1 DATE: DECEMBER 23, 2014 ADDENDUM NO.: 3 Florida Fish and Wildlife Conservation Commission Commissioners Richard A. Corbett Chairman Tampa Brian S. Yablonski Vice Chairman Tallahassee Ronald M. Bergeron Fort Lauderdale Richard Hanas Oviedo Aliese P. Liesa Priddy Immokalee Bo Rivard Panama City Charles W. Roberts III Tallahassee BID NO.: FWC 14/15-72 BID TITLE: UPDATE: APOLLO BEACH MARINE YOUTH CONSERVATION CENTER QUESTIONS AND ANSWERS, REVISED DRAWINGS, AND REVISION TO SPECS If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events. Ms. Gerri Faircloth, Procurement Manager Executive Staff Nick Wiley Executive Director Eric Sutton Assistant Executive Director Jennifer Fitzwater Chief of Staff Finance and Budget Office Stuart Potlock Purchasing Director (850) (850) FAX Managing fish and wildlife resources for their long-term well-being and the benefit of people. 620 South Meridian Street Tallahassee, Florida Voice: (850) Hearing/speech-impaired: (800) (T) (800) (V) ADDENDUM ACKNOWLEDGMENT FORM VENDOR NAME: VENDOR FEID#: ADDRESS: CITY/STATE: PHONE #: FAX #: AUTHORIZED SIGNATURE: TITLE: MyFWC.com

2 Page 2 ADDENDUM NO. 3 ITEM #1: Vendor Questions and FWC Answers Question #1: What is the construction budget? Answer #1: The maximum construction budget will not exceed $1,790, Question #2: Is this RFP subject to Davis Bacon Wages? If so, please publish wage rates. Answer #2: This is an invitation to bid and not an RFP. There is no Davis Bacon Act requirements for this project. Question #3: Does Buy American Act apply? If so did A & E specify all equipment and materials that meet the Buy American Act? Answer #3: There is no Buy American Act requirements for this project. Question #4: Please confirm FWC will provide the onsite Archeologist. Answer #4: Yes, FWC will provide the archeologist. Question #5: During the site visit, security concerns were mentioned regarding TECO and additional site visits.; Will the Contractor be allowed to visit the site during the bidding process? If so, what does the contractor need to do to access the site on multiple occasions? Answer #5: Yes, the contractor and/or subs may access the site on multiple occasions but must notify and provide a business card to the Operations Office prior to entry on the site. The Operations Office is the building located on Elisberry Road. Question #6: With regard to security concerns mentioned at the site visit, what, if any security requirements will the contractor be required to maintain during construction? Answer #6: As with all State Projects, the contractor will be responsible for security of the construction, materials, equipment, etc. Additionally, TECO states contractors will be expected to follow all OSHA guidelines and safe work practices, including the donning of personal protective equipment as required. Question #7: Please confirm that the contractor will be required to pay for the building permit and associated permits only (i.e. electric, HVAC, plumbing and sprinkler). Answer #7: The contractor must pay for all construction permits.

3 Page 3 Question #8: Will a DOT permit be required at road tie on Dickman Road? If so, who will be responsible to pay for this permit? Answer #8: No, the County Right-of-Way Use permit has already been obtained and attached. Question #9: Will impact fees and utility connection fees need to be included? If so is there an amount for each that should be included? Answer #9: The State plans to reimburse the awarded contractor through a Change Order for fees but no markup for processing is allowed. Question #10: Please provide the amount for permit fees included if known? Answer #10: The State plans to reimburse the awarded contractor through a Change Order for fees but no markup for processing is allowed. Question #11: As per General conditions clause, a Notice To Proceed will not be issued until insurance documentation, bonds and all permitting is in place. Does the period of performance start at the NTP? Answer #11: The Notice To Proceed will be issued after the building permit is received. The period of performance will start upon execution of the contract. Question #12: Is there any protected wildlife concerns with the construction site? i.e. turtles, burrowing owls, indigo snake etc. Answer #12: No Question #13: Will any additional permitting be required for the site work? i.e. storm water runoff for well pointing, site maintenance and reporting. Or will FWC monitor those activities and silt fence installation at no additional cost to the contractor? Answer #13: SWFWMD does have jurisdiction of this project; however, the Environmental Resource Permit has already been obtained (see attached). Contractor is responsible for any dewatering permits that need to be obtained. The County will require an inspection (either by their staff or request that Stantec sign off that it was complete). As it pertains to runoff, this becomes an FDEP NPDES Permit Issue which the contractor shall obtain. Question #14: Per plan page C101 Utility Note #5, Portions of work and/or material may be provided by the government municipality. Does FWC know if any portion of the work or material is provided by the municipality? Answer #14: Per conversation with George Goodwin (Hillsborough County), the County will supply the 1 and 1 ½ meter.

4 Page 4 Question #15: Should wheel stops and striping only be included in alternate A? Answer #15: Question #16: The wheel stops will be included in the base bid and the striping will be included in Alternate G. Notes # 1 & 2 on print M0.1 states Insulate Interior (Exterior) Refrigerant Piping Systems.. Section , A, Refrigerant Piping Systems: Fluid generally considered between 40 F and 65 F. It is unclear as to the scope of what is to be insulated. Are you expecting to see just the suction piping insulated or all the pipe insulated? Answer #16: Manufacturer installation instructions indicate that: The Vapor Line must always be insulated. Do not allow the Liquid Line and Vapor Line to come in direct (metal to metal) contact. The Liquid Line is not indicated to need insulation. Question #17: You specify 2 thick armaflex for the exterior refrigerate piping. This is an EXTREMELY expensive product that is not locally stocked. It has to be ordered from the factory warehouse in full carton quantities. I would like to see if it is acceptable to insulate the exterior piping with 1 armaflex, which would seem adequate (the majority of specifications insulate refrigerant piping with either ½ or 3/4 thickness). Answer #17: We would accept 1-1/2 thick armaflex insulation for exterior Vapor Lines. Two (2) layers of ¾ insulation would be an acceptable method of achieving 1-1/2 thickness. Question #18: In the Spec page r- 4 they are wanting a 2 year warranty on the system and 20 the finish. The spec is YKK YHS 50fs. YKK will only warranty it for 10 years on the finish. Are they wanting an additional 10 years from the glazing contractor? Answer #18: Note, the specification page cited is from the previous bid specification set. However, the question still applies to the currently issued specification on page s 4. Revise the specification to indicate a 10 year warranty on the finishes. Question #19: Drywall - What are the partitions types on the new wall lay out on sheet A2.2? Answer #19: See the revised sheet A2.2, rev #1 dated issued in previous addendum. The partition types are included. Question #20: Drywall - Are there low walls at the reception desk or is all mill work? Answer #20: Any low walls at reception desk are part of desk and are Not In Contract (NIC). Question #21: Drywall - On sheet A6.1, the draft stop indicates type 9-e wall on sheet A3.1 wall type 9 on sheet A3.1 is blank?

5 Page 5 Answer #21: See sheet A3.1 with issued date that was issued in previous addendum for partition types including 9E. Question #22: Windows & doors - North Elevation shows a pair of storefront doors while the floor plan shows a single door with Sidelite each side. Answer #22: See revised Floor Plan sheet A2.2, rev #1 dated and revised elevation sheet A5.1, rev #1 dated The opening has been revised on both drawing sheets. Question #23: Windows & Doors - There are no opening numbers indicated on the floor plan, can we assume same window openings as 9/24/14 drawings? Answer #23: See the revised sheet A2.2, rev #1 dated issued in previous addendum. The opening numbers are included. Question #24: Windows & Doors - I don't see a revised drawing A4.1, are we to use the 9/24/14 drawing? Answer #24: Do not use any of the previous drawings from 9/24/14. All sheets have been reissued and some sheets have been reissued and later revised. See sheet A4.1 with issue date for windows and doors. Question #25: Windows & Doors - Is the door to vestibule 136 a storefront door? Answer #25: See the revised sheet A2.2, rev #1 dated and sheet A4.1 with issue date , both issued in previous addendum. Opening 136 is a rated wood door in a HM frame. Question #26: Drywall/Stucco - Please specify Upper floor plan (A2.2) wall types. Answer #26: See the revised sheet A2.2, rev #1 dated issued in previous addendum. The wall types are included. Note, there is no stucco remaining on this project. Question #26: Drywall/Stucco - Ground floor reflected ceiling plan (A8.1): note on RCP calls for EIFS system, yet in RCP legend calls for cement fiber soffit panels. The EIFS is also called out in the following places - 3/A6.3, 2/A6.4 Answer #26: Please delete the reference to EFIS on sheet A8.1, this was in error. The notes on sheets A6.3 and A6.4 have been corrected in the currently issued drawings. See sheet A6.3, rev #1 dated and sheet A6.4, rev #1 dated These drawings were issued in previous addendum. There is no EFIS remaining on this project.

6 Page 6 Question #27: Drywall/Stucco - Underside of roof trusses: plans still call out UL P522 rating (5/8" 'C' and RC-1 channel) locations include 3/A6.3 and 2/A6.4. In the latest ITB (12/10/14) calls for this system to be deleted. Answer #27: See response above regarding current sheets A6.3 and A6.4. These notes were corrected on currently issued drawings. The rated system at the underside of the trusses has been deleted. Note, there is a rating required at the corridor ceiling. See sheet A8.2, rev #1 dated for rating at corridor ceiling. Question #28: Detail 4/A10.1 indicates that my perimeter chased walls go to underside of roof, while the building sections and wall sections do not indicate this detail or call out this detail Answer #28: Refer to the drawing set cover sheet under Scope of Project, Additional Item #5 for explanation of this detail. Only if the owner chooses to accept the bid additional item does this detail apply. If the owner does accept the bid additional item then this detail would supersede the other drawing details at this condition. Also note that this drawing was revised. The current drawing sheet A10.1, rev #1 dated , the detail number was revised to detail 9. Question #29: Drywall/Stucco - Sheet S-2.3, detail W2/S-5.1 calls for 2 x 6 wood load bearing walls at frame lines D and E. Is this correct? If so, who will build this wall - the carpenter or the drywall contractor? Would the architect consider designing a metal stud load bearing wall in lieu of wood? Answer #29: The structural drawing cited is correct. The question of what sub builds portions of the project is a contractual issue between the general contractor and his subs and cannot be answered here. After bidding, the contractor can offer suggestions to make the project better or construction more efficient and these suggestions will be considered by the architect and owner. However, the project should be bid as currently shown on the drawings with these as load bearing wood walls. Question #30: Please clarify which electric drawing(s) should be used. The plans for low voltage (T 2.2) that were uploaded on 12/16/14 are the same prints that were part of the original bid, and they appear to not match up with the electrical drawings (E 2.2) foot print and layout of the building. Please advise which drawing(s) to use? Answer #30: See revised Security and Telecommunications drawings issued with this addendum. Question #31: What areas are to be sodded? Answer #31: All areas noted as having sod and all disturbed areas with slopes greater than 6:1 shall be sodded. Seeding may occur in other areas where erosion is not an issue and if in compliance with County and State requirements but it will be the contractor s responsibility to ensure the grass establishes itself and stabilizes the areas to prevent erosion.

7 Page 7 ITEM #2: Drawing Revision Cover1 - Refer to drawing cover sheet, Index of Drawings, and revise as follows: Delete drawing sheet M2.3 - Attic HVAC Plan Delete drawing sheet P2.3 - Pavilion & Kayak Storage Plumbing Floor Plans Delete drawing sheet E3.3 Pavilion & Kayak Storage Lighting Floor Plan Delete all drawing sheets under the AUDIO VISUAL heading Delete drawing sheet SEC2.1 Ground Level Security Floor Plan Delete drawing sheet T4.4 Telecommunications Details Delete drawing sheet T4.5 Telecommunications Single line Diagrams Add drawing sheet T5.1 Labeling Scheme and General Requirements Add drawing sheet T5.2 Telecommunications Single Line Diagrams A1 A2 A3 A4 A5 A6 A7 Refer to drawing sheet A2.3, Stair Plan & Section Details 1, 2, and 3. Add an additional tread and riser at the top of the stair so that the top flight will have 10 treads. Correct the top landing elevation to Sidewalk at base will be elevation 6.6 and intermediate landing will be elevation Refer to drawing sheet A6.1, Building Section 1, delete note indicating: 5/8 gypsum board on metal studs at interior partitions. Partition construction is described elsewhere in the drawings. Refer to drawing sheet A6.3, detail 3 and drawing sheet A6.4, detail 2; for the cement fiber soffit at the underside of the wood floor, provide additional supplemental framing (not shown) as required to comply with the soffit Product Approval requirement for anchorage to 2-by framing at maximum 16 o.c. Refer to drawing sheet A6.3, detail 1. Delete note indicating aluminum guardrail. Delete reference to detail 7/ A2.3. Guardrail shall be PT 2 x 6 top rail, PT 2 x 6 horizontals, and PT 2 x 2 pickets at 4-1/4 oc. Provide additional railing support with PT 4 x 4 railing posts so that railing support does not exceed 6 ft. Paint all surfaces. Refer to drawing sheet A6.4, detail 2, at note regarding upper level ceiling plenum insulation, delete reference to fireproofing, there is no fireproofing. Refer to drawing sheet A6.4, detail 2, delete note regarding any concrete upper level floor construction. Floor construction shall be plywood deck on wood structure, see structural drawings. Refer to drawing sheet A7.1, Detail 10, delete backsplash height dimension. Also, delete note indicating ¼ back.

8 Page 8 A8 A9 Refer to drawing sheet A8.2, Upper Level Reflected Ceiling Plan, at attic access opening provide a removable plywood access panel supported in a wood frame at the ceiling level. The panel may be in two sections. Refer to drawing sheet A8.2, Upper Level Reflected Ceiling Plan, and modify note regarding soffit and porch vents. Soffit and porch ceiling vents shall be Duraflow Model or equal by another manufacturer. Vents shall be plastic with insect screen, 8 x 16 and provide 45 sq. in. net free area each. Provide 30 vents total, coordinate location with architect. A10 Refer to drawing sheet A10.1, Detail 6 title should be revised to indicate scale as 1 = 50 All technical specifications and construction plans are located at: To access documents at this website, use the following Username and Password: Username: FWC_Bid_Info Password: FWCbids1! Access the folder(s) with this bid number and title to download the associated files. ITEM #3: Specification Revisions Spec1 - Spec2 - Refer to project specifications, delete the following section from the Table of Contents and from the issued specifications: Section Audio Visual Systems Refer to project specification Section Painting, paragraph 3.7, A add item 12 as follows: Exterior Wood Porch Deck, First and Second Finish Coats: Acri-Shield PP1850. Apply per manufacturer recommendations. END OF ADDENDUM NO. 3

9 Page 9

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

December 16, Florida Fish and Wildlife Conservation Commission. Re:

December 16, Florida Fish and Wildlife Conservation Commission. Re: December 16, 20 15 Florida Fish and Wildlife Conservation Commission Tracy Hurst Tampa Permits Section U.S. Army Corps of Engineers 10117 Princess Palm Avenue, Suite 120 Tampa, FL 33610 Tracy.E.Hurst@usace.anny.mil

More information

IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD. REVISED July 15, 2017

IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD. REVISED July 15, 2017 IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD REVISED July 15, 2017 By virtue of authority granted to the Architectural Control Committee in covenants set forth in

More information

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

CONSTRUCTION / HOUSING

CONSTRUCTION / HOUSING CONSTRUCTION / HOUSING - PRINCE EDWARD ISLAND APPLIED MATHEMATICS 80A Table of Contents Construction/ Housing Reading a Tape Measure (Imperial)... - Using a Carpenter s Square... -5 Checking for Squareness

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

Garage Design Guide. October 2018

Garage Design Guide. October 2018 Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

EVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470

EVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470 EVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470 EXTERIOR RESEARCH & DESIGN, LLC. 353 CHRISTIAN STREET, UNIT #13 OXFORD, CT 06478 PHONE: (203) 262-9245 FAX: (203)

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $ CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY

More information

INFORMATION FOR OBTAINING A BUILDING PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).

More information

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

Addendum No. 4 page 1

Addendum No. 4 page 1 Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

The Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address. and/or fax. Address. Owner (if different) Phone

The Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address.  and/or fax. Address. Owner (if different) Phone Design Review Application Bluffs Lot Number Street Applicant Contact Person Email and/or fax Owner (if different) Architect/Designer (if different) Contractor Contact Person Email and/or fax Lot Area (SF)

More information

Construction Services Architect / Engineers Guidelines

Construction Services Architect / Engineers Guidelines Construction Services 2016 Architect / Engineers Guidelines TL Architect/Engineer Fee Proposal Format Fee proposals should be formatted in the following content order: Client Information: Project Name:

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

INFORMATION FOR OBTAINING A BUILDING PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).

More information

ROOFING City of Grand Rapids Building Safety Division

ROOFING City of Grand Rapids Building Safety Division ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

Code Compliance Research Report CCRR-0155

Code Compliance Research Report CCRR-0155 Code Compliance Research Report CCRR-0155 Issue Date: 03-25-2011 Revision Date: 04-18-2018 Renewal Date: 03-26-2019 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 63 00 Plastic Railings REPORT

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT. Dr. Checks Comment Responses Review: 100% Building Package B Review Project: (G168476) Ft. Gillem, Enclave Force Protection Latest Update: 03-03-2010 8:30 am 1. 3079320 We will coordinate and add to the

More information

Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division

Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division Tacoma Economic Development Department Culture and Tourism Division 747 Market Street Room 1036 Tacoma WA 98402-3793 253.591.5220 APPLICATION FOR DESIGN REVIEW FOR SINGLE FAMILY RESIDENTIAL PROPERTIES

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and

More information

REFLECTION POINTE SUBMITTAL FORMS March 2018 Edition

REFLECTION POINTE SUBMITTAL FORMS March 2018 Edition REFLECTION POINTE SUBMITTAL FORMS March 2018 Edition GENERAL NOTE: BUILDER AND PROPERTY OWNER MUST ACKNOWLEDGE THEIR ACCEPTANCE OF THESE GUIDELINES ON Page! 1 of 16 TABLE OF CONTENTS Schematic Review Submittal

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS Development Services Department Building Division 500 East Third Street, Suite 110 Loveland, CO 80537 (970) 962-2505 FAX (970)

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

DECK PERMIT APPLICATION PACKET

DECK PERMIT APPLICATION PACKET Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) The following materals shall be submitted and reviewed

More information

WALKS AND SIDEWALKS REQUIREMENTS:

WALKS AND SIDEWALKS REQUIREMENTS: DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground

More information

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

The maximum back wall height is eight-feet three-inches (8 3 ), including truss, and is allowed only in the rear half of the booth space.

The maximum back wall height is eight-feet three-inches (8 3 ), including truss, and is allowed only in the rear half of the booth space. Linear Booth: A standard/linear (10 x10 ) booth (also called in-line booth ) is any booth that shares a common back wall and adjoins other exhibits on one or two sides. NOTE: A booth that is 10 ft. in

More information

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL

More information

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479 AREA MAP DR. FAKHOURI SKIN CARE SPECIALISTS 750 WEST GRAND PARKWAY SOUTH SUITE 20 SUGAR LAND, TX 7779 DRAWING LIST G00 G002 G00 G00 G005 G00 G007 G008 A0 A02 A0 00 0 02 0 0 05 Cover Sheet General Conditions

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

INFORMATION FOR OBTAINING A BUILDING PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information