1 PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40, $40, $22, $22, Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $ $288, $ $350, Inch DIP Sanitary Sewer Line Installation LF 442 $ $143, $ $195, Add for Stream Crossing LF 60 $ $9, $ $17, Foot Diameter Manhole Base EA 9 $6, $58, $5, $45, Foot Diameter Manhole Section VLF 51 $ $33, $ $25, Manhole Frame and Cover EA 9 $ $3, $ $7, Sanitary Sewer Lateral EA 1 $2, $2, $4, $4, Connection to Existing Manhole EA 3 $7, $22, $3, $10, Pavement Restoration - Mill and Overlay Public Road LF 215 $ $37, $ $67, Pavement Restoration - Patch Public Road LF 440 $85.00 $37, $73.00 $32, Pavement Restoration - Patch Private Entrance LF 215 $ $32, $ $24, Abandon Manholes EA 3 $3, $9, $1, $5, Remove Manholes EA 1 $4, $4, $3, $3, Streambank Stablization SY 550 $85.00 $46, $51.00 $28, Sewer Lateral to SMH LS 1 $3, $3, $15, $15, inch Jack and Bore Steel Casing LF 50 $1, $75, $1, $94, Subgrade Stabilization Stone TON 182 $20.00 $3, $62.00 $11, Geotechnical Allowance LS 1 $3, $3, $3, $3, Western Virginia Water Authority Page 1 of 6
2 KENWOOD BOULEVARD 201 Mobilization, Bonds, Insurance LS 1 $14, $14, $30, $30, Inch Water Line LF 400 $45.00 $18, $25.00 $10, Inch Blowoff Assembly Installation LF 1 $2, $2, $5, $5, Water Service Installation (Near Side) LF 5 $2, $10, $1, $9, Water Service Installation (Far Side) EA 3 $3, $9, $3, $9, Connection to Existing Water Line VLF 1 $1, $1, $1, $1, Inch SDR-35 PVC Sanitary Sewer Line Installation EA 1080 $ $113, $ $316, Foot Diameter Manhole Base EA 5 $4, $22, $3, $15, Foot Diameter Manhole Section EA 32 $ $14, $ $19, Foot Diameter Manhole Base LF 1 $5, $5, $3, $3, Foot Diameter Manhole Section LF 11 $ $6, $ $10, Manhole Frame and Cover LF 6 $ $2, $1, $6, Connection to SMH-05A EA 1 $3, $3, $7, $7, Sanitary Sewer Lateral EA 10 $2, $28, $3, $36, Sanitary Sewer Lateral for 2256 Kenwood Blvd SY 1 $7, $7, $5, $5, Pavement Restoration - Patch Public Road LS 550 $85.00 $46, $73.00 $40, Abandon Sewer for SMH-05A to LF 1 $2, $2, $8, $8, Subgrade Stabilization Stone TON 155 $20.00 $3, $62.00 $9, Western Virginia Water Authority Page 2 of 6
3 GREENBRIER AVENUE 301 Mobilization, Bonds, Insurance LS 1 $17, $17, $11, $11, Inch SDR-26 PVC Sanitary Sewer Line Installation LF 205 $ $37, $ $64, Inch DIP Sanitary Sewer Line Installation LF 150 $ $33, $ $37, Inch Jack & Bore Steel Casing LF 105 $1, $131, $2, $273, Foot Diameter Manhole Base EA 3 $4, $13, $2, $7, Foot Diameter Manhole Section VLF 22 $ $9, $ $13, Foot Diameter Manhole Base EA 1 $6, $6, $4, $4, Foot Diameter Manhole Section VLF 8 $ $5, $ $6, Manhole Frame and Cover EA 4 $ $1, $ $3, Connection to Existing Manhole/Siphon Box EA 1 $8, $8, $8, $8, Abandon Manholes EA 2 $3, $6, $1, $3, Landfill Material Removal and Backfill TON 520 $85.00 $44, $ $61, Trench Stabilization Sheeting LS 1 $60, $60, $160, $160, Subgrade Stabilization Stone TON 40 $20.00 $ $56.00 $2, Western Virginia Water Authority Page 3 of 6
4 EPPERLEY AVENUE 401 Mobilization, Bonds, Insurance LS 1 $26, $26, $19, $19, Inch SDR-35 PVC Sanitary Sewer LF 158 $ $22, $ $62, Inch SDR-35 PVC Sanitary Sewer LF 260 $ $42, $ $78, Inch SDR-26 PVC Sanitary Sewer LF 1015 $ $187, $ $391, Foot Diameter Manhole Base EA 8 $4, $36, $2, $20, Foot Diameter Manhole Section VLF 32 $ $14, $ $19, Foot Diameter Manhole Base EA 2 $5, $11, $3, $7, Foot Diameter Manhole Section VLF 12 $ $6, $ $10, Manhole Frame and Cover EA 10 $ $3, $1, $11, Sanitary Sewer Lateral EA 21 $2, $59, $4, $98, Connection to Existing Manhole LF 2 $5, $11, $2, $5, Pavement Restoration - Public Road LF 1025 $85.00 $87, $78.00 $79, Pavement Restoration - Patch Private Entrance LF 32 $ $4, $ $3, Remove Manhole EA 1 $4, $4, $3, $3, Abandon Manhole EA 3 $3, $9, $1, $5, Double Sanitary Sewer Lateral EA 1 $3, $3, $2, $2, Test (Observation) Pits EA 2 $3, $6, $3, $7, Subgrade Stabilization Stone TON 150 $20.00 $3, $62.00 $9, Pipe Abandonment under 4206 & 4210 Greenlawn Ave. EA 2 $8, $17, $2, $5, Plumbing Allowance for 4206 & 4210 Greenlawn Ave. LS 1 $10, $10, $10, $10, Western Virginia Water Authority Page 4 of 6
5 EMBASSY DRIVE 501 Mobilization, Bonds, Insurance LS 1 $34, $34, $14, $14, Inch Open Cut/10-Inch Burst - Contractor's Option LF 170 $ $19, $ $32, Inch SDR-35 PVC Sanitary Sewer LF 20 $ $2, $ $5, Inch SDR-26 PVC Sanitary Sewer LF 1340 $ $301, $ $498, Inch DIP Sanitary Sewer LF 158 $ $43, $ $68, inch Jack and Bore Steel Casing LF 40 $1, $60, $1, $63, Add for Stream Crossing LF 30 $75.00 $2, $ $10, Foot Diameter Manhole Base EA 1 $4, $4, $2, $2, Foot Diameter Manhole Section VLF 1 $ $ $ $ Foot Diameter Manhole Base EA 11 $5, $60, $3, $43, Foot Diameter Manhole Section VLF 59 $ $32, $ $28, Foot Diameter Manhole Base EA 2 $6, $13, $4, $8, Foot Diameter Manhole Section VLF 12 $ $7, $ $10, Manhole Frame and Cover EA 14 $ $5, $1, $15, Sanitary Sewer Lateral EA 19 $1, $35, $4, $89, Pavement Restoration - VDOT LF 980 $95.00 $93, $ $180, Pavement Restoration - Mill and Overlay Public Road LF 140 $ $30, $ $44, Subgrade Stabilization Stone TON 205 $20.00 $4, $62.00 $12, Geotechnical Allowance LS 1 $3, $3, $3, $3, Western Virginia Water Authority Page 5 of 6
6 PLUG ABANDONED 24-INCH SEWER IN SMH 07A Mobilization, Bonds, Insurance LS 1 $ $ $6, $6, Plug Abandoned 24-Inch Sewer in SMH 07A LS 1 $10, $10, $12, $12, Total of All Unit Price Bid Items $2,873, $4,177, * Denotes a correction of an arithmetic error present in the Bid Form; the correct sum shall govern per Article C of the Instructions to Bidders. ** Denotes non-responsive bid Apparent Low Bidder: Mendon Pipeline, Inc. Prepared By: Douglas B. Hudgins, P.E. - CHA Consulting, Inc. I hereby certify that this is a true tabulation of bids received January 10, 2018, for the Contract 3 - Sanitary Sewer Replacements project. Douglas B. Hudgins, P.E. Western Virginia Water Authority Page 6 of 6
Valley Road Main Replacement
Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not
More informationImmediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court
Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationJune 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationAppendix C Construction Details
7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationRenewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.
Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM III - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 September
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationRiverside County Flood Control & Water Conservation District
10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationCONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE
LOG CT. TR. CONSTRUCTION PLANS for TOWN YORKVILLE INDEX Plan Sheet COVER TYPICAL SECTIONS & CONSTRUCTION DETAILS PLAN & PRILE Sheet No. 1 2 3-8 LEGEND Description EDGE WOODS DECIDUOUS TREE DECIDUOUS TREE
More informationADDENDUM ADDENDUM NO.: 01 PROJECT NO.: CONTRACT NO.: DATE OF ISSUE: January 12, 2018
ADDENDUM ADDENDUM NO.: 0 PROJECT NAME: Williams Park Fieldhouse PROJECT NO.: 320 CONTRACT NO.: C593 DATE OF ISSUE: January 2, 208 NOTICE OF CHANGES, MODIFICATIONS, OR CLARIFICATIONS TO CONTRACT DOCUMENTS
More informationSECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings
SECTION 095 SPECIFICATIONS DETAIL DRAWINGS Index of Detail Drawings Flat Top Manhole... 095-1 Splash Drop Manhole and Regular Drop Manhole... 095-2 Special Detail Splash Drop Manhole and Special Detail
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)
BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND
More information6'' W 8'' W 8'' W 4'' SAN 4'' SAN 2'' W 6'' W 6'' W INSTALL C.U. PAD (SEE MECHANICAL). M FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM TOP OF TOP OF SW
More informationSECTION SITE SURVEYS
SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationMARQUETTE GREENWAY TRAIL
------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,
More informationRE: City of Summersville, Glade Creek Phase llb
STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationKC Water Rules and Regulations For Water Main Extensions and Relocations
KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made
More informationREQUEST FOR BIDS WELL #4 ABANDONMENT
REQUEST FOR BIDS WELL #4 ABANDONMENT Department of Public Services 1015 S Lincoln Avenue Three Rivers, MI 49093 (269) 273-1845 Table of Contents Well #4 Abandonment... 8 Performance Bids... 8 I. Instructions...
More informationSeptember 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP
CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled
More informationTAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:
CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS
More informationRiverside County Flood Control & Water Conservation District
9/28/2016 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC. 1 MOBILIZATION L.S. 1 $50,000.00 $50,000.00 $106,571.00 $106,571.00 $180,000.00 $180,000.00 2 WATER CONTROL
More informationSTORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC
01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP
More information5.0 PLAN FORMAT AND REQUIREMENTS WATER, RECYCLED WATER AND SEWER
5.0 PLAN FORMAT AND REQUIREMENTS WATER, RECYCLED WATER AND SEWER The Developer s engineer shall prepare system improvement plans that are clear, concise, and meet Western s standards. A set of plans that
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationLee Lake Water District
Lee Lake Water District Sewer System Facility Requirements August 2008 Board Members: Charles Colladay - President Joyce Deleo - Vice President Owen Garrett - Secretary/Treasurer Grant Destache - Board
More informationJUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD
JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16
More informationSECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX
SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationCITY COUNCIL CONSENT CALENDAR
CITY COUNCIL CONSENT CALENDAR OCTOBER 17, 2016 SUBJECT: INITIATED BY: NOTICE OF COMPLETION FOR CIP 1606, RESIDENTIAL STREET PAVING PROGRAM DEPARTMENT OF PUBLIC WORKS (Oscar Delgado, Director of Public
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028
THE CENTER FOR RESEARCH AND EDUCATION IN ADVANCED TRANSPORTATION ENGINEERING SYSTEMS (CREATEs) ISSUED FOR BID - CONTRACT - 02 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 ALL DIMENSIONS MUST BE VERIFIED
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationPeters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317
3244 Washington Road McMurray, PA 15317 (724) 941-6709 Appendix C Developer Information PETERS TOWNSHIP SANITARY AUTHORITY SEWER USE RULES AND REGULATIONS APPENDIX C Procedures and Requirements for Land
More informationCITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT
Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and J Tomorrow. CITY COUNCIL AGENDA REPORT ITEM NO. 6.C.3 Meeting Date: January 13, 2015 Department:
More informationSection E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing
More informationGrease Interceptor Design Checklist
CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationSECTION III SUBMITTALS AND APPROVALS
SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More informationSewer Line Extension Permit Design Checklist
CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line
More informationCITY OF MUSKEGO DRAFTING STANDARDS
CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationTOWN of LAKESHORE SITE PLAN CHECKLIST
TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More information.1 Applicability: These criteria shall be applied as follows:
DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More information1. Land survey Work. 2. Civil and Structural engineering services.
SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification
More information3. The PAC (Permit Application Center) will notify the design professional of plan review results.
Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT
More informationUPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS
Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationEngineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings
Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers
More informationINVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA
INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationMunicipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS
Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08
More informationINVITATION FOR BID (IFB) IFB NO. GSWA
INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST
More informationREQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS
REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects
More informationPlan Submittal and Review Checklist
Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -
More informationHAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS
HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS The ideas, designs, drawings and concepts contained herein are the exclusive intellectual property of Sanitary Management
More informationREGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, FEBRUARY 24, 2014
The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on February 24, 2014, at 6:00 p.m. in the Council Chambers of the City Building, 124 N. Michigan St., Plymouth, IN. Mayor
More informationUtility Committee Meeting AGENDA. January 9, 2018 City Hall
Utility Committee Meeting AGENDA January 9, 2018 City Hall I CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Sewer Extension Project 2. Out of State Training III. ADJOURN To: City Council, Utility Committee
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationAPPENDIX 1: CONSTRUCTION PLAN CHECKLIST
APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic
More informationGuidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division
Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be
More informationSECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS
SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS 2.1 MASTER PLAN 2.1.1 A Master Plan for water, wastewater, and/or reclaimed water is required for all residential or commercial
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More information