1 Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN Total precast solution for large stadium projects meet tight schedule T.J. D Arcy The Consulting Engineers Group, Inc., San Antonio, TX, USA ABSTRACT: A report on the successful application of precast prestressed concrete in large stadium projects. Framing system design and construction methods are presented and details of the construction and design of three major league and college stadiums are presented. Precast prestressed concrete has proven to be an excellent application in major stadium projects. The Consulting Engineers Group has provided engineering services for over 70 large stadium projects in North America. These applications include stadiums for National Football teams, Major League Baseball teams, National Basketball Association teams, Olympic Stadiums and various College Stadiums. Stadiums are designed in three manners; either they are open air, enclosed or combination stadiums. Even though they are very expensive, the current trend in the major league is to build enclosed stadiums with retractable roof structures. Thereby combining both open air and enclosed when the weather demands it. The Dallas Cowboys stadium, currently under construction, has a budget of one billion dollars (Fig. 1). Stadium design and construction creates special demands. Among them are vibration control, durability and fast construction speed. These requirements are a prefect fit for the application of precast prestressed concrete. Pretensioning of seat sections provides a stiff, crack free member. Speed can be achieved because construction can be telescoped with production in precast plant proceeding while job site foundations advance. In addition high strength precast members are more durable, and the tolerance control of precast members produces fast erection and stadium completion (Fig. 2). The most typical precast member to all stadiums is the seat riser section. They have been cast one riser, two riser and three risers high and are pretensioned. The most typical shape is two risers high with lengths up to 42 feet. Vomitory members are also typically precast, as are wall panels and stairs. Precast concrete has been also employed in raker beams, columns, ramps and concourse framing.the fixed roof or retractable roofs have all been steel construction except for fabric roofs. Figure 3 is a section through a typical precast stadium framing plan. As noted previously, precast seat members (risers) are the most common precast product in stadium construction. They are typically cast two levels high (each Figure 1. Dallas Cowboys Stadium. Figure

2 Figure 3. Section of a typical concourse and seating area framing. Figure 5. Match cast moment frame. Figures 4a & 4b. Section of a typical stadium riser. 1 8 high) and the tread is 2 8 wide and are pretensioned with span up to 42 feet.the key design feature is to minimize excessive deflection and vibration in order to not cause the occupants concern. Excessive vibration can lead to panic in the stands. The live loading in a stadium is very dynamic and must be accounted for. Most precast prestressed standard sections are symmetrical about their vertical axis. However, stadium riser units are not (Fig. 4) and it is necessary to calculate properties about the principal axis. Strength design is complex (Fig. 4b) and may be approximated or computed graphically using automated computer programs. Regarding vibration control, the seating units have a three-dimensional nature and vibrate and deflect about their weakest principal axis. The minimal natural frequency of the cross-section is first determined which is then compared to the forcing frequencies in Hertz. Excessive deflection in supporting beams such as rakers must also be controlled to make sure the occupants aren t alarmed. While ideal sight lines would require many variable riser heights for economical reasons, primarily form costs, it is best to limit the numbers of different riser heights. Raker beams with their saw toothed tops are the key member supporting the seating units (Fig. 3). The top most raker beam is typically a long member with a simple span and a cantilever at each end. Because of the heavy dynamic load these members typically have a large cross-section. They are typically cast on their side and are pretensioned for handling and erection. Once in place and under load they are post-tension to provide the remainder of the load capacity primarily the negative moment at the cantilever. These raker beams can be located very high in the air; therefore, casting-them-place is difficult. In addition the tolerance control employing precast raker beams is much superior over cast-in-place beams. Cast-in-place raker beams frequently require a great deal of shimming and product trimming to get the seat section to properly fit. While precast raker beams have occasionally been supported by cast-in-place columns, the more typical and efficient method is to employ precast columns (Fig. 5). Since the columns are typically over 100 feet long they are broken into several pieces and spliced with various means. These tall columns also can support intermediate concourse levels or lower raker beams. These tall columns and horizontal beams at different levels were connected by vertical post-tensioning to create moment frames to provide 864

3 Figure 6. Sun Coast Dome. Figure 7. A schematic of stadium showing the basic roof framing system. a very stable base for the concourse and upper raker beam (Fig. 5). The beams and columns were match cast at each level so that no grouting and dry packing of the joints was required. Although an elaborate forming system was required for the match casting, the erector was able to proceed at a fast rate and no expensive scaffolding was required to grout the joints. They were sealed with epoxy applied on the ground just prior to lifting. These moment frames for the Citrus Bowl Stadium in Orlando, Florida were designed for hurricane intensity winds and lateral loads. Similar precast frames have been designed and constructed to resist seismic loads. I shall now describe three entirely different projects that employed total precast solutions for the structural framing. The original design of the structure called for a cast-in-place concrete framing system which was over budget with a poor construction schedule. The Consulting Engineers Group working with a precaster offered a total precast concrete design alternate which provided savings in cost and time. The Consulting Engineers Group was then hired to completely redesign the cast-in-place frame to a precast system. The stadium construction consists of two basic components, each made up of several unique precast members. The first component is the ring beam which supports the cable roof system. The second component is the concourse and seating area framing. The ring beam system is comprised of 6 diameter hollow column, 170 long cast in 56 lengths. Sitting atop the column is a steel knuckle assembly which supports the twin ring beam members each 8 6 high, 16 thick and 90 long (Fig. 8). A precast deck slab span between the two parallel ring beams completing the ring framing system. The seating and concourse framing was more or less conventional stadium framing with precast pretension seat sections, combination pretension and post-tensioned raker beams, precast columns and beams, vomitory panels and slabs, and concourse double tees plus precast circular pedestrian ramps. The floor member of the circular ramp was a special double tee cast in warped position to accommodate the varying inside and outside slopes. Special site erection requirements necessitated the use of a precast dead men which were made up of precast blocks that were bolted together then as needed at another location disassembled and rebolted together. 1 SUN COAST DOME, ST. PETERSBURG, FL While domed stadiums built prior to the Sun Coast dome had employed various precast components, the Sun Coast Dome was the first domed structure in which all structural elements and elevated seating are completely precast concrete (except for the cable supported fabric roof). (Fig. 6) The diameter of the stadium is 688 (210 m) with a height of 225 (69 m). The cable supported roof employs a tension cable and compression post system originated by Bucksminster Fuller termed a tensegrity system which produces an exterior compression ring and an interior tension ring (Fig. 7). 865

4 Figure 9. Completed Citrus Bowl. Figure 8. Cross-section of assembled ring beam showing post-tensioning and mild steel reinforcement. The stadium, containing over 7,000 precast components, was constructed on time and within budget representing considerable savings to the owners. Figure CITRUS BOWL STADIUM, ORLANDO, FL This is another all precast structure system which was bid as a design build project. Besides the tall, spectacular precast framing system, the structure was unique in that the penalty damages if one key completion day was missed were $24,000,000 for the one loss day. Vibration control was of extreme importance since a previous steel frame stadium was turned down because of excessive vibration causing panic in the stands the precast solution performed extremely well in vibration control. Several design and construction decisions were made to speed construction and make sure the deadline was met. The upper seating section is over 170 from the ground and the available footprint only allowed a 28 column spacing for the building frame. To withstand hurricane wind forces, the frame components were vertically post-tensioned to the foundation using post-tension bars. The raker beams were also connected to the support columns by post-tensioning. To speed up erection, it was decided to match cast the support columns to the beams located at various concourse levels. This process eliminated the need for Figure 11. University of Oregon Stadium. grouting as dry packing from scaffolding of frame joints (Fig. 5). Precast pretension double riser tee seat sections were also employed. In addition, to complete the all precast solution, the sloping ramps were constructed with load bearing precast architectural finish panels and warped precast floor slabs to create a constant sloping ramp. The total precast framing system met the tight one-year construction schedule (from Bowl game to Bowl game) and was completed one month before the deadline (Fig. 9). 866

5 3 UNIVERSITY OF OREGON STADIUM, EUGENE, OR This stadium was also conceived to be constructed with a cast-in-place framing system. However, cost over runs and scheduling problems lead to the consideration of a total precast redesign. The redesign was conducted by The Consulting Engineers Group and accepted by the architect. The architectural design of the primary bent supports for the raker beams were large V shaped frames. As drawn, the frames were too large to precast and ship. The legs of the V were then split into two components and match cast. The V components were reassembled in the field. The joints epoxy sealed and the section post-tensioned together (Fig. 10). The stadium is located in the west coast, high seismic region so all precast components and their connections required consideration of seismic forces. This stadium was constructed to meet a tight schedule related to the University football schedule (Fig. 11). 4 CONCLUSION Precast framing solutions for major sport stadiums has proven to be a viable economical solution and able to meet extremely tight schedules. Careful design considerations of vibration characteristics of precast seating members have produced structures that are vibration stable providing security and comfort to attendees. 867

6

PRECAST CONCRETE STRUCTURES

PRECAST CONCRETE STRUCTURES PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and

More information

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST SUBSTRUCTURE COMPONENTS ADVANTAGES SCHEDULE INCREASES CONSTRUCTION

More information

CE2045-PREFABRICATED STRUCTURES QUESTION BANK

CE2045-PREFABRICATED STRUCTURES QUESTION BANK CE2045-PREFABRICATED STRUCTURES QUESTION BANK UNIT I - INTRODUCTION PART A 1. Define prefabrication 2. What are the types of prefabricates based on i. Plan area ii Based on weight 3. What are the types

More information

General Layout. Eng. Maha Moddather

General Layout. Eng. Maha Moddather General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension

More information

Slope Floor. Measurement Methods

Slope Floor. Measurement Methods Slope Floor Measurement Methods Many chair installations are on sloped floors. Hussey Seating uses five different feet for floor mount chairs based on the degree of slope. The slope of the floor is a critical

More information

Unit 8 Precast Concrete

Unit 8 Precast Concrete Part ⅠIllustrated Words and Concepts Figure 8-1 Precast Slabs on a Frame of Precast Columns Figure 8-2 Hollow-core Slabs Supported on Precast Concrete Wall Panels Part Ⅱ Passages Passage A Precast Concrete

More information

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 Scope This Practice Note is intended to identify responsibilities and contractual arrangements for precast elements used in buildings. Such

More information

2013 Feeney (2/14) # B. Aluminum Railing Systems

2013 Feeney (2/14) # B. Aluminum Railing Systems 2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the

More information

Double Bar Plate Dowels for Saw-Cut Contraction Joints

Double Bar Plate Dowels for Saw-Cut Contraction Joints Double Bar Plate Dowels for Saw-Cut Contraction Joints Designed to Deliver More Serviceable Slabs Concrete slabs-on-ground must be able to withstand the repetitious, concentrated loads and abrasion of

More information

2015 Feeney (8/15) # D. Aluminum Railing Systems

2015 Feeney (8/15) # D. Aluminum Railing Systems 2015 Feeney (8/15) #2012-425D Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

TOTAL PRECAST. A sensible way to build

TOTAL PRECAST. A sensible way to build TOTAL PRECAST Since 1976, BPDL has been an industry-leading partner dedicated to ensuring the end-to-end success of large-scale precast concrete-based projects throughout North America. Thanks to the soundness

More information

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process

More information

BRIDGE TYPE CONCEPT EVALUATION

BRIDGE TYPE CONCEPT EVALUATION SD44/PLATTE-WINNER BRIDGE CORRIDOR STUDY AND ENVIRONMENTAL ASSESSMENT Agreement No. 410583, Work Order PD-19-16 Project Nos. HP5596(19); P0044()290, PCN 05X0 PROJECT MEMORANDUM BRIDGE TYPE CONCEPT EVALUATION

More information

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Construction Tolerances - The following tolerances apply to cast-in-place structures: 00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:

More information

MeadowBurke. Erector Connector. The redesigned Erector Connector eliminates seismic tension fatigue and cracking with only one weld

MeadowBurke. Erector Connector. The redesigned Erector Connector eliminates seismic tension fatigue and cracking with only one weld The redesigned Erector Connector eliminates seismic tension fatigue and cracking with only weld Patent Number: US 7619 3 Traditional slug and flange connections often require multiple slugs to bridge the

More information

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix A A 1 APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix

More information

Moment Resisting Connections for Load Bearing Walls

Moment Resisting Connections for Load Bearing Walls PRECAST: MOMENT RESISTING CONNECTIONS Moment Resisting Connections for Load Bearing Walls Manish Khandelwal Sr. Structural Engineer, Building Structures, Sweco India Private Limited Design philosophy for

More information

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado October 17-19, 2016 ATLANTA, GEORGIA Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado Case Study Overview Explore BIM requirements of

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application?

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application? P.O. Box 1190, Fort Collins, Colorado 80522-1190, Planning (970) 498-7683, Building (970) 498-7700, Larimer.org When is a Building Permit Required? A permit is required if ANY of the following is true:

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

ENGINEERING SERVICES FOR CREATING PRECAST PROJECTS

ENGINEERING SERVICES FOR CREATING PRECAST PROJECTS ENGINEERING SERVICES FOR CREATING PRECAST PROJECTS OUR SERVICES Elematic Engineering Services offer complete engineering support for your building project. The services can also be tailored to your specific

More information

SECTION COUNTERTOPS ecox PART 1 GENERAL

SECTION COUNTERTOPS ecox PART 1 GENERAL SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

In Denver, a recently completed flyover

In Denver, a recently completed flyover ASCENT CASE STUDY 36 A Fast Learning Curve Colorado flyover provides strong example of the concept of curved U-girders for use in a variety of bridge projects In Denver, a recently completed flyover ramp,

More information

Designing Precast Concrete School Buildings

Designing Precast Concrete School Buildings Designing Precast Concrete School Buildings 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers

More information

Featuring TJ Rim Board and TimberStrand LSL

Featuring TJ Rim Board and TimberStrand LSL #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM contents Introduction Owner s Statement Architect s Statement Contractor s Statement Cast in Place Coordination Structural Steel Working Within the Site

More information

What is stairs? steps.

What is stairs? steps. STAIRS What is stairs? A Stair is a system of steps by which people and objects may pass from one level of a building to another. A stair is to be designed to span large vertical distance by dividing it

More information

Value Engineering Design Build MODULAR INFRASTRUCTURE

Value Engineering Design Build MODULAR INFRASTRUCTURE Value Engineering Design Build MODULAR INFRASTRUCTURE VALUE ENGINEERING When infrastructure projects find themselves in densely populated areas, or occur on a site with poor conditions, the opportunity

More information

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): 2321-0613 Comparative Study between Precast and Cast In-Situ Structure Under Combination of Dynamic

More information

Reinforced Concrete Structures

Reinforced Concrete Structures Reinforced Concrete Structures MIM 232E RC and PREFABRICATED ROOFS PURLINS FRAMES CANTILEVERS ARCHES LBSD-7 Dr. Haluk Sesigür I.T.U. Faculty of Architecture Structural and Earthquake Engineering WG RC

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring Building Manual for F P McCann `Smoothbore Shaft Linings with EPDM Gaskets (rev 04) (To be read in conjunction with the Segmental Shaft and Tunnel Safety Data Sheet) Segmental ring types provided by F

More information

Chapter 23. Garage Construction

Chapter 23. Garage Construction Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES

More information

Architect. Architect.

Architect. Architect. The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner. Steel Reinforced Joining (Horizontal/Vertical) for Andersen 400 Series Woodwright & Tilt-Wash Double-Hung, Picture, and Transom Windows and 400 Series Double-Hung Half Circle and Flexiframe Specialty Windows

More information

1. In the Y direction: to the vertical axis of the wall (middle of the wall)

1. In the Y direction: to the vertical axis of the wall (middle of the wall) Installation of TENLOC Panel Connectors Precast Factory Installation of the TENLOC The is placed into the reinforcement of the wall and attached to the mold with nails. The wall thickness must be minimum

More information

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT

More information

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

Glulam Connection Details

Glulam Connection Details T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED

More information

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load capacity of 2x

More information

Designing for Seismic Success with Precast Concrete

Designing for Seismic Success with Precast Concrete Designing for Seismic Success with Precast Concrete Presented by: Ned Cleland, Ph.D., P.E. Blue Ridge Design, Inc. drned@brd-inc.com Byron Dietrich, S.E. TaylorTeter Byron.dietrich@taylorteter.com Learning

More information

LP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.

LP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1. LP SolidStart LSL LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.35E LSL Please verify availability with the LP SolidStart Engineered Wood Products

More information

Breadth: Change CIP Structural Walls and Beams to Precast

Breadth: Change CIP Structural Walls and Beams to Precast Breadth: Change CIP Structural Walls and Beams to Precast Issue: One of the biggest problems facing construction companies in Richmond, Virginia is the lack of skilled labor. Currently, there are approximately

More information

JVI Vector Connector

JVI Vector Connector The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,

More information

SECTION PRECAST HOLLOW CORE PLANKS

SECTION PRECAST HOLLOW CORE PLANKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Roof planks. B. Floor planks. C. Accessories. 1.2 RELATED REQUIREMENTS A. Division 01 General Requirements. SECTION 03 4113 PRECAST HOLLOW CORE PLANKS B. Section

More information

PCI Design Awards Buildings Submission Guidelines

PCI Design Awards Buildings Submission Guidelines PCI Design Awards Buildings Submission Guidelines The following information will be required for all submissions. Any Submittal with missing information will be disqualified. 1. Enter all information for

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies Technical Data Series Revised: 1 January, 2011 Article IX. SECTION 9.01 PERSONAL DOOR CANOPIES...3 SECTION 9.02 ERECTION INSTRUCTIONS...4 SECTION 9.03 ERECTION ILLUSTRATIONS...7 SECTION 9.04 MULL INSTRUCTIONS

More information

BUILT TO ENDURE. North Central College s Unique Residence Halls 12-Month Schedule Met. INSIDE: See Features on Safety from Extreme Weather Conditions!

BUILT TO ENDURE. North Central College s Unique Residence Halls 12-Month Schedule Met. INSIDE: See Features on Safety from Extreme Weather Conditions! October 2015 BUILT TO ENDURE North Central College s Unique Residence Halls 12-Month Schedule Met INSIDE: See Features on Safety from Extreme Weather Conditions! Reprinted with permission from Publications

More information

WOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6

WOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6 Chapter 6 WOODEN BUILDINGS 6.1 INTRODUCTION Wood has higher strength per unit weight and is, therefore, very suitable for earthquake resistant construction. But heavy cladding walls could impose high lateral

More information

MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION

MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI- 621 213 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION Need for prefabrication Principles Materials Modular coordination Standardization

More information

JOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener

More information

Safe and secure Dero

Safe and secure Dero B I K E D E P OT Safe and secure Whether the project is at a transit station, university campus, or residential building, the Bike Depot s modular design lets customers easily build out to meet their space

More information

IBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work

IBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work IBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work HC PRECAST SYSTEM MOULD SETTING - The wall is designed to

More information

PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE

PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE OUR PROMISE. PROFITABLE PRECAST. WHAT IS PRECAST? A smart and safe way to build consistent high quality Beautiful and sustainable Precast is a smart, industrialized

More information

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

PET*STAR 4 OPERATOR MANUAL

PET*STAR 4 OPERATOR MANUAL Operator Manual 17315060 Rev. 0 (PS - 4) PET*STAR 4 OPERATOR MANUAL Paragraph Page 1.0 INTRODUCTION... 2 2.0 INSTALLATION... 2 3.0 ALIGNMENT... 2 4.0 SPHERICAL ROLLER BEARING & PILLOW BLOCK... 5 5.0 OUTBOARD

More information

Erstantie 2, FIN Villähde Tel , Fax

Erstantie 2, FIN Villähde Tel , Fax www.anstar.eu 2 www.anstar.eu 3 CONTENTS Page 1 PRODUCT DESCRIPTION...4 2 MATERIALS AND STRUCTURE...4 2.1 PRODUCT RANGE...4 2.2 MATERIALS...4 2.3 MANUFACTURING...4 2.4 MANUFACTURING TOLERANCES...4 2.5

More information

COLUMN 11/2013 LINEAR STRUCTURAL ELEMENT

COLUMN 11/2013 LINEAR STRUCTURAL ELEMENT 11/2013 LINEAR STRUCTURAL ELEMENT OÜ TMB Element produces linear structural elements with the product name column in conformity with the standard EVS-EN 13225 Precast concrete products. Linear structural

More information

Number Object Category Attribute Name Explanation Examples Further comments

Number Object Category Attribute Name Explanation Examples Further comments 1 STORY 2 GRID 3 COLUMN 2 Story Elevation Absolute elevation for story (the name "story" is prefered over "level", as level is used in e.g. Revit Typically, our elevations for a project are all relative

More information

CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES

CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES G.Krummel PEIKKO GmbH, Waldeck, Germany Abstract Connections for continuous framing in precast concrete structures have been a problem

More information

OVERVIEW OF PRECAST INDUSTRY IN BRAZIL. ABCIC s Experience Brazilian Precast Concrete Association Íria Lícia Oliva Doniak

OVERVIEW OF PRECAST INDUSTRY IN BRAZIL. ABCIC s Experience Brazilian Precast Concrete Association Íria Lícia Oliva Doniak OVERVIEW OF PRECAST INDUSTRY IN BRAZIL ABCIC s Experience Brazilian Precast Concrete Association Íria Lícia Oliva Doniak EVOLUTION OF THE BRAZILIAN MARKET Some preliminary cases of precast - beginning

More information

Storefront Installation Guide

Storefront Installation Guide Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation

More information

Section 7. Pouring Concrete. Section 7: Pouring Concrete

Section 7. Pouring Concrete. Section 7: Pouring Concrete Section 7 Pouring Concrete Section 7: Pouring Concrete PRE-POUR CHECKLIST CHECK OUTSIDE PERIMETER FOR THESE THINGS OUTSIDE CORNERS Any missing boards on outside corner bracing? Does the outside corner

More information

Schöck dowel Type SLD plus

Schöck dowel Type SLD plus Schöck dowel Type plus Schöck dowel type plus Contents Page Design joints 10 Connection options 11 Dimensions 12-13 Installation information/notes 14-15 Design/On-site reinforcement 16-29 Punching shear

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

TREX PERGOLA INSTALLATION INSTRUCTIONS

TREX PERGOLA INSTALLATION INSTRUCTIONS RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket

More information

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado 1 2 Structural Engineers Association of Colorado White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado Prepared by the

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

Appendix A. Steel Deck Details & Calculations

Appendix A. Steel Deck Details & Calculations Appendix A Steel Deck Details & Calculations Composite Steel Deck Load Calculations: DL = 45 psf LL = 100 psf TL = 1.(45)+1.6(100) = 14 psf Total slab depth = 4 + 1.5 = 5.5 Slab Reinforcing: 4 Slab w/

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

Nasri Group Hollowcore factory

Nasri Group Hollowcore factory About Factory... 1 Factory Attributes... 2 Precast Slabs... 3 Precast Slabs types... 4 Precast Columns... 5 Precast Beams... 6 Precast Bridges... 7 Precast Stairs... 8 Precast Wall Panels... 9 Precast

More information

Completed project drawing (dimensions added for reference)

Completed project drawing (dimensions added for reference) CHAPTER 5 Fundamentals IV PROJECT EXERCISE This project exercise provides point-by-point instructions for setting up the drawing with layers and then creating the objects shown in the accompanying figure.

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned

More information

3.1 General Provisions

3.1 General Provisions WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope

More information

Design of the frame and arms of a Master for robotic surgery

Design of the frame and arms of a Master for robotic surgery Design of the frame and arms of a Master for robotic surgery P.W. Poels DCT 2007.090 Traineeship report Coach(es): dr. ir. P.C.J.N. Rosielle ir. R. Hendrix Technische Universiteit Eindhoven Department

More information

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA ) State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA -01-1911) Vince Campbell Former president of Bayshore Concrete Products Corporation, VA This presentation is developed

More information

Unit 9. Wall and Ceiling Framing

Unit 9. Wall and Ceiling Framing Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE

More information

DECKING INSTALLATION GUIDE

DECKING INSTALLATION GUIDE STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles. SECTION 07 4229 TERRACOTTA CLAY TILE IN PRECAST SPECIFICTION FOR TERRART SOLID PART 1 GENERAL 1.1 SECTION INCLUDES A. Drawings and general provisions of the Contract, including General and Supplementary

More information