AUTOMATIC TEMPERATURE CONTROL SYSTEM REPLACEMENT AT COLUMBIA ELEMENTARY SCHOOL

Size: px
Start display at page:

Download "AUTOMATIC TEMPERATURE CONTROL SYSTEM REPLACEMENT AT COLUMBIA ELEMENTARY SCHOOL"

Transcription

1 AUMAIC EMPERAURE CNRL SYSEM REPLACEMEN PRJEC ILE A CLUMBIA ELEMENARY SCHL DAE PRJEC # REVISINS N. DAE DESCRIPIN CS CVER SHEE M-1 PRJEC SCPE, GUIDELINES & EQUIPMEN DAA M-2 1S FLR - ZNE FLR PLAN & HVAC LAYU M-3 2ND FLR - ZNE FLR PLAN & HVAC LAYU M-4 CNRL DIAGRAMS - CENRAL PLAN SYSEMS M-5 CNRL DIAGRAMS - RU- 1, 2 M-6 CNRL DIAGRAMS - RU- 3, 4 M-7 CNRL DIAGRAMS - RU- 5, 6, 7 M-8 CNRL DIAGRAMS - UVS, FCUS & MISC. EQUIPMEN M-9 FUNCIN BLCK LGIC & MECHANICAL CNRL SYMBLS DRAWING ILE CVER SHEE CS

2 SCPE F WRK RU DAA GENERAL: HE CNRACR SHALL CMPLEELY REPLACE EXISING HVAC AUMAIC EMPERAURE CNRL (AC) SYSEM WIH A NEW HVAC AUMAIC EMPERAURE CNRL SYEM WIH DDC CNRLS. HE NEW BUILDING AUMAIN SYSEM (BAS) SHALL INCLUDE PERAING SEQUENCES HA ARE SPECIFICALLY DESIGNED FR HIS SIE PRVIDE MAXIMUM ENERGY EFFICIENCY AS WELL AS PIMUM CCUPAN CMFR IN HE MANAGEMEN F HE BUILDING'S HVAC SYSEMS. HE BAS WILL ALS INCLUDE A HIGH QUALIY, USER FRIENDLY GRAPHICAL INERFACE. HE CNRACR SHALL PRVIDE HE FLLWING: 1 - REMVE ALL PNEUMAIC CNRL DEVICES, INCLUDING ACUARS. REMVE ALL EXPSED PNEUMAIC UBING IN HE MECHANICAL RMS AND ELSEWHERE. FR PHASING PURPSES, ALL REMAINING UNEXPSED PNEUMAIC LINES SHALL BE CAPPED WHILE HE AIR CMPRESSR REMAINS IN SERVICE. A HE END F HE PRJEC, HE AIR CMPRESSR SHALL BE REMVED AND DISPSED F BY HE CNRACR. CNRACR SHALL REMVE EXISING DISCNNEC, CNDUI AND PWER WIRES FRM BREAKER PANEL CMPRESSR. PRJEC ILE 2 - REPLACE EXISING HREE WAY MAIN H WAER MIXING VALVE WIH NEW. REPLACE PNEUMAIC ACUAR WIH NEW SPRING REURN ELECRNIC ACUAR. PRVIDE AND INSALL NEW VARIABLE FREQUENCY DRIVES FR SPECIFIED H WAER PUMPS AND DIFFERENIAL PRESSURE RANIER A HE LCAIN SPECIFIED N DRAWING M REPLACE USIDE AIR EMPERAURE AND HUMIDIY SENSRS WIH NEW. PRVIDE AND INSALL NEW BAS WAER EMPERAURE SENSRS FR CENRAL PLAN H WAER AND CHILLED WAER SYSEMS AS SHWN N HESE DRAWINGS. WELD NEW SENSR WELL HREAD--LES N PIPES. EXISING SENSR WELLS MAY BE REUSED IF CMPAIBLE AND CLEANED WIH NEW SENSRS. PRVIDE NEW HERMAL GREASE IN EACH WELL. UV/FC DAA EXHAUS FANS 4 - REPLACE ALL HVAC EQUIPMEN (AHUS, RUS, MAUS, UVS, FCUS, FRS) HW & CHW CIL VALVES AND ACUARS WIH NEW VALVES AND ELECRNIC ACUARS. 5 - REPLACE ALL HVAC EQUIPMEN (INCLUDING EXHAUS FANS ) PNEUMAIC DAMPER ACUARS WIH NEW ELECRNIC ACUARS. CLEAN & LUBRICAE ALL UNI DAMPER LINKAGES INCLUDING BARMERIC DAMPERS AND VERIFY PRPER DAMPER PERAIN. 6 - REMVE ALL EXISING BAS CNRLLERS AND REURN FCPS. REMVE ALL EXISING CNRL DEVICES SUCH AS RELAYS, SENSRS, PWER SUPPLIES, ERMINALS, RANSDUCERS, EC. AND REPLACE WIH NEW WHERE APPLICABLE. RE-USE R REURN FCPS UNINERRUPIBLE PWER SUPPLIES (UPS). 7 - PRVIDE AND INSALL A NEW SAND ALNE DDC PRGRAMABLE CNRLLER FR EACH F HE FLLWING HVAC SYSEMS AND EQUIPMEN: CENRAL HEAING SYSEM (BILERS & HW PUMPS), CHILLED WAER SYSEMS (CHILLERS & CHW PUMPS), EACH AHU, RU, MAU, UV AND FCU. BAS CNRLLERS FR MAJR EQUIPMEN (BILERS, CHILLERS, PUMPS, AHUS, RUS & MAUS) MUS HAVE CNRL PIN (UPU) VERRIDE CAPABILIIES. HE BAS SHALL CNRL ALL EXHAUS FANS, FRS, CUHS AND UHS SHWN N HESE FLR PLANS HA ARE N CNRLLED BY ELECRNIC HERMSAS R WALL SWICH. PRVIDE AND INSALL NEW LINE VLAGE HERMSAS WIH CNCEALED SEPIN ADJUS WHERE SHWN N FLR PLANS. 8 - PRVIDE AND INSALL UNINERRUPIBLE PWER SUPPLY (UPS) PWER MASER CNRLLER. 9 - PRVIDE AND INSALL MR CURREN SENSRS AND SAUS RELAYS FR ALL EF, HW & CHW PUMP MRS AND AHU, RU & MAU AND FC FAN MRS FR HE PURPSE F MNIRING AND RENDING HE RUN SAUS F HIS EQUIPMEN AS WELL AS ACCUMULAING RUN IME. HE BAS WILL ALS MNIR & REND HE ALARM AND RUN SAUS PINS F HE BILERS AND CHILLERS PRVIDE AND INSALL NEW REURN AND SUPPLY AIR EMPERAURE DUC SENSRS IN ALL AHUS, RUS & MAUS. PRVIDE & INSALL NEW AVERAGING YPE SENSRS MNIR MIXED AIR FR ALL AHUS & RUS. PRVIDE & INSALL REURN AIR HUMIDIY DUC SENSRS WHERE SHWN N HESE DRAWINGS. PRVIDE NEW SENSRS MNIR DISCHARGE AIR FR ALL UVS & FCUS AND MUN IN CENER F UNI INSALL NEW 2 PLE FREEZESAS IN ALL UNIS WIH USIDE AIR INAKE AND HW R CHW CILS. NE PLE FR HE HARDWIRED SAFEY INERLCK SEQUENCE, HE HER FR HE BAS CNRLLER ALARM INPU PRVIDE AND INSALL NEW CCUPANCY (MIN) SENSRS IN SPACES SHWN N HESE FLR PLANS AND WIRE LCAL BAS CNRLLERS AS SHWN N HESE DRAWINGS. PRVIDE & INSALL CARBN DIXIDE (C2) SENSRS IN SPACES SHWN N FLR PLAN(S). PRVIDE CAGE YPE PRECIVE CVERS FR C2 SENSRS IN GYMS & CAFEERIA. PRGRAM CCUPANCY SEQUENCE FR HESE DEVICES AS SPECIFIED HEREIN HVAC UNI NAMES IN PRGRAMS AND RM NUMBERS N GRAPHIC SHALL MACH UNI NAMES & RM NUMBERS AS SHWN N HESE DRAWINGS. ALL SPACE SENSRS SHALL BE LABELED WIH HE HVAC ID NAME F HE UNI SERVING HA AREA. CNRACR SHALL FIELD VERIFY RM NUMBERS AND NAMES PRVIDE NEW CNRL CABINES WIH LACHING DR PANEL (WIHU KEY LCK) FR NEW BAS CNRLLERS AND REMVE ALL UNUSED CNRL CABINES. EXPSED MUNING HLES IN WALL FRM REMVED CABINES SHALL BE REFILLED AND NEWLY EXPSED AREAS SHALL BE PAINED MACH EXISING WALL CLR EXISING CNDUI SENSRS A AIR HANDLERS AND CENRAL PLAN MAY BE RE-USED IF IN GD CNDIIN AND IF SIZED PER NAINAL ELECRIC CDE. CNRACR SHALL REPAIR ALL CNDUI USED FR CNRLS INCLUDING CNNECRS AND CVER PLAES AS NEEDED. ALL NEW CNDUI FR PWER WIRING SHALL BE INERMEDIAE MEAL CNDUI IF LARGER HAN 1" R ELECRIC MEALIC UBING IF 1" R ALLER. NEW CNDUI SHALL BE SIZED PER NAINAL ELECRIC CDE. FR PWER WIRING IN HE CENRAL PLAN, LIQUID-IGH GALVANIZED SINGLE SRIP FLEXIBLE MEAL CNDUI MAY BE USED FR PWER WIRING IN LENGHS UP 24" AND A SEPARAE GREEN GRUND WIRE SHALL BE INSALLED HRUGH HE FLEXIBLE CNDUI BACK HE SURCE. FR NEW CNDUI END DEVICES SUCH AS SENSR AND ACUARS, MEAL CLAD (MC) FLEXIBLE CNDUI IN LENGHS UP 24" MAY BE USED. ALL CNRL WIRING SHALL BE NEW. WIRING SHALL BE CNINUUS FRM CNRLLER INPU SENSRS AND UPU DEVICES WIHU SPLICING R WIRE NUS. WIRING CNRL END DEVICES N MVING R VIBRAING EQUIPMEN SHALL BE RUN IN FLEXIBLE MEALIC CNDUI IN LENGHS UP 24" ALL HE EXPSED CNRL WIRING AND PWER WIRING IN CCUPIED SPACES INCLUDING BU N LIMIED CLASSRMS AND FFICES SHALL BE RUN IN 700 SERIES WIREMLD MEAL RACEWAYS. HE CLR F HE RACEWAY SHALL MACH HE CLR F HE WALL ALL NEW VALVES AND PIPING INSULAIN DISURBED DURING HE CURSE F HIS WRK SHALL BE RE-INSULAED WIH HEAVY DENSIY RIGID MLDED FIBERGLASS PIPE INSULAIN WIH FACRY APPLIED ALL SERVICE JACKE (ASJ) WIH A 'K' FACR N EXCEED 75F MEAN EMPERAURE. HE HICKNESS SHALL MACH WIH HE EXISING INSULAIN. HE NEW INSULAIN SHALL BE PAINED MACH HE EXISING INSULAIN. ALL VALVES, SRAINERS, ELBWS, AND FIINGS SHALL BE INSULAED HE CNRACR SHALL BE RESPNSIBLE FR DRAINING, REFILLING HE H WAER AND CHILLED WAER SYSEMS, AND BLEEDING AIR U F HE SYSEMS AFER REFILL AS NECESSARY PERFRM HIS WRK HE CNRACR SHALL PRVIDE A CMPLEE BACNE PIN LIS FR ALL SYSEM PINS INCLUDING NAME, INSANCE NUMBER, AND IP ADDRESS 12 - REPLACE EXISING SPACE SENSRS WIH NEW SEPIN ADJUS YPE SENSRS. SURFACE MUN N WALL WIHIN A VENILAED CVER (EXCEP IN HALLWAYS, BAHRMS & SHWERS - USE FLA WALL PLAE YPE WIHU ADJUSER) AND INSULAE BEHIND SENSR. NEW WIRING SHALL BE RUN FRM SENSR CNRLLER AND BE CNCEALED IN WALLS AND CEILING. PRVIDE CAGE YPE PRECIVE CVERS FR SENSRS IN GYMS & CAFEERIA, AND KICHEN. REMVE ALL EXISING NIGH SEBACK SENSRS ASSCIAED WIH EXISING BAS. DAE PRJEC # REVISINS N. SANDARD ABBREVIAINS AHU - Air Handling Unit BAS - Building Automation System CFM - Cubic Feet (of Air) Per Minute CH - Cabinet Heater CHW - Chilled Water CU - Control or Cooling Unit (VAV) CV - Constant Volume erminal (VAV) DP - Differential Pressure (Static) DHC - Duct Heating Coil FCPS - Fairfax County Public Schools FCU - Fan Coil Unit FR - Finned ube Radiator GPM - Gallons Per Minute HW - Hot Water LV - Line Voltage hermostat MAU - Makeup Air Unit MBH - housand BU Per Hour NIC - Not Included in Contract RAHU - Rooftop Air Handling Unit RU - Rooftop Unit UH - Unit Heater UV - Unit Ventilator VAV - Variable Air Volume VFD - Variable Frequency Drive DAE DESCRIPIN DRAWING ILE CNRL SYSEM SCPE, UNI DAA & GUIDELINES M-1

3 FR-1 FR-2 EF-7 Boiler-2 Boiler-1 5 CHWP -P4 CHWP HWP -P3 -P2 HWP -P1 6 Boiler Room Plan N SCALE UH-6 7 UH-1 UH-2 EF-1 EF-2 Kitchen hood 2 CUH-1 C CUH -3 EF-5 RU-1 CUH-2 EF-6 EF-8 UH-5 EF-8 UH-3 UH-4 EF-4 FR Chiller-1 (n roof) 8 3 PRJEC ILE SYMBLS AND ABBREVIAINS RU - RF P UNI UV - UNI VENILAR FC - FAN CIL UNI 10 RU-7 RU-6 EF-26 EF-25 4 C EF-23 EF-22 EF-21 RU-4 C 1 EF - EXHAUS FAN CUH/UH - CABINE UNI HEAER/UNI HEAER BAS - BUILDING AUMAIN SYSEM FR - FINNED UBE RADIAR SPACE EMPERAURE SENSR (BAS) LINE VLAGE HERMSA C2 - CARBN DIXIDE SENSR ZNE - HVAC CNRL ZNE NUMBER DP - DIFFERENIAL PRESSURE RANIER MRIZED DAMPER CCUPANCY SENSR FR-6 FR-7 FR-5 FR-4 FRs-4,5,6 RU-3 FC-5 FC-4 1 CUH-4 CUH-5 EF-9 FC-101 EF-19 EF utside Air Sensor location EF-24 CUH-11 CUH-10 UV-1 UV-103 UV-105 FC-107 UV-108 UV-111 EF-10 RU-5 6 FR-8 Ducts up to RU-3 DAE PRJEC # Project Notes: For all exhaust fans controlled by BAS: keep existing wall switch in place if applicable. Install line voltage motor rated on/off switch in parallel with new LV to control PRV-11 on wall in kiln room, install necessary power conductors and conduit; remove existing control relay and complete power circuit Install unit mount temperature sensor in the return of unit For all equipment controlled by LV remove existing BAS control relay and complete power circuit. Replace existing 3-way HW mixing valve with new. Replace pneumatic actuator with new spring return electronic actuator. Install VFD for hot water pumps P-1 and P-2 Install isolation ball valves for the Hot Water Pump P-1 and P-2 VFD DP transmitter tubes on top of 4" main HW supply HW return lines at ceiling in boiler room. hread-o-lets for the isolation valves shall be welded. Install DP transmitter in boiler room as indicated on floor plan. Electric meter location Gas meter location Water meter location FR-9 FR-10 FR-11 DHC-3 DHC-3 FC-1 FC-2 FC-3 DHC-1 DHC-2 5 DHC-2 RU-2 DHC-1 RU-2 C FC-6 FR-13 FR-12 FC-7 FR-14 6 UV-102 UV-104 UV-106 UV-109 UV-2 ZNES - AREA SERVED EQUIPMEN CNRLLED BY BAS 1 - ADMIN FFICES - RU CAFEERIA/KICHEN - RU - 2; EF- 2, 4, 5; CUH - 1, 2, 3 3- GYMNASIUM - RU - 4; EF- 21, 22, 23, SAGE - RU - 5; EF- 21, 22, 23, LIBRARY - RU CLASSRMS - EF- 9, 14, 15, 16; CUH - 4, 5, 6, 10, CLASSRMS, SECND FLR - EF- 13, 18; CUH - 7, 8, SACC - RU- 6, 7; EF- 25, 26 MAIN H WAER SYSEM SERVES ZNES 1, 5, 6, 7 ACIVAE CHILLER-1 FR ZNES 6, 7 CUH-6 REVISINS N. DAE DRAWING ILE DESCRIPIN ZNED FLR PLAN AND HVAC LAYU M-2

4 PRJEC ILE 3 UV-201 FC-8 FC-9 UV-203 UV-205 UV-207 UV-209 UV-211 S CUH-8 CUH-9 EF-11 EF-14 EF-12 EF-19 EF-13 EF-18 EF-20 EF-15 7 EF-16 CUH-7 EF-17 RU-3 UV-202 FC-10 FC-11 UV-204 UV-206 UV-208 UV-210 UV-212 FR-15 DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE ZNED FLR PLAN AND HVAC LAYU M-3

5 PRJEC ILE DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE H WAER PLAN AND CHILLER - 1 M-4

6 PRJEC ILE DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE RU- 1, 2 CNRL DIAGRAMS M-5

7 PRJEC ILE DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE RU- 3, 4 CNRL DIAGRAMS M-6

8 PRJEC ILE DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE RU- 5, 6, 7 CNRL DIAGRAMS M-7

9 PRJEC ILE ZNES - AREA SERVED 1 - ADMIN FFICES 2 - CAFEERIA/KICHEN 3 - GYMNASIUM 4 - MUSIC/SAGE 5 - LIBRARY 6 - CLASSRMS 7 - CLASSRMS 8 - SACC RMS DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE UV, FCU & MISC EQUIPMEN CNRL DIAGRAMS M-8

10 PRJEC ILE DAE PRJEC # REVISINS N. DAE DESCRIPIN DRAWING ILE M-9

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

DISTRICT OFFICE BUILDING VAV BOX ZONING, CONTROLS AND BALANCING

DISTRICT OFFICE BUILDING VAV BOX ZONING, CONTROLS AND BALANCING POS SREE SAN FRANCISCO, CA 909 () 7-900 BOX ZONING, CCCCD PROJ. NO.: P-0 BID CUMENS 0//08 BOX ZONING, COVER SHEE NONE 0//8 P-0 GAYNER PROJ. NO: 786 PROJEC OVERVIEW DRAWING INDEX A. HE SCOPE OF WORK COVERED

More information

Feedback Systems in HVAC ASHRAE Distinguished Lecture Series Jim Coogan Siemens Building Technologies

Feedback Systems in HVAC ASHRAE Distinguished Lecture Series Jim Coogan Siemens Building Technologies Feedback Systems in HVAC ASHRAE Distinguished Lecture Series Jim Coogan Siemens Building Technologies ASHRAE, Madison Chapter October, 2014 Agenda Definitions: feedback and closed-loop control Types of

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

A PROJECT FOR: (AIM #2779) NEW MEXICO STATE UNIVERSITY CARLSBAD CAMPUS IT RENOVATION, EMERGENCY BACKUP GENERATOR, AND BOILER REPLACEMENT LOCATION MAP

A PROJECT FOR: (AIM #2779) NEW MEXICO STATE UNIVERSITY CARLSBAD CAMPUS IT RENOVATION, EMERGENCY BACKUP GENERATOR, AND BOILER REPLACEMENT LOCATION MAP RCHE A PROJEC FOR: (AIM #) NEW MEXICO AE UNIVERIY CARLBAD CAMPU I RENOVAION, EMERGENCY BACKUP GENERAOR, AND BOILER REPLACEMEN ENGINEERING INC. MECHANICAL ELECRICAL RBM ENGINEERING INC. 1065. MAIN. BLDG

More information

Three phase full Bridge with Trench MOSFETs in DCB isolated high current package

Three phase full Bridge with Trench MOSFETs in DCB isolated high current package MTI2WX75GD Three phase full Bridge wih Trench MOSFETs in DCB isolaed high curren package S = 75 V 25 = 255 R DSon yp. = 1.1 mw Par number MTI2WX75GD G1 L1+ L2+ T1 T3 T5 G3 G5 L3+ Surface Moun Device S1

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

Three phase full Bridge with Trench MOSFETs in DCB-isolated high-current package

Three phase full Bridge with Trench MOSFETs in DCB-isolated high-current package MTI145WX1GD Three phase full Bridge wih Trench MOSFETs in DCB-isolaed high-curren package S = 1 V 5 = 19 R DSon yp. = 1.7 mw Par number MTI145WX1GD L1+ L+ L3+ G1 G3 G5 Surface Moun Device S1 S3 S5 L1 L

More information

CARLSBAD CAMPUS NEW MEXICO STATE UNIVERSITY IT RENOVATION, EMERGENCY BACKUP GENERATOR, AND BOILER REPLACEMENT NEW MEXICO CARLSBAD,

CARLSBAD CAMPUS NEW MEXICO STATE UNIVERSITY IT RENOVATION, EMERGENCY BACKUP GENERATOR, AND BOILER REPLACEMENT NEW MEXICO CARLSBAD, RCHE A PROJEC FOR: (AIM #) NEW MEXICO AE UNIVERIY CARLBAD CAMPU I RENOVAION, EMERGENCY BACKUP GENERAOR, AND BOILER REPLACEMEN ELECRICAL 1065. MAIN. BLDG D E. A LA CRUCE, NM 88005 RCHE CARLBAD, NEW MEXICO

More information

ADDENDUM NO. 1 PAGE 1 of 2

ADDENDUM NO. 1 PAGE 1 of 2 Rochester Buffalo Syracuse Capital District OWN OF BRIGHON - PUBLIC SAFEY WING - HVAC UPGRADES M/E Reference 5009 November 5, 05 NO. PAGE of his Addendum contains changes to the requirements of the Bidding

More information

1.1 The Bid Date has changed to October 4, The time and place will remain the same.

1.1 The Bid Date has changed to October 4, The time and place will remain the same. Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES

More information

T775 Series 2000 Electronic Stand-Alone Controllers

T775 Series 2000 Electronic Stand-Alone Controllers 775 Series 000 Electronic Stand-Alone ontrollers APPLIAION GUIDE AND ROSS REFERENE 6-77 775 SERIES 000 ELERONI SAND-ALONE ONROLLERS IMPORAN he 775R is an operating control, not a limit or safety control.

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

Battery Energy Storage System with Isolated Single-phase Matrix Converter using Center-tapped Transformer for Power Decoupling Capability

Battery Energy Storage System with Isolated Single-phase Matrix Converter using Center-tapped Transformer for Power Decoupling Capability Baery Energy Srage Sysem wih Islaed Single-phase Marix Cnverer using Cener-apped Transfrmer fr Pwer Decupling Capabiliy Nagisa Takaka Dep. f Elecrical Engineering Nagaka Universiy f Technlgy Nagaka, Niigaa,

More information

Fields and Waves I Spring 2005 Homework 2. Due 1 February 2005

Fields and Waves I Spring 2005 Homework 2. Due 1 February 2005 Due 1 February 5 1. PSpice Simulain f ransmissin Le We wan cnsider he same lssless ransmissin le used w differen applicains. All les have a characerisic impedance f 5 Ohms. he p cable cnnecs he funcin

More information

UNIVERSITY OF MISSOURI TEACHING HOSPITAL BAS UPGRADES, ED AHU-1, 2 & 3 MU PROJECT NO. CP JANUARY 31, 2019

UNIVERSITY OF MISSOURI TEACHING HOSPITAL BAS UPGRADES, ED AHU-1, 2 & 3 MU PROJECT NO. CP JANUARY 31, 2019 UNIVERSIY OF MISSOURI EACHING HOSPIAL DESIGN EAM ENGINEER / ARCHIEC: ENGINEER: ROSS & BARUZZINI SOUH OLD ORCHARD S. LOUIS, MO () - ARCHIEC: bc DESIGN GROUP 00 NE MISSOURI ROAD SUIE 00 LEE'S SUMMI, MO 0

More information

Introduction to BAS Technology

Introduction to BAS Technology Introduction to BAS Technology Dave Kahn, P.E. Why Back to basics? Sometimes you get what you ask for resulting in: The perfect job OR Unhappy owners & occupants Unexpected network limitations Product

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

General data 8/91. Overview

General data 8/91. Overview SIRIUS 3RS0, 3RS, 3RS0, 3RS Temperaure Monioring Relays General daa Overview Temperaure seing LED "Device on volage" LED "Relay swiched" Hyseresis swich NSB0_04a LED for display "Up and Down" keys Roary

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

Universal microprocessor-based ON/OFF and P programmable controller MS8122A MS8122B

Universal microprocessor-based ON/OFF and P programmable controller MS8122A MS8122B COMPETENCE IN MEASUREMENT Universal microprocessor-based ON/OFF and P programmable conroller MS8122A MS8122B TECHNICAL DESCRIPTION AND INSTRUCTION FOR USE PLOVDIV 2003 1 I. TECHNICAL DATA Analog inpus

More information

Daniel S Wentworth Elementary School

Daniel S Wentworth Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Don't let anyone rush you. Take careful notes of everything you see, and go over the notes again before you leave.

Don't let anyone rush you. Take careful notes of everything you see, and go over the notes again before you leave. Bring: Level, nightlight, measuring tape, flashlight Dn't let anyne rush yu. Take careful ntes f everything yu see, and g ver the ntes again befre yu leave. Overall: Check flrs fr signs f misture Lk fr

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

IG Servomotors A

IG Servomotors A IG Servomotors he IG Servomotor Series is designed to meet NEMA mounting specifications: 7, 3, and 4. hese brushless AC servomotors have high performance Neodymium Iron Boron permanent magnets in an eight-pole

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction

More information

PF Coils 2-6 Supply Scope of the project and main technical aspects

PF Coils 2-6 Supply Scope of the project and main technical aspects PF Coils 2-6 Supply Scope of he projec and main echnical aspecs PF Coils formaion Meeing Barcelona - 15 h Ocober 2012 This presenaion is inended for reference purposes only and is no a legally binding

More information

M1.0 MECHNANICAL FLOOR PLAN

M1.0 MECHNANICAL FLOOR PLAN GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY

More information

The ramp is normally enabled but can be selectively disabled by suitable wiring to an external switch.

The ramp is normally enabled but can be selectively disabled by suitable wiring to an external switch. Vickers Amplifier Cards Power Amplifiers for Proporional Valves EEA-PAM-56*-A-14 Design EEA-PAM-561-A-14 for use wih valve ypes: KDG5V-5, * and KDG5V-7, 1* series EEA-PAM-568-A-14 for use wih valve ypes:

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Engines (diesel, HFO ) and gas turbines

Engines (diesel, HFO ) and gas turbines Engines (diesel, HFO ) and gas urbines Energy Efficiency Produce power from your exhaus fumes www.aqylon.com Environmenally friendly s organic working fluids have a very low Global Warming Poenial (320).

More information

Heating and Air Conditioning. Wiring Diagram Package. Plus System. Form: Rev A (602) Supersedes: Nothing

Heating and Air Conditioning. Wiring Diagram Package. Plus System. Form: Rev A (602) Supersedes: Nothing Heating and Air Conditioning Wiring Diagram Package Plus System Form: 0-97-000 ev A (60) Supersedes: Nothing DEC ESC LINK I LD LD EC. V AU PESSUE SENS YS06 AM ESS CPU EPM 0- VDC 0- VDC K K ES ELAY UPU

More information

OPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011ADV1 EKHBRD014ADV1 EKHBRD016ADV1

OPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011ADV1 EKHBRD014ADV1 EKHBRD016ADV1 OPERAION MANUAL Indoor uni for air o waer hea pump sysem and opions EKHBRD011ADV1 EKHBRD014ADV1 EKHBRD016ADV1 EKHBRD011ADY1 EKHBRD014ADY1 EKHBRD016ADY1 EKHBRD011ADV1+Y1 EKHBRD014ADV1+Y1 EKHBRD016ADV1+Y1

More information

MODEL: M6SXF1. POWER INPUT DC Power R: 24 V DC

MODEL: M6SXF1. POWER INPUT DC Power R: 24 V DC Tension-Clamp Ulra-Slim Signal Condiioners M6S Series FUNCTION MODULE (PC programmable) Funcions & Feaures Mainenance-free ension clamp connecion Single inpu filer and funcion module 12 ypes of funcions

More information

Installation / monitoring technique

Installation / monitoring technique Insallai / mioring echnique Over- and undercurren relay varimeer IL 9277, IP 9277, SL 9277, SP 9277 Now available wih ranges up o 100 A! 02264 IL 9277 SL 9277 IP 9277 SP 9277 According o IEC/EN 60 255,

More information

OPS Solar Inverter Specification & Manual

OPS Solar Inverter Specification & Manual Solar Inverer Specificaion & Manual Conens 1 FEATURES... 2 2 TECHNICAL SPECIFICATION... 4 3 APPLICATION... 7 3.1 LED DISPLAY STATUS... 7 3.2 POWER SAVING MODE... 8 3.3 OUTPUT FREQUENCY SETTING... 8 3.4

More information

Sensing method Application Appearance Sensing distance Model Convergent-reflective Small type 30±3 mm

Sensing method Application Appearance Sensing distance Model Convergent-reflective Small type 30±3 mm Auhorised Disribuors:- AS & AAIN INDIA PV D S-, F.I.E.E., Okhla Indusrial Area, Phase-ii, New Delhi-(India) el : -9 Fax : -9 E-mail : sales@ashalain.com Compac ead Amplifier-separaed Phooelecric Sensor

More information

Installation / Monitoring Technique

Installation / Monitoring Technique Insallai / Mioring Technique VARIMETER Over- and Undercurren Relay IL 9277, IP 9277, SL 9277, SP 9277 02264 IL 9277 IP 9277 SL 9277 SP 9277 According o IEC/EN 60 255, DIN VDE 0435-303 IP 9277, SP 9277,

More information

University of Chicago Charter - NKO

University of Chicago Charter - NKO Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PIPING DUCT WITH LINING/INSULATION FCO/ YCO SUPPLY DIFFUSER OR GRILLE. THE NUMBER OF ARROWS AND DIRECTION INDICATES 1, 2, 3, OR 4-WAY DEFLECTION

PIPING DUCT WITH LINING/INSULATION FCO/ YCO SUPPLY DIFFUSER OR GRILLE. THE NUMBER OF ARROWS AND DIRECTION INDICATES 1, 2, 3, OR 4-WAY DEFLECTION A AAV AC AD AFF AF B B BFF BUH BW C CA CW CFM CO D E E EA EB EC EF EO EO EVP EWC EXH EXS EW F FCO FD FU FRL G GPM GR H H HB HC HW HF HP HWR HWS HV HX I IA IW AUOMAIC AIR VEN AIR COMPRESSOR AIR DRYER, AUOMAIC

More information

Solid-state Multi-functional Timer

Solid-state Multi-functional Timer Solid-sae Muli-funcional Timer Eigh operaing modes (H3DE-M) and four operaing modes (H3DE-S) cover a wide range of applicaions. Programmable conac enables he building of a self-holding relay circui (-

More information

EE015: Electrical Drawings and Schematics

EE015: Electrical Drawings and Schematics T e l N : + 9 7 1 2 6 6 5 4 5 4 6 F a x N : + 9 7 1 2 6 6 5 4 1 8 2 E m a i l : a i s h a @ c m c - m e. c m w w w. c m c - m e. c m EE015: Electrical Drawings and Schematics EE015 Rev.001 CMCT COURSE

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

UTSA Facilities Condition Assessment. Out Brief August XX, 2009 UTSA Facilities Condition Assessment Out Brief August XX, 2009 Agenda Opening Remarks FCA Results Summary by Category Example Deficiencies FCA Results Summary by Building Proposed Project List Potential

More information

Reduce harmonics in HVAC&R inverters through C-Less technology

Reduce harmonics in HVAC&R inverters through C-Less technology Reduce harmonics in HVAC&R inverters through C-Less technology Karim Lamrabtine Global Product Manager VSD 14-15 SEPTEMBER 2011, MUNICH Agenda www.infoplc.net What are Harmonics? Standards Compliance How

More information

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions

More information

CAMERA SCHEDULE Camera Number Location Title Camera Type HSG/MTG Type Camera Note C1A 1.1.0.02 MAIN CORRIDOR - NORTH C SM C1B 1.1.0.S2 NORTH STAIR A SM C1C 1.1.0.02 MAIN CORRIDOR - SOUTH C SM C1D 1.1.0.S1

More information

Switch Basics and Applications. Selection Service Speed

Switch Basics and Applications. Selection Service Speed Swich Basics and Applicaions Selecion Service Speed Inroducion Basic Swich Types and Applicaions Swich Funcion - Mechanical Poles and Throws, Mechanical Characerisics Swich Funcion - Elecrical Volage and

More information

George Washington Elementary School

George Washington Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Time Control Technique

Time Control Technique Time Conrol Technique muliimer Mulifuncion Relay MK 785N/2 23928 Your Advanages Up o 1 funcions in one uni Simplified sorage Increased flexibiliy Quick seing of long ime values Opions wih Pluggable Terminal

More information

Mors Smitt Industrial Technology. General purpose relays

Mors Smitt Industrial Technology. General purpose relays Mors Smi Indusrial Technology General purpose relays Mors Smi Indusrial Technology General purpose relays Mors Smi - Indusrial Technology Mors Smi has been manufacuring relays since 1902. Our wide relay

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

OPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1

OPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1 OPERAION MANUAL Indoor uni for air o waer hea pump sysem and opions EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1 EKHBRD011AAY1 EKHBRD014AAY1 EKHBRD016AAY1 EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1 EKHBRD011AAY1

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Field Devices and Wiring

Field Devices and Wiring Field Devices and Wiring Slide 2-1 Field Device and Wiring Overview The control system interfaces to the process through field devices. Our ability to control a process is limited to the accuracy of measurement

More information

A Cascade Multilevel Converter of Switched Reluctance Motor and Its Control Timing Sequence

A Cascade Multilevel Converter of Switched Reluctance Motor and Its Control Timing Sequence Sensrs & Transducers, Vl. 69, Issue 4, April 204, pp. 8-24 Sensrs & Transducers 204 by IFSA Publishing, S. L. hp://www.sensrspral.cm A Cascade Mulilevel Cnverer f Swiched Relucance Mr and Is Cnrl Timing

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Flow Switch LABO-RR.-032-S. Characteristics. Technical data. Ranges

Flow Switch LABO-RR.-032-S. Characteristics. Technical data. Ranges Flow Swich LABO-RR.032-S Simple and economical flow meer for piping diameers from 32 mm o 150 mm Made from plasic (opionally sainless seel) Wih apping sleeve fixing for very rapid insallaion Rero-fiing

More information

Study on the Wide Gap Dielectric Barrier Discharge Device Gaofeng Wang

Study on the Wide Gap Dielectric Barrier Discharge Device Gaofeng Wang Sudy on he Wide Gap Dielecric Barrier Discharge Device Gaofeng Wang School of Informaion Engineering, Zhengzhou Universiy, Zhengzhou 450001, China 932167312@qq.com Keywords: DBD; Wide air gap; Plasma body;

More information

Dimensions. Model Number. Electrical connection emitter. Features. Electrical connection receiver. Product information. Indicators/operating means

Dimensions. Model Number. Electrical connection emitter. Features. Electrical connection receiver. Product information. Indicators/operating means OBE-R-SE Dimensions.8.8 ø..75 7.5 6. 5 6.7 4.9 4. 5.9 ø.6 Model Number OBE-R-SE Elecrical connecion emier Thru-beam sensor wih m fixed cable Feaures 45 cable oule for maximum mouning freedom under exremely

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

AK8777B. Overview. Features

AK8777B. Overview. Features AK8777B Hall Effec IC for Pulse Encoders Overview The AK8777B is a Hall effec lach which deecs boh verical and horizonal (perpendicular and parallel o he marking side of he package) magneic field a he

More information

INSTALLATION INSTRUCTIONS At Air-Handler Location

INSTALLATION INSTRUCTIONS At Air-Handler Location Required Tools: INSTALLATION INSTRUCTIONS At Air-Handler Location Regular Flathead Screw Driver = for thermostat wall plate Mini Flathead Screw Driver = for wire screws Get Started! Small pliers = to better

More information

FS27 & EMS11 CODE SUMMARY & KEY PLAN FS27/EMS11 A010 EMS11 MEZZANINE KEY PLAN 5/11/2018 1:23:39 PM 11 MAY 2018

FS27 & EMS11 CODE SUMMARY & KEY PLAN FS27/EMS11 A010 EMS11 MEZZANINE KEY PLAN 5/11/2018 1:23:39 PM 11 MAY 2018 PROPOSED WOMEN'S LOCKER ROOM ADDIION, SEE FLOOR PLAN A0 PROPOSED WOMEN'S LOCKER ROOM ADDIION, SEE FLOOR PLAN A0 PROPOSED WOMEN'S LOCKER ROOM ADDIION, SEE FLOOR PLAN A0 KEY PLAN 7/-A00 SCALE: /8" = '-0'

More information

BUILDING DEPARTMENT CURRENT

BUILDING DEPARTMENT CURRENT CITY OF LAPEER FEE SCHEDULE EFFECTIVE 7-1-2018 BUILDING DESCRIPTION BUILDING DEPARTMENT CURRENT FEE Administrative Plan Review Fees Plan Review $81.00 per hour; 1 hr minimum Commercial Plan Review Deposit

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

Phoenix Military Academy High School

Phoenix Military Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John L Marsh Elementary School

John L Marsh Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Retro-reflective photoelectric sensors with polarization filter. Dimensioned drawing

Retro-reflective photoelectric sensors with polarization filter. Dimensioned drawing Rero-reflecive phooelecric sensors wih polarizaion filer Dimensioned drawing en 10-2011/04 50105364 1 khz 0 5m We reserve he righ o make changes DS_PRK3B_Sandard_EL_en.fm 10-30 V DC A 2 LS Polarized rero-reflecive

More information

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on OBE-R-SE Dimensions Transmier.. 7.5 9..5.8 4.9 4 5 M 8.9 7.5 9..5.8 4 5 M 8.9 ø.6 ø.6 Model Number OBE-R-SE Thru-beam sensor wih m fixed cable Elecrical connecion Transmier Feaures BN +UB WH IN Ulra-small

More information

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on OBE-R-SE Dimensions Transmier.. 7.5 9..5.8 4.9 4 5 M 8.9 7.5 9..5.8 4 5 M 8.9 ø.6 ø.6 Model Number OBE-R-SE Thru-beam sensor wih m fixed cable Elecrical connecion Transmier Feaures BN +UB WH IN Ulra-small

More information

Heating and Air Conditioning. Wiring Diagram Package. Basic System. Form: Rev A (602) Supersedes: Nothing

Heating and Air Conditioning. Wiring Diagram Package. Basic System. Form: Rev A (602) Supersedes: Nothing Heating and Air Conditioning Wiring Diagram Package asic System Form: 35-96- ev A (6) Supersedes: Nothing o HVAC Unit Control Panel Zone Manager VAC (5 VA) Heating and Air Conditioning Meridian Cool Mode

More information

ECMA st Edition / June Near Field Communication Wired Interface (NFC-WI)

ECMA st Edition / June Near Field Communication Wired Interface (NFC-WI) ECMA-373 1 s Ediion / June 2006 Near Field Communicaion Wired Inerface (NFC-WI) Sandard ECMA-373 1 s Ediion / June 2006 Near Field Communicaion Wired Inerface (NFC-WI) Ecma Inernaional Rue du Rhône 114

More information

Multicultural Academy of Scholarship

Multicultural Academy of Scholarship Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

DATA SHEET. 1N914; 1N916 High-speed diodes DISCRETE SEMICONDUCTORS Sep 03

DATA SHEET. 1N914; 1N916 High-speed diodes DISCRETE SEMICONDUCTORS Sep 03 DISCRETE SEMICONDUCTORS DATA SHEET M3D176 Supersedes daa of April 1996 File under Discree Semiconducors, SC01 1996 Sep 03 FEATURES Hermeically sealed leaded glass SOD27 (DO-35) package High swiching speed:

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mechanical Design. Brian Brinson Mechanical Design Manager.

Mechanical Design. Brian Brinson Mechanical Design Manager. Mechanical Design Brian Brinson Mechanical Design Manager brian.brinson@spx.com September 26, 2018 Agenda 1. Design Process 2. Pre-Approval Drawings Bid Drawings Preliminary Drawings 3. Approval Package

More information

PSI 9000 WR Series. High Efficiency Programmable DC Power Sources. 3.3 kw to 15 kw THE POWER TEST EXPERTS.

PSI 9000 WR Series. High Efficiency Programmable DC Power Sources. 3.3 kw to 15 kw THE POWER TEST EXPERTS. PSI 9000 WR Series 3.3 kw o 15 kw High Efficiency Programmable DC Power Sources THE POWER TEST EXPERTS PSI 9000 WR Series 3.3 kw o 15 kw Produc Overview The microprocessor conrolled high efficiency laboraory

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Disney II Magnet School

Disney II Magnet School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NRT 105: Electronic fan-coil controller, equiflex

NRT 105: Electronic fan-coil controller, equiflex Product data sheet 4.04 R 105: Electronic fan-coil controller, equiflex How energy efficiency is improved ECO Meter for displaying the current energy consumption and digital input for the change-over between

More information

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E AIR CONDITER REMOTE CONTROLLER ILLUSTRAT CS406-R5E 00550905 0009 Thank yu very much fr purchasing ur air cnditiner. Please read this wner's manual carefully befre using yur air cnditiner. CONTENTS Handling

More information

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 Lab 2- VGA display and Light Sensr interface Reprt due at start f class Friday September 15 th Use the prvided Ambient Light Sensr mdule

More information

Building Blocks of Wireless Communication Systems

Building Blocks of Wireless Communication Systems Building Blcks Wireless Cmmunicain Sysems Building Blcks Wireless Cmmunicain Sysems Ing. Karel Ulvec, Ph.D. CTU in Prague, Faculy Elecrical Engineering xulvec@el.cvu.cz Only r sudy purpses r sudens he!

More information

TF-02 OAK GROVE HIGH SCHOOL TRACK & FIELD RESURFACING PROTECT IN PLACE NOTES GENERAL NOTES DEMOLITION NOTES DEMOLITION PLAN LEGEND

TF-02 OAK GROVE HIGH SCHOOL TRACK & FIELD RESURFACING PROTECT IN PLACE NOTES GENERAL NOTES DEMOLITION NOTES DEMOLITION PLAN LEGEND LIMIS CONSRUCION LIMIS CONSRUCION LIMIS CONSRUCION PROEC IN PLACE NOES GENERAL NOES DEMOLIION NOES LEGEND 0 30 60 Fee SCALE: 1" = 30' S i g n a u r e R e n e w a l D a e D a e OAK GROVE HIGH SCHOOL DEMOLIION

More information

Retro-reflective photoelectric sensors with polarization filter. Dimensioned drawing

Retro-reflective photoelectric sensors with polarization filter. Dimensioned drawing Rero-reflecive phooelecric sensors wih polarizaion filer Dimensioned drawing en 10-2011/04 50105364 1 khz 0 5m We reserve he righ o make changes DS_PRK3B_Sandard_EL_en.fm 10-30 V DC A 2 LS Polarized rero-reflecive

More information

Retro-reflective photoelectric sensors with polarization filter for bottles. Dimensioned drawing

Retro-reflective photoelectric sensors with polarization filter for bottles. Dimensioned drawing Rero-reflecive phooelecric sensors wih polarizaion filer for boles Dimensioned drawing en 05-2013/08 50103461 1 khz 0 3.5m 10-30 V DC We reserve he righ o make changes DS_PRK3B42_en_50103461.fm Polarized

More information

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards The Solo, Select and Sync PWM boards provide a pulse-width modulated (PWM) signal to the EC motor to control fan speed.

More information

MODEL: M6NXF1. POWER INPUT DC Power R: 24 V DC

MODEL: M6NXF1. POWER INPUT DC Power R: 24 V DC Screw Terminal Ulra-Slim Signal Condiioners M6N Series FUNCTION MODULE (PC programmable) Funcions & Feaures Single inpu filer and funcion module 12 ypes of funcions are PC programmable 7.5-mm wide ulra-slim

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information