Coffee County Board of Education Dr. Morris C. Leis, Superintendent Destination Graduation for College, Career and Life
|
|
- Blaise Long
- 5 years ago
- Views:
Transcription
1 Coffee County Board of Education r. Morris C. Leis, Superintendent estination Graduation for College, Career and Life Reagan Miller, Chairman Adam W. Lott, Vice Chairman Jesse Jowers, Member Bryan Preston, Member Tonya Wilkerson, Member AVERTISEMENT FOR BI COFE, COUNTY, GEORGIA COFE COUNTY BOAR OF EUCATION ATA CABLING, SECURITY CAMERAS, AN WIRELESS ACCESS POINTS for the CLAYTON W. MATHIS PERFORMING ARTS CENTER at COFE HIGH SCHOOL Separate, sealed bids will be received for data cabling, security cameras, and wireless access points for the new Clayton W. Mathis Performing Arts Center at Coffee High School until :00 a.m. EST on Tuesday, April, 09 at which time bids will be opened and read. The opening will be held at the Coffee County Board of Education s central office and will be open to the public. Proposals can be mailed or delivered to the attention of Chandler Newell at the address below. Proposals received after the designated time will not be considered. Bids are being accepted for the following purchase: ata Cabling, Security Cameras and Wireless Access Points for the new Clayton W. Mathis Performing Arts Center at Coffee High School. We are seeking proposals for the installation of the following: -strand armored OM3 multimode fiber connecting new data room (labeled ATA on plan) to the switch cabinet in the existing building (labeled EXISTING IF on plan). istance is approximately feet. We will provide a GBIC on each end to connect to our switches. CAT6 plenum-rated cabling and terminations for 66 network drops, including patch panels. Each drop will be labeled, tested, and certified. We will provide a network rack, switches, and patch cables. The drops will be for security cameras (7), wireless access points (0) and standard data jacks (9). 7 IP security cameras (Axis or Wisenet preferred). Cameras should be compatible with our existing exacqvision surveillance system. Please include 7 exacvision 5-year licenses, as well as installation and configuration on our existing exacqvision server. 4 will be outdoor cameras (4 MP varifocal lens) 3 will be indoor cameras (4 MP fixed lens) 0 wireless access points (Aerohive AP50) with 5-year license Please include an itemized proposal that includes all costs, including any freight, engineering, and installation charges. Also, please specify any warranty terms that may be included in addition to any standard manufacturer s warranty on the equipment. If awarded the project, installation must begin within 30 days of receipt of Purchase Order. Pre-Bid Meeting and Walkthrough All bidders are required to attend a mandatory pre-bid meeting and walkthrough to be held onsite at the Clayton W. Mathis Performing Arts Center at Coffee High School, 59 Trojan Way, ouglas, GA 3533 on Friday, March at 0:00 AM. 3 South Peterson Avenue, ouglas, GA 3533 Phone (9) Fax: (9)
2 Bid Submission Bids should be submitted in a sealed envelope addressed to the following no later than :00 a.m. EST on Tuesday, April, 09. Bids must be received at the Coffee County Board of Education by this date. Envelopes should be marked "BI." No faxed or ed copies will be accepted. The acceptance of any or all alternatives will be at the discretion of the School System. Send bids to: Chandler Newell irector of Information Systems Coffee County School System 3 South Peterson Ave. ouglas, GA 3533 PLEASE NOTE: is preferred as the method of correspondence for any questions regarding this RFP. All questions should be submitted to: chandler.newell@coffee.k.ga.us. The Coffee County Board of Education reserves the right to reject all bids or proposals or any bid or proposal that is nonresponsive or not responsible and to waive technicalities and informalities. See attachments:. ata rop Locations. Camera Locations
3
4
5 Chapter 3 - Use and Occupancy Classification CAMERA LOCATIONS EXISTING IF The project consists of a Two-Story New Construction Performing Arts Center (with Basement). Assembly A- Occupancy. This building will be Type II-A construction. The building will be fully sprinklered. Area Modifications To Table 503 % of Allowable tabular area, At (Table 503) % Increase for frontage, If (506.) % Increase for automatic sprinklers sprinklers, Is (506.3) Total Factor 400 OCCANTS Conversion factor Total Factor = 363% / 00% = COPYRIGHT AS ATE LYMAN AVISON OOLEY. E E Section 503 General Building Height & Area Limitations 00% 63% 00% 363% 3.63 Total Frontage (F) = 83 ft Total Perimeter (P) = 945 ft Minimum width open space (W) = 30 ft Frontage increase If = (F/P - 5%) x W/30 = (83/945-5%) x 30/30 = 63% EXISTING CORRIOR Allowable area per floor: Aa x Tot. Fact.= 5,500 x 3.63 ) 0" NG '0 ATI R R. H ( 33,84 SF 33,84 SF < 56,65 SF OK FIBER ROUTE Allowable building height (503) Automatic Sprinkler System Increase (504.) Total building allowable height Actual building height 65 feet 0 feet 85 feet 4'-4" 3 stories stories 4 stories stories OK Chapter 6 - Types of Construction This building shall be Type II-A construction The fire resistance rating of building elements (from Table 60) 400 OCCANTS FROM EXISTING BUILING INTO NEW BUILING (AE TO NEW BUILING OCCANT LOA) Structural frame including columns, girders & trusses Bearing walls (exterior) Bearing walls (interior) Non-bearing walls & partitions (exterior) Non-bearing walls & partitions (interior) Floor construction including supporting beams and joists Roof construction including supporting beams & joists < 0' AFF Roof construction including supporting beams & joists > 0' AFF Section 906 Portable Fire Extinguishers - Fire Extinguishers shall be provided and located as required by the International Fire Code, Section 906, and NFPA 0. Max distance to F.E. is 75'-0" travel. Specific locations shall be as shown on the drawings. Egress Summary LOBBY 00 7,3 SF 56,65 SF Actual total floor area (st floor):,000 OCCANTS FROM EXISTING GYMNASIUM PER ORIGINAL LI SATY PLAN = First Floor Occupant Load Second Floor Occupant Load Total Occupant Load,60 persons 9 persons,830 persons Total Egress Capacity,736 persons Maximum Allowable Travel istance = 50' (NOT EXCEEE) 800 OCCANTS OCCANTS (00 SF/PERSON) 0" NG) '0 ATI.R HR ( 0" NG) '0 TI RA. HR ( C SF SF ATA WORK ROOM SF 80 SF SF STOR OCCANTS (FIXE SEATING) SEE SHT. A73 FOR SEATING LAYOUT WOMEN SF 0 AUITORIUM 3 89 SF 7,700 SF 7 OCCANTS (FIXE SEATING) SEE SHT. A73 FOR SEATING LAYOUT JAN SF STAIR NO. 0 5 SF 47 SF FAMILY RESTROOM 07 INFO ESK 3 LI SATY LEGEN HR. RATE WALL 5 69 SF HR. RATE WALL 34 OCCANTS (5 SF/PERSON) (PERFORMING AREA) MEN 6 SMOKE BARRIER WALL 88 SF 8 7 TRAVEL ISTANCE START POINT BLACKBOX THEATER 90 SF EGRESS PATH C ELEV. 07,664 SF 46 SF FAA FIRE ALARM ANUNCIATOR PANEL FAP FIRE ALARM PANEL FIRE EXTINGUISHER - NO CABINET FIRE EXTINGUISHER IN CABINET () 3'-0" WIE OOR = 34.5" 34.5"/." = 7 OFFICE 0 STAIR NO. 4 SF - 0" ) 0' NG TI RA R. ( H BALCONY OCCANTS (00 SF/PERSON) EXIT SIGN 0' - 0" 04' BOYS 4 GIRLS 3 96 SF 95 SF ( HR. RATING) 05' P.H. () 3'-0" WIE OOR = 34.5" 34.5"/." = 7 PANIC HARWARE BOYS RESSING 5 () 3'-0" WIE OOR = 34.5" 34.5"/." = SF 3 OCCANTS (5 SF/PERSON) N N 36 OCCANTS (5 SF/PERSON) N B GIRLS RESSING 6 B N 534 SF W COSTUME 7 3' PROP 8 7 SF SF STAGE 30 CORRIOR 9 4,66 SF 3,6 SF 3 OCCANTS (5 SF/PERSON) SET CONSTRUCTION 9 96' RISER ROOM 003 IMMER ROOM ',393 SF ELECTRICAL ROOM 00 () 3'-0" WIE OOR = 34.5" 34.5"/." = 7 A A ISTANCE IS GREATER THAN /3 SPACE IAGONAL 3 53' LOAING AREA N 3//07 0::40 AM C:\$Projects\Coffee County Central_freemanm.rvt 00 FIRST FLOOR - LI SATY N 3/3" = '-0" 4 BASEMENT - LI SATY /6" = '-0" 5 6 Lyman avidson ooley, Inc. 640 Powers Ferry Road Building One Marietta, GA t f lddi-architects.com Suttles & Associates Architects REVISIONS OUGLAS, GEORGIA Code Analysis - Coffee High School Performing Arts Center COFE HIGH SCHOOL PERFORMING ARTS CENTER 400 OCCANTS FACILITY NO NOT VALI UNLESS SIGNE AN SEALE. 5 IT SHALL BE RETURNE ON REQUEST. 4 IT IS NOT TO BE USE ON ANY OTHER PROJECT. 3 IT IS NOT TO BE REPROUCE IN WHOLE OR IN PART. THIS RAWING IS THE PROPERTY OF LYMAN AVISON OOLEY INCORPORATE ARCHITECTS. ARCHITECTURE PLANNING INTERIOR ESIGN PERFORMING ARTS CENTER 59 TROJAN WAY OUGLAS, GA 3533 COFE COUNTY BOAR OF EUCATION TITLE LI SATY PLAN FIRST FLOOR STATUS CONSTRUCTION OCUMENTS JOB QC Checker RAWN Author SHEET G0 ATE.9.07
SHEET INDEX PROJECT LOCATION. ARCHITECTS FORUM 8555 North River Road, Suite 220 Indianapolis, Indiana [P] [F]
TRANSWESTERN 900 West Loop South, Suite 00 Houston, Texas 7707 [P] 7.70.7700 [F] 7.70.685 SYSTEM 8465 Keystone Crossing, Suite 0 4640 [P] 7.46.5544 ARCHITECTS FORUM 8555 North River Road, Suite 0 4640
More informationAPPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:
Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationADDENDUM TO RFP DOCUMENTS
Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationSECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS
510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationSPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF
1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date
More informationTo the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603
ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,
More informationLEGENDS, DETAILS, & NOTES - TELECOM
55 urnet Road, Suite 0 Austin, Texas 78756 5.85.0 05 eltway Dr. Addison, TX 7500 97-66-887 COMMUNICATIONS SYSTEM LEGEND FRONT FACE OF WALL OR HOUR FIRE RATED GYPSUM WALL OARD ASSEMLY MAXIMUM /8" CLEARANCE
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationCLARK COUNTY FIRE CODE AMENDMENTS
CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationThe maximum back wall height is eight-feet three-inches (8 3 ), including truss, and is allowed only in the rear half of the booth space.
Linear Booth: A standard/linear (10 x10 ) booth (also called in-line booth ) is any booth that shares a common back wall and adjoins other exhibits on one or two sides. NOTE: A booth that is 10 ft. in
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationTRIENENS PERFORMANCE CENTER RENOVATION
NORTHWESTERN UNIVERSITY TRIENENS PERFORMANCE CENTER RENOVATION FINAL APR RAWINGS APRIL, 08 overall site plan West Lot Ashland Avenue Trienens Performance Center Central Street Ryan Field End Zone Building
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationOCCUPANT LOAD CALCULATIONS BASEMENT OCCUPANT LOAD FOR CLASS F4 PLACE OF ASSEMBLY WITH MOVABLE SEATS 10 SQ FT / PERSON
'- /" '-" '-0" LEGEND BOUNDARY OF NET USABLE AREA, PUBLIC ASSBLY BOUNDARY OF NET USABLE AREA, BAR SERVICE CENTER LINE OF PRIMARY EGRESS PH CENTER LINE OF SECONDARY EGRESS PH NEW OCCANCY SIGN, NEW CEILING
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationCOMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS
Community Development Department W182 S8200 Racine Ave 262-679-4145 COMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS 1. Completed City of Muskego Commercial Application 2. 4-sets of bound plans, to scale
More informationCommercial Infill Project Guide
Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit
More informationEmergency responder radio coverage in new buildings. California Fire Code Section is hereby amended to read:
Sunnyvale 2013 Fire Code Section 510 16.52.510. Emergency responder radio coverage. (a) Emergency responder radio coverage in new buildings. California Fire Code Section 510.1 is hereby amended to read:
More informationM E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation
M E M O R A N D U M TO: FROM: NFPA Technical Committee on Assembly Occupancies and Membrane Structures Linda MacKay DATE: January 12, 2010 SUBJECT: NFPA 101 ROP Letter Ballot Circulation The January 11
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationCity of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:
City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationCYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL
T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More information12560 W. Cedar Drive Lakewood, CO Barry Himmelman President
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationTRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal
TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationICONIC LAKEWOOD THEATER 1825 ABRAMS RD, DALLAS, TX 75214
FOR LEASE ICONIC LAKEWOOD THEATER 1825 ABRAMS RD, DALLAS, TX 75214 PROPERTY INFO + + Best parking available in Lakewood! More than 95 dedicated spaces 80 additional dedicated spaces reserved for valet
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationPermits (Submitted to Permit Counter) APPLICATION CHECKLIST
Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationNon-Residential and Multi-Family Plan Check Submittal Requirements
Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this
More informationCampus Cable Plant Specification for Year 1 Wireless Coverage (Phase I)
Campus Cable Plant Specification for Year 1 Wireless Coverage (Phase I) July 17, 2017 1. General 1.1. Overview This document identifies and describes the specification supporting the installation of data
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationMcKenzie County Healthcare Systems
McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More informationFIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION
PERMITS AND INSPECTIONS FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number of
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationClark County Fire Prevention Las Vegas Nevada
Clark County Fire Prevention Las Vegas Nevada PUBLIC SAFETY/FIRST RESPONDER RADIO AMPLIFICATION SYSTEMS SCOPE: This guideline sets forth requirements for the design, installation and testing of Public
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More information*********************************************************************************************************
10400 IDENTIFYING DEVICES ********************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 10 14 00 *********************************************************************************************************
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationRequ est fo r sea led bids for an addition to Be ave r Lake Bathhouse
Requ est fo r sea led bids for an addition to Be ave r Lake house The lpena County Parks and Recreation commission will be accepting sealed bids for the following t rades: Concrete/Masonry, Electrical
More informationThe NEW Inner Harbor... Underway!!! Architects: QPK Design & Dalpos Architects Rendering: Spine 3D
The NEW Inner Harbor... Underway!!! Architects: QPK Design & Dalpos Architects Rendering: Spine 3D TRUE PROJECT KEY 1. MIXED-USE RETAIL / RESIDENTIAL 2. MIXED-USE RETAIL / RESIDENTIAL 3. LUXURY APARTMENTS
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationREAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map
Electrical Information Breaker Panel 1: Service Type: 120/208 Panel Type: LP2 Panel Number: CHH31500 Manufacturer: Cutler Hammer Amps: 150 Location: Back Room Breaker Panel 2: Service Type: 120/208 Panel
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationSonoma Cheese Factory
WEST SPAIN STREET 1ST STREET WEST 1ST STREET EAST 0 10 25 2 W E S T S PA I N S T R E E T - S O N O M A, C A L I F O R N I A EXISTING AREA PLAN 50 100 w w w. s m s - a r c h. c o m WEST SPAIN STREET 1ST
More informationB. The designated coverage areas shall include both indoor and outdoor coverage.
Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet
More information11SIXTY5 Weaver Dairy Road
SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationSAKS BUILDING BIRMINGHAM, ALABAMA. SAKS BUILDING st Avenue North Birmingham, Alabama 35203
SAKS BUILDING BIRMINGHAM, ALABAMA SAKS BUILDING 1904 1st Avenue North Birmingham, Alabama 35203 BUILDING SIZE 18,848 SF (Approximately 6,000 SF/Floor) CURRENT OCCUPANCY 100% ASKING PRICE $4,259,009 AVAILABLE
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationOwner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review
Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationMarch 23, 2015 Total Project Cost 18,553,027
Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant
More information1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.
DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project
More informationwww.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete
More informationINSPECTIONS & PERMITS DEPARTMENT
TOWN Of CARY INSPECTIONS & PERMITS DEPARTMENT COMMERCIAL PROJECTS PLAN SUBMITTAL GUIDE 2017 OVERVIEW The following guide applies to commercial plans submitted for permitting. These are minimum guidelines
More informationSecond Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 12/12/ :15 AM
Second Revision No. 1-NFPA 1221-2014 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationCITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION
CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com
More informationDesign Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural
Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural and related construction. This course includes instruction
More informationTotal precast solution for large stadium projects meet tight schedule
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy
More informationBASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA
THROUGH THE YEARS THROUGH THE YEARS VIEW FROM RIGHT FIELD VIEW FROM DUGOUT VIEW FROM NEW GRANDSTAND EXISTING CONDITIONS EXTERIOR PHOTOS PLAYER S LOUNGE LOCKER ROOM TRAINING AREA COACH S OFFICE CORRIDOR
More informationIMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION
IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION This Page Intentionally Left Blank Date Received Receipt Number Approved Date Date: Zoning: Intended Use of Structure: Home
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.
DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part
More informationEMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION
CITY OF LACEY Community & Economic Development Department 420 College Street SE Lacey, WA 98503 (360) 491-5642 CASH OR CHECK ONLY PLEASE EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION FOR INSTALLATION/MODIFICATION
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationThe attached information contains mandatory requirements and a submission form.
The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP