INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
|
|
- Julius Parker
- 5 years ago
- Views:
Transcription
1 March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV JensenPumps.com
2 Figure 1: This illustration shows a complete pump station material delivery as arranged on one flat bed truck. Installation Instructions Page 2
3 Table of Contents Lift Station Identification Bracket Orientation Bracket Installation Base Elbow Orientation Base Elbow Installation Station Layout Identification Mechanical Joint Sleeve Installation Force Main Installation Intermediate Guide Rail Bracket Installation Pipe Bracing Installation Pump Installation Electrical Cable Management Control Panel Installation Appendix A Junction Box Installation Appendix B Pre commissioning Check List Installation Instructions Page 3
4 JENSEN PUMP STATION SYSTEM IDENTIFICATION DRAWING 5.) WET WELL RIM ELEVATION SINGLE DOOR HATCH 4.) FINISH GRADE ELEVATION DOUBLE DOOR HATCH FORCE MAIN LENGTH 3.) DISCHARGE STRUCTURE 1.) WET WELL 2.) VALVE VAULT 10.) OUTFALL ELEVATION 11.) DRAIN PIPE 6.) GRAVITY INLET INVERT 9.) PUMP FORCE MAIN 7.) SUBMERSIBLE PUMP 8.) BASE ELBOW FOR AUTOCOUPLING SYSTEM PUMP STATION IDENTIFICATION 1. WET WELL: WET UTILITY STRUCTURE WHICH CONTAINS PUMPS, SLIDE RAIL SYSTEM, AND LEVEL SENSORS. 2. VALVE VAULT: DRY STRUCTURE WHICH CONTAINS VALVES, PIPING AND FITTINGS. 3. DISCHARGE STRUCTURE: UPSTREAM LOCATION AT WHICH THE PUMP FORCEMAIN ENDS AND SYSTEM TURNS TO GRAVITY, TYPICALLY A MANHOLE. 4. FINISH GRADE ELEVATION: ELEVATION OF GROUND LEVEL AFTER PROJECT COMPLETION. 5. WET WELL RIM ELEVATION: ELEVATION OF TOP OF WET WELL AFTER PROJECT COMPLETION. TYPICALLY EQUAL TO FINISH GRADE. 6. GRAVITY INLET INVERT ELEVATION: ELEVATION OF INLET PIPE TO THE PUMP STATION. TYPICALLY FROM A GRAVITY PIPE, BUT CAN BE A FORCEMAIN IF COMING FROM A PRESSURIZED SOURCE SUCH AS A PUMP STATION. 7. SUBMERSIBLE PUMP: PUMP IN WET WELL THAT WILL BE SUBMERGED DURING NORMAL OPERATION. 8. BASE ELBOW: PERMANENT BASE IN WET WELL WHICH ALLOWS FOR PUMP COUPLING WHEN PUMP IS PLACED IN WET WELL. 9. PUMP FORCEMAIN: PRESSURIZED PIPE THAT CARRIES WATER FROM PUMP TO DISCHARGE STRUCTURE. 10. OUTFALL ELEVATION: ELEVATION OF FORCEMAIN PIPE TERMINATION AT THE DISCHARGE STRUCTURE. 11. DRAIN PIPE: DRAIN FROM VALVE VAULT TO WET WELL, PREVENTS WATER BUILD UP IN VALVE VAULT. Copyright Information 2011 Jensen Precast All Rights Reserved. All materials appearing as Jensen Precast documents and the like are propriety work product and are protected under U.S. copyright and other laws. Unless in conjunction with business conducted with Jensen Precast, any use of Jensen Precast work product without express, written consent is prohibited and recipient is prohibited from distributing any and all work product to non-approved third parties under penalty of civil action. PROJECT: STATION IDENTIFICATION DETAIL DRAWING DATE: DRAWN BY: SHEET NO: MARCH 2016 BP 1 of 1 PUMP STATIONS 521 DUNN CIRCLE, SPARKS, NV JensenPumps.com (855) C:\Vault\Jobs\Standard Details\Installation Procedures\Identification Sheet\Station ID Assembly.iam
5 PART LIST 1 PART DESCRIPTION 1 PRECAST CONCRETE FLAT TOP 2 PRECAST CONCRETE TOP BARREL 3 UPPER GUIDE RAIL ASSEMBLY 4 FLOAT BRACKET ASSEMBLY 5 CAST IN HATCH 6 FACTORY INSTALLED NUTRAIL Figure 2: This image shows upper guide rail bracket orientation when the flat top includes a single door hatch. Figure 3: Shown here is the upper guide rail bracket orientation when the flat top has a double door hatch. 3 4 Figure 4: The flat top must be oriented such that the long axis of the access hatch is perpendicular to the direction of the force main. Installation Instructions Page 5
6 PART LIST 2 PART QTY DESCRIPTION 1 N.A. FACTORY INSTALLED NUT RAIL 2 5 SS CHANNEL NUT 3 2 UPPER GUIDE RAIL BRACKET 4 5 SS HEX BOLT 5 4 GUIDERAIL PIPE 6 1 SSFLOAT BRACKET 7 2 OPTI FLOAT LEVEL SENSOR 8 1 PRESSURE TRANSDUCER Figure 5: Upper guide rail bracket installation. 8 Figure 6: Float bracket installation. STEPS FOR PART LIST 2 1. Install upper guide rail bracket on the force main side of wet well. a) Leave the SS Hex Head bolts loose. 2. Install float bracket on opposite side of access hatch. 3. If there is no nut rail installed, make sure that all brackets are installed no farther than 6 down the skirt of the frame. IMPORTANT! Pressure transducer handling: The pressure transducer is to be kept in a moisture free environment until it can be installed and pulled directly to the control panel. Please do not splice the cable and/or install in junction box! If a longer cable is needed, contact us at A stilling well may be used; consult Jensen Pump Stations before installing the stilling well pipe. Installation Instructions Page 6
7 PART LIST 3 PART DESCRIPTION 1 UPPER GUIDE RAIL BRACKET 2 CORE HOLE (FORCE MAIN DISCHARGE) 3 PLUMB BOB 4 PUMP BASE ELBOW 5 SS WEDGE ANCHOR 2 4 Figure 7 *Double door hatch orientation see page #3* 1 2 DISCHARGE FLANGE OF PUMP BASE ELBOW MOUNTING HOLES FOR GUIDE RAIL 3 5 Figure 8 Figure 9 STEPS FOR PART LIST 3 1. Align the center of the discharge flange of the pump base elbow, the upper guide rail bracket, and the center of the core hole for the force main discharge. (Figure 7 on this page) 2. Using a plumb bob, align the upper guide rail grommets with the mounting holes for the guide rail in the base elbow. (Figure 8 on this page) 3. Figure 9 is described further on the following page. Installation Instructions Page 7
8 Figure 10 STEPS FOR FIGURE Drill hole for wedge anchors with Roto Hammer. a) WARNING: Take care to not drill all the way through the concrete base. 2. Install wedge anchors. 3. Install base elbows. 4. Tighten wedge anchor hex head. Installation Instructions Page 8
9 *Single door hatch orientation see page 3.* Figure 11: Typical station layout PART LIST 4 PART DESCRIPTION 1 PUMP BASE ELBOW 2 STAINLESS STEEL GUIDE RAIL PIPE 3 FLANGE X PLAIN END PIPE, CUT TO LENGTH IF NEEDED 4 RESTRAINED FLANGE COUPLING ADAPTER (RFCA) 5 FLANGED 90 ELBOW 6 STAINLESS STEEL UPPER GUIDE RAIL BRACKET 7 MEGALUG 8 MECHANICAL JOINT SLEEVE (LONG) 9 PRE ASSEMBLED VALVE VAULT 1 DUCTILE IRON FLANGE: TORQUE SPECIFICATIONS Pipe Diameter Torque Value (ft lbs) Figure 12: Bolt tightening sequence Installation Instructions Page 9
10 MECHANICAL JOINT SLEEVES PRE ASSEMBLED VALVE VAULT Figure 13: MJ Sleeve installation STEPS FOR FIGURE Slide the Mega Lugs and the Joint Sleeves onto the plain ends of the pipes coming out of the valve vault. 2. Once the pipes from the wet well are placed (see Page 9), center the sleeves between the connection and tighten the bolts. Installation Instructions Page 10
11 STEPS FOR PART LIST 4 (from Page 7) 1. In the wet well, install boots into core holes for force main discharge. 2. Install horizontal force main pipe (flange X plain end) through boots. 3. Install vertical force main pipe (can be flange X flange and/or flange X plain end depending on the total well depth). 4. Bolt flanged 90 elbow to RFCA. 5. Slide RFCA onto plain end of vertical force main pipe. Leave loose. 6. Bolt flanged 90 elbow to horizontal force main pipe. 7. Refer to installation instructions provided with RFCA to tighten. 8. Remove the upper guide rail brackets in order to install the guide rails in the base elbow mounting holes (see Fig. 9, page 5), then replace them back on the hatch nut rail. 9. Refer to Fig. 18 on p. 10 for installation of intermediate guide rail brackets for deep wells. *Single door hatch orientation see page 3.* Figure 14: Step 1 Figure 15: Step 2 *Double door hatch orientation see page 3.* STEP 4 STEP 8 STEP 5 STEP 3 STEP 6 Figure 17: Step 6 & Step 8 Figure 16: Step 3 Step 5 Installation Instructions Page 11
12 *Note: Not all stations require intermediate brackets. The following instructions are specifically for stations that are provided with this hardware. Figure 18: Intermediate guide rail bracket installation illustration. STEPS FOR FIGURE With the guide rail pipe provided, measure out the sections. Guide rails are provided in 20 sticks, and quantity depends on the total depth. The guide rails may need to be field cut due to exact well depth. a) For example: If the well is 15 deep, place the intermediate bracket no more than 10 from the floor. This allows for two ~10 sections and two ~5 sections for each pump. 2. Loosely attach the U bolt to the bracket and slide the bracket down the discharge pipe to where the first section of guide rail pipe ends. If flanges do not allow sliding the bracket down the discharge line, remove the U bolt and reconnect it where the first section of the guide rail pipe ends. 3. Connect the next section of guide rail pipe directly on top of the intermediate bracket and tighten the U bolt nuts. Installation Instructions Page 12
13 *Note: Not all stations require pipe bracing. The following instructions are specifically for stations that are provided with this hardware. Figure 19: Typical pipe bracket by Placer Waterworks Inc. Figure 20: Shown above is an example of the pipe bracket installation, with a close up of the wedge anchor placement. STEPS FOR FIGURE Loosely install the U bolts on the discharge pipes and extend the bracket tubing on each side to reach the inner walls of the well. 2. Drill hole for wedge anchors with Roto Hammer. a) WARNING: Take care to not drill all the way through the wall. 3. Install wedge anchors. 4. Place bracket angles on each side. 5. Tighten wedge anchor hex heads, tighten U bolt hex heads. Installation Instructions Page 13
14 Figure 21: Pump is lowered onto base elbow via guide rails. STEPS FOR FIGURE Lower pumps down guide rails onto base elbows. a) Lifting chain with shackles are supplied with the pump station materials. 2. The weight of the pumps creates a water tight seal to the base elbow. a) There is a gasket between the guide claw and base elbow. 3. THERE IS NO BOLTING REQUIRED to connect pumps to the base elbows. *Double door hatch orientation see page 3* Note: The hoist shown on this page is not always included. Use the proper lifting equipment to lower the pumps into the well and to raise the pumps out of the well. Figure 22: Pump is lowered onto base elbow via guide rails. Installation Instructions Page 14
15 Figure 23: The above illustration is an example of electrical cable management. ELECTRICAL CABLE MANAGEMENT NOTES It is essential to utilize proper cord separation techniques when hanging electrical cables. The electrical contractor is responsible for conduit installation. Jensen Pump Stations recommends 2 minimum conduit for both high and low voltage. Pumps typically have two cables exiting the casing. Refer to the installation instructions provided by the pump manufacturer to identify the low voltage and high voltage cables (typically, the high voltage cables have a larger diameter). All low voltage and high voltage cords MUST be ran in separate conduits to the control panel. If low voltage and high voltage cables are placed in the same conduit, a current can be induced in the low voltage cables and create false seal fail alarms. See the following page for continued information. Installation Instructions Page 15
16 UNISTRUT RAIL CONDUIT PIPE Figure 24: Typical control panel installation. CONTROL PANEL INSTALLATION NOTES The location and installation of the control panel is the responsibility of the installing contractor or electrical contractor. Jensen Pump Stations recommends that the panel is mounted as close to the wet well as possible to avoid voltage loss and make start up and continued maintenance more convenient. The panel enclosure may be mounted on a nearby wall or within a nearby structure. Please pull all cables to the control panel. If the control panel is too far to use factory connections, contact JPS ( ) for longer cables. If a junction box is ABSOLUTELY necessary, take note of Pressure Transducer Handling instructions on page 4. It is crucial that the junction box is completely watertight. See Appendix A for junction box installation recommendations. Leave all excess cable coiled within the control panel. A JPS pump technician will make the electrical connections at time of start up/commissioning. Installation Instructions Page 16
17 Please contact Jensen Pump Stations with any questions about the equipment, installation, or commissioning services. (775) A completed pre commissioning check list (see Appendix B) is required in order to schedule start up and training services. Please send a copy of this form completed to PumpSupport@JensenPrecast.com and call (775) to schedule the date with one of our Pump Technicians. Please allow us 2 weeks notice to plan the commissioning of the station. Installation Instructions Page 17
18 APPENDIX A Installation Instructions Page 18
19 PUMP HIGH VOLTAGE CONDUIT (1.5" MINIMUM DIAMETER) B JENSEN PRECAST HT1730 TRAFFIC BOX PUMP LOW VOLTAGE CONDUIT (1.5" MINIMUM DIAMETER) 2'-6" TO CONTROL PANEL LEVEL SENSOR CONDUIT (1.5" MINIMUM DIAMETER) B 1'-5" PLAN SECTION NOT TO SCALE ISOMETRIC VIEW W/ COVER REMOVED NOT TO SCALE RIM/FINISH GRADE 2.5' MIN 1'-0" TYP. ELECTRICAL CONDUIT DESIGN AND MATERIAL BY OTHERS LOW VOLTAGE NEMA 4X ELECTRICAL JUNCTION BOX LOW VOLTAGE NEMA 4X ELECTRICAL JUNCTION BOX HIGH VOLTAGE NEMA 4X ELECTRICAL JUNCTION BOX SEAL CONDUIT WITH DOTTIES DUCT SEAL PUTTY OR EQUAL PRODUCT (SEWER APPLICATIONS REQUIRE GAS TIGHT CONDUIT SEAL) PUMP STATION MANHOLE 2" PVC SCH40 DRAIN LINE 2" PVC SCH40 CHECK VALVE 3" TYP. DRAIN ROCK DESIGN AND COMPACTION BY OTHERS 2" 1" UNISTRUT RAIL SUPPORT FOR JUNCTION BOXES SECTION B-B NOT TO SCALE TYPICAL SYSTEM LAYOUT NOT TO SCALE Jensen Pump Stations does not make any claim that this detail is compliant with the NEC or any other jurisdictional electrical codes or regulations. Copyright Information 2011 Jensen Precast All Rights Reserved. All materials appearing as Jensen Precast documents and the like are propriety work product and are protected under U.S. copyright and other laws. Unless in conjunction with business conducted with Jensen Precast, any use of Jensen Precast work product without express, written consent is prohibited and recipient is prohibited from distributing any and all work product to non-approved third parties under penalty of civil action. PROJECT: TRAFFIC RATED JUNCTION BOX STANDARD DETAIL DATE: DRAWN BY: SHEET NO: MARCH 2016 NEC 2 of 2 PUMP STATIONS 521 Dunn Circle, Sparks, NV JensenPumps.com (855) C:\Vault\Jobs\Standard Details\Installation Procedures\Junction Box\JENSEN JUNCTION.iam
20 APPENDIX B Installation Instructions Page 19
21 521 Dunn Circle Sparks, NV (855) PRE-COMMISSIONING CHECK LIST Please complete prior to scheduling a Jensen Engineered Systems representative for commissioning services. DATE REQUESTED FOR STATION COMMISSIONING: TODAY S DATE: PROJECT ADDRESS: REQUESTED BY: PROJECT NAME: Name: Phone #: Cell Phone #: Company: NUMBER OF STATIONS REQUIRING COMMISSIONING: GENERAL Has all mechanical equipment been installed? Yes or No Is there an acceptable water source available for commissioning? Yes or No *Acceptable water source is a water truck or fire hose connection w/ hose. Garden hose is not acceptable. Will a lifting device to remove pumps be available during commissioning? Yes or No Have the wet well and all piping been cleared of debris? Yes or No Has any of the equipment been exposed to sewage? Yes or No Have appropriate parties been scheduled for training immediately following commissioning? Yes or No ELECTRICAL Is high voltage/low voltage wires in separate conduit? Yes or No Has electrical conduit been sealed? Yes or No Have the electrical leads for the pumps been landed in control panel? Yes or No Have the leads for the level detection devices been landed in control panel? Yes or No Has power been provided to the control panel? Yes or No Is there a main disconnect panel prior to the pump station panel? Yes or No Is a junction box used? Yes or No Verify in line voltage L1/L2 = L2/L3 = L1/L3 =
22 521 Dunn Circle Sparks, NV (855) STATION DESIGNATION: *If there are multiple stations on a single job, submit a copy of this sheet for each station. PUMPS PUMP # 1 PUMP #1 PUMP #2 PUMP #2 PUMP #3 Select One: DUPLEX PUMP STATION TRIPLEX PUMP STATION Refer to tag information on the side of the pump to collect the following information: Pump # Serial Number Model Number PHOTOS Photos are very helpful for the Jensen Engineered Systems technician to review prior to visiting the project site for commissioning. If time permits, please submit pictures showing the overall site, the control panel with door open, and the inside of the wet well. Photos can be ed to PumpStations@JensenPrecast.com (please put the project name in the subject line).
REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION
INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics
More informationSIG-030-B TRAFFIC SIGNAL MAST ARM POLE AND MAST ARM DETAILS - CATEGORY I LUMINAIRE ARM 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) POLE CAP
Michigan Department of Transportation 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) LUMINAIRE ARM (SEE CONTRACT) POLE CAP 1'-6" (6'-0" ARM) 1'-10" (8'-0" ARM) 2'-0" (10'-0" ARM) NOMINAL RISE 2.38"
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationCS3 represents manufacturers of products for use in the municipal waterworks industry.
Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of
More informationBP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.
November, 0 Lit. No., Rev. 0 BP-000 Brine Pro Brine Maker Parts List This Parts List is for BP-000 brine makers with serial numbers beginning with 00 and higher. A DIVISION OF DOUGLAS DYNAMICS, LLC FRAME
More informationSIG-032-B TRAFFIC SIGNAL MAST ARM POLE AND MAST ARM DETAILS - CATEGORY III LUMINAIRE ARM (SEE CONTRACT) 6'-0", 8'-0", 10'-0" NOMINAL SPREAD
Michigan Department of Transportation 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) LUMINAIRE ARM (SEE CONTRACT) POLE CAP 1'-6" (6'-0" ARM) 1'-10" (8'-0" ARM) 2'-0" (10'-0" ARM) NOMINAL RISE 2.38"
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationMEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C
MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of
More informationUser Instructions Multiline Otter Scoreboard Caddy Assembly
List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:
More informationTS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE
TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE Triner Scale & Mfg. Co., Inc. 8411 Hacks Cross Rd. Olive Branch, MS 38654 Phone: 800-238-0152 Fax: 662-809-2386 Description The Triner Scale Model
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationStargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe
Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More informationRELINER INSIDE DROP SYSTEM SPECIFICATIONS
1. PRODUCT NAME RELINER INSIDE DROP SYSTEM U.S. Patent 6074130 Canadian Patent # 2269565 All RELINER Products are proudly made in the U.S.A. 2. MANUFACTURER RELINER /Duran Inc. 53 Mount Archer Rd. Lyme
More informationIntroduction. Depending on your kennel project, you may have some or all of the following hardware: Part # Description Part # Description 1468
Introduction Thank you very much for your investment in Mason kennels. We take great pride in providing our customers with the highest quality animal enclosures combined with an enjoyable ordering experience.
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm
More informationSECTION PRECAST CONCRETE SECTIONAL MANHOLES
SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,
More informationDOCK WEDGE - STANDARD
DOCK WEDGE - STANDARD INSTALLATION INSTRUCTIONS WOOD HEADER READ ALL INSTRUCTIONS BEFORE INSTALLING SEAL. SUPER SEAL MFG. LTD. WILL NOT BE HELD RESPONSIBLE FOR IMPROPER INSTALLATION OF ANCHORING DEVICES,
More informationINSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM
SIX INCH ALPHA MODULE INSTALLATION KEWAUNEE SCIENTIFIC CORPORATION SIX INCH ALPHA MODULE ANCHORING SYSTEM After Alpha module has been set in desired location. Adjust the four adjustment bolts until the
More informationCowVac Installation Instructions
Spalding Laboratories Spalding Laboratories, Inc. PO Box 10000, Reno, NV 89510 dd9ee.spalding-labs.com info@spalding-labs.com Technical Support 1-800-955-6576 CowVac Installation Instructions Copyright
More informationInstallation Instructions
Installation Instructions Optima LED 8 Double-Sided StretchLite Perimeter Lit Graphic Display Line Voltage Connector Optima LED DS5 (Double-sided StretchLite Graphic Display) with Graphics Corner Bracket
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationModel ThermoMark 530. T o r s i o n
Model ThermoMark 530 T o r s i o n Commercial Standard Lift Table Of Contents Pre-Installation 2 Important Safety Instructions 2 Removing an Existing Door and Preparing the Opening 2 Breakdown Of Parts
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More informationAF-4 Grooved Flange Adapter
SUBMITTAL INFORMATION PROJECT NAME: ENGINEER: CONTRACTOR: SPEC. SECTION: MEMBER FEATURES & ADVANTAGES Designed for connecting ANSI/AWWA C110/A21.10 and ASME/ANSI B16.1 Class 125/ flanged end components
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More informationMETALWORKS Wings Accent and Acoustical Clouds Installation Instructions
CEILING SYSTEMS Between us, ideas become reality METALWORKS Wings Accent and Acoustical Clouds Installation Instructions 1. GENERAL 1.1. Product Description MetalWorks Wings is a decorative ceiling element
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationPlastibeton Trench System. Installation Packet
Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationClearSpan End Frame Kit 30' Wide x 11' High
ClearSpan End Frame Kit 30' Wide x 11' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and mounting feet shown in the above diagram
More informationRiser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8
Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18 Manual 40100X35-8 3 2 4 Access covers with bolts supplied with Interceptor 1 5 14 6 11 15 Sampling Port/Cleanout cap supplied with Interceptor 12
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More information96 (Standard Length)
Setbacks 96 (Standard Length) Bike Files may be lined up end to end to fill the available space. A 36 aisle should be left between the ends of bikes in racks facing one another. 36 aisle 50 Installation
More informationBIKE FILE (301)
B IK E F I L E High Efficiency The Bike File is our most space efficient u-lock compatible product. Sturdy sliding hangers allow nine bikes to be securely stored in an eight-foot section while allowing
More informationBioPrism Solid Surface
Please read all instructions before installing products. These instructions are intended for use with InPro s standard toilet partitions, which include 58 high doors and wall panels, when deviating from
More informationConnect Transit Shelter
Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust
More informationReady To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call
Contents Overview ( 1) 3/8" Varia Panel = Cable Tensioner with Cover Plate KIT Stainless Steel: 3-15-1636-K Black Oxide: 3-15-2005-K Cable Tensioner with Cover Plate SS: 3-15-1636 BO: 3-15-2005 + M8 Thread
More informationHOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE
Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6
More informationC70 Window Roller Repair Taken from: Heres the problem:
C70 Window Roller Repair Taken from: http://www.volvospeed.com/vs_forum/topic/115086-how-to-c70-window-rollers-permanent-fix/ Heres the problem: This happened to two separate window assemblys on my c70
More information8 Ft Wide Enclosure Assembly Guide
www.rmfiberglass.com 8 Ft Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Table of Contents 1. Parts and Tools List page 3 2. Hardware page 4 3. Maintenance page 5 4.
More informationFootball Goal Posts MODEL SERIES: FGP400 and FGP600 series
Football Goal Posts MODEL SERIES: FGP400 and FGP600 series Installation and Maintenance Instructions Please read all instructions before attempting installation of these units SAVE THESE INSTRUCTIONS FOR
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationGrease Interceptor Design Checklist
CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private
More informationINSTALLATION GUIDE. Version 2.0
INSTALLATION GUIDE Version 2.0 INTRODUCTION Carefully read these instructions to assure proper installation and performance of the GatorDeck TM. TOOLS NEEDED 1. Calibrated test weights 2. Phillips screwdriver
More informationInstallation Instructions
Installation Instructions SRT-350 8 POST Guardrail End Treatment Revised July 2005 TRINITY HIGHWAY SAFETY PRODUCTS, INC. BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY 2 SRT TM 8-POST SYSTEM FOR SPECIFIC
More informationReal Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions
MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationSUBSTATION SECURITY WALL INSTALLATION MANUAL
SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended
More informationModel Series T o r s i o n
Model Series 7100 T o r s i o n Residential and Light Commercial Rear Mount Low Headroom Outside Hookup Table Of Contents Pre-Installation 2 Important Safety Instructions 2 Removing an Existing Door and
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationRBP-1215B-RX DODGE RAM QUAD CAB RX3
RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side
More informationFORD 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4431
FORD 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4431 Installation Instructions SPECIFICATIONS Fits 1999 2016 Ford F250 & F350 Short Bed Mounts to B&W gooseneck part #1108 & 1111
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8
September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers
More informationCRYSTEEL S. this manual must be included with the vehicle after completing the installation.
Website: www.tbei.com E-mail: sales@tbei.com CRYSTEEL S Grain Tipper mounting and operating instructions this manual must be included with the vehicle after completing the installation. Web Site E-Mail
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationPlastibeton Trench System. Installation Packet
Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle
More informationPARTITION INSTALLATION INSTRUCTIONS
PARTITION INSTALLATION INSTRUCTIONS 2015 Chevrolet Tahoe PPV / Part Number 5703FW, FWA & FEW Do not attempt to install this product on any vehicle equipped with third row seating! Parts List Distributed
More informationOptical Cable Entry Facility (OCEF) Installation Instructions
Instruction Sheet 860380690 Uniprise Solutions Optical Cable Entry Facility (OCEF) Installation Instructions General The Optical Cable Entry Facility (OCEF) cabinets store optical fiber splices between
More informationwww.wildmanconstruction.com Changing your toilet is an easy project that should take half a day or less. The most common toilet has a separate tank that mounts on top of the bowl. These instructions apply
More informationCable Hanging Instruction Manual
Tri-States Grain Conditioning, Inc. Cable Hanging Instruction Manual There are several types of grain storage tanks and bins. Parts of these instructions may be modified to fit the circumstances. Care
More informationDISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING
CU16003K REV 8' x 14' x 9'4" DEEP TRAFFIC FLAT WALL 0113 SHEET 1 OF 6 CU 16003K CU16003K REV 8' x 14' x 9'4" DEEP TRAFFIC FLAT WALL 0113 SHEET OF 6 CU 16003K ITEM (PER ENDWALL): A. 6" DIAMETER PVC CONDUIT
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Universal Low Profile Tilt Mount Model: U.S. Toll Free: 1-866-752-6271 Outside N. America: 1-503-748-5799 E-mail: ts@planar.com FRANCE Phone: +33 5 6378 3810 E-mail: emeats@planar.com
More information18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL
18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay
More informationEdgerail Aluminum Bridge Railing System Specification & Installation Instructions
Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification
More informationOFS ED-6C Instruction Sheet LIGHTGUIDE CROSS-CONNECT Comcode: LGX DISTRIBUTING FRAME INSTALLATION
OFS ED-6C321-50 636-299-104-01 Instruction Sheet LIGHTGUIDE CROSS-CONNECT Comcode: 845 866 367 LGX DISTRIBUTING FRAME INSTALLATION This instruction sheet is intended for use with the installation of an
More informationVORTEX ASSEMBLY AND INSTALLATION INSTRUCTIONS
VORTEX ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334
More informationINSTALLATION INSTRUCTIONS
STRIP DOORS AIR DOORS INSTALLATION INSTRUCTIONS BULK PVC FILM STRIP SHEET PANEL SCREENS, CURTAINS and ENCLOSURES MEGA-PRO SWINGING DOORS DOCK ACCESSORIES IMPORTANT Carefully examine the carton(s) for damage.
More informationTHE AquaBlast & RocketRide FUNSLIDES
THE AquaBlast & RocketRide FUNSLIDES ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * * S.R. SMITH AquaBlast TM & RocketRide TM FUNSLIDES TM ARE MANUFACTURED FOR INSTALLATION AND USE ON RESIDENTIAL
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationASSEMBLY AND INSTALLATION INSTRUCTIONS
ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 (503) 266 2231 (503) 266 4334 www.srsmith.com 06
More informationGared Pro Portable Backstop
Models: 5016, 5017, & 5018 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units PUBLICATION NO. 551754436 SAVE THESE
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Universal Low Profile Flat Mount Model: U.S. Toll Free: 1-866-752-6271 Outside N. America: 1-503-748-5799 E-mail: ts@planar.com FRANCE Phone: +33 5 6378 3810 E-mail: emeats@planar.com
More informationFOR PROFESSIONAL GARAGE DOOR INSTALLERS
Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",
More informationINSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets
TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH., 44660 Supplemental insert Copyright 2015 Wayne Dalton, a division of Part
More informationTHE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS
THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 (503) 266-2231 (503)
More informationMUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections
insertion Instructions manual MUELLER Improved, Centurion Series, Modern Improved, and 107 table of contents PAGE Centurion Series Fire Hydrant Adding an Extension 2-3 Improved Fire Hydrant Inserting Extension
More informationInstallation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.
Description The following pages show the steps required to assembly and fit the antenna mount to a vertical tower pipe of diameter 48 to 115 mm (1.9 to 4.5"). This mount provides ±20 azimuth or ±15 elevation
More informationPipe Restrainers series C Restrainers for use on IPEX Bionax AWWA CI OD C909 PVCO Pipe with MJ or Push-On Fittings
Pipe Restrainers series 1000 1000C Restrainers for use on IPEX Bionax AWWA CI OD C909 PVCO Pipe with MJ or Push-On Fittings INFORMATION Restrainers for restraining mechanical joint or push-on fittings
More informationPORTABLE ADJUSTABLE BASKETBALL SYSTEM
Instruction Manual PORTABLE ADJUSTABLE BASKETBALL SYSTEM P A R T S L I S T 5 1/2 and 8 safe play clearance Item Qty Description Item Qty Description A 1 Portable Base Assembly M 4 1/2 Lock Nut B 2 Front
More informationH HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT
Page 1 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.
More informationTREX POST MOUNT DECKING AND CONCRETE
TREX POST MOUNT DECKING AND CONCRETE for Pressure-treated Wood Framing LOCATION AND INSTALLATION OF POST MOUNTS IMPORTANT NOTES:» EACH POST MUST BE ATTACHED AS SHOWN TO ENSURE A CODE COMPLIANT AND SAFE
More informationGrowSpan Series 500 Roll-Up Ends
GrowSpan Series 500 Roll-Up Ends Photo may show a different but similar model. Doorframe materials are not included. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationTABLE OF CONTENTS REQUIRED TOOLS
TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS
More informationClearSpan End Frame Kit 26' Wide x 12' High
ClearSpan End Frame Kit 26' Wide x 12' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and struts shown in the above diagram are
More informationFreight Door Installation Instructions - HG Series OPENING QUALITY DOORS AROUND THE WORLD. JOB NAME: JOB LOCATION: COURION JOB #:
OPENING QUALITY DOORS AROUND THE WORLD JOB NAME: JOB LOCATION: COURION JOB #: LIFT #: www.couriondoors.com Freight Door Installation Instructions - HG Series COURION For Immediate Help Call 1-800-533-5760
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationEUROLINE CLASSIC PHENOLIC / EVERGREEN. Installation Instructions. Installation Instructions.
EUROLINE ASSIC PHENOLIC / EVERGREEN EUROLINE ASSIC PHENOLIC / EVERGREEN Before you begin, please note the following considerations: Safety First! Please use proper safety gear when performing any installation.
More informationThru Wall Floor Seals For New Installation
The O-Z/Gedney Thruwall and Floor Seals provide a positive means of sealing pipe, conduit or tube where they pass through a concrete foundation of a structure below grade or below ground water level or
More informationPreference Collection and Treatment Console INSTALLATION GUIDE
Preference Collection 5580.69 and 5580.96 Treatment Console INSTALLATION GUIDE WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious
More information