1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

Size: px
Start display at page:

Download "1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information."

Transcription

1 AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity modules at 325W 39.8 kw Design Information Building Occupancy Category Wind Exposure Category II B Design Wind Speed 0 mph ASCE -05 Design Snow Load Roof Height Roof Slope Area of Array Ballast Wt. Requirement Avg. Roof Loading Parapet Height Roof Membrane *Use slip sheet same as roof membrane. Rubber Feet Point loading 20 psf 9,23 ft flat 34,892 sqft See Layout 2.94 psf 0 ft N/A N/A The layout shown herein is based on site layout geometry Any changes to the building that may affect the solar PV arrays GameChange Solar is a custom design layout for provided PV GameChange Solar cannot be responsible for errors during Do not install on roofs with a slope of more than.5 SA Layout SITE PLAN of 9

2 See sheet #3 for ballast layout for section. Do not install on roofs with a slope of more than.5 SA Layout Section 2 of 9

3 See sheet #2 for rail layout for section. Do not install on roofs with a slope of more than.5 SA Layout Section 3 of 9

4 See sheet #5 for ballast layout for section 2. Do not install on roofs with a slope of more than.5 SA Layout Section 2 4 of 9

5 See sheet #4 for rail layout for section 2. Do not install on roofs with a slope of more than.5 SA Layout Section 2 5 of 9

6 See sheet # for ballast layout for section 3. Do not install on roofs with a slope of more than.5 SA Layout Section 3 6 of 9

7 See sheet #6 for rail layout for section 3. Do not install on roofs with a slope of more than.5 SA Layout Section 3 of 9

8 ) Measure and mark out the footprint of the array and create a east/west spacing jig the length of the modules +/4", with the wind deflector attached at the nearest locations to determine the N/S Rail locations. 9 3 PARTS LIST Item No. Description Part No. Material Rail/ GC Ballast Rail GC903 Galvanized G90 Steel 2 Panel Support GC9 Galvanized G90 Steel 3 Panel Support South GC9S Galvanized G90 Steel 2) Place the first N/S Rail, with the open center facing up, at the northern end of the array to start the first column of N/S Rails. Then insert next Rail into the swaged ending of the first Rail. Attach together by inserting two sets of 3/8" bolt into the circle holes, with flange nuts on the other end. Leave finger tight. Repeat Steps until Rails reach the south end of the array. There are slotted holes available at each swaged Rail joint which allows the Rails to traverese changes in the roof (Notify GameChange of these joints). Also remember to place slipsheet or rubber blocks (under Panel Support locations) under rails.. 3) Continue with the rest of the N/S Rail columns as you did with the first column. Always remember to use the longest Rails when you can, and to save the shorter Rails for the ends of the columns, or where there are breaks. 4) Make a N/S spacer jig that indicates the distance of the row to row spacing, as shown in the layout, and the distance of ". 5) Place the Jig Starting at the northern edge of the N/S Rails. Make a mark on the N/S Rails " approx. from the northern edge. Mark this distance on all N/S Rail columns. 6) Place the first E/W Rail, with the open center facing down, so that the northern edge of the E/W Rails are approx. at the " mark on the N/S Rails. Attach the E/W Rails to the N/S Rails using two /4-20 x /2" hex bolts, at diagonally opposite corner locations, and secure with /4" serrated flange nuts. Torque hardware to specifications. ) When the first E/W Rail is fully installed, attach the next E/W Rail to the first one using the swaged endings. Attach Rails together by inserting two sets of 3/8" bolt into the cirlce holes. Attach 3/8" flange nuts and torque to specification. Repeat until E/W row is finished.there are slotted holes available at each swaged Rail joint which allows the Rails to accommodate changes in the roof (Notify GameChange of these joints). Columns of N/S Rails 9 E/W Rail on top of N/S Rails 9 0 8) Use the jig to mark the row to row spacing south of the previouse mark on the N/S Rails. This is where the second E/W Rail row will begin. Repeat these steps for all E/W Rail rows. Always remember to use the longest Rails when you can, and to save the shorter Rails for the ends of the rows, or where there are breaks. Row to Row spacing 9) Ballast Rails are attached on array where noted on the layout. Measure from the southern wall of E/W Rail and place Ballast Rail such that its north side is approx. 8" away. Install the Ballast Rails where indicated on the layout and follow the same steps as the E/W Rails. 0) Place ballast block on Ballast Rails where indicated on the layout. Make sure the ballast blocks are approx. centered between the N/S Rails. 5 2 E/W Rails spaced properly on the N/S Rails Ballast Rails Wind Deflector GC95 Galvanized G90 Steel 5 Fire Guard (opt.) GC98 Galvanized G90 Steel 6 Panel Clip GC34T Stainless Steel Hex Bolts SST: /4-20 x /2" and 2.5" 3/8-6 x.5" 8 Lock Washer Stainless Steel, /4" 9 Flange Nuts Magnacoat / SST: /4-20 and 3/8-6 0 Rubber Feet (opt.) GC998 Recycled Rubber GC Roof System Use only GameChange parts. Using other parts to complete the installation as substitutes may void the warranty. Customers are responsible for making sure the roof structure is inspected, repaired and can support the loading resulting from the GC Grid-Lite System and provided PV modules Follow all safety instructions that are required by relevant local, regional and national organizations and procedures as outlined in this Install manual, both for mechanical and electrical aspects of the solar PV array installation. When encountering undocumented or unexpected obstacles requiring a work around. Work arounds should be noted on working drawings, notified to supervisor for evaluation. Work should then be completed in a manner that ensures that the remainder of the array is not affected. GC Grid-Lite System is to be mounted over a fire resistant roof covering rated for the application. Do not install on roofs with a slope of more than.5 degrees. (Contact GameChange regarding installation of Reference Install Manual for installation. Not following install manual may result in voiding warranty. Recommended that an inspection of the roof is conducted both prior to and after the installation of the GC Grid-Lite System in order for the continuation of the roof warranty. Make sure to place the array in areas where there is no shading Install the array facing as close as possible to south. Follow local building inspector setback rules. Do not connect over 50 feet of panels without a break in the array to avoid potential issues caused by thermal expansion and contraction. Material Storage Make sure to install system within several days of receipt of components. Storage of components in a damp or wet environment can lead to white rust on galvanized parts as well as other damage on other protective coatings which can lead to accelerated corrosion to components, and void the warranty. Galvanization is especially prone to white rust when components are still bundled because the zinc coating requires airflow over its surface to establish its protective patina, otherwise water can cause corrosion of the zinc and it has no protection against it in enclosed spaces, such as those between parts that are bundled. Tool Required /6-inch drivers, sockets and wrenches for /4-inch hex bolts or screws 9/6-inch drivers, sockets and wrenches for 3/8-inch hex bolts Suggested driver torque /4-inch hardware, use 5 ft-lbs 3/8-inch hardware, use 6-8 ft-lbs String Line Tape Measure Jig (sized to panel and panel and inside dimensioned panel mounting holes) for spacing. Anti-Seize lubricant such as LocTite for bolts must be used for all stainless steel hardware Concrete Ballast blocks (UV Resistant and freeze-thaw cycle resistant if in climate where freezing occurs) per GameChange Ballast plan. Dimension of the blocks should be " x.63-.5". Height should be under 2.5 inches for 5 degree tilt and up to 4 inches for 0 degree tilt systems. EPDM or other slip sheets that protrude.5 inches around sides of all Rails resting on roof must be used. Slip sheets should be compatible with the roof type at the installation, the material of which may be advised through consultation with the building's roofer to avoid risk of voiding the roof warranty. GameChange recommends that they must be at least.045 inches thick. Alternatively, rubber blocks may be bought from GameChange which are approximately 2 inch wide x 5 inch long with.25+ inch height above the roof surface to be placed under the Rails under the Panel Supports. These are made of EPDM. Make sure the roofing material vendor approves the use of these blocks in place of approved slip sheets so that you do not risk voiding the roof warranty. Make sure that the PSF on the roof under the rubber blocks is not higher than the roof is designed to accomodate, this is very important. High seismic activity areas where non-attached systems are used require specially designed rubber blocks or extra wide slip sheets. Consult GameChange for more information. Preventative Maintenance An inspections should be done after all storms with severe winds (over 80% of design wind speed) to make sure all component of the installation and torque settings remain correct. Annual inspection must be done for mechanical movement due to any reason including thermal expansion and contraction. Any mechanical movement must be rectified. Torque settings must be checked for all hardware. All Clips must be checked to make sure there is no gap between side of Clip and module. Proper preventative maintenance must be conducted or warranty may be voided. SA Layout GC Grid-Lite Roof System 8 of 9

9 2 6 PARTS LIST Item No. Description Part No. Material Rail/ GC Ballast Rail GC903 Galvanized G90 Steel ) Place Panel Supports onto the northern end of the N/S Rails. Align the north end of the Panel Support with the end of the Rail. Attach Panel Supports to Rails using four (two at each end) /4-20 x /2" hex bolts and /4" serrated flange nuts. Torque to specification. 8 6) Place panels on Panel Support's high side and slide down until panel is locked into place. If utilizing Grounding Strip for bonding, then place Grounding Strip running north south on top of hole on Panel Support and under panel frame. 2 Panel Support GC9 Galvanized G90 Steel 3 Panel Support South GC9S Galvanized G90 Steel 4 Wind Deflector GC95 Galvanized G90 Steel 5 Fire Guard (opt.) GC98 Galvanized G90 Steel 6 Panel Clip GC34T Stainless Steel Hex Bolts SST: /4-20 x /2" and 2.5" 3/8-6 x.5" 8 Lock Washer Stainless Steel, /4" 2) Repeat steps for all of the Panel Supports. Noting the distance row to row as in the layout, and using the same jig as when installing the E/W Rails. Install Panel Supports from the north end fo the array to the south end. - Recommended ballast blocks: 3) When the south end of the array is reached, complete the columns by placing Panel Support Souths. and attach using two /4-20 x /2" hex bolts and /4" serrated flange nuts. Torque to specification. 22lbs (3x8x6) for 5 deg 34lbs (4x8x6) for 0 deg 3 2 ) Place Panel Clip over panel frame and hole on the Panel Support. Attach using a /4" x 2.5" long serrated head hex bolt, or a hex bolt and lock washer, through the Panel Clip an into the hole in Panel Support. Torque to specification. 8) Repeat steps on all panels. When the southern row of panels is reached, attached using the Panel Clip and /4" hardware into the Panel Support South. Finished System. Front and Back views Flange Nuts Magnacoat / SST: /4-20 and 3/8-6 0 Rubber Feet (opt.) GC998 Recycled Rubber GC Roof System Use only GameChange parts. Using other parts to complete the installation as substitutes may void the warranty. Customers are responsible for making sure the roof structure is inspected, repaired and can support the loading resulting from the GC Grid-Lite System and provided PV modules Follow all safety instructions that are required by relevant local, regional and national organizations and procedures as outlined in this Install manual, both for mechanical and electrical aspects of the solar PV array installation. When encountering undocumented or unexpected obstacles requiring a work around. Work arounds should be noted on working drawings, notified to supervisor for evaluation. Work should then be completed in a manner that ensures that the remainder of the array is not affected. GC Grid-Lite System is to be mounted over a fire resistant roof covering rated for the application. Do not install on roofs with a slope of more than.5 degrees. (Contact GameChange regarding installation of Reference Install Manual for installation. Not following install manual may result in voiding warranty. Recommended that an inspection of the roof is conducted both prior to and after the installation of the GC Grid-Lite System in order for the continuation of the roof warranty. Make sure to place the array in areas where there is no shading Install the array facing as close as possible to south. Follow local building inspector setback rules. Do not connect over 50 feet of panels without a break in the array to avoid potential issues caused by thermal expansion and contraction. 4) Place Wind Deflectors into tabs on Panel Supports. Attach Wind Deflectors using /4" x /2" hex bolts through slots on wind delfector and into slots on Panel Supports. Use four bolts for the 0-deg system, and use two bolts at middle locations for the 5-deg System. 5) (If required) Place Fire Guards on E/W Rails with mounting tabs over holes. Attach using /4" x /2" hex bolts thorugh holes on Fire Guards and E/W Rails. 5 Tabs 3 4 9) The panels and racking system are all bonded together, east to west and north to south with use of Panel Clips or Grounding Strips installed. Ultimate earth ground shall be achieved via the mounted UL 03 Listed PV modules, as specified per corresponding installation manuals. GameChange recommends up to 6 strings may be grounded together. Repeat for each 6 strings. Use provided ground lug /4" hole in Rail. The entire system needs to be grounded from a single point to an appropriate grounding source. **Please confirm with an electrician, as this is their responsibility** Material Storage Make sure to install system within several days of receipt of components. Storage of components in a damp or wet environment can lead to white rust on galvanized parts as well as other damage on other protective coatings which can lead to accelerated corrosion to components, and void the warranty. Galvanization is especially prone to white rust when components are still bundled because the zinc coating requires airflow over its surface to establish its protective patina, otherwise water can cause corrosion of the zinc and it has no protection against it in enclosed spaces, such as those between parts that are bundled. Tool Required /6-inch drivers, sockets and wrenches for /4-inch hex bolts or screws 9/6-inch drivers, sockets and wrenches for 3/8-inch hex bolts Suggested driver torque /4-inch hardware, use 5 ft-lbs 3/8-inch hardware, use 6-8 ft-lbs String Line Tape Measure Jig (sized to panel and panel and inside dimensioned panel mounting holes) for spacing. Anti-Seize lubricant such as LocTite for bolts must be used for all stainless steel hardware Concrete Ballast blocks (UV Resistant and freeze-thaw cycle resistant if in climate where freezing occurs) per GameChange Ballast plan. Dimension of the blocks should be " x.63-.5". Height should be under 2.5 inches for 5 degree tilt and up to 4 inches for 0 degree tilt systems. EPDM or other slip sheets that protrude.5 inches around sides of all Rails resting on roof must be used. Slip sheets should be compatible with the roof type at the installation, the material of which may be advised through consultation with the building's roofer to avoid risk of voiding the roof warranty. GameChange recommends that they must be at least.045 inches thick. Alternatively, rubber blocks may be bought from GameChange which are approximately 2 inch wide x 5 inch long with.25+ inch height above the roof surface to be placed under the Rails under the Panel Supports. These are made of EPDM. Make sure the roofing material vendor approves the use of these blocks in place of approved slip sheets so that you do not risk voiding the roof warranty. Make sure that the PSF on the roof under the rubber blocks is not higher than the roof is designed to accomodate, this is very important. High seismic activity areas where non-attached systems are used require specially designed rubber blocks or extra wide slip sheets. Consult GameChange for more information. 5 Preventative Maintenance An inspections should be done after all storms with severe winds (over 80% of design wind speed) to make sure all component of the installation and torque settings remain correct. Annual inspection must be done for mechanical movement due to any reason including thermal expansion and contraction. Any mechanical movement must be rectified. Torque settings must be checked for all hardware. All Clips must be checked to make sure there is no gap between side of Clip and module. Proper preventative maintenance must be conducted or warranty may be voided. SA Layout GC Grid-Lite Roof System 9 of 9

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking. AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance

More information

1 of 5 SITE PLAN 26' ' " Front to Front. 16'-48 Row Spacing kw modules at 310W. Sample

1 of 5 SITE PLAN 26' '  Front to Front. 16'-48 Row Spacing kw modules at 310W. Sample 3" 26'-96 Array nformation Manufacturer Astronergy Gamechange HSM662 P Dimensions 76.93" x 38.98" x.57" Quantity 9690 640 Tubs learance 9690 modules at 30W 9" 65'-6 Design nformation " Front to Front 6'-48

More information

Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration

Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration CONTENTS I II III IV V VI VII VIII IX GENERAL SAFETY PRECAUTIONS AND RESPONSIBILITY OF INSTALLER MATERIALS AND TOOLS

More information

Installation Manual Tilt Leg

Installation Manual Tilt Leg Installation Manual Tilt Leg Solar Mounting Solutions March www.ironridge.com 2010 IronRidge, Inc. All Rights Reserved Version 2.0 2 Tilt Leg Installation Guide Introduction The Tilt Leg is a flexible

More information

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01 MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood

More information

May 14, Installation Manual

May 14, Installation Manual May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012

More information

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15 MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood

More information

SolarMount (E)volution

SolarMount (E)volution SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution

More information

Install Manual GC Pour-in-Place Round Tub Ballasted Ground Galvanized Purlin System - Bottom Mount Configuration 1 and 2 Up Portrait

Install Manual GC Pour-in-Place Round Tub Ballasted Ground Galvanized Purlin System - Bottom Mount Configuration 1 and 2 Up Portrait Install Manual GC Pour-in-Place Round Tub Ballasted Ground Galvanized Purlin System - Bottom Mount Configuration 1 and 2 Up Portrait CONTENTS I II III IV V VI VII VIII IX X XI GENERAL SAFETY PRECAUTIONS

More information

Rayport G Eco Ballasted

Rayport G Eco Ballasted Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener

More information

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted 509 West Monroe Street Highland, IL 62249 Phone: (618) 654-2184 Fax: (618) 654-9199 Tools Needed For Installation 1. ¾

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8

More information

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams

More information

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER # ZOMEWORKS FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER # 1 1011 Sawmill Road NW, PO Box 25805, Albuquerque, NM 87125 USA (505) 242-5354 / (800) 279-6342 / FAX (505) 243-5187 E-mail: zomework@zomeworks.com

More information

Installation Manual XRL Solar Rail System

Installation Manual XRL Solar Rail System Installation Manual XRL Solar Rail System Solar Mounting Solutions June 2009 www.ironridge.com 2009 IronRidge, Inc. All Rights Reserved Version 1.0 2 XRL Solar Rail System Installation Guide Introduction

More information

orientation Conergy SunTop Instructions for professional installation

orientation Conergy SunTop Instructions for professional installation On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-7 3. Tool List.... P8 4. Assembly.... P9-19 www.aetenergy.com Supporting a Cleaner, Greener Tomorrow

More information

MTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2

MTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2 MTS-SP100 RENOGY Pole Mount System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.2 Important Safety Instructions Please save these instructions. This manual contains important safety,

More information

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 1. ATTACH BASES 3 2. PLACE RAILS 3 3. SECURE LUG 4 4. CLAMP MODULES 4 EXPANSION

More information

RIDGE MAST MOUNT (RMM)

RIDGE MAST MOUNT (RMM) May 5, 009 Revision E ASSEMBLY MANUAL (RMM) General Dynamics Satcom Technologies 1500 PRODELIN DRIVE NEWTON NC 8658 88-464-4141 www.gdsatcom.com 1.0 INTRODUCTION: 1.1 Features: The Ridge Mast Mount (RMM)

More information

STRATUS SHELTER. Take bike parking to new heights

STRATUS SHELTER. Take bike parking to new heights Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American

More information

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...

More information

BLACK WIDOW COMPOSITE

BLACK WIDOW COMPOSITE PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL

More information

MONKEY BARS OVERHEAD RACK INSTALLATION

MONKEY BARS OVERHEAD RACK INSTALLATION MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE

More information

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL CONTENTS DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 0. ATTACH BASES 3 1. PLACE RAILS 3 2. SECURE LUG 4 3. CLAMP MODULES 4 EXPANSION

More information

Installation Manual. Side of Pole Mount Edition v1.02. For models:

Installation Manual. Side of Pole Mount Edition v1.02. For models: Side of Pole Mount Installation Manual 2015 Edition v1.02 For models: UNI-SP/01 UNI-SP/01A UNI-SP/01XH UNI-SP/01XX UNI-SP/02 UNI-SP/02A UNI-SP/02X UNI-SP/03 UNI-SP01-MAN Installation Manual Side of Pole

More information

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design. T WO - T I E R B IK E LO C K E R Next Level Security We take long-term bicycle storage to new heights with the new Dero Two-Tier Bike Locker. It is easy to load and provides a space-saving solution to

More information

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN Pole Mount Installation Manual 2016 Edition v1.01 For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN Table of Contents 1 1 2 3 4 5 5 Introduction Customer Support Project Essentials Assembly: Steps

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS AUTOMOTIVE PRODUCTS, INSTALLATION INSTRUCTIONS ROCK SLIDERS APPLICATION: 2007-2017 Jeep Wrangler JK 2 Door PART NUMBER: 42-7005 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1,2 2 ROCK SLIDER ASSEMBLY, DRIVER

More information

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F. PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL

More information

UPM 6X. UPM 6X Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8

UPM 6X. UPM 6X Standard stock Tee socket sized for 5 schedule 40 or 80 Pipe. Page 1 of 8 Page 1 of 8 UPM 6X A. TEE SOCKET: 6 O.D. PIPE SOCKET TO FIT OVER 5 SCHEDULE 40 OR 80 STEEL PIPE B. CROSS PIECE: 2 X 2 X 1/8, LENGTH DEPENDENT ON MODULE USED, SQ. TUBE 2 PLACES C. LONGITUDINAL: 2 X 2 X

More information

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical

More information

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF Quick Rack Components & Tools Components are pre-assembled and ready for installation right

More information

SunPower Installation Manual

SunPower Installation Manual SunPower SF System Planning and Assembly SunPower SUNPOWER CORPORATION WWW.SUNPOWERCORP.COM Pub #101001-SP2 October 2010 - Rev. 8 2010 by SunPower, Corp All rights reserved. Part I. Scope, components,

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SNYPER TUBULAR FENDERS APPLICATION: 2007-2017 Jeep Wrangler JK PART NUMBER: 62-1005, 62-1015 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1,2 2 FRONT FENDERS, DRIVER (1) AND PASSENGER

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS Universal Top-of-Pole Mount 8 Modules (UTPM8) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 022714-1 Universal Top-of-Pole Mount 8 Modules (UTPM8) for

More information

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).

More information

Installation Manual. Tamarack Solar Products. Side of Pole Mount Edition v1.02. For models:

Installation Manual. Tamarack Solar Products. Side of Pole Mount Edition v1.02. For models: Mount Installation Manual 2016 Edition v1.02 For models: UNI-SP/01 UNI-SP/01A UNI-SP/01XH UNI-SP/01XX UNI-SP/02 UNI-SP/02A UNI-SP/02X UNI-SP/03 UNI-SP01-MAN Table of Contents 1 Introduction 1 Customer

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS Universal Top-of-Pole Mount 6 Modules (UTPM6) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 020314-1 Universal Top-of-Pole Mount 6 Modules (UTPM6) for

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS R5 STEP BOARD APPLICATION: 2009-2017 Dodge Ram 1500 Quad / Crew Cab 2010-2017 Dodge Ram 2500/3500 Crew Cab PART NUMBER: 28-51040, 28-51045, 28-51050, 28-51055 ITEM QUANTITY DESCRIPTION

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS Universal Top-of-Pole Mount 5 Modules (UTPM5) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version, Rev A PCN 0904- Universal Top-of-Pole Mount 5 Modules (UTPM5) for Module

More information

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: , INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1

More information

Independent Containment System (ICS)

Independent Containment System (ICS) Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.

More information

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A SP3358-2 PCN 060712-5 Side-of-Pole Mount for 4 Modules (SPM4) For

More information

CYCL E STAT IO N. High Capacity

CYCL E STAT IO N. High Capacity CYCL E STAT IO N High Capacity The Dero Cycle Station provides high-capacity, covered bike parking for bicycle commuters. With a high roof and open platform, the Dero Cycle Station allows bike corrals,

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount

28 Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount 28" Adjustable Solar Tilt Mount ADJ-28 Owner's Manual Please read this manual BEFORE installing your solar tilt mount SECTION 1 Introduction Mounting your solar panel inclined to an optimized angle with

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL S-SERIES SOLAR RACKS T OLL FREE 877-765-2759 WWW.SILVERBACKSOLAR.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

UPM 6X Custom. UPM 6X CUSTOM Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8

UPM 6X Custom. UPM 6X CUSTOM Standard stock Tee socket sized for 5 schedule 40 or 80 Pipe. Page 1 of 8 Page 1 of 8 UPM 6X Custom A. TEE SOCKET: 6 O.D. PIPE SOCKET TO FIT OVER 5 SCHEDULE 40 or 80 STEEL PIPE B. CROSS PIECE: 2 X 2 X 3/16, LENGTH DEPENDENT ON MODULE USED, SQUARE TUBE 2 PLACES C. LONGITUNDINAL:

More information

Installation Manual. Side of Pole Mount Edition v3.24. For models:

Installation Manual. Side of Pole Mount Edition v3.24. For models: Mount Installation Manual 2016 Edition v3.24 For models: UNI-SP/01 UNI-SP/01A UNI-SP/01XH UNI-SP/01XX UNI-SP/02 UNI-SP/02A UNI-SP/02X UNI-SP/03 UNI-SP/03W UNI-SP01-MAN Table of Contents 1 1 2 3 4 5 6 7

More information

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTRUCTIONS INSTRUCCIONES CONSIGNES AUTOMOTIVE PRODUCTS, INC. INSTRUCTIONS INSTRUCCIONES CONSIGNES APPLICATION: GMC SIERRA 1500 HDX & SPORTSMAN GRILLE GUARDS (2014 & UP) APPLICATION PART # S 57-3690, 57-3695, 40-3695, 45-3690 ITEM QUANTITY

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

SolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY

SolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY SolarMount-I INSTALLATION MANUAL 2011 by Unirac, Inc. All rights reserved. Pub 110518-1ii, May 2011 A HILTI GROUP COMPANY R 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac Inc.

More information

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type D

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type D Side-of-Pole Mount for 4 Modules (SPM4) For Module Type D ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 060712-7 Side-of-Pole Mount for 4 Modules (SPM4) For Module Type

More information

PV-ezRack Solar Terrace II-A Installation guide

PV-ezRack Solar Terrace II-A Installation guide PV-ezRack Solar Terrace II-A Installation guide Contents 1 Introduction..2 2 Tools & Components.3 3 System overview.4 4 Installation steps..7 5 Notices and Safety Precautions.. 14 6 Project Case...16 7

More information

KO LO SH E LT E R. High Capacity and Flexibility

KO LO SH E LT E R. High Capacity and Flexibility KO LO SH E LT E R High Capacity and Flexibility The unique styling of our redesigned Dero Kolo Shelter will help beautify your facility and provide secure, covered bike parking for cyclists. The Kolo is

More information

Roof Mount Ground Mount Specialised Clamps Spares Application Notes

Roof Mount Ground Mount Specialised Clamps Spares Application Notes DPA Solar Racking Solutions Solar PV Racking Catalogue Roof Mount Ground Mount Specialised Clamps Spares Application Notes www.dpasolar.com.au 1300 447 500 Rails & Splices Page 3 Mid & End Clamps Page

More information

Track Rack. * Track Racks are not lockable

Track Rack. * Track Racks are not lockable The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SPORTSMAN WINCH MOUNT GRILLE GUARD APPLICATION: 2016-2018 Toyota Tacoma PART NUMBER: 40-93885, 45-93880, 46-23885 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 WINCH TRAY 15MM SOCKET

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

SolarMount-I INSTALLATION MANUAL

SolarMount-I INSTALLATION MANUAL SolarMount-I INSTALLATION MANUAL 2010 by Unirac, Inc. All rights reserved. Pub 100621-1ii, June 2010 R A HILTI GROUP COMPANY 1411 Broadway Boulevard NE Albuquerque, NM 87102-1545 USA IMPORTANT! Unirac

More information

Type XTSR71 Sizes

Type XTSR71 Sizes (Page 1 of 13) s 494-5258 Type XTSR71 s 494-5258 Figure 1 Thomas XTSR71 Coupling 1. General Information 1.1 Thomas Couplings are designed to provide a mechanical connection between the rotating shafts

More information

Contractors Rack Assembly and Installation Instructions

Contractors Rack Assembly and Installation Instructions Part # 18601 & 16601 Contractors Rack Assembly and Installation Instructions 4751 Littlejohn St. Unit A, Baldwin Park, CA 91706 Page 1 of 12 11/13/08 Thank you for purchasing the Paramount Restyling Contractors

More information

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTRUCTIONS INSTRUCCIONES CONSIGNES AUTOMOTIVE PRODUCTS, INC. INSTRUCTIONS INSTRUCCIONES CONSIGNES APPLICATION: 2007-2010 CHEVY/GMC SILVERADO/SIERRA 2500/3500 (EXCLUDES CLASSIC) APP PART #46-23715, 40-92315/45-92310 MAX WINCH TRAY, SPORTSMAN

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack

More information

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

Midmark Stainless Steel Cages Setup Manual

Midmark Stainless Steel Cages Setup Manual Midmark Stainless Steel Cages Setup Manual Table of Contents Pre-Installation......................... 2 Parts Identification..................... 2-3 Base Construction....................... 3 Assembly............................

More information

EZ Tile Hook System. SunModo PV Rack Mount System UL2703 Compliant

EZ Tile Hook System. SunModo PV Rack Mount System UL2703 Compliant SunModo PV Rack Mount System UL2703 Compliant Pub. D10007-V005 Copyright 2016 Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety grounding and bonding

More information

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated

More information

Downtown Rack. Custom logo option available

Downtown Rack. Custom logo option available Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking

More information

Leveling Foot RB210. Leg Extender RLT66

Leveling Foot RB210. Leg Extender RLT66 Landing for Right & Left Turn R342 ITEMS # 0254049, 0254061, 0254072, 0254076, 0016567, 0254099, 0254110, 0054116, 0254117, 0254126, 0254140, 0254150, 0254156 CUSTOM ACCESS RAMP SYSTEM MODELS # R100, R242,

More information

Model #SH & CH SH Pine CH Naturaline

Model #SH & CH SH Pine CH Naturaline Model #SH304-101 & CH304-101 Assembly Manual SH304-101 Pine CH304-101 Naturaline Component Parts A 2 ea. Angled Rail - 2 x 4 x 107-1/8" B 1 ea. Center Angled Rail - 2 x 4 x 107-1/8" C 9 ea. Rock Board

More information

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V013

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V013 Catalog Mounts Racking Rail Clamps L-Feet Systems Pub. C10001-V013 Copyright 2017 On behalf of our organization, thank you for considering SunModo for your racking needs. At SunModo, we are dedicated to

More information

Pickup Box Utility Rack Package Installation (Instruction ID: )

Pickup Box Utility Rack Package Installation (Instruction ID: ) 017 Chevrolet Colorado Pickup - WD (VIN S) Canyon, Colorado Accessory Installation Manual N America Document ID: 3966961 Pickup Box Utility Rack Package Installation (Instruction ID:3144879) Installation

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

INSTALLATION GUIDE FRAME MICRORAIL PUB2017JUL18

INSTALLATION GUIDE FRAME MICRORAIL PUB2017JUL18 MICRORAIL INSTALLATION GUIDE TABLE OF CONTENTS A- TOOLS & SPECIFICATIONS B- SYSTEM COMPONENTS C- SYSTEM COMPONENTS D- SYSTEM COMPONENTS E - SYSTEM LAYOUT F- THERMAL EXPANSION LIMITS G- FLASHING & SLIDERS

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-RSAN-INT INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1. MTS-ZB RENOGY Photovoltaic Module Z-Bracket Mounting System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual

More information

CRITICAL INFORMATION:

CRITICAL INFORMATION: IMPORTANT ALERT: GM uses a very strong thread-locking compound on all body bolts. Use of an air assisted impact ratchet can cause damage to the threads on factory body mount bolts and the internal nut

More information

DERO BIKE LOCKER 33. Maximum Security

DERO BIKE LOCKER 33. Maximum Security Maximum Security The Dero Bike Locker 33 offers bike parking for a single bicycle per unit, thus providing a narrower footprint when space is limited. This affordable bike locker is a perfect option for

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

ADJUSTABLE MOUNTING POST

ADJUSTABLE MOUNTING POST C Part Number 069 B EACH CARTON CONTAINS D Floor Mounting Kit A. Bottom Post Assembly B. Top Post Assembly C. Flange Head Bolts (x2) D. Floor Mounting Kit. 5/8 Wx/6 Hx0 L framing channels (x2) 2. /8-6x4

More information

3/4 Rear DuraRac Installation Instructions

3/4 Rear DuraRac Installation Instructions 3/4 Rear DuraRac Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: CRC 27-1010-001 V1.0.09.28.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

Connect Transit Shelter

Connect Transit Shelter Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust

More information

10-PIECE. Garage Storage Set OWNER'S MANUAL. Patent pending

10-PIECE. Garage Storage Set OWNER'S MANUAL. Patent pending 10-PIECE Garage Storage Set OWNER'S MANUAL Patent pending IMPORTANT When you open the cartons, carefully check the units and make sure there IS NO damage. If you have any problems with the units or with

More information

Rear Mount Installation Instructions

Rear Mount Installation Instructions Rear Mount Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: DTC 0809-011 V1.0.10.12.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA Supplement Assembly and Maintenance Guide Titan Series Commercial Step System Manufactured in the USA IMPORTANT! Read and follow all labels and assembly instructions including warnings and cautions prior

More information

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only) INSTALLATION MANUAL FRONT Level of Difficulty Moderate Product Photo (center section only) All hardware listed below will be provided with the bumpers center section. Additional hardware will be supplied

More information

KOLO SHELTER Installation Instructions Parts List

KOLO SHELTER Installation Instructions Parts List Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14

More information

A Huffy Sports Company In-Ground Basketball System Owners Manual. Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

A Huffy Sports Company In-Ground Basketball System Owners Manual. Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A. A Huffy Sports Company In-Ground Basketball System Owners Manual Customer Service Center N53 W2400 South Corporate Circle Sussex, WI 53089 U.S.A. Write Model Number From Box Here: WARNING! REQUIRED TOOLS

More information

Lab Style Table Frame Part No Assembly Guide Automation Technology

Lab Style Table Frame Part No Assembly Guide Automation Technology Ergonomic Workstations Lab Style Table Frame Part No. 8 0 Assembly Guide 7 90 70 Automation Technology SPECIFICATIONS Lab style frame part number... 80 Height... 70 mm (8.") Width... 90 mm (.7") Depth...

More information

Installation Instructions for Solar Snow Pad (SSP-T-3)

Installation Instructions for Solar Snow Pad (SSP-T-3) Installation Instructions for Solar Snow Pad (SSP-T-3) Warning- Do not use this product on solar arrays where the calculated array snow loads exceed 50 pounds per square foot (psf). Most solar panels are

More information

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1. MTS-ACB RENOGY Photovoltaic Module Adjustable Curved Bracket 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS AUTOMOTIVE PRODUCTS, INSTALLATION INSTRUCTIONS PLATINUM 4 OVAL STEP BAR (90 BENT END) APPLICATION: 2010-2015 Dodge Ram 2500/3500 Mega Cab PART NUMBER: 21-3570, 21-3575, 23-3570, 23-3575, 25-3570, 25-3575,

More information

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS 1 OF 17 A 1. PURPOSE: Instructions for in field replacement of 9004 mechanical suspension top pan 2. SCOPE: 9004 mechanical suspension with legacy two point LX back frame and current LX back frame 3. PROCEDURE:

More information