3.2 Structures in Small Lined Canals
|
|
- Merry Chandler
- 5 years ago
- Views:
Transcription
1 Weirs with a partition board - The flow divisor consists essentially of a broadcrested weir with rectangular control section and a partition board downstream from the crest. The partition board may be fixed or movable depending on the need to change the division of flow over the canal branches. The advantages of combining the measuring and regulation functions into one structure are: (1) less hydraulic head is needed; (2) a multipurpose structure usually is cheaper to construct than the two separate structures (one for regulation and one for measurement) it replaces; and (3) the operation of one structure is less timeconsuming. Owing to the latter, gatemen or ditchriders tend to distribute irrigation water more accurately, and a higher efficiency of irrigation water use can be attained. 3.2 Structures in Small Lined Canals In the past, flow measurements with flumes and weirs were costly, of variable accuracy, and difficult to apply in field situations. Major problems included the requirement of reshaping the canals to accommodate a limited assortment of calibrated devices, as is the case for Parshall flumes, and the requirement for relatively large water surface drops associated with sharp-crested weirs. Not the least of these problems was the general inability to control installation errors and readout errors for an accurate, convenient, and reliable head reading. Many of these problems are significantly reduced by the use of long-throated flumes and the hydraulically related broad-crested weirs provided in this book (Figure 3.2). Figure 3.2 Broad-crested weir operating at design discharge (Arizona). 62 Flume and Weir Qpes and Construction Methods
2 1 The construction of a small broad-crested weir in a concrete-lined (irrigation) canal is relatively easy and straightforward. The existing canal lining can serve as: 1) approach channel; 2) part of the converging transition, throat, and the diverging transition; and 3) tailwater channel. If no energy head needs to be recovered, an abrupt diverging transition is sufficient, and the weir has only two sections that need to be constructed: a throat section with a length L, and a converging transition with a length equal to three times the sill height, or 3pl (Figure 3.3). As was shown in Figure 1.3, the contraction of the canal can be from the sides, from the bottom, or both. Most lined canals are irrigation canals with a ratio of maximum to minimum flows, Qmar/Qmin, below 5. Since broad-crested weirs (bottom contractions) can satisfy this range of flows and are generally much easier and less costly to construct, they are recommended for this application. Design procedures, standard sizes (defined in terms of crest width, b,), and rating tables are discussed in Section The constructed crest width, b,, should be as close to the values in the rating tables as the design accuracy of the measurement, because a 1 % error in b, will produce about a 1% error in discharge (see Table 2.5). Although the sill height pi is important in selecting the weir because it controls the water surface elevation and thus the modular limit and freeboard relationships, its precise vertical dimension is not at all critical to the weir head-discharge relationship. For example, pi can vary by *lo% before causing noticeable calibration changes. Also, the crest length L can be adjusted 3=10% without significant effect. The ramp length of 3pl is also approximate and its purpose is to convey the water smoothly to the weir crest. Thus the ramp may be straight or nt for establishing gage zem L/C to L/3 from end, on weir recorder r--1-4-i- I I X K 4 SECTION ALONG CENTER LINE CROSS SECTION Figure 3.3 Broad-crested weir in a concrete lined canal. Chapter 3 63
3 gently curved, but straight is usually more readily constructed. These liberal tolerances should not be an excuse for sloppy or poor construction, but they can make construction quick and easy. More accurate rating tables can be developed by measuring the exact structure dimensions and using the computer program of Chapter Cast-in-Place Structures Trapezoidal channels Following site selection and the design of a structure, cadin-place construction is straightforward. If the canal has construction joints, the structure should be placed so that the gage location is at least 0.5 m downstream from the joint. If that is difficult, locate the gage slightly upstream from the joint and position the sill at distance (La + Lb) downstream as listed in the rating tables and shown in Figure 3.4. If possible, construction joints in the area of the sill should be avoided. Construction joints occurring in the ramp section are acceptable. If a construction joint is located between the weir sill and gage, care should be exercised to ensure that no vertical movement occurs. Otherwise, the zero-reference (sill-reference) of the gage may not remain reliable. The suggested construction sequence is In a workshop, make two forms from galvanized angle iron to the cross sectional shape of the control section, with the edge on one angle (not the flat side) making the shape. These edges will be used as the forms for screeding and troweling the concrete. For a flume with bottom plus side contraction, these forms shape the bottom and sides of the control. For weirs with bottom contraction only, the top of the angle irons have a length of b, since the sides of the canal function as sides of the control. gaging station control section J I I I I L I, /PI approach channel %onverging throat diverging transition " tailwater transition channel Figure 3.4 Illustration of terms. ~- 64 Flume and Weir Types and Construction Methods i
4
5
6 Figure 3.8 Structure with rectangular control section in lined trapezoidal canal ramp and crest from being forced downstream. Thus we recommend that the structure be firmly anchored to the floor or the walls. Otherwise, the construction sequence is the same as for the trapezoidal channels. In some cases, it may be desirable to narrow the structure. For trapezoidal channels, we recommend constructing the sill and then narrowing the crest. For rectangular structures, it is easier to narrow the structure with block or brickwork, and then add the sill, if needed. Culverts are an attractive site to construct a measuring flume in otherwise unlined channels, since the foundation for the structure is already in place. If the flume or weir is placed near the outlet of the culvert, additional scour protection may be needed (see Chapter 7). Other channel shapes There are a variety of other lined channel cross-section shapes, including semi-circular, U-shaped, circular (e.g., culverts), parabolic, triangular, etc. Where sloping sidewalls exist, construction procedures are essentially the same as for trapezoidal channels. If the sidewalls are vertical, then the construction considerations for rectangular channels are appropriate. The main objective is to build a sill that is level in both directions and has a cross-section that is smooth and uniform throughout the throat Prefabricated concrete structures In principle, all of the cast-in-place concrete weirs of Section can be precast as reinforced concrete beams and slabs. The locally available equipment for transporting Chapter 3 67
7
8
9
10
11
12 suitable for the sizes mentioned. The angles should be about 80 mm (6 in.) on each leg, and have a length equal to the weir width. The downward pointing leg of each angle end is then bent so that it will match the canal side slope z and serve as a tab for securing the sill to the canal walls. The ramp is then cut to match the sill width, and a tab is included to secure it to the sill edge. The tab is bent on a 3: 1 angle so that the sill and ramp smoothly intersect without overlapping. Like prefabricated concrete weirs, local materials, available tools, labor skills, and type of use will somewhat control whether the weirs are bolted together or spot welded, and painted or otherwise coated for rust protection. The weir shown in Figure 3.14 uses three galvanized, 50 x 76 x 3 mm (2 x 3 x '/* in.) steel angles available commercially. The sill top was 16 gage galvanized steel sheet (about in. or 1.6 mm thick). Also, the two ramp sections are shown with some stiffening members made from the galvanized sheet. Because the edge of the ramp rests on the canal wall and is fixed to the sill beam, very little additional stiffness is needed. In practice, water pressure holds all parts in place and the canal fastenings are needed only to prevent wind damage when the canal is empty and to prevent accidental movement by people servicing the canal or by animals. Simple structural analysis should be made to determine the expected deflection of the sill during use. Figure 3.15 shows the ramp section for a large temporary metal weir being hoisted into place. Figure 3.15 The upstream ramp of a 3 m wide (IO ft) weir is hoisted into place after the sill has been installed (Arizona). Chapter 3 73
13
14
15 _= Static pressure tube \ f i-.".. - _ - T i Ff i pjq... j....- W... :D : 3D _ Layout 112 of minor and major axis on ruler as shown here p(dm)/2 = D Y I+ D'2+jx TOP VIEW Y ENDVIEW " to establish outline of ellipse b sliding points x and y along respective axis as indicated. Figure 3.17 Layout scheme for portable long-throated measurement structures in partially full circular conduits. 16 Flume and Weir opes and Construction Methods
16
17 cup0 required height flow * PVC pipe end co I 300," $ LL2 rubber seal (a) goo 1L7 Y ' UNFOLDED SILL COVER UnfddPd sheet o sill reference point tor zerdng point mgo I I r I L L/2 converging sectm [ramp).l thmd spctmhlltopl,,~ diverginp I 1- sectlo" a FRONT VIEW SILL COVER AND sill cover sheet 2 1 oluminum tii ips (b) 3x100 mm rubber sheeting Figure 3.20 Construction drawings for portable weir 78 Flume and Weir Types and Construction Methods
18 Figure 3.20 (continued), Chapter 3 79
19 k, I 930 >I oluminum pipe golv. reducer galv. nipple I 020u FRONT ASSEMBLY BOTTOM FRAME Figure 3.20 (continued). The weight of the welded version shown is about 10 kg (25 Ib). Leakage past the weir is controlled by rubber sealing strips made of 3.2-mm (1/2-in.) thick sheeting cut about O. 10 m (4 in.) wide. The seal is fastened to the sides of the ramp and to the lower front angle of the framework by aluminum strips and pop rivets. It is helpful if, during construction, the rubber sheeting is stretched slightly so that it warps strongly upward, especially across the bottom of the weir. Water pressure then causes a good seal against the canal walls and bottom. Insufficient stretching may allow the rubber to turn under the weir frame during placement, negating its effectiveness. Translocation of the point gage and stilling-well cup to a position above the point of zero registration makes portable weirs insensitive to minor problems of leveling in all directions and eliminates the need for lateral transfers of elevations by surveying techniques (Figure 3.21). Thus careful leveling is not necessary, just gross adjustments readily observed by the eye (see also Section 4.10). The upstream water level can be sensed by attaching flexible tubing from the cup to a sensing pipe. The sensing pipe can either be attached to the portable flume (and retractable as shown here), or be separate (see also Sections 4.9 and 4. IO). For structures with side walls, as in Figure 3.22, a side-wall tap replaces the sensing pipe. The temporary structures described in Section can often be used as portable structures. To accomplish this requires a portable head detection method, which is described in Section Flume and Weir Types and Construction Methods
20
Surface Developments. Sacramento City College Engineering Design Technology. Surface Developments 1
Surface Developments Sacramento City College Engineering Design Technology Surface Developments 1 Surface Developments A surface development is a full-size layout of an object made on a single flat plane.
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationExperience the Hi-Lite Advantage
Experience the Hi-Lite Advantage 12K Aluminum Shoring System INTRODUCTION The 12K Shoring System is primarily a hand-set system. It can also be handled with a crane, and may also be used quite successfully
More informationSteel Sound Enclosure
Steel Sound Enclosure INSTALLATION MANUAL List of tools recommended for use during installation: vise grips c clamp ladder electric drill drill bits / taps as req d screw drivers hammer rubber mallet pipe
More informationUnderside Standard Installation Instructions For Existing Decks
Patent #6,385,931,B1 Water Diversion System drain Patent #6,415,571,B2 Underside Standard Installation Instructions For Existing Decks I. Getting Started Before starting the installation, read these instructions
More informationSTEEL RULE. Stock TRY SQUARE
FITTING INTRODUCTION Fitting consists of a handwork involved in fitting together components usually performed at a bench equipped with a vice and hand tools. The matting components have a close relation
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationMATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.
Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.
More informationRodney Hunt. A GA Industries Company Glydaseal Gates
Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationPENSTOCK VALVES. Performance through Excellence
VALVES & MANUFACTURING (1988) LTD. PENSTOCK VALVES Performance through Excellence SLIDEGATES WEIR GATES STOP LOGS SLIDEGATES PRECISION FACE SEALING VALVES WEIR GATES STOP LOGS SLIDEGATES Actuation Installation
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More information1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section.
SECTION 12360 LIBRARY SHELVING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 06100 - Carpentry. 2. 09200 - Metal Studs, Lath, Suspension Ceiling, Plaster and Stucco. 3. 09660 - Resilient Tile Flooring.
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationKEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM
S Y S T E M D E T A I L S FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM PAGE TITLE PAGE Table of Contents Fundermax Max Exterior Product Information Design and Installation Information
More informationThe Ultimate Guide To Creating A Wind Turbine
The Ultimate Guide To Creating A Wind Turbine DISCLAIMER These guides and videos have been designed to help others to help create alternative energy by showing how to create a wind turbine. Every effort
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationA. Suggested Tool List
These instructions are intended to be a basic guide to the installation and assembly of plate structures. Job site specific conditions may require other procedures. A Statement on Safety The assembly procedure
More informationPrecision Folding Technology
Precision Folding Technology Industrial Origami, Inc. Summary Nearly every manufacturing process has experienced dramatic improvements in accuracy and productivity as well as declining cost over the last
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More informationDesign Data 12M. Hydraulic Capacity of Precast Concrete Boxes. RISE, Millimeters. Span Millimeters
Design Data 12M Hydraulic Capacity of Precast Concrete Boxes Under certain conditions the hydraulic or structural characteristics of reinforced concrete box sections offer advantages over the circular
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationCorso di Studi di Fabbricazione
Corso di Studi di Fabbricazione 3a Richiami dei processi tecnologici di trasformazione FUNDAMENTAL OF METAL FORMING 1 METAL FORMING Large group of manufacturing processes in which plastic deformation is
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationAl Keller s Inexpensive Backyard Greenhouse Plans
Al Keller s Inexpensive Backyard Greenhouse Plans There are many ways to construct low cost greenhouses for your property. This is just one man s design, using easily obtainable and fairly inexpensive
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationASSEMBLY, INSTALLATION AND OPERATION MANUAL
ASSEMBLY, INSTALLATION AND OPERATION MANUAL - 1-312 SOUTH HWY. 73, PO BOX 398 FALLS CITY, NE 68355-0398 800-500-9777 PO Box 398 Falls City, NE 68355 800-500-9777 Version Date 03/07/2007 P/N 94000100 Revision
More informationJob no. 5241_Accessories Brochure_Size: 8.2 x 8.2 _ KOHLER Genuine Accessories
KOHLER Genuine Accessories CHOOSING THE PERFECT WALL-HUNG TOILET FOR YOUR BATHROOM IS N0T ENOUGH. KOHLER presents a range of accessories to enhace your bathroom experience. INSTAFIT+ Specially designed
More informationSteel Roll Forming Plant. horse stalls. midwestmanufacturing.com. Front wall. Fax Effective 1 Oct 2014
s LET MIDWEST HELP you Custom build your own STABLE system with these wall sections. partition section partition section partition section door Front wall wall section door Front wall 46 Fax 715-876-5564
More informationSUPPORTS FOR SPRINKLER RISER PIPES
( (" r SUPPORTS FOR SPRINKLER RISER PIPES ROBERT E. STROHMAN LAWRENCE W. LARSON SUPPORTS FOR SPRINKLER RISER PIPES ROBERT E. STROHMAN LAWRENCE W. LARSON Photographs by WILLIAM T. KIRSCHBAUM Circular 46
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More informationPRESTON HEALTH SERVICES ARCHITECT S NO. 2700
SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.
More informationRelease Notes - Fixes in Tekla Structures 2016i PR1
Release Notes - Fixes in Tekla Structures 2016i PR1, you can now set the to either or. is modified., the ID of the connection plate is not changed anymore when the connection now uses normal rebar groups
More informationUltra Space Saver American Bicycle Security Company
The Ultra Space Saver is userfriendly and allows easy access to bikes. It provides convenient space for u-lock security on nearly any bike, including bikes with fenders and fork shocks. The double-sided
More informationshawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures
More informationFORWARD FUSELAGE SIDES & REAR TOP SKINS
FORWARD FUSELAGE SIDES & REAR TOP SKINS WORK REPORT Step No. Check Parts / Tools Qty Preparations. 1 [ ] 6F5-3 Upper Front Longerons 2 2 [ ] 6F5-5 Heel Support 1 3 [ ] 6F5-2 Front Floor Skin 1 3 [ ] Firewall
More informationWADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains.
Universal Carrier Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains. The 400 series carrier accommodates most urinal, water-cooler or hanger plate lavatory
More informationTool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor
Rope Pump MANUFACTURING checklist for quality control A Welding General 1 Check if welding jigs are used for welding of the main parts (wheel, structure frame and bushings) 2 Check if the pump parts are
More informationSkybolt V2 Construction Manual
Skybolt V2 Construction Manual Property of www.ppgplans.com Do not duplicate or make public. Warnings & Disclaimers. This product shows how to build a basic frame only for Powered Paragliding. It is the
More informationTable of Contents F Series Frames
Table of Contents F Series Frames How to Order Frames... F 1 F Series Spec Sheet... F 2 F Series Profiles 1 of 6... F 3 F Series Profiles 2 of 6... F 4 F Series Profiles 3 of 6... F 5 F Series Profiles
More informationMEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C
MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of
More informationProfessional welding tables
Professional welding tables WELDING TABLES ACCESSORIES STOPS PRESSURERS/CLAMPS/GRIPS BOLTS weldingmaster We are the manufacturers of modular welding tables. Weldingmaster tables are highly innovative products,
More informationInstallation Instructions for. Handrail Component System
Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32
More informationTotal precast solution for large stadium projects meet tight schedule
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy
More informationNECESSITY IS THE MOTHER OF INVENTION I. INTRODUCTION
NECESSITY IS THE MOTHER OF INVENTION M. Leslie Boyd, P.E., Freese and Nichols, Inc Mike Lowe, P.E., Lower Colorado River Authority Dustin Mortensen, P.E., Freese and Nichols, Inc. I. INTRODUCTION When
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationReplogle 45) Date of Patent: Oct. 20, ADJUSTABLE FLUME 4,195,519 4/1980 Replogle et al... 73/215
IIIHIH III United States Patent 19 11 USOO5156489A Patent Number: Replogle 45) Date of Patent: Oct. 20, 1992 54 ADJUSTABLE FLUME 4,195,519 4/1980 Replogle et al.... 73/215 4,467,645 8/1984 Murphee... 73/25
More informationStop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977
Stop Gates & Stop Logs Series 500 Manufacturing high quality gates since 1977 ine Stop Gates & Stop Logs Series 500 Contents Stop Gate Introduction 3 Model 501 3 Model 503 4 Model 503-C 4 Stop Gate Specification
More informationMobile Weapons Storage System Specifications
Mobile Weapons Storage System Specifications Whatever your weapon storage needs, Hi-Density s customized Weapons Storage System will be designed to fit your unique specifications. We recognize that security
More informationACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE
acorn WIRE ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES 10 22 13 WIRE MESH PARTITION 10 22 16 FOLDING GATE GUIDE Page 4 / 5 No. 130A All wire type for normal industrial use. 7, 8, 9, 10 and
More informationMidwest Roadside Safety Facility
19'-11 1/2" 6083 239'-11 1/2" 73139 Impact 1100C 25 43 5/16" 1100 upstream from the upstream face of the first shear fender downstream of the joint between barrier nos. 7 and 8 Upstream End Downstream
More informationASSEMBLY AND OPERATING INSTRUCTIONS FOR MODELS SD1200 AND SD2000
ASSEMBLY AND OPERATING INSTRUCTIONS FOR MODELS SD1200 AND SD2000 WARNING: The watercraft ramp you have purchased has certain hazards associated with it s use. Never stand behind a watercraft while it is
More informationMETAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.
METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.
More informationMECHANICAL ASSEMBLY John Wiley & Sons, Inc. M. P. Groover, Fundamentals of Modern Manufacturing 2/e
MECHANICAL ASSEMBLY Threaded Fasteners Rivets and Eyelets Assembly Methods Based on Interference Fits Other Mechanical Fastening Methods Molding Inserts and Integral Fasteners Design for Assembly Mechanical
More informationThe New Unrivalled SRB Titan Magnet Clamps & Spartan Composite Adjustable Sideforms
SRB PRECAST FORMWORK The New Unrivalled SRB Titan Magnet Clamps & Spartan Composite Adjustable Sideforms Australian Designed and Manufactured to suite Robust and Demanding requirements of the Precast Industry.
More informationorthwest Corrosion Engineering
January 27, 2015 N orthwest Corrosion Engineering Mr. William Davis, P.E. City of Bremerton 3027 Olympus Drive Bremerton, WA 98310 10995 Warfield Road, Sedro-Woolley, WA 98284 Phone: (360) 826-4570 Fax:
More informationWELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1
WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.
More informationFENCE INSTALLATION GUIDE 6 HIGH FENCE
FENCE INSTALLATION GUIDE 6 HIGH FENCE 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationCINTRALUX ALU BARREL VAULT EP 10/10
CINTRALUX ALU BARREL VAULT EP 10/10 Installation instructions EN 14963 Artn 43984 E_MH_Cintralux EP 10/10 mm AG.PLASTICS QUALITY 1 Installation instructions Cintralux aluminium barrel vault: Cintralux
More informationCENTER WING SECTION (CWS) WORK REPORT
CENTER WING SECTION (CWS) WORK REPORT No. Check Parts / Description Qty PHASE 1: Preparations 1 [ ] 6V1-3 Rear ribs 2R & 2L 1 [ ] L Angle 6 2 [ ] 6V2-1 Rear Ribs.032 2R & 2L 2 [ ] 6V5-1 Gear Rib Doubler
More informationPAT installation of a Sun Dome over a in-ground
PAT. 3766573 Installation of Sun Domes for in-ground pool GENERAL INSTRUCTIONS: STEP 1. Read thru the entire instructional materials before beginning any installation. You will find that the installation
More informationH20 Beam for Elevated Slabs Application Guide
H20 Beam for Elevated Slabs Application Guide A WORD ABOUT SAFETY High productivity depends on safety; even a minor accident causes job delays and inefficiency, which run up costs. That s why Symons, in
More informationProject: # Solano Community College District
ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District
More informationEngineering Graphics. Class 2 Drafting Instruments Mohammad Kilani
Engineering Graphics Class 2 Drafting Instruments Mohammad Kilani Drafting Instruments A Design is as good as its instruments A engineering drawing is a highly stylized graphic representation of an idea.
More informationRoof Only Lean-to Instruction Manual
Roof Only Lean-to Instruction Manual for 10 x 20 2 x 8 /10 6 covers Our unique assembly process quickly transforms the individual pieces into a finished structure that will give you a lifetime of service.
More informationSHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail
SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts
More informationTECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic
TECHNICAL MANUAL OPTIMAJOINT Free Movement Joint Free Movement Joint System for Heavy Traffic Version: PEIKKO GROUP 12/2018 OPTIMAJOINT Free Movement Joint Free Movement Joint System for heavy traffic
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationVersatrac R-System Stock Extrusions, Clips and Accessories
Versatrac R-System Extrusions are available in 300 series (for 3 3/4" walls) and 400 series (for 4 7/8" walls). Standard finishes are Satin Metallic Bronze, Satin Black, Satin White Baked Enamel, and Clear
More informationPioneers in Gate Design
Stop Logs Pioneers in Gate Design Hydro Gate 3888 E. 45th Ave. #120 Denver, CO 80216 Your Source for Water Control Gates No matter what type of gates your project demands, chances are excellent Hydro Gate
More informationInstallation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation
Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation
More informationModular Shelter Breezeway Assembly Instructions
Modular Shelter Breezeway Assembly Instructions Hardware Kit 76900188 THANK YOU FOR PURCHASING THIS PRODUCT Behlen Country has been in the business of providing quality products for more than 75 years.
More informationC. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.
SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationBBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105
BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,
More informationFENCE INSTALLATION GUIDE 8 HIGH WALLS
FENCE INSTALLATION GUIDE 8 HIGH WALLS 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative
More informationThe Compound Gothic Design
The Compound Gothic Design You are building the Template Hoop, after it is completed all tubing can be precut and remaining hoops assembled on top of this template hoop, one at a time. Don t build and
More informationBarrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm
of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm Steel tube Ø 76, Ø 89, 70 x 70 mm with welded steel cap approx. 900 mm above ground, total length 1400 mm hot-dip galvanized and yellow coated with black stripes
More informationYOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual
YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual [USA Fireplace Models [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE MODELS: STAND ALONE 7565 CURVED TUNNEL DOUBLE
More informationNote Pad Holder. Tools:
Note Pad Holder Name: Date: Description: The note pad holder is a cold metal project that involves layout skills and sheet metal fabrication skills Materials: 3 1/8 x ¼ Aluminum Pop Rivet 18 ga. Galvanized
More informationDouble Storey HC Precast System Drawing - 3D
Double Storey HC Precast System Drawing - 3D Superstructure ( Frame & Wall ) : - By HC Precast System Sub- Structure By Other : - Appointed By Client 77 % 23 % INDUSTRIALISED BUILDING SYSTEM ( IBS ) is
More informationFABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as
FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as you fabricate it. Our CCM is as easy to fabricate as wood:
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More information5. Outdoor equipment. Barrier posts. Stainless steel
5. Outdoor equipment Urban Equipment Building Equipment 5.1 Bicycle stands / lean-on hoops 252-262 5.2 Laundry drying stands 263 5.4 Litter bins 264-265 5.5 Planters 266 Aufpreis: 40,00 Euro 251 Bicycle
More informationCablelink Plus Flush Technical
Cablelink Plus Flush Technical 107 technical hotline +44 (0)1268 563720 screeded floor systems is designed to provide power and data distribution highways in screeded floors. The robust system offers a
More informationSECTION LOW PRESSURE DUCTWORK
SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation
More informationUSER S MANUAL. Horizontal inclinometer system Model TES-AN-25H
USER S MANUAL Horizontal inclinometer system Model TES-AN-25H Doc. # WI 6002.82 Rev. 01 Printed May 2011 System description & method statement for installing ABS casing (Model TES-AN-25H horizontal inclinometer
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationPRO Series Brakes Operating Instructions
PRO Series Brakes Operating Instructions Tapco Products Company PRO Brake System PRO Cut Off Gauge Simplifies cutting. PRO Cut-Off Quickly, safely, and easily makes factory quality cuts in coil stock,
More informationSide "C" Stake here. Side "B" Here Shirley and I are setting up a 10 X 16 ground work.
Choosing the Location It is always best to locate your greenhouse so that it can receive maximum sunlight at all times of the year especially in winter months. If Possible orient the long side towards
More informationINVICTA PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS
INVICTA PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS INVICTA PENSTOCK RANGE Invicta is a well established, service driven company offering complete valve, penstock and actuator solutions. Invicta Valves was formed
More informationPENSTOCKS Sluice Gates
Sluice Gates PENSTOCKS ENGINEERED FOR WATER SİSMAT ULUSLARARASI is a well-known penstock supplier, manufacturing high quality, high performance water control gates for all industries as standard designs
More informationSCI-FAB Product Specifications. Casework Section 1. Part 1 General
SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.
More informationCertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High
CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers
More informationBuildPro Welding Tables
Introducing the new BuildPro Welding Tables The affordable, professional BuildPro Welding Tables are setting a new standard in price and performance. Plates can be reconfigured to extend the width of the
More information