1 Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov. 30, 2017 at 1:00 PM, to Tuesday, Dec. 5, 2017 at 1:00 PM. Any inquiries regarding this opportunity must be directed to Paul Stavros of the Procurement and Supply Chain Management Department at (215) or pstavros@septa.org. Sincerely, Paul Stavros Paul Stavros Sr. Contract Administrator Procurement & Supply Chain Management Dept.
2 Sealed Bid No APES Addendum No. 2, APES Install DC Stinger Distribution System - SEPTA Fern Rock Car House To All Bidders: The following constitutes Addendum No. 2 to SEPTA's Sealed Bid No. Install DC Stinger Distribution System - SEPTA Fern Rock Car House. This Addendum must be acknowledged by inserting the date of the Addendum on the Bid Addenda Acknowledgement Form to be submitted with your Bid. Failure to do so may render a bidder's proposal as nonresponsive. Questions, Answers, and Clarifications issued with this Addendum are hereby incorporated by reference and made part of the Terms and Conditions of this project. A. General 1. Due Date/Time for Bid Opening is hereby changed from Thursday, November 30, 2017 at 1:00 PM to Tuesday, December 5, 2017 at 1:00 PM. 2. Please see attached Revised Schedule A. 3. Please see attached Revised Set of Drawings (11), which includes revisions to Drawings: a. E200; b. E201; c. E202; d. E204; e. E205; and, f. E Please see attached Revised Specification which: a. Removes Sections & 16511; and; b. Revises the following sub-sections of Section 01010; i. sub-section G.2; ii. sub-section J.1; and, iii. sub-section J.2 B. Questions/Responses: 1. Q. I do not see any mention or requests for an infrared survey in this project. Is an infrared inspection required? R. No, an infrared inspection is not required. 2. Q. Bid form Schedule A page 13 has a bid item for Division 02 Site Work. I do not see any site work on the drawings. Are we just to put a zero dollar amount in that bid Item? R. There is no site work on this project. Please see attached Revised Schedule A form, which removes the bid line item for Division 02 - Site Work. Page 1 of 4
3 Addendum No. 2, APES 3. Q. Specification section Lighting A fixture type is specified however when reviewing the drawings we cannot identify any lighting. Please advise. R. Section has been removed from the Specification. See revised Specification. 4. Q. Is rigid steel conduit to be used for the control portion of the project? From the existing panel MLP to the new DCSB and from the DCSB to all the control stations? R. Rigid steel conduit is not permitted. All conduits are to be FRE. 5. Q. Drawing E200 & E201 Notes 1, 2 & 3 state that the contractor is to coil the DC cable at the overhead, third rail & new FRE box and SEPTA will make final connections. Is this statement correct? If the contractor is to make the connections, please provide a detail of the method of connection that will be accepted for both the third rail and the overhead rail? R. Yes, the statements on drawings E200 & E201 are correct. The contractor is to leave the DC cables coiled and SEPTA will make the final connections. 6. Q. Drawing E200, note #1 states contractor shall coil cable at existing overhead and third rail. Is this referring to the existing overhead buss system that feeds the stinger and power plug drops? R. See response to Question #5. Contractor to make all stinger/power tip/probe and power plug connections. SEPTA will make final connections. 7. Q. Drawing E200, note #2 states contractor to run (2) 1000MCM cables from DCSB to new FRE box and coil. Please confirm that SEPTA will make the final terminations. R. See response to Question #5. Contractor to make all stinger/power tip/probe and power plug connections. SEPTA will make final connections. 8. Q. Drawing E200, note #3 states final connections will be made by SEPTA. Please clarify. Is this for the power tip/cable and power plug/cable shown on E207? Is this for the 500MCM wire leaving DCSB to the existing overhead buss system? Is it for the 500MCM wire leaving DCSB to the third rail? R. See response to Question #5. Contractor to make all stinger/power tip/probe and power plug connections. SEPTA will make final connections. 9. Q. Drawing E200, note #4 states contractor to install new conduit and cable to each control station from DCSB. Please provide the number of conduits needed, size of conduits, quantity of wires, and gauge of wires. No single line or description was provided. R. See schematic on drawing E205 for information on wire and conduit size. Page 2 of 4
4 Addendum No. 2, APES 10. Q. Drawing E200, note #5 states contractor to install new conduit and cable from existing MLP to DCSB for control power. Please provide the number of conduits needed, size of conduits, quantity of wires, and gauge of wires. No single line or description was provided. R. Refer to new note added to drawing E Q. Drawing E202, note #4 states mounting, installation work, and furnishing hardware shall be by others. Please clarify who others would be. R. Others on drawing E202 refers to the contractor doing the installation work. 12. Q. Drawing E207 shows detail of power tip with retractable and lockable sleeve. Please provide specific manufacturer and part number for these. R. Please contact MAC Products for additional information. 13. Q. Drawing E207 shows detail of cable mounted hanger for storage of service power tip. Please provide specific manufacturer and part number for these. R. Manufacturer information is provided on drawing E Q. Bid form page #13, item No.2 listed as site work. Please give a description of this work (if any). If there is not what would you like to see inputted for that line item (n/a, $0.00)? R. Please see attached Revised Schedule A form, which removes the bid line item for Division 02 - Site Work. 15. Q. Will prime E.C. contractor be responsible for office meeting trailer for job progress meetings? If so please show laydown area for this, and closest available water/electrical connections points. R. A contractor trailer is not required for this project. See specification section for additional information. 16. Q. Will prime E.C. contractor be able to use an area in the building for laydown/staging area for materials and tools? If not please show laydown area for this, and closest available water/electrical connections points. R. Caged area for new DCSB will be available for on-site material and tool storage. See specification section for additional information. 17. Q. What are the cable lengths for the stinger and plug drops? R. The cable lengths for the stinger and plug drops are 30. These dimensions have been added to the drawings. 18. Q. What type of lug is required for the beginning of the drop, compression or mechanical? R. See drawing E207 for lug information. Page 3 of 4
5 Page 4 of 4 Addendum No. 2, APES 19. Q. Provide cable type and wire size for both the stinger and plug drops. We were unable to read any of the text on the cables in the maintenance facility, these grease was too thick. R. Cable type to be 2/0; RHH/RHW-2. This information has been added to drawing E Q. Provide manufacturer name and part number on the plug. R. Manufacturer information is provided on drawing E Q. Strobe Lights: Drawing shows a quantity of (12), Schematic shows a quantity of (7). Which one is correct? R. The quantities shown on the schematic on drawing E205 have been revised to show the correct number. 22. Q. Horns: Drawing shows a quantity of (12), Schematic shows a quantity of (7). Which one is correct? R. The quantities shown on the schematic on drawing E205 have been revised to show the correct number. 23. Q. Control Stations: Drawing shows a quantity of (14), Schematic shows a quantity of (7). Which one is correct? R. The quantities shown on the schematic on drawing E205 have been revised to show the correct number. 24. Q. Is there a chance that this bid due date gets extended to 12/01/17? R. The Bid Due date was extended via Addendum No. 1 and is again extended by this Addendum No Q. Spec sections and are these relevant to this project? R. Specification sections and are not needed on this project and have been removed from the attached revised Specification. 26. Q. What are the elevations of the strobe lights and control stations? R. Height dimensions have been added to drawing E200 and E Q. In section j 3 states track outages are to be on Saturday and Sunday. Will there be any time available during normal weekday work hours? R. Yes, additional hours are available. See revised specification section Q. Will there be a lay down or storage area in close proximity to the car shop? R. See response to Question # Q. Who is the manufacture of the existing trolley buss? R. Information on the existing trolley bus manufacturer is unavailable. **** End Addendum ****
6 SCHEDULE A (REVISED via ADDENDUM No. 2) ITEMS AND DIVISION PRICES BID Project Name: APES, DC Stinger Distribution System Install, Fern Rock Car Shop Provide all Labor, Material, Equipment, Bonds, Insurance, Permits, Licenses, etc. to complete the Work in accordance with the IFB and all related Contract Documents, which include: Specifications, Drawings, and any other documents provided with the IFB, and as Amended during the Bidding Period. All items must be bid for award consideration. All work shall be completed within One-Hundred and Eighty-Three (183) Days of issuance of the Notice to Proceed. ITEM DESCRIPTION TOTAL PRICE NO. 1 Division 01 General Requirements $ 2 Division 16 Electrical $ Total (Sum of Items #1 & # 2): $ Basis of Award: Please refer to Instructions to Bidders Item # 4 From: Name of Bidder Name/Title of Contact Address of Bidder City, State, Zip / Contact Phone / Mobile Number FAX Number (if available) Contact Address Bid Forms 13 State Construction Contract 1017
Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA
BUILDING THE FUTURE Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA 19107-3780 May 25, 2017 Dear Sir/Madam: Subject: Sealed Bid No. 17-00093-AMZK Enclosed please
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationCHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationProcurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington
More informationIFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1
IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are
More informationAnswer: Only to ChurchWoods, LLC.
ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More informationCOMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION
More informationBid #3990DB - Two Way Motorola Radio System District Wide Upgrade
LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan
More informationCITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI. ADVERTISE: July 31 & August 7, 2015
CITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI ADVERTISE: July 31 & August 7, 2015 BID DEADLINE: August 14, 2015, 9:30 a.m. Local Time Bid Invitation Your firm
More informationADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number:
ADDENDUM # 01 Date: March 16, 2017 Reference: District- Wide Grease Trap Pumping Services RFQ Number: 117-22-3-29 The following questions were submitted for clarification and/or to request additional information.
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project
More informationADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions
More informationCITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR
CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR Permit # Complete this application and submit it to the Development Services Team, 400 S. Eagle Street, Naperville.
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationBID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS
BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS March 17, 2016 To prospective bidders & others concerned: This addendum sets forth changes and/or information
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings
More informationAddendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017
Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer
More information10930 W. Sam Houston Parkway N., Suite 900
ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont
More informationTRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval
Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc. 1178 Folsom Street San Francisco, CA 94103 Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationCompany. Signed: Date:
ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET
More informationADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement
ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.
ADDENDUM No. 1 RFP No. 933 Gallup Park Custom Playground Equipment Design Due: Tuesday, August 4, 2015 by 10:00 a.m. The following changes, additions, and/or deletions shall be made to the Request for
More informationRHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals
RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box 437 1 East Shore Road Jamestown, Rhode Island 02835-0437 Invitation to Bid Request for Proposals Mototrbo Digital VHF Radio System Solicitation Number:
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSolicitation No.: The enclosed addendum amends the proposal documents for the above referenced Project.
Date: June 30, 2017 Project: Ketchikan Shipyard Transfer Carts Solicitation No.: 18002 Addendum No. One TO ALL PLANHOLDERS: The enclosed addendum amends the proposal documents for the above referenced
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION City of Hawaiian Gardens Community Development Department 21815 Pioneer Boulevard, Hawaiian Gardens, CA 90716 Ph: (562) 420-2641 Fax: (562) 420-8521 www.hgcity.org Please complete
More informationINDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION
INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationMINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:
MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay
More informationADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)
ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationCITY OF TACOMA Tacoma Power/Transmission & Distribution
CITY OF TACOMA Tacoma Power/Transmission & Distribution ADDENDUM NO. 1 DATE: November 6, 2017 REVISIONS TO: Request for Bids Specification No. PT17-0442N Surplus Overhead Distribution Transformer NOTICE
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationHow to Estimate the Cost of a. Precast Concrete Parking Structure
How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationThis section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.
Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationCOUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre
April 12, 2019 COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations 19-10 - To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre The attached information, questions and
More informationLAUSD Facilities Technology Program Management Group
LAUSD Facilities Technology Program Management Group 034 Mignonette Street Los Angeles, CA 9006 Ph #: 3-0-690 Fax: 3-48-8475 Date: 0/07/04 To: LAUSD/New Facilities Project Management From: Stefan Brown
More informationADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR
ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental
More informationSECTION VI SCOPE OF WORK
SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationINVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA
INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More informationCITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP
DEPARTMENT OF FINANCE PURCHASING DIVISION MARGARET E. MCEVILLY PHONE: 815/724-3925 FAX: 815/724-3929 mmcevilly@jolietcity.org CITY OF JOLIET ADDENDUM NO. 1 LOCAL AREA NETWORK (LAN) HARDWARE RFP 2215-1216
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.
DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part
More informationPurchasing Services AOC East Fowler Avenue Tampa, Florida (813) Web Address:
Purchasing Services AOC 200 4202 East Fowler Avenue Tampa, Florida 33620 (813) 974-2481 Web Address: http://usfweb2.usf.edu/purchasing/purch2.htm January 30, 2015 Invitation to Negotiate No. 15-08-GC Entitled:
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1
A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10
More informationADDENDUM NO. 1. Request for Proposal #1342 Custom Printing March 22, 2018
Procurement Services Phone: 973.655.4145 Fax: 973.655.5468 ADDENDUM NO. 1 Request for Proposal #1342 Custom Printing March 22, 2018 Date of Original Bidding Documents: March 9, 2018 Date of Addendum No.
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS PROJECT: Painting of the Signal Poles, Mast Arms and Decorative Bases OWNER: City of Goose Creek, Department of Public Works RECEIPT OF PROPOSALS: Separate sealed proposals for the
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement
Following are the questions submitted on or before September 29, 2017, in accordance with RFP specifications. Responses to questions, clarifications of material, or corrections are indicated in green after
More informationLincoln County Tax Appraisal Office Project No. RFB
Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More informationJUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD
JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More information8 th April 2018 ADDENDUM NO. 1
PACIFIC AVIATION INVESTMENT PROGRAM TONGA AVIATION INVESTMENT PROJECT PROCUREMENT OF AIR TRAFFIC CONTROL (ATC) EQUIPMENT AND AIR TRAFFIC CONTROL TRAINING SIMULATOR FOR THE NEW ATC TOWER BUILDING OF FUA
More informationRFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions
RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS
More informationSTANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES
STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More information.1 Applicability: These criteria shall be applied as follows:
DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the
More informationIngham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18
Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationAddendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)
United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation
ADDENDUM NUMBER ONE (1) For Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation Addendum Date: Thursday, May 4, 2017 GENERAL: A. This addendum is hereby made a part
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More information