1 Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List P Tool List.... P8 4. Assembly.... P Supporting a Cleaner, Greener Tomorrow
2 1. Installer Notes Thank you for purchasing AET s Rayport G Eco ground mount racking system manufactured in Maumee, Ohio. The system has been configured to accommodate framed (30-51mm thick) modules at two-high in portrait. Designed with the installer in mind, the Rayport G Eco system allows for a top down installation, common fasteners, and integrated panel grounding with single point rack grounding. The Rayport G Eco racking system has been internally tested to withstand snow loads as high as 50psf and winds of 120mph with a tilt angle of 10 to 45 degrees. P2
3 2. Installation - Parts List Post -Variable lengths are available based on customer design constraints. Capital Plate Post/Capital Plate Hardware Strut P3
4 2. Installation - Parts List Cont. Capital Plate/Strut Hardware Bracket Bracket - Post Hardware Bracket Post / Brace Hardware P4
5 2. Installation - Parts List Cont. Purlin -Lengths will vary depending on customer design constraints Purlin Splice Front - P/N: / 4 thru holes (8) places Purlin Splice Back - P/N: / 16 thru holes (8) places Purlin Splice Hardware P5
6 2. Installation - Parts List Cont. Purlin Hardware (2 per joint) Brace(Purlin) - 1 x 1 Angle Cross-Section Purlin/Brace Hardware Mid Clamp Assembly -Module thickness 30-51mm thick P6
7 2. Installation - Parts List Cont. End Clamp Assembly -Module thickness mm thick Purlin Holding Fixture P7
8 3. Installation - Tool List Layout/BOM from AET Impact Driver Socket Wrench 3 / 4 Deep Well Socket ½ Deep Well Socket 3 / 8 Deep Well Socket 7 / 16 Deep Well Socket 100 ft. Tape Measure Torque Wrench String/Laser Level P8
9 4. Installation - Assembly Instructions 1. Post Installation Pursuant to a geotech analysis and report of the project location, AET can provide the minimum depth that each post in the given array must be driven. In some cases, it may be necessary to use concrete footings. AET can provide this design information as well. Consult the AET sales team for project specific pricing. Establish baselines by using the first and last posts of the array. All posts must meet the following tolerances. North/South alignment must be held within +/ inches. East/West spacing must be held within +/- 2.0 inches. Overall height must be maintained within +/ inches. Maximum angle tolerance of +/- 0.5 degrees. See figure 1. Figure 1 P9
10 4. Installation - Assembly Instructions Cont. Post Section for Driver Head Figure 2 - W6 x 7 Post Section Figure 3 - W6 x 8.5 Post Section P10
11 4. Installation - Assembly Instructions Cont. 2. Capital Plate to Post Assembly (Up-Down Alignment) Establish a benchmark line using the top of the first and last posts of the array. Note: The height of the benchmark line may require adjustment if the middle posts are higher than the end posts. Also, to ensure a smooth transition between adjacent arrays and to eliminate stepping height differences, establish the benchmark line using the first post of the two adjacent arrays. Up/Down Direction North Place (1) capital plate on the top of each post in the array aligning them in the Up-Down direction relative to the benchmark line. Fasten the capital plates to the post using (2) ½ x 1-1/4 carriage bolts, washers and nuts each. Torque each carriage bolt to ft-lb. Note: the capital plate must be positioned on the east side of the post web. The capital plates are now aligned in the Up-Down direction. Post Web East 3. Capital Plate to Post Assembly (North-South Alignment) Establish a benchmark line using the top of the capital plates located on the first and last posts of the array. Place a mark on the west side of the upper horizontal slot of each capital plate to identify which position aligns to the benchmark line in the North- South direction. This position is where the strut will be installed in the next step. East North Torque to ft-lb. (after height adjustment) The capital plates are now aligned in the North-South direction. P11
12 4. Installation - Assembly Instructions Cont. 4. Bracket to Post Assembly Attached a bracket to the post using (2) ½ x 1-1/2 bolts, washers and nuts. Position the fasteners in the middle of the slots and torque to ft-lb. Note: The bracket must be positioned on the post as show in figure Strut to Capital Assembly Loosely attach the strut to the capital plate using (1) ½ x 1-1/4 carriage bolt, washer, and nut. Use the slot position that was marked in step 2. See figures 5a, 5b and 5c Note: The strut must be positioned on the east side of the capital plate. North Figure 4 East North North East East Figure 5a Figure 5b Figure 5c P12
13 4. Installation - Assembly Instructions Cont. 6. Brace to Strut Assembly With one person holding the lower end of the strut, have a second person loosely attach the brace to the strut with a ½ x 3 ½ bolt, washers and nut (see figure 6). Brace to Bracket-Post attachment location 7. Brace to Bracket-Post Assembly While one person continues to hold the lower end of the strut, the angle can be adjusted while a second person holds the brace to its rough location on the bracket-post. Verify the angle of the strut with a protractor (digital or manual). Choose one of the three hole locations that matches the angle shown on the layout. Note: The bracket to post interface is slotted. It can be re-positioned if additional adjustment is required (see figure 4). Attach the brace to the bracket -post with a ½ x 3 ½ bolt, washers and nut (see figures 6 and 7a). Torque the fasteners at the (3) joint locations to the value shown in figure 7b. Figure 6 Torque to ft-lbs. Brace to Strut attachment location Adjust height for angle adjustment Figure 7b Figure 7a P13
14 4. Installation - Assembly Instructions Cont. 8. Purlin to Splice Assembly Align the (2) slots of the front splice to the prepunched holes located at the ends of each purlin. Attach the front splice to the purlins using (2) ¼ x 1-1 / 8 self drilling screws. Note: The purlins should form a straight line through the splice joint. This can be accomplished by pushing the front splice against the top flange of the purlin and using it as a straight edge to align the purlins. (See figure 8a). Top flange of the purlin Figure 8a Complete the attachment of the front splice to the purlin using (8) ¼ x 1-1 / 8 self drilling. (See figures 8b and 8c). Complete the purlin to splice assembly using the back splice and (10) ¼ nuts. Torque the fasteners to 5-7 ft-lb. (see figures 8d, 8f and 8e). Figure 8b Figure 8c Figure 8d Figure 8f Figure 8e P14
15 4. Installation - Assembly Instructions Cont. 9. Purlin to Strut Assembly Position the purlin holding fixtures at the top (north) holes located on the top face of each strut of the array. (See figure 9a). Note: The bottom brackets of the fixture are slotted for adjustability. This can be accomplished by loosing the wind nuts and moving the brackets to the desired location. Rest the upper purlin against the purlin fixtures and across the struts. Note: The purlin must be in the proper orientation. (See figure 9b and 9c). Starting at the west end of the array, position the end of the upper purlin from the center of the strut to the distance shown on the layout. (See figure 9d). Attach the upper purlin to the of struts using (2) ¼ x 1-1 / 8 self drilling screws and nuts per joint. Torque to 5-7 ft-lb. (See figure 9e and 9f). Note: The entire purlin length for the array should be assembled prior to completing this step. Top Face Figure 9b Push bolt into thru hole to position purlin fixture Figure 9a Purlin Orientation Figure 9c P15
16 4. Installation - Assembly Instructions Cont. 9. Purlin to Strut Assembly Cont. Re-position the purlin holding fixtures to the bottom (south) holes located on the top face of each strut in the array. Rest the lower purlin against the holding fixtures. Note: The purlin must be in the proper orientation. (See figure 9c). End of purlin to centerline of strut distance. Using a string line or a straight edge, align the west end of the lower purlin to the purlin. (See figure 9d). Attach the lower purlin to the struts using (2) ¼ x 1-1 / 8 self drilling screws and nuts per joint. Torque to 5-7 ft-lb. (See figure 9f, 9f and 9h). Note: The entire purlin length for the array should be assembled prior to completing this step. Install the remaining purlins using the steps described above. Figure 9d Figure 9e (2) self drilling screws and nuts per joint Figure 9f P16
17 4. Installation - Assembly Instructions Cont. 10. Brace to Purlin Assembly Attach the brace to the purlins using (1) ¼ x 1-1 / 8 self drilling screw and nut per joint. Reference the layout to determine the approximate location between the posts. (See figure 10a and 10b). Torque fasteners to 5 7 ft-lb. Purlins Strut Figure 10a 4 places Figure 10b P17
18 4. Installation - Assembly Instructions Cont. 11. Panel Assembly Establish a benchmark line along the entire length of the lower purlin at a distance which is slightly greater than the overhang distance shown on the layout. (See figure 11a). Starting from the west end of the array, square up a bottom module to the benchmark line. Reference the layout to determine the distance the module should be positioned in from the west end of the purlins. The distance from the lower edge of the module to the middle of the lower purlin should be set to the overhang distance. (See figure 11a). Fasten the end-clamps to hold the module in place but do not torque them down at this time. (See figure 11b). Approximately a 1 gap between modules End of purlin to module distance On the opposite side of the module position a midclamp assembly on the purlins. Slide the mid-clamp assembly until the side of the mid-clamp lower hits the side of the module and the angled barb is under the module. Fasten the mid-clamps to hold the module in place but do not torque them down at this time. (See figure 11c and 11d). Continue installing the next module on the bottom row using the steps described above. Use the string line to align the bottom edge of the remaining modules. Torque each mid-clamp and end clamp to 5-7 ft-lb. Starting from the west end of the array, square up the top modules to the bottom modules. Factor in approximately a 1 gap between the modules on the top and bottom rows. Fasten the top modules to the purlins using the steps described above. Figure 11a Overhang Figure 11b Mid-Clamp Lower Grounding Barb Figure 11c Figure 11d P18
19 4. Installation - Assembly Instructions Cont. 12. Grounding One post per array is required to be grounded. This will effectively ground each entire sub-array (usually panels). P19
Rayport G Eco Ballasted
Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationCSS Central Mount System
CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationInstallation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products
Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products Warning- Do not use this product on solar arrays where the ground snow loads exceed 50 pounds per square foot (psf).
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01
MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15
MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationSRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted
SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted 509 West Monroe Street Highland, IL 62249 Phone: (618) 654-2184 Fax: (618) 654-9199 Tools Needed For Installation 1. ¾
More informationUSSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS
1 OF 17 A 1. PURPOSE: Instructions for in field replacement of 9004 mechanical suspension top pan 2. SCOPE: 9004 mechanical suspension with legacy two point LX back frame and current LX back frame 3. PROCEDURE:
More informationPOWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N
POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams
More informationPatented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs
Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF Quick Rack Components & Tools Components are pre-assembled and ready for installation right
More informationorientation Conergy SunTop Instructions for professional installation
On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation
More informationStraight Stringer Installation Instructions
Straight Stringer Installation Instructions Floor-to-Wall Installation F L I G H T P L A N Unpack: What s included? Your Stringer Tread Screws (8) per tread (1) Torque Wrench (1) Socket (for the brackets
More informationMONKEY BARS OVERHEAD RACK INSTALLATION
MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE
More informationPARTITION INSTALLATION INSTRUCTIONS
PARTITION INSTALLATION INSTRUCTIONS 2015 Chevrolet Tahoe PPV / Part Number 5703FW, FWA & FEW Do not attempt to install this product on any vehicle equipped with third row seating! Parts List Distributed
More informationAWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS
INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...
More informationCTTR Tire Rack Required tools
CTTR Tire Rack Required tools Torque wrench, ratchet, 9/16 socket, tape measure, and square edge. ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. Failure to follow the assembly instructions
More information1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.
AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance
More informationInstallation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)
www.trasnowandsun.com S Installation Manual FLUSH MOUNT - Shingle, Slate,etc. At TRA Snow and Sun we engineer and layout each project upon request free of charge. Just give us the project details and we
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationInstallation Instructions
FORD 20K Industry Standard Rail Custom Mounting Kit #2738 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to determine
More informationPole Mount Installation Manual
Pole Mount Installation Manual Thank You for Choosing AIMS Power! 1. AIMS Power is a leading supplier of solar products, specializing in PV mounting systems. We ensure our products are manufactured to
More informationIN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.
Tools Required 2011-C Ford F250/F350 No Drilling into Vehicle is Required 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench FL277 x 1 Torque Specification: 1/4 Bolts - 6 Ft Lbs.
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationInstallation Instructions for Solar Snow Pad (SSP-T-3)
Installation Instructions for Solar Snow Pad (SSP-T-3) Warning- Do not use this product on solar arrays where the calculated array snow loads exceed 50 pounds per square foot (psf). Most solar panels are
More informationPickup Box Utility Rack Package Installation (Instruction ID: )
017 Chevrolet Colorado Pickup - WD (VIN S) Canyon, Colorado Accessory Installation Manual N America Document ID: 3966961 Pickup Box Utility Rack Package Installation (Instruction ID:3144879) Installation
More informationCNC Router Parts PRO Machine Kit Cable Track Installation Instructions
1 1 X CABLE TRACK TRAYS & BRACKETS The cable track on the side of the system is supported by a metal tray (or multiple trays for longer systems such as a PRO4896). These trays hang from brackets on the
More informationTABLE OF CONTENTS REQUIRED TOOLS
TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS
More information1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.
AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity 224 224 modules at 325W
More informationRBP-1215B-RX DODGE RAM QUAD CAB RX3
RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side
More informationSINGLE TRACK BYPASS (patent pending) barn door hardware
SINGLE TRACK BYPASS (patent pending) barn door hardware Installation Manual What is included in your kit: Part number Part name Quantity 1 Inner door hanger 2 2 Outer door hanger 2 3 5/16 x 1.5 lag bolts
More informationInstallation Instructions
TOYOTA 16K Industry Standard Rail Custom Mounting Kit #2748 Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationVideo Wall Installation Instructions 2W X 3H, 3W X 3H
Video Wall Installation Instructions 2W X 3H, 3W X 3H www.microndisplaysolutions.com Table of Contents Important Safety Instructions... 3 Configuration... 4 Package Contents, included and optional items...
More informationSide-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation
Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A SP3358-2 PCN 060712-5 Side-of-Pole Mount for 4 Modules (SPM4) For
More informationINSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM
SIX INCH ALPHA MODULE INSTALLATION KEWAUNEE SCIENTIFIC CORPORATION SIX INCH ALPHA MODULE ANCHORING SYSTEM After Alpha module has been set in desired location. Adjust the four adjustment bolts until the
More informationInstallation Instructions
CHEVY / GMC 20K Industry Standard Rail Custom Mounting Kit #2724 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order
More informationHeavy-Duty Bypass Track System
Heavy-Duty Bypass Track System Please Note: This track system must be installed with the screws going into a solid surface such as studs or a header. Due to the spacing of the holes on these Brackets,
More informationULTRA SPACE SAVER SQUARED Installation Instructions
Installation Instructions The Ultra Space Saver Squared has several steps for installation. Note that the single and double sided setups and parts are different. Make sure you follow the instructions according
More informationFORD #2228. Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY
FORD 24K Industry Standard Rail Heavy Duty Custom Mounting Kit #2228 Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY Please note, in
More information8 Ft Wide Enclosure Assembly Guide
www.rmfiberglass.com 8 Ft Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Table of Contents 1. Parts and Tools List page 3 2. Hardware page 4 3. Maintenance page 5 4.
More informationSide-of-Pole Mount for 4 Modules (SPM4) For Module Type D
Side-of-Pole Mount for 4 Modules (SPM4) For Module Type D ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 060712-7 Side-of-Pole Mount for 4 Modules (SPM4) For Module Type
More informationInstallation Guidelines
Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and
More informationBLACK WIDOW COMPOSITE
PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationSTRATUS SHELTER. Take bike parking to new heights
Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More informationInstallation Instructions
CHEVY / GMC 16K Industry Standard Rail Custom Mounting Kit #2730 Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY Please note, in order
More informationATLANTIS RAIL Contact Information
ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing
More informationLab Style Table Frame Part No Assembly Guide Automation Technology
Ergonomic Workstations Lab Style Table Frame Part No. 8 0 Assembly Guide 7 90 70 Automation Technology SPECIFICATIONS Lab style frame part number... 80 Height... 70 mm (8.") Width... 90 mm (.7") Depth...
More informationINSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,
INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1
More informationModular Shelter Breezeway Assembly Instructions
Modular Shelter Breezeway Assembly Instructions Hardware Kit 76900188 THANK YOU FOR PURCHASING THIS PRODUCT Behlen Country has been in the business of providing quality products for more than 75 years.
More informationIn the box: Figure 1: Instructions, 1-channel, 2 retainers, 2 adjustable tubes, 1 chrome ring, and hardware. Channel
1 P a g e Thunder Mounts Garage Systems The Overhead Garage Mount Solution The World s Leader of Multi-fit Overhead Garage Mount Safety and Technology. Overhead Garage Door Opener Mounting Instructions.
More information96 (Standard Length)
Setbacks 96 (Standard Length) Bike Files may be lined up end to end to fill the available space. A 36 aisle should be left between the ends of bikes in racks facing one another. 36 aisle 50 Installation
More informationBBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105
BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,
More informationInstallation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS
- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS TruGroove Drywall A3 MOUNTING Ceiling INSTALLATION System Overview These instructions review how to install trimless drywall versions of TruGroove
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More informationInstalling the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools
Installing the Profile Privacy Panel Complete these instructions to install the Profile Privacy Panel. Privacy panels are available in various heights to match tiers and include mounting hardware for slat
More informationRemoving the Z-Axis lead screw
Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains
More informationInstallation Instructions
CHEVY / GMC 24K Industry Standard Rail Heavy Duty Custom Mounting Kit #2226 Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY Please note,
More informationInstallation Instructions
CHEVY / GMC 20K Industry Standard Rail Custom Mounting Kit #2724 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order
More informationIndependent Containment System (ICS)
Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 8 Modules (UTPM8) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 022714-1 Universal Top-of-Pole Mount 8 Modules (UTPM8) for
More informationInstallation Instructions
DODGE 16K Industry Standard Rail Custom Mounting Kit #2728 Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationCHEVY 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4434
CHEVY 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4434 Installation Instructions SPECIFICATIONS Fits 1999-2010 Chevy 2500 & 3500 Short Bed Mounts to B&W gooseneck part #1067 Hitch
More informationINSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: and Application: All UTV s*
INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: 83970 and 84360 Application: All UTV s* * does not include Arctic Cat vehicles Your safety, and the safety of others, is very important. To help
More information10 Octagon Cedar Gazebo Assembly Instructions
10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions
More informationAdjustable Countertop Installation
Adjustable Countertop Installation Applies to Models: A1, A2, A3, A4, A5, & A6 Required Tools: Stud Finder, Level 1/4 deep well socket, Screwdrivers, Tape Measure, Drill and Drill Bits Language of origin:
More informationUser Instructions Multiline Otter Scoreboard Caddy Assembly
List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 6 Modules (UTPM6) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 020314-1 Universal Top-of-Pole Mount 6 Modules (UTPM6) for
More informationBIKE FILE (301)
B IK E F I L E High Efficiency The Bike File is our most space efficient u-lock compatible product. Sturdy sliding hangers allow nine bikes to be securely stored in an eight-foot section while allowing
More informationPocket Shelter. Covered bike parking earns your site LEED credits.
Small and versatile, the Pocket Shelter stores bikes in areas that would not normally accommodate bike parking. This shelter is a modular system that provides covered and secure bike storage but is extremely
More informationx2 1/4 (6mm) Floor Anchor
INSTALLATION GUIDE Main Components x1 Rail x5 Wall Spacer x2 Anti-jump Block x2 Straight Strap x1 Right Stopper x1 Left Stopper x5 5/16 (8mm x 60mm) Carriage Bolt x5 5/16 (8mm x25mm) Anchor x5 5/16 (8mm
More informationInstallation Instructions
Important 1. Acclimate materials 24 hrs before installation. Maintain temperature controlled environment after installation 2. Install in accordance with manufacturer s installation instructions. Failure
More informationSystem FS Duo Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 7
System FS Duo Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 7 5 Module mounting 8 6 Tolerances 8 1 / 8 1 General 1.1
More informationInstallation Instructions Kit, Base Rail Bracket Part # 31413
Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating and
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 5 Modules (UTPM5) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version, Rev A PCN 0904- Universal Top-of-Pole Mount 5 Modules (UTPM5) for Module
More informationRange height adjustable assembly
Table of contents Digital handset operation 3 Height adjustable bench kit 4-5 Cable carrier 6 Ganging tray and ganging rail 7 Height adjustable return frame kit 8 Cable entry pole 9 24 and 30 d worksurfaces
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationSolarMount (E)volution
SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution
More information- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.
- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS TruGroove Drywall A3 MOUNTING Ceiling INSTALLATION System Overview These instructions review how to install drywall trim versions of TruGroove recessed
More informationCYCL E STAT IO N. High Capacity
CYCL E STAT IO N High Capacity The Dero Cycle Station provides high-capacity, covered bike parking for bicycle commuters. With a high roof and open platform, the Dero Cycle Station allows bike corrals,
More informationInstallation Instructions
FORD 20K Industry Standard Rail Custom Mounting Kit #2760 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to determine
More informationClearSpan PolyMax Windbreak Wall
ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: April 2007ldg STK# DIMENSIONS
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationUPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.
PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More informationDX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations
ASSEMBLY GUIDE DX-TVMLPTB03 Low-Profile TV Wall Mount For either wood-stud or concrete wall installations Safety information and specifications...2 Tools needed...........................3 Package contents......................3
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationHeavy Duty Ceiling Tilt Mount Installation Manual
HD-CTM-5580 Heavy Duty Ceiling Tilt Mount Installation Manual *This Installation requires a minimum of two people. For your safety: Read the complete instruction manual before starting an installation
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationPPM-5710 JK HEAVY DUTY SKID PLATE ASSEMBLY Version 2.0
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 PPM-5710 JK HEAVY DUTY SKID PLATE ASSEMBLY Version 2.0 GENERAL NOTES: These instructions are also available on our website; www.synergymfg.com.
More informationSystem FS Uno Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 6
System FS Uno Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 6 5 Module mounting 6 6 Tolerances 7 1 / 7 1 General 1.1
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 Section 1: 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More informationINSTALLATION GUIDE N5-DS48-4
INSTALLATION GUIDE N5-DS48-4 Shelving ( steel ) Transit High Roof & Medium Roof Promaster Standard Roof & High Roof Nissan NV High Roof Sprinter Low Roof & High Roof Box Truck / Trailer QUICK START GUIDE
More informationMM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationConnect Transit Shelter
Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust
More informationUNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS
UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS FRAME SIZES: WIDTH: 10, 12, 14, 16, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4, 4 1/2, AND 5 FRAME LENGTH: 4 ON CENTER 20-2, 4 1/2 ON CENTER 18 AND 5
More information