1 Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017

2

3 Safety Since Notice to Proceed: Manpower Hours: 3,280,898 (As of 12/23/2016) Recordable Rate: 0.97 (vs. National Average: 3.30) Lost Time Rate: 0.06 (vs. National Average: 1.70) Current Program Focus: Work adjacent to traffic and within Maintenance of Traffic (MOT) areas Mobile equipment Energized Systems

4 Phase 2 Design Status Design Status Overall: 99% Complete Geotechnical Work 100% Complete Field Survey Work 100% Complete Track Design 100% Complete Systems Design 100% Complete Civil Design 100% Complete Utilities Design 100% Complete Facilities Design (Stations) 99% Complete Wayside Design 100% Complete Structures Design (Aerial Guideway/3 Bridges) 100% Complete

5 Overall Project Status Design and Construction: 52.3% Construction Status: 48.1% Design Status: 99.9%

6 Aerial Guideway: Shafts/Columns/Caps 197 of 197 Shafts: 100% Complete 137 of 137 Round Columns: 100% Complete 54 of 54 Rectilinear Piers: 100% Complete 113 of 113 Caps: 100% Complete

7 610 of 622 Girders Fabricated (98%) 566 of 622 Girders Installed (91%) Aerial Guideway: Girders

8 121 of 177 Decks Poured (68% Complete) Aerial Guideway: Decks

9 Aerial Guideway: Straddle Bents 7 of 8 Straddle Bents Poured (88%)

10 Facilities: Herndon Station Precast (Ongoing) Jul 2016 Jan 2017 Steel Erection Jan 2017 Mar 2017 Mechanical/Electrical/Plumbing Rough-In Jan 2017 Summer 2017

11 Facilities: Reston Town Center Station Precast (Ongoing) Oct 2016 Mar 2017 Steel Erection Mar 2017 May 2017 Mechanical/Electrical/Plumbing Rough-In Jan 2017 Summer 2017

12 Facilities: Innovation Center Station Mechanical/Electrical/Plumbing Rough-In Ongoing Ceiling Rough-In Ongoing Roofing, Skylights Start Jan 2017 Platform Work Start Spring 2017

13 Facilities: Dulles Airport Station Precast & Steel (Ongoing) Sep 2016 Jun 2017 Tunnel Demolition Complete Concrete Masonry Unit Walls Ongoing Mechanical/Electrical/Plumbing Rough-In Ongoing Roofing Start Jan 2017

14 Facilities: Loudoun Gateway Station Cast-In-Place Concrete (Ongoing) Complete Feb 2017 Precast & Steel Jan 2017 Jun 2017

15 Facilities: Ashburn Station Enabling Work (Complete) Aug 2016 Nov 2016 Excavation & Foundations Nov 2016 May 2017 Precast & Steel Apr 2017 Oct 2017

16 Pedestrian Bridges and Pavilions Pedestrian Bridge Drilled Shafts 8 of 32 Pedestrian Bridge Columns 3 of 21 Pedestrian Bridge Caps 2 of 21 Pavilion Concrete Ongoing: Innovation South, Herndon South, Reston North Pedestrian Bridge Span Deliveries & Assembly: Innovation Spans 5 & 8 Pedestrian Bridge Erection start Feb 2017

17 Civil: Wayside Ductbank TPSS 15 Wayside: Active, building set. TPSS 15 Median: Complete TPSS 14 Wayside: Active, complete Q1 TPSS 14 Median: Complete TPSS 13 Wayside: Complete TPSS 13 Median: Active, complete Q1 TBS 6 Median & Wayside: Active, complete Q1 TPSS 12 Wayside: Active TPSS 12 Median: Complete Q TBS 6 Wayside: Start in next 30 days TBS 7 Wayside: Start Jan 2017 TPSS 17 Wayside: Active, complete Q1 TBS 9 Wayside: Start after TBS 10 TBS 10 Wayside: Start Q1 TPSS 18 Wayside: Start Q1 TPSS 18 Median: Active, complete Q1 TBS 11: Start Q2 TPSS 19 Wayside: Active, complete Q1 TPSS 19 Median: Start Q1 TPSS 20 Wayside: Start Q1 TPSS 20 Median: Active, complete Q2 TBS 8: Start Q2-Q3

18 Civil: 34.5 kv Ductbank 118 of 172 Manholes installed 42,043 of 62,300 duct bank installed N07: Tie in to Phase 1 N08: Clean manholes and proof duct N09: North of Innovation Station complete Q1, clean manholes and proof duct. TPSS 15 to Route 28 connection turned over to DVP for cable install. N10: Rudder Rd, Autopilot Drive, Cargo 4 to Dulles Station complete Q2 N97: Greenway Median East of 606 bridge; Connection to Package B Underneath Horsepen Lake N11 & N12: Broad Run bridge to TPSS 20: Active, complete Q2

19 Civil: Utility Crossings Utility Crossing Remaining Work: N11 & N12 Jack & Bores to be completed in Q1: 3 storm, 3 at TBS #8, 3 in yard leads under streams Directional Drill: Beneath Horsepen Lake complete Q1. Airport bores start Q1 Hand Mine: 2 at 606 Station North, 1 at Herndon Station, 1 partial at Reston Station

20 Civil: Storm Drainage Storm/Wet Utilities Upcoming Work: N07: Reston Station interior storm Q2 N08: Herndon Station interior storm Q1, Herndon South C/D Ramp Q1-Q2, DIAAH/DTR median storm Q1-Q2 N09: Innovation N. Pavilion Q1, DIAAH/DTR median storm Q1-Q1 N10: Adjacent to Dulles Station. N96: Pier drain splash pads N97: TPSS #18 to 606 bridge Q1-Q2 N11: 606 North Pavilion 90% complete N11 & N12: Broad Run to 772 Station active Q1-Q2, North 772 pavilion active, South 772 pavilion Q1

21 Civil: Storm Drainage East Segment remaining work 7,250 : Herndon and Reston Station tie-in s, Phase 1 connection, under Fairfax County Parkway. Complete all footers by end of Q1. West Segment start Q1, N97 tall walls started near abutments in median

22 Civil: Storm Drainage Upcoming Work: N07: 48 water line protection slab Q1 N08: Centreville to Monroe turned over to Track. South Herndon utility relocations and grading in Q1 N09: Abutment A to Horsepen turned over to Track N97: Track wall excavation and undercut N12: Ashburn South Pavilion excavation and site work

23 Track: Cable Trough Cast-in-Place Cable Trough Wall in Forms Span 70 Setting Precast Cable Trough between Centerville and Monroe Precast Cable Trough Installed: 18,400 of 85,730 linear feet Cast-in-Place Cable Trough Poured: 6,128 of 38,520 linear feet

24 Track: Direct Fixated (DF) Plinths Direct Fixated Track Plinth: 7,100 of 37,178 track feet poured DF Track Construction Span 98/99 DF Track at TPSS 17

25 Track: Ballasted Dumping Initial Ballast West of Horsepen Stockpiling Continuously Welded Rail (CWR) Strings West of Monroe Welded N08 & N09 rail Placing ballast between Abutment A and Horsepen Bridge

26 Facilities/Systems: Traction Power Substations (TPSS) TPSS 15: Building set; Rough-in and installation; first section of 34.5 kv cable has been pulled to TPSS 15 TPSS 13 Slab poured. Building installation: Jan kv Ductbank installation: TPSS 12, 14, 17, 18, 19, 20, and TBS 6, 9, TBS 10 Ongoing Electrical Grounding: Bridges/Track Wall/Dulles Station Aerial Pier Ongoing

27 Contact Information 198 Van Buren Street Suite 300 Herndon, VA

Linear Scheduling 101. How to create your most-valuable project management tool on a single page.

Linear Scheduling 101. How to create your most-valuable project management tool on a single page. Linear Scheduling 101 How to create your most-valuable project management tool on a single page. 2 The problem with Gantt charts on major projects: Our schedule has 2,638 activities on 61 pages. This doesn

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

adopted in Hong Kong

adopted in Hong Kong Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation

More information

THE TRANSPORTATION ISSUE

THE TRANSPORTATION ISSUE Precast Pavement Perfection // Banking on Precast // California s Precast Express WINTER 2018 THE TRANSPORTATION ISSUE Banking on Precast A variety of precast concrete products will offer the new Bonner

More information

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST SUBSTRUCTURE COMPONENTS ADVANTAGES SCHEDULE INCREASES CONSTRUCTION

More information

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 1 Segmental Bridge Technology Established and Evolving W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 2 Segmental Bridge Topics Addressed Definition of concrete segmental

More information

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first

More information

The $13.2 billion Central Artery/Tunnel Project (CA/

The $13.2 billion Central Artery/Tunnel Project (CA/ PART 2 Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology Paul J. Towell, P.E. Senior Bridge Engineer Bechtel/Parsons Brinckerhoff New York, New York Part 1 of this series of

More information

Amajor transportation infrastructure undertaking, billed

Amajor transportation infrastructure undertaking, billed PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011 I-405 Sepulveda Pass Improvements Project Community Advisory Committee April 28, 2011 1 Major Issues Wilshire Loops (GSA, VA) Mulholland Dr Bridge demolition Completing south side of Sunset Bl Bridge 2

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane Overview of Precast ABC Projects in the Pacific Northwest Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane 1 Techniques Additional prefabrication of units to reduce field timeline Simplify deck installation

More information

2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"

2' x 3' Polymer Pull Box Cover 4'-0 7'-0 24 x 76 Access Opening 3'-6 Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

OpenBridge Modeler: What is it and how can I use it today?

OpenBridge Modeler: What is it and how can I use it today? 2015 Bentley Systems, Incorporated OpenBridge Modeler: What is it and how can I use it today? Steve Willoughby, Senior Application Engineer Agenda: Introducing OpenBridge Modeler OpenBridge Modeler Features

More information

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation Delivering energy safely, reliably, efficiently and affordably. For the past two summers, several substations in the Little Rock area showed low voltages with no

More information

2013 Feeney (2/14) # B. Aluminum Railing Systems

2013 Feeney (2/14) # B. Aluminum Railing Systems 2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0 Massport Capital Programs Enterprise Schedule Management Primavera Schedule Toolkit Design January 2018 Version 1.0 Contents 1.0 INTRODUCTION 2 1.1 DISCLAIMER 3 2.0 TOOLKIT SCHEDULE COMPONENTS 4 2.1 SCHEDULE

More information

Proven precast solutions for every application

Proven precast solutions for every application Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly

TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly COMPUTERS AND STRUCTURES, INC., MARCH 2015 TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD Introduction This document describes the use of the segmental bridge wizard, including functionality, options, and terminology.

More information

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF Through inherited experience of its personnel and through its own projects, DNEC have accumulated over 30 years of precast concrete expertise.

More information

MONTHLY OPERATING REPORT

MONTHLY OPERATING REPORT LONG ISLAND RAIL ROAD MONTHLY OPERATING REPORT September 2010 Helena E. Williams President 09/27/10***** Page 15 FOR MONTH OF AUGUST 2010 2010 Data 2009 Data Performance Summary Annual YTD thru YTD thru

More information

ICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents

ICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents 1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Nov. Dec. Vol. 15 : No. 6 Contents - Articles - Pages (Subject wise Alphabetically Indexed) - 2-3 - Addition of Books - 4 - Reports - 5-15 Prepared

More information

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives. APPENDIX C: MAIN RIVER BRIDGE PLANS The graphics in this appendix depict the Practical Alternatives. NO. DESCRIPTION BY 4:36:17 PM 10/3/2007 STA.10+843.000 \ PYLON 6.000 5.000 (TYP) PYLON ELEVATION 210.000

More information

AASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration

AASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration AASHTO/NSBA Steel Bridge Collaboration G 1.2-2003 Design Drawing Presentation Guidelines AASHTO/NSBA Steel Bridge Collaboration Preface This document is a standard developed by the AASHTO/NSBA Steel Bridge

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Total precast solution for large stadium projects meet tight schedule

Total precast solution for large stadium projects meet tight schedule Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy

More information

UNDERGROUND AND UTILITIES

UNDERGROUND AND UTILITIES ARMTEC.COM UNDERGROUND AND UTILITIES WIDE RANGE OF UNDERGROUND AND UTILITY PRODUCTS DESIGNED FOR DEMANDING INFRASTRUCTURE AND MINING APPLICATIONS UNDERGROUND AND UTILITIES Armtec designs, manufactures

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Bridge Design and Drafting Manual Oregon Department of Transportation

Bridge Design and Drafting Manual Oregon Department of Transportation Bridge Design and Drafting Manual - 2005 SECTION 2: DRAFTING PRACTICES 2.1 COMPUTER AIDED DRAFTING (CAD) 2.1.1 Standard File Format The standard file format for submission of electronic CAD files to the

More information

PQ Data Applications in Con Edison

PQ Data Applications in Con Edison PQ Data Applications in Con Edison John Foglio July 29th, 2014 Power Quality Monitoring System 69 PQ monitors currently installed in our secondary networks 2 Power Quality Monitoring System 135 PQ monitors

More information

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION

More information

Anti-Trust Statement

Anti-Trust Statement Anti-Trust Statement http://www.concrete-pipe.org/ A joint effort of the Texas Concrete Pipe Association and the Texas Department of Transportation What brought this about? The TxDOT organization consists

More information

Subtracting Rational Numbers

Subtracting Rational Numbers . How can you use what you know about subtracting integers to subtract rational numbers? ACTIVITY: Work with a partner. Use a number line to find the difference. a. Then move unit left to end at. Subtract.

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

Comparing Guided Auger Boring Techniques under Challenging Conditions

Comparing Guided Auger Boring Techniques under Challenging Conditions North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TM1-T4-02 Comparing Guided Auger Boring Techniques under Challenging Conditions Matthew

More information

ALL YOUR PRECAST SOLUTIONS

ALL YOUR PRECAST SOLUTIONS PO Box 265 Waverly, WV 26184 304-464-4441 ENERGY PRODUCTS ALL YOUR PRECAST SOLUTIONS UP STREAM MID STREAM DOWN STREAM Carr Concrete began in 1974 as Marietta Wilbert, Inc. of Marietta, Ohio. The only product

More information

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply

More information

STRLodgingPerformanceSnapshotAugust2017CYTD

STRLodgingPerformanceSnapshotAugust2017CYTD % Occupancy % Occ ADR % ADR RevPAR % RevPAR County Cityof Downtown MissionValey MissionBay LaJola Pt.LomaPeninsula NorthCoastal(UTC,I-5Cor. NorthInland(I-15Coridor) 78.7% 83.4% 8 78. 8 81. 83.7% 8 79.8%

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

06/09/54. Theory of Rust

06/09/54. Theory of Rust Theory of Rust 1 Type Of Corrosion Protections - Painting System Polyurethane Base, Epoxy Base, Oil Paint, Fluorine Base Type Of Corrosion Protections - Insulation System Fiberglass, Close cell PE 2 Type

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

WSN in Prague metro. Martin Vaníček - CTU

WSN in Prague metro. Martin Vaníček - CTU WSN in Prague metro Martin Vaníček - CTU WSN installation in Prague - past Test site Near Dejvická metro station (~70m) 8 wireless nodes + Stargate gateway installed 5 nodes + Stargate in one ring 3 nodes

More information

Site Preparation Information for:

Site Preparation Information for: Site Preparation Information for: Product Series - Big Doors Product Type - MultiGlide Door Read these instructions and the Product Safety Information before starting procedure. For: MultiGlide Door Instructions/Videos

More information

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute Accelerated With Bridge Construction Bridges Concrete Segmental William R. (Randy) Cox, P.E. American Segmental Bridge Institute Outline Introduction Precast Segmental Bridges Balanced Cantilever Span-by-Span

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

East African Roofing Systems Ltd.

East African Roofing Systems Ltd. East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable

More information

Hardware Commissioning

Hardware Commissioning Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status

More information

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix A A 1 APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix

More information

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION

More information

Experienced Worker Assessment Blueprint Carpentry

Experienced Worker Assessment Blueprint Carpentry Blueprint Carpentry Test Code: 0207 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Hand Tools Use and maintain fastening and prying tools Use and maintain sawing and cutting

More information

civil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS

civil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS kilform civil product range ESB CCTV Eircom Services Lighting Risers DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS Untrapped Gully Trapped Gully Large Trapped Gully Headwalls

More information

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus University of Rhode Island DigitalCommons@URI Senior Honors Projects Honors Program at the University of Rhode Island 2009 Assessing the Feasibility of Wind Power Production for the University of Rhode

More information

CS 2. Case Study. Grounded in strength.

CS 2. Case Study. Grounded in strength. Payson Utah LDS Temple CS 2 Case Study Grounded in strength. Forterra Structural & Specialty Products Classic, Ornate Design Sculpted In Architectural Precast Project Description Bright and sparkling,

More information

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018 Bank of Japan Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018 Report on the Services Producer Price ( Preliminary Figures for April 2018 ) The Services Producer Price (All

More information

BOX CULVERTS DRAINAGE & WATER MANAGEMENT. v2.1

BOX CULVERTS DRAINAGE & WATER MANAGEMENT. v2.1 BOX CULVERTS DRAINAGE & WATER MANAGEMENT v2.1 FPMCCANN.CO.UK Lisnaskea Magherafelt ARMAGH UddingSton Alnwick Weston Underwood Ellistown Byley Grantham Littleport Wellesbourne Lydney London Cadeby FP McCann

More information

Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013

Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013 NEWS RELEASE Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013 Toronto, Ontario, February 7, 2013 Colossus Minerals Inc. (the Company or Colossus ) (TSX: CSI)(OTCQX:COLUF)

More information

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,

More information

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type

More information

Client Name General Description Date

Client Name General Description Date Client Name General Description Date Town of Bristol, NH Remove existing communication site and install new 80 self-support tower with 7 antennas and new communications shelter JUN/JUL/AUG 2017 Wheeler

More information

Designer s NOTEBOOK WINDOW PANELS

Designer s NOTEBOOK WINDOW PANELS Designer s NOTEBOOK WINDOW PANELS PCI s Architectural Precast Concrete Services Committee explains the finer points of designing architectural panels with window openings Window Panels Offer Many Options

More information

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg Contents F-5-1a Concrete Bollards F-5-1b Concrete Bollards F-5-2 Concrete Bollards with City Logo F-5-3 Cast Iron Bollards F-5-4 Decorative Steel Bollard F-5-5 Swivel P Gate Steel Bollard F-5-6 Steel Bollard

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

Appendix B: Noise Study

Appendix B: Noise Study Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete STORMWATER History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within

More information

ccu-one Products Head office 23, Sicheong-ro 940 beon-gil, Paltan-myeon, Hwaseong-si, Gyeonggi-do, Korea Tel ~7 Fax.

ccu-one Products Head office 23, Sicheong-ro 940 beon-gil, Paltan-myeon, Hwaseong-si, Gyeonggi-do, Korea Tel ~7 Fax. Products CNC Combined Machine of Plasma & Machining CNC Combined Machine of Plasma & Drilling CNC Industrial Plasma Cutting Machine CNC Duct Plasma Cutting Machine CNC Gas Cutting Machine ccu-one Head

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Source 2018 COURSE SCHEDULE SGT. MAJ. PHIL FASCETTI GIVES BACK UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY FEST

Source 2018 COURSE SCHEDULE SGT. MAJ. PHIL FASCETTI GIVES BACK UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY FEST SAFETY Source S AV I N G L I V E S W I T H W O R K F O R C E E D U C AT I O N, P R E PA R AT I O N & A W A R E N E S S Est. 1992 UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY

More information

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1 Wood structures Copyright G G Schierle, 2001-02 press Esc to end, for next, for previous slide 1 Wood Types: Balloon framing (rare) Platform framing Heavy timber framing Advantages: The only renewable

More information

Climate Update March 2006 Meeting

Climate Update March 2006 Meeting Climate Update March 2006 Meeting Nolan Doesken Colorado Climate Center presented at the Joint Meeting of the Flood Task Force & Water Availability Task Force, NRCS, Denver, CO, March 14, 2006 Prepared

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

PRECAST CONCRETE STRUCTURES

PRECAST CONCRETE STRUCTURES PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America RPSEA 09121-3300 3300-05 05 Autonomous Inspection of Subsea Facilities Phase I Final Presentation / Phase II Status Report UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July

More information

HMS VICTORY Nov-12 Front part of second deck, 2x dummy cannon supports, 12 pounder cannon

HMS VICTORY Nov-12 Front part of second deck, 2x dummy cannon supports, 12 pounder cannon HMS VICTORY ISSUE DESPATCH & PAYMENT DATE COVERMOUNT EXTRAS 1 30-Jul-12 Bow frames and 12-pounder cannon Gift 1 - Magnifying Glass 2 30-Jul-12 Bow frames and anchor 3 30-Jul-12 Internal keel and carronade

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

Demonstration of PFR Improvement September ERCOT Operations Planning

Demonstration of PFR Improvement September ERCOT Operations Planning Demonstration of PFR Improvement September 2017 ERCOT Operations Planning Agenda Overview BAL-001-TRE-1 Standard Applicability to Alternative Resources Ancillary Service Products & Dispatch Improvements

More information

Block Foundation. From the 1950s through the 80s. Hydraulically driven. piers provide bearing. for a settling foundation

Block Foundation. From the 1950s through the 80s. Hydraulically driven. piers provide bearing. for a settling foundation RESCUING FIXING A A Block Foundation Hydraulically driven piers provide bearing for a settling foundation From the 1950s through the 80s before poured concrete became the norm many homes in northern New

More information

Installation and Maintenance Manual IM 770-1

Installation and Maintenance Manual IM 770-1 Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready

More information

UQFL426 Torbrek Home Units Collection

UQFL426 Torbrek Home Units Collection UQFL426 Torbrek Home Units Collection Size Contents 391 drawings, 53 photographs, 13 items, 1 display model Architectural drawings, photographs and some associated records relating to the design and construction

More information

Aegis Heavy Capacity 20K Floor Scale

Aegis Heavy Capacity 20K Floor Scale Installation Manual Aegis Heavy Capacity 20K Floor Scale Model(s): PLF-6200-H Series PLF-6200-HQ Series 2002 by Fairbanks Scales Inc. All rights reserved 50224/ SJ4799 Issue 2 08/02 Amendment Record Aegis

More information