Phase 2 Silver Line Update
|
|
- Ethelbert Washington
- 6 years ago
- Views:
Transcription
1 Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017
2
3 Safety Since Notice to Proceed: Manpower Hours: 3,280,898 (As of 12/23/2016) Recordable Rate: 0.97 (vs. National Average: 3.30) Lost Time Rate: 0.06 (vs. National Average: 1.70) Current Program Focus: Work adjacent to traffic and within Maintenance of Traffic (MOT) areas Mobile equipment Energized Systems
4 Phase 2 Design Status Design Status Overall: 99% Complete Geotechnical Work 100% Complete Field Survey Work 100% Complete Track Design 100% Complete Systems Design 100% Complete Civil Design 100% Complete Utilities Design 100% Complete Facilities Design (Stations) 99% Complete Wayside Design 100% Complete Structures Design (Aerial Guideway/3 Bridges) 100% Complete
5 Overall Project Status Design and Construction: 52.3% Construction Status: 48.1% Design Status: 99.9%
6 Aerial Guideway: Shafts/Columns/Caps 197 of 197 Shafts: 100% Complete 137 of 137 Round Columns: 100% Complete 54 of 54 Rectilinear Piers: 100% Complete 113 of 113 Caps: 100% Complete
7 610 of 622 Girders Fabricated (98%) 566 of 622 Girders Installed (91%) Aerial Guideway: Girders
8 121 of 177 Decks Poured (68% Complete) Aerial Guideway: Decks
9 Aerial Guideway: Straddle Bents 7 of 8 Straddle Bents Poured (88%)
10 Facilities: Herndon Station Precast (Ongoing) Jul 2016 Jan 2017 Steel Erection Jan 2017 Mar 2017 Mechanical/Electrical/Plumbing Rough-In Jan 2017 Summer 2017
11 Facilities: Reston Town Center Station Precast (Ongoing) Oct 2016 Mar 2017 Steel Erection Mar 2017 May 2017 Mechanical/Electrical/Plumbing Rough-In Jan 2017 Summer 2017
12 Facilities: Innovation Center Station Mechanical/Electrical/Plumbing Rough-In Ongoing Ceiling Rough-In Ongoing Roofing, Skylights Start Jan 2017 Platform Work Start Spring 2017
13 Facilities: Dulles Airport Station Precast & Steel (Ongoing) Sep 2016 Jun 2017 Tunnel Demolition Complete Concrete Masonry Unit Walls Ongoing Mechanical/Electrical/Plumbing Rough-In Ongoing Roofing Start Jan 2017
14 Facilities: Loudoun Gateway Station Cast-In-Place Concrete (Ongoing) Complete Feb 2017 Precast & Steel Jan 2017 Jun 2017
15 Facilities: Ashburn Station Enabling Work (Complete) Aug 2016 Nov 2016 Excavation & Foundations Nov 2016 May 2017 Precast & Steel Apr 2017 Oct 2017
16 Pedestrian Bridges and Pavilions Pedestrian Bridge Drilled Shafts 8 of 32 Pedestrian Bridge Columns 3 of 21 Pedestrian Bridge Caps 2 of 21 Pavilion Concrete Ongoing: Innovation South, Herndon South, Reston North Pedestrian Bridge Span Deliveries & Assembly: Innovation Spans 5 & 8 Pedestrian Bridge Erection start Feb 2017
17 Civil: Wayside Ductbank TPSS 15 Wayside: Active, building set. TPSS 15 Median: Complete TPSS 14 Wayside: Active, complete Q1 TPSS 14 Median: Complete TPSS 13 Wayside: Complete TPSS 13 Median: Active, complete Q1 TBS 6 Median & Wayside: Active, complete Q1 TPSS 12 Wayside: Active TPSS 12 Median: Complete Q TBS 6 Wayside: Start in next 30 days TBS 7 Wayside: Start Jan 2017 TPSS 17 Wayside: Active, complete Q1 TBS 9 Wayside: Start after TBS 10 TBS 10 Wayside: Start Q1 TPSS 18 Wayside: Start Q1 TPSS 18 Median: Active, complete Q1 TBS 11: Start Q2 TPSS 19 Wayside: Active, complete Q1 TPSS 19 Median: Start Q1 TPSS 20 Wayside: Start Q1 TPSS 20 Median: Active, complete Q2 TBS 8: Start Q2-Q3
18 Civil: 34.5 kv Ductbank 118 of 172 Manholes installed 42,043 of 62,300 duct bank installed N07: Tie in to Phase 1 N08: Clean manholes and proof duct N09: North of Innovation Station complete Q1, clean manholes and proof duct. TPSS 15 to Route 28 connection turned over to DVP for cable install. N10: Rudder Rd, Autopilot Drive, Cargo 4 to Dulles Station complete Q2 N97: Greenway Median East of 606 bridge; Connection to Package B Underneath Horsepen Lake N11 & N12: Broad Run bridge to TPSS 20: Active, complete Q2
19 Civil: Utility Crossings Utility Crossing Remaining Work: N11 & N12 Jack & Bores to be completed in Q1: 3 storm, 3 at TBS #8, 3 in yard leads under streams Directional Drill: Beneath Horsepen Lake complete Q1. Airport bores start Q1 Hand Mine: 2 at 606 Station North, 1 at Herndon Station, 1 partial at Reston Station
20 Civil: Storm Drainage Storm/Wet Utilities Upcoming Work: N07: Reston Station interior storm Q2 N08: Herndon Station interior storm Q1, Herndon South C/D Ramp Q1-Q2, DIAAH/DTR median storm Q1-Q2 N09: Innovation N. Pavilion Q1, DIAAH/DTR median storm Q1-Q1 N10: Adjacent to Dulles Station. N96: Pier drain splash pads N97: TPSS #18 to 606 bridge Q1-Q2 N11: 606 North Pavilion 90% complete N11 & N12: Broad Run to 772 Station active Q1-Q2, North 772 pavilion active, South 772 pavilion Q1
21 Civil: Storm Drainage East Segment remaining work 7,250 : Herndon and Reston Station tie-in s, Phase 1 connection, under Fairfax County Parkway. Complete all footers by end of Q1. West Segment start Q1, N97 tall walls started near abutments in median
22 Civil: Storm Drainage Upcoming Work: N07: 48 water line protection slab Q1 N08: Centreville to Monroe turned over to Track. South Herndon utility relocations and grading in Q1 N09: Abutment A to Horsepen turned over to Track N97: Track wall excavation and undercut N12: Ashburn South Pavilion excavation and site work
23 Track: Cable Trough Cast-in-Place Cable Trough Wall in Forms Span 70 Setting Precast Cable Trough between Centerville and Monroe Precast Cable Trough Installed: 18,400 of 85,730 linear feet Cast-in-Place Cable Trough Poured: 6,128 of 38,520 linear feet
24 Track: Direct Fixated (DF) Plinths Direct Fixated Track Plinth: 7,100 of 37,178 track feet poured DF Track Construction Span 98/99 DF Track at TPSS 17
25 Track: Ballasted Dumping Initial Ballast West of Horsepen Stockpiling Continuously Welded Rail (CWR) Strings West of Monroe Welded N08 & N09 rail Placing ballast between Abutment A and Horsepen Bridge
26 Facilities/Systems: Traction Power Substations (TPSS) TPSS 15: Building set; Rough-in and installation; first section of 34.5 kv cable has been pulled to TPSS 15 TPSS 13 Slab poured. Building installation: Jan kv Ductbank installation: TPSS 12, 14, 17, 18, 19, 20, and TBS 6, 9, TBS 10 Ongoing Electrical Grounding: Bridges/Track Wall/Dulles Station Aerial Pier Ongoing
27 Contact Information 198 Van Buren Street Suite 300 Herndon, VA
University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.
Simpson, B., & Vardanega, P. J. (2014). Results of monitoring at the British library excavation. Proceedings of the ICE - Geotechnical Engineering, 167(2), 99-116. DOI: 10.1680/geng.13.00037 Peer reviewed
More informationLinear Scheduling 101. How to create your most-valuable project management tool on a single page.
Linear Scheduling 101 How to create your most-valuable project management tool on a single page. 2 The problem with Gantt charts on major projects: Our schedule has 2,638 activities on 61 pages. This doesn
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationadopted in Hong Kong
Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation
More informationBRIDGE TYPE CONCEPT EVALUATION
SD44/PLATTE-WINNER BRIDGE CORRIDOR STUDY AND ENVIRONMENTAL ASSESSMENT Agreement No. 410583, Work Order PD-19-16 Project Nos. HP5596(19); P0044()290, PCN 05X0 PROJECT MEMORANDUM BRIDGE TYPE CONCEPT EVALUATION
More informationRecreation Facility Hours
NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV
More informationAccelerated Bridge Construction (ABC) and the Utah Experience
Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology
More informationWelcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR
Welcome Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR HKSAR Government, Highways Department s Contract HY/2011/09 Hong Kong Zhuhai Macao Bridge Hong Kong Link Road 1 Contents
More informationTHE TRANSPORTATION ISSUE
Precast Pavement Perfection // Banking on Precast // California s Precast Express WINTER 2018 THE TRANSPORTATION ISSUE Banking on Precast A variety of precast concrete products will offer the new Bonner
More informationIOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015
IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT No Record Drawing Comments by Veit for this Sheet! FOR FEBRUARY, 2015 VEIT Record Drawings Demolition Project Manager: Jason Mueller Demolition Superintendent:
More informationAmtrak s 138 kv Transmission System that supplies traction power to electric locomotives traveling on the
Word Count: 3039 Replacement of Amtrak s 138 KV Cable through the Baltimore Tunnels Raymond G. Verrelle, PE Amtrak Engineering Department 30 th St. Station, 4 th Floor South Fourth Floor, South Tower Philadelphia,
More informationPRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering
PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST SUBSTRUCTURE COMPONENTS ADVANTAGES SCHEDULE INCREASES CONSTRUCTION
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationDigitally Signed 06/02/2015
Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY
More informationValue Engineering Design Build MODULAR INFRASTRUCTURE
Value Engineering Design Build MODULAR INFRASTRUCTURE VALUE ENGINEERING When infrastructure projects find themselves in densely populated areas, or occur on a site with poor conditions, the opportunity
More informationCustomer Service, Operations and Security Committee. Action Item III-A. May 11, 2017
Customer Service, Operations and Security Committee Action Item III-A May 11, 2017 Art In Transit Reston Town Center Page 3 of 62 Washington Metropolitan Area Transit Authority Board Action/Information
More informationSegmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG
1 Segmental Bridge Technology Established and Evolving W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 2 Segmental Bridge Topics Addressed Definition of concrete segmental
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationThe Big Train Project Status Report (Part 94)
The Big Train Project Status Report (Part 94) Like last month, this month s report will be a look back at the history of one of the scenes on the EnterTRAINment Junction (EJ) layout, showing how it has
More informationEngineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings
Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationCity of Vaughan Engineering Department DESIGN STANDARD DRAWINGS
City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationThe $13.2 billion Central Artery/Tunnel Project (CA/
PART 2 Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology Paul J. Towell, P.E. Senior Bridge Engineer Bechtel/Parsons Brinckerhoff New York, New York Part 1 of this series of
More informationAmajor transportation infrastructure undertaking, billed
PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is
More informationTECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018
TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018 3 4 2 1 1. SOUTH SHORE 2018-2019 SCHEDULE End of June 2018 Temporary reconfiguration of Highway 10 (Sherbrooke direction) Deflection
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationConstruction Tolerances - The following tolerances apply to cast-in-place structures:
00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationPrecast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6
Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its
More informationOverview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane
Overview of Precast ABC Projects in the Pacific Northwest Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane 1 Techniques Additional prefabrication of units to reduce field timeline Simplify deck installation
More informationReport by Customer Service and Operations Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Report by Customer Service and Operations Committee (A) 02-25-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201704 Resolution: Yes
More informationNo limitations to precast
Infra No limitations to precast Haitsma Beton produces a great diversity of precast concrete elements for engineering structures in the infra industry. Our products cover a wide range of standard cross-sections,
More informationPANEL CRIB PIERS AND TOWERS
CHAPTER 17 PANEL CRIB PIERS AND TOWERS Panel crib piers are made of trusses with panels set horizontally or vertically and are normally braced with transoms, sway bracing, rakers, bracing frames, and tie
More informationUnion Station Tunnel Overall DBE Goal Calculation
Bi-State Development Agency of the Missouri-Illinois Metropolitan District Union Station Tunnel Overall DBE Goal Calculation Federal Transit Administration Prepared by: Francoise Lyles-Wiggins Bi-State
More informationHOLLOW CORE PRODUCTS GROUNDED IN STRENGTH
HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"
More informationSuggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees
Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011
I-405 Sepulveda Pass Improvements Project Community Advisory Committee April 28, 2011 1 Major Issues Wilshire Loops (GSA, VA) Mulholland Dr Bridge demolition Completing south side of Sunset Bl Bridge 2
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationOpenBridge Modeler: What is it and how can I use it today?
2015 Bentley Systems, Incorporated OpenBridge Modeler: What is it and how can I use it today? Steve Willoughby, Senior Application Engineer Agenda: Introducing OpenBridge Modeler OpenBridge Modeler Features
More information2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"
Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationEnergy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.
Holland Bottom 500/161/115kV Substation Delivering energy safely, reliably, efficiently and affordably. For the past two summers, several substations in the Little Rock area showed low voltages with no
More information11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition
Successes in Accelerated Bridge Construction Mary Lou Ralls, P.E. Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer) 1 Accelerated Bridge Construction (ABC) Definition Structural & geotechnical
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationABC and Innovative Bridge Construction for Minnesota Local Roads
ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918
More informationSegmental Bridge Construction. Segmental Bridges It s a Construction Technique with Design Implications. Plans Review Group
Structures g Design Plans Review Group Segmental Bridge Construction Segmental Bridges It s a Construction Technique with Design Implications 2010 FDOT/FTBA Construction Conference February 23-24 Orlando,
More informationDesigner s NOTEBOOK DESIGN ECONOMY, PART 3
Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More information2013 Feeney (2/14) # B. Aluminum Railing Systems
2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationUnit 8 Precast Concrete
Part ⅠIllustrated Words and Concepts Figure 8-1 Precast Slabs on a Frame of Precast Columns Figure 8-2 Hollow-core Slabs Supported on Precast Concrete Wall Panels Part Ⅱ Passages Passage A Precast Concrete
More informationVAN BUREN COUNTY TENNESSEE
VAN BUREN COUNTY TENNESSEE CONSOLIDATED LISTING OF MICROFILMED VAN BUREN COUNTY RECORDS CONSISTING OF ROLLS 1-43, 45-67 and A9296 A9328 Note: I - available through Interlibrary Loan TENNESSEE STATE LIBRARY
More informationCTA Blue Line Forest Park Branch Feasibility/Vision Study
CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!
More information6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.
Kentucky Society of Professional Engineers May 23 rd, 2014 Lexington KY Milton Madison Bridge Slide Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Project Partners The Challenge Milton, KY Existing Bridge
More informationJames Luebke, PE Structural Development Engineer WisDOT Bureau of Structures
James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationCOMMERCE METRO CENTER WELCOME Centennial Park Drive & Commerce Park Drive Reston, VA
1850 Centennial Park Drive 11400 & 11440 Commerce Park Drive Reston, VA WELCOME The only Class A office park with direct access to the Silver Line Metro station at Wiehle Avenue Efficient floor plans Finished
More informationMassport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0
Massport Capital Programs Enterprise Schedule Management Primavera Schedule Toolkit Design January 2018 Version 1.0 Contents 1.0 INTRODUCTION 2 1.1 DISCLAIMER 3 2.0 TOOLKIT SCHEDULE COMPONENTS 4 2.1 SCHEDULE
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationMONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2
MONTH : December 2015 PHOTOGAPH NO: 000587 DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2 MONTH : December 2015 PHOTOGRAPH NO: 000588 DESCRIPTION : Concrete Casting for
More informationProven precast solutions for every application
Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major
More information2015 Feeney (8/15) # D. Aluminum Railing Systems
2015 Feeney (8/15) #2012-425D Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationLETTING : CALL : 029 COUNTIES : GOODHUE
PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO
More informationProject Booklet. Structural Drafting with AutoCAD
Project Booklet Structural Drafting with AutoCAD Introduction 1 General Setup 2 Border and Title Block 3 Drafting the Foundation Plan (Plate 1) 8 Drafting the South Elevation (Plate 2) 11 Drafting Section
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More informationEstimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5
Estimation of Fault Resistance from Fault Recording Data Daniel Wong & Michael Tong 2014-November-5 Agenda Project Background & Introduction Fault Resistance & Effect Estimation Algorithm Estimation Results
More informationTARGET FIELD: REMOVING THE VARIABLES THROUGH BIM
TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM contents Introduction Owner s Statement Architect s Statement Contractor s Statement Cast in Place Coordination Structural Steel Working Within the Site
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationCustomer Connection Guide Updates Effective May 2017
This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationd e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
More informationMONTHLY OPERATING REPORT
LONG ISLAND RAIL ROAD MONTHLY OPERATING REPORT September 2010 Helena E. Williams President 09/27/10***** Page 15 FOR MONTH OF AUGUST 2010 2010 Data 2009 Data Performance Summary Annual YTD thru YTD thru
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc.
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationSECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting
SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation
More informationICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Nov. Dec. Vol. 15 : No. 6 Contents - Articles - Pages (Subject wise Alphabetically Indexed) - 2-3 - Addition of Books - 4 - Reports - 5-15 Prepared
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationAPPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.
APPENDIX C: MAIN RIVER BRIDGE PLANS The graphics in this appendix depict the Practical Alternatives. NO. DESCRIPTION BY 4:36:17 PM 10/3/2007 STA.10+843.000 \ PYLON 6.000 5.000 (TYP) PYLON ELEVATION 210.000
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationGENERAL ELEVATION SECTION A-A
NORTH OR WEST Final pavement Elev. m @ roadway 12 352 out to out precast backwall panels Final pavement Elev. m @ roadway SOUTH OR EAST Pile cut-f Elev. m Pile cut-f Elev. m 3:1 3:1 Approx. existing groundline
More informationTECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly
COMPUTERS AND STRUCTURES, INC., MARCH 2015 TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD Introduction This document describes the use of the segmental bridge wizard, including functionality, options, and terminology.
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-27370-5 SOUTH AFRICAN NATIONAL STANDARD Precast concrete manhole sections and components Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001
More information24" Dia. 36" Dia. WE BUILD CONFIDENCE
WE BUILD CONFIDENCE WE BUILD CONFIDENCE PRECAST STRUCTURES SERVE AS KEY COMPONENTS OF OUR UTILITY AND TRANSPORTATION INFRASTRUCTURE. AND MAKING THE INDUSTRY S BEST PRECAST PRODUCTS TAKES DEDICATION, ATTENTION
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010
I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More informationCooke Precast Concrete
Cooke Precast Concrete ACCESS COVERS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationUNDERGROUND AND UTILITIES
ARMTEC.COM UNDERGROUND AND UTILITIES WIDE RANGE OF UNDERGROUND AND UTILITY PRODUCTS DESIGNED FOR DEMANDING INFRASTRUCTURE AND MINING APPLICATIONS UNDERGROUND AND UTILITIES Armtec designs, manufactures
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More informationGrounding for EMC at the European XFEL
Grounding for EMC at the European XFEL Herbert Kapitza, Hans-Jörg Eckoldt, Markus Faesing Deutsches Elektronensynchrotron (DESY) D-22603 Hamburg, Germany Email: herbert.kapitza@desy.de Abstract The European
More information