ADDENDUM NO. 4 November 15, Page 1
|
|
- Abigayle Kelley
- 5 years ago
- Views:
Transcription
1 ADDENDUM NO. 4 November 15, Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM, FOREHAND, MATTHEWS & MOORE, ARCHITECTS, INC MANCHESTER STREET, N. E. ATLANTA, GEORGIA SHL-D The following items shall take precedence over the plans and specifications (Project Manual) for the above named project and shall become a part of the Contract Documents. Where any items called for in the specifications or indicated on the drawings are supplemented hereby, the original shall remain in effect. Where any original item is amended, voided, or superseded hereby, the provisions of such item not specifically amended voided, or superseded shall remain in effect. The following items shall be incorporated in the Plans and Project Manual A. PROJECT MANUAL: ITEM NO. 1: ADDENDUM NO. 3: ITEM NO. 1: SECTION BDA - ADVERTISEMENT FOR BIDS, SECTION BDI - INSTRUCTIONS TO BIDDERS: At PRE-BID CONFERENCE:, at "The existing fire alarm system manufacturer is," change from "Simplex" to "Notifier". ITEM NO. 2: SECTION BDA - ADVERTISEMENT FOR BIDS/SECTION BDI - INSTRUCTION TO BIDDERS: Per the Bid Advertisement and the Instructions to Bidders, the following General Contractors are approved bidders: A. M. Adams Building Corporation
2 ADDENDUM NO. 4 November 15, Page 2 Amacher Brothers Construction Bowen & Watson Inc. Grahl Construction Kevin Price Construction McKnight Construction Company ITEM NO. 3: SECTION HVAC: At PART 2 - PRODUCTS: a. Add the following paragraphs: "HEAT PUMP SYSTEMS: A. Heat pump system shall be an air-to-air electric heat pump outdoor unit in combination with a direct expansion fan-coil air handling indoor unit with auxiliary resistance heat. B. The indoor fan-coil unit shall consist of a direct expansion cooling coil, condensate drain pan, direct drive fan, resistance electric heater and filter, all contained in a steel cabinet with baked enamel finish. C. Cooling coil shall be aluminum fins with copper or aluminum tubing. Coil shall be direct expansion type with refrigerant metering device. D. Fan shall be forward curved centrifugal with multi-speed direct drive motor and fan relay. E. Resistance heater shall be an open wire type with built-in contactors and safety limit controls and shall be U.L. labeled for use with the fan-coil unit. F. Filter shall be 1" thick throwaway or permanent washable type. G. The outdoor heat pump unit shall consist of a steel cabinet with baked enamel finish with coil and fan guards, hermetic compressor, propeller type condenser fan with direct drive permanently lubricated motor, and condenser coil. Refrigerant circuit shall contain service valves and filter-drier. Compressors shall be protected by a five year warranty. H. Controls shall include a low pressure switch, crankcase heater, suction line accumulator, pressure relief device. Motor compressor shall have both thermal and current sensitive overloads. Outdoor unit shall have a timer to prevent compressor short cycling and shall prevent restarting for five minutes. An automatic defrost control shall accomplish defrosting if required every 90 minutes for
3 ADDENDUM NO. 4 November 15, Page 3 not more than 10 minutes. I. Where indicated in the schedule, a low ambient solid state fan speed control type head pressure control shall permit compressor operation at outdoor temperatures down to 0 F. J. Heat pump system shall be of the size and capacity indicated on the drawings and as manufactured by Carrier or approved equal by Lennox or Trane. EXHAUST FANS - CEILING MOUNTED: A. Ceiling mounted exhaust fans shall have centrifugal fan, shaded pole fan motor with built-in thermal overload protection, steel cabinet with fiberglass acoustical lining, backdraft damper and ceiling grille. Support fan from building structure using four 1/4" diameter threaded rods. B. Ceiling mounted exhaust fan shall be AMCA rated. C. Provide wall discharge caps, brick vents, sloped roof caps or curb mounted roof caps as indicated on the drawings. D. Ceiling mounted exhaust fan shall be of the size, capacity and arrangement indicated on the drawings and as manufactured by PennBarry or approved equal by Acme, Breidert, Broan, Carnes, Cook, Greenheck, Jenn-Air or Twin City Fans. E. Prefabricated roof curbs as specified herein shall be provided for each roof cap as indicated on the drawings. EXHAUST FAN - INLINE CENTRIFUGAL - DIRECT DRIVE: A. Inline centrifugal exhaust fans shall have zinc coated steel housing with hinged access door and spun aluminum inlet venturi. Fan wheel shall be backward inclined centrifugal wheel made of aluminum. B. Motors shall be direct drive, fractional horsepower with built-in thermal overload protection. Motors shall be cooled by air drawn in from outside the air stream. C. The fan shall be equipped with a backdraft damper, vibration isolation hangers and a built in disconnect switch. D. Provide wall-mounted solid-state speed controllers as scheduled on the drawings. E. Exhaust fans shall be AMCA rated for both air and sound.
4 ADDENDUM NO. 4 November 15, Page 4 F. Inline exhaust fans shall be of the size, arrangement and capacity indicated on the drawings and as manufactured by PennBarry or approved equal by Acme, Breidert, Carnes, Cook, Greenheck, Jenn-Air or Twin City Fans." b. At 2.4 ENERGY RECOVERY UNITS: 1. Replace paragraph "S." with the following: S. Where scheduled on the drawings the unit shall include an auxiliary natural gas furnace with 4 stages of capacity. Gas furnace shall be factory-mounted and consist of stainless steel heat exchangers with multiple concavities, an induced draft blower and an electronic pressure switch to lockout the gas valve until the combustion chamber is purged and combustion airflow is established. Furnace shall include all necessary safeties and a gas ignition system consisting of an electronic igniter to a pilot system, which will be continuous when the heater is operating, but will shut off the pilot when heating is not required. Unit shall include a single gas connection and have gas supply piping entrances in the unit base for through-the-curb piping and in the outside cabinet wall for across the roof gas piping. Auxiliary heating capacity shall be available for operation to supplement the heat pump or to serve as emergency backup. Heat exchangers shall carry a 15 year non-prorated warranty. 2. Replace sub-paragraph Y. 8. with the following: 8. Where the unit is scheduled on the drawing to provide comfort cooling & heating (Locker Rooms) the unit controls shall function as follows: a. When the temperature of the space is below 72 F the gas heat shall be energized in 4 stages. b. A temperature sensor in the supply air shall limit the supply air temperature to not less than 72 F when in the heating mode." c. At 2.8 SERIES FAN POWERED MIXING BOX UNITS:, replace paragraph "K" with the following: K. Control package shall be a Carrier i-vu or Loytec pressure independent electronic control package providing constant fan operation, VAV cooling, electric heat and 0.5" W.G. pressure transducer. d. Delete section 2.11 PRE-FABRICATED PIPE VAULT ASSEMBLY:.
5 ADDENDUM NO. 4 November 15, Page 5 e. Delete section 2.21 OUTSIDE AIR INTAKE AND EXHAUST HOODS:. ITEM NO. 4: SECTION ATC & EMS: At PART 4 - SEQUENCES, at "B.," change to "B. Temperature controls for Roof- Top Units (with VVT) shall be as follows:." B. DRAWINGS: ITEM NO. 1: DRAWING A1.1: At "GENERAL NOTES" add the following: "24. G.C. SHALL PATCH ROOFING AT NEW PIPE CURBS. SEE MECHANICAL DRAWINGS. 25. G.C. SHALL PATCH ROOF AT ALL DEMO'D ELECTRICAL AND GAS PIPING PENETRATIONS TWO (2) PENETRATIONS PER EXISTING ROOF TOP UNIT. SEE MECHANICAL DEMOLITION DRAWINGS. ITEM NO. 2: DRAWING A2.8: Add sketch SK-A2.8-1, dated 11/15/18 and attached herein. ITEM NO. 3: DRAWING M1.8: Replace Drawing M1.8 with revised drawing. ITEM NO. 4: DRAWING M3.1: Replace Drawing M3.1 with revised drawing. ITEM NO. 5: DRAWING M3.2: Replace Drawing M3.2 with revised drawing. ITEM NO. 6: DRAWING E1.1: Replace Drawing E1.1 with revised drawing. ITEM NO. 7: DRAWING E1.2: Replace Drawing E1.2 with revised drawing. ITEM NO. 8: DRAWING E1.3: Replace Drawing E1.3 with revised drawing.
6 ADDENDUM NO. 4 November 15, 2018 Page 6 ITEM NO. 9: DRAWING E1.4: Replace Drawing E1.4 with revised drawing. ITEM NO.10: DRAWING E1.5: Replace Drawing E1.5 with revised drawing. ITEM NO.11: DRAWING E1.6: Replace Drawing E1.6 with revised drawing. ITEM NO.12: DRAWING E1.7: Replace Drawing E1.7 with revised drawing. ITEM NO.13: DRAWING E1.8: Replace Drawing E1.8 with revised drawing. ITEM NO.14: DRAWING E1.9: Replace Drawing E1.9 with revised drawing. ITEM NO.15: DRAWING E1.10: Replace Drawing E1.10 with revised drawing. ITEM NO.16: DRAWING E1.11: Replace Drawing E1.11 with revised drawing. ITEM NO.17: DRAWING E1.12: Replace Drawing E1.12 with revised drawing. ITEM NO.18: DRAWING E1.13: Replace Drawing E1.13 with revised drawing. ITEM NO.19: DRAWING E2.1: Replace Drawing E2.1 with revised drawing. C. PRODUCT AND/OR MANUFACTURER APPROVAL: None this Addendum End of Addendum No. 4
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationIndustrial Pipe Marking
Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More information13acd MERIT SERIES R 22 A I R C O N D I T I O N E R S. SEER up to to 5 Tons Cooling Capacity 17,500 to 60,000 Btuh
E N G I N E E R I N G D A T A A I R C O N D I T I O N E R S 13acd MERIT SERIES R 22 Bulletin No. 210423 April 2008 Supersedes January 2008 SEER up to 14.0 1.5 to 5 Tons Cooling Capacity 17,500 to 60,000
More information2012 IMC Performing Commercial Mechanical Inspections
2012 IMC Performing Commercial Mechanical Inspections Based Primarily on the 2012 International Mechanical Code (IMC ) and the 2012 International Fuel Gas Code (IFGC ) as applicable. ` Welcome I am You
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationSECTION MECHANICAL IDENTIFICATION
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationAcknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.
ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationM1.0 MECHNANICAL FLOOR PLAN
GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY
More informationAWUF Series. Wall-Mount Air Handler 1½ to 3 Tons. Contents. Product Features
Series Wall-Mount Air Handler 1½ to 3 Tons Contents Nomenclature...2 Accessories...2 Product Specifications...3 Dimensions...6 Airflow Data...8 Wiring Diagram...9 Product Features Equipped with a Check
More informationGUIDE SPECIFICATIONS CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP GENERAL DESCRIPTION
GUIDE SPECIFICATIONS 256920-UGS-A-0506 Simplicity Intelli-Comfort Optional Control in 3-25 Ton Packaged Units GENERAL DESCRIPTION CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP Equipment with Simplicity
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationSPLIT DUCTED UNIT TECHNICAL SELECTION DATA SRA141C / SRA140E SPECIFICATION SUMMARY UNIT FEATURES CONTROL FEATURES CONTROL OPTIONS. PLENUMS (Optional)
TECHNICAL SELECTION DATA SPLIT DUCTED UNIT 1 SINGLE PHASE SCROLL SINGLE STAGE SS M SOFT START CENTRIFUGAL LOUVRE AXIAL UNIT FEATURES Scroll Compressor Multiple Speed Outdoor Fans Single Phase Soft Starter
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.
More informationADDENDUM 4 BID OPPORTUNITY NO
` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationThe Ins and Outs of Basic. A practical approach to reading and understanding the schematic diagrams used to explain how HVACR systems operate.
Part 3 The Ins and Outs of Basic Sch ematic Symbols A practical approach to reading and understanding the schematic diagrams used to explain how HVACR systems operate. B y H o w a r d L. P e m p e r, C
More informationC0330, C0530, C0630, C0830, C1030 Service Parts
This part list contains the service parts for the air cooled, water cooled and remote air cooled C00, C00, C00, C080, C00 ice machines. To avoid costly and time consuming errors, double check the model
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationZone Control Unit (ZCU) VAV Turnkey Solution
Description The Zone Control Unit (ZCU) is a VAV turnkey solution. It is an applied equipment-controls package that is pre-engineered and factory-fabricated, to dramatically reduce field installed equipment
More informationSPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK
SPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK PART 1.0 GENERAL 1.1 SCOPE A. This specification contains the minimum requirements for the design, manufacture and testing of a UL listed,
More informationADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017
Procurement Services Lucas Administrative Center, 617 1 Nunn Drive Highland Heights, KY 41099 859.572.6605 FAX 859.572.6995 ADDENDUM NO: 1 IFB/RFP No: NKU-22-18 Commodity: Kentucky Hall Renovation Date:
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationThe General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.
SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in
More informationHeat Exchanger Construction Checklist
Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationMcQuay. Commercial Unitary Rooftop Cooling with Gas Heat. LGA 088, 100 Design 1. Last Manufactured: 2004
Replacement Parts List No. 700021800 New 08/2011 McQuay Commercial Unitary Rooftop Cooling with Gas Heat LGA 088, 100 Design 1 Last Manufactured: 2004 To find your Daikin Applied parts distributor, call
More informationSECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More information1.1 The Bid Date has changed to October 4, The time and place will remain the same.
Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES
More informationTechnical Development Program
Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationCSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct
More informationC0330, C0530, C0630, C0830, C1030 Service Parts
This part list contains the service parts for the air cooled, water cooled and remote air cooled C00, C00, C00, C00, C00 ice machines. There was a change to panels and the C00 air cooled condenser in late
More informationRepair Parts List REFRIGERATOR MODEL NUMBER JS48SEDBDA. When requesting service or ordering parts, always provide the following information:
Repair Parts List REFRIGERATOR MODEL NUMBER JS48SEDBDA When requesting service or ordering parts, always provide the following information: - Product Type - Part Number - Model Number - Part Description
More informationCommercial Refrigeration Price List
Commercial Refrigeration Price List KPL3_004_073118 Effective Date: August 1, 2018 Krack Commercial Refrigeration Price Lists are updated quarterly; January, April, July and October; and posted on our
More informationCITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE
San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER
More informationPARTS CATALOG R410A. No. OCB603 REVISED EDITION-A. March 2016 HFC SUZ-KA25VA5.TH-ET SUZ-KA35VA5.TH-ET SUZ-KA50VA5.TH-ET SUZ-KA60VA5.
SPLIT-TYPE, HEAT PUMP AIR CONDITIONERS PARTS CATALOG R410A [Model Name] SUZ-KA5VA5 SUZ-KA35VA5 SUZ-KA50VA5 SUZ-KA60VA5 SUZ-KA71VA5 [Service Ref.] SUZ-KA5VA5.TH SUZ-KA5VA5.TH-ET SUZ-KA35VA5.TH SUZ-KA35VA5.TH-ET
More informationTechnical Information
Date of last update: Aug-14 Ref: REFRIGERATION - CONTROLLING DIGITAL SCROLL Application Engineering Europe 1 Introduction Refrigeration applications such as retail and convenience stores are requesting
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationInstallation and Maintenance Manual IM 770-1
Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationZone Control Unit (ZCU) Solution
Description The Zone Control Unit (ZCU) is a VAV turnkey solution. It is an applied equipment-controls package that is preengineered and factory-fabricated, to dramatically reduce field installed equipment
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified 8/23/17 Updated sections on System Design and Performance Requirements; Submittals; Equipment; Accessories or Special Features; Quality
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationPRESTON HEALTH SERVICES ARCHITECT S NO. 2700
SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.
More informationYD (MOD A-C) WITH OPTIVIEW CONTROL CENTER FIELD CONTROL MODIFICATIONS
Supersedes: 160.69-PW2 (815) Form 160.69-PW2 (116) WIRING DIAGRAM CONTRACTOR ORDER NO. JCI CONTRACT NO. JCI ORDER NO. YD (MOD A-C) WITH OPTIVIEW CONTROL CENTER FIELD CONTROL MODIFICATIONS PURCHASER JOB
More information05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:
ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,
More informationSmartZone-2 & SmartZone-4
SmartZone-2 & SmartZone-4 Quick-Start Guide UPDATED 2011-7-26 This guide is intended to give the installer a brief set of instructions about how to set up the XCI Zoning SmartZone System. For more detailed
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationPART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,
More informationSUZ-KA25VA3.TH SUZ-KA35VA3.TH SUZ-KA50VA3.TH SUZ-KA60VA3.TH SUZ-KA71VA3.TH
SPLIT-TYPE, HEAT PUMP AIR CONDITIONERS February 013 No. OCB530 REVISED EDITION-A PARTS CATALOG R410A Outdoor unit [Model names] SUZ-KA5VA3 SUZ-KA35VA3 SUZ-KA50VA3 SUZ-KA60VA3 SUZ-KA71VA3 [Service Ref.]
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationILLUSTRATED PARTS LIST COUNTERTOP ICEMAKER IMD SERIES
Distributed By: Commercial Refrigeration Service, Inc. http://www.corneliusparts.com http://www.icecubes.net toll free (8) Ice Maker () 89-888 ILLUSTRATED PARTS LIST COUNTERTOP ICEMAKER IMD SERIES IMD
More informationMichigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE
PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationStepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS
Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 74 00 (April 2006) Change 1-08/15 -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-11744 (August 2004) UNIFIED FACILITIES GUIDE
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationSECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationThe NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:
Reclosers NOVA Three-Phase Recloser Functional Specification Guide Functional specification for NOVA three-phase recloser 1. Scope This specification describes the features and ratings of the NOVA recloser.
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationGUIDE SPECIFICATIONS CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP GENERAL DESCRIPTION
y GUIDE SPECIFICATIONS 407466-UGS-A-0508 SIMPICITY VAV (VARIABE AIR VOUME) Optional 15-25 Ton Packaged Product Comfort Control System CONTROS SPECIFICATIONS AND CONTRO POINT DATA MAP GENERA DESCRIPTION
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationEvaporator E2 Series. Innovative Refrigeration Solutions. Medium & Low Temperature Models. Issue: 05/14
Evaporator E2 Series Medium & Low Temperature Models Innovative Refrigeration Solutions Issue: 05/14 APPLICATION BENEFITS / FEATURES HIGH EFFICIENCY HEAT EXCHANGER COIL Capacity steps in the range are
More informationFUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.
FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior
More informationBidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.
Addendum No. 3 Re / Objet: Phase Two Espanola High School Redevelopment Project 147 Spruce Street Espanola, ON YBA Project No.: 1323 `The following information, amendments and revisions shall constitute
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationB. Manufacturers: Square-D, G.E. or Westinghosue.
SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)
TENDER ADDENDUM PROCUREMENT SERVICES 1221 8 th St, SW Calgary, AB T2R 0L4 Telephone: (403) 817-7495 Fax: (403) 777-6008 Proposal No: 2017TEN754 Covering: DR. G. M. EGBERT SCHOOL VARIOUS UPGRADES Addendum
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,
More informationParts available from Parts Distributor
Parts available from Parts Distributor Dacor Technical Service 14425 Clark Avenue Industry, CA 91745 Phone 800-353-2267 FAX 909-348-5601 Cabinet Ref # Vendor Part # Dacor Part # Description 1 67006258
More informationTECHNICAL SUPPORT MANUAL Fan Coils FXM4X
Fan Coils FXM4X DANGER, WARNING, CAUTION, and NOTE The signal words DANGER, WARNING, CAU- TION, and NOTE are used to identify levels of hazard seriousness. The signal word DANGER is only used on product
More informationHeat Exchangers TUBE TO FIN, LIQUID-TO-AIR HEAT EXCHANGERS
Heat Exchangers TUBE TO FIN, LIQUID-TO-AIR HEAT EXCHANGERS ATS tube-to-fin, liquid-to-air heat exchangers are made with the industry s highest density fins to maximize heat transfer from liquid to air,
More informationTFS Application Guide
AG-TFS-00 TFS Application Guide Titus Air Distribution Technologies 605 Shiloh Road Plano, Texas 75074 972.212.4800 www.titus-hvac.com Titus, the Titus Spiral, The Leader in Air Management, Fantom, Fantom
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More information