1 Integration of Band 5 receivers at ALMA/JAO Giorgio Siringo Senior RF Engineer & FrontEnd Technical Lead - JAO on behalf of the B5 integration team

2 Who is Who B5 Management ESO Project Manager: Pavel Yagoubov ESO Integration Manager at JAO: Gianni Marconi NA Development Program Manager: William Randolph

3 Who is Who Who designed the CCA: Pre-production: GARD, Sweden Production: GARD + NOVA Who delivers the CCA: GARD+NOVA for ESO Who delivers the WCA (and cold multipliers): NRAO Technology Center (CV)

4 Who is Who Several people involved at GARD/Chalmers, at NOVA, at ESO, at NRAO......and at JAO: 2 electronics engineers (50%) 3 technician (100%) workforce distributed in the two shifts supervised by Gianni Marconi and myself

5 B5 Receiver B5 project: just a bit of history Pre-production design started in 2005 at Chalmers (GARD) 6 cartridges were delivered to JAO Tested by SIST in 2012 Production project started in 2013 Some important changes ASTE, APEX-SEPIA, LLAMA

6 B5 Receiver 2012: Astro-holography at 209 GHz DV23xDA51 (at the OSF) AIV DV23

7 B5 Receiver 2012: Astro-holography at 209 GHz DV23xDA51 (at the OSF) AIV DA51

8 B5 Receiver pre-production design

9 B5 Receiver production design YTO range: GHz LO driver: GHz WCA multiplier: Modified to 6x CCA multipliers: 2x at 110 K Extended Sky frequency range: (158) GHz

10 Integration The integration process starts before shipment: the cartridges are carefully tested by the manufacturer before shipment (the CCAs cold in a test cryostat at NOVA, the WCAs at NTC) in a process called Preliminary Acceptance In-house (PAI) The results go in a report uploaded to the EDM, globally available within the ALMA consortium. We have done 70 WCAs and 44 CCAs PAI so far.

11 Integration When non-compliances are detected, these are evaluated case by case. Minor non-compliances are usually waived, typical CCA waivers for: image rejection ratio (14), cross-talk (11), gain compression (2), IF power variations (27) Major non-compliances would result in blocking the shipment.

12 Integration If all PAI results are acceptable and eventual waivers approved, the cartridge is shipped to JAO/OSF. When we receive it, we do a new series of tests at room temperature, the so-called Provisional Acceptance on-site (PAS), mainly to certify integrity after shipment by cross-check with PAI results.

13 Integration The cartridges (a CCA + WCA pair) are then integrated in a suitable Front-End (FE) (when available...) The integration process is not limited to the installation of the two cartridges only, but also of the window, IR filter, band-specific power supply module (CPDS), M&C configuration parameters (CCA thermometers calibration, optimal bias voltages and currents of the SIS mixers and LNA amplifiers,...)

14 Integration The cartridges (a CCA + WCA pair) are then integrated in a suitable Front-End (FE) Before cooling down, another warm health check is done to verify that the hardware survived the integration process. After cool down, a set of verification tests are done on the antenna simulator (FETMS) and optimization based on parameters provided by NOVA, for 3.5 K (FE operation) and 4.0 K (specifications) reference temperatures. (FETMS=FE Test & Measurement System)

15 Integration The cartridges (a CCA + WCA pair) are then integrated in a suitable Front-End (FE) after-integration verification on the FETMS (at OSF): vacuum leak check at CCA and window; LO waveguide mapping; warm health check; WCA locking tests at warm; cool-down and cryogenics performance verification; cold health check (did it survive cool down?); workmanship verification (elevation dip, lose cables?); noise noise temperature check/optimization; (Cycle5!) IF output power level and variations; beam pattern verification (including polarization efficiency)

16 Integration: FETMS The cartridges (a CCA + WCA pair) are then integrated in a suitable Front-End (FE)

17 Integration: FETMS The cartridges (a CCA + WCA pair) are then integrated in a suitable Front-End (FE)

18 In antenna verification The FE + integrated B5 cartridges is then installed on a suitable antenna element In antenna engineering verification (at AOS): signals-path connectivity receiver noise temperature verification/optimization amplitude stability (Allan variance) ambient load elevation dip azimuth slew

19 In antenna verification The FE + integrated B5 cartridges is then installed on a suitable antenna element In antenna engineering verification (at AOS)

20 In antenna verification The FE + integrated B5 cartridges is then installed on a suitable antenna element In antenna engineering verification (at AOS)

21 Integration Progress Requirements for Cycle5 (October 2017): 43x12m + 10x7m + 3xTP total: 56 AE/FE blocker: 41x12m +9x7m + 3xTP = 53 (not yet official - ALMA Technical Handbook) Already integrated: 32 / FEs to go: 38 We keep track of the progress in several places: FETMS database, JIRA, CMMS, EDM and two twiki pages: one for the pre-acceptance (FETMS/OSF) the other for the on-sky verification (AE/AOS)

22 Integration Progress We keep track in FETMS database, JIRA, CMMS, EDM. We also have two twiki pages to track activities. If pre-accepted move to antenna at the AOS

23 Integration Progress 32 FEs integrated (as of January 2017) 28 already fully tested on sky

24 On sky verification DV01 / FE61 / CCA5-08 spectral check: Trx Tsys

25 On sky verification

26 On sky verification Birdie at GHz in both polarizations associated to the 12th harmonic of WVR LO drive signal at

27 On sky verification Water line detection in Orion OMC 1

28 On sky verification Science verification projects: VY Cma: H2O and SiO, polarization capabilities demonstrated Arp 220: H2O, CS and HNC observations Sgr B2: full band spectral scan from 163 to 211 GHz ( Science verification program already completed between June and November 2016 topic of next talk by Liz Humphreys

29 Ancillary story #1 Some problems with cryogenics are slowing down the integration rate We are facing unexpected difficulties with the cryogenics, we switched from planned preventive maintenance (FE maintenance every hours ~ 1 year of operation) to condition-based maintenance = we only take a FE out of an AE if the cryogenics performance is bad impossibility to integrate new cartridges! (with consequences on the short and long term)

30 Ancillary story #1

31 Ancillary story #2 We found that the ALMA software was not able to optimize the LO power for B5 receivers We then found that actually the problem was not limited to B5 but other bands (in particular B10) were also affected: problem unnoticed until the introduction of B5. We are now testing a new algorithm based on probabilistic bisectioning (Baesian approach) going to be used for all bands, using mostly B5 for testing and fine-tuning of some parameters

32 Integration Enjoy ALMA Band 5 receiver!

33 Integration We keep track in FETMS database, JIRA, CMMS, EDM. We have some other tools...

34 Integration We keep track in FETMS database, JIRA, CMMS, EDM. We have some other tools...

ALMA Interferometer and Band 7 Cartridge

ALMA Interferometer and Band 7 Cartridge ALMA Interferometer and Band 7 Cartridge B7 Cartridge designed, assembled and tested by: S. Mahieu, D. Maier (mixer team lead), B. Lazareff (now at IPAG) G. Celestin, J. Chalain, D. Geoffroy, F. Laslaz,

More information

Electronics Division Technical Note No Modular Analysis Software for the ALMA Front End Test and Measurement System

Electronics Division Technical Note No Modular Analysis Software for the ALMA Front End Test and Measurement System Electronics Division Technical Note No. 221 Modular Analysis Software for the ALMA Front End Test and Measurement System Aaron Beaudoin- NRAO Technology Center Summer Intern Abstract: A new software library

More information

The ALMA Front End. Hans Rudolf

The ALMA Front End. Hans Rudolf The ALMA Front End Hans Rudolf European Southern Observatory, ALMA, Karl-Schwarzschild-Straße 2, 85748 Garching, Germany, +49-89-3200 6397, hrudolf@eso.org Abstract The Atacama Large Millimeter Array (ALMA)

More information

Ku-Band Receiver System for SHAO

Ku-Band Receiver System for SHAO Ku-Band Receiver System for SHAO Overview Brent Willoughby July 2014 Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

More information

Revisions: jee Initial jee Corrected label on Figs 6 and 7, Updated Block Diagram

Revisions: jee Initial jee Corrected label on Figs 6 and 7, Updated Block Diagram Memorandum To: From: File John Effland Date: 5-5-2 Revisions: 5-5-2 jee Initial 5-5-16 jee Corrected label on Figs 6 and 7, Updated Block Diagram Subject: Comparison of Band 6 Cartridge Measurements in

More information

Band 5 Beam Scanner Test Source design description and test results FEND XXX-A-DSN. Version: A. Status: Draft

Band 5 Beam Scanner Test Source design description and test results FEND XXX-A-DSN. Version: A. Status: Draft Test Source design description and test results FEND-40.10.05.00-XXX-A-DSN Version: A 2010-07-22 Prepared By: Name(s) and Signature(s) Organization Date Ricardo Finger Nicolás Ramos Department of Astronomy2010-07-22

More information

ALMA Assembly, Integration and Verification: Overview and Work Plan

ALMA Assembly, Integration and Verification: Overview and Work Plan SYSE.85.01.00.00-001-A-PLA 2005-03-12 Prepared By: Name(s) and Signature(s) Rick Murowinski, with numerous contributors Organization JAO Page: 2 of 22 Change Record Version Date Affected Paras Reason 0.4

More information

Computing IPT. B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review October

Computing IPT. B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review October Computing IPT B.E. Glendenning (NRAO) J. Ibsen (JAO) G. Kosugi (NAOJ) G. Raffi (ESO) Computing IPT ALMA Annual External Review 25-28 October 2010 1 Outline Overall Status Software Development Organization

More information

North American Front End Integration Center Test and Measurement System Design

North American Front End Integration Center Test and Measurement System Design Center Test and Measurement System FEND-40.09.03.00-002-A-DSN 2007-09-07 Prepared By: Name(s) and Signature(s) Organization Date G.A.Ediss NRAO 2007-09-07 Approved By FE IPT Name and Signature Organization

More information

Observing Modes and Real Time Processing

Observing Modes and Real Time Processing 2010-11-30 Observing with ALMA 1, Observing Modes and Real Time Processing R. Lucas November 30, 2010 Outline 2010-11-30 Observing with ALMA 2, Observing Modes Interferometry Modes Interferometry Calibrations

More information

ALMA. ALMA Construction Status. Mark McKinnon. ALMA-NA Project Director/Manager September 28, 2011

ALMA. ALMA Construction Status. Mark McKinnon. ALMA-NA Project Director/Manager September 28, 2011 Construction Status Mark McKinnon -NA Project Director/Manager September 28, 2011 Antennas at AOS 18 antennas August 13, 2011 17 antennas August 6, 2011 Total of 44 antennas at the site (21NA, 13 EA, 10

More information

Revisions: Initial jee Minor editorial changes jee Minor editorial changes suggested by J. Webber

Revisions: Initial jee Minor editorial changes jee Minor editorial changes suggested by J. Webber Memorandum To: John Webber ALMA Document: FEND-40.02.06.00-101-A-REP From: John Effland Kamaljeet Saini Date: 2006-06-28 Revisions: 2006-06-28 Initial 2006-06-28 jee Minor editorial changes 2006-06-29

More information

Influence of Temperature Variations on the Stability of a Submm Wave Receiver

Influence of Temperature Variations on the Stability of a Submm Wave Receiver Influence of Temperature Variations on the Stability of a Submm Wave A. Baryshev 1, R. Hesper 1, G. Gerlofsma 1, M. Kroug 2, W. Wild 3 1 NOVA/SRON/RuG 2 DIMES/TuD 3 SRON / RuG Abstract Radio astronomy

More information

Performance of H Maser During the EOC Week 29 July to 03 August

Performance of H Maser During the EOC Week 29 July to 03 August Performance of H Maser During the EOC Week 29 July to 03 August ALMA Technical Note Number: 6 Status: FINAL Prepared by: Organization: Date: Anthony Remijan (EOC Program Scientist for Extension and Optimization

More information

APEX training 2014 HETERODYNE GROUP FLASH & CHAMP. MPIfR Division for Submm Technologies Heterodyne Group

APEX training 2014 HETERODYNE GROUP FLASH & CHAMP. MPIfR Division for Submm Technologies Heterodyne Group HETERODYNE GROUP APEX training 2014 FLASH & CHAMP MPIfR Division for Submm Technologies Heterodyne Group March 2014 FLASH+ instrument - receiver capabilities bias control PC simultaneous observations at

More information

Wideband Passive Circuits for Sideband Separating Receivers

Wideband Passive Circuits for Sideband Separating Receivers Wideband Passive Circuits for Sideband Separating Receivers Hawal Rashid 1*, Denis Meledin 1, Vincent Desmaris 1, and Victor Belisky 1 1 Group for Advanced Receiver Development (GARD), Chalmers University,

More information

Sideband-Separating SIS Mixer at 100GHz Band for Astronomical Observation

Sideband-Separating SIS Mixer at 100GHz Band for Astronomical Observation Sideband-Separating SIS Mixer at 100GHz Band for Astronomical Observation S. Asayama l, K. Kimura 2, H. Iwashita 3, N. Sato l, T. Takahashi3, M. Saito', B. Ikenoue l, H. Ishizaki l, N. Ukital 1 National

More information

Holography Transmitter Design Bill Shillue 2000-Oct-03

Holography Transmitter Design Bill Shillue 2000-Oct-03 Holography Transmitter Design Bill Shillue 2000-Oct-03 Planned Photonic Reference Distribution for Test Interferometer The transmitter for the holography receiver is made up mostly of parts that are already

More information

Sideband Smear: Sideband Separation with the ALMA 2SB and DSB Total Power Receivers

Sideband Smear: Sideband Separation with the ALMA 2SB and DSB Total Power Receivers and DSB Total Power Receivers SCI-00.00.00.00-001-A-PLA Version: A 2007-06-11 Prepared By: Organization Date Anthony J. Remijan NRAO A. Wootten T. Hunter J.M. Payne D.T. Emerson P.R. Jewell R.N. Martin

More information

THE ARO 0.4mm ( GHz) SIS MIXER RECEIVER. Revision 1.0

THE ARO 0.4mm ( GHz) SIS MIXER RECEIVER. Revision 1.0 THE ARO 0.4mm (600 720 GHz) SIS MIXER RECEIVER Revision 1.0 April, 2008 Table of Contents 1 System Overview... 3 2 Mixer Operation... 3 2.1 Setting the Mixer Voltage and Current... 3 2.1.1 Setting Vj:...

More information

System Considerations for Submillimeter Receiver

System Considerations for Submillimeter Receiver System Considerations for Submillimeter Receiver Junji INATANI Space Utilization Research Program National Space Development Agency of Japan (NASDA) March 12-13, Nanjing 1 Introduction 640 GHz SIS Receiver

More information

Development of SIS mixers for future receivers at NAOJ

Development of SIS mixers for future receivers at NAOJ Development of SIS mixers for future receivers at NAOJ 2016/05/25 Takafumi Kojima On behalf of NAOJ future development team ALMA Developer s workshop Summary of ALMA Cartridge Receivers at NAOJ Developed

More information

ALMA Memo 436. Band 6 Receiver Noise Measurements using a Pre- Prototype YIG-Tunable LO

ALMA Memo 436. Band 6 Receiver Noise Measurements using a Pre- Prototype YIG-Tunable LO Page: 1 of 11 ALMA Memo 436 Measurements using a Pre- Prototype Eric W. Bryerton, S. K. Pan, Dorsey Thacker, and Kamaljeet Saini National Radio Astronomy Obervatory Charlottesville, VA 2293, USA FEND-.1.6.-1-A-MEM

More information

EVLA Front-End CDR. EVLA Ka-Band (26-40 GHz) Receiver

EVLA Front-End CDR. EVLA Ka-Band (26-40 GHz) Receiver EVLA Front-End CDR EVLA Ka-Band (26-40 GHz) Receiver 1 EVLA Ka-Band Receiver Overview 1) General Description 2) Block Diagram 3) Noise & Headroom Model 4) Feed & Thermal Gap 5) RF Tree - Phase-Shifter

More information

ALMA Band-1: Key Components, Cartridge Design, and Test Plan

ALMA Band-1: Key Components, Cartridge Design, and Test Plan ALMA Band-1: Key Components, Cartridge Design, and Test Plan Yuh-Jing Hwang, Chau-Ching Chiong, Yue-Fang Kuo, Ted Huang, Doug Henke, Marian Pospieszalski, Nicolas Reyes, Ciska Kemper, and Paul Ho ASIAA,

More information

ELEC RADAR FRONT-END SUMMARY

ELEC RADAR FRONT-END SUMMARY ELEC Radar Front-End is designed for FMCW (including CW) radar application. The output frequency of each RX provides range, speed, and amplitude information to DSP. It will detect target azimuth angle

More information

Band 11 Receiver Development

Band 11 Receiver Development Band 11 Receiver Development Y. Uzawa on behalf of Band 10 team 2013 July 8 2013 EA ALMA Development Workshop 1 Outline Band 10 status Band 11 specifications and required technologies Preliminary consideration

More information

ANASAC, September 20, 2012

ANASAC, September 20, 2012 ANASAC, September 20, 2012 Construction Mark McKinnon Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Antennas

More information

ALMA Memo 553. First Astronomical Observations with an ALMA Band 6 ( GHz) Sideband-Separating SIS Mixer-Preamp

ALMA Memo 553. First Astronomical Observations with an ALMA Band 6 ( GHz) Sideband-Separating SIS Mixer-Preamp Presented at the 17 th International Symposium on Space Terahertz Technology, Paris, May 2006. http://www.alma.nrao.edu/memos/ ALMA Memo 553 15 August 2006 First Astronomical Observations with an ALMA

More information

5 RECEIVERS TABLE TBD: EVLA RECEIVER FREQUENCY RANGES AND OPERATING TEMPERATURES

5 RECEIVERS TABLE TBD: EVLA RECEIVER FREQUENCY RANGES AND OPERATING TEMPERATURES EVLA Project Book, Chapter 5. 5 RECEIVERS Robert Hayward, Ed Szpindor, and Daniel J. Mertely Last changed 2001-Oct-30 Revision History 2001-July-01: Initial release. 2001-Oct-01: Sys-def & detail added.

More information

The WVR at Effelsberg. Thomas Krichbaum

The WVR at Effelsberg. Thomas Krichbaum The WVR at Effelsberg Alan Roy Ute Teuber Helge Rottmann Thomas Krichbaum Reinhard Keller Dave Graham Walter Alef The Scanning 18-26 GHz WVR for Effelsberg ν = 18.5 GHz to 26.0 GHz Δν = 900 MHz Channels

More information

Anne-Laure Fontana, Catherine Boucher, Yves Bortolotti, Florence Cope, Bastien Lefranc, Alessandro Navarrini, Doris Maier, Karl-F.

Anne-Laure Fontana, Catherine Boucher, Yves Bortolotti, Florence Cope, Bastien Lefranc, Alessandro Navarrini, Doris Maier, Karl-F. Multi-beam SIS Receiver Development Anne-Laure Fontana, Catherine Boucher, Yves Bortolotti, Florence Cope, Bastien Lefranc, Alessandro Navarrini, Doris Maier, Karl-F. Schuster & Irvin Still Institut t

More information

LOW COST PHASED ARRAY ANTENNA TRANSCEIVER FOR WPAN APPLICATIONS

LOW COST PHASED ARRAY ANTENNA TRANSCEIVER FOR WPAN APPLICATIONS LOW COST PHASED ARRAY ANTENNA TRANSCEIVER FOR WPAN APPLICATIONS Introduction WPAN (Wireless Personal Area Network) transceivers are being designed to operate in the 60 GHz frequency band and will mainly

More information

IF/LO Systems for Single Dish Radio Astronomy Centimeter Wave Receivers

IF/LO Systems for Single Dish Radio Astronomy Centimeter Wave Receivers IF/LO Systems for Single Dish Radio Astronomy Centimeter Wave Receivers Lisa Wray NAIC, Arecibo Observatory Abstract. Radio astronomy receivers designed to detect electromagnetic waves from faint celestial

More information

Heterodyne Sweeping Radiometer

Heterodyne Sweeping Radiometer 46 Robezu str. LV-1004 Riga, Latvia Fax: +371-7-065102 Mm-wave Division in St. Petersburg, Russia Fax: +7-812- 326-10-60 Tel: +7-812-326-59-24 E-mail: ivanovph@nnz.ru Heterodyne Sweeping Radiometer Operation

More information

Antennas & Receivers in Radio Astronomy Mark McKinnon. Twelfth Synthesis Imaging Workshop 2010 June 8-15

Antennas & Receivers in Radio Astronomy Mark McKinnon. Twelfth Synthesis Imaging Workshop 2010 June 8-15 Antennas & Receivers in Radio Astronomy Mark McKinnon 2010 June 8-15 Outline Context Types of antennas Antenna fundamentals Reflector antennas Mounts Optics Antenna performance Aperture efficiency Pointing

More information

Preliminary Tests of Waveguide Type Sideband-Separating SIS Mixer for Astronomical Observation

Preliminary Tests of Waveguide Type Sideband-Separating SIS Mixer for Astronomical Observation ALMA MEMO #481 Preliminary Tests of Waveguide Type Sideband-Separating SIS Mixer for Astronomical Observation Shin ichiro Asayama 1,2, Kimihiro Kimura 1, Hiroyuki Iwashita 2, Naohisa Sato 3, Toshikazu

More information

THE ARO 1.3mm IMAGE-SEPARATING MIXER RECEIVER SYSTEM. Revision 1.0

THE ARO 1.3mm IMAGE-SEPARATING MIXER RECEIVER SYSTEM. Revision 1.0 THE ARO 1.3mm IMAGE-SEPARATING MIXER RECEIVER SYSTEM Revision 1.0 September, 2006 Table of Contents 1 System Overview... 3 1.1 Front-End Block Diagram... 5 1.2 IF System... 6 2 OPERATING PROCEDURES...

More information

ALMA Band 9 technology for CCAT. Andrey Baryshev

ALMA Band 9 technology for CCAT. Andrey Baryshev ALMA Band 9 technology for CCAT Andrey Baryshev ALMA band 9 group SRON A. Baryshev B. Jackson R. Hesper J. Adema F.P. Mena J. Barkhoff M. Bekema K. Keizer G. Gerlofsma A. Koops J. Panman W. Wild TUDelft

More information

EVLA Receivers PDR. (4m, P,) L, S, C BAND RECEIVERS. AuthorDaniel (Mert) Mertely

EVLA Receivers PDR. (4m, P,) L, S, C BAND RECEIVERS. AuthorDaniel (Mert) Mertely EVLA Receivers PDR (4m, P,) L, S, C BAND RECEIVERS Daniel (Mert) Mertely 1 Trx Projections EVLA RX FREQ RANGES AND OP TEMPS: REQUIRED vs. PROJECTED BND FRQ REQ CURNT CURNT CALC IDR RANGE Tsys (2) Tsys

More information

A Low Noise GHz Amplifier

A Low Noise GHz Amplifier A Low Noise 3.4-4.6 GHz Amplifier C. Risacher*, M. Dahlgren*, V. Belitsky* * GARD, Radio & Space Science Department with Onsala Space Observatory, Microtechnology Centre at Chalmers (MC2), Chalmers University

More information

1. INTRODUCTION 2. GENERAL CONCEPT V. 3 (p.1 of 7) / Color: No / Format: Letter / Date: 5/30/2016 8:36:41 PM

1. INTRODUCTION 2. GENERAL CONCEPT V. 3 (p.1 of 7) / Color: No / Format: Letter / Date: 5/30/2016 8:36:41 PM An ultra-broadband optical system for ALMA Band 2+3 V. Tapia a, R. Nesti b, A. González c, I. Barrueto d, F. P. Mena* d, N. Reyes d, F. Villa e, F. Cuttaia e, P. Yagoubov f. a Astronomy Department, Universidad

More information

Low-cost water vapour radiometry

Low-cost water vapour radiometry Low-cost water vapour radiometry Prospects and progress Tinus Stander, Pr.Eng, PhD, SMIEEE Hilo, 13 June 2017 Agenda Introduction to CEFIM mm-wave group Project Context An engineer s view of WVR Current

More information

Multibeam Heterodyne Receiver For ALMA

Multibeam Heterodyne Receiver For ALMA Multibeam Heterodyne Receiver For ALMA 2013/07/09 National Astronomical Observatory of Japan Advanced Technology Centor Takafumi KOJIMA, Yoshinori Uzawa and Band- Question discussed in this talk and outline

More information

Evolution of the Capabilities of the ALMA Array

Evolution of the Capabilities of the ALMA Array Evolution of the Capabilities of the ALMA Array This note provides an outline of how we plan to build up the scientific capabilities of the array from the start of Early Science through to Full Operations.

More information

Development of cartridge type 1.5THz HEB mixer receivers

Development of cartridge type 1.5THz HEB mixer receivers Development of cartridge type 1.5THz HEB mixer receivers H. H. Chang 1, Y. P. Chang 1, Y. Y. Chiang 1, L. H. Chang 1, T. J. Chen 1, C. A. Tseng 1, C. P. Chiu 1, M. J. Wang 1 W. Zhang 2, W. Miao 2, S. C.

More information

Table 5.1 Specifications for The Evaluation Receivers (33-45?) GHz HFET amplifier GHz SIS mixer GHz (HFET amp covers GHz)

Table 5.1 Specifications for The Evaluation Receivers (33-45?) GHz HFET amplifier GHz SIS mixer GHz (HFET amp covers GHz) MMA Project Book, Chapter 5 Section 1 Evaluation Receivers John Payne Graham Moorey Last changed 1999-May-2 Revision History: 1998-11-18: Major revision 1999-05-02: Minor specification changes in Table

More information

PXIe Contents SPECIFICATIONS. 14 GHz and 26.5 GHz Vector Signal Analyzer

PXIe Contents SPECIFICATIONS. 14 GHz and 26.5 GHz Vector Signal Analyzer SPECIFICATIONS PXIe-5668 14 GHz and 26.5 GHz Vector Signal Analyzer These specifications apply to the PXIe-5668 (14 GHz) Vector Signal Analyzer and the PXIe-5668 (26.5 GHz) Vector Signal Analyzer with

More information

Atacama Large Millimeter Array Project Status. M. Tarenghi ALMA Director

Atacama Large Millimeter Array Project Status. M. Tarenghi ALMA Director Atacama Large Millimeter Array Project Status M. Tarenghi ALMA Director Atacama Large Millimeter Array Specifications Partners: US (NSF)+Canada (NRC) - ESO+Spain - Chile 64 12-m antennas, at 5000 m altitude

More information

Summary Report / EVLA FE PDR

Summary Report / EVLA FE PDR Summary Report / EVLA FE PDR This report is a summary of the findings of the EVLA FE PDR Review Panel and the responses by the Task Leader. The report is based on a top level presentation of the design

More information

Longer baselines and how it impacts the ALMA Central LO

Longer baselines and how it impacts the ALMA Central LO Longer baselines and how it impacts the ALMA Central LO 1 C. Jacques - NRAO October 3-4-5 2017 ALMA LBW Quick overview of current system Getting the data back is not the problem (digital transmission),

More information

More Radio Astronomy

More Radio Astronomy More Radio Astronomy Radio Telescopes - Basic Design A radio telescope is composed of: - a radio reflector (the dish) - an antenna referred to as the feed on to which the radiation is focused - a radio

More information

ABSTRACT SYSTEM. 15th International Symposium on Space Terahertz Technology

ABSTRACT SYSTEM. 15th International Symposium on Space Terahertz Technology 1024 15th International Symposium on Space Terahertz Technology Integrated submillimeter system Dr. Anders Emrich, Omnisys Instruments AB Gruvgatan 8, 41230 Vastra FrOlunda, Sweden ae@orrinisys.se, Tel,

More information

Sub-millimeter Wave Planar Near-field Antenna Testing

Sub-millimeter Wave Planar Near-field Antenna Testing Sub-millimeter Wave Planar Near-field Antenna Testing Daniёl Janse van Rensburg 1, Greg Hindman 2 # Nearfield Systems Inc, 1973 Magellan Drive, Torrance, CA, 952-114, USA 1 drensburg@nearfield.com 2 ghindman@nearfield.com

More information

MIXER-PREAMP PERFORMANCE GRAPHS FOR THE SMT 1.3mm RECEIVER

MIXER-PREAMP PERFORMANCE GRAPHS FOR THE SMT 1.3mm RECEIVER MIXER-PREAMP PERFORMANCE GRAPHS FOR THE SMT 1.3mm RECEIVER GENERAL INFORMATION The following graphs are the results in the performance of the sideband-separating mixer-preamps used in the 1.3mm receiver

More information

ALMA water vapour radiometer project

ALMA water vapour radiometer project ALMA water vapour radiometer project Why water vapour radiometers? Science requirements/instrument specifications Previous work ALMA Phase 1 work Kate Isaak and Richard Hills Cavendish Astrophysics, Cambridge

More information

RFI: Sources, Identification, Mitigation. Ganesh Rajagopalan & Mamoru Sekido & Brian Corey

RFI: Sources, Identification, Mitigation. Ganesh Rajagopalan & Mamoru Sekido & Brian Corey RFI: Sources, Identification, Mitigation Ganesh Rajagopalan & Mamoru Sekido & Brian Corey 1 Effects of RFI on VLBI RFI increases system temperature. Depending on strength of RFI, it may affect only those

More information

Heterodyne Receivers

Heterodyne Receivers Heterodyne Receivers Introduction to heterodyne receivers for mm-wave radio astronomy 7 th 30-m Summer School September 15 th, 2013 Alessandro Navarrini IRAM, Grenoble, France Outline Introduction to Heterodyne

More information

ACA; Atacama Compact Array

ACA; Atacama Compact Array ACA; Atacama Compact Array Ryohei Kawabe, ALMA-J Project Scientist & East Asian ARC Manager ALMA-J Office NAOJ 1 Array Configuration of ALMA 12-m Array ACA The ACA System 7m Array; Twelve (12) 7-meter

More information

Investigation of the Repeatability of the NA FEIC Beam Scanner: Status Report prior to the start of PAI Testing on FE#8

Investigation of the Repeatability of the NA FEIC Beam Scanner: Status Report prior to the start of PAI Testing on FE#8 Investigation of the Repeatability of the NA FEIC Beam Scanner: Status Report prior to the start of PAI Testing on FE#8 August 13, 2009 T. R. Hunter, J. Crabtree, G. Ediss 0. Summary The repeatability

More information

Symmetry in the Ka-band Correlation Receiver s Input Circuit and Spectral Baseline Structure NRAO GBT Memo 248 June 7, 2007

Symmetry in the Ka-band Correlation Receiver s Input Circuit and Spectral Baseline Structure NRAO GBT Memo 248 June 7, 2007 Symmetry in the Ka-band Correlation Receiver s Input Circuit and Spectral Baseline Structure NRAO GBT Memo 248 June 7, 2007 A. Harris a,b, S. Zonak a, G. Watts c a University of Maryland; b Visiting Scientist,

More information

A Planar SIS Receiver with Logperiodic Antenna for Submillimeter Wavelengths. F. Schdfer *, E. Kreysa* T. Lehnert **, and K.H.

A Planar SIS Receiver with Logperiodic Antenna for Submillimeter Wavelengths. F. Schdfer *, E. Kreysa* T. Lehnert **, and K.H. Fourth International Symposium on Space Terahertz Technology Page 661 A Planar SIS Receiver with Logperiodic Antenna for Submillimeter Wavelengths F. Schdfer *, E. Kreysa* T. Lehnert **, and K.H. Gundlach**

More information

TECHNOLOGICAL DEVELOPMENTS AT IGN INSTRUMENTATION AND TECHNOLOGICAL DEVELOPMENTS AT THE IGN

TECHNOLOGICAL DEVELOPMENTS AT IGN INSTRUMENTATION AND TECHNOLOGICAL DEVELOPMENTS AT THE IGN INSTRUMENTATION AND TECHNOLOGICAL DEVELOPMENTS AT THE IGN Yebes Observatory is a Fundamental Geodetic Station where Astronomical, Geodetic and Geophysical techniques are combined. Yebes, Guadalajara, Spain

More information

NMA Antenna and Receiver Concepts

NMA Antenna and Receiver Concepts EVLA Planning Workshop NRAO, Socorro, NM August 23, 2001 NMA Antenna and Receiver Concepts 1. Station Cost Equation 2. Hydroformed Antennas 3. Wideband Receivers Sander Weinreb, Caltech/JPL sweinreb@caltech.edu

More information

Chapter 3. Instrumentation. 3.1 Telescope Site Layout. 3.2 Telescope Optics

Chapter 3. Instrumentation. 3.1 Telescope Site Layout. 3.2 Telescope Optics Chapter 3 Instrumentation 3.1 Telescope Site Layout The 12m is located on the southwest ridge of Kitt Peak, about two miles below the top of the mountain. Other telescopes on the southwest ridge are the

More information

VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS August 22, 2016

VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS August 22, 2016 To: From: Subject: VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS 01886 Space Geodesy Project August 22, 2016 Ganesh Rajagopalan and Chris Eckert Failure

More information

Receiver Design for Passive Millimeter Wave (PMMW) Imaging

Receiver Design for Passive Millimeter Wave (PMMW) Imaging Introduction Receiver Design for Passive Millimeter Wave (PMMW) Imaging Millimeter Wave Systems, LLC Passive Millimeter Wave (PMMW) sensors are used for remote sensing and security applications. They rely

More information

Antennas & Receivers in Radio Astronomy

Antennas & Receivers in Radio Astronomy Antennas & Receivers in Radio Astronomy Mark McKinnon Fifteenth Synthesis Imaging Workshop 1-8 June 2016 Purpose & Outline Purpose: describe how antenna elements can affect the quality of images produced

More information

Millimeter Wave Product Catalogue VivaTech Consulting S.A.R.L.

Millimeter Wave Product Catalogue VivaTech Consulting S.A.R.L. VivaTech Consulting S.A.R.L. sales@vivatech.biz Telephone: +33 04 89 01 14 61 Fax: +33 04 93 87 08 66 Table of Contents Millimeter Wave Low Noise Amplifiers VTLNA Series...3 Millimeter Wave Power Amplifiers

More information

ALMA Memo No NRAO, Charlottesville, VA NRAO, Tucson, AZ NRAO, Socorro, NM May 18, 2001

ALMA Memo No NRAO, Charlottesville, VA NRAO, Tucson, AZ NRAO, Socorro, NM May 18, 2001 ALMA Memo No. 376 Integration of LO Drivers, Photonic Reference, and Central Reference Generator Eric W. Bryerton 1, William Shillue 2, Dorsey L. Thacker 1, Robert Freund 2, Andrea Vaccari 2, James Jackson

More information

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free Physical Properties Measurement System (PPMS): A Cryogen-free Physical Properties Measurement system that operates over a wider range of temperature and magnetic fields: fully automated/computer controlled

More information

MMA Memo 242: Suggestion on LSA/MMA Front-end Optical Layout

MMA Memo 242: Suggestion on LSA/MMA Front-end Optical Layout MMA Memo 242: Suggestion on LSA/MMA Front-end Optical Layout Abstract Victor Belitsky belitsky@oso.chalmers.se Onsala Space Observatory Chalmers University of Technology Gothenburg, Sweden December 1998

More information

EVLA Memo # 194 EVLA Ka-band Receiver Down Converter Module Harmonics: The Mega-Birdie at MHz

EVLA Memo # 194 EVLA Ka-band Receiver Down Converter Module Harmonics: The Mega-Birdie at MHz EVLA Memo # 194 EVLA Ka-band Receiver Down Converter Module Harmonics: The Mega-Birdie at 29440 MHz R. Selina, E. Momjian, W. Grammer, J. Jackson NRAO February 5, 2016 Abstract Observations carried out

More information

SERIES PLS PHASE LOCKED SYNTHESIZER. FEATURES: Small Size, Low Cost, Simple to use Low Phase Noise Auto-sensing Internal or External 10MHz Reference

SERIES PLS PHASE LOCKED SYNTHESIZER. FEATURES: Small Size, Low Cost, Simple to use Low Phase Noise Auto-sensing Internal or External 10MHz Reference PHASE LOCKED SYNTHESIZER FEATURES: Small Size, Low Cost, Simple to use Low Phase Noise Auto-sensing Internal or External 10MHz Reference Can be utilized as a synthesizer, or a fixed frequency oscillator

More information

Revisions: jee Initial A jee Webber s comments: Prediction changed to predetection and explicit text added about Warm IF amp

Revisions: jee Initial A jee Webber s comments: Prediction changed to predetection and explicit text added about Warm IF amp Memorandum To: From: File John Effland Date: 004-09-15 Revisions: - 004-09-15 jee Initial A 004-09-16 jee Webber s comments: Prediction changed to predetection and explicit text added about Warm IF amp

More information

EVLA Memo #119 Wide-Band Sensitivity and Frequency Coverage of the EVLA and VLA L-Band Receivers

EVLA Memo #119 Wide-Band Sensitivity and Frequency Coverage of the EVLA and VLA L-Band Receivers EVLA Memo #119 Wide-Band Sensitivity and Frequency Coverage of the EVLA and VLA L-Band Receivers Rick Perley and Bob Hayward January 17, 8 Abstract We determine the sensitivities of the EVLA and VLA antennas

More information

MMA Memo 143: Report of the Receiver Committee for the MMA

MMA Memo 143: Report of the Receiver Committee for the MMA MMA Memo 143: Report of the Receiver Committee for the MMA 25 September, 1995 John Carlstrom Darrel Emerson Phil Jewell Tony Kerr Steve Padin John Payne Dick Plambeck Marian Pospieszalski Jack Welch, chair

More information

Cryogenic Systems and Receiver Maintenance

Cryogenic Systems and Receiver Maintenance Cryogenic Systems and Receiver Maintenance Christian Plötz Email: christian.ploetz@bkg.bund.de Federal Agency for Cartography and Geodesy Geodetic Observatory Wettzell Germany Objective Provide basic knowledge

More information

ALMA MEMO 429. Fixed-tuned waveguide 0.6 THz SIS Mixer with Wide band IF. 28-July-2002

ALMA MEMO 429. Fixed-tuned waveguide 0.6 THz SIS Mixer with Wide band IF. 28-July-2002 ALMA MEMO 429 Fixed-tuned waveguide 0.6 THz SIS Mixer with Wide band IF 28-July-2002 A. Baryshev 1, E. Lauria 2, R. Hesper 1, T. Zijlstra 3, W. Wild 1 1 SRON-Groningen, Groningen, NOVA, University of Groningen,

More information

RF & Microwave Amplifiers to 20GHz

RF & Microwave Amplifiers to 20GHz RF & Microwave Amplifiers to 20GHz Short form Catalog EuMW 2013 Low-Noise & Small Signal Power Amplifiers High Energy Physics Wideband GaN ECM Digital TV IMD Testing General Purpose Wideband Particle Physics,

More information

345 GHz Single Ended barney Rx, Data analyses Jacob W. Kooi 6/23/2006

345 GHz Single Ended barney Rx, Data analyses Jacob W. Kooi 6/23/2006 345 GHz Single Ended barney Rx, Data analyses Jacob W. Kooi 6/23/2006 Fig. 1 Instrument sensitivity in Hilo and the CSO. The red dot data is at the CSO. Fig. 2 IV, Y-factor and Phot/Pcold curves. Optimal

More information

Terahertz Limb Sounder TELIS. Axel Murk M. Birk, R. Hoogeveen, P. Yagoubov, B. Ellison

Terahertz Limb Sounder TELIS. Axel Murk M. Birk, R. Hoogeveen, P. Yagoubov, B. Ellison Terahertz Limb Sounder TELIS Axel Murk M. Birk, R. Hoogeveen, P. Yagoubov, B. Ellison Overview THz Limbsounder with three cryogenic receivers: 1.8 THz HEB mixer with solid state LO (DLR) 500-650 GHz superconducting

More information

Developments in Expanding the Event Horizon Telescope: Phased ALMA and South Pole Telescope

Developments in Expanding the Event Horizon Telescope: Phased ALMA and South Pole Telescope The 8 th East Asia VLBI Workshop 2015, Sapporo, Japan, 8-10 July 2015 Developments in Expanding the Event Horizon Telescope: Phased ALMA and South Pole Telescope Jan Wagner on behalf of European and Korean

More information

GPS Time and Frequency Reference Receiver

GPS Time and Frequency Reference Receiver $ GPS Time and Frequency Reference Receiver Symmetricom s 58540A GPS time and frequency reference receiver features: Eight-channel, parallel tracking GPS engine C/A Code, L1 Carrier GPS T-RAIM satellite

More information

The TWIN-Radiotelescopes Wettzell;

The TWIN-Radiotelescopes Wettzell; The TWIN-Radiotelescopes Wettzell Critical Design Points G. Kronschnabl, BKG; Dr. A. Neidhardt, TUM; Dr. K. Pausch, Vertex GmbH; W. Göldi, Mirad; R. Rayet, Callisto; A. Emrich, Omnisys; 1 VLBI 2010 VLBI

More information

Hardware Commissioning

Hardware Commissioning Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status

More information

Isolation Amplifier (electrically isolated input-output) ISO 6, ISO 4 and ISO 2. Instrumentation Amplifier (low drift) IA 6, IA 4, IA 2

Isolation Amplifier (electrically isolated input-output) ISO 6, ISO 4 and ISO 2. Instrumentation Amplifier (low drift) IA 6, IA 4, IA 2 Isolation Amplifier (electrically isolated input-output) ISO 6, ISO 4 and ISO 2 Instrumentation Amplifier (low drift) IA 6, IA 4, IA 2 Low Noise Amplifier LNA6, LNA4, LNA2 Square Wave Stimulator DST8 (Digitally

More information

A Noise-Temperature Measurement System Using a Cryogenic Attenuator

A Noise-Temperature Measurement System Using a Cryogenic Attenuator TMO Progress Report 42-135 November 15, 1998 A Noise-Temperature Measurement System Using a Cryogenic Attenuator J. E. Fernandez 1 This article describes a method to obtain accurate and repeatable input

More information

Etude d un récepteur SIS hétérodyne multi-pixels double polarisation à 3mm de longueur d onde pour le télescope de Pico Veleta

Etude d un récepteur SIS hétérodyne multi-pixels double polarisation à 3mm de longueur d onde pour le télescope de Pico Veleta Etude d un récepteur SIS hétérodyne multi-pixels double polarisation à 3mm de longueur d onde pour le télescope de Pico Veleta Study of a dual polarization SIS heterodyne receiver array for the 3mm band

More information

Measurements of Allan Variance and short term phase noise of millimeter Local Oscillators

Measurements of Allan Variance and short term phase noise of millimeter Local Oscillators Measurements of Allan Variance and short term phase noise of millimeter Local Oscillators R. Ambrosini Institute of Radioastronomy, CNR Bologna, Italy 24 May 2000 Abstract Phase stability over rather wide

More information

The 4mm (68-92 GHz) Receiver

The 4mm (68-92 GHz) Receiver Chapter 18 The 4mm (68-92 GHz) Receiver 18.1 Overview The 4 mm receiver ( W-band ) is a dual-beam, dual-polarization receiver which covers the frequency range of approximately 67-93 GHz. The performance

More information

EVLA System Commissioning Results

EVLA System Commissioning Results EVLA System Commissioning Results EVLA Advisory Committee Meeting, March 19-20, 2009 Rick Perley EVLA Project Scientist t 1 Project Requirements EVLA Project Book, Chapter 2, contains the EVLA Project

More information

November SKA Low Frequency Aperture Array. Andrew Faulkner

November SKA Low Frequency Aperture Array. Andrew Faulkner SKA Phase 1 Implementation Southern Africa Australia SKA 1 -mid 250 15m dia. Dishes 0.4-3GHz SKA 1 -low 256,000 antennas Aperture Array Stations 50 350/650MHz SKA 1 -survey 90 15m dia. Dishes 0.7-1.7GHz

More information

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES LARGE SCALE TESTING OF SRF CAVITIES AND MODULES Jacek Swierblewski IFJ PAN Krakow IKC for the XFEL Introduction IFJ PAN 2 Institute of Nuclear Physics (IFJ) located in Kraków, Poland was founded in 1955

More information

EVLA Antenna and Array Performance. Rick Perley

EVLA Antenna and Array Performance. Rick Perley EVLA Antenna and Array Performance System Requirements EVLA Project Book, Chapter 2, contains the EVLA system requirements. For most, astronomical tests are necessary to determine if the array meets requirements.

More information

A TECHNIQUE TO EVALUATE THE IMPACT OF FLEX CABLE PHASE INSTABILITY ON mm-wave PLANAR NEAR-FIELD MEASUREMENT ACCURACIES

A TECHNIQUE TO EVALUATE THE IMPACT OF FLEX CABLE PHASE INSTABILITY ON mm-wave PLANAR NEAR-FIELD MEASUREMENT ACCURACIES A TECHNIQUE TO EVALUATE THE IMPACT OF FLEX CABLE PHASE INSTABILITY ON mm-wave PLANAR NEAR-FIELD MEASUREMENT ACCURACIES Daniël Janse van Rensburg Nearfield Systems Inc., 133 E, 223rd Street, Bldg. 524,

More information

MPIfR KOSMA MPS DLR-PF

MPIfR KOSMA MPS DLR-PF ATM 1-5 THz, 14 km altitude S. Heyminck Max-Planck-Institute for Radio Astronomy Ringberg Workshop 2015 Page 1 GREAT - the Consortium GREAT: German REceiver for Astronomy at Terahertz frequencies Principle

More information

Automatic Tracking Filter for DDS Generator

Automatic Tracking Filter for DDS Generator Riccardo Gionetti, IØFDH Via S. Bernadette, 00 Roma RM, Italy: rgionetti@virgilio.it Automatic Tracking Filter for DDS Generator Reduce spurious responses from a digital synthesizer with this filter. The

More information

Introduction to Surface Acoustic Wave (SAW) Devices

Introduction to Surface Acoustic Wave (SAW) Devices May 31, 2018 Introduction to Surface Acoustic Wave (SAW) Devices Part 7: Basics of RF Circuits Ken-ya Hashimoto Chiba University k.hashimoto@ieee.org http://www.te.chiba-u.jp/~ken Contents Noise Figure

More information

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Current Projects CABB ATCA C/X Upgrade FAST Parkes

More information