Mechanical Design. Brian Brinson Mechanical Design Manager.

Size: px
Start display at page:

Download "Mechanical Design. Brian Brinson Mechanical Design Manager."

Transcription

1 Mechanical Design Brian Brinson Mechanical Design Manager September 26, 2018

2 Agenda 1. Design Process 2. Pre-Approval Drawings Bid Drawings Preliminary Drawings 3. Approval Package 4. Design Tools CAD Computer Aided Design FEA Finite Element Analysis 5. Mechanical Design Internal Design Features External Design Features Oil Preservation Systems September 26,

3 Design Process

4 Design Process Start Cycle time varies depending on the design complexity Approval Package Order Entry Marketing & Engineering Specification Questions Electrical Design Initial BOM Electrical Checks Cooling Design Electrical Design Group Internal Design Tank Design Accessory Layout Outline Mechanical BOM Mechanical Design Group Controls Design Controls Drawings Controls BOM Controls Design Group Nameplate 90% Design Complete Design 90% Complete Submit Approval Drawings to Customer When you receive approval package 90% of engineering work is complete; detail work starts following completion of design work. September 26,

5 Pre-Approval Drawings

6 Bid Outlines Basic layout of transformer with anticipated location of major components only (LTC, radiators, control cabinet, etc.) Should not be used for construction purposes, only to give a general idea of what the transformer will look like Dimensions provided include overall height, overall width, overall depth, shipping height, shipping width and shipping depth Bid outlines are by request only as they require engineering resources to create and may take a week to complete. September 26,

7 Preliminary Outlines Show anticipated location of major components with a higher degree of accuracy than bid outlines Generally reserved for designs where the design must meet strict dimensional requirements, such as a retrofit Dimensions provided will vary depending on the need but typically include a tolerances These are by request only as they require significant engineering resources to create and may have an additional cost. September 26,

8 Approval Package

9 Approval Package Outline Nameplate Control Wiring Accessory Drawings Typical review period for approval package is 1 week, delaying return beyond planned review period could compromise ship date. September 26,

10 Outline Drawing Page 1 Special requirements should be noted at quote stage not at approvals, changes to requirements at approval stage may impact price and delivery. September 26,

11 Outline Drawing Page 2 September 26,

12 Things to Consider: Electronic vs. Paper Drawings Traditional Approval Package Package can consist of 12 or more sheets per set of prints That is x 36 pieces of paper for you to look at and keep up with until they are returned, not counting small drawings Generally our order processing group will spend 1 2 days printing and preparing your package Once the drawings are printed they must be mailed to you, generally next day air Electronic Approval Package No paper Generally our order processing group can process in a few hours No shipping delays Reduce total approval submittal and return time by as much as a week Multiple people can make markups on the same print easily Easier to store at your site and easier to find if you need them If you have more than one person reviewing the prints, you will have to put all markups on one set of prints causing even more delays Consider not requiring any approval drawings, electronic or otherwise, on duplicates unless changes are requested. September 26,

13 Design Tools

14 CAD Computer Aided Design Model Based Drawings vs. Traditional 2D Drawings Advantages: Ability to create drawings quickly Accuracy of drawing views Parametric drawing views Parametric dimensions Key items ballooned automatically Ballooned legend on drawings Allows automation of common part details Preset view orientations linked to model Sheet metal parts cut directly from models Models are modeled at 1:1 scale Ability to check fit visually September 26,

15 Sample Drawing Video September 26,

16 Manufacturing Documentation Model Based Shop Drawings Actual Part Parts and assemblies are detailed for plant level processes Typical Standard DWG Specification A B C BEND UP 90 D A=1.5, B=5, C=3, D=10, E=20 Example of perception problem Example of perception problem Pre-programmed drawings that reflect the standard model improve consistency and accuracy Drawing details customizable to reflect changes not pre-programmed All jobs specific parts to be made are shown true to scale, eliminating perception problems Key BOM information displayed on drawings eliminates constant cross referencing We can now utilize computers with the 3D CAD models on the shop floor to further improve visualization. September 26,

17 Parametric Models Core, coils and accessory specifications from design engineers are used by the mechanical design program to build the model; utilize existing, proven mechanical design programs Model reflects proven producible designs at the plant level Contain standard pre-designed transformer options/variations Customizable to resolve conflicts or to make additions to meet customer specifications Assembled from parts which carry plant level bill of material (BOM) attributes; model drives BOM Parts contain material properties to provide assembly weights and center of gravity for customers and manufacturing September 26,

18 Standard Parts Libraries Save time by modeling parts once Error reduction on purchased parts Electronic pick-list of common parts Part data associated with models SPX part number Manufacturing data Component description Weight Some suppliers already have 3D CAD models saving us from having to remodel these parts. September 26,

19 Finite Element Analysis: Mechanica Utilizing our CAD models and FEA packages we can analyze our designs to establish design standards. September 26,

20 Mechanical Design

21 Internals: Adjustable Flat Clamp Press feet Vertical Draw Rods Top Pressure Ring Bottom Yoke Band Assembly Bottom Winding Support Blocks Top Yoke Band Assembly Provides framework for stability in lifting and short circuit Secures core and coil assembly to the tank September 26,

22 Low Voltage Side Internals: Adjustable Flat Clamp RV Leads HV Finish Leads RV Leads LV Finish Leads High Voltage Side RV Lead Structure RV Leads LV Start Leads Tap Leads RV Leads HV Start Leads De-energized Tap Changer Handle Copper stranded, thermally-upgraded paper insulated cables, secured for short circuit forces Insulation and clearances vary depending on the voltage The flat clamp design requires less welding on clamps and allows for smaller tank sizes compared to box beam design. September 26,

23 Tank End Walls and Base Main tank weld seams welded inside and out Complete Unit Lift Lugs LTC Holddown Tank Assembly Acetal Block (cut to size at final assembly) Formed Corners (no corner welds) LTC Holddown Bar (bolted to main clamp) Jack Pads Steel base with beveled edges for skidding End Wall assemblies welded to base Non-standard base customized to meet special anchor bolt requirement September 26,

24 Top Cover Core Ground Bushing Boss Ground Pads HV Bushing Boss Brace Venting Provisions PRD Mounting Boss CT Junction Box CT Mounting Provisions Cover Lift Lug Uni-hoist Non- Fall Magnetic Protection Insert Filling Flange Usually cut from single sheet of mild steel Domed cover Braced for full vacuum Machined bosses with contained gasket grooves Cover Bar Braces September 26,

25 Top Cover Assembly Manhole Access HV Bushing Ground Bus PRD CT Support Plate CT Mounting Support Rod Insulation Core Ground Bushing LV Bushing CT Junction Box Bushing mounted current transformers rated per customer specifications Pre-assembled top cover welded in final assembly September 26,

26 Complete Tank Assembly Radiator Vent Plug Brace Venting for Gas Space LTC LLG LTC LTI Well Pressure Switch LTC Drain Valve Control cabinet layout and wiring details completed by controls group using E3 Radiators Drain Plug Radiators ship detached Radiator valves with fully contained gasket groove LV Side Wall with Bus Duct Flange High efficiency bolt-on radiators 17 or 34 panels or custom panels Standard radiators are hot dipped galvanized, equipped with lift lugs and drain/vent plugs September 26,

27 Internal Wiring Simplified representations of complete transformer for routing of cables and checking clearances Cables routed in Pro/E allow for accurate support structures, correct cable lengths with minimal waste, and enable designers to verify electrical clearances September 26,

28 Assembly Sample Video September 26,

29 Things to Consider: Conduit All rigid conduit vs. rigid conduit with short (<36 ) runs of flex All rigid conduit does not allow for easy installation of gauges, etc., causing a maintenance headache Rigid conduit with shorts runs of flex to gauges and fans will allow for simpler and more user friendly conduit runs SPX s standard flexible conduit is rated 60º to +150º C sunlight resistant Short runs of flex All rigid If you need all rigid conduit make sure to specify it, otherwise consider allow short runs of conduit to gauges and fans. September 26,

30 Things to Consider: Seismic Do you need your transformer designed for seismic? If so which standard? Most designs that specify seismic requirements specify IEEE IEEE has three qualification levels: High Moderate Low If a customer specifies IEEE but does not specify the fastening method, then the transformer will be designed for a welded base, not bolted Unless specified a certified seismic report will not be supplied, the transformer will be designed to meet the required standards based on our internal design practices only Typical seismic reports can cost $10,000 or more and average 8 10 weeks for completion Sample of welded base design September 26,

31 Things to consider..environmental Conditions Did you know that there are many different environmental conditions that can affect your transformer? High Altitude = Decreased dielectric strength so You need additional phase to phase spacing, additional cooling, possibly special bushings, etc. Cold Climate = Depending on the temperature, you could need Special gaskets Additional heaters in control cabinets Special controls component consideration Special consideration on oil drop Heavy Industry = Depends on the specifics of the conditions Refinery Geothermal Paper Mills = Depends on the specifics of the conditions Open Mines = Depends on the specifics of the condition Many of these conditions warrant the use of special breathers, etc., so keep in mind the more information you tell your supplier, the better! September 26,

32 Oil Preservation Sealed Tank N2 Tank Conservator Tank September 26,

33 Oil Preservation Systems Sealed tank design typically operates between 5 and +7.5 psig Nitrogen (inert gas) system typically operates between +0.5 and +5.0 psig Enclosed system nitrogen bottle enclosed in cabinet Open system nitrogen bottle outside of cabinet N2 generator maintains own supply of nitrogen Conservator system typically operates between 0 and +2 psig May be used with or without air cell September 26,

34 Sealed Tank Pressure-Vacuum Gauge Provides indication of pressure/ vacuum inside transformer Typically range from 10 to +10 psig Can be used in conjunction with a pressure-vacuum bleeder on sealed tank designs to bleed and breathe in at pre-set levels Also used for shipping units filled with dry air or nitrogen if inert air system is not installed and activated for shipment September 26,

35 Nitrogen Systems Enclosed Style Open Style Enclosed = bottle inside cabinet Open = bottle outside cabinet September 26,

36 Nitrogen Systems: Generator Generates N2 on demand Eliminates need to transport and replace N2 bottles Nitrogen gas is generated as needed and stored in a tank to provide a reserve supply of nitrogen in the event of power failure Fits same footprint as standard N2 enclosure Nitrogen Purity: 99.0% to 99.5% September 26,

37 Conservator System: Diagram Conservator shapes vary from round to octagonal Size is dependent on volume of oil in main tank NOTE: When installed correctly, oil surrounds the air cell, the oil level is determined by the bottom of the air cell. September 26,

38 Questions? Thank you!

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor

More information

Liquid-Filled Transformers

Liquid-Filled Transformers Liquid-Filled Transformers Custom Transformers at Standard Prices NIAGARA TRANSFORMER CORP. Induction Furnace Transformer Cycloconverter Rectifier Duty Transformer Arc Furnace Transformer Full Range of

More information

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %

More information

SECTION TRANSFORMERS

SECTION TRANSFORMERS SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section

More information

Expression of Interest for Power Transformer Drawing Automation

Expression of Interest for Power Transformer Drawing Automation Invitation of Expression of Interest for Power Transformer Drawing Automation Transformer Engineering Department BHEL Jhansi 1 / 9 About Bharat Heavey Electrical Limited BHEL is a premier engineering and

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

Substation transformers

Substation transformers Substation transformers Triplex Indoor Power Centers Functional specification guide Functional specification for Triplex Indoor Power Centers (IPC) 750 2500 kva 1.0 Scope 1.1. This specification covers

More information

UFGS (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-33 73 00.00 40 (November 2008) ----------------------------------- Preparing Activity: NASA Superseding UFGS-33 73 00.00 40 (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 73 00.00 40 (November 2014) ----------------------------------- Preparing Activity: NASA Superseding UFGS-33 73 00.00 40 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

Hands-On Transformer Testing and Maintenance

Hands-On Transformer Testing and Maintenance Hands-On Course Description This Hands-On course will teach you how to prioritize your transformer maintenance strategy, stretch your maintenance budget and at the same time maximize the life and condition

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

OIL-IMMERSED ARC-SUPPRESSION COILS

OIL-IMMERSED ARC-SUPPRESSION COILS ISO 9001:2000 99-320 Żychlin, ul. Narutowicza 70 ISO 14001:2004 PN-N-18001:2004 www.ftz.pl Secretary s Office Tel.: +48 24 285 46 05, Fax: +48 24 285 46 31 zarzad@ftz.pl Sales and Marketing Department

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS SECTION 15062 NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS For best results, display hidden notes to specifier. PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe supports. B. Conduit supports. C. Duct supports,

More information

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class GE Ventilated Dry-Type Transformers Secondary Substation Transformers - 5 and 15kV Class GE ventilated dry-type transformers are designed for indoor or outdoor applications in schools, hospitals, industrial

More information

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX Particulate Control O&M Training APC/PCUG Conference July 12-16, 2009 The Woodlands, TX WPCA Particulate Training Seminar July 11, 2009 ESP Power Supply Choices Slide No 1 Precipitator Power Supplies Conventional

More information

300 Series Racks. 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options

300 Series Racks. 19 Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options 300 Series Racks 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails Applications The 300 Series is ideal to house electronic equipment for any type of application, both commercial and residential,

More information

Liquid Filled Transformers Load Tap Changing Transformers Three-Phase Voltage Regulators

Liquid Filled Transformers Load Tap Changing Transformers Three-Phase Voltage Regulators Liquid Filled Transformers Load Tap Changing Transformers Three-Phase Voltage Regulators Virginia Transformer is a leader in custom power transformers engineered precisely for your application and optimized

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

Installation and Maintenance Manual IM 770-1

Installation and Maintenance Manual IM 770-1 Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED

More information

PES & IAS NY Chapter And NY LMAG June 23 rd, 2015

PES & IAS NY Chapter And NY LMAG June 23 rd, 2015 PES & IAS NY Chapter And NY LMAG June 23 rd, 2015 High Temperature Insulation Systems and their use in Mobile Transformers Myron B. Bell, PE mbell@deltastar.com Delta Star, Inc. June 23 rd 2015 Introduction

More information

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch. Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training

More information

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD. Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules

More information

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A Group F : No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS Table : A No. Description 1. Make & Manufacturer 2. Place of Manufacturer 3. Voltage Ratio 4. Rating

More information

Transformer Factory Testing

Transformer Factory Testing Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

ABB Power Products Service

ABB Power Products Service Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?

More information

Power transformers for Network, Rectifiers, Furnace

Power transformers for Network, Rectifiers, Furnace E N G L I S H OTN, OTR, OTF Transformers Power transformers for Network, Rectifiers, Furnace TTR TTO OTN, OTR, OTF reactors TTH OTN, OTR, OTF Transformers Technology Design Our designers experience combined

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V This specification is property of SEC and subject to change or modification without

More information

Customer Drawings Product Selection

Customer Drawings Product Selection Customer Drawings Product Bulletin Customer Drawings Product Selection Emerson offers a wide selection of drawing products; to include 2D drawings, 3D models, CAD files and Dimensional Data for Piping

More information

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600

More information

HOW TO SAFE GUARD THE TRANSFORMER..???

HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various

More information

51-SDMS-02 SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36KV 400/230 VOLTS

51-SDMS-02 SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36KV 400/230 VOLTS SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36KV 400/230 VOLTS This specification is property of SEC and Subject to change or modification without any notice Table of Contents Clause Page 1.0 SCOPE

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT SPECIFICATION SS-25 / 14 POWER TRANSFORMERS 150/15.75-21kV, 40/50 MVA WITH AUTOMATIC LOAD-RATIO CONTROL CONNECTION

More information

SPECIFICATION GUIDE. ABB Power Technology, S.A. Zaragoza, SPAIN. ABB Power Technologies Distribution Transformers

SPECIFICATION GUIDE. ABB Power Technology, S.A. Zaragoza, SPAIN. ABB Power Technologies Distribution Transformers SPECIFICATION GUIDE ABB VACUUM CAST COIL DRY TRANFORMERS CONTENTS 1. General 1.1. Codes and standards 1.2. Service conditions 1.3. System characteristics 1.4. Documentation 2. Design and construction 2.1.

More information

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide 1ZSC000562-AAJ en, Rev. 1 Vacuum on-load tap-changers, type VUBB Technical guide Original instruction The information provided in this document is intended to be general and does not cover all possible

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of

More information

Installation and Maintenance Manual

Installation and Maintenance Manual Installation and Maintenance Manual IM770 Group: pplied ir Part Number: IM770 Date: pril 2003 Roof Curb for Skyline TM Outdoor ir Handlers 2013 Daikin pplied IM 770 Page 1 Table of Contents General Description...

More information

Compliant to DOE 10, CFR Part 431 (effective as of January 1 st, 2016)

Compliant to DOE 10, CFR Part 431 (effective as of January 1 st, 2016) Typical Specification 1.2kV Class Energy Efficient Dry-Type Distribution Transformers Compliant to DOE 10, CFR Part 431 (effective as of January 1 st, 2016) Canada 595 Southgate Drive Guelph, Ontario N1G

More information

Introduction. Centrado leading-edge transformer. Introduction

Introduction. Centrado leading-edge transformer. Introduction Introduction Centrado leading-edge transformer products are designed to optimize safety and produced to deliver a great electrical power experience and solution - for factory, infrastructure, home industry,

More information

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with

More information

Electrical Design Process

Electrical Design Process Electrical Design Process Jason Varnell Lead Design Engineer Jason.Varnell@spx.com SPX Transformer Solutions, Inc. September 26, 2018 Agenda 1. Bid Design Process Parameters Affecting Bid Design 2. Final

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

AGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover.

AGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover. AGUB Instrument and Meter Enclosures Furnished with aluminum body and solid or window cover. Class I, Division 1 and, Groups B, C, D Application To pull or splice wires and/or to mount and enclose electrical

More information

User s Manual For CT Model IMB

User s Manual For CT Model IMB User s Manual For CT Model IMB 2 of (13) Contents: A. Introduction... 3 B. Steps on receipt and opening the cases... 3 C. Transportation and handling... 3 D. Unpacking the transformer... 4 E. Storage...

More information

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY 354 BIBLIOGRAPHY MODERN POWER TRANSFORMER PRACTICE Bolton, D. J., Electrical Engineering Economics, Chapman and Hall, London, 2nd edn (1936) Brownsey, C. M., 'The Problem of Noise with Particular Reference

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

EBU PX-S02 Substation Equipment Collector Substation Main Power Transformer

EBU PX-S02 Substation Equipment Collector Substation Main Power Transformer E n g in e e r :S te v e Ha a c k e P r e mp a tn i,ku ld ip S a n d h u,s ik h ihu y n h,ma twe is e n s e e,jo s h B o h r n E n g in e e r :S ik h iu Hu y n h S te v e Ha a c k e,r a c h e le Ha n n

More information

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS 006: 2008 CEB SPECIFICATION COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS CEYLON ELECTRICITY BOARD SRI LANKA Specification for COMBINED METERING TRANSFORMERS (OUTDOOR TYPE) FOR

More information

METER - INSTALLATION Pad Mount Transformer

METER - INSTALLATION Pad Mount Transformer ER 1-210-C PAGE 1 OF 5 USE: Pad mount transformer secondary compartment LATEST REVISION: PREVIOUS REVISION 10-01-12 ORIGINATED 0-94 PREVIOUS NUMBER ER 700, 10-01-86 Added specification for placement and

More information

Commissioning Manual Distribution Transformers - Three-phase Oil Filled

Commissioning Manual Distribution Transformers - Three-phase Oil Filled 1LPL000006A2110 rev. 1 Commissioning Manual Distribution Transformers - Three-phase Oil Filled 1LPL000006A2110 rev. 1 2 / 7 Table of contents 1 Commissioning and start-up... 3 1.1 Transformer survey...

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS TABLE OF CONTENTS PAGE 1.0 SCOPE... 2 2.0 STANDARDS... 2 3.0 DESIGN REQUIREMENTS... 2 3.01 Service Conditions... 2 3.02 Ratings... 3 4.0 Sectionalizer Construction... 4 5.0 Mechanism... 6 6.0 Solid Dielectric

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Lockformer / 16 Gauge Speednotch

Lockformer / 16 Gauge Speednotch Lockformer / 16 Gauge Speednotch INSTALLATION PRELIMINARY: After uncrating, locate unit, with or without base skid, to area of operation. Unbind foot switch cord and cylinder hoses and remove gauge pin

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

Product Guide Specification

Product Guide Specification HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier

More information

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Part 1 - General Scope and Product Description 1.0 This specification contains the minimum design

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013)

S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013) S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013) 1.0 GENERAL 1.1 This specification covers the electrical and mechanical

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio Installation Guide Model #400 Corporate Office: 349 Highland Road East Macedonia, Ohio 44056 1.866.822.7328 www.ezbreathe.com Copyright 2006, EZ Breathe, LLC WHAT S INSIDE Before installing your EZ Breathe

More information

Index Pipe Hangers and Straps

Index Pipe Hangers and Straps Index Pipe Hangers and Straps Fig. 1 Standard Clevis Hanger MSS-SP-69, Type 1 WW-H-171E, Type 1 Page 14 Fig. 1CI Clevis Hanger for A.W.W.A. Page 16 Fig. 81 Clevis Hanger WW-H-171E, Type 12 Page 70 Fig.

More information

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS n Bureau of Indian Standards (BIS) is the NATIONAL STANDARD BODY. Established

More information

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER TECHNICAL SPECIFICATION FOR POWER TRANSFORMER NOTE: Vendor to give their offer in line with this data sheet only. Any deviations/additions/deletions shall be brought out in a separate sheet. A TECHNICAL

More information

Howard Smart Transformer Specification Guide

Howard Smart Transformer Specification Guide Howard Smart Transformer Specification Guide General Requirements Overhead pole-type smart distribution transformers shall be single phase, 60 Hz, mineral-oil filled and self-cooled and shall conform as

More information

TECHNICAL SPECIFICATIONS 240/320/400 MVA AUTOTRANSFORMER TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS 240/320/400 MVA AUTOTRANSFORMER TABLE OF CONTENTS TECHNICAL SPECIFICATIONS 240/320/400 MVA AUTOTRANSFORMER TABLE OF CONTENTS PARAGRAPH PAGE 1. SCOPE... 1 2. PROJECT ENGINEER... 1 3. BIDDERS PREQUALIFICATIONS... 1 4. GENERAL... 1 5. ELECTRICAL DESIGN...

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

TRANSFORMER TECHNOLOGY GPT

TRANSFORMER TECHNOLOGY GPT Core-Form TRANSFORMER TECHNOLOGY GlobalPT Corporation performs research and engineering developments and co-ordination of works of technical partners in the field of technological progress and commercial

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior

More information

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER Version: 3 Issued: February 2018 Owner: Head of Engineering - Electrical Approved By: Andrew Russack Head

More information

Transformer Technology Seminar What to consider at Design Reviews

Transformer Technology Seminar What to consider at Design Reviews Pomona CA, May 24-25, 2016 Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Why to perform Design Review Meetings? To ensure both parties having the same understanding of the

More information

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni Bracket guide LK Radiator fixture Uni LK Radiator fixture Uni c/c 40 (Article no. 481 43 92) LK Radiator fixture Uni c/c 50 (Article no. 481 44 03) LK Pipe Pole (Article no. 481 43 91, 481 43 90) Used

More information

Ch.2 Solutions posted on web page, go thru them for review.

Ch.2 Solutions posted on web page, go thru them for review. EE 5200 - Lecture 5 Wed Sep 13, 2017 Topics for Today: Announcements Software: Matlab? Will begin using as early as next week. Office hrs: 2pm, M,W,F (will try this, can adjust if needed) Grader Office

More information

DX450 Red-D-Arc PARTS LIST FOR RETURN TO MAIN INDEX

DX450 Red-D-Arc PARTS LIST FOR RETURN TO MAIN INDEX Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies P-582 RETURN TO MAIN INDEX PARTS LIST FOR DX450 Red-D-Arc P-582 Index of Sub

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

Installation requirements

Installation requirements Installation requirements for SUNNY CENTRAL 500U 1 Contents This document describes the requirements which have to be observed for the installation site of the Sunny Central 500U. The installation and

More information

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS.

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS. SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS. 1. SCOPE: This specification covers design, manufacture, testing and supply of 6.64/10.12 KV 24/15.7, 30/19.7

More information

Ritz Instrument Transformers GmbH. Welcome

Ritz Instrument Transformers GmbH. Welcome Ritz Instrument Transformers GmbH Welcome About Ritz together with over 200 years of experience in instrument transformer production since 1945 since 1945 since 1945 since 1904 RITZ Group - Organization

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information