TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03

Size: px
Start display at page:

Download "TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03"

Transcription

1 TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03 Drawing: \\Aci-acad\caddrawings\15486\15486D2-D14.dwg - Layout Tab: K Date: Aug 30, :54pm - Plotted by: jchandler Xrefs: USGS CONTOURS.dwg SILT FENCE OR COMPOST FILTER SOCK (SEE DETAILS, FIGURE NOS. 7 & 25) SB \\Aci-acad\caddrawings\15486\15486D2-D14.dwg, 8/30/2016 2:53:55 PM, _DWG To PDF-NO LAYERS.pc3, 1:1

2 ROAD CROSSING (SEE DETAIL, FIGURE NO. 12) SB SILT FENCE OR COMPOST FILTER SOCK (SEE DETAILS, FIGURE NOS. 7 & 25) ROAD CROSSING (SEE DETAIL, FIGURE NO. 12) WETLAND CROSSING (SEE DETAIL, FIGURE NO. 23) SILT FENCE OR COMPOST FILTER SOCK (SEE DETAILS, FIGURE NOS. 7 & 25) SA-04 W-TQSM-004 Drawing: \\Aci-acad\caddrawings\15486\15486D2-D14.dwg - Layout Tab: K Date: Aug 30, :55pm - Plotted by: jchandler Xrefs: USGS CONTOURS.dwg PAR-039A TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PIPELINE B105 ABANDONMENT \\Aci-acad\caddrawings\15486\15486D2-D14.dwg, 8/30/2016 2:55:05 PM, _DWG To PDF-NO LAYERS.pc3, 1:1 PAR-039

3 ROUTE SELECTION, SURVEY, AND ROW ACQUISITION CLEARING AND GRADING CENTERLINE SURVEY OF TRENCH TOPSOIL SEGREGATION (AS APPROPRIATE) AND TRENCHING (ROCK FREE) TRENCHING (ROCK) STRINGING BENDING LINE UP, STRINGER BEAD, AND HOT PASS FILL AND CAP WELD AS-BUILT FOOTAGE X-RAY AND COATING FIELD WELD REPAIR AND FACTORY WELDS INSPECTION (JEEPING) AND REPAIR OF COATING LOWERING IN AND TIE-INS PAD AND BACKFILL TEST AND FINAL TIE-IN REPLACE TOPSOIL AND RESTORATION Drawing: \\Aci-acad\caddrawings\15486\15486D15.dwg - Layout Tab: Model Date: Aug 25, :21pm - Plotted by: jchandler Xrefs:

4 Drawing: \\Aci-acad\caddrawings\15486\15486D16.dwg - Layout Tab: Model Date: Aug 25, :21pm - Plotted by: jchandler Xrefs:

5 5' 5' 3' Drawing: \\Aci-acad\caddrawings\15486\15486D17.dwg - Layout Tab: Model Date: Aug 25, :31pm - Plotted by: jchandler Xrefs:

6 Drawing: \\Aci-acad\caddrawings\15486\15486D18.dwg - Layout Tab: Model Date: Aug 25, :32pm - Plotted by: jchandler Xrefs:

7 Feature ID W-DSTQ-01 W-DSTQ-02 Line K270 K270 Closest Mile Post W-DSTQ-03 K Baldwin Run None Baldwin Run None Baldwin Run None modified PUB 0.03 W-DSJF-01 K Baldwin Run None W-DSTQ-05 K None W-DSTQ-04 K None W-SMJF-25 K None W-DSJF-02 K None W-DSJF-03 K None PSS W-DSTQ-06 K None W-DSTQ-07 K None W-SMJF-26 K None W-SMJF-27 K None 0.09 W-DSTQ-08 K None W-SMJF-28 K W-TQSM-01 K270 Reroute 12 Digit HUC HUC Name NWI Classification PFO1C 1C Field-Identified Cowardin Classification PSS PFO or 2 gray zone 1.62 PFO 4.29 W-TQSM-02 K270 1 or 2 gray 2.57 Reroute 1C zone W-TQSM-03 K270 Reroute None W-TQSM-04 K270 Reroute None Total 12.2 ABBREVIATIONS: HUC HYDROLOGIC UNIT CODE ID IDENTIFICATION NA NOT APPLICABLE PALUSTRINE EMERGENT PFO PALUSTRINE FORESTED PSS PALUSTRINE SCRUB-SHRUB 1. CORRESPONDS TO LOCATION IN FIGURE 5 SERIES. 2. THE WETLAND MAY EXTEND OUTSIDE OF THE ENVIRONMENTAL SURVEY CORRIDOR; THIS ACREAGE CORRESPONDS TO THE SIZE OF THE FEATURE LOCATED WITHIN THE ENVIRONMENTAL SURVEY CORRIDOR. 3. THE DETERMINATIONS OF HYDROLOGIC CONNECTION IS BASED ON THE BOUNDARY DELINEATIONS AND HAVE NOT BEEN FORMALLY APPROVED BY THE USACE AND/OR OEPA. ORAM Score ORAM Category Area within survey corridor (acres)² Hydrologic connection³ Feature ID Line Closest Mile Post 12-Digit HUC HUC Name Waterbody Name Flow Regime² RPW or Non-RPW³ Drainage Area (acres) HHEI Score HHEI Class. PHWH QHEI Score QHEI Class. Average OHWM Width (feet) S-DSTQ-01 K Baldwin Run Ewing Run RPW Class II Length Delineated in Survey Corridor (feet) TNW Connection 248 Scioto S-DSTQ-02 K Baldwin Run UNT to Ewing Run RPW Class II Scioto S-DSTQ-03 K Baldwin Run UNT to Ewing Run RPW Intermittent Class I Scioto S-DSTQ-04 K Baldwin Run UNT to Ewing Run Ephemeral Non-RPW Class I S-DSTQ-05 K Baldwin Run UNT to Ewing Run RPW Class I S-DSTQ-06 K Baldwin Run UNT to Ewing Run Ephemeral RPW Class I S-DSTQ-07 K Baldwin Run UNT to Ewing Run Ephemeral Non-RPW Class I S-DSTQ-08 K Baldwin Run UNT to Fetters Run Intermittent RPW Class I S-DSTQ-09 K Baldwin Run UNT to Fetters Run RPW Class I Scioto 464 Scioto 100 Scioto 467 Scioto 207 Scioto 352 Scioto S-DSTQ-10 K Baldwin Run Fetters Run RPW Good Scioto S-DSTQ-11 K Ephemeral Hocking Non-RPW Class I Hocking S-SMJF-35 K Ephemeral Hocking Non-RPW Class I Hocking S-DSTQ-12 K Hocking Intermittent RPW Class I Hocking S-DSJF-03 K Hocking Ephemeral Non-RPW < Class I Hocking S-DSJF-04 K Hocking Ephemeral Non-RPW < Class I Hocking S-DSJF-02 K Hocking Ephemeral Non-RPW Class I Hocking S-DSJF-01 K Hocking RPW Class I Hocking S-TQSM-02a K Hocking RPW Good Hocking S-TQSM-03 K Hocking RPW Fair Hocking S-TQSM-04 K Ephemeral Hocking Non-RPW Class I Hocking S-TQSM-02 K270 alternate Hocking RPW Fair Hocking S-TQSM-01 K270 alternate Hocking RPW Excellent Hocking S-DSJF-06 K270 staging Hocking RPW Good Hocking S-DSJF-07 K270 access Headwaters Claypools Run road Hocking RPW Fair Hocking Total ABBREVIATIONS: HUC HYDROLOGIC UNIT CODE ID IDENTIFICATION OHWM ORDINARY HIGH WATER MARK NON-RPW NON-RELATIVELY PERMANENT WATER RPW RELATIVELY PERMANENT WATER TNW TRADITIONAL NAVIGABLE WATER 1. CORRESPONDS TO LOCATION IN FIGURE 5 SERIES. 2. FLOW REGIME IS DEFINED AS PERENNIAL, INTERMITTENT, OR EPHEMERAL. THIS DETERMINATION WAS INTERPRETED USING FIELD OBSERVATIONS AND USGS TOPOGRAPHIC MAPS, AS APPROPRIATE. 3. INTERMITTENT AND PERENNIAL STREAMS WERE RECORDED AS RPWS; EPHEMERAL STREAMS WERE RECORDED AS NON-RPWS Feature ID Line Figure Sheet Letter ¹ Closest Mile Post 12-Digit HUC HUC Name NWI Classification Acreage Delineated in Survey Corridor Headwaters P-DSTQ-01 K Hocking PUBGx 0.6 Total 0.6 ABBREVIATIONS: HUC HYDROLOGIC UNIT CODE ID IDENTIFICATION 1. CORRESPONDS TO LOCATION IN FIGURE 5 SERIES. Drawing: \\Aci-acad\caddrawings\15486\15486D19.dwg - Layout Tab: Model Date: Aug 25, :32pm - Plotted by: jchandler Xrefs:

Map and Drawing Standards for the South Pacific Division Regulatory Program

Map and Drawing Standards for the South Pacific Division Regulatory Program Map and Drawing Standards for the South Pacific Division Regulatory Program Hollis Jencks Project Manager, Nevada/Utah Section Sacramento District Regulatory Program Workshop 31 May 2018 US Army Corps

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

NWP of 10 Enclosure

NWP of 10 Enclosure #6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

SPECIAL PUBLIC NOTICE

SPECIAL PUBLIC NOTICE SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program August 6, 2012 Corps contacts: Sacramento District: Michael Finan (916) 557-5324 (Michael.C.Finan@usace.army.mil)

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

MVP Variance Request Form

MVP Variance Request Form E-4 4/10/2018 Requested By: Andy Travenio Spread: E Variance Type: WS Variance Sequence Request repared By *: Megan Neylon Number: 004 * The FERC compliance monitor should be alerted and given a copy of

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

SPECIAL PUBLIC NOTICE

SPECIAL PUBLIC NOTICE SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program March 5, 2012 Comment period: ends April 5, 2012 Corps contact: Thomas Cavanaugh (415) 503-6574 (Thomas.J.Cavanaugh@usace.army.mil)

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

CITY OF MERCER ISLAND

CITY OF MERCER ISLAND CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org NONLAND USE APPLICATION- PLAN SET GUIDE The applicant for a land use approval

More information

3 rd Generation Thunderstorm Map. Predicted Duck Pair Accessibility to Upland Nesting Habitat in the Prairie Pothole Region of Minnesota and Iowa

3 rd Generation Thunderstorm Map. Predicted Duck Pair Accessibility to Upland Nesting Habitat in the Prairie Pothole Region of Minnesota and Iowa 3 rd Generation Thunderstorm Map Predicted Duck Pair Accessibility to Upland Nesting Habitat in the Prairie Pothole Region of Minnesota and Iowa Grassland Bird Conservation Areas Wetland Reserve Program

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

SECTION GNSS & GIS MAPPING AND GEODATA

SECTION GNSS & GIS MAPPING AND GEODATA PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 83 02 A. The contractor shall collect GeoData with Global Navigation Satellite System (GNSS) coordinate locations and elevations for the work to be performed

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

Legend ") Compressor Station (C/S) (Proposed Modification) ") Compressor Station (C/S) (Proposed New)! M&R Station (Modification Required)! M&R Statio

Legend ) Compressor Station (C/S) (Proposed Modification) ) Compressor Station (C/S) (Proposed New)! M&R Station (Modification Required)! M&R Statio Legend ") Compressor Station (C/S) (roposed odification) ") Compressor Station (C/S) (roposed New)! &R Station (odification Required)! &R Station (roposed New) roposed ipeline Existing aritimes & Northeast

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade). Snyderville Basin G. Site Plan Requirements: Three (3) copies of a site plan, a minimum size of 11" x 17" (must be legible) and a maximum size of 36" x 48" shall be submitted with all building permit applications

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Consultant s As Constructed Survey Certification Check List

Consultant s As Constructed Survey Certification Check List This check list shall be used to guide the user through the activities required to meet "asconstructed" specifications defined within Melbourne Water Survey as per the Land Development Website. Drainage

More information

VICINITY MAP LOCATION MAP GRAPHIC SCALES

VICINITY MAP LOCATION MAP GRAPHIC SCALES VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION

More information

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 7 NOVEMBER 13 TH TO NOVEMBER 17 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

APPLICATION FOR SITE PLAN CONTROL

APPLICATION FOR SITE PLAN CONTROL APPLICATION FOR SITE PLAN CONTROL Section 41 of the Planning Act, RSO 1990, as amended A Pre-Application Consultation with City staff is encouraged prior to submission of this application. This application

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS 2.1 MASTER PLAN 2.1.1 A Master Plan for water, wastewater, and/or reclaimed water is required for all residential or commercial

More information

Updating the National Wetland Inventory (NWI) for Southern Lower Peninsula of Michigan

Updating the National Wetland Inventory (NWI) for Southern Lower Peninsula of Michigan Updating the National Wetland Inventory (NWI) for Southern Lower Peninsula of Michigan FINAL REPORT Submitted to: U.S. Fish and Wildlife Service Great Lakes Coastal Program Office Agreement Number: 301813J010

More information

Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption

Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption Application

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

QUALITY ASSURANCE SPECIFICATION

QUALITY ASSURANCE SPECIFICATION Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose

More information

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

Onlot System Component Matrix

Onlot System Component Matrix Onlot System Component Matrix Absorption Area Component Classification and Secondary / Advanced Treatment Options Slope Minimum Suitable Soil Depth to a Seasonal High-Water Table Limiting Zone Minimum

More information

Town of Apex, North Carolina

Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule

More information

Tiered Species Habitats (Terrestrial and Aquatic)

Tiered Species Habitats (Terrestrial and Aquatic) Tiered Species Habitats (Terrestrial and Aquatic) Dataset Description Free-Bridge Area Map The Department of Game and Inland Fisheries (DGIF s) Tiered Species Habitat data shows the number of Tier 1, 2

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

PREPARATION GUIDELINES FOR UDFCD MAINTENANCE SITE PLAN

PREPARATION GUIDELINES FOR UDFCD MAINTENANCE SITE PLAN PREPARATION GUIDELINES FOR UDFCD MAINTENANCE SITE PLAN Overview The Urban Drainage and Flood Control District (District) is now requiring that a Maintenance Site Plan (Plan) be submitted for all pond projects

More information

Relicensing Study 3.5.1

Relicensing Study 3.5.1 Relicensing Study 3.5.1 BASELINE INVENTORY OF WETLAND, RIPARIAN AND LITTORAL HABITAT IN THE TURNERS FALLS IMPOUNDMENT, AND ASSESSMENT OF OPERATIONAL IMPACTS ON SPECIAL-STATUS SPECIES Updated Study Report

More information

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT Case #: SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Email Address:

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

HDD Wire Guided Waterway Crossing ATON Plan. Youghiogheny River (S122)

HDD Wire Guided Waterway Crossing ATON Plan. Youghiogheny River (S122) HDD Wire Guided Waterway Crossing ATON Plan Youghiogheny River (S122) Mariner East Phase 2 Pipeline Project Prepared for: Sunoco Pipeline, L.P. 535 Friztown Road Sinking Springs, PA 19608 Prepared by:

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

Northern Pass Special Use Permit Application Amendment Exhibits. September 5, 2013

Northern Pass Special Use Permit Application Amendment Exhibits. September 5, 2013 Northern Pass Special Use Permit Application Amendment Exhibits September 5, 2013 Northern Pass SUP Application Amendment Exhibits Exhibit 1 Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 Exhibit 6 Exhibit 7

More information

Town of Holly Springs Sign Installation Packet

Town of Holly Springs Sign Installation Packet Town of Holly Springs Sign Installation Packet Department of Planning & Zoning 128 S. Main Street P.O. Box 8 Holly Springs, NC 27540 (919) 557-3908 HSPlanning@hollyspringsnc.us GENERAL INFORMATION: If

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

Pesi 593 April 17, 2018

Pesi 593 April 17, 2018 Pesi 593 April 17, 2018 Ms. Tiernan Lennon and Mr. John Schmidt U.S. Fish & Wildlife Service West Virginia Field Office 90 Vance Drive Elkins, WV 26241 RE: Variances MVP-ATWS-SM-027, MVP-ATWS-SM-037, MVP-ATWS-SM-037-

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax) King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

TUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139

TUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 TUSCAN VILLAGE - 03-11- 2016 MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 t: 617-547-8120 f: 617-661-4986 www.prellwitzchilinski.com PROGRAM 50

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

Abandoned Facility Management

Abandoned Facility Management Abandoned Facility Management 2014 AASHTO Subcommittee on Right of Way, Utilities and Outdoor Advertising Control Conference James H. Anspach, P.G. Cardno ASCE Definitions Abandoned facility shall mean

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

Pesi 593 April 17, Variance MVP-ATWS-SM-031 Detailed Habitat Assessment and Portal Searches

Pesi 593 April 17, Variance MVP-ATWS-SM-031 Detailed Habitat Assessment and Portal Searches Pesi 593 April 17, 2018 Ms. Tiernan Lennon and Mr. John Schmidt U.S. Fish & Wildlife Service West Virginia Field Office 90 Vance Drive Elkins, WV 26241 RE: Variance MVP-ATWS-SM-031 Detailed Habitat Assessment

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

Clear Creek County Site Development

Clear Creek County Site Development Clear Creek County Annex Community Development Clear Creek County Site Development The Clear Creek Board of County Commissioners has adopted design standards for the construction of driveways. These design

More information

Phone Number: Address:

Phone Number:  Address: Case #: SITE DEVELOPMENT APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Project

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

APPENDIX A Map Exhibits

APPENDIX A Map Exhibits APPENDIX A Map Exhibits (See attached) County Rd 0 County Rd 7 County Rd Map Document: (P:\007\gis\permit\Final\SPA_Exhibits\007doq0B_ex.mxd) 0//00 -- 0::7 AM 00 Westwood Professional Services, Inc. Section

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (PAG-02)

VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (PAG-02) COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED MANAGEMENT VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION

More information

The above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager.

The above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager. Water Main Construction Projects The requirements and deliverables identified below are those for water main construction projects performed by Developers, Contractors, and Internal Illinois-American Water

More information

Photographic Survey of Building on frontage

Photographic Survey of Building on frontage KNIGHT S COURT, TEMPLETON, PEMBROKESHIRE SUMMARY OF ARCHAEOLOGICAL WORKS COMPLETED AS PART OF ORIGINAL PLANNING PERMISSION BY DAT ARCHAEOLOGICAL SERVICES 1 INTRODUCTION 1.1 DAT Archaeological Services

More information

AutoCAD Civil 3D 2013 South African Country Kit

AutoCAD Civil 3D 2013 South African Country Kit AutoCAD Civil 3D 2013 South African Country Kit Contents 1 General... 3 1.1 Introduction from the author and creator... 3 1.2 Overview... 4 2 Drawing Settings... 8 2.1 Edit Drawing Settings... 8 3 Layers...

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

11/06/2014 Pay Items - 1

11/06/2014 Pay Items - 1 Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...

More information

Yavapai County Development Services

Yavapai County Development Services Yavapai County Development Services Prescott Office 1120 Commerce Dr., Prescott, AZ 86305 (928) 771-3214 Fax: (928) 771-3432 Cottonwood Office 10 S. 6 th Street, Cottonwood, AZ 86326 (928) 639-8151 Fax:

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 OCTOBER 15 TH - OCTOBER 20 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

MOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A

MOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A Green shapes show initial service ramps Blue shapes show future system ramps UNNAMED TRIBUTARY TO LEE CREEK LEE DRAIN MOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A RITER CANAL SEE SHEET B UNVEGETATED

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

East-West Gas Pipeline. Construction Project of 45km Section of Qubuleti (Dn500) Branch Pipeline Cost Estimate Ref.: KOBU -GE05-CM-BOQ-0001-ENG-A01

East-West Gas Pipeline. Construction Project of 45km Section of Qubuleti (Dn500) Branch Pipeline Cost Estimate Ref.: KOBU -GE05-CM-BOQ-0001-ENG-A01 1 ROW Preparation 1.1 Topsoil stripping and storage along the pipeline ROW m 42788 2 Transportation of Pipes and other Fittings to the Construction Site 2.1 Transportation and stringing of DN500 pipes

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information