section 2.02.C to be the following: C. Tack board and Tack Surface: Vinyl fabric covered tack surface, factory wrapped panels. 1. Manufacturer: a. Chatfield-Clarke Company, Fontana, CA. b. Claridge Products and Equipment, Inc. c. ABC School Equipment, Inc. Corona, CA. Page 6

7 2. Core: ½ inch thick fiberboard, comply with ASTM C208, medium density cellulose fiber insulating board. 3. Primer: No Prep and Prime, Multipurpose bonding primer, by ICI Paints Commerce, CA, or equal as recommended by adhesive manufacturer. 4. Adhesive: As recommended by manufacturer for application of fabric to core material and for application of assembled panel to wall substrate. 5. Fabric: Vinyl Koroseal, Ceres. Complying with Federal Specification CCC-W-408 A, Type II. Class A flame spread less than 15, smoke density less than 20, ASTM E84, NFPA 225. a. Panels: 4-0 wide. b. No field gluing of fabric to substrate board. c. Architect to select color from manufacturer standard. 6. Trims: Fabric-covered aluminum and edge moldings and corner trims, J-Molds at top and bottom, manufacturer s standard, square butt joints with fabric-covered edges. 7. Joints: Vertical butt joints Specification Reference: Wall and Corner Guards: Remove Specification Section in its entirety Specification Reference: Wiring Devices: Revise Specification Section as follows: A. Provide wiring device finishes as described below. B. Wiring Devices Installed in Finished Spaces: Ivory with stainless steel wall plate. C. Wiring Devices Installed in unfinished spaces: Ivory with stainless steel wall plate. D. Wiring Devices Installed in Wet or Damp Locations: Ivory with specified weatherproof cover. Santiago Hills ES 1.07 Specification Reference: Thermal Insulation and Table of Contents Revise title of specification section to Insulation Specification Reference: Thermal Insulation Revise Section 2.03.A.2. as follows: 2. Thickness of material to match stud size. Fill wall cavity Specification Reference: Acoustical Vertical Blades Revise section 2.02.A as follows: A. Group suspension system Prelude XL by Armstrong as Basis of Design Refer to Specification Section Page 7

8 B. Color: Black Specification Reference: Visual Display Boards Revise section 2.01.A. to be the following: 1. Platinum Visual Systems, DTS series with writeanium surface, as Basis of Design for markerboards used as a projection surface. 2. Claridge Products and Equipment, Inc: Basis of Design for markerboards not used as a projection surface. 3. Polyvision Corporation (Nelson Adams): Specification Reference: Visual Display Boards Revise section 2.02.A.8 to be the following: 8. Joints: Not allowed. Refer to drawings for marker Specification Reference: Visual Display Boards Revise section 2.02.B to be the following: B. Marker Tray Provide one per white board. 1. Magnetic Aluminum Tray. Not integrated into frame. 2. Four inch wide Specification Reference: Visual Display Boards Revise section 2.02.C to be the following: C. Tack board and Tack Surface: Vinyl fabric covered tack surface, factory wrapped panels. 1. Manufacturer: a. Chatfield-Clarke Company, Fontana, CA. b. Claridge Products and Equipment, Inc. c. ABC School Equipment, Inc. Corona, CA. 2. Core: ½ inch thick fiberboard, comply with ASTM C208, medium density cellulose fiber insulating board. 3. Primer: No Prep and Prime, Multipurpose bonding primer, by ICI Paints Commerce, CA, or equal as recommended by adhesive manufacturer. 4. Adhesive: As recommended by manufacturer for application of fabric to core material and for application of assembled panel to wall substrate. 5. Fabric: Vinyl Koroseal, Ceres. Complying with Federal Specification CCC-W-408 A, Type II. Class A flame spread less than 15, smoke density less than 20, ASTM E84, NFPA 225. a. Panels: 4-0 wide. b. No field gluing of fabric to substrate board. c. Architect to select color from manufacturer standard. Page 8

9 6. Trims: Fabric-covered aluminum and edge moldings and corner trims, J-Molds at top and bottom, manufacturer s standard, square butt joints with fabric-covered edges. 7. Joints: Vertical butt joints Specification Reference: Wall and Corner Guards Remove Specification Section in its entirety Specification Reference: Wiring Device Revise Specification Section as follows: Stone Creek ES A. Provide wiring device finishes as described below. B. Wiring Devices Installed in Finished Spaces: Ivory with stainless steel wall plate. C. Wiring Devices Installed in unfinished spaces: Ivory with stainless steel wall plate. D. Wiring Devices Installed in Wet or Damp Locations: Ivory with specified weatherproof cover. 4.2 Reference New Section Structure Moving: Add attached new Section in its entirety. 4.3 Reference New Section Pipe and Tube Railings: Add attached Section in its entirety. 4.4 Reference Section Door Hardware: Hardware finish to be bronze. 4.5 Reference New Section Audio Visual Equipment: Add attached Section in its entirety. 4.6 Reference New Section Testing, Adjusting and Balancing for HVAC: Add attached Section in its entirety. 4.7 Reference New Section Metal Ducts: Add attached Section in its entirety. 4.8 Reference Section Earthwork and Excavations: Paragraphs 3.09.B and 3.09.C, revise depth to be 12-inches in lieu of 2- feet. IV: DRAWINGS - Please note - The numbering below correlates with each Architect s numbering of their respective site addendum. Bonita Canyon ES 4.1 General Items: Page 9

10 4.1.1 Patch and repair soffits at spaces adjacent to new doors as required. Material type and color to match existing Existing walls at hallways and classrooms are finished with existing wall covering. Patch, repair, and replace wall covering where it is affected by new work Where (E) glazing is shown for removal, the (E) frame shall be removed as part of the demolition Reference Sheet AS-0.1: Contractor is to remove and reinstall existing bench along the new 6 curb near flag pole Existing wall at Door 03F to be demolished is wood frame with wood siding Reference Sheet AS-1.0: Revise detail callout for collaboration space at library to read 27/AD-1.0 in lieu of 21/AD Reference Sheet A-7.1: Remove all tack wall panel shown at Commons spaces. Reference Exhibits A, B and C for new wall graphics and Section Add new Air Transfer Grill Detail per attached Sketch ASK Detail 2, add new fire extinguisher per attached Sketch ASK Detail 1, add detail callout for new window at column per attached Sketch ASK Reference Sheet A-7.2: Detail 26, Doors 9B and 13A are existing to remain. Remove and replace door and hardware per schedule Detail 26, Door 3E, 3F, 13A and 9B are to receive new Exit Sign per Detail 7/AD Reference Sheet AD-1.0: Detail 2, revise note to refer to Section in lieu of Detail 3, refer to Section for additional information regarding color requirements for contrast Add new Recessed Fire Cabinet Detail 29 per attached Sketch ASK Reference Sheet AD-1.1: Remove Details 22 and 23 in their entirety Detail 30, remove map rail. Locations where data outlets occur, outlet shall be installed below markerboard at a min. of 12 A.F.F Add new Detail 7 per attached Sketch ASK Reference Sheet E0.1: Revise symbol list per attached revised Sheet E Reference Sheet E-1.0: Revise Demolition Plan per attached revised Sheet E-1.0. Page 10

11 4.18 Reference Sheet E-1.1: Revise Electrical Plan at Commons spaces per attached revised Sheet E New outlets shown at whiteboards shall be installed below the whiteboard Reference New Sheet E-AV1: Add attached new Sheet E-AV1 in its entirety. College Park ES 1.1 Drawing Reference A012: Provide wall base at walls that receive new finish. 1.2 Drawing Reference A131: Framed gypsum ceilings shall be 1-hr rated assemblies, with the exception of soffits and ceilings in Common Space C2, which are non-rated assemblies. 1.3 Drawing Reference A131: O.F.C.I Short Throw Projectors are O.F.C.I Ultra Short Throw Projectors and mount. Provide wall backing, and coordinate with electrical and low voltage for locations of power and data outlets. 1.4 Drawing Reference A131: Where suspended gypsum ceiling is patched to match existing, finish shall match adjacent color and texture. Transition between new and existing ceiling shall be seamless, and unnoticeable. 1.5 Drawing Reference E001: Data cables shall terminate at IDF/MDF shown in plans. Telephone cables shall terminate at communications cabinet or telephone backboard shown in plan. 1.6 Drawing Reference E102: Coordinate locations of WP junction boxes and trenching with modular buildings. Provide junction boxes in locations that do not conflict with windows, mechanical units and other existing components on exterior elevations. Electrical drawings are diagrammatic and indicate general arrangement of systems. Verify modular buildings and existing conditions prior to installation of conduit and wall mounted junction boxes. 1.7 Drawing Reference E301: Data cabling and cable trays above the corridor ceilings are to be protected in place. 1.8 Drawing Reference E301: Existing WAP devices are located above the ceiling and are to be protected in place. 1.9 Drawing Reference E201 and E401: Refer to E401 for new occupancy sensors locations. Remove existing occupancy sensors in rooms and corridors that receive new sensors Drawing Reference N/A: See attached for Finish List Drawing Reference L001: Existing Calsense ET2000e Controller is located within the trash enclosure. Refer to the attached L001 for revised controller location, conduit, wiring, trenching requirements. Page 11

12 1.23 Drawing Reference A002: Revise O.F.C.I Projection Screens to C.F.C.I. Provide projector screen above marker board in each portable (Typical of 5) Drawing Reference AD101: District to remove and salvage demolition keynotes 18 and Drawing Reference AD131 and A131: Remove ceiling mounted projectors in A103, A109, A110, A113, A114, A115 and A119. Salvage and reinstall at new location in same room. Reinstall outlets and extend wires and conduit to new location Drawing Reference AD101, AD131, A101 and A131: Remove and reinstall whiteboards and ceiling mounted projectors in A103, A109, A110, A113, A114, A115 and A119. Each classroom has 2 large instruction white boards, and 1 projection whiteboard that shall be installed in the following locations: Classroom A103: Install 2 instruction whiteboards centered on west wall. Install projection whiteboard centered on south wall. Reinstall projector and align with projection whiteboard. Classroom A109: Install projection whiteboard centered on the north wall. Install one instruction white board on each side of projection whiteboard. Reinstall projector and align with projection whiteboard. Classroom A110: Install 2 instruction whiteboards centered on south wall. Install projection whiteboard centered on west wall. Reinstall projector and align with projection whiteboard. Classroom A113: Install projection whiteboard centered on the south wall. Install one instruction white board on each side of projection whiteboard. Reinstall projector and align with projection whiteboard. Classroom A114: Install projection whiteboard centered on the north wall. Install one instruction white board on each side of projection whiteboard. Reinstall projector and align with projection whiteboard. Classroom A115: Existing 2 instruction whiteboards shall remain in place on east wall. Install projection white board on south wall. Reinstall projector and align with projection whiteboard. Classroom A119: Install 2 instruction whiteboards centered on west wall. Install projection whiteboard centered on north wall. Reinstall projector and align with projection whiteboard Drawing Reference AD131: Refer to AD131 attached for locations of ceiling mounted projectors that are to be removed and returned to the District Drawing Reference AD101, A101, A402, and A551: Remove door and wall at Reception A170, as shown on the attached AD101. Provide casework and door as shown in the attached A101, A402, and A551. Provide electronic lock at door latch. Provide power to lock, and connect new system to existing DMP system, with buzzer at reception desk. Conceal wiring and conduit in walls and ceilings. Provide the following components for the electronic lock and controls: Page 12

13 Electric Strike Body 9500 Montgomery Hardware Co. DMP Control Module #734 DMP Power Supply # Card Reader MP-5365 DMP keyfob Proximity keys Push button/panic button 1.29 Drawing Reference A012: Revise General Note 2 to the following: 2. PROVIDE FULL HEIGHT CORNER GUARDS IN CORRIDORS TO PROTECT CORNER EDGES Drawing Reference A013: Add the following to the Door Schedule Notes. 7. WHERE ELECTRONIC KEY CARD READERS ARE REMOVED AND REINSTALLED, EXTEND WIRING AND CONDUIT TO NEW LOCATION Drawing Reference A101: Remove SF4 located on the north elevation of room A119. Refer to A101 attached Drawing Reference AD101 and A101: Return Backpack hooks to District. District will reinstall backpack hooks at a later date Drawing Reference A531: Revise Note 10 on A531 Interior Wall schedule as follows. 10. PROVIDE ACOUSTICAL SEALANT AT TOP AND BOTTOM OF NEW AND EXISTING WALLS LOCATED IN MUSIC ROOM A Drawing Reference AD101, A101, A131, A402: Music Room A111: Remove curtain and brackets from scope. Location of green paint, white boards, casework, shelves, and tack boards have been revised. Provide O.F.C.I projector and mounting bracket. Refer to A101, A131, and A402 attached. Library Room A102: Revised requirements for white board, tack board, and short throw projector. Casework Legend provided to clarify shelving in library. Interior elevation provided on A402 attached Drawing Reference G001, AD101 and A121: Remove Alternate 2, and incorporate into scope of work. AD101 and A121 have been revised to include the scope previously identified as Alternate 2. See attached AD101 and A Drawing Reference A101, A401, and E301: Remove O.F.C.I Monitor and Brackets for scope of work. Remove power, TV, and data outlets, wiring, and conduit that are feeding the O.F.C.I. Monitors Drawing Reference A121: PT 5 and 6 have been added. PT 4 location has been revised. Refer to A121 attached for revised locations Drawing Reference A131: Provide openings in walls above the ceiling for plenum return. Refer to drawing sheet A131 attached. Page 13

14 1.39 Drawing Reference A401: Provide full height tack panels on east elevation of Innovation Lab. Refer to A401 attached Drawing Reference A401 and A402: Marker board and short throw projector mounting heights have been revised. Refer to A401 and A402 attached Drawing Reference MP001: Sink model has been revised. Refer to MP001 attached Drawing Reference MP001, MP201 and MP301: Mechanical Ducts revised at Library. Refer to MP001, MP201 and MP301 attached Drawing Reference MP301 and MP501: Provide lined duct boots at return air grilles. Refer to MP301 and MP501 attached Drawing Reference MP301 and MP501: Provide transfer air ducts at music room. Refer to MP301 and MP501 attached Drawing Reference E001 and E102: Electrical and low voltage requirements in portables have been revised. Refer to attached E001 and E Drawing Reference E201 and E301: Electrical and low voltage requirements and locations of outlets have been revised. Refer to E201 and E301 attached. Culverdale ES 4.1 General Items: Where concrete is shown for demolition for new work, concrete shall be demolished to nearest joint Corridors to receive new wall covering, all fire alarm devices, thermostats, light switches and outlets are to be removed. Contractor to reinstall all items at same locations after installation of new wall covering Existing walls at hallways and classrooms are finished with existing wall covering. Patch, repair, and replace wall covering where it is affected by new work Contractor to remove and replace asphalt and concrete as required for new utility lines. Patch to match existing with flush transition Where work is called out as typical to bays, this work corresponds to the commons area at each classroom wing Where casework is shown to be partially removed, it shall be to the closest existing full module unit. 4.9 Reference Sheet C-3.1: All areas under overhangs at classrooms 1, 3, 5, 7, 9, 11, 13, 15, 18 and 20 shall be concrete per Note 9 to end of wing wall. Elevations remain unchanged Reference Sheet AS-1.0: Page 14

15 Omit the following note: (E) plumbing fixtures to be removed. Cap and abandon existing plumbing in wall Classroom 2, note for (E) power and data to be re-routed is typical all classrooms, refer to Electrical Drawings for additional information Refer to Legend, revise notes to read as follows: (E) ASPHALT PAVING TO BE REMOVED, REFER TO C-3.1 FOR NEW MATERIAL AND LAYOUT. (E) CONCRETE PAVING TO BE REMOVED AND REPLACED; REFER TO C Bench located near entry to be removed and reinstalled Ramp outside Classroom 10 shown for removal shall include the removal of existing handrails. Sack and patch exposed adjacent wall damaged by demolition to match existing Remove note for (N) Utility Drain and Yard Drains outside workroom, drainage to be per Civil Drawings At new Door 16B, existing light and motion sensor to be removed and reinstalled, location to be coordinated with District Reference New Sheets A-1.0, A-1.1 and A-1.2: Add attached new Sheets A-1.0, A-1.1 and A-1.2 for enlarged new and demo floor plans and elevations Reference Sheet A-7.1: Whiteboards at Commons Elevation B are 3 x7, whiteboards at Commons Elevation C at 3 x7 and 4 x Detail 9, provide blackout window tint by 3M on interior at existing exterior window located behind new wall Reference Sheet AD-1.0: Detail 20: a. Remove and reinstall existing thermostat at location of new door 19B. Install at 48 A.F.F. to meet ADA mounting height requirement. Final location to be coordinated with district. b. Reroute existing electrical conduit as required at new Door 20B, location to be coordinated in field Reference Sheet AD-1.1: Remove Details 22 and 23 in their entirety Detail 30, remove map rail. Locations where data outlets occur, outlet shall be installed below markerboard at a min. of 12 A.F.F Reference New Plumbing Sketches MPSK-1 and MPSK-2: Add attached Sketches MPSK-1 and MPSK-2 for plumbing work at new Kindergarten Restroom 9/A Reference Sheet E0.1: Revise Symbols List per attached revised Sheet E0.1. Page 15

16 4.17 Reference Sheet E-1.0: Revise Electrical Demolition Plan per clouded areas of attached revised Sheet E Reference Sheet E-1.1: Revise Electrical Plan per clouded areas of attached revised Sheet E Reference New Sheet E-AV1: Add attached new Sheet E-AV1 in its entirety. Greentree ES 1.01 Drawing Reference A101, A131, A211, and L4/A581: Provide acoustic sealant around perimeter of framed gypsum ceilings at restrooms. Refer to detail L4/A581 and specification section Drawing Reference A013 and A542: Door and window frames are to be hollow metal Drawing Reference A101 and A542: Remove existing wall covering where new graphic wall covering occurs Drawing Reference N/A: See attached for Finish List Drawing Reference A012: Remove General Note Drawing Reference A013: Remove louvers from door B105.1, B108.2, C105.1, C106.1, F105.1, and F Drawing Reference AD101: District to remove and salvage demolition keynotes 9, and Drawing Reference A101: Remove size of whiteboard from Floorplan Keynote 3. Refer to A401 for sizes of marker boards Drawing Reference A101 and A401: Revise 2 whiteboards in each Work Spaces to be one centered tack board. Size to tack board shall make the size shown on A2/A401. On A101 replace keynote 3 for markerboards in Work Spaces with keynote 6. District to provide furniture below and adjacent to tackboard. Provide backing per C8/A Drawing Reference A101: POD D graphic walls shall be revised to GW 5A/5B. POD C graphic walls shall be revised to GW 1A/1B Drawing Reference A2/A401: Remove existing wall covering from walls where markerboards are to be installed. Provide painted gypsum finish Drawing Reference E2/A401: Paint existing recessed fire extinguisher cabinet trim and door to match color of graphic wall Drawing Reference A131, A211 and L4/A581: Provide insulation in gypsum framed ceilings Drawing Reference M101: Revise location of existing thermostat per attached M Drawing Reference E003: New panels shown on single line diagram are existing panels to remain. Page 16

17 1.25 Drawing Reference E101 and E102: Refer to attached E102 for revision of power and TV outlets, and locations of existing Wireless Access Points Drawing Reference E201: Lights are to be centered in rooms. Refer to the attached E201. Santiago Hills ES 1.01 Drawing Reference A012: Existing walls between Hallways and Classrooms are finished with an existing wall covering. Patch, repair, and replace wall covering where it is affected by new work Drawing Reference A012, A101, and A102: New walls and infill walls shall receive wall base on both sides of the wall Drawing Reference A012 and A102: Infill walls for new doors at classrooms shall have a painted gypsum finish. Paint color to be selected by Architect. Adjacent walls have an existing wall covering finish that is to remain. Provide straight and clean edge at existing wall covering where infill wall occurs Drawing Reference A101 and A102: Prep and paint HVAC control panel doors and trims. Paint color to match adjacent wall Drawing Reference A131: Center light fixtures in B5, D5, and F Drawing Reference N/A: See attached for Finish List Drawing Reference A012: Remove General Note Drawing Reference AD101: District to remove and salvage demolition keynotes 10, 16, and Drawing Reference AD101: Remove existing ceiling mounted TV and bracket from existing offices adjacent to Classroom B1 and F1 and return to District. Remove wall mounted TV and bracket from existing offices adjacent to A1 and E1 and salvage for reinstallation. Install one monitor and bracket on the north wall of the administration office, and install one monitor and bracket on the east wall of the principal office. Provide backing per detail E4/A551. Provide the following low voltage for the monitors: Administration Office Monitor: Provide HDMI, VGA, and 3.5MM Outlet box 4S. Mounted 18 A.F.F. with ¾ C. Pathway to second HDMI, VGA, and 3.5MM Outlet Box 4S at 60 A.F.F. adjacent to monitor. Provide (1) HDMI, (1) 3.5MM, and (1) VGA Cable between source and receiver plate. C2G or equal. Principal Office Monitor: Provide (1) Data Outlet per E001 signal legend, and provide (1) HDMI, VGA, and 3.5MM Outlet box 4S mounted 18 A.F.F. with ¾ C. pathway to second HDMI, VGA, and 3.5MM Outlet Box 4S at 60 A.F.F. adjacent to monitor. Provide (1) HDMI, (1) 3.5MM, and (1) VGA Cable between source and receiver plate. C2G or equal Drawing Reference A102: Refer to the attached A102 for locations of graphic wall covering. Page 17

18 1.20 Drawing Reference AD101, A101, and A102: Trim top of existing closet doors located in hallways (Typical of 6 pairs of doors). Top of existing closet doors shall align with adjacent windows and soffit. Refinish top of doors to match existing. Paint doors, color to be selected by Architect Drawing Reference AD101, A012, and A102: At rooms B5, D5, and F5 remove existing vinyl fabric finish on existing walls. Provide clean, straight and concealed edge on existing vinyl fabric to remain. Provide gypsum with painted finish Drawing Reference A101 and A401: Provide shelving shown in Work Room G18, as shown on A101. Refer to the revised A101 and A401 for additional information Drawing Reference A131 and A581: Revise vertical blade suspension hardware from individual suspended hardware to t-grid suspended ceiling system. Refer to revised detail C6 on the attached A581 sheet Drawing Reference M201, M301, M302, and M303: Point of Demolition and Point of Connection for duct work above wood hard lid ceiling has been revised. Refer to the attached M201, M301, M302, and M303 for new locations Drawing Reference P001: Sink model has been revised. Refer to attached P Drawing Reference E001, E102: TV outlet requirements have been revised. Refer to E001 and E102 attached Drawing Reference E101 and E102: District has provided new data cabling, coiled above the ceiling at the common areas. Route existing spare cabling in ceiling space above common areas to data locations shown on plans within the common areas Drawing Reference E101, E102: Remove and reinstall existing Wireless Access Points. Refer to E101 and E102 attached. Stone Creek ES 4.1 General Items: Contractor to remove and relocate three (3) existing trees where new relocatables are to be placed. Location to be selected by district. Contractor to cut, cap and reroute existing irrigation around new relocatables Contractor to remove and reinstall (E) fire alarm equipment displaced by demolition in same location. Contractor to test existing system after installation Contractor to patch and repair existing wall vinyl and/or tack wall surface located adjacent to new walls damaged during construction. Repair work to match existing Existing walls at hallways and classrooms are finished with existing wall covering. Patch, repair, and replace wall covering where it is affected by new work Carpet for patch will be provided by District, contractor to install. Contractor to provide new base, Roppe 6 rubber base to match existing. Page 18

19 4.1.6 New walls shown on plan to receive wall covering on both sides to match existing type and color. 4.9 Reference Sheet C2-4.1: Sheet C2-4.1 from Increment 2 is provided For Reference Only Reference Sheet AS-1.0: Cut back (E) carpet to install (N) wall and door. Prep floor to install carpet for patch from District stock Add demolition notes for fencing and landscape per attached Sketch ASK Reference Sheet ASD-1.0: Add new Drywell Detail 29 per attached Sketch ASK-4.2. Drywell to be located behind (2) new interim portables, pipes to drain to single drywell centered at rear of portables Reference Sheet A-1.1: Detail 8: a. Demo casework adjacent to Door 6A to the nearest full cabinet. b. Detail 8, relocate (E) light above door 04A into Room Detail 9, remove Window Type B. No sidelights to occur this project Detail 19: a. Classroom 7 ductwork requires penetration through wall. Contractor to provide framing at penetration, typical two (2) locations. b. Revise Detail callout at new window at Admin to be 9/- in lieu of 15/-. c. Revise (E) ramp new Boy s and Girl s Restrooms at Classrooms 10 and 11 to be (N), see new Details 21 & 22/AD-1.0 and 21, 22 & 26/AD-1.1 this addendum Reference Sheet AD-1.0: Add new Detail 21 per attached Sketch ASK Add new Detail 22 per attached Sketch ASK Reference Sheet AD-1.1: Omit Detail 4 in its entirety Replace Detail 14 per attached Sketch ASK Detail 20, interior finish for wall to be vinyl wall covering both sides, typical all locations. Color as selected by Architect to match existing Add new Detail 21 per attached Sketch ASK Add new Detail 22 per attached Sketch ASK Add new Detail 26 per attached Sketch ASK Reference Sheet E0.1: Page 19

20 Revise symbol list per attached revised Sheet E Reference Sheet E-1.0: Revise motion sensor shown in Classroom 5 to be in Resource Room, location to be coordinated in field Reference Sheet E-1.1: Remove screen at Library per attached revised Sheet E New outlets shown at whiteboards shall be installed below the whiteboard Reference Sheet E-1.2: Revise Electrical Floor Plan for relocatables and add Reference Note 10 per attached revised Sheet E Reference Sheet ES-1.1: Revise Electrical Site Plan per clouded areas of attached revised Sheet ES Reference New Sheet E-AV1: Add attached new Sheet E-AV1 in its entirety. V: CHANGES TO PRIOR ADDENDA None. VI: OTHER DOCUMENTS 1. See attached Addendum #4 (includes Attachments, Exhibits, Specifications, Sketches and Sheets) for College Park E.S., Greentree E.S. and Santiago Hills ES from Dougherty dated April 28, 2017 (also noted as (DSA Addendum #1). All items listed are also indicated throughout this addendum, numbering correlates with Architect s numbering of respective site addendum. 2. See attached Addendum #4 (includes Attachments, Exhibits, Specifications, Sketches and Sheets) for Bonita Canyon ES from Ruhnau, Ruhnau, Clarke dated May 1, All items listed are also indicated throughout this addendum, numbering correlates with Architect s numbering of respective addendum. 3. See attached Addendum #4 (includes Attachments, Exhibits, Specifications, Sketches and Sheets) for Culverdale ES from Ruhnau, Ruhnau, Clarke dated May 1, All items listed are also indicated throughout this addendum, numbering correlates with Architect s numbering of respective addendum. 4. See attached Addendum #4 (includes Attachments, Exhibits, Specifications, Sketches and Sheets) for Stone Creek ES from Ruhnau, Ruhnau, Clarke dated May 1, All items listed are also indicated throughout this addendum, numbering correlates with Architect s numbering of respective addendum. 5. See attached T&I Sheets for Bonita Canyon ES as issued in response to RBFI See attached T&I Sheets for Culverdale ES as issued in response to RFBI 014. Page 20

21 7. See attached T&I Sheets for Stone Creek ES as issued in response to RFBI 015. VII: PRE-BID QUESTIONS Bonita Canyon ES No. 1 Question: (CM s RFBI #003) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Existing Bench at Front of School - Please reference sheets AS-0.1 & AS-1.0; There is an existing bench at the front of the school, along the new 6" curb near the flag pole. Are we to remove and reinstall this bench? Answer: SEE ADDENDUM 4, ITEM NO No. 2 Question: (CM s RFBI #004) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Commons A, East Wall Removing - Please reference sheet AS-0.1; In commons A, along the east wall, are we just removing the glazing or should this keynote include the removal of the frame as well? Answer: SEE ADDENDUM 4, ITEM NO No. 3 Question: (CM s RFBI #005) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Commons C (South Elevation) - Demo Keynote for the Frame - Please reference sheet AS-0.1; At the south elevation in commons C room, should the demo keynote include the frame for this opening? Answer: SEE ADDENDUM 4, ITEM NO No. 4 Question: (CM s RFBI #006) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Commons B (East Elevation) - Key Notes - Please reference sheet AS-0.1; At the east elevation in commons B, are we just removing the glazing or should this keynote include the removal of the frame as well? Answer: SEE ADDENDUM 4, ITEM NO No. 5 Question: (CM s RFBI #007) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Sheet AS Detail of Space off the Library - The detail referenced for the collaboration space off the library should read 27/AD-1.0 in lieu of 21. Answer: SEE ADDENDUM 4, ITEM NO No. 6 Question: (CM s RFBI #008) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Sheet AD-1.0 Details 26 & 27- Library Wall Finish & Framing - 1. What is the wall finish on the library side of this wall? 2. There are no framing details referenced for this elevation. Answer: SEE ADDENDUM 4, ITEM NO No. 7 Question: (CM s RFBI #009) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - No Work in Restrooms - Please confirm that there is no work in the restrooms and the details and dimensions are provided for information only. Answer: REFER TO ENLARGED DETAILS ON AD-1.0 SHOWING THESE RESTROOMS ARE EXISTING. Page 21

22 No. 8 Question: (CM s RFBI #010) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Detail 1/A Door Frame 03E - 1. At the west end of new door frame 03E, how are we to attach to the existing hollow metal frame? 2. At frame 03E, a portion of the exterior soffit will need to be demolished and patched back in order to install the new frames. Answer: 1.REFER TO ASK 4.4 AND SEE ADDENDUM 4, ITEM NO No. 9 Question: (CM s RFBI #011) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Sheet AD-7.1 detail 2 - Fire Extinguisher's in Commons B and Classroom 7 - Are the Fire Extinguisher's shown in commons B and classroom 7 new or existing? If these are new, please provide call out and detail. Answer: COMMONS B IS NEW, REFER TO ADDENDUM NO. 3. CLASSROOM 7 IS EXISTING. ALVIN FLORES, RRC. No. 10 Question: (CM s RFBI #012) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Sheet E Elevations and Locations for T.V. Monitor's Electrical and Data Outlets - 1. Please provide elevations and locations for TV monitor electrical and data outlets and indicate if these are new or to pick up existing circuits and data drops. 2. There is also no HDMI boxes indicated. Will these be required? This is typical at all sites. Answer: all power/data/hdmi elevations please refer to our updated symbol list sheet, E-0.1 and E-AV1 sheet.04/26/2017 (Typical for all sites). Seth Mahdavian, FBA. No. 11 Question: (CM s RFBI #013) Ledesma & Meyer Construction Co., Inc. submitted 4/10/17 Bonita Canyon ES - Testing and Inspection Sheets - Please confirm Testing and Inspection Sheets are not required for these projects. LMCCI could not locate in DSA approved specs. Answer: T&I REQUIRED PER ATTACHED DSA APPROVED 103. ALVIN FLORES, RRC. No. 12 Question: (CM s RFBI #016) American Electric submitted 4/19/17 Bonita Canyon ES - Ground Fault Current Interrupter - There are (4) receptacles shown next to what appear to be sinks. Do these need to be Ground Fault Current Interrupter (GFCI)? Answer: The receptacles are all existing and they won't be touched or removed. Only their conduit routing would change from surface mounted to inside existing walls. FBA Engineering. No. 13 Question: (CM s RFBI #017) American Electric, submitted 4/19/17 Bonita Canyon ES - Receptacles and Wiremold - Please reference sheet E-1.0; Where new Receptacles and Wiremold are shown, are there existing circuits in these locations that are to be used or will they require new conduit and wire back to the panels? Does the Wiremold only feed receptacles or will it need to have data outlets as well? Answer: Both existing receptacles and data outlets will remain as is. Only a short distance of their surface mounted conduits will be re-routed to conduits inside the wall for both power and data outlets. Please refer to updated E-1.1 sheet. FBA Engineering. Page 22

23 No. 14 Question: (CM s RFBI #062) Ledesma & Meyer Construction Co., Inc. submitted 4/24/17 Bonita Canyon ES General Note Electrical drawings - 1. Need to indicate on the electrical drawings the following: a. Power and data for projectors with heights. b. Power and data for monitors with heights. c. HDMI connections, cables and routing locations and heights. Answer: Please refer to updated drawings for both Bonita Canyon and Culverdale. Seth Mahdavian, FBA. College Park ES No. 1 Question: (CM s RFBI #011) Ledesma & Meyer Construction Co., Inc., submitted 4/12/17 College Park ES - Sheet L001 and A001 - New Master Valve - The location of the new master valve, point of controller connection, does not match between the two (2) sheets. Please review and advise. Answer: Existing controller is located within the trash enclosure. Refer to Addendum #4 for additional information, and the revised L001. Malcolm Edwards, Dougherty. No. 2 Question: (CM s RFBI #012) Ledesma & Meyer Construction Co., Inc., submitted 4/12/17 College Park ES - Sheet AD101 - Both Interior Ramps - 1. The indication for the carpet to be removed on both interior ramps are not the same. For bidding purposes please make both darkened. 2. The indication for removal of carpet shown with diagonal lines is not called out on the legend. Answer: Existing Carpet shall be removed as shown on AD101 and where new floor finish is specified. Contractor to provide new carpet as shown on A121. Refer to Addendum #4 for additional information in regards to flooring finishes. Malcolm Edwards, Dougherty. No. 3 Question: (CM s RFBI #013) Ledesma & Meyer Construction Co., Inc., submitted 4/12/17 College Park ES - Sheet E001 and E301 - Cable T.V. - Is there Cable TV at these schools? Thought IUSD just wanted data and an HDMI pathway from TV to 18" AFF? Answer: O.F.C.I Monitors and brackets have been removed from scope of work. This includes outlets for power, TV, and data and associated wiring and conduit that are feeding the O.F.C.I monitors. Refer to addendum #4 for additional information. Malcolm Edwards, Dougherty. No. 4 Question: (CM s RFBI #017) American Electric, submitted 4/18/17 College Park ES - Sheet E003 - Panel Schedules for PC1, PC2, PC3, PC4 and PC5 - On the Single Line Diagram panels, PC1, PC2, PC3, PC4 and PC5 are shown as new and there are no panel schedules for these panels. Are these existing panels that come in the portables or are the panel schedules missing from the drawings? Answer: These panels are part of the modular building and will not be installed by the electrical contractor. Jonathan Bianchet, Design West Engineering. No. 5 Question: (CM s RFBI #020) Ledesma & Meyer Construction Co., Inc. submitted 4/20/17 College Park ES General Note Electrical drawings - 1. Need to indicate on the electrical drawings the following: a. Power and data for projectors Page 23

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

TELEPHONE: (215) Addendum No. 01

TELEPHONE: (215) Addendum No. 01 THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017 These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE: ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of

More information

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.: KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657 39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

SECTION WOOD DOORS

SECTION WOOD DOORS SECTION 08211 WOOD DOORS Notice to Vendors: CANV prefers to purchase products that contain tropical wood only if they are certified according to the guidelines of the Forest Stewardship Council (FSC).

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.: Addendum No.: 1 Date: 3/15/216 Project: Canyon ISD City View Elementary Additions Project No.: 15-48.1 From: To: Dekker/Perich/Sabatini 5 South Taylor St., Suite 75 Amarillo, TX 7911 All Prospective Bidders

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED DISTRICT, DESIGN AND ADDENDUM NO. PROJECT: ADA Site Improvements of April 0, 08 Upper Play Yard at Noriega EES 775 44 th -Avenue San Francisco, CA 94 SFUSD Project No. 004 OWNER:

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements. SECTION 12356 - CASEWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type. SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #

ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT # ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #13-046 10-23-2013 Bidders shall acknowledge receipt of this Addendum on the Bid Form, in the

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

B. The designated coverage areas shall include both indoor and outdoor coverage.

B. The designated coverage areas shall include both indoor and outdoor coverage. Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

NIAGARA REGIONAL HOUSING MZE FILE NO

NIAGARA REGIONAL HOUSING MZE FILE NO M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

B. Samples: For color, letter style, and graphic representation required for each identification material and device. PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative. ADDENDUM_04 1 page(s) I 1 project number CIN001 project name Cinemark XD12 Altoona, IA issue date December 16, 2013 venue > distribution Jeff Duffy EDC jduffy@edcweb.com Justin Couch VCC USA jcouch@vccusa.com

More information

SECTION PAINTS AND COATINGS

SECTION PAINTS AND COATINGS SECTION 09 90 00 PAINTS AND COATINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints and other coatings. 1.2 RELATED SECTIONS A. Division 05 - Metal Fabrications.

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information