NWP of 10 Enclosure
|
|
- Tracey Watson
- 5 years ago
- Views:
Transcription
1 #6301 4/16/2018 Pacific Habitat Services, Inc SW Commerce Circle, Suite 180 Wilsonville, OR Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States Geological Survey (USGS), Gervais, Oregon, 7.5 Quadrangle, 2017 United States Geological Survey (USGS), Mission Bottom, Oregon, 7.5 Quadrangle, 2017 (viewer/nationalmap.gov/basic) 1 NWP of 10 Enclosure
2 #6301 4/16/2018 Pacific Habitat Services, Inc SW Commerce Circle, Suite 180 Wilsonville, OR Project Site Tax Lot Map Reed Pit Expansion - Marion County, Oregon The Oregon Map (ormap.net) 2 NWP of 10 Enclosure
3 #6301 4/16/2018 Pacific Habitat Services, Inc SW Commerce Circle, Suite 180 Wilsonville, OR Project Site Aerial Photo Reed Pit Expansion - Marion County, Oregon GoogleEarth, NWP of 10 Enclosure
4 Continues Beyond Wetland D (1.32 ac) Continues Beyond (4.85 ac) Farm Access Road Wetland H (0.01 ac) Wetland I (0.03 ac) Wetland G (0.01 ac) Wetland F (0.003 ac) Existing Quarry Pond (30.11 ac) Wetland E (0.01 ac) Wetland B (0.59 ac) Wetland C (0.94 ac) Continues Beyond Continues Beyond LEGEND (72.44 ac) Wetland (Site Total 7.70 ac) Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Potentially Non-Jurisdictional Areas (0.06 ac) Existing Quarry Pond (30.11 ac) Existing Conditions Phone: (503) Fax (503) X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig4 ExistCond.dwg, 6/28/2018 1:46:34 PM, DWG To PDF.pc3 NWP of 10 Enclosure
5 Proposed Temporary Diversion Discharge Point Proposed Silt Fence Wetland D Permanent Impact / Removal (4.31 ac/ 1,200,000 cy) A Proposed Silt Fence Construction Access and Staging A' Proposed Farm Access Road Wetland H Proposed Mitigation Area See Figure 6 Wetland I Excavation Area Wetland G SEE 5B Wetland F Existing Quarry Pond Wetland E Proposed Silt Fence Wetland B Permanent Impact / Fill (0.18 ac / 900cy) Proposed SEE 5A Temporary Diversion Pipe Follows Center of Road Wetland C Proposed Farm Access Road NOTE: For Cross Section A-A' See Figure 5C. LEGEND (72.44 ac) Wetland (Site Total 7.70 ac) Potentially Non-Jurisdictional Areas (0.06 ac) Wetland Impact Site Total (4.60 ac) Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Existing Quarry Pond (30.11 ac) Site Plan Overview and Sheet Index Phone: (503) Fax (503) X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5 SitePlan OV.dwg, 6/28/2018 3:19:14 PM, DWG To PDF.pc3 NWP of 10 Enclosure
6 Existing Quarry Pond Excavation Area Proposed Limit of Excavation Proposed Sediment Fence Proposed Temporary Diversion Dam (Temporary Impact 0.01 ac/ 85 cy fill) Proposed Farm Access Road Proposed Temporary Diversion Pipe (Impact 0.10 ac/ 850 cy fill) Proposed Limit of Fill for 2:1 Side Slopes Proposed Sediment Fence LEGEND Proposed Two 12-inch Culverts Wetland Wetland Impact Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Phone: (503) Fax (503) Wetland Impact and Stream Diversion Detail 5A X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5A StreamDivers.dwg, 6/28/2018 1:56:21 PM, DWG To PDF.pc3 NWP of 10 Enclosure
7 Wetland B (Impact 0.18 ac/ 900 cy fill) Proposed Farm Access Road Existing Quarry Pond LEGEND Wetland Wetland Impact Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Phone: (503) Fax (503) Wetland Impact Detail 5B X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5B SitePlan.dwg, 6/28/2018 1:57:21 PM, DWG To PDF.pc3 NWP of 10 Enclosure
8 NWP of 10 Enclosure Water Proposed to Mine Previously Mined Previously Mined Fill Temporary Drainage Diversion Pipe Limit of Mine Excavation Wetlands Overburden Water Gravel in this area will not be removed Gravel to be removed Cross Section A-A' Not to Scale Phone: (503) Fax (503) Typical Quarry Excavation Detail 5C
9 LEGEND Existing Wetland Proposed Wetland Creation (7.08 ac) Proposed Upland Buffer (1.73 ac) Habitat Structures Direction of Flow Wetland D B B' Existing Quarry Pond NOTES: See Figure 6A for Mitigation Section B-B' See Figure 6B for Mitigation Plant List See Figure 6C For Habitat Structure Details Wetland B Wetland C Phone: (503) Fax (503) Wetland Mitigation Plan X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig6 MitPlan.dwg, 8/16/2018 9:30:02 AM, DWG To PDF.pc3 NWP of 10 Enclosure
10 NWP of 10 Enclosure Proposed Wetland Mitigation Area :1 Match Existing Grade at Elevation 122' Water Surface (Elevation = 105') Existing Grade Proposed Wetland Surface Elevation = 105' Wetland Mitigation Cross Section B-B' Wetland Mitigation Cross-Section B-B' Phone: (503) Fax (503) X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig6A Mitigation-Xsect.dwg, 6/21/ :42:12 AM, DWG To PDF.pc A
NWP Page 1 of 13 Enclosure 1
Project Area #6429 5/25/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 General Location and Topography United States Geological Survey (USGS), Lake Oswego,
More informationI FIG URE I. Location and general topography for the CarMax project in Salem, Oregon (USGS Salem East, Oregon. Quadrangle, 1969, photo revised 1986)
5179 6/5/13 Location and general topography for the CarMax project in Salem, Oregon (USGS Salem East, Oregon. Quadrangle, 1969, photo revised 1986) Pacific Habitat Services, nc. 9450 SW Commerce Circle,
More informationNWP of 9 Enclosure
A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS
More informationFigure 1 Site Location Map Joint Permit Application: The Ridge at South Cooper Mountain West Hills Land Development. Project Site WASHINGTON COUNTY
SKYLINE WOODS LN 30 26 SILER RIDGE LN COUNTRY HAVEN LN 405 Hillsboro Portland H HIL IGH LL N Project Site 205 LN ER OP HORSE C O TAIN N TAIL LN M O U 5 SW E TIL Project Site Bellairs Lolich V U FRIENDLY
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationCorps No. NWP Page 1 of 9
DR ALOCLEK AMBERWOOD DR AMBERBROOK DR NW CORNELL RD 194TH AVE 26 Hillsboro 30 84 THORNCROFT DR Portland 5 STUCKI AVE 205 Newberg ROCKSPRING LN 210TH LN SWIRE LN AMBER VIEW LN HODES DR 206TH AVE AMBERGLEN
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationGrading, Erosion and Sediment Control (GESC) Checklist
Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment
More informationCHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d
Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit
More informationLab #4 Topographic Maps and Aerial Photographs
Lab #4 Topographic Maps and Aerial Photographs Purpose To familiarize you with using topographic maps. Visualizing the shape of landforms from topographic maps is an essential skill in geology. Proficiency
More informationApplication Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division
Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationKing And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)
King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal
More informationMap and Drawing Standards for the South Pacific Division Regulatory Program
Map and Drawing Standards for the South Pacific Division Regulatory Program Hollis Jencks Project Manager, Nevada/Utah Section Sacramento District Regulatory Program Workshop 31 May 2018 US Army Corps
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationSUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT
Case #: SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Email Address:
More informationHartwell Lake Application for Dry Dredging
Hartwell Lake Application for Dry Dredging Applicant: Mailing Address: E-Mail Address: Day Time Phone Number/s: Dredging Site Address: Subdivision: Lot #: Shoreline Use Permit #: Next Upstream Permit #,
More informationMinor Site Plan Application and Checklist Land Disturbing Activities
Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based
More informationENVI.2030L Topographic Maps and Profiles
Name ENVI.2030L Topographic Maps and Profiles I. Introduction A map is a miniature representation of a portion of the earth's surface as it appears from above. The environmental scientist uses maps as
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program August 6, 2012 Corps contacts: Sacramento District: Michael Finan (916) 557-5324 (Michael.C.Finan@usace.army.mil)
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationLOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)
MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationCHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist
Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A This checklist is used for subdivision, mobile home parks, and
More informationLand Use & Development Application
Salt Lake County Public Works Department Planning and Development Services Division 2001 S. State Street #N-3600, Salt Lake City, UT 84190-4050 Phone 385-468-6700 FAX: 385-468-6674 Visit our web site:
More informationPhone Number: Address:
Case #: SITE DEVELOPMENT APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Project
More informationTOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw
I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed
More informationSection E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationTown of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014
Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program March 5, 2012 Comment period: ends April 5, 2012 Corps contact: Thomas Cavanaugh (415) 503-6574 (Thomas.J.Cavanaugh@usace.army.mil)
More informationMINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.
MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.
More informationA. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT
400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early
More informationSurvey Requirements. Design Guidelines and Standards. June Office of the University Architect
Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSubdivision Application Checklist
City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application
More informationPRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: PRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3) For this assignment you will require: a calculator and metric ruler.
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationCITY OF MERCER ISLAND
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org NONLAND USE APPLICATION- PLAN SET GUIDE The applicant for a land use approval
More informationAPPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST
VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street
More informationTown of Apex, North Carolina
POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule
More informationCOPYRIGHTED MATERIAL. Contours and Form DEFINITION
1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above
More informationCITY OF MUSKEGO DRAFTING STANDARDS
CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under
More informationApplication for Site Plan Review
Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission
More informationIntroduction to Aerial Photographs and Topographic maps (Chapter 3)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 3) For this assignment you will require: a calculator and metric ruler. Objectives:
More informationLast Name: First Name: M.I:
ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)
More informationProject Name: County File No.: Checked by: For: Date:
Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction
More informationVICINITY MAP LOCATION MAP GRAPHIC SCALES
VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationIntroduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition) For this assignment you will require:
More informationMILL HILL ARTS VILLAGE
OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationb. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).
Snyderville Basin G. Site Plan Requirements: Three (3) copies of a site plan, a minimum size of 11" x 17" (must be legible) and a maximum size of 36" x 48" shall be submitted with all building permit applications
More informationLegal Description & Site Plan Requirements and Layouts
Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan
More informationVARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)
VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must
More informationNWP Page 1 of 14 Public Notice Figures
Natural Resources Consulting FIGURE 1 Vicinity ap Project: aple Street W N S E NWP-2018-116 Page 1 of 14 Public Notice Figures FIGURE 2 Tax ot ap N W Natural Resources Consulting NWP-2018-116 Project:
More information1. The topographic map below shows a depression contour line on Earth's surface.
1. The topographic map below shows a depression contour line on Earth's surface. Points A, B, C, and D represent surface locations. Contour line elevations are in feet. Which profile best shows the topography
More informationTechnical Memorandum ECO-7
To: Woody Frossard, TRWD From: Bob Brashear, CDM This document is released for the purpose of interim review under the authority of Robert Brashear, P.E., TX license 80771 on 21-Mar-2005. It is not to
More informationCompensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014
Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 i. Project Overview 1. USACE # # SPK 2013 00851 2. Permittee:
More informationSUBMITTAL REQUIREMENTS RCV D REJECT PENDING
1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3
More informationBACKGROUND INFORMATION
Build an Island INTRODUCTION For this assignment, you will be creating a topographic map and three-dimensional model of a fictional island that you have designed. You will start by exploring some basic
More informationADMINISTRATIVE DESIGN REVIEW Information
Information The following information summarizes the City s Administrative Design Review (ADR) provisions. If you have any questions, please contact the Planning and Development Services Department at
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationIF YOU WERE GIVEN the task of installing a drainage
Applying Profile Leveling Techniques IF YOU WERE GIVEN the task of installing a drainage system, how would you determine the slope needed to keep the water flowing? Profile leveling is an option. As part
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationGCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationPart 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)
COMMON ERRORS Typical Site Review issues Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID) E&S Phase I Constructability (PFM 11-0109.3) Safety during construction and
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationNatural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption Application
More informationDECK PERMIT APPLICATION PACKET
Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationSite Development Permit Submittal Requirements
Site Development Permit Submittal Requirements Development Services Department 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 DSD@issaquahwa.gov Purpose The purpose of the Submittal Requirements
More informationTEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03
TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03 Drawing: \\Aci-acad\caddrawings\15486\15486D2-D14.dwg - Layout Tab: K270-12
More informationModule 2: Mapping Topic 3 Content: Topographic Maps Presentation Notes. Topographic Maps
Topographic Maps 1 Take a few moments to study the map shown here of Isolation Peak, Colorado. What land features do you notice? Do you thinking hiking through this area would be easy? Did you see the
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationRE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
November 19, 2009 Ms. Melissa Jundt NOAA Fisheries Hydropower Division 1201 NE Lloyd Boulevard, Suite 1100 Portland, Oregon 97232 RE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
More informationApplying for a Site Development Review
Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.
More informationDate Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project
Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must
More informationCHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.
CHECK LIST MOBILEHOME PERMANENT FOUNDATION BUILDING PERMIT SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 INSPECTION REQUEST-24
More informationAPPLICATION FOR SITE PREPARATION PERMIT
Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.
More informationARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS
ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS Introduction This section provides guidance on the submittal requirements for a development to obtain a Watershed Management Permit from
More informationREPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016
REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationMAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223
PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More information