CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Size: px
Start display at page:

Download "CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT"

Transcription

1 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: Modernization of Classroom Building 300 Chabot College All Prospective Bidders: This addendum is issued to clarify, add, delete, correct and/or change the contract documents to the extent indicated and is hereby made a part of the above noted contract documents on which the contract will be based. Any modifications/changes made by this addendum affect only the portions or paragraphs specifically identified herein; all remaining portions of the proposal to remain in force. It is the responsibility of all bidders to conform to this addendum. Acknowledge receipt of this addendum in the space provided on the bid form. Failure to do so may subject Bidder to Disqualification. The original Bid Documents are modified by the revision as follows: 1. GENERAL CLARIFICATIONS: Refer to the attached for Addendum no. 09.R. If you have any questions regarding this Addendum No.09.R, please contact the Office of the Facilities Planning & Management in writing, via facsimile or . All other terms and conditions of BID No are to remain the same Franklin Drive, Pleasanton, California Tel. (925) FAX (925)

2

3

4

5

6 2) The water treatment representative is to install a temporary automatic chemical injection pump for the injection of corrosion inhibitor into each piping system. 3) Water is not to be introduced into any piping system unless it has been treated by the water treatment representative. 4) The water treatment representative is to provide a report at the completion of their work indicating the water chemical analysis at the site, the steps taken in cleaning and chemically treating the water in the system and the chemical analysis of the water in the piping system at the completion of their work. F. Part 3 Execution, J - Cleaning and testing hydronic piping,.3 - Pressure testing, f f. The following new text has been added, Pressure testing shall be witnessed and approved by the IOR, District s representative and the Construction Manager. Item No. AD9-1.14: Reference Section , electronic access Control and Intrusion detection (1.03) (A): Revise reference from Building 300 to Building 100. (1.05) (D): Revise paragraph to read: D. Intrusion detection devices shall be configured and programmed in alarm zones. Alarm zone information shall be coordinated with the District and the Consultant. 1. After-Hours Operation: The ACAMS shall be programmed so that a valid pin code followed by a valid card read at the designated main entry door shall disarm all alarm zones in the building (the associated zone) and shall momentarily unlock the associated door and then immediately re-lock it while still keeping all other exterior doors locked.. Upon exit, a valid pin code shall re-arm the entire building zone. In those instances where there is more than one exterior card reader on a building, after-hours access will only be possible at the card reader with the key pad at the designated main entry door. All other card readers shall be programmed to be locked out at all times during after hours operation. 2. Business-Hours Operation: The ACAMS shall be programmed to disarm all alarm zones in the building (the associated zone) and Owner-specified exterior (perimeter) doors will unlock. For specific exterior doors, doors shall remain locked and a valid card read shall unlock the door to relock on closure. For specific interior doors as shown on the Drawings, the ACAMS shall be programmed so that a valid card read followed by a valid pin code shall activate an event to unlock the door and the door shall remain unlocked until a second swipe of the card is initiated thus locking the door or after 2 hours as a failsafe. During the transition from business hours to after hours operation, the entire building will arm and all doors will lock. (2.02) (D): Add charcoal grey in color. (2.02) (E): Remove section. (2.02) (F): Add The color is to be coordinated with the owner. Item No. AD9 1.15: Reference Section , Communications Cabinets, Racks, Frames And Enclosures A. Revise Subparagraph 2.2.B.3 to read as: 3. Manufacturers, Zone 4 rated assembly - subject to minimum panel opening criteria scheduled above: ADDENDUM NO. 9-5 HMC chabot-las positas

7 a. CPI Seismic Frame Two Post Rack with CPI Evolution G2, 8 wide, 7 high, Double-Sided Vertical Cable Manager b. B-Line Advantage Seismic Relay Rack SB FB with CPI Evolution G2, 8 wide, 7 high, Double-Sided Vertical Cable Manager c. Hoffman ESDR19FM45U with CPI Evolution G2, 8 wide, 7 high, Double-Sided Vertical Cable Manager d. or equal. B. Delete Subparagraph 2.2.C.2.d.viii viii No side panels. C. Revise Subparagraph 2.2.C.2.f to read as: f. Multirack installation in a row. Bolt racks together using means provided by manufacturer. D. Revise Subparagraph 2.2.C.3 to read as: 3. Manufacturers: a. Middle Atlantic Products WMRK-4542 Server Rack, with installed accessories: i. ERK-ST Solid Top. ii. LVFD-WMRK-45 Front Door (Perforated 79% Open Area). iii. MW-CFRD-45 Split Rear Doors with Integrated Fans. iv. Two (2) WMRK-45 Solid Side Panels. v. LACE-44-OP Vertical Lacer Strip, 77 inch, 2 each. vi. LBH-1930-T Horizontal Lacer Strip. vii. WMRK-Z4 Seismic Floor Anchor Brackets. viii GANG-10 Ganging Kit quantity as required. ix. At raised floor conditions, provide SRB Series Seismic Certified Riser Bases. b. Or equal. Item No. AD Reference Section , Communications Termination Blocks And Patch Panels A. Revise Subparagraph 2.1.A.3. to read as: 3. Manufacturer a. Systimax 360 GigaSPEED X10D Patchmax GS5 Modular Patch Panel. (District Standard). B. Revise Subparagraph 2.2.C.3. to read as: 3. Manufacturer: a. Systimax 360 G2 Series (District Standard). Item No. AD Reference Section , Communications Indoor Backbone Cabling A. Revise Subparagraph 2.2.B.5.a to read as: a. Systimax LAZRSPEED 550 (District Standard) ADDENDUM NO. 9-6 HMC chabot-las positas

8 B. Revise Subparagraph 2.2.C.5.a to read as: a. Systimax TERASPEED (District Standard). C. Revise Subparagraph 2.2.E.7.a to read as: a. Loose Tube: i. Systimax LazrSPEED 550 Multimode and TeraSpeed Singlemode Loose Tube Cable (District Standard). D. Revise Subparagraph 2.2.F.7.a to read as: a. Systimax LazrSPEED 550 Multimode and TeraSpeed Singlemode (District Standard). Item No. AD Reference Section , Communications Outside Plant Backbone Cabling A. Revise Subparagraph 2.2.E.7.a to read as: a. Loose Tube: i. Systimax LazrSPEED 550 Multimode and TeraSpeed Singlemode Loose Tube Cable (District Standard). Item No. AD Reference Section , Communications Horizontal Cabling A. Revise Subparagraph 2.1.A.4.a to read as: a. Systimax 360 GigaSPEED X10D 2091B Plenum (District Standard). B. Revise Subparagraph 2.2.A.4.a to read as: a. Systimax 360 GigaSPEED X10D MGS600 (District Standard). C. Revise Subparagraph 2.2.G to read as: G. Patch Cords 1. Data Patch Cords one 14 for each station jack and one patch cord for each patch panel jack, in 7 lengths (color: blue, category 6A). 2. Fiber Patch Cords Provide dual SC-LC type patch cord (single mode and multimode) for every dual patch panel port. Match the fiber specifications called for in Section Voice Patch Cords Twenty five (25) patch cords, in 7 lengths (color: white, category 6A). 4. Manufacturers: a. Systimax 360 GigaSPEED X10D GS10E (District Standard). Item No. AD Reference Section , Integrated Audio-Video Systems And Equipment A. Revise Subparagraph 2.1.C.1.a to read as: 1. Chief Manufacturing RPMA1 Series Inverted LCD/DLP Projector Ceiling Mount with: a. CMA-100 Ceiling Plate. b. CMS Speed-Connect Series Adjustable Extension Columns. Verify length required in the field ADDENDUM NO. 9-7 HMC chabot-las positas

9 c. CMA-152 Threaded Pipe Coupler. d. CMA Structural Adapter as required. e. CMA-640 Finishing Ring - Chrome. f. CMA-275 Quick Snap Cable Cover g. Lateral bracing as detailed on Drawing T9.4. ARCHITECTURAL DRAWINGS Item No. AD9-1.21: Reference Revised Architectural Drawings A. The following revised drawings are hereby issued: AD9-A1 through AD9-A18. A1.1-A Building First & Second Floor Demo Plan A2.1-A Building First & Second Floor Plan A3.1-A Building First & Second Floor Reflected ceiling Plan A4.1-A Building Roof Plan A5.1-A Building Exterior Elevations A6.1-A Building Building Section A7.3-A Building Enlarged Plans & Elevations A8.1-A Building Interior Elevations A8.2-A Building Interior Elevations A10.10 Specialties Details Item No. AD9-1.22: Reference drawing A7.1, Building 300 & 500 Enlarged Plans & Elevations A. Added to detail callouts 22/A10.9, 23/A10.9 the note: "typical" STRUCTURAL DRAWINGS Item No. AD Reference drawing S2.1, Building 300 Foundation Plan A. Provided reference to typical detail for pipe penetrations through existing foundations, see AD-9.S01 Item No. AD Reference drawing S2.2, Building 300 Second Floor Framing Plan A. Provided new openings in existing concrete slab for mechanical shafts, see AD-9.S03 B. Provided for new cored penetrations through existing concrete slab to accommodate electrical/data floor boxes, see AD-9.S02 & AD-9.S03. C. Showed additional existing mechanical unit to remain, see AD-9.S03 Item No. AD Reference drawing S2.3, Building 300 Roof Framing Plan A. Allowed wall tie/crosstie to be offset from Grid 2 to avoid existing roof hatch, see AD-9.S ADDENDUM NO. 9-8 HMC chabot-las positas

10 Item No. AD Reference drawing S3.2, Details A. New typical detail for infill of existing penetrations in existing second floor concrete slab; see AD-9.S05 MECHANICAL DRAWINGS Item No. AD9-1.27: Reference Drawing M0.1 Mechanical Legend and Notes Find attached re-issued drawing M0.1 showing the following revisions: A. Added System Acoustics Notes 1.A. and 1.B. B. Added Building 300 and 500 First Floor Attic Plenum note. C. Revised List of Drawings. Item No. AD M0.1.1 Building title 24 forms See attached re-issue drawing M0.1.1 showing revised Title 24 Calculations. Item No. AD9-1.29: Reference Drawing M0.2 Mechanical Schedules Find attached re-issued drawing M0.2 showing the following revisions: A. Added Servicing Requirements for Existing Fan Coil Units note. B. Added Air Handling Unit Schedule. C. Added Existing Fan Coil Unit Notes 4 and 5 to Fan Coil Unit Schedule and revised Notes column accordingly. Item No. AD9-1.30: Reference Drawing M0.3 Mechanical Schedules Find attached re-issued drawing M0.3 showing the following revisions: A. At Fan Coil Unit Schedule (Cont d.), revised values at entire Model column, entire Air Quantity (CFM) column, entire Voltage / Phase column and value for FC-311A in Smoke Detector Required column. B. Revised Existing Fan Coil Unit Notes and Notes column accordingly. Item No. AD9-1.31: Reference Drawing M0.5 Mechanical Schedules Find attached re-issued drawing M0.5 showing the following revisions: A. Revised all values for CR-301, 302 and 303 at Radiator Schedule ADDENDUM NO. 9-9 HMC chabot-las positas

11 Item No. AD9-1.32: Reference Drawing M0.6 Mechanical Schedules Find attached re-issued drawing M0.6 showing the following revisions: A. Added EF-301 to Roof-Mounted Centrifugal Exhaust Fan Schedule. B. Added GR-301, 302 and 303 to Gravity Hood Schedule. B. Removed Ceiling Exhaust Fan Schedule. Item No. AD9-1.33: Reference Drawing M0.7 Mechanical Schedules Find attached re-issued drawing M0.7 showing the following revisions: A. Added CC-301 through CC-307 to Ductless Split Cooling Only Schedule. Item No. AD9-1.34: Reference Drawing M1.1 Bldg. 300 Mechanical First Floor Demolition Plan Find attached re-issued drawing M1.1 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.35: Reference Drawing M1.2 Bldg Mechanical Second Floor Demolition Plan Find attached re-issued drawing M1.2showing the following revisions: A. Entire sheet revised. Item No. AD9-1.36: Reference Drawing M1.3 Bldg Mechanical Roof Demolition Plan Find attached re-issued drawing M1.3 showing the following revisions: A. All Sheet Notes revised. B. Louvered roof penthouse revised as demolished. Item No. AD9-1.37: Reference Drawing M2.1 Bldg. 300 Mechanical First Floor Plan Find attached re-issued drawing M2.1 showing the following revisions: A. Entire sheet revised except Cleaning Notes Existing Duct Systems. Item No. AD9-1.38: Reference Drawing M2.2 Bldg. 300 Mechanical Second Floor Plan Find attached re-issued drawing M2.2 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.39: Reference Drawing M2.3 Bldg. 300 Mechanical Roof Plan ADDENDUM NO HMC chabot-las positas

12 Find attached re-issued drawing M2.3 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.40: Reference Drawing M4.1 Bldg. 300 Mechanical First Floor Piping Plan Find attached re-issued drawing M4.1 showing the following revisions: A. Entire sheet revised except Cleaning Notes Existing Piping Systems. Item No. AD9-1.41: Reference Drawing M4.2 Bldg. 300 Mechanical Second Floor Piping Plan Find attached re-issued drawing M4.2 showing the following revisions: A. Entire sheet revised except Cleaning Notes Existing Piping Systems. Item No. AD9-1.42: Reference Drawing M5.1 Mechanical Details Find attached re-issued drawing M5.1 showing the following revisions: A. Note added to Details 4/M5.1 and 5/M5.1. Item No. AD9-1.43: Reference Drawing M5.2 Mechanical Details Find attached re-issued drawing M5.2 showing the following revisions: A. Added Details 5/M5.2, 6/M5.2, 7/M5.2 and 8/M5.2. Item No. AD9-1.44: Reference Drawing M5.3 Mechanical Details Find attached re-issued drawing M5.3 showing the following revisions: A. Added Note 8 on Detail 5/M5.3. Item No. AD9-1.45: Reference Drawing M6.1 Mechanical Control Diagrams Find attached re-issued drawing M6.1 showing the following revisions: A. Added Detail 4/M6.1 B. Removed reference to bid alternative #1 from Detail 3/M6.1. C. Removed reference to Building 300 from Detail 2/M6.1. D. Revised notes 1 and 4 in Detail 1/M6.1. Item No. AD9-1.46: Reference Drawing M6.2 Mechanical Control Diagrams Find attached re-issued drawing M6.2 showing the following revisions: A. Added duct smoke detector to Detail 5/M ADDENDUM NO HMC chabot-las positas

13 B. Revised note 4 on Detail 5.M6.2. Item No. AD9-1.47: Reference Drawing M6.3 Mechanical Control Diagrams Find attached re-issued drawing M6.3 showing the following revisions: A. Removed reference to Building 300 from Detail 2/M6.3. B. Added Detail 4/M6.3. Item No. AD9-1.48: Reference Drawing M6.4 Mechanical Control Diagrams Find attached re-issued drawing M6.4 showing the following revisions: A. Added Detail 5/M6.4. PLUMBING DRAWINGS Item No. AD9-1.49: Reference Drawing P0.1 - Plumbing Legend, Schedule, and Notes Find attached re-issued drawing P0.1 showing the following revisions: A. Revised Plumbing Fixture Schedule. Item No. AD9-1.50: Reference Drawing P1.1 Bldg. 300 Plumbing First and Second Floor Demo. Plans Find attached re-issued drawing P1.1 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.51: Reference Drawing P2.1 Bldg. 300 Plumbing First Floor Plan Find attached re-issued drawing p2.1 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.52: Reference Drawing P2.2 Bldg. 300 Plumbing Second Floor Plan Find attached re-issued drawing P2.2 showing the following revisions: A. Entire sheet revised. Item No. AD9-1.53: Reference Drawing P3.1 Plumbing Details Find attached re-issued drawing P3.1 showing the following revisions: A. Detail 4/P3.1 replaced ADDENDUM NO HMC chabot-las positas

14 ELECTRICAL DRAWINGS Item No. AD9-1.54: Reference Drawing E0.0 Find attached re-issued drawing AD9-E1 showing the following revisions: A. Remove references to phase 1 demolition. Item No. AD9-1.55: Reference Drawing E2.0, Building 300 First Floor Demolition Plan Find attached re-issued drawing E2.0 showing the following revisions: A. Remove references to phase 1 demolition. Item No. AD9-1.56: Reference Drawing E3.0, Building 300 First Floor Lighting Plan Find attached re-issued drawing E3.0 showing the following revisions: A. Revise lighting layout within Rooms 304, 306, 308, 310, 312, 314, 318, 320, 320, 322, 324, 326, 328, and 332. Item No. AD9-1.57: Reference Drawing E3.1, Building 300 Second Floor Lighting Plan Find attached re-issued drawing E3.1 showing the following revisions: A. Revise lighting layout within Rooms 307, 309, 311, 315, 317, 319, and 321. See attached E3.1. Item No. AD9-1.58: Reference Drawing E4.0, Building 300 First Floor Electrical Plan Find attached re-issued drawing E4.0 showing the following revisions: A. Revise power layout within Rooms 304, 306, 308, 310, 312, 314, 318, 320, 320, 322, 324, 326, 328, and 332. B. Revise connections to mechanical units within central corridor. C. Revise location for power connections to fire smoke dampers. D. Revise security layout for revised doors. Item No. AD9-1.59: Reference Drawing E4.1, Building 300 Second Electrical Lighting Plan Find attached re-issued drawing E4.1 showing the following revisions: A. Revised power layout within Rooms 307, 309, 311, 315, 317, 319, and 321. B. Revised connections to mechanical units within central corridor. C. Revised location for power connections to fire smoke dampers. D. Revised security layout for revised doors. Item No. AD9-1.60: Reference Drawing E5.0, Schedules Find attached re-issued drawing E5.0 showing the following revisions: ADDENDUM NO HMC chabot-las positas

15 A. Revised panelboard schedules for 3R1, 3R2, 3L1, and 3L2. B. Added panel 3R1A, 3L1A, and 3L2A. Item No. AD9-1.61: Reference Drawing E5.2, Schedules find attached re-issued drawing E5.2 showing the following revisions: A. Revised equipment schedules for to change Fan Coil Units to 3-phase motors (adjust circuit numbers and wiring accordingly). B. Added split systems per revised mechanical plans. Item No. AD9-1.62: Reference Drawing E5.3, Schedules find attached re-issued drawing E5.3 showing the following revisions: A. Revise panelboard schedules for 3L2 B. Add panel 3L1A and 3L2A. Item No. AD9-1.63: Reference Drawing E6.0, Diagrams find attached re-issued drawing E6.0 showing the following revisions: A. Revised single line diagram for additional panelboards. Item No. AD9-1.64: Reference Drawing E6.1, Diagrams find attached re-issued drawing AD9-E2 showing the following revisions: A. Revised control of corridor and exterior lights through relays located within the EMS panel. Item No. AD9-1.65: Reference Drawing F2.0, Building 300 First Floor Fire Alarm Plan find attached re-issued drawing F2.0 showing the following revisions: A. Revised fire alarm layout within Rooms 304, 306, 308, 310, 312, 314, 318, 320, 320, 322, 324, 326, 328, and 332. B. Revised location of addressable modules to control fire smoke dampers. Item No. AD9-1.66: Reference Drawing F2.1, Building 300 Second Electrical Lighting Plan find attached re-issued drawing F2.1 showing the following revisions: A. Revised fire alarm layout within Rooms 307, 309, 311, 315, 317, 319, and 321. B. Revised location of duct smoke detectors to control fire smoke dampers ADDENDUM NO HMC chabot-las positas

16 Item No. AD9-1.67: Reference Drawing F3.0, Diagrams find attached re-issued drawing AD9-F1 and AD9-F2 showing the following revisions: A. Revised riser diagram with associated changes to first and second floor fire alarm plans. Item No. AD9-1.68: Reference Drawing F4.0, Schedules find attached re-issued drawing AD9-F3 and AD9-F4 showing the following revisions: A. Revised fire alarm calculations with associated changes to first and second floor fire alarm plans. Item No. AD9-1.69: Reference Drawing F4.1, Schedules find attached re-issued drawing AD9-F5 and AD9-F6 showing the following revisions: A. Revised fire alarm calculations with associated changes to first and second floor fire alarm plans. TELECOMMUNICATION DRAWINGS Item No. AD9 1.70: Reference Drawing T0.2, Symbol, Pull Box And Jbox Schedules find attached re-issued drawing T0.2 showing the following revisions: A. Revised data, telephone and WAP symbols as shown on Addendum Drawing AD9- T1. Item No. AD9 1.71: Reference Drawing T2.1-A, Building First & Second Floor Demolition Plan find attached re-issued drawing T2.1-A showing the following revisions: A. Revised layout of the data outlets in the re-configured first and second floor plans. B. Revised keynotes. Item No. AD9 1.72: Reference Drawing T2.1-C, Building Device Schedule find attached re-issued drawing T2.1-C showing the following revisions: A. Revised the device schedule. Item No. AD9 1.73: Reference Drawing T3.1-A, Building First & Second Floor Reflected Ceiling Plan find attached re-issued drawing T3.1-A showing the following revisions: A. Revised cable tray layout. B. Revised quantity and layout of the projector mounts. C. Revised keynotes ADDENDUM NO HMC chabot-las positas

17 Item No. AD Reference Drawing T7.1, Bldg MDF/ IDF1.1 Enlarged Plans & Elevations find attached re-issued drawing T7.1 showing the following revisions: A. Details 1 & 2 - Revised existing and new enlarged plans. B. Detail 3 Revised reflected ceiling plan. C. Details 4 to 9 Revised as shown. D. Revised/Added demolition notes. Item No. AD9 1.75: Reference Drawing T7.2, Bldg IDF2.1 Enlarged Plans & Elevations find attached re-issued drawing T7.2showing the following revisions: A. Detail 1 Moved conduit sleeves and data outlet for security. B. Detail 2 Moved cable tray. C. Detail 4 Revised rack elevation. Item No. AD9 1.76: Reference Drawing T7.5, Building 200 Plan and Elevation find attached re-issued drawing T7.5 showing the following revisions: A. Revised the sheet in its entirety as shown on Addendum Drawing AD9-T7. Item No. AD9 1.77: Reference Drawing T7.6, Bldg District Server Room 334 Enlarged Plan find attached re-issued drawing T7.6 showing the following revisions: A. Revised sever rack layout. B. Revised cable tray layout. C. Added keynotes E3 and E4. Item No. AD9 1.78: Reference Drawing T8.1, Fiber Cabling Single Line Diagram find attached re-issued drawing T8.1 showing the following revisions: A. Revised fiber patch panel in the MDF Room Item No. AD9 1.79: Reference Drawing T8.2, Copper Cabling Single Line Diagram find attached re-issued drawing T8.2 showing the following revisions: A. Revised copper single line diagram ADDENDUM NO HMC chabot-las positas

18 Item No. AD9 1.80: Reference Drawing T9.1, Device Details find attached re-issued drawing T9.1 showing the following revisions: A. Details 1 to 5 - Revised/Added the various data and voice outlets. B. Added detail 9, Flat Panel TV Back Box. HMC ARCHITECTS ADDENDUM NO HMC chabot-las positas

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures. PAGE 271200-1 SECTION 271200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM NO. 3, March 14, 2017 A.B.C. No ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1)

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1) CELRL-PM-R July ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, Jun ( ENCLOSURE

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

(Larry D. Svitak, PE) License No

(Larry D. Svitak, PE) License No ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

B. Division-16 Basic Materials and Methods section apply to work specified in this section. Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

APPENDIX 3-CLASSROOMS (review by MB) General Guidelines- All Classrooms

APPENDIX 3-CLASSROOMS (review by MB) General Guidelines- All Classrooms APPENDIX 3-CLASSROOMS (review by MB) General Guidelines- All Classrooms A.Normally, install chalkboard??????/markerboards on the front wall of the classroom. Review the specific requirements and placement

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS Part 1 General 1.1 Summary 1.1.1 This section shall govern the products and installation of identification and labeling of all required parts, pieces and accessories of the communications cabling system,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN

More information

ADDENDUM NO. 1. Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID

ADDENDUM NO. 1. Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID FACILITIES PLANNING & CONSTRUCTION ADDENDUM NO. 1 PROJECT NAME: UNL PROJECT NUMBER: CONSULTANT: ADDRESS: University of Nebraska Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID C060P103

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

Solutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs

Solutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs AGRICULTURAL LABORATORY & CLASSROOM FURNITURE Education to Industry for Your Workspace & Storage Needs www.ageducationalsolutions.com 864-256-0621 info@ageducationalsolutions.com Workbenches Potting Benches

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

Installation Instructions Student 101 Fume Cupboard

Installation Instructions Student 101 Fume Cupboard Installation Instructions Student 101 Fume Cupboard Refer drawing on next page 0. If your fume cupboard is supplied with a flatpack bench frame, see step1. If your fume cupboard will be mounted on an existing

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

Element Z General Design Requirements Standards and Other Requirements

Element Z General Design Requirements Standards and Other Requirements P AR T 1 - GENERAL 1.01 OVERVIEW A. The Table identified in Part 2 of this document summarizes A/E deliverables and minimum level of information to be depicted on construction documents at 100 percent

More information

B. The designated coverage areas shall include both indoor and outdoor coverage.

B. The designated coverage areas shall include both indoor and outdoor coverage. Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet

More information

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE: ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION

More information

WaveTrax. Fiber Cable Management System

WaveTrax. Fiber Cable Management System Table of Contents 1. Overview... 3 2. Ordering Information... 8 Fiber Trough System... 8 Express T (Expand Trough Runs without Cutting)... 18 Mounting Brackets... 20 Vertical Fiber Management Solutions...

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

System 3000 specifications

System 3000 specifications System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be

More information

ADDENDUM NO. 3. Ellis County Elections Building

ADDENDUM NO. 3. Ellis County Elections Building AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS

More information

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX SOFTBALL BLEACHER REPLACEMENT PROJECT SOLANO COMMUNITY COLLEGE DISTRICT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA 94534 PROJECT NO: 7-003 APPLICATION NO: SUBMITTAL GENERAL NOTES LEGEND PROJECT SCOPE INDEX

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information