1 Western Mining Electric Association San Antonio TX NOVEMBER 15, 2012
2 PRESENTED BY David L. Harris, PE Customer Technical Executive SPX Transformer Solutions, Inc. Office: Cell: Dave has a BS Electrical Engineering from Clarkson University, Potsdam, New York, and an MS Engineering Management from Milwaukee School of Engineering. He has been in the transformer industry for 43 years in design, development, manufacturing, testing, marketing, sales and management of transformers and load tap changers. Currently, he holds the position of Customer Technical Executive for SPX Transformer Solutions. Dave is a Life Member of the IEEE and is active in the Electric Power Industry as a past chair of several Working Groups and Subcommittees for the IEEE Substations Committee and IEEE Transformers Committee. Dave is an individual member of CIGRE.
3 Agenda Thermal Performance Mechanical Performance Failure Photos Questions 3
4 Rectangular, Layer-Type Transformers 4
5 Transformer Winding Conductors Copper Strip or Foil Bus bar Rectangular wire (MW) Continuously Transposed Cable (CTC) MW CTC 5
6 Winding Types SLL / Layer / Barrel 6
7 Winding Types (cont.) Helical / Screw 7
8 Winding Types (cont.) Continuous Disk Winding Inner cross-over Outer cross-over 8
9 Circular, Layer-Type Transformers 9
10 Power Class Transformer 10
11 Layer Winding Conductor Arrangements 11
12 Layer Winding Thermal Performance Layer Type Windings Very large thermal mass of conductor and insulation between cooling ducts: difficult to calculate and control the hot spot temperatures No radial ducts, some axial ducts, most of them just on ends, not all around 12
13 Thermal Performance Non-directed flow Directed flow Disk Type Windings All turns are in contact with MOVING oil to lower hot spot temperatures 13
14 Thermal Performance IEEE Std C , IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers Exponents used in temperature determination equations: Adobe Acrobat Document C GUIDE TYPICAL TESTED VALUES* TYPE OF COOLING m n m n OA FA Non-Directed FOA or FOW Not Available Directed FOA or FOW Not Available * Based on transformers tested by SPX Transformer Solutions for disk-type transformers. Similar information should be obtained for transformers with layertype windings for thermal evaluation and loading. 14
15 Thermal Performance (cont.) A four-level criterion has been developed to classify risks to transformers, when there is no previous dissolved gas history, for continued operation at various combustible gas levels. The criterion uses both concentrations for separate gases and the total concentration of all combustible gases (see Table 1 on next slide). Condition 1: TDCG below this level indicates the transformer is operating satisfactorily. Any individual combustible gas exceeding specified levels should prompt additional investigation. Condition 2: TDCG within this range indicates greater than normal combustible gas level. Any individual combustible gas exceeding specified levels should prompt additional investigation. Action should be taken to establish a trend. Fault(s) may be present. Condition 3: TDCG within this range indicates a high level of decomposition. Any individual combustible gas exceeding specified levels should prompt additional investigation. Immediate action should be taken to establish a trend. Fault(s) are probably present. Condition 4: TDCG within the range indicates excessive decomposition. Continued operation could result in failure of the transformer. Proceed immediately and with caution. 15
16 Thermal Performance IEEE Std C , IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers Defines various conditions and limits of gases for each condition: TABLE 1 - DISSOLVED GAS CONCENTRATIONS DISSOLVED KEY GAS CONCENTRATION LIMITS (ppm*) STATUS H 2 CH 4 C 2 H 2 C 2 H 4 C 2 H 6 CO CO 2 TDCG CONDITION CONDITION CONDITION CONDITION 4 >1800 >1000 >80 >200 >150 >1400 >10000 >
17 Winding Leakage Flux Plot Finite Element Analysis of Leakage Flux Between Coils Axial locations of HV DETC taps Flux leaks out radially whenever there is an axial spreading out of turns in a coil. 17
18 Ampere Turn Winding Distribution Plot 18
19 LV and TV Winding Turn Spreading 19
20 Short Circuit Winding Mechanical Performance Short circuit forces pulsate at twice system frequency Major and minor pulses gradually become equal as the offset current decays and the fault current becomes symmetrical 20
21 Layer Winding Short Circuit Performance Fig B2 Forces acting on both the HV and LV windings of a simplified rectangular two-winding core-type transformer during through fault conditions. 21
22 Mechanical Performance 22
23 Short Circuit Mechanical Performance Radial Forces Buckling (inner coil) Axial Forces (Applying Left Hand Rule) Radial Forces Hoop Stress (outer coil) Outward Radial Force converted to Tensile Stress Power Class transformers are designed to withstand forces in all directions. 23
24 Axial Forces Applying Left Hand Rule (Br) (I) Current (I) Flux (B) Force (F) (Fa) Length of beam: l = 2 π R OD m -W ks 24
25 Design for Short Circuit Duty Conductor Telescoping Failure Typically a problem for Layer windings Can happen to disk or helical windings Extent of damage to paper insulation will determine how soon a total unit failure will happen 25
26 Circular, Layer-Type Transformers What is the Axial Force during thru-faults? How much axial compression can you put on this unit? 26
27 Failure Photos 27
28 Failure Photos (cont.) 28
29 Failure Photos (cont.) 29
30 Failure Photos (cont.) 30
31 Failure Photos (cont.) 31
32 Failure Photos (cont.) 32
33 Questions? Thank You! 33
Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications
The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of
More informationRegional Technical Seminar SHORT CIRCUIT FORCES
Regional Technical Seminar SHORT CIRCUIT FORCES Short Circuit Forces Wallace Exum Electrical Design Engineer wallace.exum@spx.com Agenda 1. What is Short Circuit 2. Types of Faults 3. How to Calculate
More informationRegional Technical Seminar SHORT CIRCUIT FORCES
Regional Technical Seminar SHORT CIRCUIT FORCES Douglas W Reed Principal Electrical Design Engineer douglas.reed@spx.com SPX Transformer Solutions, Inc. June 20th, 2018 Agenda 1.Review transformers: How
More informationTransformer Technology Seminar What to consider at Design Reviews
Pomona CA, May 24-25, 2016 Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Why to perform Design Review Meetings? To ensure both parties having the same understanding of the
More informationCHAPTER 2 ELECTROMAGNETIC FORCE AND DEFORMATION
18 CHAPTER 2 ELECTROMAGNETIC FORCE AND DEFORMATION 2.1 INTRODUCTION Transformers are subjected to a variety of electrical, mechanical and thermal stresses during normal life time and they fail when these
More informationPES & IAS NY Chapter And NY LMAG June 23 rd, 2015
PES & IAS NY Chapter And NY LMAG June 23 rd, 2015 High Temperature Insulation Systems and their use in Mobile Transformers Myron B. Bell, PE mbell@deltastar.com Delta Star, Inc. June 23 rd 2015 Introduction
More informationTRANSFORMER TECHNOLOGY GPT
Core-Form TRANSFORMER TECHNOLOGY GlobalPT Corporation performs research and engineering developments and co-ordination of works of technical partners in the field of technological progress and commercial
More informationElectrical Design Process
Electrical Design Process Jason Varnell Lead Design Engineer Jason.Varnell@spx.com SPX Transformer Solutions, Inc. September 26, 2018 Agenda 1. Bid Design Process Parameters Affecting Bid Design 2. Final
More informationPower Transformers Basics
Power Transformers Basics Transformer Basic Objective Introduce Basic Transformer Theory as it Relates to Diagnostics Provide a Better Understanding of the Diagnostic Test Environment Identify Important
More informationTransformer Design: Economics & Reliability
Transformer Design: Economics & Reliability Weidmann-ACTI Inc. Technical Conference New Diagnostic Concepts for Better Asset Management November 8 10, 2004 Holiday Inn Capitol Plaza, Sacramento, CA H.
More informationDEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER
DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER JESSE M LOPEZ CPS ENERGY USA EMILIO MORALES CRUZ QUALITROL USA SUMMARY Power transformers are essential
More informationPOWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009
POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power
More informationAcoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F.
Acoustic Emission in power transformers 1 More expensive equipment in the substation Many years of operation First indication of a problem: Dissolved Gases Begin investigation to determine the origin of
More informationTransformer Technology Seminar Winding Selection
Pomona, CA May 24 25, 2016 Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Windings: Page 2 Example GSU 274/464MVA H0 H1 H2 H3 U U I I H L H L N = N N = N L H H L HV: 405kV ±8x1.25%
More informationSiemens Transformer Technology Seminar Insulation & Thermal Design
Customer Technical Meeting Pomona, CA May 24 25, 2016 Siemens Transformer Technology Seminar Insulation & Thermal Design Siemens AG Transformers siemens.com/answers Winding Selection Windings: Page 2 Winding
More informationHOT SPOT STUDIES FOR SHEET WOUND TRANSFORMER WINDINGS
HOT SPOT STUDIES FOR SHEET WOUND TRANSFORMER WINDINGS Sheldon P. Kennedy, Thomas Gordner Niagara Transformer Jean-Noel Bérubé Qualitrol / Neoptix Robert Ringlee, Jacques Aubin Consultant ABSTRACT Application
More informationSUMMARY. PALAVRAS CHAVE Power Transformer, CFD, Hot spot, Winding, Temperature
VII WORKSPOT- International workshop on power transformers, equipment, substations and materials RIO DE JANEIRO, RJ NOVEMBER, 23-26, 2014 Hot Spot Determination in Transformer Windings through CFD Analysis
More informationTIGHTENING TORQUE ON WOODEN CORE CLAMP (Nm) (STEEL FASTENER) 1 M M M M M
SL. NO NOMINAL DIAMETER "D" mm GASKETED JOINT (Nm) WOODEN CORE CLAMP (Nm) STEEL FIXING STUD FOR BUSHING (Nm) BUSHING STEM (Nm) (BRASS /COPPER) COPPER BUSBAR (Nm) 1 M6 5 - - - - 2 M8 12 - - 10-3 M10 22
More informationPower transformers for Network, Rectifiers, Furnace
E N G L I S H OTN, OTR, OTF Transformers Power transformers for Network, Rectifiers, Furnace TTR TTO OTN, OTR, OTF reactors TTH OTN, OTR, OTF Transformers Technology Design Our designers experience combined
More informationPCS Working Group on General Requirements C
WG Item 82 C57.12.00-2000 Section 7.1.4.4 Stabilizing windings Change Requested by : V. Sankar 5/07/2005 & 10/23/2006 Requested Change : Request to form a task force to discuss the following on buried
More informationCHAPTER 3 SHORT CIRCUIT WITHSTAND CAPABILITY OF POWER TRANSFORMERS
38 CHAPTER 3 SHORT CIRCUIT WITHSTAND CAPABILITY OF POWER TRANSFORMERS 3.1 INTRODUCTION Addition of more generating capacity and interconnections to meet the ever increasing power demand are resulted in
More informationRegional Technical Seminar
Regional Technical Seminar TRANSFORMER 101 Transformer 101 Dharam Vir Vice President of Engineering Dharam.Vir@spx.com Agenda 1.Review transformers: How they work (textbook vs reality) 2.How do we build
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,
More informationTransformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation)
Transformer Thermal Impact Assessment White Paper Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance for Geomagnetic Disturbance Events Background On
More information(2) New Standard IEEE P (3) Core : (4) Windings :
(d) Electrical characteristics (such as short-circuit withstand, commutating reactance, more number of windings, etc); (e) Longer life expectancy; (f) Energy efficiency; (g) more demanding environment.
More informationEXPERIENCE WITH DETECTION AND IDENTIFICATION OF WINDING BUCKLING IN POWER TRANSFORMERS. Victor V. Sokolov and Boris V. Vanin ZTZ-Service Company
EXPERENCE WTH DETECTON AND DENTFCATON OF WNDNG BUCKLNG N POWER TRANSFORMERS Victor V. Sokolov and Boris V. Vanin ZTZ-Service Company ABSTRACT The paper summarizes experience with identification of buckling
More informationPower Cables and their Application
Power Cables and their Application Parti Materials Construction Criteria for Selection Project Planning Laying and Installation Accessories Measuring and Testing Editor: Lothar Heinhold 3rd revised edition,
More informationREPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.
REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. (DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/2015-16/Mgr(T)O&M-E-2/22
More informationIJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online): 2321-0613 Conditioning Monitoring of Transformer Using Sweep Frequency Response for Winding Deformation
More informationProlific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2
Plot No. A-267, MIDC, Road No. 6A, Opp. ESIS Hospital, Wagle Industrial Estate, Thane (West) - 400 604 CORE DETAILS Date: 4/2/206 Design No. mahati Step No. SIDES Figure - I B L- Wt- CENTRE Figure - II
More informationTransformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events
Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL-007-2 includes requirements for entities to
More informationBenefits of SFRA - Case Studies
6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO
More informationABB Power Products Service
Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?
More informationPomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers
Pomona, CA May 24 & 25, 2016 LTC Applications - Location, Series & Preventative Auto s siemens.com/answers Introduction Tap changer at active part Example of 3-phase tapchanger Page 2 Winding Configurations
More informationTransformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events
Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL 007 2 includes requirements for entities to
More informationEvaluating the Response of Surge Arresters
1 Jens Schoene Chandra Pallem Tom McDermott Reigh Walling Evaluating the Response of Surge Arresters to Temporary Overvoltages Panel Session of the IEEE Wind and Solar Collector Design Working Group 2014
More informationAssessment of Winding Deformation in Power Transformer using SFRA and Numerical Techniques Ashwini Bhujangrao Gaikwad
Assessment of Winding Deformation in Power Transformer using SFRA and Numerical Techniques Ashwini Bhujangrao Gaikwad Department of Electrical Engineering National Institute of Technology Rourkela Assessment
More informationBasic Principles and Operation of Transformer
Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core
More informationNew prospects for power transformer winding thermal design optimisation using THNM and CFD simulations
21, rue d Artois, F-75008 PARIS http : //www.cigre.org Crowne-Plaza Le Palace Brussels, Belgium March 12-14, 2014 New prospects for power transformer winding thermal design optimisation using THNM and
More informationCholla T809 Condition Assessment Report Provided by students of Northern Arizona University with the support of Arizona Public Service
Cholla T809 Condition Assessment Report Provided by students of Northern Arizona University with the support of Arizona Public Service Andrew Morin, Richard Barnes, Kyle Wiedeman, Scott Lederhos, Kenneth
More informationANALYSIS OF OPERATION MODE AND PERFORMANCE INDICATORS OF A TRANSFORMER WHEN CONTROLLING ITS VOLTAGE WITH AN ALTERNATING MAGNETIC FLUX
International Journal of Mechanical Engineering and Technology (IJMET) Volume 9, Issue 10, October 2018, pp. 211 218, Article ID: IJMET_09_10_020 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=9&itype=10
More informationMODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY
354 BIBLIOGRAPHY MODERN POWER TRANSFORMER PRACTICE Bolton, D. J., Electrical Engineering Economics, Chapman and Hall, London, 2nd edn (1936) Brownsey, C. M., 'The Problem of Noise with Particular Reference
More informationTPL is a new Reliability Standard to specifically address the Stage 2 directives in Order No. 779.
Transformer Thermal Impact Assessment White Paper Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-12 Transmission System Planned Performance for Geomagnetic Disturbance Events Background On
More informationTransformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation)
Transformer Thermal Impact Assessment White Paper (Draft) Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance during Geomagnetic Disturbances Background
More informationUnits. In the following formulae all lengths are expressed in centimeters. The inductance calculated will be in micro-henries = 10-6 henry.
INDUCTANCE Units. In the following formulae all lengths are expressed in centimeters. The inductance calculated will be in micro-henries = 10-6 henry. Long straight round wire. If l is the length; d, the
More informationMechanical Design. Brian Brinson Mechanical Design Manager.
Mechanical Design Brian Brinson Mechanical Design Manager brian.brinson@spx.com September 26, 2018 Agenda 1. Design Process 2. Pre-Approval Drawings Bid Drawings Preliminary Drawings 3. Approval Package
More informationFushun Power Supply Company, Liaoning Electric Power Company Limited, State Grid, China
2nd International Conference on Automation, Mechanical Control and Computational Engineering (AMCCE 2017) Harm and Preventive Measures of Transformer Outlet Short Circuit Hua Zhang1, Qinghao Wang 1, Guobin
More informationSoftware System for Finding the Incipient Faults in Power Transformers
Software System for Finding the Incipient Faults in Power Transformers Nikolina Petkova Technical University of Sofia, Department of Theoretical Electrical Engineering, 1156 Sofia, Bulgaria Abstract In
More informationProtecting power transformers from common adverse conditions
Protecting power transformers from common adverse conditions by Ali Kazemi, and Casper Labuschagne, Schweitzer Engineering Laboratories Power transformers of various size and configuration are used throughout
More informationCFD Simulation on Forced Air Cooled Dry-type Transformers. W. WU ABB Inc. USA
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium CFD Simulation on Forced Air Cooled Dry-type Transformers W. WU ABB Inc. USA SUMMARY
More informationSPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)
SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor
More informationLIFE EXPECTANCY VS ACTUAL LIFE OF THE MAIN TRANSFORMERS FOR THE 3.4 MW POWER SUPPLY SUMMARY
SLACTN6820 C. A. Harris July 16, 1968 not to be abstracted, quoted oz further diaolosedwithout approd @CC > LFE EXPECTANCY VS ACTUAL LFE OF THE MAN TRANSFORMERS FOR THE 3.4 MW POWER SUPPLY SUMMARY One
More informationTransformer Protection
Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary
More informationTest Report CESI A6/ Approved Page 1. MF Trasformatori s.r.l. - Calcinato (BS) Italy
A6/028659 Test Report CESI Approved Page 1 Client MF Trasformatori s.r.l. - Calcinato (BS) Italy Tested equipment Non-enclosed three-phase dry-type power transformer with three windings, with encapsulated
More informationSGB at a glance. One of the leading manufacturers. for transformers worldwide
SGB at a glance One of the leading manufacturers SGB Regensburg for transformers worldwide 50 kva up to 1.200 MVA turnover (2010): ~ EUR 580 million 1.309 employees Headquarters: Regensburg, Germany 5
More informationShunt Reactors. Global Top Energy, Machinery & Plant Solution Provider
Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical
More informationCriteria. Table of Contents
Criteria Title: SUBSTATION EQUIPMENT AMPACITY RATINGS Department: Document No: Issue Date: Previous Date: Asset Management CR-0063 v08 06-16-2014 12-26-2013 Table of Contents 1.0 Scope... 2 2.0 Introduction...
More informationLiquid-Filled Transformers
Liquid-Filled Transformers Custom Transformers at Standard Prices NIAGARA TRANSFORMER CORP. Induction Furnace Transformer Cycloconverter Rectifier Duty Transformer Arc Furnace Transformer Full Range of
More informationHOW TO SAFE GUARD THE TRANSFORMER..???
CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various
More informationDennis Marlow has begun work on the first two topics. The others will be addressed in new business.
9.7 Insulation Life Subcommittee - D.W. Platts The Insulation Life Subcommittee met at 8:00 AM Wednesday, October 17, 2001 in Orlando.. Attendance was 37 members and 72 guests. The minutes of the April
More informationCASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division
CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION
More informationRegional Technical Seminar TAP CHANGERS
Regional Technical Seminar TAP CHANGERS SPX Transformer Solutions, Inc. September 4, 2018 De-Energized and Load Tap Changers Jason Varnell Lead Design Engineer jason.varnell@spx.com SPX Transformer Solutions,
More informationsave energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers
save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED
More informationTransformer Factory Testing
Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification
More informationGroup F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A
Group F : No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS Table : A No. Description 1. Make & Manufacturer 2. Place of Manufacturer 3. Voltage Ratio 4. Rating
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationUnderstanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques
Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion
More informationCopper Core & Coil Transformer
Copper Core & Coil Transformer Transformer Stomach Pain Normal Operation: Transformer internal structures and windings are subjected to mechanical forces due to the magnetic forces. Through fault current
More informationA Comparative Diagnosis Approach on Transformer s Insulating Oil Ming-Jong Lin
Information Technology and Mechatronics Engineering Conference (ITOEC 2015) A Comparative Approach on Transformer s Insulating Oil Ming-Jong Lin No. 11 North Road Nanke, Shanhua District, Tainan City,
More informationGOVERNMENT COLLEGE OF ENGINEERING, BARGUR
1. Which of the following is the major consideration to evolve a good design? (a) Cost (b) Durability (c) Compliance with performance criteria as laid down in specifications (d) All of the above 2 impose
More informationKNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers
KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.
More informationINTERPRETATION METHODOLOGY TO IDENTIFY FAULT LOCATION IN A POWER TRANSFORMER
Volume: 03 Issue: 07 July16 www.irjet.net p-issn: 2395-0072 INTERPRETATION METHODOLOGY TO IDENTIFY FAULT LOCATION IN A POWER TRANSFORMER Sameer S. Patel 1, 1 Student, Electrical Dept, Rajasthan Institute
More informationThe Generators and Electric Motor Monitoring and Diagnostics Systems
The Generators and Electric Motor Monitoring and Diagnostics Systems MDR and PGU-DM 1 The «MDR» - Motor Diagnostics Relay the Universal System for Insulation Monitoring in Electric Machines PD-Monitor
More informationnical catalogue Tech
Technical catalogue About Etra 33 has been acting as transformer manufacturer over more than 75 years. Specializing in the manufacturing of power transformers rating up to 500 MVA and 420 kv the company
More informationTransmission Facilities Rating Methodology for Florida
Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke
More informationRESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS
RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS Authored by: Sanjay Srivastava, Chief Engineer (HE&RM), Rakesh Kumar, Director (HE&RM), R.K. Jayaswal, Dy. Director (HE&RM)
More informationEfacec work every day to anticipate solutions for a sustainable world in the new energy era.
Transformers Efacec is the largest industrial portuguese company of the electric and electromechanical sector developing high technology products, solutions and systems used every day by millions of people
More informationChapter 7 Conclusion 7.1 General
Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due
More informationTRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS
1.0 SCOPE 2.0 BONDING METHODS 2.1 Introduction 2.2 Design 2.3 Single-Point Bonding 2.4 Cross Bonding 2.5 Sheath Sectionalizing Joints 2.6 Sheath Standing Voltage 2.7 Sheath Voltage at Through Fault 2.8
More informationPhase Shifting Transformers. Presented by
Phase Shifting Transformers Presented by Phase Shifting Transformers (PST s) (a.k.a. Phase Angle Regulators) VS φ S P V V S = X L L X L sin( φ φ ) L S VL φ L PST s are power flow control devices between
More informationPOWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working
More informationRegional Technical Seminar
Regional Technical Seminar LOAD TAP CHANGERS (LTCS) DESIGN, OPERATION, AND MAINTENANCE CONSIDERATIONS SPX Dallas Facility Damon Jones General Manager SPX Transformer Solutions Components Group Cell: 214-422-8979
More informationDesign Comparison for Rectangular and Round Winding Distribution Transformer (1000kVA)
Volume 7 ssue 10,375-380, 018, SSN:-319 7560 Comparison for Rectangular and Round Winding istribution Transformer (1000kVA) Ei Ei Chaw epartment of Electrical Power Engineering Technological University
More informationTutorial: designing a converging-beam electron gun and focusing solenoid with Trak and PerMag
Tutorial: designing a converging-beam electron gun and focusing solenoid with Trak and PerMag Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationMartin Stoessl R&D Manager Siemens Transformers Austria - Weiz
Martin Stoessl R&D Manager Siemens Transformers Austria - Weiz 2007 1979 1892 Transformer reliability Ability to perform its required functions under stated conditions for a specified period of time Failure
More informationWESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)
WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices
More informationTransformer Protection
Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing
More informationB3-102 THE ROMANIAN EXPERIENCE REGARDING THE RISK OF MANAGEMENT IN THE OPERATION AND MAINTENANCE OF LARGE POWER TRANSFORMERS IN HV SUBSTATIONS
21, rue d'artois, F-75008 Paris http://www.cigre.org B3-102 Session 2004 CIGRÉ THE ROMANIAN EXPERIENCE REGARDING THE RISK OF MANAGEMENT IN THE OPERATION AND MAINTENANCE OF LARGE POWER TRANSFORMERS IN HV
More informationAS/NZS :2013 (IEC , , MOD)
AS/NZS 60076.7:2013 (IEC 60076-7, Ed. 1.0 2005, MOD) Australian/New Zealand Standard Power transformers Part 7: Loading guide for oil-immersed power transformers AS/NZS 60076.7:2013 AS/NZS 60076.7:2013
More informationGenerator Users Group Annual Conference Core testing, low and high flux, tap. Mladen Sasic, IRIS Power
Generator Users Group Annual Conference 2015 Core testing, low and high flux, tap Mladen Sasic, IRIS Power Stator Cores Cores provide low reluctance paths for working magnetic fluxes Support stator winding,
More informationFederal Power Transformers LLC based in Abu Dhabi, UAE
www.fpt.ae Federal Power Transformers LLC based in Abu Dhabi, UAE CONTENTS The Company...03 Design Process...05 Manufacturing...07 Testing...11 Quality...13 After Sales Support & Other Services...15 Satisfied
More informationTougher than any challenge. Transformers for highcurrent. industrial applications. siemens.com/transformers
Tougher than any challenge Transformers for highcurrent and large drive industrial applications siemens.com/transformers Powering industry Water-cooled LV-side high-current U-tube bushings Metallurgical
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationRecent Trends in Ultralarge-capacity Three-phase Transformer Technology
Recent Trends in Ultralarge-capacity Three-phase Transformer Technology 164 Recent Trends in Ultralarge-capacity Three-phase Transformer Technology Naoki Amano Kenichi Kawamura Masakazu Yokoyama iroaki
More informationPower System Protection. Dr. Lionel R. Orama Exclusa, PE Week 3
Power System Protection Dr. Lionel R. Orama Exclusa, PE Week 3 Operating Principles: Electromagnetic Attraction Relays Readings-Mason Chapters & 3 Operating quantities Electromagnetic attraction Response
More informationSHARDA Make Harmonics Filter
SHARDA Make Harmonics Filter SHARDA offers perfect solution to minimize Harmonics level of industries where non-linear load like, VFD, Electronics load, Convertors, Voltage booster equipment s are present.
More informationSTRAY FLUX AND ITS INFLUENCE ON PROTECTION RELAYS
1 STRAY FLUX AND ITS INFLUENCE ON PROTECTION RELAYS Z. GAJIĆ S. HOLST D. BONMANN D. BAARS ABB AB, SA Products ABB AB, SA Products ABB AG, Transformers ELEQ bv Sweden Sweden Germany Netherlands zoran.gajic@se.abb.com
More informationFault location on power cables. Fault location on power cables
Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 1. Introduction Fault location on communication and power cables
More information