1 Pomona, CA May 24 & 25, 2016 LTC Applications - Location, Series & Preventative Auto s siemens.com/answers

2 Introduction Tap changer at active part Example of 3-phase tapchanger Page 2

3 Winding Configurations Primary > High voltage, many turns Secondary > Heavy current, more copper

4 Winding Configurations Tap Changers and Tap Windings: DETC or OLTC? OLTC vs. external Regulator? Separate or integral tap windings? Page 4

5 Reactance-Type on-load Tap changer (LV) Page 5

6 Resistance-type OLTC (HV or LV) Page 6

7 Function of the Preventive Auto-transformer Enables the tap changer to move from one position to an adjacent position Without breaking the tap connection Without causing a winding short circuit. Provides an intermediate voltage step between the tap winding steps.

8 Components of the Preventive Auto The PA has 2 equal windings connected in series as an Auto The windings are inter-wound to reduce the impedance to load current. main transformer tap winding P4 P1 Core Selector switches PA I L The voltage drop due to load current is insignificant. Winding 2 Vacuum interrupter P3 By-pass switches Winding 1 P2 I L P

9 Non-bridging position P4 P1 I L /2 I L /2 Currents in the 2 windings are in opposing directions. P3 P2 The windings are inter-wound to reduce the impedance to a low level to avoid voltage drop across the PA. 1 No voltage is applied to the windings and there is no core flux.

10 Bridging position P4 I L /2+I C P1 I L /2-I C When bridging, voltage applied to 2 windings in series. Selected of selected tap voltages. This circulates a current (I C ) through both windings, tap winding section, and by-pass switches. P3 P2 Circulating current limited by PA s magnetizing impedance. If used standard transformer core, impedance would be very high and circulating current would be small (<1%). 6 It s necessary to reduce magnetizing impedance to allow reasonable circulating current,. This done by introducing airgaps in PA s core leg. The transformer now has the magnetizing characteristics of a gapped core reactor.

11 Loss Evaluation at Nominal Rating Three possibilities for loss evaluation 1. Bridging 2. Non-bridging 3. Average Recommend average of bridging and non-bridging position losses.

12 Components: Helical windings with CTC

13 Components: Disc windings with simple conductors

14 Components: Rectangular core and windings Core E Foil windings E with windings fitted Top yoke, clamps and tie rods fitted

15 Noise level Noise occurs whenever legs excited (on bridging position). Noise also produced during commutation; it sounds like a grunt lasting about 1 sec. Noise created by compression of gap material, - Can be reduced by making gap material very hard, -OR- -Some designs use very high compression forces & softer gap material. As gaps are magnetically compressed, leg blocks & yokes are subject to vibration. Anti-vibration mountings may be used to reduce vibration transmitted to the tank.

16 Types of regulation Reversing Regulation Similar to linear arrangement, Selector contact moves up or down. There is also a reversing switch which reverses the sense of regulating winding. Maximum tap position > Regulating winding is 100% in positive sense. Mid tap position > none of regulating winding is in circuit Minimum tap position > when 100% regulation is in negative sense Page 16

17 Autotransformer Line End Regulation HV Do autotransformers require flux remaining constant across all tap positions? MV Can position regulating winding at MV terminal, rather than at neutral. Disadvantage - regulating winding (& tap changer) directly exposed to transients (lightning strikes) from MV terminal Page kV and 230KV voltages require 3 x single-phase tap changers (high currents). Maybe also Metal Oxide Varistors (MOV s) across regulating winding (lightning surges)

18 Autotransformer with Neutral End regulation HV Better alternative - place cheaper 3-phase tap changer at neutral end. MV With graded insulation, neutral terminal & OLTC have lower insulation levels. Disadvantage - number of turns in both MV and HV circuits changes simultaneously. Without one winding acting as a constant voltage, the transformer becomes a variable flux transformer. If tertiary winding is used, its output voltage will vary, unless a booster is fitted to compensate. Page 18

19 Page 19

20 In-tank Tap changer Cut-away Showing Completed Tap changer Regulating Leads Connections Motor Drive Page 20

21 Tap changer Basics Mounting flange Elbow pipes for connection to conservator Diverter Housing Connections for transformer leads Selector The main components are the selector, diverter, drive mechanism and surge relay. The selector is in the main bulk oil. The diverter, which makes and breaks the current path, is in a separate oil compartment with it s own conservator & surge relay. The drive mechanism houses the drive motor which moves tap switches, and controls and indications. Page 21

22 Tap changer Motor Drive Unit Page HAND CRANK 2. INSPECTION LAMP 3. SHAFT FOR HAND CRANK 4. OPERATION COUNTER 5. POSITION COUNTER 6. DRAG HANDS 7. TAP CHANGE INDICATOR 8. DOOR HAND FOR LAMP 9. MOTOR PROTECTION DEVICE 10. RAISE/LOWER CONTROL SWITCH 11.HEATING PANEL 12. SWING-FRAME LATCH 13. DRAWINGS 14.COVER PLATE 15. PADLOCKING FACILITY 16.QUICK RELEASE SCREWS

23 Tap changer Separate Oil Systems of OLTC and expansion tank Separation wall Siliga gel breather OLTC expansion tank Protective relay Diverter switch oil Silica gel breather Main Buchholz relay Main transformer oil Page 23

24 Tap changer Protective Relay OLTC Surge Relay A type RS 2001 surge relay is fitted in the pipe work between the divertor compartment and the OLTC conservator. The surge relay generates a trip signal on a fault which is latched. A red flag can be seen in the relay window when it has tripped. Testing Remove the terminal box lid to reveal the test and reset buttons. Pressing the test button latches the switch in the trip position. It must be reset. TERMINAL BOX INSPECTION WINDOW Page 24

25 Examples for Tap Changers OLTC V III 200 D (MR) OLTC M III 350/M III 500 (MR) OLTC RM III 600 (MR) Page 25

26 Siemens US s Contact James McIver Principal Application Engineer E T TR US 6860 Bermuda Road, STE 100 Las Vegas NV USA Mobile: (702) james.mciver@siemens.com siemens.com/transformers Page 26

Transformer Technology Seminar Winding Selection

Transformer Technology Seminar Winding Selection Pomona, CA May 24 25, 2016 Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Windings: Page 2 Example GSU 274/464MVA H0 H1 H2 H3 U U I I H L H L N = N N = N L H H L HV: 405kV ±8x1.25%

More information

Regional Technical Seminar

Regional Technical Seminar Regional Technical Seminar LOAD TAP CHANGERS (LTCS) DESIGN, OPERATION, AND MAINTENANCE CONSIDERATIONS SPX Dallas Facility Damon Jones General Manager SPX Transformer Solutions Components Group Cell: 214-422-8979

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

ON LOAD TAP CHANGERS RS 6.3 / RS 6 TECHNICAL DATA

ON LOAD TAP CHANGERS RS 6.3 / RS 6 TECHNICAL DATA ON LOAD TAP CHANGERS RS 6.3 / RS 6 TECHNICAL DATA Hyundai Heavy Industries Co. Bulgaria 2017-2 EA 710. /1 EN Contents 1. Basic characteristics... 3 1.1. Basic technical data... 3 1.2. Rated through current

More information

ON LOAD TAP CHANGERS RSV 5.3 TECHNICAL DATA

ON LOAD TAP CHANGERS RSV 5.3 TECHNICAL DATA ON LOAD TAP CHANGERS RSV 5.3 TECHNICAL DATA Hyundai Heavy Industries Co. Bulgaria 2017 EA 782/15 ENG Contents 1. Basic characteristics... 3 1.1. Basic technical data... 3 1.2. Rated through current (Iu),

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

ON LOAD TAP CHANGERS RS 9.3 / RS 9 TECHNICAL DATA

ON LOAD TAP CHANGERS RS 9.3 / RS 9 TECHNICAL DATA ON LOAD TAP CHANGERS RS 9.3 / RS 9 TECHNICAL DATA Hyundai Heavy Industries Co. Bulgaria EA 675/15 ENG Contents 1. Basic characteristics... 3 1.1. Basic technical data... 3 1.2. Rated through current (Iu),

More information

On-Load Tap Changer Type M

On-Load Tap Changer Type M On-Load Tap Changer Type M OLTC type model M III 500 Y, U m = 123 Kv, 500A, ± 9 steps The type M On Load tap changers are used to vary the ratio of oil-immersed transformers under load.in general they

More information

TECHNICAL DATA TYPE CMD OIL-IMMERSED ON-LOAD TAP CHANGER

TECHNICAL DATA TYPE CMD OIL-IMMERSED ON-LOAD TAP CHANGER TECHNICAL DATA TYPE CMD OIL-IMMERSED ON-LOAD TAP CHANGER HM0.154.1901 SHANGHAI HUAMING POWER EQUIPMENT CO., LTD. General 1. General 3 2. Technical specifications 4 3. Type explanation 5 4. Terms and definitions

More information

The measurement of winding resistance is useful in detecting a number of types of fault in a transformer. Malfunctioning tap changer mechanisms

The measurement of winding resistance is useful in detecting a number of types of fault in a transformer. Malfunctioning tap changer mechanisms Why Measure Winding Resistance? The measurement of winding resistance is useful in detecting a number of types of fault in a transformer. Malfunctioning tap changer mechanisms Partial or dead short-circuited

More information

Transformer Protection

Transformer Protection Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary

More information

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %

More information

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of

More information

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY 354 BIBLIOGRAPHY MODERN POWER TRANSFORMER PRACTICE Bolton, D. J., Electrical Engineering Economics, Chapman and Hall, London, 2nd edn (1936) Brownsey, C. M., 'The Problem of Noise with Particular Reference

More information

Regional Technical Seminar TAP CHANGERS

Regional Technical Seminar TAP CHANGERS Regional Technical Seminar TAP CHANGERS SPX Transformer Solutions, Inc. September 4, 2018 De-Energized and Load Tap Changers Jason Varnell Lead Design Engineer jason.varnell@spx.com SPX Transformer Solutions,

More information

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER TECHNICAL SPECIFICATION FOR POWER TRANSFORMER NOTE: Vendor to give their offer in line with this data sheet only. Any deviations/additions/deletions shall be brought out in a separate sheet. A TECHNICAL

More information

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

Technical guide. Type VRLTC load tap changer

Technical guide. Type VRLTC load tap changer Technical guide Type VRLTC load tap changer Table of contents General information... 2 Electrical characteristics... 3 Type tests... 4 Switching sequence... 5 Tank characteristics... 7 Terminal board...

More information

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD. Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules

More information

Phase Shifter Application Workshop. Siemens Energy, Inc.

Phase Shifter Application Workshop. Siemens Energy, Inc. Phase Shifter Application Workshop Siemens Energy, Inc. PJM Power Pool, March, 2015 siemens.com/energy Phase Shifter Application Workshop Phase Shifting Transformers Principles, Design Aspects and Operation

More information

Phase Shifting Transformers. Presented by

Phase Shifting Transformers. Presented by Phase Shifting Transformers Presented by Phase Shifting Transformers (PST s) (a.k.a. Phase Angle Regulators) VS φ S P V V S = X L L X L sin( φ φ ) L S VL φ L PST s are power flow control devices between

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information

TECHNICAL DATA TYPE SHZV VACUUM ON-LOAD TAP CHANGER FOR OIL-IMMERSED TRANSFORMER

TECHNICAL DATA TYPE SHZV VACUUM ON-LOAD TAP CHANGER FOR OIL-IMMERSED TRANSFORMER TECHNICL DT TYPE SHZV VCUUM N-LD TP CHNGER FR IL-IMMERSED TRNSFRMER HM0.154.3901-02.06/2018 SHZV(cylinder tap selector) SHZV(cage tap selector) SHNGHI HUMING PWER EQUIPMENT C., LTD. General 1. General

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor

More information

TAP CHANGER SELECTING MANUAL TECHNICAL DATA

TAP CHANGER SELECTING MANUAL TECHNICAL DATA TECHNICAL DATA HM0.154.000 SHANGHAI HUAMING POWER EQUIPMENT CO., LTD. General 1. General requirement for tap changer selecting 2 2. Attention for tap changer mounting 10 3. Tap changer accessories 10 4.

More information

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX Particulate Control O&M Training APC/PCUG Conference July 12-16, 2009 The Woodlands, TX WPCA Particulate Training Seminar July 11, 2009 ESP Power Supply Choices Slide No 1 Precipitator Power Supplies Conventional

More information

Transformer Technology Seminar What to consider at Design Reviews

Transformer Technology Seminar What to consider at Design Reviews Pomona CA, May 24-25, 2016 Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Why to perform Design Review Meetings? To ensure both parties having the same understanding of the

More information

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide 1ZSC000562-AAJ en, Rev. 1 Vacuum on-load tap-changers, type VUBB Technical guide Original instruction The information provided in this document is intended to be general and does not cover all possible

More information

Power transformers for Network, Rectifiers, Furnace

Power transformers for Network, Rectifiers, Furnace E N G L I S H OTN, OTR, OTF Transformers Power transformers for Network, Rectifiers, Furnace TTR TTO OTN, OTR, OTF reactors TTH OTN, OTR, OTF Transformers Technology Design Our designers experience combined

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

Technical guide. Type VRLTC load tap changer

Technical guide. Type VRLTC load tap changer Technical guide Type VRLTC load tap changer Table of contents 2 General information 4 Switching sequences 6 Tank characteristics 6 Terminal board 7 Tap selector 7 Stationary contacts 7 Reversing switch

More information

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.

More information

TRANSFORMER TECHNOLOGY GPT

TRANSFORMER TECHNOLOGY GPT Core-Form TRANSFORMER TECHNOLOGY GlobalPT Corporation performs research and engineering developments and co-ordination of works of technical partners in the field of technological progress and commercial

More information

Prolific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2

Prolific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2 Plot No. A-267, MIDC, Road No. 6A, Opp. ESIS Hospital, Wagle Industrial Estate, Thane (West) - 400 604 CORE DETAILS Date: 4/2/206 Design No. mahati Step No. SIDES Figure - I B L- Wt- CENTRE Figure - II

More information

Transformer Factory Testing

Transformer Factory Testing Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification

More information

Load Tap Changers for Power Transformers

Load Tap Changers for Power Transformers Load Tap Changers for Power Transformers Dr. Dieter Dohnal / Maschinenfabrik Reinhausen GmbH Dipl. Ing. Bernhard Kurth / Reinhausen Manufacturing Inc. Load Tap Changers for Power Transformers Content Basic

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

Chapter 7 Conclusion 7.1 General

Chapter 7 Conclusion 7.1 General Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due

More information

Power Transformers Basics

Power Transformers Basics Power Transformers Basics Transformer Basic Objective Introduce Basic Transformer Theory as it Relates to Diagnostics Provide a Better Understanding of the Diagnostic Test Environment Identify Important

More information

CHAPTER 4. Distribution Transformers

CHAPTER 4. Distribution Transformers CHAPTER 4 Distribution Transformers Introduction A transformer is an electrical device that transfers energy from one circuit to another purely by magnetic coupling. Relative motion of the parts of the

More information

OIL-IMMERSED ARC-SUPPRESSION COILS

OIL-IMMERSED ARC-SUPPRESSION COILS ISO 9001:2000 99-320 Żychlin, ul. Narutowicza 70 ISO 14001:2004 PN-N-18001:2004 www.ftz.pl Secretary s Office Tel.: +48 24 285 46 05, Fax: +48 24 285 46 31 zarzad@ftz.pl Sales and Marketing Department

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

On-load tap-changer VACUTAP VRC and VRE

On-load tap-changer VACUTAP VRC and VRE www.reinhausen.com On-load tap-changer VACUTAP VRC and VRE Technical Data TD 246/03 Table of Contents Table of Contents 1 General / Technical data... 4 1.1 On-load tap-changer designations... 4 1.2 Summary

More information

(2) New Standard IEEE P (3) Core : (4) Windings :

(2) New Standard IEEE P (3) Core : (4) Windings : (d) Electrical characteristics (such as short-circuit withstand, commutating reactance, more number of windings, etc); (e) Longer life expectancy; (f) Energy efficiency; (g) more demanding environment.

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Siemens Transformer Technology Seminar Insulation & Thermal Design

Siemens Transformer Technology Seminar Insulation & Thermal Design Customer Technical Meeting Pomona, CA May 24 25, 2016 Siemens Transformer Technology Seminar Insulation & Thermal Design Siemens AG Transformers siemens.com/answers Winding Selection Windings: Page 2 Winding

More information

Dynamic Testing for On Load Tap Changer Condition Assessment

Dynamic Testing for On Load Tap Changer Condition Assessment 4th International Colloquium "Transformer Research and Asset Management TUTORIAL Dynamic Testing for On Load Tap Changer Condition Assessment Dr. Raka Levi, AMforum Abstract The tutorial covers different

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

Industrial Applications

Industrial Applications Industrial Applications Transformers for Industrial Applications Tamini has always produced industrial transformers of high quality and reliability, designed to satisfy the most diverse and complex technical

More information

On-load tap-changers, type UC and VUC Technical guide

On-load tap-changers, type UC and VUC Technical guide 1ZSE 5492-105 en, Rev. 7 On-load tap-changers, type UC and VUC Technical guide The manufacturer Hereby declares that The products Manufacturer s declaration ABB AB Components SE-771 80 LUDVIKA Sweden comply

More information

Hands-On Transformer Testing and Maintenance

Hands-On Transformer Testing and Maintenance Hands-On Course Description This Hands-On course will teach you how to prioritize your transformer maintenance strategy, stretch your maintenance budget and at the same time maximize the life and condition

More information

TECHNICAL DATA TYPE CV & SV OIL-IMMERSED ON-LOAD TAP CHANGER

TECHNICAL DATA TYPE CV & SV OIL-IMMERSED ON-LOAD TAP CHANGER TECHNICAL DATA TYPE CV & SV OIL-IMMERSED ON-LOAD TAP CHANGER SHANGHAI HUAMING POWER EQUIPMENT CO., LTD. CONTENT 1. General 2 2. Technical specifications 2 3. Model explanation 4 4. Terms and definitions

More information

SPECIFICATION No SS-88/5 630 kva, 30 / 0.4 kv THREE-PHASE TRANSFORMERS WITH ON-LOAD TAP CHANGER

SPECIFICATION No SS-88/5 630 kva, 30 / 0.4 kv THREE-PHASE TRANSFORMERS WITH ON-LOAD TAP CHANGER INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION February 2017 SPECIFICATION No SS-88/5 630 kva, 30 / 0.4 kv THREE-PHASE TRANSFORMERS WITH ON-LOAD TAP CHANGER

More information

Transformers. 6.1 Principles of operation. Professor D.J. Allan Merlindesign. Chapter 6

Transformers. 6.1 Principles of operation. Professor D.J. Allan Merlindesign. Chapter 6 Chapter 6 Transformers Professor D.J. Allan Merlindesign 6.1 Principles of operation In simple form, a transformer consists of two windings connected by a magnetic core. One winding is connected to a power

More information

1ZSE en, Rev. 9. On-load tap-changers, type UC and VUC Technical guide

1ZSE en, Rev. 9. On-load tap-changers, type UC and VUC Technical guide 1ZSE 5492-105 en, Rev. 9 On-load tap-changers, type UC and VUC Technical guide The manufacturer Hereby declares that The products Manufacturer s declaration ABB AB Components SE-771 80 LUDVIKA Sweden comply

More information

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8] Code No: RR320205 Set No. 1 1. (a) Explain about Bewley s Lattice diagrams and also mention the uses of these diagrams. [6+2] (b) A line of surge impedance of 400 ohms is charged from a battery of constant

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title POWER SYSTEM GENERATION & DISTRIBUTION Training Duration 5 days Training Venue and Dates Power System Generation & Distribution 5 08-12 December, 2019 $4,000 Dubai, UAE Trainings will be

More information

Impact of Distributed Generation on Network Voltage Levels

Impact of Distributed Generation on Network Voltage Levels EEE8052 Distributed Generation Taster Material Impact of Distributed Generation on Network Voltage Levels Steady-state rise in network voltage levels Existing practice is to control distribution voltage

More information

Transformer Protection

Transformer Protection Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing

More information

Transformer Protection Principles

Transformer Protection Principles Transformer Protection Principles 1. Introduction Transformers are a critical and expensive component of the power system. Due to the long lead time for repair of and replacement of transformers, a major

More information

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT SPECIFICATION SS-25 / 14 POWER TRANSFORMERS 150/15.75-21kV, 40/50 MVA WITH AUTOMATIC LOAD-RATIO CONTROL CONNECTION

More information

Tap Changer Condition Assessment Using Dynamic Resistance Measurement

Tap Changer Condition Assessment Using Dynamic Resistance Measurement Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 00 (2017) 000 000 www.elsevier.com/locate/procedia 4th International Colloquium "Transformer Research and Asset Management Tap

More information

Tab 8 Surge Arresters

Tab 8 Surge Arresters s en em Tab 8 Surge Arresters Si Distribution System Engineering Course Unit 10 2017 Industry Inc., All Rights Reserved Surge Arresters The main protective devices against system transient overvoltages.

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

HOW TO SAFE GUARD THE TRANSFORMER..???

HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various

More information

ECE 3600 Transformers b

ECE 3600 Transformers b Transformer basics and ratings A Transformer is two coils of wire that are magnetically coupled. Transformers b Transformers are only useful for AC, which is one of the big reasons electrical power is

More information

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class GE Ventilated Dry-Type Transformers Secondary Substation Transformers - 5 and 15kV Class GE ventilated dry-type transformers are designed for indoor or outdoor applications in schools, hospitals, industrial

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

Power Measurements and Basic Electrical Diagnostic Tests

Power Measurements and Basic Electrical Diagnostic Tests Power Measurements and Basic Electrical Diagnostic Tests Instrument Basics Burden VA Sources V and I Meters V and I KVL and KCL Kelvin Connection KVL and KCL Kelvin Connection 4-Wire Technique Exclude

More information

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes

More information

1ZSC AAW en, Rev. 2. On-load tap-changers, type UC Technical guide

1ZSC AAW en, Rev. 2. On-load tap-changers, type UC Technical guide 1ZSC000562-AAW en, Rev. 2 On-load tap-changers, type UC Technical guide Original instruction The information provided in this document is intended to be general and does not cover all possible applications.

More information

Regional Technical Seminar SHORT CIRCUIT FORCES

Regional Technical Seminar SHORT CIRCUIT FORCES Regional Technical Seminar SHORT CIRCUIT FORCES Short Circuit Forces Wallace Exum Electrical Design Engineer wallace.exum@spx.com Agenda 1. What is Short Circuit 2. Types of Faults 3. How to Calculate

More information

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY)

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY) E -Tender Notice No. Annexure - VII SOUTHCO/DEPOSIT/3.15 & 5 MVA Power Transformer /02/2015 16 Dt. 02.03.2016 NAME OF THE WORK PROCUREMENT OF33/11 KV, 3.15 MVA & 5 MVA Power Transformer SUPPLIER INFORMATION

More information

nical catalogue Tech

nical catalogue Tech Technical catalogue About Etra 33 has been acting as transformer manufacturer over more than 75 years. Specializing in the manufacturing of power transformers rating up to 500 MVA and 420 kv the company

More information

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A Group F : No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS Table : A No. Description 1. Make & Manufacturer 2. Place of Manufacturer 3. Voltage Ratio 4. Rating

More information

Benefits of SFRA - Case Studies

Benefits of SFRA - Case Studies 6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD NTERNATONAL STANDARD EC 60214-1 Edition 2.0 2014-05 colour inside Tap-changers Part 1: Performance requirements and test methods EC 60214-1:2014-05(en) THS PUBLCATON S COPYRGHT PROTECTED Copyright 2014

More information

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of

More information

PRODUCT / TEST MANUAL 2V162K4 VOLTAGE REGULATOR RELAY

PRODUCT / TEST MANUAL 2V162K4 VOLTAGE REGULATOR RELAY Sheet 1 of 12 TEST DATE CUSTOMER SERIAL No OLTC ACKNOWLEDGE SETUP AUTOMATIC or FEEDBACK CONTROL PRODUCT / TEST MANUAL 2V162K4 VOLTAGE REGULATOR RELAY Issue Date Level I 21/05/1998 Initial issue. Summary

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections

More information

148 Electric Machines

148 Electric Machines 148 Electric Machines 3.1 The emf per turn for a single-phase 2200/220- V, 50-Hz transformer is approximately 12 V. Calculate (a) the number of primary and secondary turns, and (b) the net cross-sectional

More information

TECHNICAL DESCRIPTION ND-387. THREE-PHASE TRANSFORMERS, 150 / 21kV, 40/50MVA AND 20/25 MVA, Dyn1

TECHNICAL DESCRIPTION ND-387. THREE-PHASE TRANSFORMERS, 150 / 21kV, 40/50MVA AND 20/25 MVA, Dyn1 HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. December 2017 TECHNICAL DESCRIPTION ND-387 THREE-PHASE TRANSFORMERS, 150 / 21kV, 40/50MVA AND 20/25 MVA, Dyn1 I. SCOPE The scope of the present description

More information

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc.

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc. Surge Arresters Secondary Arresters and Protective Gaps Electrical Apparatus 235-10 GENERAL INFORMATION The necessity of providing surge arrester protection on low-voltage circuits is fundamentally the

More information

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch. Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training

More information

Reyrolle Protection Devices. 7PG11-18 Alpha Electromechanical Relays. Siemens. Answers for energy.

Reyrolle Protection Devices. 7PG11-18 Alpha Electromechanical Relays. Siemens. Answers for energy. Reyrolle Protection Devices 7PG11-18 Alpha Electromechanical Relays Answers for energy. Siemens Alpha Technical Manual Contents Contents Technical Manual Chapters 1. Introduction to Electromechanical

More information

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and

More information

Electrical Design Process

Electrical Design Process Electrical Design Process Jason Varnell Lead Design Engineer Jason.Varnell@spx.com SPX Transformer Solutions, Inc. September 26, 2018 Agenda 1. Bid Design Process Parameters Affecting Bid Design 2. Final

More information

Regional Technical Seminar

Regional Technical Seminar Regional Technical Seminar TRANSFORMER 101 Transformer 101 Dharam Vir Vice President of Engineering Dharam.Vir@spx.com Agenda 1.Review transformers: How they work (textbook vs reality) 2.How do we build

More information

PRODUCT/TEST MANUAL 2V162K12 VOLTAGE REGULATOR RELAY

PRODUCT/TEST MANUAL 2V162K12 VOLTAGE REGULATOR RELAY Sheet 1 of 15 TEST DATE: CUSTOMER: SERIAL NO: OLTC ACKNOWLEDGE SETUP AUTOMATIC or FEEDBACK CONTROL PRODUCT/TEST MANUAL 2V162K12 VOLTAGE REGULATOR RELAY Issue Date Level A 06/01/1997 Initial issue. Summary

More information

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working

More information

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS INTERPLANT STANDARD - STEEL INDUSTRY IPSS CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS Corresponding IS does not exist IPSS:1-04-035-08 0. FOREWORD 0.1 This Inter