1 JOB No.: CVR O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846
2 DRAWN : JG JOB No.: S-1 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846
3 JOB No.: S-2 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846
4 JOB No.: S-3 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846
5 SERIES 100 RACKING SYSTEM TYPICAL ROO LAYOUT - STANDARD LAG BOLT SPEC ASSUMES /16" LAG BOLTS WITH 2." EMBEDMENT IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16 " HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS RAIL CAN MOUNT TO EITHER SIDE O POST (UPSLOPE vs. DOWNSLOPE) - OR UNEVEN ROO SURACES, USE UP TO TWO LEVELING SPACERS PER L OOT OR STANDO. SEE DRAWING "STANDARD RAIL LEVELING" OR DETAILS AND LIMITATIONS SERIES 100 ON LASHED L-EET LASHED L-EET ARE OPTIMIZED OR QUICK AND ROBUST INSTALLATION ON STANDARD COMPOSITION SHINGLE ROO SURACES OR OTHER ROO TYPES STANDOS ARE RECOMMENDED ROO RATERS OR STRUCTURAL MEMBERS MODULE MID CLAMPS MODULE OVERHANG (NOT TO EXCEED 30% OR MANUACTURER'S RECOMMENDATIONS) STANDARD RAIL MODULE OVERHANG ROO RATER TYP (ROO ATTACHMENTS SHOULD ALWAYS BE EMBEDDED INTO ROO RATERS OR STRUCTURAL MEMBERS SUCH AS STEEL PURLINS) ROO SHEATHING, UNDERLAYMENT, AND ROOING MATERIAL, TYP. LASHED L-OOT S100 D SERIES 100 TYPICAL LAYOUT 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O DRATER: SERIES 100 OVERVIEW, ON LASHED L-EET S100 D01 SERIES 100 RACKING SYSTEM SHOWN MOUNTED ON STANDOS WITH TOP MOUNT END CLAMP MID CLAMP ASSEMBLY 12/02/1 RAIL STANDARD STANDARD RAIL SPLICE INSERT STANDARD RAIL SPLICE BASE STANDO CLAMP CHANNEL NUTS - STANDARD LAG BOLT SPEC ASSUMES /16" LAG BOLTS WITH 2." EMBEDMENT IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16 " HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS RAIL CAN MOUNT TO EITHER SIDE O POST (UPSLOPE vs. DOWNSLOPE) - OR UNEVEN ROO SURACES, USE UP TO TWO LEVELING SPACERS PER L OOT OR STANDO. SEE DRAWING "STANDARD RAIL LEVELING" OR DETAILS AND LIMITATIONS GAP RAILS 0.1"-0.1" OR THERMAL EXPANSION AT SPLICES RUBBER RAIN COLLAR 16" LAG BOLT WITH WASHER STANDO SHAT (VARIOUS SIZES) CENTER SPLICE ON RAIL GAP 1/4" ASSEMBLED SYSTEM (SOLAR MODUELS NOT SHOWN) STANDO BASE STANDARD 1-HOLE SYSTEM SHOWN WITH STANDO MOUNTING COMPATIBLE WITH ALL ROO TYPES USE LASHED L OOT OR ASTER INSTALLATION ON COMPOSITION SHINGLE ROOS 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O G.McPheeters DRATER: D.Ryan G.McPheeters S100 D04 12/02/1 STANDARD RAIL SERIES 100 TILT KITS 0-1 DEG 12/02/1 - LAG BOLTS MUST EMBED IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16" HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS CHANNEL NUT STANDO CLAMP - RAILS CAN MOUNT TO EITHER SIDE O POST (UPSLOPE VS. DOWNSLOPE) RUBBER RAIN COLLAR INSTALLS OVER TOP O LASHING - RAILS CAN BE LEVELED UP TO 3" USING UP TO TWO LEVELING SPACERS AS SHOWN IN DRAWING S100 D07 "SERIES 100 HD STANDO LEVELING" STANDO SHAT HD (VARIOUS SIZES INCLUDING 7, 9., 12, AND 18" SHATS) 16" LAG SCREW IS TYPICAL OR SECURING STANDO BASE TO ROO RATER, 2." MIN EMBEDMENT INTO RATER TYP. STANDO BASE HD, 6-HOLE LASH POST WITH STANDARD GALVANIZED STEEL OR DEAD SOT ALUMINUM ROO LASHING OR 1" DIAMETER VENT PIPE. A POURED SEALANT-STYLE LASHING MAY BE USED WITH STANDOS AS AN ALTERNATIVE TO A TYPICAL CONE LASHING WHEN INSTALLED PER MANUACTURER'S INSTRUCTIONS ON LOW-SLOPE ROO SURACES OAM INSULATION, TYP. JENSEN BEACH, LORIDA DRATER: THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O PROPOSED PLANS OR: DAVEY RESIDENCE 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) "RAIL END OVERHANG" (NOT TO EXCEED 34% O ACCEPTABLE RAIL SPAN) N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No "RAIL SPAN" DISTANCE BETWEEN ROO ATTACHMENTS SEAL PENETRATION AND UNDER BASE WITH APPROPRIATE ROO SEALANT I 2 LAG SCREWS ARE USED, LOCATE SCREWS IN OPPOSITE CENTER HOLES ON BASE ROO RATER OR STRUCTURAL MEMBER ROO DECKING TYP. HD STANDOS ARE OTEN USED WITH OAM ROO INSULATION STANDO MOUNTING POINT OR USE ON ALL ROO SURACES 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O DRATER: DRAWN : JG S100 PEN D08 12/02/1 PEN DETAIL 08, HD STANDO JOB No.: S-4 O 1 S
INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01
MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15
MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationPV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack
More informationSeries 100 Roof Mount
Series 100 Roof Mount Code Compliant Installation Manual 2011 Table of Contents 1. INTRODUCTION...3 1.1 OVERVIEW OF THE SNAPNRACK SYSTEM...3 1.2 OVERVIEW OF THIS MANUAL...4 1.3 YOUR RESPONSIBILITY AS INSTALLER...4
More informationPV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack
More informationFlush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing
Flush Mount Kit SunEarth Flush Mount Kit Installation Manual Thank you for purchasing the SunEarth flush mount kit. The flush mount kit (MTG-EC-FM) is our simplest and least expensive mounting system.
More informationFlush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing
Flush Mount SunEarth Flush Mount Installation Manual Thank you for choosing the SunEarth flush mount method. It provides a strong durable solution for mounting SunEarth collectors parallel to the roof
More informationPatented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs
Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF Quick Rack Components & Tools Components are pre-assembled and ready for installation right
More informationSolarMount (E)volution
SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 1. ATTACH BASES 3 2. PLACE RAILS 3 3. SECURE LUG 4 4. CLAMP MODULES 4 EXPANSION
More informationSolar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System
Solar Mounting Solutions Series 100 Residential Roof Mount System Installation Manual 2703 Listed PV Mounting System An Intro to SnapNrack Series 100 SnapNrack Series 100 PV Mounting System offers a low
More informationSolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY
SolarMount-I INSTALLATION MANUAL 2011 by Unirac, Inc. All rights reserved. Pub 110518-1ii, May 2011 A HILTI GROUP COMPANY R 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac Inc.
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL CONTENTS DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 0. ATTACH BASES 3 1. PLACE RAILS 3 2. SECURE LUG 4 3. CLAMP MODULES 4 EXPANSION
More informationInstallation Instructions for Solar Snow Pad (SSP-T-3)
Installation Instructions for Solar Snow Pad (SSP-T-3) Warning- Do not use this product on solar arrays where the calculated array snow loads exceed 50 pounds per square foot (psf). Most solar panels are
More informationSRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted
SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted 509 West Monroe Street Highland, IL 62249 Phone: (618) 654-2184 Fax: (618) 654-9199 Tools Needed For Installation 1. ¾
More informationMTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.
MTS-ACB RENOGY Photovoltaic Module Adjustable Curved Bracket 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual
More informationMTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.
MTS-ZB RENOGY Photovoltaic Module Z-Bracket Mounting System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual
More informationSolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List
APPLICATION: The product line provides an easy -to-install and economical solution for a 5, 10 or 15 degree tilted roof mounted system. integrates with Professional Solar s (ProSolar) patented top-down
More informationCatalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V020
Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V020 Copyright 2018 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to
More informationPV MOUNTING SYSTEM INSTALLATION MANUAL
PV MOUNTING SYSTEM INSTALLATION MANUAL The ROOF TRAC PV mounting system makes the installation of PV modules for rooftop installations easy, safe and attractive. The patented (pat #6,360,491) PV support
More informationEmpire & SunWise Collectors. Imperial Collectors. Copperheart ICS (asphalt shingles)
Standoff Mounting Standoff mounting is the simplest and most cost effective way to install SunEarth solar collectors on sloped roof surfaces. Standoff mounting components are designed to lift the collectors
More informationRoof Attachment Overview
Roof Attachment Overview MY STORY Brandon Gwinner Account Executive OUR RACKING SOLUTIONS - Construction and Sales for over 15 years - SunModo brand representative for over 5 years - OSEIA board of Directors
More informationRayport G Eco Ballasted
Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener
More informationRoof Mount Ground Mount Specialised Clamps Spares Application Notes
DPA Solar Racking Solutions Solar PV Racking Catalogue Roof Mount Ground Mount Specialised Clamps Spares Application Notes www.dpasolar.com.au 1300 447 500 Rails & Splices Page 3 Mid & End Clamps Page
More informationCatalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V016
Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V016 Copyright 2018 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to
More informationSolarMount-I INSTALLATION MANUAL
SolarMount-I INSTALLATION MANUAL 2010 by Unirac, Inc. All rights reserved. Pub 100621-1ii, June 2010 R A HILTI GROUP COMPANY 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac
More informationCatalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V013
Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V013 Copyright 2017 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to
More informationDouble Beam Freestanding Pergola Installation Guide
Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and
More informationGeneral Array Layout Sketch
General Array Layout Sketch Cold TO Panels Hot FROM Panels OR Cold TO Panels Hot FROM Panels 1 Introduction This document describes how to install EZ series panels. The EZ series panels are designed to
More informationROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL
: p: (800) 284-1412 f: (903) 759-3598 www.lmcurbs.com 827 fisher rd longview, tx 75604 Installation Check List: Attach Sub-Frames Layout Curb on Back-up Channels Apply Sealants & Set Curb in Place Fasten
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-7 3. Tool List.... P8 4. Assembly.... P9-19 www.aetenergy.com Supporting a Cleaner, Greener Tomorrow
More informationCSS Central Mount System
CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning
More informationBLACK WIDOW COMPOSITE
PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL
More informationInstalling Quick Mount PV Products on. Metal Shingle Roofs RESPECT THE ROOF
Installing Quick Mount PV Products on Metal Shingle Roofs RESPECT THE ROOF Getting Started Steel Shingle Roofing Flashing Method and Product Type Terminology Flashing QBase Mount Interlocking Steel Shingle
More informationSteep-Slope ApplicAtionS
Steep-Slope ApplicAtionS GreenFasten GF1 PRODUCT GUIDE Exploded Product View/B.O.M. 1 Installation Instructions 2 Cut Sheets 3 Specifications 4 Test Data 5 Price List 6 Exploded Product View, Bill of Materials
More information2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2
Level Railing Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster Connectors installed)
More information1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.
AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance
More informationTransmission Line Support Systems
Antenna Support Bracket for transmission line The Antenna Support Bracket angle mounts directly to a 4-1/2" (114 mm) OD antenna pipe mount or tower leg. This is ideal for supporting transmission line runs
More informationLevel Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M
Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster
More informationTable of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1
Table of Contents DECRA Tile & Shake Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheets... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment... 4 Deck Preparation....
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:
More informationUPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.
PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationInstallation Manual for The Asphalt/Bitumen Shingle Roof Hook System
Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System (F-IMG-1534-SolNV) Installation of Asphalt/Bitumen Shingle Roof Hook System Installing Rail / Purlin System Installing Cross Rail System
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationAssembly Instructions for 12x16 Floating Dock
Assembly Instructions for 12x16 Floating Dock www.rollingbarge.com Congratulations on the purchase of your Floating Dock kit. This kit includes all the aluminum frame parts, and all the fasteners. You
More information1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.
AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity 224 224 modules at 325W
More information28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount
28" Adjustable Solar Tilt Mount ADJ-28 Owner's Manual Please read this manual BEFORE installing your solar tilt mount SECTION 1 Introduction Mounting your solar panel inclined to an optimized angle with
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationPole Mount Installation Manual
Pole Mount Installation Manual Thank You for Choosing AIMS Power! 1. AIMS Power is a leading supplier of solar products, specializing in PV mounting systems. We ensure our products are manufactured to
More informationINSTALLATION MANUAL v. 1.0
INSTALLATION MANUAL v. 1.0 2009 by Unirac, Inc. All rights reserved. Pub 090501-1ii, May 2009 www.clicksys-beam.com IMPORTANT! Unirac Inc. makes no warranty of any kind with regard to this material, including,
More informationAssembly Book. 10' x 16' the Cambridge II. revised July 15, 2014
Assembly Book revised July 15, 2014 the Cambridge II 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the
More informationinstallation guide Villa
installation guide Villa Table of Contents Introduction............................. 2 Safety................................... 2 Tools.................................... 2 Codes & Requirements....................
More informationPost & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS
Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM
More informationTREX PERGOLA INSTALLATION INSTRUCTIONS
RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket
More informationDEEP-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY
DEEP-DECK PANEL INSTALLATION DETAILS 800-669-0009 www.berridge.com INDEX INDEX INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INTRODUCTION TO TYPICAL
More informationOutline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions
www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical
More informationATLANTIS RAIL Contact Information
ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing
More informationSIGN MOUNTED BEACON SIG-027-A SINGLE SIGN MOUNTED FLASHING BEACON INSTALLED ON ONE WOOD POST DETAIL "A-1"
1 1/2" x 60" Galvanized (thread both ends) Top Bolt See Detail "A-1" and Slotted Channel Parallel Conduit Clamp Warning Sign 3 Equal Bolt Spacings (3 places at 12" min. spacing) (1) 3/8"x 7" min. (4"x
More informationChiko Flat Pitched roof installation roof installation Guide Gui
Mounting Systems Tilt Kit Installation Guide Table of Contents Part I. Preparing.. 2-6 Part II. Feature of the Rail and the Module 6-8 Part III. Planning the array laylout... 9 Part IV. Installation instruction.
More informationYUKON PATIO COVER INSTALLATION INSTRUCTIONS
YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm
More informationSolarRoofHook CATALOG. (844) A DIVISION OF QUICKSCREWS INTERNATIONAL CORP.
SolarRoofHook A DIVISION OF QUICKSCREWS INTERNATIONAL CORP. 2018 CATALOG Low Profile QuickBOLT with Microflashing. See page 7. Take a look inside at SolarRoofHook s innovative solar mounting solutions
More informationVerge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip
Tolerance Detail (recommended) Verge Closure Verge Channel Verge Clip Verge Flashing VERGE CHANNEL RIVETTED TO EUROSEAM AT APPROX 400MM CENTRES USING 4.8 X 12MM RIVETS. NB: DO NOT RIVET AT HALTER POSITION
More informationExtrusions POLYLOCK ATTACHING EXTRUSIONS
Extrusions POLYLOCK ATTACHING EXTRUSIONS ITEM # DESCRIPTION USES 1001 Aluminum Girt 16 lengths Used in metal end packages and sidewalls as horizontal members. Requires girt/baseboard splice (#1000). 1000
More informationINSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM
SIX INCH ALPHA MODULE INSTALLATION KEWAUNEE SCIENTIFIC CORPORATION SIX INCH ALPHA MODULE ANCHORING SYSTEM After Alpha module has been set in desired location. Adjust the four adjustment bolts until the
More informationAdjustable Mounting System Installation Manual
Adjustable Mounting System Installation Manual Thank You For Choosing Hopergy! Why Hopergy 1. Hopergy is a professional supplier, specialising in PV mounting systems. We have experienced engineers and
More informationEkoroof LiteTile Dimensions
Ekoroof LiteTile Dimensions 7 3 3.5 Height 40 Width 20 Length Weight per Panel: 3 kg / 6.61 lbs 2 2 Area per panel 800 in / 5.55 ft 2 Panels per Square: 20 (including overlap, for a 100 ft covered area)
More informationPlease be sure to read this manual before using the product.
ANGLE HEAD UNIVERSAL TYPE AGU30 OPERATION MANUAL Please be sure to read this manual before using the product. Consult the separate operation manual for Angle Head also regarding the general handling of
More informationMOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET
CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).
More informationAssembly Instructions
Section A Interna-Rail Components Handrail systems utilizing Interna-Rail in-line fittings provide a sleek architectural finish with anodized fittings and aluminum pipe. Interna- Rail has the clean look
More informationBig Block Installation Manual For Systems without A/C
Big Block Installation Manual For Systems without A/C Billet Specialties, Inc. 500 Shawmut Ave. La Grange, IL 60526 Tech Line (708) 588-0505 Fax (708) 588-7181 Hardware List For Chevrolet Big Block Tru
More informationGROUND MOUNTING SYSTEM INSTALLATION MANUAL
GROUND MOUNTING SYSTEM INSTALLATION MANUAL JIANGYIN TITANERGY CO.,LTD APRIL 2016, RE V 1 Using the special splice kits to connect Titan Solar's aluminium HD rail makes installation easier,more flexible
More informationProject A. AC Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips. For
Project 16-258A AC286-12 Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips For EcoFasten Solar 4741 W. Polk Street, Suite 4 Pheonix, AZ 85043 PFS Corporation dba PFS TECO Cottage Grove Laboratory
More informationResidential & Industrial Fence
Residential & Industrial Fence Assembly Instructions CONTENTS 02: OVERVIEW & CONTENTS 03: PRODUCT SPECIFICATIONS 04: GETTING STARTED 05: WALL ATTACHMENT & LINE POST ASSEMBLY 06: CORNER POST ASSEMBLY 07:
More informationSunPower Installation Manual
SunPower SF System Planning and Assembly SunPower SUNPOWER CORPORATION WWW.SUNPOWERCORP.COM Pub #101001-SP2 October 2010 - Rev. 8 2010 by SunPower, Corp All rights reserved. Part I. Scope, components,
More informationINDEX PAGE RELEASE SECTION NUMBER DATE
INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001
More informationTREX POST MOUNT DECKING AND CONCRETE
TREX POST MOUNT DECKING AND CONCRETE for Pressure-treated Wood Framing LOCATION AND INSTALLATION OF POST MOUNTS IMPORTANT NOTES:» EACH POST MUST BE ATTACHED AS SHOWN TO ENSURE A CODE COMPLIANT AND SAFE
More informationMI: (Secure this number someplace, for possible future need) SPECIFICATIONS:
6C ASSEMBLY INSTRUCTIONS ANTENNA MODEL T6 MI: 030927 (Secure this number someplace, for possible future need) SPECIFICATIONS: FORWARD GAIN 5.1 dbd F:B RATIO 15-25 db (Rises with frequency) FREQUENCY COVERAGE
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationDoor Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:
Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around
More informationAWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS
INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8
More informationorientation Conergy SunTop Instructions for professional installation
On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation
More informationInstallation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)
www.trasnowandsun.com S Installation Manual FLUSH MOUNT - Shingle, Slate,etc. At TRA Snow and Sun we engineer and layout each project upon request free of charge. Just give us the project details and we
More informationUnirac Installation Manual
Tile Roof Hook Universal Mount Unirac R Pub 120803-1ii August 2012 A HILTI GROUP COMPANY Unirac welcomes input concerning the accuracy and user-friendliness of this publication. Please write to publications@unirac.com.
More informationInstallation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products
Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products Warning- Do not use this product on solar arrays where the ground snow loads exceed 50 pounds per square foot (psf).
More informationHIGH RISE Portable Restroom Assembly Instructions
HIGH RISE Portable Restroom Assembly Instructions 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 / Fax: 763-553-1905 800-328-3332/ www.satelliteindustries.com PN 20930 REV C 8/16
More informationPergola Installation Guide. When only the best will do.
Pergola Installation Guide When only the best will do. Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) 5 /8" Drill Bit 5 /16" Magnetic Driver
More informationPergola Installation Guide
Pergola Installation Guide When only the best will do. 1 Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) ½" Drill Bit 5 /8" Drill Bit 5 /16"
More informationCable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue
ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com
More informationFortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS
Fortress Railing Overview 4 3 1 Fe 26 Iron Railing Systems Fortress Use the steps below for the following pages to complete your rail Vertical Cable and Glass Options Available Fortress Iron Railing System
More informationOriginally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019
SUNMODO CORPORATION 14800 NE 65 th Street Vancouver, WA 98682 SUNMODO EZ ROOF MOUNT L-FOOT KITS FOR SHINGLE ROOFS CSI Section: 06 25 23 Wood, Plastic, and Composite Fastenings 07 71 00-Roof Specialties
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationInstallation and Maintenance Manual
Installation and Maintenance Manual IM770 Group: pplied ir Part Number: IM770 Date: pril 2003 Roof Curb for Skyline TM Outdoor ir Handlers 2013 Daikin pplied IM 770 Page 1 Table of Contents General Description...
More informationS-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY
S-DECK PANEL INSTALLATION DETAILS MANUACTURING 800-669-0009 www.berridge.com INDEX INDEX INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INTRODUCTION
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More information