1 JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO XXX-16 SYRACUSE REGIONAL AIRPORT AUTHORITY TO ALL HOLDERS OF THE CONTRACT DOCUMENTS: This addendum is part of the Contract Documents in accordance with the provisions of the Agreement and Information for Bidders. A. PRE-BID MEETING: 1. See Attachment No. 1 for the Pre-Bid Meeting Minutes. These meeting minutes are provided for information only and are not part of the Contract Documents. B. IN THE CONTRACT SPECIFICATIONS: 1. Section , Specific Airport Operating Requirements, Page , Part D.4. a. At the end of the first paragraph, Insert The Contractor shall verify with the FAA that all circuits and cables in the vicinity of the work area (for the runway approach lights or other devices) are in good working condition prior to any work being performed on this project. If the circuits are in good condition, work can proceed without testing of cables. b. At the beginning of the second paragraph, Insert After completed work of this project, the Contractor shall verify with FAA that all circuits and cables in the vicinity of the work area (for the runway approach lights or other devices) are still working properly. The Contractor shall only provide testing listed within for circuits and cables that require repair due to damage during construction of this project. Any repairs to circuits and cables shall be by the Contractor, no additional cost to the Owner, per FAA direction and standards. 2. Item D-752 CONCRETE BOX CULVERTS, Page D-752-2, Section BACKFILLING, part c: a. At end of first sentence for direct payment. Insert under this Item D b. Delete the entire second sentence, Performance, and: Insert Measurement and payment for backfill is included under Item P-152. Z:\specs\14\Culvert Replacement\Addenda\Addendum No 1.doc

2 C. IN THE CONTRACT DRAWINGS: Addendum No. 1 Page 2 of 2 1. Contract Drawing G-3 Construction Safety, Site Access & Phasing Plan, after callout CONTRACTOR STAGING & STORAGE AREA. a. Insert: INCIDENTAL TO ITEM M-100. IF NEEDED, CONTRACTOR SHALL PLACE GEOTEXTILE STABILIZATION FABRIC AND P-209 CRUSHED STONE. ANY AREA DISTURBED BY CONTRACTOR FOR STAGING AND STORAGE SHALL BE RESTORED TO ORIGINAL CONDITION. 2. Contract Drawing G-7 Erosion and Sediment Control Plan and Notes, under Stream Area Construction Sequence notes, Note 1: a. After the words All stream Insert and crane 3. Contract Drawing G-10 Access Road Site Plan and Miscellaneous Details, Detail 1, 15 Foot Driveway Swing Gate Detail: a. For height of fence fabric, Insert 6-0. b. After Note 6, Insert 7. Contractor shall remove existing wood posts, total of two, adjacent to existing gate. Sincerely, Arcadis of New York John C. Perriello, PE Project Manager JCP/bek Z:\specs\14\Culvert Replacement\Addenda\Addendum No 1.doc

3 ATTACHMENT NO. 1 MEETING MINUTES SYRACUSE HANCOCK INTERNATIONAL AIRPORT (SHIA) CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD June 23, :00 a.m. SHIA, Veronica Room Arcadis of New York, Inc Towpath Road P O Box 66 Syracuse New York Tel Fax Type of meeting Minutes prepared by Attendees Pre-Bid Meeting Benjamin R. Tillotson, PE Ben Tillotson, PE, Arcadis John Perriello, PE, Arcadis Linda Ryan, SRAA Brian Dorman, SRAA Tim McMahon, SRAA Nick Gambino, WD Malone Ryan Malone, WD Malone Jim Stratton, Slate Hill Keith Frisbey, Paragon Env. Const., Inc. Brad Brinkman, Barret Paving Materials, Inc. David Wornica, Barrett Paving Materials, Inc. Jeff Yaro, Vet4U, LLC Pat Dimauro, Vet4U, LLC A pre-bid meeting was held to provide a summary of the project to perspective bidders. The following items were discussed: 1. Project Overview and Description: B. Tillotson introduced himself and asked each meeting attendee to introduce themselves. B. Tillotson gave a brief project description: The project consists of removal of an existing 96-inch diameter corrugated metal culvert showing signs of failure located outside of the airport operations area (AOA) on an access road to the end of Runway 28 at the SHIA. The access road is needed for emergency vehicle access to Runway 28 as well as for the FAA to maintain the approach lights. The project includes replacing the existing culvert with a precast concrete box culvert. Requirements for excavation, backfill, dewatering, cofferdams, stream bypassing, topsoil, seeding and paving are included in the project. Existing conduits that cross the culvert are required to be protected in place during the project. 2. Bid Date and Time June 30, 2016, 1:00 p.m. local time. Bids will be received until the above listed date and time at the Syracuse Regional Airport Authority (SRAA) offices located at Syracuse Hancock International Airport, 1000 Col. Eileen Collins Blvd., Syracuse, New York Z:\bek16\ Culvert Prebid Mtg Minutes.docx Page: 1/3

4 MEETING MINUTES 3. Questions shall be directed to: Benjamin Tillotson, PE, Arcadis B. Tillotson stated that any questions can be asked in this meeting and/or ed in writing to his attention no later than close of business (5:00 pm) on Friday, 6/24/16. This will allow time for an addendum to be issued on Monday, 6/27/ Contract Duration calendar days, Construction Duration - 30 calendar days/2 calendar days The Contract Duration has been set to 120 calendar days (Section ). The actual in-field construction days has been set to 30 calendar days per Section , Part B. Two calendar days are allowed for use of a crane and stream bypassing work per Section , Part C. 5. Construction Safety and Phasing Plan B. Tillotson stated the requirements of the Construction Safety and Phasing Plan shown on Contract Drawing G-2 and G Bid Bond (5%) and Surety Bond (100%) of total bid amount The requirements for bonds are listed in Section Instructions to Bidders. 7. Fill out all requirements of Section 300. Submit entire book with Bid. 8. Federal and NYS Wage Rates are in effect for this project 9. DBE/M/WBE Requirements 7.1 Percent DBE goal, 3% M/WBE goal for money not federally funded. Also, the service disabled vetran-owned business enterprise (SDVOB) goal of 0.3% for money not federally funded. All requirements are listed in Section Instructions to Bidders. Forms are included as an appendix to Section Information for Bidders. 10. Comments A site visit was conducted for perspective bidders after this meeting. Any perspective bidder that would like a site visit (not present at meeting) can contact Brian Dorman, SRAA to arrange one. A discussion was held regarding issuance of a NOTAM for crane work. As stated in the Contract Documents (900-15, Part C), a minimum of 72 hours notice to SRAA is required for NOTAM. This work will require permits from both the Army Corps of Engineers and the NYS DEC for working in the stream bed and banks and around nearby wetlands, all of which have been applied for by the SRAA. As noted in Section , Part C, no work shall begin until these permits are in place. Questions (Questions below were asked in this meeting and/or received by ): 1. Can clarification be provided for the two day work period? Response: The two day work period is described in Section , Part C is geared for both crane lifting and bypass pumping operations. Currently, there are no permit requirements in place for stream bypassing, but this work should be completed in two days with crane lifting operations to minimize impacts to N. Branch Ley Creek and Runway On Page , there is a requirement for no open trenches. Can you please clarify if this applies to the project? Response: This requirement applies to work adjacent to (in vicinity of) runway and taxiways, so would not apply to this project. arcadis.com Z:\bek16\ Culvert Prebid Mtg Minutes.docx Page: 2/3

5 MEETING MINUTES 3. On Page , there is a requirement for pre and post testing of the Airport Cables. Can you please clarify if this will be a requirement? Response: Yes, assume that testing will be a requirement for Airport Cables located in vicinity of work area. Any changes to these requirements will be made by addendum. 4. Where does the 10 cubic yards of concrete go? There are 10 cubic yards of concrete listed in the bid form. Looks to me like everything is precast. Response: There are 10 cubic yards of concrete listed in the bid forms for miscellaneous use. Though, nothing specific is shown on the Contract Drawings. During construction, the Resident Engineer may direct Contractor for concrete in a specific area. 5. How tall is the Driveway Gate shown in detail on Contract Drawing G-10? Response: The height of the new driveway gate on the access road shall be 6-0. Clarification will be provided by addendum. 6. What class RCP pipe is the 30 culvert to be replaced along the access road? Response: As listed in the detail and notes on Contract Drawing G-10, this culvert shall be Class IV RCP pipe. 7. Do the quantities in the bid sheets include materials to build the bypass pumping pad and also the contractor storage area? Or is this material incidental to the project cost? Response: This will be clarified by addendum. The notes on Contract Drawing G-7 list the bid items for the bypass pumping pad. 8. In Section D , Backfill, part c, it states that backfilling will not be measured for direct payment and shall be considered as a subsidiary obligation of the Contractor, covered under the contract unit price for unclassified excavation for structures. Is this correct? Response: This will be clarified by addendum. The measurement and payment for backfill will be paid for under Item P-152. If the recipient of these meeting minutes requires any corrections, modifications, or clarifications, please provide them in writing to the undersigned: Benjamin R. Tillotson, PE Arcadis 6723 Towpath Road, Box 66 Syracuse, New York Distribution: Attendees Christina Callahan, Executive Director, SRAA Robert Levine, FAA NYADO Attachments: Meeting Sign-in Sheet arcadis.com Z:\bek16\ Culvert Prebid Mtg Minutes.docx Page: 3/3

6

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015 ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION Application information below to be completed by Applicant/Agent//Owner APN PROPERTY ADDRESS PROPERTY LOCATION (if no address) APPLICANT S NAME

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS. Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM III - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 September

More information

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

OFFICE OF MANAGEMENT AND FINANCE

OFFICE OF MANAGEMENT AND FINANCE CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

Customer Requirements Commercial Secondary Service

Customer Requirements Commercial Secondary Service Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

RE: City of Summersville, Glade Creek Phase llb

RE: City of Summersville, Glade Creek Phase llb STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2 City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

VICINITY MAP LOCATION MAP GRAPHIC SCALES

VICINITY MAP LOCATION MAP GRAPHIC SCALES VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington

More information

CONSTRUCTION CERTIFICATION PACKAGE

CONSTRUCTION CERTIFICATION PACKAGE Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

The several methods for making linear measurements are quite simple and straightforward. They are described below:

The several methods for making linear measurements are quite simple and straightforward. They are described below: INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are

More information

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE DOWELS INTO CONCRETE - Item No. Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE 1.0 SCOPE This Special Provision covers the performance requirements

More information

Section 1. Introduction

Section 1. Introduction Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

RE: Addendum to the project bid documents dated March 5, 2008

RE: Addendum to the project bid documents dated March 5, 2008 March 19, 2008 ADDENDUM 1 TO ALL BIDDERS: Reference: Invitation for Bids: IFB#214-08-Heating Plant Commodity: Construction of Replacement Heating Plant Dated: February 25, 2008 For Delivery To: Longwood

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

TONOPAH AIRPORT RECONSTRUCT TAXIWAY A

TONOPAH AIRPORT RECONSTRUCT TAXIWAY A RECONSTRUCT TAXIWAY A AIP NO. 3-32-0019-15 PWP-NY-2018-137 NYE COUNTY BID NUMBER 2018-01 NYE COUNTY, NEVADA MARCH 16, 2018 376 Coaldale 265 Silver Peak 6 95 Tonopah TONOPAH AIRPORT Goldfield Warm Springs

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT February 04, 2016 BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT The Bid Documents that are included as part of the above bid package include the following: 1). Instructions to bidders

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248) White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $

More information

Town of Apex, North Carolina

Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section

More information

1.0 General Description

1.0 General Description 1.0 General Description Figure 1 Plug-N-Play Noise Blanker for the Collins KWM-2/2A The Collins Noise Blanker is designed to be a Plug-N-Play accessory for the Collins KWM-2/2A transceivers. It plugs directly

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert

More information

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017 Project No. 6040.0, Contract No. E7-09 SECTION 0090 ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. JULY 2, 207 This Addendum No. ( Addendum ) as dated above modifies certain

More information

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846 PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O

More information

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Valley Road Main Replacement

Valley Road Main Replacement Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not

More information

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed

More information