1 ANASAC, September 20, 2012 Construction Mark McKinnon Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

2 Antennas at the AOS 64 of 66 antennas at the site (25 NA, 16 EA, 23 EU) 53 antennas accepted (24 NA, 16 EA, 13 EU) 44 through AIV All EA antennas conditionally accepted as of Aug 23, antennas at the AOS (18 NA, 12 EA, 10 EU) ANASAC, September 20,

3 Vertex Antennas - I 24 Vertex antennas accepted. DV24 conditionally accepted on Sep 12, 2012 DV25 Panel installation and photogrammetry complete. Acceptance delayed until mid-oct due to late delivery of encoder Tiltmeter replacement Ethanol-based electrolyte freezes at low temperatures Replaced with methanol-based solution Completed on 22 antennas Surface adjuster replacement Over-torqued adjusters caused depressions in antenna surface Revised installation procedure for proper torque Completed on all affected antennas (DV01-DV11)in Aug ANASAC, September 20,

4 Vertex Antennas - II DV25 from Kilgore on Apr 10 (above) DV25 BUS install on Jul 9 (left) Kilgore project team (lower left) Kilgore integration team (below) ANASAC, September 20,

5 Surface Imperfections on Vertex Antennas - I Astro -holography conducted at AOS shows temperature-dependent imperfections in surfaces of some Vertex antennas ( um RMS/deg C) Surface pattern appears astigmatic In some cases, magnitude of astigmatic term approaches 25um RMS However, term is not necessarily a proxy for total surface RMS AEM antennas show similar, but smaller effect (< 0.5 um RMS/deg C) Tests indicate effect not due to subreflector or receiver Tower -holography at OSF also indicates temporal dependence Next steps Correct astro-holography analysis for inadvertent inclusion of holography feed correction and report results as total surface RMS to Vertex Consolidate results on temporal dependence from tower holography and report as total surface RMS to Vertex Vertex committed to resolving problem; test preliminary ideas on DV12 ANASAC, September 20,

6 Surface Imperfections on Vertex Antennas - II Astigmatism component vs temperature, DV08 Difference map of DV02 T = 9.3 C elev = ~20 deg t = 3 hours ANASAC, September 20,

7 Optical Pointing Telescope (OPT) OPTs used to verify pointing performance of antennas. Prototype units now in use for NA and EU antennas OPT design revised to minimize thermal effects Status of 4 remaining units Units 1-3 at OSF Factory acceptance completed at vendor facility in Tucson On-antenna tests for Unit 1 completed; JAO acceptance to be held upon delivery of test report Unit 4 assembled; deliver to OSF after factory acceptance ANASAC, September 20,

8 Nutator Chopping secondary (5) used for total power measurements Delayed due to issues with servo control of secondary and stiffness of mirror back plate Factory acceptance of first unit still scheduled for mid-oct 2012 Anticipate on-antenna tests in Nov Four remaining units to ship to Chile in Jan 2013 Three mirrors at coating vendor (CMA) in Tucson for resurfacing using new 3-layer process. CRE to document changes in nutator performance specifications in preparation. ANASAC, September 20,

9 Site AOS Roads All 67km completed in late Apr JAO acceptance review on Nov 1 AOS Utilities (fiber and electrical power to antenna stations) Utilities work estimated at 85% complete as of Aug 31 Contractor remobilized to site this month after Chilean winter Estimate completion in Dec arbitration cases resulting from termination of original Utilities contract E&K vs AUI: E&K sought ~$5M for profit loss & damages Resolved in AUI s favor on May 30; no reparations due E&K AUI vs E&K insurance company, for refusing to pay performance guarantee (~$1M) on contract termination. Process terminated on Jul 31 with no decision New process to be initiated; use E&K result as supporting evidence ANASAC, September 20,

10 Front End 59 assembled Front Ends (FEs) delivered to Chile (22 EA, 20 NA, 17 EU) NA FEIC assembly status: 20 of 22 NA FEs shipped to Chile 2 remaining units to ship in Sep 2012 Delivery of NA FE components complete! Production of Band 3 CCAs completed in Feb 2012 Production of Band 6 CCAs completed in Aug NA FEs on schedule despite delay caused by ITAR export control issue. NA could not deliver FEs and components or have technical discussions with partners until issue resolved. US Department of State determined that FEs are not subject to ITAR export control on Jun 15 Plan developed to ship FE test measurement system from NA FEIC to OSF Integration of Band 4, 8 & 10 to occur at OSF, instead of EU & NA FEICs ANASAC, September 20,

11 Band 3 CCAs HIA Feb 20, 2012 ANASAC, September 20,

12 Front End Service Vehicle (FESV) FESVs (2) are used to transport FEs to/from AOS antennas/osf. Fabricated in Taiwan FESV1 accepted on Aug 30, 2011 FESV2 accepted Dec14, 2011 ANASAC, September 20,

13 Front End Handling Vehicle (FEHV) Custom cart (4) designed to move FEs between the FESV and antennas Designed and fabricated in Chile CDR on December16 Antenna IPTs confirmed antennas can accommodate additional weight of FEHV In process of verifying maneuverability within AEM antennas Deliver 4 months after delta-cdr Pallet jack used in interim ANASAC, September 20,

14 Backend, Correlator, and Computing Backend (BE) Central Local Oscillator Article completed in Aug 2011 All BE components delivered Correlator Fourth quadrant installed in AOS Technical Building Turnover to CSV to occur on Sep 21 Computing Currently restricted to 32 antenna operation because of memory allocation problem. Software modification underway. Final release of software (R9.1) under the construction project is now in use by CSV R9.1 to be implemented for Cycle 0 observations by Oct 3 ANASAC, September 20,

15 Operations Organization Ops AD M. McKinnon (Interim) NAASC A. Woo&en (Interim) OCA M. Pilleux Off- site Hardware TBD Offsite So;ware B. Glendenning Development B. Randolph Transition of construction staff to operations largely complete Transition was managed & targeted a planned organizational structure Search for NRAO AD for -NA Operations is nearing completion ANASAC, September 20,

16 Construction Budget Project-wide cost to complete exercise is underway Current estimate is budget is sufficient to complete the project Very little margin to cover risk Increased costs in NA Site IPT Unfavorable currency exchange rate Increased scope of work (e.g. gas pipeline crossing) Increased fuel costs Legal fees for E&K arbitrations ANASAC, September 20,

17 Schedule Major remaining milestones End of construction review Oct 2012 Power generation transition Oct 2012 AOS Utilities complete (NA) Dec 2012 Delivery of last FE (EU) Feb 2013 Inauguration Mar 2013 Delivery of last antenna (EU) Jul antennas in service Sep 2013 Residencia complete (EU) Dec 2014 ANASAC, September 20,

ALMA. ALMA Construction Status. Mark McKinnon. ALMA-NA Project Director/Manager September 28, 2011

ALMA. ALMA Construction Status. Mark McKinnon. ALMA-NA Project Director/Manager September 28, 2011 Construction Status Mark McKinnon -NA Project Director/Manager September 28, 2011 Antennas at AOS 18 antennas August 13, 2011 17 antennas August 6, 2011 Total of 44 antennas at the site (21NA, 13 EA, 10

More information

ALMA Interferometer and Band 7 Cartridge

ALMA Interferometer and Band 7 Cartridge ALMA Interferometer and Band 7 Cartridge B7 Cartridge designed, assembled and tested by: S. Mahieu, D. Maier (mixer team lead), B. Lazareff (now at IPAG) G. Celestin, J. Chalain, D. Geoffroy, F. Laslaz,

More information

Atacama Large Millimeter Array Project Status. M. Tarenghi ALMA Director

Atacama Large Millimeter Array Project Status. M. Tarenghi ALMA Director Atacama Large Millimeter Array Project Status M. Tarenghi ALMA Director Atacama Large Millimeter Array Specifications Partners: US (NSF)+Canada (NRC) - ESO+Spain - Chile 64 12-m antennas, at 5000 m altitude

More information

ALMA Assembly, Integration and Verification: Overview and Work Plan

ALMA Assembly, Integration and Verification: Overview and Work Plan SYSE.85.01.00.00-001-A-PLA 2005-03-12 Prepared By: Name(s) and Signature(s) Rick Murowinski, with numerous contributors Organization JAO Page: 2 of 22 Change Record Version Date Affected Paras Reason 0.4

More information

Recreation Facility Hours

Recreation Facility Hours NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV

More information

Time and Frequency Distribution Overview and Issues Rob Selina

Time and Frequency Distribution Overview and Issues Rob Selina Time and Frequency Distribution Overview and Issues Rob Selina Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

More information

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America RPSEA 09121-3300 3300-05 05 Autonomous Inspection of Subsea Facilities Phase I Final Presentation / Phase II Status Report UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July

More information

Metrological Telecommunication System Development Project

Metrological Telecommunication System Development Project Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:

More information

Computing IPT. B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review October

Computing IPT. B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review October Computing IPT B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review 25-28 October 2010 1 Outline Overall Status Software Development Organization

More information

Planning ALMA Observations

Planning ALMA Observations Planning Observations Atacama Large mm/sub-mm Array Mark Lacy North American Science Center Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very

More information

PLATO Preliminary Requirements Review Technical Report

PLATO Preliminary Requirements Review Technical Report PLATO Preliminary Requirements Review Technical Report Prepared by Review Team Reference SRE-F/2013.075/ Issue 1 Revision 1 Date of Issue 16/12/2013 Status Issued Document Type Distribution Title Issue

More information

The Atacama Large Millimeter/submillimeter Array: Current Status. Alison Peck Deputy Project Scientist Joint ALMA Office

The Atacama Large Millimeter/submillimeter Array: Current Status. Alison Peck Deputy Project Scientist Joint ALMA Office The Atacama Large Millimeter/submillimeter Array: Current Status Alison Peck Deputy Project Scientist Joint ALMA Office Overview International project to build & operate a large (up to 80- antennas) millimeter/submm

More information

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0 Massport Capital Programs Enterprise Schedule Management Primavera Schedule Toolkit Design January 2018 Version 1.0 Contents 1.0 INTRODUCTION 2 1.1 DISCLAIMER 3 2.0 TOOLKIT SCHEDULE COMPONENTS 4 2.1 SCHEDULE

More information

Quarterly Status Update (QSU) January March 2010

Quarterly Status Update (QSU) January March 2010 Quarterly Status Update (QSU) January March 2010 Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Primer The structure

More information

Prime Focus Imaging Spectrograph

Prime Focus Imaging Spectrograph Prime Focus Imaging Spectrograph Status 8 of 9 collimator and 6 of 9 camera lenses received (including all lenses) Slitmask mechanism assembled and wired, waveplate mechanism assembled Structure in fabrication

More information

GPS Modernization and Program Update

GPS Modernization and Program Update GPS Modernization and Program Update GPS Update to ION Southern California Chapter 22 Feb 2011 Colonel Bernie Gruber Director Global Positioning Systems Directorate Contents Current Constellation Modernization

More information

Integration of Band 5 receivers at ALMA/JAO. Giorgio Siringo Senior RF Engineer & FrontEnd Technical Lead - JAO on behalf of the B5 integration team

Integration of Band 5 receivers at ALMA/JAO. Giorgio Siringo Senior RF Engineer & FrontEnd Technical Lead - JAO on behalf of the B5 integration team Integration of Band 5 receivers at ALMA/JAO Giorgio Siringo Senior RF Engineer & FrontEnd Technical Lead - JAO on behalf of the B5 integration team Who is Who B5 Management ESO Project Manager: Pavel Yagoubov

More information

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT 21-22 FIRST QUARTER REPORT Active Cable TV Connections AFN Cable connections in the business plan are projected to be 2,44 by July 22. As of October 31, 21, there are 1,895 connections, which means AFN

More information

The Second Health Information Technology Summit

The Second Health Information Technology Summit The Second Health Information Technology Summit Shared HIT/HIPAA Issues: The National Provider Identifier and the Impact on Payers, Health Plans and Clearinghouses Session 5.05 Tom Polhemus Principal Operations

More information

Results for the Three-Month Period Ended June 30, 2013

Results for the Three-Month Period Ended June 30, 2013 Statements made in this document with respect to SQUARE ENIX HOLDINGS CO., LTD. and its consolidated subsidiaries' (together, SQUARE ENIX GROUP") plans, estimates, strategies and beliefs are forward-looking

More information

Helioseismic Magnetic Imager Program at LMSAL

Helioseismic Magnetic Imager Program at LMSAL Helioseismic Magnetic Imager Program at LMSAL Contract PY-2223 Progress Report for December 2002 Introduction This is the third monthly progress report for the HMI program at LMSAL. We/LMSAL are collaborators

More information

HPS Upgrade Proposal

HPS Upgrade Proposal HPS Upgrade Proposal HPS collaboration July 20, 2017 Analysis of the HPS engineering run data showed worse than expected reach in both the bump hunt and the vertexing searches. These reach discrepancies

More information

THIS REPORT CONTAINS ASSESSMENTS OF COMMODITY AND TRADE ISSUES MADE BY USDA STAFF AND NOT NECESSARILY STATEMENTS OF OFFICIAL U.S.

THIS REPORT CONTAINS ASSESSMENTS OF COMMODITY AND TRADE ISSUES MADE BY USDA STAFF AND NOT NECESSARILY STATEMENTS OF OFFICIAL U.S. THIS REPORT CONTAINS ASSESSMENTS OF COMMODITY AND TRADE ISSUES MADE BY USDA STAFF AND NOT NECESSARILY STATEMENTS OF OFFICIAL U.S. GOVERNMENT POLICY Required Report - public distribution Date: GAIN Report

More information

Technical Considerations: Nuts and Bolts Project Planning and Technical Justification

Technical Considerations: Nuts and Bolts Project Planning and Technical Justification Technical Considerations: Nuts and Bolts Project Planning and Technical Justification Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long

More information

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Richard Orren, Global Technical Head, Director Mark Finch, Geotechnical Director Senergy Survey and GeoEngineering

More information

EVLA Project Book, Chapter 4 4 Antennas and Feeds. Jim Ruff, Ed Szpindor, S. Srikanth Last changed 2002-Feb-28

EVLA Project Book, Chapter 4 4 Antennas and Feeds. Jim Ruff, Ed Szpindor, S. Srikanth Last changed 2002-Feb-28 EVLA Project Book, Chapter 4 4 Antennas and Feeds Jim Ruff, Ed Szpindor, S. Srikanth Last changed 2002-Feb-28 Revision History: 2002-Feb-28, Rev C Add paragraph on RFI; identify cable, tubing, and ducting

More information

Planning (VLA) observations

Planning (VLA) observations Planning () observations 14 th Synthesis Imaging Workshop (May 2014) Loránt Sjouwerman National Radio Astronomy Observatory (Socorro, NM) Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very

More information

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Current Projects CABB ATCA C/X Upgrade FAST Parkes

More information

Rochester Institute of Technology. Wildfire Airborne Sensor Program (WASP) Project Overview

Rochester Institute of Technology. Wildfire Airborne Sensor Program (WASP) Project Overview Rochester Institute of Technology Wildfire Airborne Sensor Program (WASP) Project Overview Introduction The following slides describe a program underway at RIT The sensor system described herein is being

More information

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018

Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018 Bank of Japan Research and Statistics Department FOR RELEASE 8:50 A.M. Monday, May 28, 2018 Report on the Services Producer Price ( Preliminary Figures for April 2018 ) The Services Producer Price (All

More information

Special Notice # N R-S002 - Frequently Asked Questions #1

Special Notice # N R-S002 - Frequently Asked Questions #1 Special Notice # N00014-19-R-S002 - Frequently Asked Questions #1 General and Contracting Questions 1. Q: Would you please describe CONOPS more? A: The CONOPS described in the Special Notice and at the

More information

Space Technology FY 2013

Space Technology FY 2013 Space Technology FY 2013 Dr. Mason Peck, Office of the Chief Technologist ASEB April 4, 2012 O f f i c e o f t h e C h i e f T e c h n o l o g i s t Technology at NASA NASA pursues breakthrough technologies

More information

Estimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5

Estimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5 Estimation of Fault Resistance from Fault Recording Data Daniel Wong & Michael Tong 2014-November-5 Agenda Project Background & Introduction Fault Resistance & Effect Estimation Algorithm Estimation Results

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

Table 5.1 Specifications for The Evaluation Receivers (33-45?) GHz HFET amplifier GHz SIS mixer GHz (HFET amp covers GHz)

Table 5.1 Specifications for The Evaluation Receivers (33-45?) GHz HFET amplifier GHz SIS mixer GHz (HFET amp covers GHz) MMA Project Book, Chapter 5 Section 1 Evaluation Receivers John Payne Graham Moorey Last changed 1999-May-2 Revision History: 1998-11-18: Major revision 1999-05-02: Minor specification changes in Table

More information

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013 NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP Embargo until 15.00 hours on 11 th January 2013 Our monthly estimates of GDP suggest that output declined by 0.3 per cent in

More information

Space and Missile Systems Center

Space and Missile Systems Center Space and Missile Systems Center Global Positioning Systems Directorate GPS Status & Modernization Progress: Service, Satellites, Control Segment, and Military GPS User Equipment 3 Nov 2016 Col Steve Whitney,

More information

Bridge Condition Assessment Using Remote Sensors

Bridge Condition Assessment Using Remote Sensors A Summary of the 4th Quarterly Report for the Technical Activities Council Bridge Condition Assessment Using Remote Sensors Michigan Technological University USDOT Cooperative Agreement No. DTOS59-10-H-00001

More information

ECSEL JU Update. Andreas Wild Executive Director

ECSEL JU Update. Andreas Wild Executive Director ECSEL JU Update Andreas Wild Executive Director ARTEMIS & ITEA Co-summit, Berlin, 11 March 2015 Content 2014 Outcome 2015 Progress 1. All topics open 2. RIA versus IA 3. No restrictions 2015 Plans and

More information

RADIOMETRIC PERFORMANCE OF THE CRIS INSTRUMENT FOR JPSS-1

RADIOMETRIC PERFORMANCE OF THE CRIS INSTRUMENT FOR JPSS-1 Place image here (10 x 3.5 ) RADIOMETRIC PERFORMANCE OF THE CRIS INSTRUMENT FOR JPSS-1 RONALD GLUMB, LAWRENCE SUWINSKI, STEVEN WELLS, REBECCA MALLOY CALCON Technical Conference Logan, UT August 22-25,

More information

Preparation of requirements. Part I Notification principles and time schedule

Preparation of requirements. Part I Notification principles and time schedule ASBU ITU Workshop 2004 22 25 November 2004 Damascus, Syria Preparation of requirements for T-DAB T and DVB-T Part I Notification principles and time schedule B. Rackov, Radiocommunication Bureau Notification

More information

Miniature Deployable High Gain Antenna for CubeSats

Miniature Deployable High Gain Antenna for CubeSats Phantom Works Miniature Deployable High Gain Antenna for CubeSats Charles S. Scott MacGillivray Office: (714) 372-1617 e-mail: charles.s.macgillivray@boeing.com Mobile: (714) 392-9095 e-mail: zserfv23@gmail.com

More information

NASA Space Exploration 1 st Year Report

NASA Space Exploration 1 st Year Report Exploration Systems Mission Directorate NASA Space Exploration 1 st Year Report Rear Admiral Craig E. Steidle (Ret.) Associate Administrator January 31, 2005 The Vision for Space Exploration THE FUNDAMENTAL

More information

Doug Dunn ASML President and Chief Executive Officer Deutsche Bank Conference London, England September 19, / Slide 1

Doug Dunn ASML President and Chief Executive Officer Deutsche Bank Conference London, England September 19, / Slide 1 Doug Dunn ASML President and Chief Executive Officer Deutsche Bank Conference London, England September 19, 2003 / Slide 1 Safe Harbor Safe Harbor Statement under the U.S. Private Securities Litigation

More information

Innovative Approaches in Collaborative Planning

Innovative Approaches in Collaborative Planning Innovative Approaches in Collaborative Planning Lessons Learned from Public and Private Sector Roadmaps Jack Eisenhauer Senior Vice President September 17, 2009 Ross Brindle Program Director Energetics

More information

ANTENNAS. ALMA Project Book, Chapter 4. Jeffrey Kingsley and Jaap Baars Last revised 2002-JAN-12

ANTENNAS. ALMA Project Book, Chapter 4. Jeffrey Kingsley and Jaap Baars Last revised 2002-JAN-12 ALMA Project Book, Chapter 4 ANTENNAS Jeffrey Kingsley and Jaap Baars Last revised 2002-JAN-12 4 ANTENNAS... 2 4.1 INTRODUCTION... 3 4.2 SPECIFICATIONS AND REQUIREMENTS... 4 4.2.1 Operating Environment...

More information

Seaworthy Quantum Key Distribution Design and Validation (SEAKEY) Contract Period of Performance (Base + Option): 7 February September 2016

Seaworthy Quantum Key Distribution Design and Validation (SEAKEY) Contract Period of Performance (Base + Option): 7 February September 2016 12 November 2015 Office of Naval Research 875 North Randolph Street, Suite 1179 Arlington, VA 22203-1995 BBN Technologies 10 Moulton Street Cambridge, MA 02138 Delivered via Email to: richard.t.willis@navy.mil

More information

Proposal Smart Vision Sensors for Entomologically Inspired Micro Aerial Vehicles Daniel Black. Advisor: Dr. Reid Harrison

Proposal Smart Vision Sensors for Entomologically Inspired Micro Aerial Vehicles Daniel Black. Advisor: Dr. Reid Harrison Proposal Smart Vision Sensors for Entomologically Inspired Micro Aerial Vehicles Daniel Black Advisor: Dr. Reid Harrison Introduction Impressive digital imaging technology has become commonplace in our

More information

CYGNSS Mission Update

CYGNSS Mission Update International Ocean Vector Wind Science Team Meeting Portland, OR 19-21 May 2015 CYGNSS Mission Update Chris Ruf (1) CYGNSS Principal Investigator Paul Chang (2), Maria Paola Clarizia (1), Scott Gleason

More information

VAN BUREN COUNTY TENNESSEE

VAN BUREN COUNTY TENNESSEE VAN BUREN COUNTY TENNESSEE CONSOLIDATED LISTING OF MICROFILMED VAN BUREN COUNTY RECORDS CONSISTING OF ROLLS 1-43, 45-67 and A9296 A9328 Note: I - available through Interlibrary Loan TENNESSEE STATE LIBRARY

More information

European Workgroup. 7th May 2015

European Workgroup. 7th May 2015 European Workgroup Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 7th May 2015 Code Status

More information

Information Warfare Research Project

Information Warfare Research Project SPACE AND NAVAL WARFARE COMMAND Information Warfare Research Project Charleston Defense Contractors Association 49th Small Business Industry Outreach Initiative 30 August 2018 Mr. Don Sallee SSC Atlantic

More information

When Failure Means Success: Accepting Risk in Aerospace Projects NASA Project Management Challenge 2009

When Failure Means Success: Accepting Risk in Aerospace Projects NASA Project Management Challenge 2009 When Failure Means Success: Accepting Risk in Aerospace Projects NASA Project Management Challenge 2009 Daniel L. Dumbacher,, Director Christopher E. Singer, Deputy Director Engineering Directorate Marshall

More information

Hydrocarbon Production Operations

Hydrocarbon Production Operations An Intensive 5 Day Training Course Hydrocarbon Production Operations The Role of Technology in Operations 01-05 Oct 2017, Dubai 05-MAR-17 This course is Designed, Developed, and will be Delivered under

More information

Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 26, 2017

Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 26, 2017 Bank of Japan Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 26, 2017 Report on the Services Producer Price ( Preliminary Figures for September 2017 ) The Services Producer

More information

Distributed by: www.jameco.com 1-8-831-4242 The content and copyrights of the attached material are the property of its owner. 35mW SURFACE MOUNT ENER DIODE Features Planar Die Construction 35mW Power

More information

Maldives: Strengthening Capacity for Operations Management

Maldives: Strengthening Capacity for Operations Management Completion Report Project Number: 45416-001 Technical Assistance Number: 8070 July 2018 Maldives: Strengthening Capacity for Operations Management This document is being disclosed to the public in accordance

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission Village of Glenview Appearance Commission STAFF REPORT June 13, 2018 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2018-062 LOCATION: PROJECT NAME: 1533 Waukegan

More information

Software as a Medical Device (SaMD)

Software as a Medical Device (SaMD) Software as a Medical Device () Working Group Status Application of Clinical Evaluation Working Group Chair: Bakul Patel Center for Devices and Radiological Health US Food and Drug Administration NWIE

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) , R-1 #49 COST (In Millions) FY 2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 Cost To Complete Total Cost Total Program Element (PE) Cost 21.845 27.937 41.497 31.896 45.700 57.500 60.200 72.600

More information

Economic & Real Estate Outlook. Tax Reform. Michigan 4/26/18

Economic & Real Estate Outlook. Tax Reform. Michigan 4/26/18 Economic & Real Estate Outlook By Lawrence Yun, Ph.D. Chief Economist, National Association of REALTORS Presentations at Michigan REALTORS Broker Summit Plymouth, MI April 25, 2018 Tax Reform Mortgage

More information

Appendix-1. Project Design Matrix (PDM)

Appendix-1. Project Design Matrix (PDM) Appendix-1 Project Design Matrix (PDM) Appendix-I Project Design Matrix (PDM) Version 1 PDM: Electric Power Technical Standards Promotion Project in Vietnam Duration: 3 Years (March in 2010 to January

More information

NPN Silicon Planar High Voltage Transistor

NPN Silicon Planar High Voltage Transistor NPN Silicon Planar High Voltage Transistor FEATURES High BV CEO, BV CBO High current gain Compliant to RoHS Directive 2011/65/EU and in accordance to WEEE 2002/96/EC Halogen-Free according to IEC 61249-2-21

More information

SAW components. SAW RF filter Digital radio. RF360 Europe GmbH A Qualcomm TDK Joint Venture. Date: April 26, 2017 Version: 2.1

SAW components. SAW RF filter Digital radio. RF360 Europe GmbH A Qualcomm TDK Joint Venture. Date: April 26, 2017 Version: 2.1 A Qualcomm TDK Joint Venture Digital radio Series/type: Ordering code: B39232U410 Date: April 26, 2017 Version: 2.1 RF360 products mentioned within this document are offered by RF360 Europe GmbH and other

More information

Canon Digital-Ixus V Jun 2001

Canon Digital-Ixus V Jun 2001 L i s t o f C a m e r a s - D C B A list of digital cameras which can be used in conjunction with Swarovski Optik's ATS and STS telescopes using the Swarovski Optik digital camera adapter DCB. Canon Digital-Ixus

More information

SAW components. SAW RF filter Short range devices. RF360 Europe GmbH A Qualcomm TDK Joint Venture. Date: September 15, 2017 Version: 2.

SAW components. SAW RF filter Short range devices. RF360 Europe GmbH A Qualcomm TDK Joint Venture. Date: September 15, 2017 Version: 2. A Qualcomm TDK Joint Venture Short range devices Series/type: Ordering code: B39921U410 Date: September 15, 2017 Version: 2.4 RF360 products mentioned within this document are offered by RF360 Europe GmbH

More information

Maritime Telecommunication System Development Project (3)

Maritime Telecommunication System Development Project (3) Indonesia Maritime Telecommunication System Development Project (3) 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: August 2000 Location Map of the Project Area Equipment

More information

ASX CHESS Replacement Project Webinar

ASX CHESS Replacement Project Webinar ASX CHESS Replacement Project Webinar Q4 update 14 December 2017 Audio Trouble Shooting & Reminder to Submit Questions Your Participation Having trouble hearing via Computer Audio? Switch to Phone call!

More information

Ultra Low Jitter LVPECL or LVDS Clock

Ultra Low Jitter LVPECL or LVDS Clock Features Ceramic Surface Mount Package Ultra Low Phase Jitter Performance, 100fs Typical Fundamental or 3 rd Overtone Crystal Design Frequency Range 80 170MHz * +2.5V or +3.3V Operation Output Enable Standard

More information

NOTICE OF THE 5TH ANNUAL GENERAL MEETING OF SHAREHOLDERS

NOTICE OF THE 5TH ANNUAL GENERAL MEETING OF SHAREHOLDERS Note: This document is a translation of a part of the Japanese original. The translation is prepared and provided for the purpose of the readers convenience only. All readers are strongly recommended to

More information

Evolution of the Capabilities of the ALMA Array

Evolution of the Capabilities of the ALMA Array Evolution of the Capabilities of the ALMA Array This note provides an outline of how we plan to build up the scientific capabilities of the array from the start of Early Science through to Full Operations.

More information

Ku-Band Receiver System for SHAO

Ku-Band Receiver System for SHAO Ku-Band Receiver System for SHAO Overview Brent Willoughby July 2014 Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

More information

Start Date. Census Date Delivery Mode EFTSL Unit Fee. End Date

Start Date. Census Date Delivery Mode EFTSL Unit Fee. End Date End Delivery Mode EFTSL Unit Campus: BUNBURY FULL TIME - DIPLOMA ART BUNBURY Unit and Total: $3,253.16 Total: $2,979.60 $273.56 TUESDAY D0631 MAKE A PRESENTATION 19-Jul-16 29-Nov-16 23-Sep-16 Local Class

More information

CMT 12th LPG Trade Summit Oct, Dubai, U A E

CMT 12th LPG Trade Summit Oct, Dubai, U A E CMT 12th LPG Trade Summit - 23-25 Oct, 217 - Dubai, U A E Connecting high quality analytics with commercial decision making Commercial Advice Consulting Market Insights Multiclient Products Retainer Agreements

More information

The North America Array

The North America Array The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting Pasadena, CA The North America Array is... Technology

More information

Data Digitization & Transmission Session Moderator: Chris Langley

Data Digitization & Transmission Session Moderator: Chris Langley Data Digitization & Transmission Session Moderator: Chris Langley Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

More information

ABSTRACT. Keywords: ESSP, Earth Venture, program management, NASA Science Mission Directorate, Class-D mission, Instrument-first 1.

ABSTRACT. Keywords: ESSP, Earth Venture, program management, NASA Science Mission Directorate, Class-D mission, Instrument-first 1. SSC14-VI-10 Opportunities for Small Satellites in NASA s Earth System Science Pathfinder (ESSP) Program Frank Peri, Richard, C. Law, James E. Wells NASA Langley Research Center, 9 Langley Boulevard, Hampton,

More information

COS NCM2 Mirror Substrate Specification

COS NCM2 Mirror Substrate Specification Date: Document Number: Revision: Contract No.: NAS5-98043 CDRL No.: N/A Prepared By: E. Wilkinson 2-18-99 E. Wilkinson, COS Instrument Scientist, CU/CASA Date Reviewed By: R. Cahill 2-18-99 R. Cahill,

More information

Raven a scientific and technical Multi-Object Adaptive Optics (MOAO) demonstrator

Raven a scientific and technical Multi-Object Adaptive Optics (MOAO) demonstrator Raven a scientific and technical Multi-Object Adaptive Optics (MOAO) demonstrator Olivier Lardière, Célia Blain, Colin Bradley, Reston Nash, Darryl Gamroth, Kate Jackson, Dave Andersen, Shin Oya, Yoshito

More information

PLETRONICS NCF4 Series

PLETRONICS NCF4 Series NCF4 2.0 x 2.5 x 1.0 mm LCC Ceramic Package Electrical Characteristics Features Pletronics NCF4 Series Temperature Compensated Crystal Oscillator Optional Voltage Control Function Clipped Sine Wave Output

More information

ACA; Atacama Compact Array

ACA; Atacama Compact Array ACA; Atacama Compact Array Ryohei Kawabe, ALMA-J Project Scientist & East Asian ARC Manager ALMA-J Office NAOJ 1 Array Configuration of ALMA 12-m Array ACA The ACA System 7m Array; Twelve (12) 7-meter

More information

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016 The world s largest oil discovery 2014 Melbourne Mining Club Cutting Edge Series 15 March 2016 FAR snapshot Two major basin opening oil discoveries in Senegal in 2014 SNE Field largest global oil find

More information

Bourns Transformers Now Available in Lead Free Versions

Bourns Transformers Now Available in Lead Free Versions April, 2005 Manufacturers Representatives Corporate Distributor Product Managers Americas Sales Team Asia Sales Team Europe Sales Team Bourns Internal INDUCTIVE COMPONENTS Bourns Transformers Now Available

More information

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY CURRENT TIMELINE TIMELINE MADISON LIBRARY PINNEY MING/ PRE-DESIGN 1 SCHEMATIC DESIGN 2 DESIGN DEVELOPMENT 3

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

PROTECTING mmparadise. Eduardo Hardy

PROTECTING mmparadise. Eduardo Hardy PROTECTING mmparadise Eduardo Hardy NRAO CORF-Santiago, 10 August 2009 OBJECTIVES Clarify the nature and status of RFI protection ti in the Chajnantor area Our SUBTEL colleagues are here (Mónica ), so

More information

EVLA Science Operations: the Array Science Center. Claire Chandler NRAO/Socorro

EVLA Science Operations: the Array Science Center. Claire Chandler NRAO/Socorro EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro SAGE meeting Socorro, May 22-23, 2007 The need for an Array Science Center 2 The VLA/VLBA currently supply users with raw

More information

OPTICS OF SINGLE BEAM, DUAL BEAM & ARRAY RECEIVERS ON LARGE TELESCOPES J A M E S W L A M B, C A L T E C H

OPTICS OF SINGLE BEAM, DUAL BEAM & ARRAY RECEIVERS ON LARGE TELESCOPES J A M E S W L A M B, C A L T E C H OPTICS OF SINGLE BEAM, DUAL BEAM & ARRAY RECEIVERS ON LARGE TELESCOPES J A M E S W L A M B, C A L T E C H OUTLINE Antenna optics Aberrations Diffraction Single feeds Types of feed Bandwidth Imaging feeds

More information

The WVR at Effelsberg. Thomas Krichbaum

The WVR at Effelsberg. Thomas Krichbaum The WVR at Effelsberg Alan Roy Ute Teuber Helge Rottmann Thomas Krichbaum Reinhard Keller Dave Graham Walter Alef The Scanning 18-26 GHz WVR for Effelsberg ν = 18.5 GHz to 26.0 GHz Δν = 900 MHz Channels

More information

LV55D Series 3.3 V LVDS Clock Oscillators February 2016

LV55D Series 3.3 V LVDS Clock Oscillators February 2016 LV55D Series 3.3 V February 206 Pletronics LV55D Series is a quartz crystal controlled precision square wave generator with an LVDS output. The package is designed for high density surface mount designs.

More information

ANTENNAS. ALMA Project Book, Chapter 4. Torben Andersen and Peter Napier Last changed 2000-Dec-11. Summary

ANTENNAS. ALMA Project Book, Chapter 4. Torben Andersen and Peter Napier Last changed 2000-Dec-11. Summary ALMA Project Book, Chapter 4. ANTENNAS Torben Andersen and Peter Napier Last changed 2000-Dec-11 Revision History: 1998-Aug-23: Added information from PDR; test plan, earthquake spec, receiver cabin power

More information

Research and Innovation in Science and Technology Project (P121842)

Research and Innovation in Science and Technology Project (P121842) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 11-Dec-2018 ISR35076 Implementing Agencies: Ministry

More information

Model 653 Very Low Jitter LVPECL or LVDS Clock

Model 653 Very Low Jitter LVPECL or LVDS Clock Features Ceramic Surface Mount Package Very Low Phase Jitter Performance, 500fs Maximum Fundamental or 3 rd Overtone Crystal Design Frequency Range 10 320MHz * +2.5V or +3.3V Operation Output Enable Standard

More information

Industrials China paper

Industrials China paper Industrials China paper Walden Shing* Analyst The Hongkong and Shanghai Banking Corporation Limited +852 2996 6751 waldenshing@hsbc.com.hk *Employed by a non-us affiliate of HSBC Securities (USA) Inc,

More information

SAW components. SAW RF Uplink 2in1 input diplex filter Base stations LTE band 5 and 13. RF360 Europe GmbH A Qualcomm TDK Joint Venture

SAW components. SAW RF Uplink 2in1 input diplex filter Base stations LTE band 5 and 13. RF360 Europe GmbH A Qualcomm TDK Joint Venture A Qualcomm TDK Joint Venture Base stations LTE band 5 and 13 Series/type: Ordering code: B39841U510 Date: January 19, 2018 Version: 2.1 RF360 products mentioned within this document are offered by RF360

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

LV77D Series 2.5 V LVDS Clock Oscillators November 2018

LV77D Series 2.5 V LVDS Clock Oscillators November 2018 Pletronics LV77D Series is a quartz crystal controlled precision square wave generator with an LVDS output. The package is designed for high density surface mount designs. Low cost mass produced oscillator.

More information

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 14 May Braddock Dam

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 14 May Braddock Dam Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division Braddock Dam 14 May 2015

More information

UkrGasVydobuvannya Public invitation for Expression of Interest for participation in the project of gas production enhancement

UkrGasVydobuvannya Public invitation for Expression of Interest for participation in the project of gas production enhancement UkrGasVydobuvannya Public invitation for Expression of Interest for participation in the project of gas production enhancement October 2018 Kyiv Summary and objectives One of the current UkrGasVydobuvannya

More information

GLOBAL RIG AND OFFSHORE CONSTRUCTION MARKETS

GLOBAL RIG AND OFFSHORE CONSTRUCTION MARKETS Information Analytics Expertise OCTOBER 214 GLOBAL RIG AND OFFSHORE CONSTRUCTION MARKETS Slowdown on all fronts? Evgenia Kukina, Sr. Product Manager +44 ()231 593 38 Evgenia.kukina@ihs.com BLACK SEA OFFSHORE

More information