MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 01 / 31 / 2018

Size: px
Start display at page:

Download "MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 01 / 31 / 2018"

Transcription

1 PINNEY LIBRARY UPDAE 01 / 31 / 2018

2

3 CURREN IMELINE

4 IMELINE PROGRAMMING/ PRE-DESIGN 1 SCHEMAIC DESIGN 2 DESIGN DEVELOPMEN 3 CONSRUCION DOCUMENS 4 BIDDING AND CONSRUCION 5 Studies the world of possibilities, set aspirations, and identifies the major ideas to move forward. Blends the project goals, design thinking, and physical realities into spatial concepts. Pushes the spatial concepts into reality by defining specific forms, materials, and building systems. Develops detailed drawings that provide instruction about assembling the building s various components. Delivers documents for selection of contractor and ensures original design vision is maintained during construction.

5 IMELINE ask Name Duration Start Finish Predecessors Step 4 - Design Development 13 wks Mon 11/20/17 Fri 2/16/ A/E Produces DDs 11 wks Mon 11/20/17 Fri 2/2/ City/Library DD Review 2 wks Mon 2/5/18 Fri 2/16/ DD Cost Estimate 2 wks Mon 2/5/18 Fri 2/16/18 2 Step 5 - Construction Documents 13 wks Mon 2/19/18 Fri 5/18/ a A/E Produces CDs 10 wks Mon 2/19/18 Fri 4/27/ a City CD Review 1 wk Mon 4/30/18 Fri 5/4/ b State DSPS Review/Approval 1 wk Mon 4/30/18 Fri 5/4/ c BPW Approval of Plans/Specs 0 wks Wed 5/16/18 Wed 5/16/ AE Completes Bid Verification 1 wk Mon 5/7/18 Fri 5/11/ City/AE Bid Verification Review 1 wk Mon 5/14/18 Fri 5/18/18 10 Step 6 - Bidding + Contract 13 wks Mon 8/6/18 Fri 11/2/ Bid Advertisement 6 wks Mon 8/6/18 Fri 9/14/ DCR/AA SBE Review 1 wk Mon 9/17/18 Fri 9/21/ BPW Approval 1 wk Mon 9/24/18 Fri 9/28/ CC Approval 2 wks Mon 10/1/18 Fri 10/12/ Contract Routing 1 wk Mon 10/15/18 Fri 10/19/ Start Work Letter 2 wks Mon 10/22/18 Fri 11/2/18 17 Step 7 - Construction 39 wks ue 2/19/19 Mon 11/18/ Construction - Construction 33 wks ue 2/19/19 Mon 10/7/ Construction - Furn/Shelve Install + Mov 6 wks ue 10/8/19 Mon 11/18/19 20 PINNEY NEIGHBORHOOD LIBRARY DRAF SCHEDULE arter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 5/16

6

7 PROJEC GOALS Provide a flexible, interactive, and technology-rich platform for the community Sustain and support a high level of interaction between patrons and staff Emphasize collections prominently, whether print or digital, in every space Foster community collaboration and cultural inclusion Promote early literacy

8 WHA HAVE WE HEARD? EMERGING HEMES INCLUSION WELCOMING HEALING ENVIRONMEN QUIE READING/SUDY SPACES CREAE SPACES WARM AND INVIING CONNECION O HE OUDOORS

9 EXISING BUILDING SHELL

10 SIE PLAN 1 OUDOOR EVENS SPACE 1 1 NEW PINNEY LIBRARY 1 VEHICULAR ACCESS 1 SIE PLAN C-1.1 1" = 20' SERVICE ACCESS BIKE RAIL ACCESS PEDESRIAN ACCESS C-1

11 SHELL SPACE FLOOR PLAN LOADING DOCK SERVICE ENRY DRIVE HRU BOOK DROP OUDOOR BIKE GARDEN / PAIO PARKING LO PEDESRIAN ENRY F.E.C. NEW PINNEY LIBRARY ~20,500 SF SHARED ARIUM INERIOR BOOK DROP COAGE GROVE RD PEDESRIAN ENRY

12 NEW vs. OLD PROGRAM COMPARISON ~20,500 GSF - PROPOSED PROGRAM ~10,000 GSF - EXISING PROGRAM ADUL SCHOOL AGED CHILDREN S 800 SF - PROPOSED 84 SF - EXISING 5,340 SF - EXISING 7,900 SF - PROPOSED CHILDREN S 750 SF - EXISING 2,900 SF - PROPOSED SUDY CHILDREN S PROGRAM PUBLIC ECHNOLOGY SAFF & CIRCULAION UNASSIGNED 2,550 SF - PROPOSED 1,115 SF - EXISING 610 SF - PROPOSED 0 SF - EXISING 1000 SF - PROPOSED 0 SF - EXISING 560 SF - PROPOSED 500 SF - EXISING 755 SF - PROPOSED 540 SF - EXISING 3,140 SF - PROPOSED 1,675 SF - EXISING

13 ADJACENCY DIAGRAM DRIVE-HRU BOOK DROP BIKE PAVILION 761 SF SAFF BREAK 184 SF SAIR A LOCKERS SAFF RES 91 SF DRIVE HROUGH BOOK REURN 206 SF PROGRAM GARDEN/ PAIO DELIVERIES SAFF OPEN 221 SF SUPERVISORS 201 SF PROJEC WORK AREA 576 SF YOUH SERVICES 100 SF PLAYLAB PROGRAM 178 SF 815 SF 2124 SF SCHOOL AGED SHIPPING/ RECEIVING 302 SF & PLAY LAB 3878 SF 648 SF VESIBULE I F.E.C. SAIR C ENCLOSURE 228 SF FAMILY RES 90 SF NEW MOMS 88 SF FAMILY 90 SF HOLDS 147 SF SAIR B SF 1210 SF PUBLIC RESS 547 SF SERVICE POIN SELF CHECK CIRCULAION 173 SF SORING / SAFF WORK 520 SF MECH. ARIUM ADUL QUIE READING 661 SF ADUL S 7513 SF BOOK DROP CREAOR SPACE CREAOR SPACE LIBRARY ENRY 276 SF 74 SF ERRACE 245 SF 4 PERSON SUDY 137 SF 4 PERSON SUDY 137 SF 4 PERSON SUDY 136 SF SMALL UNCONFERENCE 144 SF ERRACE 639 SF

14 CONCEP DEVELOPMEN OPION 1 OPION 2 OPION 3

15 DESIGN VOCABULARY NAURAL SHAPES & FORMS CONNECION O NAURE NAURAL PAERNS COHESIVE INERIOR AND EXERIOR SPACES SIMPLE MAERIALIY

16 INIIAL CONCEP PLAN PROGRAM BIKE PAVILION DRIVE-HRU BOOK DROP 854 SF REF. BREAK 180 SF SAIR A SAFF RES / SHW 83 SF DRIVE-HRU BOOK REURN 166 SF MECH CHASE RAISED PLANER BED GARDEN/ PAIO 2124 SF 64 SEAED KIDS SAFF OPEN 429 SF PROJEC WORK AREA 601 SF WALL YOUH SERVICES 163 SF PROGRAM 155 SF MECH CHASE ENCLOSURE COPIER/ SUPPLIES CAR CAR 178 SF SHIPPING/ RECEIVING 267 SF I 127 SF PLAYLAB + PLAYLAB 3457 SF SCHOOL AGED 925 SF SAIR B F.E.C. VESIBULE SAIR C 88 PEOPLE SEAED FAMILY RES 81 SF NEW MOMS 81 SF FAMILY 72 SF SUPERVISORS 147 SF AV CLOSE PUBLIC RESS 370 SF SERVICE DESK BUSINESS CENER HOLDS CIRCULAION 171 SF SORING / AMH 387 SF MECH CLOSE 51 SF ARIUM SF SF ADUL 7859 SF SELF CHECK BOOK DROP POWER/ DISPLAY WALL 489 SF 36 SF CREAOR SPACE MECH CHASE ERRACE 245 SF ERRACE 639 SF 269 SF 4P SUDY 4P SUDY 4P SUDY SMALL UNCONFERENCE 124 SF 124 SF 126 SF 127 SF

17 MICRO-PROGRAMMING AND SPACE VALIDAION GENERAL EQUIPEMEN, AND MISCELLANEOUS APPLIANCES O BE PROVIDED BY OHERS. P: F. All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc. shall retain all common law, statutory and other reserved rights, including the copyright thereto OPN Architects, Inc. Owner S Project R Q P N ABLE RACKS M L A B C D E LIBRARIANS O HAVE DESK PHONE PHONE A LA WORK AREA PHONE SUPERVISORS SAFF OPEN SF ENCLOSURE ENCLOSURE Z10 LIGHING O HAVE DIMMING CAPACIY K INEGRAED CRESRON SYSEM (LIGHING AND A/V) ACOUSICAL / FABRIC PANEL 582 SF MOVEABLE PARIION J WIRELESS SOUND SYSEM H G F E IF COA REQUIRED, FURN. IS REDUCED OPN O PROVIDE FURN. LAYOU POSSIBLE AR DISPLAY MAILBOXES A CIRC DESK folding coat rack KICHENEE & POSSIBLE AR DISPLAY LOCAION MECH CHASE REF. BREAK SF SUPERVISOR'S SF CAR 126A 20 SF 114A 205 SF ADUL QUIE READING SF SAIR A PROJEC WORK SF 30 lockers SHIPPING/ RECEIVING 126 door access storage 314 SF JANIORS CLOSE SF YOUH SERVICES 136A 163 SF PLAYLAB SF I SF SOUHWES ERRACE EX SF MECH CHASE SAFF RES / SHW SF LED SCREEN LED SCREEN WRIABLE RERACABLE SURFACES WIH ACKABLE PANELS (MAGNEIC?) DIVIDER kitchenette 96 PEOPLE SEAED MOORIZED SCREEN WIH CEILING PROJECOR CAMERA WIH WEB VIDEO MOVEABLE SHELVING AND FURNIURE IN HIS AREA - PRE/POS FUNCION SPACE PODIUM PROGRAM 136B 155 SF SF A/V DRIVE-HRU BOOK REURN SF POSSIBLE AR DISPLAY POSSIBLE AR DISPLAY INFORMAL SROLLER PARKING wirelessly project ipad to screen - speakers in screen - wirelessly play music without screen being on from ipad FAMILY RES SF PUBLIC RESS SF NEW MOMS SF RES CODE REVIEW UNDERWAY PROGRAM SF COA HOOKS 64 - EAMES SEAED KIDS COLUMN O BE CAPURED IN RR WALL clusters of 3 or 4 - sim to Seq. Lib. - computing clusters closer together crestron system? LED screen - HDMI connected + PLAYLAB SF FAMILY SF toy storage -possibly above computers - colors / drawings - locked and unlocked cabinet not req'd MECH CHASE staff controlled shades SERVICE DESK laptop storage? dimmable lighting in program room and large community room DOUBLE DUY AS 'CLINICIAN SPACE' CHAIR O BE ADDED CONFIRM NO DOORS NEEDED SROLLER PARKING SELF CHECK SAION FEL BOARD PANEL WHIE BOARD PANEL * CONFIRM CARPE 2 LAPOP - 2 positions LOCAIONS - Able to stand up - ADA ransaction ADUL Surface as well FICION/NON-FICION - Visible to Patrons SF -Storage possibilities behind 12 computers needed NEED O CONSIDER W/ COMPUING no NORH GARDEN/ PAIO EX SF computer cluster for school aged children closer to entry of children's BES SELLERS (HIGH URNOVER) POSSIBLE AR DISPLAY BIKE PAVILION why 42" 42" DOUBLE DOORS WIH CARD ACCESS print station copier layout space 2 flatbed scanners * *laptop shift to the east - away from entry to restrooms for social /work comfort DIGIAL DISPLAY WALL SELF CHECK HOLDS SF SELF CHECK SAION check PROVIDE / RECYCLE playlab service point? - hotel station - not always staffed - can it do double duty / summer reading registration should not be prime focus - coordination ongoing SCHOOL AGED SF 2 stations + ipads * DOOR SELF CHECK SORING / CIRC. WORK SF CIRCULAION SF circ desk SANDING HEIGH RANSACION SURFACE tables similar to downtown - stools VERIFY HOSE BIB LOCAIONS AND ELECRICAL LOCAIONS CREAOR SPACE SF SOUHEAS ERRACE EX SF SAIR B 2 COMPUER WORK SAIONS (HOEL SAION FOR CLERK) 2 CARS 2 SAFF POSIIONS SF MECH CLOSE SF DIGIAL DISPLAY WALL 103A 36 SF MECH CHASE ACIVIIES INCLUDE: OUDOOR MOVIES WAER PLAY ANJIPLAY PICNIC ASROURF/WOOD CHIPS? SNOWMAN MAKING GARDENING / PLANER SPACES OPN O WORK WIH LIBRARY SAFF ON HOW S MIGH WORK WIH CURVED SHELVING F.E.C. 101A 107 SF VESIBULE SF POSSIBLE AR DISPLAY OR LOCAION DIGIAL SCREEN - OUCH SCREEN? CONFIRM NEED OPENING ARIUM 2 WORK SAIONS 101 CASH 1923 SF FOR PROCESSING RANSACION AND 2ND SAFF POIN 7 OR 8 CARS FOR PRESHELVING 2 EXRA CARS SLIDING DOOR? - OPN O UPDAE DIGIAL DISPLAY WALL IN LIEU OF POWERWALL - MPL O CONFIRM WRIABLE SURFACE ON MOVEABLE GLASS WALL SAIR C MORE HOLDS SHELVING 30% NO FUNCIONAL MORE HOLDS CHECK-IN BUCKES - SPACE FOR 3 RED CARS OF BUCKES SLIDING W/ BREAKOU PANELS NO LONGER MOVABLE WRIABLE SURFACE E HAVE ASKED FOR SPECS ON BUBBLER ABLES NESING ABLE AND CHAIRS 36" screens - pinney to verify LARGE DOUBLE SINK 22" X 20" HARD FLOORING A B C D PINNEY BRANCH LIBRARY MEP/ Engineer IMEG 1800 DEMING WAY, SUIE 200 MADISON, WI P F Key Plan Revision Date F ACCESS O ERRACE F MOORIZED SCREEN WIH CEILING PROJECOR D LED SCREEN WIH A/V PLUG IN 4P SUDY SF 4P SUDY SF laptop bar - standing height 4P SUDY SF SMALL UNCONFERENCE SF LED SCREEN WIH A/V PLUG IN GARBAGE AND RECYLE IN WALL POSSIBLE ADDIIONAL IN ENCLOSURE SOLAR POWERED WIFI WALL V W/ GREEN SCREEN MAY BE BEER. WHY PROJECOR?

18 FLOOR PLAN SAFF RES / SHW DRIVE-HRU BOOK REURN PROGRAM BIKE PAVILION SUPERVISOR'S SAIR A SAFF OPEN PROJEC WORK NORH GARDEN/ PAIO SCHOOL AGED BREAK ENCLOSURE 1 SHIPPING/ RECEIVING I LIBRARIAN S 2 NEW MOHERS PROGRAM FAMILY RES JANIORS CLOSE PUBLIC RESS PLAYLAB FAMILY SUDY HOLDS / BUSINESS CENER REFERENCE ADUL FICION/NON-FICION CIRCULAION SORING / CIRC. WORK SAIR B F.E.C. MECH CLOSE VESIBULE ARIUM SAIR C YOUNG ADUL ADUL SUDY/CONFERENCE PROGRAM SAFF/SUPPOR CIRC DESK/SELF-CHECK OUDOOR PUBLIC UNASSIGNED ADUL QUIE READING CREAOR 4P SUDY 4P SUDY 4P SUDY SMALL UNCONFERENCE SOUHEAS ERRACE CREAOR SPACE

19 FLOOR PLAN SAFF RES / SHW DRIVE-HRU BOOK REURN PROGRAM BIKE PAVILION SUPERVISOR'S SAIR A SAFF OPEN PROJEC WORK NORH GARDEN/ PAIO SCHOOL AGED BREAK ENCLOSURE SHIPPING/ RECEIVING I LIBRARIAN S NEW MOHERS PROGRAM FAMILY RES JANIORS CLOSE PLAYLAB FAMILY SUDY HOLDS / BUSINESS CENER SAIR B F.E.C. VESIBULE SAIR C 1 2 REFERENCE CIRCULAION SORING / CIRC. WORK MECH CLOSE ARIUM PUBLIC RESS ADUL FICION/NON-FICION ADUL QUIE READING CREAOR 4P SUDY 4P SUDY 4P SUDY SMALL UNCONFERENCE SOUHEAS ERRACE CREAOR SPACE

20 Next Steps Explore interior finish palette Integrate design and finish palette throughout library Continue coordinating Mechanical, Electrical, Plumbing, and elecommunications Complete construction documents and specifications from which the project can be built

21 QUESIONS

22

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY CURRENT TIMELINE TIMELINE MADISON LIBRARY PINNEY MING/ PRE-DESIGN 1 SCHEMATIC DESIGN 2 DESIGN DEVELOPMENT 3

More information

CAC MEETING, FEB. 28 TH, 2017 NADAAA

CAC MEETING, FEB. 28 TH, 2017 NADAAA ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL

More information

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized

More information

2600 Capitol Avenue Suite 200 Sacramento, CA phone fax

2600 Capitol Avenue Suite 200 Sacramento, CA phone fax 26 Capiol Avenue Suie 2 Sacrameno, CA 9816 916.64.4 phone 916.64.41 fax www.esassoc.com memorandum dae Sepember 2, 216 o from subjec Richard Rich, Ciy of Sacrameno; Jeffrey Dorso, Pioneer Law Group Brian

More information

ADDENDUM 2 Addendum No ELS Project No

ADDENDUM 2 Addendum No ELS Project No ADDENDUM 2 Addendum No. 2 11-13-2017 ELS Project No. 201707 PROJEC: OWNER: CONRAC: ARCHIEC: Bonita House Berkeley Wellness Center Bonita House Inc. Issue Set ELS Architecture and Urban Design Description:

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

Reuse Inventory: 309 W. Wash, Version 1. Legend. Building Materials. July 26, 2005

Reuse Inventory: 309 W. Wash, Version 1. Legend. Building Materials. July 26, 2005 Madison Environmental Group, Inc. 25 North Pinckney P.O. Box 1607 Madison, WI 53703 608.280.0800 phone 608.280.8108 fax meg@madisonenvironmental.com Reuse Inventory: 309 W. Wash, Version 1 July 26, 2005

More information

VAN BUREN COUNTY TENNESSEE

VAN BUREN COUNTY TENNESSEE VAN BUREN COUNTY TENNESSEE CONSOLIDATED LISTING OF MICROFILMED VAN BUREN COUNTY RECORDS CONSISTING OF ROLLS 1-43, 45-67 and A9296 A9328 Note: I - available through Interlibrary Loan TENNESSEE STATE LIBRARY

More information

THE. Harbor Master ELEVATION 2

THE. Harbor Master ELEVATION 2 THE Harbor Master ELEVATION 2 Additional Elevations ELEVATION 1 ELEVATION 3 Lower Level Patio 28'10" x 12'0" Mechanicals on Raised Platform H Lower Entry HVAC Parking 20'4" x 48'0" Side Entry Garage Side

More information

THE GUTHRIE PRICING SET

THE GUTHRIE PRICING SET DRAWINGS FOR: FOR REVIEW ONLY. Sitework, Planting and Irrigation VICINIY MAP A PROJEC BY INDEX OF SHEES OWNER: ARGYLE RESIDENIAL LANDSCAPE ARCHIEC: BG Partners Reference CONAC: John Burnham 1601 S Mopac

More information

STRLodgingPerformanceSnapshotAugust2017CYTD

STRLodgingPerformanceSnapshotAugust2017CYTD % Occupancy % Occ ADR % ADR RevPAR % RevPAR County Cityof Downtown MissionValey MissionBay LaJola Pt.LomaPeninsula NorthCoastal(UTC,I-5Cor. NorthInland(I-15Coridor) 78.7% 83.4% 8 78. 8 81. 83.7% 8 79.8%

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

Recreation Facility Hours

Recreation Facility Hours NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

Campus GIS (Tsukuba University Campus Geospatial Information)

Campus GIS (Tsukuba University Campus Geospatial Information) Campus GIS (Tsukuba University Campus Geospatial Information) User Manual Draft version 3.0 20130402 Department Homepage http://giswin.geo.tsukuba.ac.jp/sis/jp/ 1 Contents 1. Graphical User Interface 2.

More information

Architecture Firm ID 439 Contract Design I Due: May 4, 2015

Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Project Objectives: 1) To engage in multi-disciplinary collaboration 2) To understand sustainability as it pertains to building methods, materials,

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

The student will create simulations of vertical components of circular and harmonic motion on GX.

The student will create simulations of vertical components of circular and harmonic motion on GX. Learning Objecives Circular and Harmonic Moion (Verical Transformaions: Sine curve) Algebra ; Pre-Calculus Time required: 10 150 min. The sudens will apply combined verical ranslaions and dilaions in he

More information

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP BIM Case Study About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP Coordination Rob Muellner MEP Fabrication Chad

More information

9 EAST Cesar 0 CHAVEZ 1 AUSTIN

9 EAST Cesar 0 CHAVEZ 1 AUSTIN AVAILABLE FOR LEASE u 8,054 Square Fee u Locaed in he hear of booming Eas Ausin 901 Eas Cesar Chavez Sree offers a srong combinaion of locaion, access, placemen, and visibiliy. The propery is ideally-locaed

More information

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13. Simpson, B., & Vardanega, P. J. (2014). Results of monitoring at the British library excavation. Proceedings of the ICE - Geotechnical Engineering, 167(2), 99-116. DOI: 10.1680/geng.13.00037 Peer reviewed

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

Laci Coppins, Photographer Proposal

Laci Coppins, Photographer Proposal Laci Coppins, Photographer Proposal Libraries are an anchor of the community, a third place. As American urban sociologist Ray Oldenburg calls one's "first place," the individuals you live with or the

More information

March 23, 2015 Total Project Cost 18,553,027

March 23, 2015 Total Project Cost 18,553,027 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant

More information

Integrating CFD, VR, AR and BIM for Design Feedback in a Design Process An Experimental Study

Integrating CFD, VR, AR and BIM for Design Feedback in a Design Process An Experimental Study Integrating CFD, VR, AR and BIM for Design Feedback in a Design Process An Experimental Study Nov. 20, 2015 Tomohiro FUKUDA Osaka University, Japan Keisuke MORI Atelier DoN, Japan Jun IMAIZUMI Forum8 Co.,

More information

EDGEWATER COMMUNITY INPUT REPORT

EDGEWATER COMMUNITY INPUT REPORT EDGEWATER COMMUNITY INPUT REPORT NOVEMBER 2017 In 2016, the opportunity for a new and expanded library for Edgewater became a reality when the City offered Jefferson County Public Library (JCPL) 10,000

More information

754 Sir Francis Drake Boulevard

754 Sir Francis Drake Boulevard APN: 006-09 - 39 Town of San Anselmo Submittal Number : April 06 Revised June 0, 06 PROJECT TEAM INDEX TO DRAWINGS APPLICANT MONFREDINI PROPERTIES LLC South San Francisco, California 94080 (650) 873-0440

More information

MONTHLY OPERATING REPORT

MONTHLY OPERATING REPORT LONG ISLAND RAIL ROAD MONTHLY OPERATING REPORT September 2010 Helena E. Williams President 09/27/10***** Page 15 FOR MONTH OF AUGUST 2010 2010 Data 2009 Data Performance Summary Annual YTD thru YTD thru

More information

Start Date. Census Date Delivery Mode EFTSL Unit Fee. End Date

Start Date. Census Date Delivery Mode EFTSL Unit Fee. End Date End Delivery Mode EFTSL Unit Campus: BUNBURY FULL TIME - DIPLOMA ART BUNBURY Unit and Total: $3,253.16 Total: $2,979.60 $273.56 TUESDAY D0631 MAKE A PRESENTATION 19-Jul-16 29-Nov-16 23-Sep-16 Local Class

More information

ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON

ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON MARTIN J. WALSH, MAYOR BOSTON PUBLIC LIBRARY AND PUBLIC FACILITIES DEPARTMENT DAVID LEONARD, PRESIDENT, BOSTON PUBLIC LIBRARY PATRICK I. BROPHY,

More information

ROGERS PARK NEW CONSTRUCTION 6418 N. SHERIDAN RD. 5,842 SF Available Adjacent to CONTACT US FOR LEASE FALL 2018 DELIVERY SPRING 2019 OPENING

ROGERS PARK NEW CONSTRUCTION 6418 N. SHERIDAN RD. 5,842 SF Available Adjacent to CONTACT US FOR LEASE FALL 2018 DELIVERY SPRING 2019 OPENING ROGERS PARK NEW CONSRUCION 6418 N. SHERIDAN RD. 5,842 SF Available Adjacent to FALL 2018 DELIVERY SPRING 2019 OPENING 5,842 SF OF REAL SPACE AVAILABLE CONAC US PEER GRAHAM Vice President +1 312 861 7851

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

HANSCOM FIELD ARFF AND CBP BUILDING

HANSCOM FIELD ARFF AND CBP BUILDING HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

Denton Public Library Technology Assessment Interview. Sara Davis INFO Brittany Barrett. University of North Texas.

Denton Public Library Technology Assessment Interview. Sara Davis INFO Brittany Barrett. University of North Texas. Denton Public Library Technology Assessment Interview Sara Davis INFO 4710.001 Brittany Barrett University of North Texas February 26, 2016 1 Part 1 Denton Public Library Background Information The Denton

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

A Southglen Center. Site Plan scale: 1" = 60'-0" Overland Park, Kansas. a preliminary plan for. 119th & Metcalf. Lot 8 Southglen Center

A Southglen Center. Site Plan scale: 1 = 60'-0 Overland Park, Kansas. a preliminary plan for. 119th & Metcalf. Lot 8 Southglen Center Lo 8 Souhglen Cener Zoning CP- Lo Parcel Legend Lo a c il A Lo 5 n 0 saces Lo 3 3,00 sq. f. 5 saces Lo 4 5,30 sq. f. 97 saces Lo 5 3,46 sq. f. 43 saces Lo 6 6,90 sq. f. 55 saces Lo 6A 3,97 sq. f. 4 saces

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Distributed by: www.jameco.com 1-8-831-4242 The content and copyrights of the attached material are the property of its owner. 35mW SURFACE MOUNT ENER DIODE Features Planar Die Construction 35mW Power

More information

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT 21-22 FIRST QUARTER REPORT Active Cable TV Connections AFN Cable connections in the business plan are projected to be 2,44 by July 22. As of October 31, 21, there are 1,895 connections, which means AFN

More information

SUPPLEMENT 2 TO SECTIONS 14 & 15

SUPPLEMENT 2 TO SECTIONS 14 & 15 assurance. SUPPLEMENT 2 TO SECTIONS 14 & 15 DESIGN SERIES ELEVATIONS SUPPLEMENT - 2 CABINET DESIGN SERIES - CDS THE FOLLOWING CASEWORK ILLUSTRATIONS ARE ADOPTED AS DESIGN STANDARDS AND PROVIDED TO ASSIST

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE

24' - 0 99' - 0 B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE 5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY

More information

SINGAPORE HOTEL RATES VALID FROM NOW - 31MARCH 2016

SINGAPORE HOTEL RATES VALID FROM NOW - 31MARCH 2016 For Reservation Please Call CENTURY TRAVEL CENTRE SDN BHD Tel: +673 2221747 2341747 3331787 Email : century@brunet.bn muaracentury@brunet.bn SINGAPORE HOTEL RATES VALID FROM NOW - 31MARCH 2016 CURRENCY:

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

HURON SHORES GENEALOGICAL SOCIETY (Iosco County Michigan) October

HURON SHORES GENEALOGICAL SOCIETY (Iosco County Michigan) October HURON SHORES GENEALOGICAL SOCIETY (Iosco County Michigan) October 31 2007 1 HURON SHORES GENEALOGICAL SOCIETY (Iosco County Michigan) October 31 2007 2 INDEXERS ARE THE GENEALOGIST S BEST FRIENDS HSGS

More information

Usually use an op-amp circuit Often found as a pre-amplifier to ADC circuitry Simple circuit to computer natural logarithm

Usually use an op-amp circuit Often found as a pre-amplifier to ADC circuitry Simple circuit to computer natural logarithm Connecing he compuaion capabiliies of a microconroller o exernal signals Transforming variable values ino volages and vice-versa Digial and analog Issues How many signals can be conrolled? How can digial

More information

Phase 2 Silver Line Update

Phase 2 Silver Line Update Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017 Safety Since Notice to Proceed: Manpower Hours: 3,280,898

More information

BEDROOM FURNITURE ROLLTOP & FLAT TOP DESKS

BEDROOM FURNITURE ROLLTOP & FLAT TOP DESKS F u r n i t u r e O A K, C H E R R Y, M a p l e & Q u a r t e r - s a w n W h i t e O a k BEDROOM FURNITURE ROLLTOP & FLAT TOP DESKS HUTCHES BOOKCASES The Shaker Collection The Shaker Style is popular

More information

Pictured: Adrienne Queen Sleigh Bed with High Footboard, item is shown here. This furniture was crafted using solid Maple with our #304

Pictured: Adrienne Queen Sleigh Bed with High Footboard, item is shown here. This furniture was crafted using solid Maple with our #304 Adrienne Picured: Adrienne Queen Sleigh Bed wih High Fooboard, iem 10113 is shown here. This furniure was crafed using solid Maple wih our #304 Charcoal sain and our Adrienne sandard hardware, BP19008SS.

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-11 42 00 (January 2008) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED

More information

WHAT TO EXPECT IN 20I8

WHAT TO EXPECT IN 20I8 CALENDAR WHAT TO EXPECT IN METROPOLITAN SURVEYS GfK JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC SURVEY I Tue I3 SURVEY 2 Tue 24 SURVEY 3 Tue 5 SURVEY 4 Tue I0 SURVEY 5 Tue 28 SURVEY 6 Thu 4 SURVEY

More information

Come stay at THE PROSPECTOR CONDOMINIUMS In ASPEN, COLORADO

Come stay at THE PROSPECTOR CONDOMINIUMS In ASPEN, COLORADO Come stay at THE PROSPECTOR CONDOMINIUMS In ASPEN, COLORADO Located in the heart of Aspen. Ski lifts and free skiers shuttle in walking distance. Spectacular mountain views. Includes wood burning fireplaces.

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

Number patterns on a spreadsheet

Number patterns on a spreadsheet A1 SS Number patterns on a spreadsheet This sheet will help you to create your own number patterns on a spreadsheet. Do the steps one at a time. You will soon feel more confident with a spreadsheet program.

More information

RANCH RAIL FENCE AND GATE INSTALLATION INSTRUCTIONS

RANCH RAIL FENCE AND GATE INSTALLATION INSTRUCTIONS Good Fences Make Good Neighbors RANCH RAIL FENCE AND GATE INSTALLATION INSTRUCTIONS HUSKER VINYL Ranch Rail Fence & Gae Insallaion Insrucions 1 BEFORE YOU START, IT S IMPORTANT TO CHECK: Tha fence or he

More information

Revised-Technical Specifications

Revised-Technical Specifications Annex A Revised-Technical Specifications 1. Promotional Materials # a. Print and design Participants Badge supplied with high quality conference neck lanyard (neck strap) and in plastic cover : Strap:

More information

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0 Massport Capital Programs Enterprise Schedule Management Primavera Schedule Toolkit Design January 2018 Version 1.0 Contents 1.0 INTRODUCTION 2 1.1 DISCLAIMER 3 2.0 TOOLKIT SCHEDULE COMPONENTS 4 2.1 SCHEDULE

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

THE RESEARCH OFFICE CAMPUS OF MONTEREY 20 RYAN RANCH 20 RYAN RANCH RD. MONTEREY, CA

THE RESEARCH OFFICE CAMPUS OF MONTEREY 20 RYAN RANCH 20 RYAN RANCH RD. MONTEREY, CA THE RESEARCH OFFICE CAMPUS OF MONTEREY 20 RYAN 20 RYAN RD. MONTEREY, CA LOBBY RE- ENERGIZED Handling Tenants needs with: 208,000 RSF of: Office R&D Interior Lab and Storage High-end MFG/Data areas and

More information

BUILDING FLOOR PLAN HERITAGE 09T MEETINGHOUSE

BUILDING FLOOR PLAN HERITAGE 09T MEETINGHOUSE 2 2 SERVING AREA 3 102 103 104 PRIARY 4 1 AERIALS CENER ECH. FA. RES. SORAGE RESROO - WOEN PLAFOR 8 10 10 CULURAL CENER 10 RESROO - EN RELIEF SOCIEY 14 FA. RES. 22 2 21 20 RISER 4 1 1 18 2 1 1 1 0 1 OHER'S

More information

LEGENDS, DETAILS, & NOTES - TELECOM

LEGENDS, DETAILS, & NOTES - TELECOM 55 urnet Road, Suite 0 Austin, Texas 78756 5.85.0 05 eltway Dr. Addison, TX 7500 97-66-887 COMMUNICATIONS SYSTEM LEGEND FRONT FACE OF WALL OR HOUR FIRE RATED GYPSUM WALL OARD ASSEMLY MAXIMUM /8" CLEARANCE

More information

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS,

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS, http://oac.cdlib.org/findaid/ark:/13030/kt0h4nd9mz No online items PROJECTS, 1984-1995 Finding Aid prepared by Vladimira Stefura Getty Research Institute Research Library Special Collections and Visual

More information

N-Channel Power MOSFET 800V, 0.3A, 21.6Ω

N-Channel Power MOSFET 800V, 0.3A, 21.6Ω N-Channel Power MOSFET 800V, 0.3A, 21.6Ω FEATURES Advanced planar process 100% avalanche tested Fast switching APPLICATION Power Supply Lighting KEY PERFORMANCE PARAMETERS PARAMETER VALUE UNIT V DS 800

More information

1250 E. KALISPELL STREET

1250 E. KALISPELL STREET Franklin Rd LAND AVAILABLE: SIE Kalispell St Adkins Way Parcel Size: Price: Rate: Zoning: Utilities: DEMOGRAPHICS: 207 Population: Avg HH Income: Employees: Median Age: Households:.699 Acres $475,000 $6.42

More information

Tufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS

Tufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS Tufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS Tufftec Lockers Specifications Tufftec Lockers Specifications & Drawings TUFFTEC LOCKERS Solid Plastic Lockers Specifications - Section

More information

Announcement. Allowed

Announcement. Allowed 9//05 nnouncemen Firs es: Sep. 8, Chap. -4 llowed wriing insrumen poce calculaor ruler One 8.5" " paper conaining consans, formulas, and any oher informaion ha you migh find useful (NOT any inds of soluions).

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

National Qualifications

National Qualifications N5 Date December 2013 National Qualifications Mark Graphic Communication Duration 1 hour and 30 minutes Fill in these boxes and read what is printed below. Name Form Class Teacher Mr Todd Class Set 4C

More information

Redwood Empire Quilters Guild Job Description Rev. 08/2010

Redwood Empire Quilters Guild Job Description Rev. 08/2010 Redwood Empire Quilters Guild Job Description Rev. 08/2010 Job Title Quilt Show Voting Board Member Yes Key Responsibilities Tasks Prior to Guild Meeting Conducts monthly quilt show meetings. See detailed

More information

The Confederation Commemorative

The Confederation Commemorative The 1917 3 Confederation Commemorative Leopold Beaudet Admiral Study Group meeting, BNAPEX 2008 (revised in 2018) Introduction Based on a study by Richard M. Morris of the 1917 3 Confederation commemorative

More information

30 COVE ROAD. 30 Cove Road Belvedere, Residential Remodel. ProjectInformation. General Notes. Sheet Index. Cover Shee. r e m p e l ARCHITECTS

30 COVE ROAD. 30 Cove Road Belvedere, Residential Remodel. ProjectInformation. General Notes. Sheet Index. Cover Shee. r e m p e l ARCHITECTS GENERAL NOES :. General notes are an aid to the contractor in understanding the work and should not be construed as being complete in every detail. It is the explicit and specific responsibility the Contractor

More information

TEST (a) Write these numbers in order of increasing size. 12, 7, 15, 4, 1, 10, Circle all the odd numbers.

TEST (a) Write these numbers in order of increasing size. 12, 7, 15, 4, 1, 10, Circle all the odd numbers. 1 TEST 5 1. Complete the picture so that it has 7 dots. 2. What is the number shown? 0 5 10 3. Fill in the missing numbers. 2 + 3 = 4 1 = (c) 3 + 4 = (d) 4 + = 9 (e) 8 = 3 (f) + 7 = 7 4. Write these numbers

More information

N-Channel Power MOSFET 100V, 81A, 10mΩ

N-Channel Power MOSFET 100V, 81A, 10mΩ N-Channel Power MOSFET 100V, 81A, 10mΩ FEATURES Advanced Trench Technology 100% avalanche tested APPLICATION Synchronous Rectification in SMPS High Speed Power Switching KEY PERFORMANCE PARAMETERS PARAMETER

More information

Dimensions. Model Number. Electrical connection emitter. Features. Electrical connection receiver. Product information. Indicators/operating means

Dimensions. Model Number. Electrical connection emitter. Features. Electrical connection receiver. Product information. Indicators/operating means OBE-R-SE Dimensions.8.8 ø..75 7.5 6. 5 6.7 4.9 4. 5.9 ø.6 Model Number OBE-R-SE Elecrical connecion emier Thru-beam sensor wih m fixed cable Feaures 45 cable oule for maximum mouning freedom under exremely

More information

NPN Silicon Planar High Voltage Transistor

NPN Silicon Planar High Voltage Transistor NPN Silicon Planar High Voltage Transistor FEATURES High BV CEO, BV CBO High current gain Compliant to RoHS Directive 2011/65/EU and in accordance to WEEE 2002/96/EC Halogen-Free according to IEC 61249-2-21

More information

N-Channel Power MOSFET 100V, 160A, 5.5mΩ

N-Channel Power MOSFET 100V, 160A, 5.5mΩ N-Channel Power MOSFET 100V, 160A, 5.5mΩ FEATURES Advanced Trench Technology Low R DS(ON) 5.5mΩ (Max.) Low gate charge typical @ 154nC (Typ.) Low Crss typical @ 260pF (Typ.) KEY PERFORMANCE PARAMETERS

More information

N-Channel Power MOSFET 900V, 4A, 4.0Ω

N-Channel Power MOSFET 900V, 4A, 4.0Ω N-Channel Power MOSFET 900V, 4A, 4.0Ω FEATURES Low R DS(ON) 4Ω (Max.) Low gate charge typical @ 25nC (Typ.) Improve dv/dt capability APPLICATION High efficiency switch mode power Supply Lighting KEY PERFORMANCE

More information

MRVARCHITECTS. UASStudentResidenceHal

MRVARCHITECTS. UASStudentResidenceHal MRVARCHITECTS UASStudentResidenceHal ' - 0" 0' - 0" EXISTING PARKING/ CONTRACTOR STAGING 0 GLACIER AVE. #0 JUNEAU, AK 9980 907-8-7 FAX 907-- NEW EXTG. ADA ADA E F G H NEW EXISTING MRV # 0' - 0" ADDITIVE

More information

Oyster Monitoring ( ) Nikki Dix, Pam Marcum, Matt Monroe

Oyster Monitoring ( ) Nikki Dix, Pam Marcum, Matt Monroe Oyster Monitoring (2014-20) Nikki Dix, Pam Marcum, Matt Monroe Oyster Monitoring Objectives 1) Evaluate the status of GTM oysters 2) Estimate ecosystem services Guiding Questions NE FL Oyster Research

More information

Updated Sheet Index for DRC Submittal A0.1

Updated Sheet Index for DRC Submittal A0.1 Sheet Index Landscape Architecture A0.0 Cover Sheet A0.1 Sheet Index A0.2 Enhanced Perspective A0.3 Enhanced Perspective A0.4 Enhanced Perspective A0.5 Enhanced Perspective A0.6 Enhanced Perspective A0.7

More information

MURAL GUIDELINES. Design and Review Criteria for Murals

MURAL GUIDELINES. Design and Review Criteria for Murals MURAL GUIDELINES Design and Review Criteria for Murals Definition: A mural is a painting, mosaic, fresco, or other permanent artwork attached or applied directly to the outside of a structure. Goals: To

More information

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011 As responsible stewards of our facility, this list is maintained by the trustees to identify tasks we need to have completed to keep our church well groomed and attractive to present a welcoming, safe,

More information

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is

More information

Nahz Anvary, CCIM Senior Vice President LIC #

Nahz Anvary, CCIM Senior Vice President LIC # FOR LEASE 606 and 630 Peña Drive in the Mace Ranch neighborhood in East Davis provide a great opportunity to lease ±1,621 or ±1,963 square feet of flex/tech/office/lab space in Davis. These buildings are

More information

TSM6866SD 20V Dual N-Channel MOSFET

TSM6866SD 20V Dual N-Channel MOSFET TSSOP-8 Pin Definition: 1. Drain 1 8. Drain 2 2. Source 1 7. Source 2 3. Source 1 6. Source 2 4. Gate 1 5. Gate 2 PRODUCT SUMMARY V DS (V) R DS(on) (mω) I D (A) 30 @ V GS = 4.5V 6.0 20 40 @ V GS = 2.5V

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

ANASAC, September 20, 2012

ANASAC, September 20, 2012 ANASAC, September 20, 2012 Construction Mark McKinnon Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Antennas

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

TSM V N-Channel MOSFET

TSM V N-Channel MOSFET SOT-23 Pin Definition: 1. Gate 2. Source 3. Drain PRODUCT SUMMARY V DS (V) R DS(on) (mω) I D (A) 60 156 @ V GS = 10V 3 192 @ V GS = 4.5V 2.1 Features Advance Trench Process Technology High Density Cell

More information

CONTENT INTRODUCTION AIM MATERIALS METHODOLOGY. RESULTS and CONCLUSIONS

CONTENT INTRODUCTION AIM MATERIALS METHODOLOGY. RESULTS and CONCLUSIONS INTRODUCTION CONTENT AIM MATERIALS METHODOLOGY RESULTS and CONCLUSIONS Main debae is... Concree or Seel? If concree, why? If no, why? If Seel, why? If no, why? Type of applicaion, Economic concerns, Archiecural

More information

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on

Dimensions. Transmitter Receiver ø2.6. Electrical connection. Transmitter +UB 0 V. Emitter selection. = Light on = Dark on OBE-R-SE Dimensions Transmier.. 7.5 9..5.8 4.9 4 5 M 8.9 7.5 9..5.8 4 5 M 8.9 ø.6 ø.6 Model Number OBE-R-SE Thru-beam sensor wih m fixed cable Elecrical connecion Transmier Feaures BN +UB WH IN Ulra-small

More information