CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

Size: px
Start display at page:

Download "CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE"

Transcription

1 San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER POLLUTION CONTROL PLANT CONTRACT NO. ADDENDUM NO. 1 oy Gullette, P.E. f rian Carlomagno, P.E. Project Engineer Contract Standards Engineer Project Manager r Date: May 18, 2018 CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION Signature: -711 JO NA WONG, Mi95GER ENGINEERING MANAGEMENT BUREAU NOTICE TO PARTIES HOLDING SPECIFICATIONS AND CONTRACT PROPOSAL: Bidders are hereby advised that the Bid Opening date has been extended. Bids will be received and publicly read no later than Thursday, June 21, 2018, at 2:00 p.m., at 525 Golden Gate Avenue, 3rd Floor - Tuolumne Room, San Francisco, CA The Contract Documents of the contract named above are hereby amended as follows: Specifications Section Advertisement For Bids Section Table of Contents DELETE the first sentence in the first paragraph and REPLACE WITH "Sealed bids will be received at 525 Golden Gate Avenue, 3rd Floor - Tuolumne Room, San Francisco, CA 94102, until 2:00 P.M. on 6/21/2018." Section , pages 3 and 4: DELETE " QUALITY CONTROL" ADD " SHEET METAL FLASHING AND TRIM" Template Version p Page 1 of 11

2 after FLUID-APPLIED MEMBRANE ROOFING ADD STAINLESS STEEL DOORS AND FRAMES before FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FIBERGLASS RESIN TRANSFER MOLDED DOOR FRAMES REVISE (Rev. 1) FIXED LOUVERS ADD GYPSUM BOARD SHAFT WALL ASSEMBLIES before COATING AND LINING ADD PAINTING after COATING AND LINING Section Instruction to Bidders Section Exhibit A Clean Water State Revolving Fund (SRF) Contract Requirement, Davis Bacon Prevailing Wage Rate Section Agreement Form Section , Page 5, Article 1.06C.5.b: DELETE subparagraph b in its entirety and REPLACE WITH b. Not Used. DELETE Section Exhibit A, Davis Bacon Prevailing Wage Rate (General Decision Number CA /06/2018 CA29) in its entirety and REPLACE WITH Section Exhibit A (Rev. 1) Davis Bacon Prevailing Wage Rate (General Decision Number CA /04/2018 CA29) Section , Page 2, Article 2.01: DELETE Article 2.01 in its entirety and REPLACE WITH 2.01 Completion Dates. As set forth in Section , the Work shall be Substantially Complete within seven-hundred thirty (730)-consecutive calendar days, beginning with and including the official date of Notice-To-Proceed as established by the GENERAL MANAGER, and Finally Complete in accordance with Article 9 of the General Conditions (Section ) within ninety (90)-consecutive calendar days after the date the CITY issues a Notice of Substantial Completion. Page 2 of 11

3 Section Contract Time and Liquidated Damages Section , Page 3, Article 1.04B.12: DELETE subparagraph 12 in its entirety and REPLACE WITH 12. Section Summary of Work, the Contractor shall pay three-thousand dollars ($3,000/day) for each day, it has been determined that the Contractor-caused an unscheduled and/or unaccepted shutdown for associated mitigation costs for City equipment and forces to mitigate potential damages to assets and property resulting in the Contractor-caused shutdown will result in Contractor payment of Liquidated Damages. Section Price and Payment Procedures Section , Page 10, Bid Item 16: DELETE the description for Bid Item 16 Selective Mechanical and HVAC Demolition Work in its entirety and REPLACE WITH it with Payment for all selective mechanical and HVAC demolition work based on OSP building project work areas as follows: OSP 620: Selective mechanical demolition includes selective gas purifier / digester gas process piping and support demolition and disposal to accommodate the installation of the new work, shall include material, labor, and equipment to perform the Work, as shown on the MD-Drawings and specified in Divisions 22 and 40 technical specifications, and elsewhere herein. OSP 741: Selective mechanical demolition includes selective demolition includes removal and disposal of the gas holder / digester gas holder tank assembly (including stairs, handrails, piping and instrumentation), and appurtenances, removal and disposal of compressed gas receiver assembly, piping and appurtenances, removal and disposal of 4-inch blended gas piping, manifold and valve assembly, selective salvage of existing equipment and instrumentation, including but not limited to; pressure/vacuum relief assemblies, flame arrest assemblies, pressure indicating transmitters/sensor assemblies, tank level instrument assemblies. Selective concrete patching and repairs, removal and disposal of 14- inch digester gas piping, supports, valves and manifold assemblies, utility protection of natural gas pressure reducing valve and pipe assemblies and appurtenances Work, as shown on the MD-Drawings and specified in Divisions 03, 22 and 40 technical specifications, and elsewhere herein. See Bid Item Page 3 of 11

4 15 for Selective Structural Demolition items. OSP 800: Selective mechanical demolition includes removal and disposal of digester gas trains; including but not limited to; co-generation engines, exhaust heat recovery silencers, critical silencers, digester gas piping, fittings and valves, equipment and pipe metallic supports, boiler expansion tank assembly, boiler exhaust assemblies, air receiver tank assemblies, process heat exchangers, jacket water cooling heat exchangers, plumbing systems, compress air systems, salvage boiler assemblies and gas chromatograph / gas analyzer assembly, remove and dispose of liquid ring compressor assemblies, piping, fittings, and valve / manifold assemblies, remove and dispose of coalescing filter separator assemblies, remove and dispose of digester gas booster assemblies, remove and dispose of natural gas diluting/boosting assemblies, salvage flame arrestor assembly, pressure indicating transmitter/sensor assemblies, motorized control valve assemblies, and fixed gas monitoring (H2S) instrumentation, field purging and process pipe welding, concrete wall patch repairs, and related Work, as shown on the MD-Drawings and specified in Divisions 03, 22 and 40 technical specifications, and elsewhere herein. OSP 800: Selective HVAC demolition includes removal and disposal of ventilation equipment, associated duct work, appurtenances and supports, and related Work, as shown on the HD-Drawings and specified in Divisions 03, 23 and 40 technical specifications, and elsewhere herein. Payment for selective mechanical and HVAC demolition at OSP building work areas OSP 620, OSP 741 and OSP 800 shall include material, labor, and equipment to perform the Work, as shown on the MD- and HD-Drawings and specified in Divisions 03, 22, 23 and 40 of the technical specifications, and elsewhere herein at the Lump Sum bid price listed in the Schedule of Bid Prices. Section Quality Control Section Sheet Metal Flashing and Trim DELETE Section in its entirety. ADD new Section , attached herewith. Page 4 of 11

5 Section Stainless Steel Doors and Frames Section Fixed Louvers Section Gypsum Board Shaft Wall Assemblies ADD new Section , attached herewith. DELETE Section in its entirety and REPLACE WITH Section (Rev. 1), attached herewith ADD new Section , attached herewith. Section Painting Section Raceway and Boxes for Electrical Systems ADD new Section , attached herewith. Section , Page 2, Article 2.02A: DELETE paragraph A in its entirety. Section , Page 9, Article 3.02A: DELETE paragraph A in its entirety and REPLACE WITH A. For outdoor, non-hazardous service locations, provide PVC-coated RGS conduit except as follows and unless indicated otherwise: 1. For indoor, non-hazardous service locations, provide RGS conduit. 2. For corrosive or wet areas, provide PVC-coated RGS conduit. 3. In Class I, Div I or Div II hazardous locations, provide PVC-coated RGS conduit. Section Motor Control Centers Section , Page 4, Article 1.03: ADD Article 1.03 as follows: 1.03 QUALITY ASSURANCE 1. The Manufacturer of equipment specified herein shall be regularly engaged in the engineering design, manufacturer, operation, maintenance, spare parts, and manufactures services for a minimum of fifteen (15)-years. 2. The Manufacturer shall have local, full-service manufacturer certified equipment support services and Page 5 of 11

6 equipped service facility where they repair and test electrical systems, within one-hundred (100)-miles of the project site with manufacture certified staff and equipment required to troubleshoot, maintain, service and repair electrical equipment specified herein within a twenty-four (24)-hour response time, seven (7)-days a week all year around. Section , Page 12, Article 2.08: DELETE Article 2.08 in its entirety and REPLACE WITH MCC MANUFACTURER, OR EQUAL A. Allen-Bradley B. ABB Section Variable Frequency Motor Controllers Section , Page 8, Article 2.05: DELETE Article 2.05 in its entirety and REPLACE WITH 2.05 MANUFACTURERS, OR EQUAL A. Allen-Bradley B. ABB Section Diesel-Engine-Driven Generator Sets Section , Page 2, Article 1.03B.4: DELETE subparagraph 4 in its entirety and REPLACE WITH 4. Emissions Tier 3 Compliance Section , Page 19, Article 3.02: ADD new paragraph E as follows: E. The Contractor shall obtain and comply with all necessary permits from local, state, and federal agencies and fire districts for the installation of the diesel fuel tank. All license and permit fees shall be borne by the Contractor. Section Aboveground Fuel-Storage Tanks Section , Page 8, Article 2.01O: DELETE paragraph O in its entirety and REPLACE WITH O. Appurtenances: Nozzles as specified below. Location of Nozzles shall be as shown in the drawings. Page 6 of 11

7 1. (1) Storage Tank fill port with: a. (1) 4-inch fill pipe 2. (1) 1-inch leak detection connection 3. (1) 1-inch level switch connection 4. (1) 1-inch level transmitter connection 5. (1) 4-inch fuel storage tank vent 6. (1) 6-inch fuel storage tank emergency vent 7. (2) 4-inch spare connection ports 8. (2) 2-inch spare connection ports Section , Page 9, Article 2.03: DELETE Article 2.03 in its entirety. Section Gas Analysis Process Measurement Devices Section , Page 3, Article 2.02D.1: DELETE subparagraph D in its entirety and REPLACE WITH D. Manufacturers: 1. Draeger model Polytron with a sensor for each gas and with calibration/test kit, including calibration gases. Section Process Control Software Section , Page 2, Article 2.01A: DELETE paragraph A in its entirety and REPLACE WITH A. The application software shall be the latest versions of Invensys Wonderware, running on the latest updated version of Microsoft Windows operating system. Section Cogeneration Engine System Section , Page 32, Article 1.11A.1.g: DELETE subparagraph g in its entirety and REPLACE WITH g. Methane: 50 to 65 percent Section , Page 38, Article 2.01B: DELETE paragraph B in its entirety and REPLACE WITH B. The engine-generators shall be a factory assembled unit, specifically designed and equipped for continuous cogeneration operation on low BTU digester gas, natural gas, Page 7 of 11

8 and blended digester gas and natural gas. The engine and generator shall be directly connected, shall be free from injurious torsional or other vibration that results in static deflections in excess of 6-mils. The engine-generator s shall be mounted on a heavy steel sub-base. Section , Page 43, Article 2.04O.1: DELETE subparagraph 1 in its entirety and REPLACE WITH 1. GE Jenbacher JMS 312, Caterpillar CG132-12, Siemens SGE-36SL or approved equal Section , Page 45, Article 2.05: ADD new paragraph J as follows: J. CH4 Compensation 1. Fuel blending shall be controlled by the engine control system. The proportion of the gases shall be programmed into the engine control system. A gas analyzer shall be provided to monitor the mixed gas methane content and provide this information to the engine controller. A single gas analyzer may service two or more engine generator sets. 2. Each engine fuel system shall be capable of maintaining continuous safe engine operation while adapting to fluctuations in methane (CH4) content due to digester generated gas. 3. Each engine fuel system shall include its own methane sensing device that shall be capable of measure methane percentage by volume between the range of 40%-100% at a minimum. 4. Each engine controller shall be configured to monitor real time CH4 status. Reading status shall trigger on configurable onboard alarms of each engine and drive automatic operation controls if selected. CH4 readings shall be configurable to be output to plant DCS monitoring system. 5. Dual Gas Operation (natural gas blending) a. The system shall blend two gasses: type A (digester gas) and type B (natural Page 8 of 11

9 gas). The CH4 compensation device shall provide a signal to the controller denoting the methane content of the mixed gases. The controller shall adjust the engine settings to accommodate starting and operation on the blended fuel based on the methane content information provided by the CH4 sensor. 6. Make and Model a. Multi-Engine Fuel analyzer: Union Instruments INCA 3011 or approved equal. b. Individual Fuel Train CH4 Sensor: BlueSens BCP-CH4 or approved equal. Drawings 800-MD MD MD MD SD S S A A A A M-6005 DELETE 800-MD-0001 in its entirety and REPLACE WITH 800-MD-0001 (REV 1). DELETE 800-MD-1001 in its entirety and REPLACE WITH 800-MD-1001 (REV 1). DELETE 800-MD-1002 in its entirety and REPLACE WITH 800-MD-1002 (REV 1). DELETE 800-MD-1004 in its entirety and REPLACE WITH 800-MD-1004 (REV 1). DELETE 820-SD-3001 in its entirety and REPLACE WITH 820-SD-3001 (REV 1). DELETE 820-S-1002 in its entirety and REPLACE WITH 820-S-1002 (REV 1). DELETE 820-S-3001 in its entirety and REPLACE WITH 820-S-3001 (REV 1). DELETE 000-A-5001 in its entirety and REPLACE WITH 000-A-5001 (REV 1). DELETE 820-A-1001 in its entirety and REPLACE WITH 820-A-1001 (REV 1). DELETE 820-A-2001 in its entirety and REPLACE WITH 820-A-2001 (REV 1). DELETE 820-A-4001 in its entirety and REPLACE WITH 820-A-4001 (REV 1). DELETE Drawing 000-M-6005 in its entirety and Page 9 of 11

10 800-M M M E E E E E E E E-1001 REPLACE WITH Drawing 000-M-6005 (REV 1). DELETE Drawing 800-M-1001 in its entirety and REPLACE WITH Drawing 800-M-1001 (REV 1). DELETE Drawing 821-M-1003 in its entirety and REPLACE WITH Drawing 821-M-1003 (REV 1). DELETE Drawing 821-M-3001 in its entirety and REPLACE WITH Drawing 821-M-3001 (REV 1). DELETE Drawing 008-E-6009 in its entirety and REPLACE WITH Drawing 008-E-6009 (REV 1). DELETE Drawing 008-E-6106 in its entirety and REPLACE WITH Drawing 008-E-6106 (REV 1). DELETE Drawing 008-E-6110 in its entirety and REPLACE WITH Drawing 008-E-6110 (REV 1). DELETE Drawing 008-E-6118 in its entirety and REPLACE WITH Drawing 008-E-6118 (REV 1). DELETE Drawing 008-E-6204 in its entirety and REPLACE WITH Drawing 008-E-6204 (REV 1). DELETE Drawing 011-E-6001 in its entirety and REPLACE WITH Drawing 011-E-6001 (REV 1). DELETE Drawing 800-E-6001 in its entirety and REPLACE WITH Drawing 800-E-6001 (REV 1). DELETE Drawing 820-E-1001 in its entirety and REPLACE WITH Drawing 820-E-1001 (REV 1). Attachments: Specifications: 1. Section Exhibit A (Rev. 1) 2. Section Section Section (Rev. 1) 5. Section Section Drawings: MD-0001 (REV 1): GENERAL DEMOLITION NOTES MD-1001 (REV 1): OSP 800 FIRST FLOOR PLAN MD-1002 (REV 1): OSP 800 FIRST FLOOR PLAN AREA A - DEMOLITION MD-1004 (REV 1): OSP 800 FIRST FLOOR PLAN AREA C DEMOLITION SD-3001 (REV 1): OSP 820 BOILER BUILDING SECTION I DEMO S-1002 (REV 1): OSP 820 BOILER BUILDING ROOF PLAN S-3001 (REV 1): OSP 820 BOILER BUILDING SECTIONS AND DETAILS A-5001 (REV 1): DOOR AND LOUVER SCHEDULES Page 10 of 11

11 A-1001 (REV 1): OSP 820 BOILER BUILDING 1ST FLOOR PLAN A-2001 (REV 1): OSP 820 BOILER BUILDING - EXTERIOR ELEVATIONS A-4001 (REV 1): OSP 820 BOILER BUILDING INTERIOR ELEVATIONS M-6005 (REV 1): PIPE SCHEDULE M-1001 (REV 1): OSP 800 FIRST FLOOR PLAN M-1003 (REV 1): FUEL STORAGE AREA PLAN M-3001 (REV 1): FLARE BUILDING SECTION E-6009 (REV 1): SS-5 REMOTE OPERATOR PANEL E-6106 (REV 1): CABLE SCHEDULE E-6110 (REV 1): CONDUIT SCHEDULE E-6118 (REV 1): CONDUIT SCHEDULE E-6204 (REV 1): CONDUIT DEVELOPMENT E-6001 (REV 1): 12KV MAIN PLANT SWITCHGEAR MPS SINGLE LINE DIAGRAM E-6001 (REV 1): ENERGY RECOVERY BUILDING SS-5 SINGLE LINE DIAGRAM E-1001 (REV 1): BOILER BUILDING POWER PLAN END OF ADDENDUM NO. 1 Page 11 of 11

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE San Francisco Water Power Sewer SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS CONTRACT NO. WW-654 ADDENDUM NO. 3 Signatures: 9i;,.,,:.._\

More information

744 Kent Minh, Project Engineer

744 Kent Minh, Project Engineer San Francisco Water Power Sewer Senricos of the San Francisco Public Utilities Commis 'on SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

State College of Florida, Manatee-Sarasota

State College of Florida, Manatee-Sarasota State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

oxy.iq Panametrics Oxygen Transmitter Applications Features bhge.com Two-wire, loop-powered 4 to 20 ma transmitter An oxygen transmitter for use in:

oxy.iq Panametrics Oxygen Transmitter Applications Features bhge.com Two-wire, loop-powered 4 to 20 ma transmitter An oxygen transmitter for use in: oxy.iq Panametrics Oxygen Transmitter Applications An oxygen transmitter for use in: Glove box purge and leak detection Natural gas Semiconductor wafer machines Coating process machines Membrane air separators

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

RE: City of Summersville, Glade Creek Phase llb

RE: City of Summersville, Glade Creek Phase llb STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

1.1 The Bid Date has changed to October 4, The time and place will remain the same.

1.1 The Bid Date has changed to October 4, The time and place will remain the same. Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Section Project Closeout

Section Project Closeout Section 01700 - Project Closeout PART 1 GENERAL A. STIPULATIONS The section Special Requirements forms a part of this section by this reference thereto and shall have the same force and effect as if printed

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

SECTION FUEL OIL SYSTEM (PLUMBING)

SECTION FUEL OIL SYSTEM (PLUMBING) SECTION 15484 FUEL OIL SYSTEM (PLUMBING) PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-In-Place Concrete. 3. 15410 -

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS March 17, 2016 To prospective bidders & others concerned: This addendum sets forth changes and/or information

More information

Residential Room Additions

Residential Room Additions Residential Room Additions The purpose of this information sheet is to provide information regarding building code and permit processing requirements for RESIDENTIAL ROOM ADDITION(S) in the City of Poway.

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017 Project No. 6040.0, Contract No. E7-09 SECTION 0090 ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. JULY 2, 207 This Addendum No. ( Addendum ) as dated above modifies certain

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

ADDENDUM 4 BID OPPORTUNITY NO

ADDENDUM 4 BID OPPORTUNITY NO ` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

Zone Control Unit (ZCU) VAV Turnkey Solution

Zone Control Unit (ZCU) VAV Turnkey Solution Description The Zone Control Unit (ZCU) is a VAV turnkey solution. It is an applied equipment-controls package that is pre-engineered and factory-fabricated, to dramatically reduce field installed equipment

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

CLARK COUNTY FIRE CODE AMENDMENTS

CLARK COUNTY FIRE CODE AMENDMENTS CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

CHAPTER 10 - PUBLIC SAFETY RADIO SYSTEM COVERAGE INTENT AND PURPOSE DEFINITIONS USE AND OCCUPANCY EXEMPTIONS.

CHAPTER 10 - PUBLIC SAFETY RADIO SYSTEM COVERAGE INTENT AND PURPOSE DEFINITIONS USE AND OCCUPANCY EXEMPTIONS. CHAPTER 10 - PUBLIC SAFETY RADIO SYSTEM COVERAGE 8950 - INTENT AND PURPOSE The intent of the chapter is to provide a regulatory framework for the purpose of providing effective 800 MHz Countywide Coordinated

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

(Larry D. Svitak, PE) License No

(Larry D. Svitak, PE) License No ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

Product Guide Specification

Product Guide Specification Extrutech Plastics, Inc. September 2012 5902 West Custer Street Manitowoc, Wisconsin 54220 Toll Free 888-818-0118 Phone 920-684-9650 Fax 920-684-4344 Website www.epiplastics.com E-mail info@epiplastics.com

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction. SECTION 230800 GENERAL MECHANICAL REQUIREMENTS 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. General 1. Incorporate,

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information