9. Pay for the power consumed until the project has been accepted as substantially complete.
|
|
- Ambrose Ramsey
- 5 years ago
- Views:
Transcription
1
2 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph: G. Deductive Alternate Bid DA3 1. Install bar-wrapped concrete cylinder pipe in lieu of steel pipe in Base Bid Item 4. The quoted deduct shall be the reduction to furnish and install 3,390 LF of barwrapped concrete cylinder pipe in lieu of polyurethane coated steel pipe. The deduct also includes the cost to provide an impressed current Cathodic Protection System required for bar-wrapped pipe in lieu of galvanic anodes required for steel pipe. A4-3. SECTION ALTERNATES A. Reference Page 1, Paragraph : Modification: Modify the first two sentences as follows: 5. The Wilson H. Fox Park will be partially opened to the public noon May 21, The boat ramp and western all remaining campsites will be open to the public. A4-4. SECTION UNIT MASONRY ASSEMBLIES A. Reference Page 6, Paragraph 2.10.: Modification: Delete Paragraph 2.10 in its entirety. A4-5. SECTION ELECTRICAL EQUIPMENT A. Reference Page 1, Paragraph 2.01.A.4.a. Addition: Modify the paragraph to read as follows: Contractor shall provide 5 sets of [4-500kcmil (DLO), #4/0G. (DLO)] in 50 foot lengths with corresponding female cam-locks on one end and pigtail connection on the other end. Cam-locks shall be as manufactured by Crouse-Hinds E1016 or approved equal. B. Reference Page 1, Paragraph 2.01.A.5. Addition: Add the following to the end of paragraph 2.01.A.5: Generator Connection Cabinet shall be 1600A, 3-phase, 4-wire, with 5 sets of male Crouse-Hinds E1016 camlocks per phase and ground. Bus bars shall be copper. C. Reference Page 2, Paragraph 2.02.A.2. Addition: Add the following to the end of the paragraph: Pedestal enclosures shall be steel and pedestals shall be suitable for pedestal mounting. The Pedestal shall include terminals suitable for underground loop feed which shall be able to accept up to 2 sets of 250kcmil conductors per phase, and include equipment ground terminals suitable for up to 2 sets of #2/0 AWG. A4-6. SECTION COMMUNICATIONS OPTICAL FIBER HORIZONTAL CABLING A. Reference Page 1, Paragraph Modification: Modify paragraph 1.01 to read as follows: Fiber optic data highway consisting of furnishing, installing, and testing of Fiber-Optic Cable between the two (2) fiber optic patch panels provided under this contract located at the pump station and at the existing water treatment plant sites. Cable shall be installed in direct buried configuration without any splices. Cable shall be placed in inner duct and installed in the conduit routed along the pipeline as indicated in the plans for Contract A, and cable shall also be installed in the fiber-optic conduit system provided by others under Contract B. The fiber-optic conduit system provided under Contract B (by others) will include a maximum of 16 fiber-optic pull boxes. The Addendum No BRA09103 Contract A Raw Water Intake Pump Station
3 maximum linear distance between the fiber optic patch panels is 26,000ft (this distance does not include the amount of cable that shall be coiled in each pull box). The fiber-optic cable procurement and installation shall be coordinated with electrical contractor. See plans for routing provided under Contract A. A4-7. SECTION VIDEO SURVEILLANCE A. Reference Page 4, Paragraph 2.05.A. Modification: Modify paragraph 2.05.A to read as follows: shall be compatible with the existing DVR (Pelco DVR model DX ) and shall provide a minimum of 250GB of additional storage. Provide. A4-8. SECTION BUTTERFLY VALVES A. Reference Page 1, Paragraph 1.02.B.5: Modification: Modify the paragraph as follows to add one additional Acceptable Motor Operator Manufacturer: 5. AUMA 6. No other manufacturers will be accepted. A4-9. SECTION SLUICE GATES A. Reference Page 1, Paragraph 1.02.B.5: Modification: Modify the paragraph as follows to add one additional Acceptable Motor Operator Manufacturer: 5. AUMA 6. No other manufacturers will be accepted. A4-10. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM A. Reference Page 6, Paragraph Addition: Add the following paragraph C.: C. The EWC WTP includes two HMI/Operator Work Stations. Both HMIs are located within the same building at the EWC WTP; one HMI is located downstairs running Wonderware Version 10 with a 60,000 I/O license and the other HMI is located above the filter gallery running Wonderware Version 10 with an unlimited I/O license. A4-11. SECTION LOOP DESCRIPTIONS A. Reference Page 2, Loop 101, 102 & 103, Paragraph F.4.a. Addition: Add the following to the of paragraph F.4.a.: The OWS shall also provide an option to operate the pumps based on maintaining the level at the Plant s Terminal Storage Reservoir between an operator adjustable high level and low level set points. A4-12. SECTION VERTICAL TURBINE PUMPS A. Reference Page 2, Paragraph 1.02.A.: Addition: Add RuhRPumpen to the list of Acceptable Pump Manufacturers B. Reference Page 2, Paragraph 1.03.A. Addition: Add the following sentence after ISO requirements: The components of the pump that will require ISO certification include the bowl assembly, impeller and discharge head. C. Reference Page 13, Paragraph 1.07.C.1.: Modification: Modify two lines in the table as follows: Minimum Wire-to-Water Efficiency at Rated Point #1 = 76% 74% Maximum Speed, RPM = Addendum No BRA09103 Contract A Raw Water Intake Pump Station
4 D. Reference Page 14, Paragraph 1.07.C.4.: Modification: Modify one line in the table as follows: Pump Discharge and Column Diameter (I.D.) = 14 A4-13. DELETE THE FOLLOWING SECTIONS: METAL WALL PANELS DRAWINGS: A4-14. DRAWING NO. C-1, SHEET NO. 4 A. Reference Note 4: Modification: Delete Note 4 and replace with the following. 4. Contractor to repair COE Park Roads. See hatching of roads in drawing below. Unhatched roads will only require repairs to damaged areas to meet pre-construction conditions. Hatched roads will be rebuilt or repaved per the legend. See Specification for total park and partial park shut down sequence and requirements for temporary and permanent road repairs. B. Reference Entire Sheet: Clarification: The hatch is difficult to see in the hard copy of the plan set. The plan sheet has been reissued as part of the addendum as a PDF. The hatch is clear in the PDF version. A4-15. DRAWING NO. C-21 A. Reference Notes: Addition: Add the following note: 2. Refer to Sheet E-20 for Fiber Optic Details. See Sheet E-2 for additional information on Oncor Duct Bank Requirements. A4-16. DRAWING NO. C-22 A. Reference Notes: Addition: Add the following note: 2. Refer to Sheet E-20 for Fiber Optic Details. See Sheet E-2 for additional information on Oncor Duct Bank Requirements. A4-17. DRAWING NO. C-23 A. Reference Notes: Addition: Add the following note: 2. Refer to Sheet E-20 for Fiber Optic Details. See Sheet E-2 for additional information on Oncor Duct Bank Requirements. B. Reference Plan View Addition: Add an Electrical Pull Box on the Proposed Oncor Duct Bank at Station 34+20, 25 RT of the 48 Pipe Centerline. Addendum No BRA09103 Contract A Raw Water Intake Pump Station
5 A4-18. DRAWING NO. S-6, SHEET NO. 48 A. Reference Detail 6, Building Section: Vertical Conduit Support Slab: Modification: Adjust the RE:PLAN dimension s left extension line to align with thickened slab edge below typical slab. A4-19. DRAWING NO. S-25, SHEET NO. 67 A. Reference Sheet s Title Block: Modification: Delete the sheet title Transformer Pad and replace with Transformer Pad Guide Detail B. Reference Notes Addition: Add the following notes to Drawing No ALL INFORMATION CONTAINED ON THIS SHEET IS FOR INFORMATION PURPOSES ONLY. PROVIDE A COMPLETE DESIGN FOR A TRANSFORMER PAD SIMILAR TO THAT SHOWN AND WHICH INCORPORATES THE OIL SKIMMER SYSTEM INDICATED IN NOTE #2 BELOW. SUBMIT FOR APPROVAL THE ENGINEERED DRAWINGS FOR THE TRANSFORMER PAD S DESIGN. DRAWINGS SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF TEXAS. 2. THE UTILITY TRANSFORMER PAD SHALL UTILIZE SCM-FLOW LEAK MANAGEMENT CONTAINMENT AND SHALL BE PROVIDED BY TEXAS ECO SERVICE, INC (TES). COORDINATE WITH TES FOR ALL REQUIREMENTS THAT PERTAIN TO THEIR CONTAINMENT SYSTEM. ADJUST THE TRANSFORMER PAD GUIDE DETAIL SHOWN AS REQUIRED. TES CONTACT: RANDY FREELAN (214) A4-20. DRAWING NO. E-2, SHEET NO. 88 A. Reference: Notes By Symbol No.2: Modification: Modify Notes By Symbol No.2 to read as follows: to Utility provided power pole on Higginbotham Property. RE: C-24 C-23 for location of power pole. Coordinate B. Reference: Notes By Symbol No.4: Modify Notes By Symbol No.4 to read as follows: Contractor shall route duct bank from electrical manhole EMH-1 and Terminate/Cap duct bank 5-0 from manhole conduits in secondary section of utility transformer pad, for future use when electrical service increases.. C. Reference: Notes By Symbol notes: Addition: Add Notes By Symbol No.13. Notes By Symbol No.13 shall read as follows: Cathodic Protection Station, RE: C-7 for location. D. Reference: Plan 1, Site Plan: Addition: Route the duct bank associated with Duct Bank Detail No.5 from the electrical manhole EMH-1 to the utility transformer. E. Reference: Plan 1, Site Plan: Addition: Add a Notes By Symbol No.13 and locate 20 feet North of the meter vault. Route 2 #2, #4G., 1 1/2 Conduit from the Notes By Symbol No.13 to circuit LP1-28. A4-21. DRAWING NO. E-3, SHEET NO. 89 A. Reference: Plan 1, Pump Station Building Power Plan: Clarification: Route the 5 conduits with cable UTIL-P associated with Duct Bank Detail No.6, from electrical manhole EMH-1 to the 480V Switchboard via the Building Exterior Cable Tray. Addendum No BRA09103 Contract A Raw Water Intake Pump Station
6 A4-22. DRAWING NO. E-15, SHEET NO. 101 A. Reference: Panel Schedule LP1: Modification: Refer to Circuit LP1-28. Modify circuit breaker from 20A/1P to be 40A/1P. Modify the load for the circuit from 1000VA to 3750VA. Modify the circuit description to read Cathodic Protection. A4-23. DRAWING NO. E-20, SHEET NO. 106 A. Reference: Detail 1: Modification: Delete Note 1-1/2 HDPE Conduit (Typ 3) and replace with 1-1/2 HDPE Conduit (Typical) Clarification: A single 1-1/2 HDPE Conduit is required to be laid. At each pull box, one conduit enters the vault, one conduit exits the vault and one conduit runs to the post. A4-24. REPLACE THE FOLLOWING DRAWINGS REPLACE DRAWING NO. WITH DRAWING NO. C-1, SHEET NO. 4 C-1, SHEET NO. 4 P-14, SHEET NO. 40 P-14, SHEET NO. 40 RE-3, SHEET NO. 123 RE-3, SHEET NO. 123 RE-4, SHEET NO. 124 RE-4, SHEET NO. 124 RE-5, SHEET NO. 125 RE-5, SHEET NO. 125 RE-6, SHEET NO. 126 RE-6, SHEET NO. 126 END OF ADDENDUM NO. 4 Addendum No BRA09103 Contract A Raw Water Intake Pump Station
7
8
9
10
11
12
Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationUniversity of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.
University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationSECTION 5 TRANSFORMERS
SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established
More informationWisconsin Contractors Institute Continuing Education
IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems
More informationCustomer Connection Guide Updates Effective May 2017
This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationCITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE
San Francisco Water Power Sewer SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS CONTRACT NO. WW-654 ADDENDUM NO. 3 Signatures: 9i;,.,,:.._\
More informationCHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT
CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the
More informationJune 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June
More informationSewer/Water Utility - Trace Wire Specification
Sewer/Water Utility - Trace Wire Specification Materials General All trace wire and trace wire products shall be domestically manufactured in the U.S.A. All trace wire shall have HDPE insulation intended
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationOFFICE OF MANAGEMENT AND FINANCE
CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement
More informationAmerican Electrical Institute
American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article
More informationDESIGN CHECKLIST INTRODUCTION
INTRODUCTION 1 The checklist is intended to serve as a convenient guide in design development as well as the final checking of plans and specifications for construction projects. Its main usefulness for
More information744 Kent Minh, Project Engineer
San Francisco Water Power Sewer Senricos of the San Francisco Public Utilities Commis 'on SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS
More informationCONTINUING EDUC ATION
3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationSECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL
PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.
More informationConstruction Standard No:
Page: 1 of 5 GENERAL * This Construction Standard governs trace wire installation on water mains. A 14 gauge or larger trace wire shall be installed on all water mains. Exception: Water mains as part of
More informationADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationInstallation requirements
Installation requirements for SUNNY CENTRAL 500U 1 Contents This document describes the requirements which have to be observed for the installation site of the Sunny Central 500U. The installation and
More informationTABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES
TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationArticle 250 Grounding & Bonding
Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education
More informationMichigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE
PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationValley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationINSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationSECTION III SUBMITTALS AND APPROVALS
SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District
More informationADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center
ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationNEW OR UPGRADED ELECTRICAL SERVICE
NEW OR UPGRADED ELECTRICAL SERVICE The following steps summarize the general process and procedures necessary for CVEA to complete construction of a new or upgraded service. Variances may be necessary
More informationAmtrak s 138 kv Transmission System that supplies traction power to electric locomotives traveling on the
Word Count: 3039 Replacement of Amtrak s 138 KV Cable through the Baltimore Tunnels Raymond G. Verrelle, PE Amtrak Engineering Department 30 th St. Station, 4 th Floor South Fourth Floor, South Tower Philadelphia,
More informationNational Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002
National Radio Astronomy Observatory Socorro, NM 87801 EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable T. Baldwin June 05, 2002 Summary Double-armor triple-sheath fiber optic cable will be
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationSeptember 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP
CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled
More informationApplying the NEC to Amateur Radio. By Tim Kuhlman, PE
Applying the NEC to Amateur Radio By Tim Kuhlman, PE KD7RUS Purpose of this Course Detail Review of the National Electrical Code as it Applies to Amateur Radio Overview of the NEC Structure Define Article
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationA. Deviation from this standard must be approved by the Project Architect.
September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of
More informationSAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4
SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity
More informationQuality Control Checklist - Design Drawings
Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationCSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct
More information.1 Applicability: These criteria shall be applied as follows:
DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationUNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012
SECTION 01950 - RECORD DRAWINGS & SPACE FLOOR PLANS 1.1 RECORD DRAWINGS MATERIAL AND FORMAT A. Definition 1. Final record drawings, or as-builts, are drawings, which are revised to reflect the changes
More informationPROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS
EVANS DREXEL DREXEL ELLIS ELLIS PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS SHEETS INDEX TO SHEETS DESCRIPTION 90 294 94 LANGLEY EVANS 48TH COTTAGE
More informationAGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover.
AGUB Instrument and Meter Enclosures Furnished with aluminum body and solid or window cover. Class I, Division 1 and, Groups B, C, D Application To pull or splice wires and/or to mount and enclose electrical
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationPage Electric Utility Service Specifications
T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationSECTION COMMUNICATIONS COPPER OSP CABLING
SECTION 27 13 14 COMMUNICATIONS COPPER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,
More informationADDENDUM 4 BID OPPORTUNITY NO
` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More informationConstruction Specification for Watermain and Water Service Tracer Wire
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.40 April 2013 for Watermain and Water Service Tracer Wire Table of Contents TS 7.40.01 SCOPE... 2 TS
More informationSEL Phase Comparison Faulted Circuit Indicator (PC FCI) Communicates to line crews using the. Features and Benefits
SEL-8 Phase Comparison ed Circuit Indicator (PC FCI) SEL-8 SEL-8 SEL-8 SEL-8 SEL-8 SEL-8 Communicates to line crews using the Features and Benefits Locates ed Cable Sections Quickly Locate cable failures
More informationCity of Palm Coast. 160 Cypress Point Parkway, Suite B-106 Palm Coast, FL Tel (386)
ITB-C-CM-14-11 Holland Park Improvements ISSU AT: July 24, 2014 BI AT: SUBJCT: INTNT: August 11, 2014 @ 2:00 PM ANUM NO. 01 City of Palm Coast 160 Cypress Point Parkway, Suite B-106 Palm Coast, FL 32164
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More information6B.6 Substation Grounding
1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationSECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting
SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation
More informationb. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1)
CELRL-PM-R July ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, Jun ( ENCLOSURE
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling
More informationChapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5
Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationPlan Submittal and Review Checklist
Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -
More informationB. The designated coverage areas shall include both indoor and outdoor coverage.
Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More information05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:
ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More information