1 JOB No.: CVR O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846

2 DRAWN : JG JOB No.: S-1 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846

3 JOB No.: S-2 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846

4 JOB No.: S-3 O 1 S PROPOSED PLANS OR: DAVEY RESIDENCE JENSEN BEACH, LORIDA N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No. 7846

5 SERIES 100 RACKING SYSTEM TYPICAL ROO LAYOUT - STANDARD LAG BOLT SPEC ASSUMES /16" LAG BOLTS WITH 2." EMBEDMENT IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16 " HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS RAIL CAN MOUNT TO EITHER SIDE O POST (UPSLOPE vs. DOWNSLOPE) - OR UNEVEN ROO SURACES, USE UP TO TWO LEVELING SPACERS PER L OOT OR STANDO. SEE DRAWING "STANDARD RAIL LEVELING" OR DETAILS AND LIMITATIONS SERIES 100 ON LASHED L-EET LASHED L-EET ARE OPTIMIZED OR QUICK AND ROBUST INSTALLATION ON STANDARD COMPOSITION SHINGLE ROO SURACES OR OTHER ROO TYPES STANDOS ARE RECOMMENDED ROO RATERS OR STRUCTURAL MEMBERS MODULE MID CLAMPS MODULE OVERHANG (NOT TO EXCEED 30% OR MANUACTURER'S RECOMMENDATIONS) STANDARD RAIL MODULE OVERHANG ROO RATER TYP (ROO ATTACHMENTS SHOULD ALWAYS BE EMBEDDED INTO ROO RATERS OR STRUCTURAL MEMBERS SUCH AS STEEL PURLINS) ROO SHEATHING, UNDERLAYMENT, AND ROOING MATERIAL, TYP. LASHED L-OOT S100 D SERIES 100 TYPICAL LAYOUT 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O DRATER: SERIES 100 OVERVIEW, ON LASHED L-EET S100 D01 SERIES 100 RACKING SYSTEM SHOWN MOUNTED ON STANDOS WITH TOP MOUNT END CLAMP MID CLAMP ASSEMBLY 12/02/1 RAIL STANDARD STANDARD RAIL SPLICE INSERT STANDARD RAIL SPLICE BASE STANDO CLAMP CHANNEL NUTS - STANDARD LAG BOLT SPEC ASSUMES /16" LAG BOLTS WITH 2." EMBEDMENT IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16 " HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS RAIL CAN MOUNT TO EITHER SIDE O POST (UPSLOPE vs. DOWNSLOPE) - OR UNEVEN ROO SURACES, USE UP TO TWO LEVELING SPACERS PER L OOT OR STANDO. SEE DRAWING "STANDARD RAIL LEVELING" OR DETAILS AND LIMITATIONS GAP RAILS 0.1"-0.1" OR THERMAL EXPANSION AT SPLICES RUBBER RAIN COLLAR 16" LAG BOLT WITH WASHER STANDO SHAT (VARIOUS SIZES) CENTER SPLICE ON RAIL GAP 1/4" ASSEMBLED SYSTEM (SOLAR MODUELS NOT SHOWN) STANDO BASE STANDARD 1-HOLE SYSTEM SHOWN WITH STANDO MOUNTING COMPATIBLE WITH ALL ROO TYPES USE LASHED L OOT OR ASTER INSTALLATION ON COMPOSITION SHINGLE ROOS 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O G.McPheeters DRATER: D.Ryan G.McPheeters S100 D04 12/02/1 STANDARD RAIL SERIES 100 TILT KITS 0-1 DEG 12/02/1 - LAG BOLTS MUST EMBED IN ROO STRUCTURAL MEMBERS/RATERS - TORQUE ALL 16" HARDWARE TO THE OLLOWING: - SILVER S.S T-LBS - BLACK S.S. 7-9 T-LBS CHANNEL NUT STANDO CLAMP - RAILS CAN MOUNT TO EITHER SIDE O POST (UPSLOPE VS. DOWNSLOPE) RUBBER RAIN COLLAR INSTALLS OVER TOP O LASHING - RAILS CAN BE LEVELED UP TO 3" USING UP TO TWO LEVELING SPACERS AS SHOWN IN DRAWING S100 D07 "SERIES 100 HD STANDO LEVELING" STANDO SHAT HD (VARIOUS SIZES INCLUDING 7, 9., 12, AND 18" SHATS) 16" LAG SCREW IS TYPICAL OR SECURING STANDO BASE TO ROO RATER, 2." MIN EMBEDMENT INTO RATER TYP. STANDO BASE HD, 6-HOLE LASH POST WITH STANDARD GALVANIZED STEEL OR DEAD SOT ALUMINUM ROO LASHING OR 1" DIAMETER VENT PIPE. A POURED SEALANT-STYLE LASHING MAY BE USED WITH STANDOS AS AN ALTERNATIVE TO A TYPICAL CONE LASHING WHEN INSTALLED PER MANUACTURER'S INSTRUCTIONS ON LOW-SLOPE ROO SURACES OAM INSULATION, TYP. JENSEN BEACH, LORIDA DRATER: THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O PROPOSED PLANS OR: DAVEY RESIDENCE 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) "RAIL END OVERHANG" (NOT TO EXCEED 34% O ACCEPTABLE RAIL SPAN) N.E. 4th. Ave. North Miami Beach, l Tel: (30) jgarcia.pe@outlook.com LA. P.E. Licence No "RAIL SPAN" DISTANCE BETWEEN ROO ATTACHMENTS SEAL PENETRATION AND UNDER BASE WITH APPROPRIATE ROO SEALANT I 2 LAG SCREWS ARE USED, LOCATE SCREWS IN OPPOSITE CENTER HOLES ON BASE ROO RATER OR STRUCTURAL MEMBER ROO DECKING TYP. HD STANDOS ARE OTEN USED WITH OAM ROO INSULATION STANDO MOUNTING POINT OR USE ON ALL ROO SURACES 77 IERO LANE, SUITE 200 SAN LUIS OBISPO, CA USA PHONE (80) AX (80) THE INORMATION IN THIS DRAWING IS CONIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREO IS PROHIBITED WITHOUT THE WRITTEN CONSENT O DRATER: DRAWN : JG S100 PEN D08 12/02/1 PEN DETAIL 08, HD STANDO JOB No.: S-4 O 1 S

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01 MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood

More information

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15 MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood

More information

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack

More information

Series 100 Roof Mount

Series 100 Roof Mount Series 100 Roof Mount Code Compliant Installation Manual 2011 Table of Contents 1. INTRODUCTION...3 1.1 OVERVIEW OF THE SNAPNRACK SYSTEM...3 1.2 OVERVIEW OF THIS MANUAL...4 1.3 YOUR RESPONSIBILITY AS INSTALLER...4

More information

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack

More information

Flush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing

Flush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing Flush Mount Kit SunEarth Flush Mount Kit Installation Manual Thank you for purchasing the SunEarth flush mount kit. The flush mount kit (MTG-EC-FM) is our simplest and least expensive mounting system.

More information

Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing

Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing Flush Mount SunEarth Flush Mount Installation Manual Thank you for choosing the SunEarth flush mount method. It provides a strong durable solution for mounting SunEarth collectors parallel to the roof

More information

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF Quick Rack Components & Tools Components are pre-assembled and ready for installation right

More information

SolarMount (E)volution

SolarMount (E)volution SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution

More information

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 1. ATTACH BASES 3 2. PLACE RAILS 3 3. SECURE LUG 4 4. CLAMP MODULES 4 EXPANSION

More information

Solar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System

Solar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System Solar Mounting Solutions Series 100 Residential Roof Mount System Installation Manual 2703 Listed PV Mounting System An Intro to SnapNrack Series 100 SnapNrack Series 100 PV Mounting System offers a low

More information

SolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY

SolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY SolarMount-I INSTALLATION MANUAL 2011 by Unirac, Inc. All rights reserved. Pub 110518-1ii, May 2011 A HILTI GROUP COMPANY R 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac Inc.

More information

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL CONTENTS DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 0. ATTACH BASES 3 1. PLACE RAILS 3 2. SECURE LUG 4 3. CLAMP MODULES 4 EXPANSION

More information

Installation Instructions for Solar Snow Pad (SSP-T-3)

Installation Instructions for Solar Snow Pad (SSP-T-3) Installation Instructions for Solar Snow Pad (SSP-T-3) Warning- Do not use this product on solar arrays where the calculated array snow loads exceed 50 pounds per square foot (psf). Most solar panels are

More information

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted 509 West Monroe Street Highland, IL 62249 Phone: (618) 654-2184 Fax: (618) 654-9199 Tools Needed For Installation 1. ¾

More information

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1. MTS-ACB RENOGY Photovoltaic Module Adjustable Curved Bracket 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual

More information

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1. MTS-ZB RENOGY Photovoltaic Module Z-Bracket Mounting System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual

More information

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List APPLICATION: The product line provides an easy -to-install and economical solution for a 5, 10 or 15 degree tilted roof mounted system. integrates with Professional Solar s (ProSolar) patented top-down

More information

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V020

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V020 Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V020 Copyright 2018 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to

More information

PV MOUNTING SYSTEM INSTALLATION MANUAL

PV MOUNTING SYSTEM INSTALLATION MANUAL PV MOUNTING SYSTEM INSTALLATION MANUAL The ROOF TRAC PV mounting system makes the installation of PV modules for rooftop installations easy, safe and attractive. The patented (pat #6,360,491) PV support

More information

Empire & SunWise Collectors. Imperial Collectors. Copperheart ICS (asphalt shingles)

Empire & SunWise Collectors. Imperial Collectors. Copperheart ICS (asphalt shingles) Standoff Mounting Standoff mounting is the simplest and most cost effective way to install SunEarth solar collectors on sloped roof surfaces. Standoff mounting components are designed to lift the collectors

More information

Roof Attachment Overview

Roof Attachment Overview Roof Attachment Overview MY STORY Brandon Gwinner Account Executive OUR RACKING SOLUTIONS - Construction and Sales for over 15 years - SunModo brand representative for over 5 years - OSEIA board of Directors

More information

Rayport G Eco Ballasted

Rayport G Eco Ballasted Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener

More information

Roof Mount Ground Mount Specialised Clamps Spares Application Notes

Roof Mount Ground Mount Specialised Clamps Spares Application Notes DPA Solar Racking Solutions Solar PV Racking Catalogue Roof Mount Ground Mount Specialised Clamps Spares Application Notes www.dpasolar.com.au 1300 447 500 Rails & Splices Page 3 Mid & End Clamps Page

More information

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V016

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V016 Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V016 Copyright 2018 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to

More information

SolarMount-I INSTALLATION MANUAL

SolarMount-I INSTALLATION MANUAL SolarMount-I INSTALLATION MANUAL 2010 by Unirac, Inc. All rights reserved. Pub 100621-1ii, June 2010 R A HILTI GROUP COMPANY 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac

More information

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V013

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V013 Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V013 Copyright 2017 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to

More information

Double Beam Freestanding Pergola Installation Guide

Double Beam Freestanding Pergola Installation Guide Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and

More information

General Array Layout Sketch

General Array Layout Sketch General Array Layout Sketch Cold TO Panels Hot FROM Panels OR Cold TO Panels Hot FROM Panels 1 Introduction This document describes how to install EZ series panels. The EZ series panels are designed to

More information

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL : p: (800) 284-1412 f: (903) 759-3598 www.lmcurbs.com 827 fisher rd longview, tx 75604 Installation Check List: Attach Sub-Frames Layout Curb on Back-up Channels Apply Sealants & Set Curb in Place Fasten

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-7 3. Tool List.... P8 4. Assembly.... P9-19 www.aetenergy.com Supporting a Cleaner, Greener Tomorrow

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

BLACK WIDOW COMPOSITE

BLACK WIDOW COMPOSITE PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL

More information

Installing Quick Mount PV Products on. Metal Shingle Roofs RESPECT THE ROOF

Installing Quick Mount PV Products on. Metal Shingle Roofs RESPECT THE ROOF Installing Quick Mount PV Products on Metal Shingle Roofs RESPECT THE ROOF Getting Started Steel Shingle Roofing Flashing Method and Product Type Terminology Flashing QBase Mount Interlocking Steel Shingle

More information

Steep-Slope ApplicAtionS

Steep-Slope ApplicAtionS Steep-Slope ApplicAtionS GreenFasten GF1 PRODUCT GUIDE Exploded Product View/B.O.M. 1 Installation Instructions 2 Cut Sheets 3 Specifications 4 Test Data 5 Price List 6 Exploded Product View, Bill of Materials

More information

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2 Level Railing Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster Connectors installed)

More information

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking. AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance

More information

Transmission Line Support Systems

Transmission Line Support Systems Antenna Support Bracket for transmission line The Antenna Support Bracket angle mounts directly to a 4-1/2" (114 mm) OD antenna pipe mount or tower leg. This is ideal for supporting transmission line runs

More information

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster

More information

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1 Table of Contents DECRA Tile & Shake Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheets... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment... 4 Deck Preparation....

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F. PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL

More information

May 14, Installation Manual

May 14, Installation Manual May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012

More information

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System (F-IMG-1534-SolNV) Installation of Asphalt/Bitumen Shingle Roof Hook System Installing Rail / Purlin System Installing Cross Rail System

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

Assembly Instructions for 12x16 Floating Dock

Assembly Instructions for 12x16 Floating Dock Assembly Instructions for 12x16 Floating Dock www.rollingbarge.com Congratulations on the purchase of your Floating Dock kit. This kit includes all the aluminum frame parts, and all the fasteners. You

More information

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity 224 224 modules at 325W

More information

28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount

28 Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount 28" Adjustable Solar Tilt Mount ADJ-28 Owner's Manual Please read this manual BEFORE installing your solar tilt mount SECTION 1 Introduction Mounting your solar panel inclined to an optimized angle with

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

Pole Mount Installation Manual

Pole Mount Installation Manual Pole Mount Installation Manual Thank You for Choosing AIMS Power! 1. AIMS Power is a leading supplier of solar products, specializing in PV mounting systems. We ensure our products are manufactured to

More information

INSTALLATION MANUAL v. 1.0

INSTALLATION MANUAL v. 1.0 INSTALLATION MANUAL v. 1.0 2009 by Unirac, Inc. All rights reserved. Pub 090501-1ii, May 2009 www.clicksys-beam.com IMPORTANT! Unirac Inc. makes no warranty of any kind with regard to this material, including,

More information

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014 Assembly Book revised July 15, 2014 the Cambridge II 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

installation guide Villa

installation guide Villa installation guide Villa Table of Contents Introduction............................. 2 Safety................................... 2 Tools.................................... 2 Codes & Requirements....................

More information

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM

More information

TREX PERGOLA INSTALLATION INSTRUCTIONS

TREX PERGOLA INSTALLATION INSTRUCTIONS RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket

More information

DEEP-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY

DEEP-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY DEEP-DECK PANEL INSTALLATION DETAILS 800-669-0009 www.berridge.com INDEX INDEX INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INTRODUCTION TO TYPICAL

More information

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

SIGN MOUNTED BEACON SIG-027-A SINGLE SIGN MOUNTED FLASHING BEACON INSTALLED ON ONE WOOD POST DETAIL "A-1"

SIGN MOUNTED BEACON SIG-027-A SINGLE SIGN MOUNTED FLASHING BEACON INSTALLED ON ONE WOOD POST DETAIL A-1 1 1/2" x 60" Galvanized (thread both ends) Top Bolt See Detail "A-1" and Slotted Channel Parallel Conduit Clamp Warning Sign 3 Equal Bolt Spacings (3 places at 12" min. spacing) (1) 3/8"x 7" min. (4"x

More information

Chiko Flat Pitched roof installation roof installation Guide Gui

Chiko Flat Pitched roof installation roof installation Guide Gui Mounting Systems Tilt Kit Installation Guide Table of Contents Part I. Preparing.. 2-6 Part II. Feature of the Rail and the Module 6-8 Part III. Planning the array laylout... 9 Part IV. Installation instruction.

More information

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm

More information

SolarRoofHook CATALOG. (844) A DIVISION OF QUICKSCREWS INTERNATIONAL CORP.

SolarRoofHook CATALOG.   (844) A DIVISION OF QUICKSCREWS INTERNATIONAL CORP. SolarRoofHook A DIVISION OF QUICKSCREWS INTERNATIONAL CORP. 2018 CATALOG Low Profile QuickBOLT with Microflashing. See page 7. Take a look inside at SolarRoofHook s innovative solar mounting solutions

More information

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip Tolerance Detail (recommended) Verge Closure Verge Channel Verge Clip Verge Flashing VERGE CHANNEL RIVETTED TO EUROSEAM AT APPROX 400MM CENTRES USING 4.8 X 12MM RIVETS. NB: DO NOT RIVET AT HALTER POSITION

More information

Extrusions POLYLOCK ATTACHING EXTRUSIONS

Extrusions POLYLOCK ATTACHING EXTRUSIONS Extrusions POLYLOCK ATTACHING EXTRUSIONS ITEM # DESCRIPTION USES 1001 Aluminum Girt 16 lengths Used in metal end packages and sidewalls as horizontal members. Requires girt/baseboard splice (#1000). 1000

More information

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM SIX INCH ALPHA MODULE INSTALLATION KEWAUNEE SCIENTIFIC CORPORATION SIX INCH ALPHA MODULE ANCHORING SYSTEM After Alpha module has been set in desired location. Adjust the four adjustment bolts until the

More information

Adjustable Mounting System Installation Manual

Adjustable Mounting System Installation Manual Adjustable Mounting System Installation Manual Thank You For Choosing Hopergy! Why Hopergy 1. Hopergy is a professional supplier, specialising in PV mounting systems. We have experienced engineers and

More information

Ekoroof LiteTile Dimensions

Ekoroof LiteTile Dimensions Ekoroof LiteTile Dimensions 7 3 3.5 Height 40 Width 20 Length Weight per Panel: 3 kg / 6.61 lbs 2 2 Area per panel 800 in / 5.55 ft 2 Panels per Square: 20 (including overlap, for a 100 ft covered area)

More information

Please be sure to read this manual before using the product.

Please be sure to read this manual before using the product. ANGLE HEAD UNIVERSAL TYPE AGU30 OPERATION MANUAL Please be sure to read this manual before using the product. Consult the separate operation manual for Angle Head also regarding the general handling of

More information

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).

More information

Assembly Instructions

Assembly Instructions Section A Interna-Rail Components Handrail systems utilizing Interna-Rail in-line fittings provide a sleek architectural finish with anodized fittings and aluminum pipe. Interna- Rail has the clean look

More information

Big Block Installation Manual For Systems without A/C

Big Block Installation Manual For Systems without A/C Big Block Installation Manual For Systems without A/C Billet Specialties, Inc. 500 Shawmut Ave. La Grange, IL 60526 Tech Line (708) 588-0505 Fax (708) 588-7181 Hardware List For Chevrolet Big Block Tru

More information

GROUND MOUNTING SYSTEM INSTALLATION MANUAL

GROUND MOUNTING SYSTEM INSTALLATION MANUAL GROUND MOUNTING SYSTEM INSTALLATION MANUAL JIANGYIN TITANERGY CO.,LTD APRIL 2016, RE V 1 Using the special splice kits to connect Titan Solar's aluminium HD rail makes installation easier,more flexible

More information

Project A. AC Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips. For

Project A. AC Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips. For Project 16-258A AC286-12 Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips For EcoFasten Solar 4741 W. Polk Street, Suite 4 Pheonix, AZ 85043 PFS Corporation dba PFS TECO Cottage Grove Laboratory

More information

Residential & Industrial Fence

Residential & Industrial Fence Residential & Industrial Fence Assembly Instructions CONTENTS 02: OVERVIEW & CONTENTS 03: PRODUCT SPECIFICATIONS 04: GETTING STARTED 05: WALL ATTACHMENT & LINE POST ASSEMBLY 06: CORNER POST ASSEMBLY 07:

More information

SunPower Installation Manual

SunPower Installation Manual SunPower SF System Planning and Assembly SunPower SUNPOWER CORPORATION WWW.SUNPOWERCORP.COM Pub #101001-SP2 October 2010 - Rev. 8 2010 by SunPower, Corp All rights reserved. Part I. Scope, components,

More information

INDEX PAGE RELEASE SECTION NUMBER DATE

INDEX PAGE RELEASE SECTION NUMBER DATE INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001

More information

TREX POST MOUNT DECKING AND CONCRETE

TREX POST MOUNT DECKING AND CONCRETE TREX POST MOUNT DECKING AND CONCRETE for Pressure-treated Wood Framing LOCATION AND INSTALLATION OF POST MOUNTS IMPORTANT NOTES:» EACH POST MUST BE ATTACHED AS SHOWN TO ENSURE A CODE COMPLIANT AND SAFE

More information

MI: (Secure this number someplace, for possible future need) SPECIFICATIONS:

MI: (Secure this number someplace, for possible future need) SPECIFICATIONS: 6C ASSEMBLY INSTRUCTIONS ANTENNA MODEL T6 MI: 030927 (Secure this number someplace, for possible future need) SPECIFICATIONS: FORWARD GAIN 5.1 dbd F:B RATIO 15-25 db (Rises with frequency) FREQUENCY COVERAGE

More information

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools... INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach

More information

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone: Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around

More information

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8

More information

orientation Conergy SunTop Instructions for professional installation

orientation Conergy SunTop Instructions for professional installation On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation

More information

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800) www.trasnowandsun.com S Installation Manual FLUSH MOUNT - Shingle, Slate,etc. At TRA Snow and Sun we engineer and layout each project upon request free of charge. Just give us the project details and we

More information

Unirac Installation Manual

Unirac Installation Manual Tile Roof Hook Universal Mount Unirac R Pub 120803-1ii August 2012 A HILTI GROUP COMPANY Unirac welcomes input concerning the accuracy and user-friendliness of this publication. Please write to publications@unirac.com.

More information

Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products

Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products Warning- Do not use this product on solar arrays where the ground snow loads exceed 50 pounds per square foot (psf).

More information

HIGH RISE Portable Restroom Assembly Instructions

HIGH RISE Portable Restroom Assembly Instructions HIGH RISE Portable Restroom Assembly Instructions 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 / Fax: 763-553-1905 800-328-3332/ www.satelliteindustries.com PN 20930 REV C 8/16

More information

Pergola Installation Guide. When only the best will do.

Pergola Installation Guide. When only the best will do. Pergola Installation Guide When only the best will do. Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) 5 /8" Drill Bit 5 /16" Magnetic Driver

More information

Pergola Installation Guide

Pergola Installation Guide Pergola Installation Guide When only the best will do. 1 Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) ½" Drill Bit 5 /8" Drill Bit 5 /16"

More information

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS Fortress Railing Overview 4 3 1 Fe 26 Iron Railing Systems Fortress Use the steps below for the following pages to complete your rail Vertical Cable and Glass Options Available Fortress Iron Railing System

More information

Originally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019

Originally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019 SUNMODO CORPORATION 14800 NE 65 th Street Vancouver, WA 98682 SUNMODO EZ ROOF MOUNT L-FOOT KITS FOR SHINGLE ROOFS CSI Section: 06 25 23 Wood, Plastic, and Composite Fastenings 07 71 00-Roof Specialties

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Installation and Maintenance Manual

Installation and Maintenance Manual Installation and Maintenance Manual IM770 Group: pplied ir Part Number: IM770 Date: pril 2003 Roof Curb for Skyline TM Outdoor ir Handlers 2013 Daikin pplied IM 770 Page 1 Table of Contents General Description...

More information

S-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY

S-DECK PANEL INSTALLATION DETAILS BERRIDGE MANUFACTURING COMPANY S-DECK PANEL INSTALLATION DETAILS MANUACTURING 800-669-0009 www.berridge.com INDEX INDEX INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION INTRODUCTION

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc