M2PP-23R-D-DWG
|
|
- Ralph Casey
- 5 years ago
- Views:
Transcription
1 07 Aug 14 05:01 p.m. B FAULKNER V BILLETT N P BRADSHAW 2 REVISED BASED ON GEOTECHNICAL INPUT MP MP BF DS B EVANS FOR CONSTRUCTION MP GFB DH DC G F-B Date DUNE ROUNDING DETAIL M2PP-23R-D-DWG N * Refer to Revision 1 for Signature STANDARD DETAILS M2PP-23R-D-DWG-8904.DWG
2 27 Jul 15 04:41 p.m. 43R-81 MP MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN OVERHEAD WIRES CLEARZONE NORTHBOUND SOUTHBOUND A 2 A 3 A 3 A 4 A 4 B 1 MT F 2 NGARARA ROAD MT F 1 OH OH OH A 1 A 1 A 2 52R DWG 83 5 A OH OH OH OH OH OH OH MT F 3 B 2 OH OH COMPLETELY REMOVE ROAD FORMATION, RIP / LOOSEN SUBSOIL AND BACKFILL WITH LIGHTLY COMPACTED TOPSOIL AS SPECIFIED PLANT SPECIES SUITED TO WETTER OUND IN THIS DEPRESSION PROVISION FOR PEDESTRIAN ACCESS TO SCRUFFY DOME 53R DWG 82 MATCHLINE: REFER BELOW OH PLANT SHRUBS AND ASSES UNDER ELECTRICAL OVERHEAD WIRES MARKED AS ** ON SCHEDULE MT F 4 B 3 A 1 1:0 1:0 S DUNN M POWELL B. CHAPPELL A. POINTON * Refer to Revision 1 for Signature MS A 3 54R DWG 81 5 NGARARA ROAD CROSSING PLANS SHEET 1 CYCLEWAY WALKWAY BRIDLEWAY 1 FOR CONSTRUCTION MP AJP D SW MATCHLINE: REFER ABOVE 5 M2PP-53R-D-DWG-81 1 M2PP-53R-D-DWG-81.DWG
3 Drawing Plotted: Jul 15 01:29 p.m. A 1 53R-82 43R-81 MP MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN NGARARA ROAD 5 5 A 1 53R-82 A 2 53R-82 53R DWG 81 INCREASE EMBANKMENT SLOPE LOCALLY TO AVOID TREE 5 A 1 53R-82 NGA MANU ACCESS ROAD 53R-82 EXOTIC TREES AND WEEDS SHALL BE REMOVED FROM THE AREA PRIOR TO RIPARIAN SPECIES 5 54R DWG 81 2 FOR CONSTRUCTION - REVISED AS NOTED, REDLINE INCLUDED MP FOR CONSTRUCTION MP AJP D SW :0 1:0 S DUNN M POWELL B. CHAPPELL A. POINTON * Refer to Revision 1 for Signature 54R DWG NGARARA ROAD CROSSING PLANS SHEET 2 KAKARIKI STREAM OUIDE THE (CONDITION 43 A + B) TO BE ECOLOGICAL MITIGATION TO BE PROTECTED M2PP-53R-D-DWG-82 2 M2PP-53R-D-DWG-82.DWG
4 27 Jul 15 04:55 p.m. CYCLEWAY WALKWAY BRIDLEWAY 53R DWG 81 53R DWG 82 A 1 54R-81 MT F 1 54R-81 A 1 54R-81 NGA MANU ACCESS ROAD A 2 54R-81 B 2 54R-81 NORTHBOUND SOUTHBOUND B 1 54R-81 54R-81 MT F 2 54R-81 54R-81 MT F 3 54R R DWG A 1 54R-81 TO FILL GAPS IN EXISTING VEGETATION OUIDE AS PART OF AEEMENT WITH NEARBY LANDOWNERS A 3 54R-81 43R-81 MP MASSED 1 FOR CONSTRUCTION MP AJP D SW MASSED - LOW MT MASSED - TREE ENRICHMENT MS MASSED - SWALE 1:0 1:0 S DUNN M POWELL B.FAULKNER A.POINTON * Refer to Revision 1 for Signature TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN R DWG 81 SMITHFIELD SECTION PLANS SHEET 1 M2PP-54R-D-DWG-81 1 M2PP-54R-D-DWG-81.DWG
5 NGA MANU ACCESS ROAD C 1 54R-82 54R-82 54R-82 RIPARIAN EXTENDED TO CONNECT WITH ADDITIONAL MITIGATION OUIDE OF 53R DWG 82 Drawing Plotted: Jul 15 01:29 p.m. 54R DWG 83 A 1 54R-82 C1 5 RIP RAP C 3 54R-82 C 4 54R-82 A 3 54R-82 MT F 1 54R-82 A 1 54R-82 54R R-81 54R DWG MT F 2 54R-82 MS A 3 54R-82 CYCLEWAY WALKWAY BRIDLEWAY A 2 54R-82 B 1 54R-82 NORTHBOUND B 2 54R-82 C 5 54R-82 KAKARIKI STREAM C 6 54R-82 MT D 2 54R-82 SOUTHBOUND MAINTENANCE TRACK 58R DWG 81 PEDESTRIAN MAINTENANCE ACCESS FORD 43R-81 MP MASSED MASSED - LOW MT MASSED - TREE ENRICHMENT MS MASSED - SWALE 2 FOR CONSTRUCTION - REVISED AS NOTED, REDLINE INCLUDED MP FOR CONSTRUCTION MP AJP D SW :0 1:0 TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE S DUNN M POWELL B.FAULKNER A.POINTON * Refer to Revision 1 for Signature ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN 5 5 SMITHFIELD SECTION PLANS SHEET 2 M2PP-54R-D-DWG-82 2 M2PP-54R-D-DWG-82.DWG
6 27 Jul 15 04:55 p.m. 54R DWG 82 43R-81 MP MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN PROPOSED ALTERED 54R DWG 84 54R-83 A 1 54R-83 WP D 1 54R-83 MAINTENANCE ACCESS MT F 2 54R-83 B 1 54R-83 A 1 54R-83 WP G 1 54R-83 WP G 2 54R-83 WETLAND 12 C 1 54R-83 C 2 A 1 54R-83 54R-83 54R-83 WP F 1 54R-83 CYCLEWAY WALKWAY BRIDLEWAY NORTHBOUND SOUTHBOUND MT F 1 54R-83 ALLOWANCE FOR CONCRETE V-CHANNEL B 2 54R-83 PEDESTRIAN MAINTENANCE ACCESS 54R-83 53R DWG 82 1 FOR CONSTRUCTION MP AJP D SW :0 1:0 S DUNN M POWELL B.FAULKNER A POINTON * Refer to Revision 1 for Signature 5 SMITHFIELD SECTION PLANS SHEET 3 M2PP-54R-D-DWG-83 1 M2PP-54R-D-DWG-83.DWG
7 27 Jul 15 04:56 p.m. 54R DWG 84 43R-81 MP MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN ALLOWANCE FOR CONCRETE V-CHANNEL DRAIN 54R-84 A 1 54R-84 C 1 54R-84 B 1 54R-84 CYCLEWAY WALKWAY BRIDLEWAY NORTHBOUND SOUTHBOUND A 2 54R-84 A 3 54R-84 PEDESTRIAN MAINTENANCE ACCESS 58R DWG 82 J 1 54R-84 J 2 54R-84 MT D 2 54R-84 B 2 54R-84 A 4 54R-84 MS C 1 54R-84 ALLOWANCE FOR RIP RAP MAINTENANCE TRACK A 54R FOR CONSTRUCTION MP AJP D SW :0 1:0 S DUNN M POWELL B.FAULKNER A.POINTON * Refer to Revision 1 for Signature 5 SMITHFIELD SECTION PLANS SHEET 4 M2PP-54R-D-DWG-84 1 M2PP-54R-D-DWG-84.DWG
8 27 Jul 15 04: p.m. KAKARIKI STREAM A 2 A 1 54R DWG 81 WETLAND 11A C 1 C 1 WP K 1 MAINTENANCE TRACK WP M 1 WP K R-81 54R DWG 82 WP K 4 NO. PEDESTRIAN MAINTENANCE ACCESS WP K 5 58R DWG 82 WP H 1 WP G 1 WP K 3 FORD J 4 WP L B-43 WP M 2 WP F 1 WP H 2 C 2 WP L 1 WP L 2 J 5 WP G 2 WP D 1 C 2 KAKARIKI STREAM RIPARIAN VEGETATION CONDITION G.41 c) i) 8. REALIGNED SMITHFIELD DRAIN J 1 J 7 HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV NOTE: NEAR HIGH VOLTAGE TRANSMISSION LINES TO BE DONE IN ACCORDANCE WITH THE ELECTRICITY (HAZARDS FROM TREES) REGULATIONS 03 ED MT D 2 MT C 3 HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV 43R-81 ASS - LOW ASS - SWALE ASS - ROUGH MP MASSED RIPARIAN OVERHEAD WIRES CLEARZONE MASSED - LOW MT MASSED - TREE ENRICHMENT MS MASSED - SWALE 58R DWG 83 1 FOR CONSTRUCTION MP AJP D SW :0 1:0 TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE S DUNN M POWELL B FAULKNER A POINTON * Refer to Revision 1 for Signature NGA MANU ACCESS ROAD A 1 A 2 C 3 MP N 1 MP N 3 5 MP N 2 MP N 4 5 J 2 OH OH OH OH J 3 TRANSMISSION TOWER PLAORM WP L 4 MS C 2 A 3 J 6 WP M 3 A 3 OH OH OH OH SMITHFIELD LINK ROAD TRANSMISSION TOWER PLAORM 5 5 WP L 5 A 4 MAINTENANCE ACCESS PLANT SHRUBS AND ASSES UNDER ELECTRICAL OVERHEAD WIRES MARKED AS ** ON SCHEDULE SMITHFIELD LOCAL ROADS PLANS SHEET 1 WP M 4 A 4 WP L 6 MS A 3 WP M 5 J 8 MS A 4 OH OH OH M2PP-58R-D-DWG-81 1 M2PP-58R-D-DWG-81.DWG
9 58R DWG 81 43R-81 MP MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH RIPARIAN OVERHEAD WIRES CLEARZONE Drawing Plotted: 27 Jul 15 04: p.m. NO - PEDESTRIAN MAINTENANCE ACCESS WP K 1 54R DWG 83 J 1 WP L 1 WP G 1 WP M 2 REALIGNED SMITHFIELD DRAIN J 6 WP M 1 WP M 3 54R DWG 84 J 3 A 2 J 2 J 4 HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV WP G 3 WP G 3 TRANSMISSION TOWER PLAORM A 3 A 1 WP M 4 WP L 3 WP M 5 WP M 6 WP G 2 NO - PEDESTRIAN MAINTENANCE ACCESS V HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV WP M 7 MS C 1 WP L 4 TRANSMISSION TOWER PLAORM 5 5 SMITHFIELD LINK ROAD A 1 A 2 OH OH OH OH OH OH OH MS A 3 OH OH OH OH 1 FOR CONSTRUCTION MP AJP D SW :0 1:0 S DUNN M POWELL B FAULKNER A POINTON * Refer to Revision 1 for Signature PLANT SHRUBS AND ASSES UNDER ELECTRICAL OVERHEAD WIRES MARKED AS ** ON SCHEDULE 5 5 SMITHFIELD LOCAL ROADS PLANS SHEET 2 NOTE: NEAR HIGH VOLTAGE TRANSMISSION LINES TO BE DONE IN ACCORDANCE WITH THE ELECTRICITY (HAZARDS FROM TREES) REGULATIONS 03 M2PP-58R-D-DWG-82 1 M2PP-58R-D-DWG-82.DWG
10 Drawing Plotted: 27 Jul 15 04: p.m. FENCING AND RESTORATION OF KOHEKOHE LINED TRIBUTARY. TO BE A 5M WIDE FRINGE ALONG THE DRIP LINE OF ROBUST PIONEER SPECIES. TOTAL AREA =0.07HA MP F 1 58R-83 WP N 1 58R-83 MT I 1 58R-83 PLANT SHRUBS AND ASSES UNDER ELECTRICAL OVERHEAD WIRES MARKED AS ** ON SCHEDULE FENCING AND WETLAND ENRICHMENT WITHIN EXISTING CYPERUS DOMINANT WETLAND. ENRICHMENT KAHIKATEA POSITIONED IN SCATTERED CLUSTERS ACROSS THE SITE WITH AN AVERAGE SPACING OF 1 PER 25M2 (5MX5M) 58R-83 C 1 58R-83 KAKARIKI STREAM C 3 58R-83 C 2 58R-83 58R DWG 81 MT D 2 58R-83 A 1 58R-83 MT D 3 58R-83 TREATMENT OF EXISTING ROAD OUIDE SUBJECT TO CONFIRMATION WITH NGA MANU NATURE RESERVE A 2 58R-83 NGA MANU ACCESS ROAD MT D 4 58R-83 A 3 58R-83 MS C 1 58R-83 A 1 58R-83 43R-81 MP MASSED MASSED - LOW MT MASSED - TREE ENRICHMENT MS MASSED - SWALE 1 FOR CONSTRUCTION MP AJP D SW :0 1:0 S DUNN M POWELL B FAULKNER A POINTON * Refer to Revision 1 for Signature TREES - FORESTRY ADE TREES - SPECIMEN ADE TREES - POLE ADE ASS - LOW ASS - SWALE ASS - ROUGH OVERHEAD WIRES CLEARZONE RIPARIAN 5 SMITHFIELD LOCAL ROADS PLANS SHEET 3 M2PP-58R-D-DWG-83 1 M2PP-58R-D-DWG-83.DWG
DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationDETAIL DESIGN (DET) SH1 MACKAYS TO PEKA PEKA EXPRESSWAY RP 1012/0.00 TO 1023/5.00 M2PP-121-D-GPH-8501 CS1 - CROSS SECTION-WETLAND 6
CS1 CROSS SECTIONWETLND 6 SCLE 1:2@1 1:0@3 FCING NORTH SSMP LOCTION MPM2PP121DGPH56 15m m PRIVTE LND FENCE P 1 SSMP 4 SSMP 5 SSM 5m POPLR VE RUMTI RD IHKR ST KPTI RD MZENGR RD OTIHNG RD WIKNE RIVER TE
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationGENERAL DEVELOPMENT APPLICATIONS. General Submission Requirements
COMPLETE APPLICATION CHECKLIST Jan 2016 The following checklist has been compiled to assist the applicant in preparing their application for approval pursuant to Ontario Regulation 162/06. This checklist
More informationTexas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan
Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions
More information5.7 Plan Documentation and Supporting Information.
5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS
ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS Introduction This section provides guidance on the submittal requirements for a development to obtain a Watershed Management Permit from
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationSITE PLAN APPLICATION
SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective
More informationGuideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area
Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown
More informationSection 1. Introduction
Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL CTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC MARION 7.0658A I-7 NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE OR END TREATMENT IS REQUIRED FOR 8 8 BRIDGE APOACH, ADD.5
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More informationAPPENDIX D: DRAWING SUBMISSION STANDARDS
1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission
More informationInterim Distribution Substation Manual (DSM)
Interim Distribution Substation Manual (DSM) Section 4 Kiosk General Arrangements and Installation Guides Original Issue: June 1997 This Revision: 6 th - June 2018 EDM# 22966949 (Published) EDM# 23581608
More informationCLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017
CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of July 10, 2017, at the Clay Township Municipal Office,
More informationTOWN of LAKESHORE SITE PLAN CHECKLIST
TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationAPPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings
APPENDIX 4 Checklists Township of King Design Criteria and Standard Detail Drawings Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 CHECKLISTS Engineering Submissions : The following
More informationCITY OF PLEASANT HILL
PHONE FAX (925) 671-5209 (925) 682-9327 CITY OF PLEASANT HILL www.ci.pleasant-hill.ca. us 100 Gregory Lane Pleasant Hill, CA 94523 TREE REMOVAL PERMIT SUBMITTAL REQUIREMENTS The submittal information shall
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationKing And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)
King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal
More informationApplication for Site Plan Review
Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationCity of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST
City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST One 11 x 17 signed and sealed original set and 11 copies must be submitted to the Planning and Zoning Department inclusive of all
More informationDate Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project
Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationField Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah
Sediment Transport Workshop, Utah State University, 1 August 2017 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I. Goals for learning and discussion:
More informationSlope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading
6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line
More informationCity of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements
More informationEDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS
ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of
More informationRIICCM203D Read and Interpret Plans and Specifications
RIICCM203D Read and Interpret Plans and Specifications Reference Material www.pertrain.com.au Table of Contents 1. Contents READ AND INTERPRET PLANS AND SPECIFICATIONS 1. General Obligations...2 2. Legislation
More informationDuteau Creek Water Treatment Plant UV Upgrades. Regional District of North Okanagan ADDENDUM # 3 ISSUE FOR TENDER
Project Client Tender No. Duteau Creek Water Treatment Plant UV Upgrades Regional District of North Okanagan 2017-E372.09.04 Date August 09, 2017 ADDENDUM # 3 ISSUE FOR TENDER INSTRUCTIONS Tenderers are
More informationTOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw
I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed
More informationProtecting our Natural Areas from Phragmites and other Invaders
Protecting our Natural Areas from Phragmites and other Invaders by Laurie Kaufman www.stewardshipnetwork.org/midmich Asclepias incarnata, photo by Laurie Kaufman What do we mean by Invasive Species? The
More informationMAJOR GRADING PLAN CHECKLIST
MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading
More informationDEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay
More informationINDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION
INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone
More informationOffice use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK
Office use only: Application Date: UT No.: EA No.: Development Title: Property Address: Application for ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK The following to be completed
More informationDeep Creek Canyon US Highway 12
Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location
More informationResearch on ecological change in sanctuaries and proposed indicators of restoration success. Bruce Burns
Research on ecological change in sanctuaries and proposed indicators of restoration success. Bruce Burns Two themes 1. What ecological changes are occurring in sanctuaries as a result of the exclusion
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More information1 MUNICIPAL INFRASTRUCTURE
Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationMOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A
Green shapes show initial service ramps Blue shapes show future system ramps UNNAMED TRIBUTARY TO LEE CREEK LEE DRAIN MOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A RITER CANAL SEE SHEET B UNVEGETATED
More informationAPPLICATION FOR SITE PLAN CONTROL
APPLICATION FOR SITE PLAN CONTROL Section 41 of the Planning Act, RSO 1990, as amended A Pre-Application Consultation with City staff is encouraged prior to submission of this application. This application
More informationCITY OF MERCER ISLAND
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org NONLAND USE APPLICATION- PLAN SET GUIDE The applicant for a land use approval
More informationARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS
SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized
More informationNWP of 10 Enclosure
#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States
More informationVARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)
VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must
More informationTown of Apex, North Carolina
POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationCity of Palmetto Florida
Date Submitted: City of Palmetto Florida General Development/ Construction/ Final Site Plan Application For Planned Developments nly) PRJECT NAME: TYPE F APPRVAL DESIRED: See fee schedule below) Small
More informationDECK PERMIT APPLICATION PACKET
Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationCONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR
LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION
More informationW 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603
869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867
More informationTABLE OF CONTENTS. Chapter 6 Environmental Division
Chapter 6 Environmental Division TABLE OF CONTENTS CHAPTER 6...2 6.1 Noise Section...2 6.1.1 Introduction...2 6.1.2 Procedures...2 6.2 Natural Resource Section... 6.2.1 Introduction:... 6.2.2 File Names:...
More informationRiparian Conservation Project Monitoring and Avian Habitat in Colorado
Riparian Conservation Project Monitoring and Avian Habitat in Colorado October 14, 2004 Colorado Riparian Association Alison Banks Cariveau Rocky Mountain Bird Observatory Conserving birds of the Rocky
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationNatural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption Application
More informationBen's Garden Plot OVERVIEW THE BIG IDEA
Math Tasks Ben's Garden Plot OVERVIEW OBJECTIVE Children will determine the perimeter of irregular shapes by counting, and compare shapes with the same area. In this activity, children use to design plots
More informationGrading, Erosion and Sediment Control (GESC) Checklist
Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment
More informationCity of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:
City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS
More informationGuide to Developing a Stream Photograph Documentation Program
Guide to Developing a Stream Photograph Documentation Program William Robertson: MSUEWQ & BSWC Introduction Landscape photographs can offer a qualitative and, in some situations, quantitative evaluation
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationWaynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet
Waynetown Water System Improvements Division A -New Water Treatment Plant Town of Waynetown, IN Submittal Review Sheet Attached is the submittal for the Backflow Preventer 3 for the Waynetown Water Systems
More informationTUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139
TUSCAN VILLAGE - 03-11- 2016 MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 t: 617-547-8120 f: 617-661-4986 www.prellwitzchilinski.com PROGRAM 50
More informationMADISON METROPOLITAN SEWERAGE DISTRICT MADISON, WISCONSIN PUMPING STATION 15 REHABILITATION CITY OF MADISON PLANNING COMMISION SUBMITTAL
PUMPING STATION CITY OF MADISON PLANNING COMMISION SUBMITTAL CALL DIGGERS HOTLINE 004 TOLL FREE 4' 4" ' " ' 4" ' " ' " ' " ' /" 4' 9 /" ' " ' 4" 4' 0" PUMP STATION 0 ' " ' 0" ' 0" ' 0" ' 0" ' 0" 4' " '
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationPLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT
Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative
More informationConservation Partners Legacy Grant Application
CPL Applications (Total to date: 129) Spreadsheet Conservation Partners Legacy Grant Application CPL1000055 Name and Contact Project CPL1000055 Identifier: Roberts Bird Sanctuary Habitat Project Name:
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION
For Office Use Only Date Received: Approved: ARC Non-Refundable Fees: ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL
More informationCounty Wetlands Board Minutes. July 8, 2008
County Wetlands Board Minutes July 8, 2008 Call to Order The July 8, 2008 meeting of the Middlesex County Wetlands Board was called to order by Chairman Miller Smither at 9:00 A.M. in the Boardroom of
More informationNE Oregon Wildlife Project Precious Lands. Managed by The Nez Perce Tribe Angela C. Sondenaa, Ph.D.
NE Oregon Wildlife Project Precious Lands Managed by The Nez Perce Tribe Angela C. Sondenaa, Ph.D. 1. Project History 2. Project Goals 3. Limiting Factors 4. Project Accomplishments 5. Major Work Elements
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationCity of Santa Paula Planning Department
City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:
More informationSite Development Plan Checklist
Site Development Plan Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the review. Incomplete
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationI. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.
ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this
More informationModifications Committee Guidelines
Modifications Committee Guidelines Changed Jul 13, 10 Changed Apr 12, 11 1 WYNLAKES MODIFICATIONS COMMITTEE Modifications Review Guidelines I. Purpose II. III. IV. Submittal Process A. One step minor work
More information4-H Conservation Guidelines
4-H Conservation Guidelines The following are guidelines for providing learning experiences in the conservation project area. THE GUIDELINES FOR ALL MEMBERS Understand what Natural Resources are; how to
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationCity of Cambridge. Site Plan Approval. Reference Guide. D e v e l o p m e n t P l a n n i n g D i v i s i o n
City of Cambridge Site Plan Approval Reference Guide February 2014 1 What is Site Plan Approval? Site Plan Approval is a design (site design/building design) and technical review process of a development
More informationMINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.
MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.
More informationIntegrated Environmental Management in the Colorado River Basin A Dream, or Moving to Reality?
Integrated Environmental Management in the Colorado River Basin A Dream, or Moving to Reality? Chris Harris Deputy Director Colorado River Board of California 1922 Compact 1928 BCPA 1944 Treaty w/mexico
More informationMESSAGES. International Society for Soil Mechanics and Geotechnical Engineering
MESSAGES International Society for Soil Mechanics and Geotechnical Engineering 5 GROUPS Geotechnical Community Non-Geotechnical Professionals Clients The Public Decision Makers and Governments Different
More informationTelecommunication Application Form
Page 1 of 5 Fees Total Fee $1130.00 Processing Fee $330.00 *Advertising Deposit $800.00 *Where costs differ from the deposit, the balance will be charged or refunded to the applicant. Description of proposed
More informationDivision: Habitat and Species Conservation Authors: Claire Sunquist Blunden and Brad Gruver
Division: Habitat and Species Conservation Authors: Claire Sunquist Blunden and Brad Gruver Report date: December 13, 2018 All photos by FWC unless otherwise acknowledged Presenting 6 new guidelines 1
More informationTEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03
TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03 Drawing: \\Aci-acad\caddrawings\15486\15486D2-D14.dwg - Layout Tab: K270-12
More information