Hardware Commissioning

Size: px
Start display at page:

Download "Hardware Commissioning"

Transcription

1 Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status of the documentation document plan tools for following progress and storing test results superconducting electrical circuits normal conducting electrical circuits special regions of the collider 1

2 documentation: superconducting electrical circuits Power Converters not connected to to Magnets Power Converters connected to Magnets Test of power converters connected to the DC cables in short circuit, including controls for powering, ramp, monitoring Interlock tests of a powering subsector prior and after connection of the power cables to the DFB leads Individual System Tests of Powering Interlock Control Individual System Tests of the Quench Protection and Energy Extraction Systems Post-Mortem System tests Commissioning of the electrical circuits one by one or in groups at low, intermediate and nominal currents connexion of power cables to current leads Commissioning of all the electrical circuits of the sector powered in unison to nominal current with nominal ramp rates Electrical Quality Assurance 300 K 90 K 1.9 K documentation: superconducting electrical circuits LHC-D-HCP-0001 Power Converters not connected to Magnets Power Converters connected to Magnets LHC-R-HCP-0001 LHC-D-HCP-0002 LHC-D-HCP-0003 Test of power converters connected to the DC cables in short circuit, including controls for powering, ramp, monitoring LHC-CI-TP-0001 Interlock tests of a powering subsector prior and after connection of the power cables to the DFB leads Individual System Tests of Powering Interlock Control LHC-DQ-TP-0001 Individual System Tests of the Quench Protection and Energy Extraction Systems Post-Mortem System tests Commissioning of the electrical circuits one by one or in groups at low, intermediate and nominal currents LHC-DE-TP-0001 Electrical Quality Assurance connexion of power cables to current leads Commissioning of all the electrical circuits of the sector powered in unison to nominal current with nominal ramp rates LHC-DFL-HCP K 90 K 1.9 K 2

3 documentation: superconducting electrical circuits The Commissioning of the AC Electrical Distribution in the LHC Tunnels, Galleries and Caverns The Commissioning of the Water Cooling System in the LHC Tunnels, Galleries and Caverns The Commissioning of the Ventilation System in the Tunnels, Galleries and Caverns Individual System Tests of Powering Interlock Control Individual System Tests of the Quench Protection and Energy Extraction Systems Electrical Quality Assurance Test of power converters connected to the DC cables in short circuit, including controls for powering, ramp, monitoring Interlock tests between Power Converters, QPS and PIC together before connection to magnets and at stand-by current Commissioning of the electrical circuits one by one or in groups at low, intermediate and nominal currents Commissioning of all the electrical circuits of the sector powered in unison to nominal current with nominal ramp rates documentation: other areas normal conducting electrical circuits special regions of the collider RF injection dump inner triplet software applications walkthrough the procedures state diagrams LHC-MW-HCP-0001 LHC-A-HCP-0001 LHC-I-HCP-0001 LHC-TD-HCP-0001 LHC-D-HCP-0004 MTF 3

4 Resources for Hardware Commissioning basic assumptions programme of the tests sequence of the tests time needed for each test inventory of the test teams and their composition This document presents the resources identified for a commissioning scenario restricted by a number of assumptions: in particular, the parallel commissioning of two sectors around an even point -not more and not less- and the staggered commissioning of an additional set of two sectors where the cool down follows the of the first set. However from the data presented in this document, it is possible to derive the resources needed for a different scenario when some of the restrictions are lifted or relaxed. Resources for Hardware Commissioning basic assumptions programme of the tests sequence of the tests time needed for each test inventory of the test teams and their composition 1. Two sectors at a time around an even point 2. Five-day working weeks 3. Two shifts during 4. Two commissioning fronts per sector 5. The magnets are left floating in temperature after the commissioning 6. The RF system is commissioned just before commissioning with beam 7. The PS and SPS complex run in

5 Management Report : RESOURCES FOR HARDWARE COMMISSIONING basic assumptions programme of the tests sequence of the tests time needed for each test inventory of the test teams and their composition 1. Tests at warm validation of subsystems, connectivity, computer networks and filed buses, timing, supervision, etc. validation of the instrumentation and subsystem functional tests electrical quality assurance short circuit tests, interlocks 2. Cool down calibration at cold and cryo loop tuning electrical quality assurance 3. Tests at cold electrical quality assurance quench protection 4. Powering Tests validation of the interlocks validation at low, nominal current and all circuits in unison The resulting schedule tests at cold weeks right of the even point 8weeks left of the even point 23 weeks 5

6 Parallelism as per basic assumptions 28 months the adjusted overloading only the Operator,, HC Coordination and Cryo Operation Teams specified in the report 20 months The resulting need for resources with the basic assumption The personnel involved in the individual system tests and the hardware commissioning 142 of which 46 are missing. Additional budget for IS and FSU is MCHF. Cryogenic Instrumentation & Process Control Technical Engineer Engineer Database Expert Quench Protection Technician Engineer Machine Interlocks Technician Electrical Engineering (Power Converters) Technician Engineer Commissioning Coordination Technician Engineer Controls Technician Engineer Missing Possible Source Staff Staff Staff Staff Staff, IS 6

7 Report Summary with the basic assumption ~20 months 142 people involved 46 missing in some cases experience is a must engineers and technicians cryogenics quench protection interlocks coordination & operation controls possible sources national institutes but also recruitment staff for supervision is already critical training of new resources for commissioning is critical what do we do with the Report? convince Management this is serious find additional resources study alternatives strategies alternative to personnel directly under the supervision of the Groups partial commissioning of the sectors review the commissioning procedures 7

8 commissioning time as planned feasible but with additional resources not yet found [months] MAC14 MAC15 MAC16 0 Jan 03 Apr 03 Jul 03 Oct 03 Feb 04 May 04 Aug 04 Dec 04 Mar 05 Jun 05 Sep 05 Jan 06 Apr 06 Jul 06 Nov 06 Feb 07 May 07 Aug 07 programme for the coming year: the latest schedule... Sylvain Weisz on November 26, 2004 at TCC 8

9 the equipment concerned Inner Triplet L8 with a Separation Dipole Part of the Matching Section L8 with a Separation Dipole Sector 78 : installation sequence 1 install QRL subsectors A and B in sector 78 with a return module 2 leak and pressure test the QRL subsectors A and B in sector 78 with the return module 3 cold test the QRL subsectors without any magnet connected to it and warm it up 4 install the Q 1 Q 2 Q 3 D 1, Q 4 D 2 and the Q 5 machine subsectors and connect them to the QRL subsectors A and B in parallel, install and interconnect the rest of the QRL in the sector in parallel, start the interconnection of all the magnets without jumper connection in the DS region L8 and first two arc cells 5 leak and pressure test the QRL and the Q 1 Q 2 Q 3 D 1, Q 4 D 2 and the Q 5 machine subsectors 6 cold test the QRL and the Q 1 Q 2 Q 3 D 1, Q 4 D 2 and the Q 5 machine subsectors 7 power test the Q 1 Q 2 Q 3 D 1, Q 4 D 2 and the Q 5 machine subsectors in parallel, interconnect all the magnets without jumper connection 8 warm up the QRL and the Q 1 Q 2 Q 3 D 1, Q 4 D 2 and the Q 5 machine subsectors 9 install and interconnect all the SSSs with jumper 10 leak and pressure test 11 open cryostat interconnect and final closure Point 7 Point 8 9

10 Sector 78 : installation sequence as planned key dates 13 June October October March 2006 QRL test LSS subsector partly in parallel with QRL test of whole sector power tests of LSS subsector partly in parallel with QRL test of whole sector power tests of LSS subsector must end by 10

11 the sector test in in summary the work on documentation is close to the end domains studied and documents started or published feasibility of the computer assisted progress follow-up and storage of test results the priority for 2005 is the detailed program for sector 78 and the preparation for the deployment of the teams in the field the Hardware Commissioning of LSS L8 (String 3!) the time available for commissioning has been constantly reduced over the past year without compensating it with adequate resources 2005 is promising to be a very interesting year 11

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07 Plan for Collimator Commissioning R. Assmann, CERN/AB 7/12/2007 for the Collimation Project LHC MAC RWA, LHC MAC 12/07 1) Installation Planning and Performance Reach Collimation is an performance-driven

More information

ELQA maintenance, diagnostics and data handling

ELQA maintenance, diagnostics and data handling ELQA maintenance, diagnostics and data handling Jaromir Ludwin The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy of Sciences, Kraków Poland WP definition KE2058/TE KE2059/TE KE2060/TE

More information

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland LHC STATUS Lyndon Evans, CERN, Geneva, Switzerland Abstract The installation of the Large Hadron Collider at CERN is now approaching completion. Almost 1100 of the 1232 main bending magnets are installed

More information

Series manufacture of the LHC main. dipole magnets. Notes about the CERN. approach to industrial. production. C.Wyss & L.

Series manufacture of the LHC main. dipole magnets. Notes about the CERN. approach to industrial. production. C.Wyss & L. Series manufacture of the LHC main dipole magnets Notes about the CERN approach to industrial production C.Wyss & L.Rossi / CERN SCRF05-12 July 2005 L.Rossi & C.Wyss - CERN 1 1232 +16 units, 8.3 T nominal

More information

THE ELECTRICAL CIRCUITS IN THE LHC REFERENCE DATABASE

THE ELECTRICAL CIRCUITS IN THE LHC REFERENCE DATABASE CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project Project Document No. CERN Div./Group or Supplier/Contractor Document No. AC-TCP EDMS Document No. 355662 Date: 2003-01-06 Engineering

More information

LHC: CONSTRUCTION AND COMMISSIONING STATUS

LHC: CONSTRUCTION AND COMMISSIONING STATUS LHC: CONSTRUCTION AND COMMISSIONING STATUS L. Evans, CERN, Geneva, Switzerland. Abstract The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with

More information

LHC COMMISSIONING AT HIGHER ENERGY

LHC COMMISSIONING AT HIGHER ENERGY LHC COMMISSIONING AT HIGHER ENERGY P. Collier, F. Bordry, J. Wenninger, CERN, Geneva, Switzerland Abstract The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway

More information

ELECTRONIC SYSTEMS FOR THE PROTECTION OF SUPERCONDUCTING ELEMENTS IN THE LHC

ELECTRONIC SYSTEMS FOR THE PROTECTION OF SUPERCONDUCTING ELEMENTS IN THE LHC EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 697 ELECTRONIC SYSTEMS FOR THE PROTECTION OF SUPERCONDUCTING ELEMENTS

More information

CERN PS, SL & ST Divisions

CERN PS, SL & ST Divisions EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN PS, SL & ST Divisions CERN-PS-2002 CERN-SL-2002 CERN-ST-2002 1 st February 2002 TOWARDS A COMMON MONITORING

More information

2008 JINST 3 S Powering and protection. Chapter Overview. 6.2 Powering circuits

2008 JINST 3 S Powering and protection. Chapter Overview. 6.2 Powering circuits Chapter 6 Powering and protection 6.1 Overview A very large number of superconducting and normal conducting magnets will be installed in the LHC, and most magnets of a given type in the same sector will

More information

3.9 GHz System (AH1) XFEL WP46

3.9 GHz System (AH1) XFEL WP46 3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status

More information

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES LARGE SCALE TESTING OF SRF CAVITIES AND MODULES Jacek Swierblewski IFJ PAN Krakow IKC for the XFEL Introduction IFJ PAN 2 Institute of Nuclear Physics (IFJ) located in Kraków, Poland was founded in 1955

More information

SPS Crab Cavity Validation Run ( )

SPS Crab Cavity Validation Run ( ) SPS Crab Cavity Validation Run (2017-2018) Alick Macpherson BE-RF-SRF Acknowledgments Marton Ady, Vincent Baglin, Philippe Baudrenghien, Krzyzstof Brodzinski, Rama Calaga, Ofelia Capatina, Frederic Galleazzi,

More information

THE HARDWARE INTERFACES BETWEEN WARM MAGNET INTERLOCK SYSTEM, NORMAL CONDUCTING MAGNETS, POWER CONVERTERS AND BEAM INTERLOCK SYSTEM FOR THE LHC RING

THE HARDWARE INTERFACES BETWEEN WARM MAGNET INTERLOCK SYSTEM, NORMAL CONDUCTING MAGNETS, POWER CONVERTERS AND BEAM INTERLOCK SYSTEM FOR THE LHC RING CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. AB/CO EDMS Document No. 599288 Date: 2005-06-09 Engineering

More information

Motivation: ERL based e linac for LHeC

Motivation: ERL based e linac for LHeC Erk Jensen, for the LHeC team and the RF group ERL 2013, BINP, Novosibirsk, 09 Sep 2013 09 Sep 2013 1 Motivation: ERL based e linac for LHeC ( O. Brünings presentation) NB.: This is a 09 Sep 2013 2 Some

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

INTERLOCK AND PROTECTION SYSTEMS FOR SUPERCONDUCTING ACCELERATORS: MACHINE PROTECTION SYSTEM FOR THE LHC

INTERLOCK AND PROTECTION SYSTEMS FOR SUPERCONDUCTING ACCELERATORS: MACHINE PROTECTION SYSTEM FOR THE LHC INTERLOCK AND PROTECTION SYSTEMS FOR SUPERCONDUCTING ACCELERATORS: MACHINE PROTECTION SYSTEM FOR THE LHC K.H. Meß and R. Schmidt CERN, Geneva, Switzerland Abstract The protection of the LHC accelerator

More information

Standard ELQA measurements, ELQA for splice and proximity equipment consolidation

Standard ELQA measurements, ELQA for splice and proximity equipment consolidation Standard ELQA measurements, ELQA for splice and proximity equipment consolidation Piotr Jurkiewicz The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy of Sciences, Kraków Poland ELQA

More information

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction Chapter 4 The RF systems and beam feedback 4.1 Introduction The injected beam will be captured, accelerated and stored using a 400 MHz superconducting cavity system, and the longitudinal injection errors

More information

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

Recreation Facility Hours

Recreation Facility Hours NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV

More information

Magnet Powering with zero downtime a dream?

Magnet Powering with zero downtime a dream? Magnet Powering with zero downtime a dream? M. Zerlauth LHC Performance Workshop February 2012 Thanks to : HWC team, H.Thiesen, V.Montabonnet, J.P.Burnet, S.Claudet, E.Blanco, R.Denz, R.Schmidt, E.Blanco,

More information

Strategy for the engineering integration of the ESS accelerator

Strategy for the engineering integration of the ESS accelerator Applications of Nuclear Techniques (CRETE15) International Journal of Modern Physics: Conference Series Vol. 44 (2016) 1660208 (7 pages) The Author(s) DOI: 10.1142/S2010194516602088 Nikolaos Gazis nick.gazis@esss.se

More information

Minutes of the ALICE Technical Board, CERN

Minutes of the ALICE Technical Board, CERN ALICE MIN-2012-10 TB_F-2012 Date 15.10.2012 Minutes of the ALICE Technical Board, CERN 11.10.2012 1. Minutes The draft minutes of the June 2012 TB were approved. No minutes were taken of the July, August

More information

ALMA Interferometer and Band 7 Cartridge

ALMA Interferometer and Band 7 Cartridge ALMA Interferometer and Band 7 Cartridge B7 Cartridge designed, assembled and tested by: S. Mahieu, D. Maier (mixer team lead), B. Lazareff (now at IPAG) G. Celestin, J. Chalain, D. Geoffroy, F. Laslaz,

More information

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem

More information

The HL-LHC Machine *

The HL-LHC Machine * Chapter 3 The HL-LHC Machine * I. Bejar 1, O. Brüning 1, P. Fessia 2, L. Rossi 1, R. Tomas 3 and M. Zerlauth 2 1 CERN, Accelerator and Technology Sector, Genève 23, CH-1211, Switzerland 2 CERN, TE Department,

More information

Betatron cleaning in IR3: results of FLUKA calculations. Fluka team

Betatron cleaning in IR3: results of FLUKA calculations. Fluka team Betatron cleaning in IR3: results of FLUKA calculations Fluka team R2E Meeting, July 17 th 2008 Goal of the study Verify the impact of the optional temporary functional move of the betatron cleaning to

More information

Information Warfare Research Project

Information Warfare Research Project SPACE AND NAVAL WARFARE COMMAND Information Warfare Research Project Charleston Defense Contractors Association 49th Small Business Industry Outreach Initiative 30 August 2018 Mr. Don Sallee SSC Atlantic

More information

KEYWORDS: LHC, helium cryogenics, superconductor, electrical feedbox, HTS current leads, busbar, magnet

KEYWORDS: LHC, helium cryogenics, superconductor, electrical feedbox, HTS current leads, busbar, magnet N EDMS 1035275 COMMISSIONING OF THE CRYOGENICS OF THE LHC LONG STRAIGHT SECTIONS A. Perin 1, J. Casas-Cubillos 1, S. Claudet 1, C. Darve 2, G. Ferlin 1, F. Millet 1, C. Parente 1, R. Rabehl 2, M. Soubiran

More information

Miljardkonferensen Procurement at CERN

Miljardkonferensen Procurement at CERN Miljardkonferensen Procurement at CERN 29 April 2015, Stockholm Anders Unnervik Procurement at CERN Introduction to CERN Procurement budget What does CERN buy? How? Procedures and Rules What is in it for

More information

Operation of the LHC Cryogenics system and interface with beam & machine operation

Operation of the LHC Cryogenics system and interface with beam & machine operation Operation of the LHC Cryogenics system and interface with beam & machine operation S. Claudet (CERN, Geneva) on behalf of the Cryogenics Group Technology Department Outline Introduction to LHC Cryogenics

More information

FLASH II: an Overview

FLASH II: an Overview FLASH II: an Overview 1. Layout. 2. Status 1. Civil Construction 2. E-beamline 3. Photon Beamline 3. Timeplan 4. Finances 5. Personnel Situation 6. Simultaneous Operation of FLASH1 and 2 FLASH II is a

More information

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13) Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters

More information

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55

More information

The ATLAS Toroid Magnet

The ATLAS Toroid Magnet The ATLAS Toroid Magnet SUN Zhihong CEA Saclay DAPNIA/SIS 1 The ATLAS Magnet System The ATLAS Barrel Toroid Mechanical computations on the Barrel Toroid structure Manufacturing and assembly of the Barrel

More information

Cryogenic Operations at SLAC

Cryogenic Operations at SLAC Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation

More information

Status and Future Perspective of the HIE-ISOLDE Project

Status and Future Perspective of the HIE-ISOLDE Project Status and Future Perspective of the HIE-ISOLDE Project International Particle Accelerator Conference, IPAC 12 New Orleans, Louisiana, USA, May 20-25, 2012 Yacine.Kadi@cern.ch OUTLINE Scope of HIE-ISOLDE

More information

Philippe Lebrun & Laurent Tavian, CERN

Philippe Lebrun & Laurent Tavian, CERN 7-11 July 2014 ICEC25 /ICMC 2014 Conference University of Twente, The Netherlands Philippe Lebrun & Laurent Tavian, CERN Ph. Lebrun & L. Tavian, ICEC25 Page 1 Contents Introduction: the European Strategy

More information

INDUSTRIAL CONTROLS FOR TEST SYSTEMS FROM SUPERCONDUCTING STRANDS TILL MAGNET FIDUCIALISATION IN THE TUNNEL FOR THE LHC PROJECT

INDUSTRIAL CONTROLS FOR TEST SYSTEMS FROM SUPERCONDUCTING STRANDS TILL MAGNET FIDUCIALISATION IN THE TUNNEL FOR THE LHC PROJECT INDUSTRIAL CONTROLS FOR TEST SYSTEMS FROM SUPERCONDUCTING STRANDS TILL MAGNET FIDUCIALISATION IN THE TUNNEL FOR THE LHC PROJECT ABSTRACT A. Rijllart, C. Charrondière, B. Khomenko, M. Marchesotti, E. Michel,

More information

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 896 Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting

More information

LHC MAGNET POLARITIES

LHC MAGNET POLARITIES CEN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project 9LHC Project Document No. CEN Div./Group or Supplier/Contractor Document No. AB/CO, LHC/TCP, AT/MEL EDMS Document No. 90041 Date: 2005-08-09

More information

FORESIGHT METHOD HORIZONS. Module. Introduction to Foresight for Canada Beyond 150

FORESIGHT METHOD HORIZONS. Module. Introduction to Foresight for Canada Beyond 150 HORIZONS FORESIGHT METHOD for Canada Beyond 50 OVERVIEW Where are we in the process? What is Horizons approach to foresight? How do the foresight tools fit together for Canada Beyond 50? 2 A NEW MODEL

More information

DESIGN, PRODUCTION AND FIRST COMMISSIONING RESULTS OF THE ELECTRICAL FEEDBOXES OF THE LHC

DESIGN, PRODUCTION AND FIRST COMMISSIONING RESULTS OF THE ELECTRICAL FEEDBOXES OF THE LHC EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1071 DESIGN, PRODUCTION AND FIRST COMMISSIONING RESULTS OF THE ELECTRICAL

More information

Demonstration of PFR Improvement September ERCOT Operations Planning

Demonstration of PFR Improvement September ERCOT Operations Planning Demonstration of PFR Improvement September 2017 ERCOT Operations Planning Agenda Overview BAL-001-TRE-1 Standard Applicability to Alternative Resources Ancillary Service Products & Dispatch Improvements

More information

STPA FOR LINAC4 AVAILABILITY REQUIREMENTS. A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016

STPA FOR LINAC4 AVAILABILITY REQUIREMENTS. A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016 STPA FOR LINAC4 AVAILABILITY REQUIREMENTS A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016 LHC colliding particle beams at very high energy 26.8 km Circumference LHC Accelerator (100

More information

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13. Simpson, B., & Vardanega, P. J. (2014). Results of monitoring at the British library excavation. Proceedings of the ICE - Geotechnical Engineering, 167(2), 99-116. DOI: 10.1680/geng.13.00037 Peer reviewed

More information

IFJ PAN contribution to international projects

IFJ PAN contribution to international projects IFJ PAN contribution to international projects D. Bocian, A. Kotarba, J. Ludwin, M. Stodulski, J. Świerblewski, M. Wiencek IFJ PAN - ESS meeting Lund, 25 th June 2013 Kraków (Cracow) 700,000 inhabitants

More information

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. AC/TCP EDMS Document No. 107398 Date: 1999-11-16 Quality

More information

Beam Loss Monitoring (BLM) System for ESS

Beam Loss Monitoring (BLM) System for ESS Beam Loss Monitoring (BLM) System for ESS Lali Tchelidze European Spallation Source ESS AB lali.tchelidze@esss.se March 2, 2011 Outline 1. BLM Types; 2. BLM Positioning and Calibration; 3. BLMs as part

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE

Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Current Projects CABB ATCA C/X Upgrade FAST Parkes

More information

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals

More information

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1 RF Gun History RF Guns operated

More information

POWERING LAYOUT OF THE SSS CORRECTION SCHEME (Optics version 6.4)

POWERING LAYOUT OF THE SSS CORRECTION SCHEME (Optics version 6.4) CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project ocument No. LHC-CC-ES-0003.00 rev. 3.0 CERN iv./group or Supplier/Contractor ocument No. LHC-CRI/PB/cl EMS ocument No. 104157

More information

LHC Electronics irradiation tests in the CNGS side gallery September 2009

LHC Electronics irradiation tests in the CNGS side gallery September 2009 LHC Electronics irradiation tests in the CNGS side gallery September 2009 D.Kramer for the RADWG Thanks to B.Todd, E.Gousiou, E.Calvo, E.Effinger, R.Denz, K.Roeed, J.Lendaro, M.Brugger, EN/MEF, DG/SCR,

More information

How did the LHC access system perform in 2009

How did the LHC access system perform in 2009 How did the LHC access system perform in 2009 L. Ponce On behalf of the OP team And a special thanks to all the volunteers who helped giving access Outline Some preliminary remarks Status and major issues

More information

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS CH-1211 Geneva 23 Switzerland the Large Hadron Collider project Div./Group or Supplier/Contractor Document No. AC/TCP EDMS Document No. 107398 Date: 1999-10-07 Quality Assurance Definition NAMING CONVENTIONS

More information

Overview over CERN SPS test beams

Overview over CERN SPS test beams Overview over CERN SPS test beams A. Gerbershagen On behalf of CERN Experimental Areas Group 17/1/2018 A. Gerbershagen - Overview over CERN SPS secondary beams 1 CERN Accelerator Complex SPS : protons/ions

More information

SOLEIL Libera Performance

SOLEIL Libera Performance SOLEIL Libera Performance Libera Workshop 24/25 September 2007 on behalf of the SOLEIL BPM team BPM system: MAC2 requirements, Feb. 2002 closed orbit Correction number of BPMs 120 instead of 112 single

More information

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013 NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP Embargo until 15.00 hours on 11 th January 2013 Our monthly estimates of GDP suggest that output declined by 0.3 per cent in

More information

Draft of Conceptual Phase 2 Collimation System Design. Phase 2 Specification and Implementation Meeting R. Assmann

Draft of Conceptual Phase 2 Collimation System Design. Phase 2 Specification and Implementation Meeting R. Assmann Draft of Conceptual Phase 2 Collimation System Design Phase 2 Specification and Implementation Meeting R. Assmann 22.05.2008 Introduction So far 5 meetings for phase 2 specification. Goal today: Discuss

More information

CERN (The European Laboratory for Particle Physics)

CERN (The European Laboratory for Particle Physics) 462 IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, VOL. 48, NO. 2, APRIL 1999 The Measurement Challenge of the LHC Project Gunnar Fernqvist Abstract In 2005, CERN is planning to commission its next

More information

Brett Parker, representing the

Brett Parker, representing the Compact Superconducting Magnet Solution for the 20 mr Crossing Angle Final Focus Brett Parker, representing the Brookhaven Superconducting Magnet Division Message: Progress continues on the compact superconducting

More information

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Every accelerator needs a linac as injector to pass the region where the velocity of the particles increases with energy. At high energies (relativity)

More information

MERcury Intense Target (MERIT) Experiment or ntof-11

MERcury Intense Target (MERIT) Experiment or ntof-11 MERcury Intense Target (MERIT) Experiment or ntof-11 Experiment overview & Safety Issues Contact persons: Ilias Efthymiopoulos Adrian Fabich Mercury fountain, Funtació Juan Miró, Barcelona - Spain AB Safety

More information

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY Presented at the 1999 Particle Accelerator Conference, New York City, NY, USA, March 29 April 2 CLNS 99/1614 / SRF 990407-03 THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

VErtex LOcator (VELO)

VErtex LOcator (VELO) Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group 1 Overview Introduction LHCb experiment. The Vertex Locator (VELO). Description of System.

More information

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special

More information

Review of the UK oilfield services industry. January 2016

Review of the UK oilfield services industry. January 2016 Review of the UK oilfield services industry January 2016 Wells 04 Review of the UK oilfield services industry January 2016 23 Wells Figure 15: UK upstream oil and gas supply chain sub-sectors Supply chain

More information

Cryogenics for Large Accelerators

Cryogenics for Large Accelerators Cryogenics for Large Accelerators Dr. Sergiy Putselyk Deutsches Elektronen-Synchrotron (DESY) MKS Division Notkestrasse 85 22607 Hamburg (Germany) Phone: +49 40 89983492 Fax: +49 40 89982858 E-Mail: Sergiy.Putselyk@desy.de

More information

RESISTIVE SOLDERING OF LINE N 6 ka BUS BARS IN THE DISPERSION SUPRESSOR ZONE

RESISTIVE SOLDERING OF LINE N 6 ka BUS BARS IN THE DISPERSION SUPRESSOR ZONE CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. AT-CRI-CI/TC/cl EDMS Document No. 362427 Date: 2004-06-10

More information

Patrick Frome Luke Ivers Molly Marineau. Established in 1982, The Pritchard Art gallery is located

Patrick Frome Luke Ivers Molly Marineau. Established in 1982, The Pritchard Art gallery is located PRITCHARD ART GALLERY CASE STUDY Patrick Frome Luke Ivers Molly Marineau BUILDING DESCRIPTION PRITCHARD ART GALLERY Established in 1982, The Pritchard Art gallery is located at 414 S. Main St. Moscow,

More information

High-Speed Mobile Communications in Hostile Environments

High-Speed Mobile Communications in Hostile Environments High-Speed Mobile Communications in Hostile Environments S Agosta, R Sierra and F Chapron CERN IT department, CH-1211 Geneva 23, Switzerland E-mail: stefano.agosta@cern.ch, rodrigo.sierra@cern.ch, frederic.chapron@cern.ch

More information

C ll l i l m i a m to t rs Słąwomir Wronka O t u l t i l n i e

C ll l i l m i a m to t rs Słąwomir Wronka O t u l t i l n i e Collimators High Power Hadron Machines, CAS Bilbao, 31.05.2011 Słąwomir Wronka Outline Introduction & definitions Types of collimators Typical chalanges & problems Examples 1 Definition A collimator is

More information

SHMS Q2Q3Dipole Acceptance Test Plans Operations and Lessons Learned

SHMS Q2Q3Dipole Acceptance Test Plans Operations and Lessons Learned SHMS Q2Q3Dipole Acceptance Test Plans Operations and Lessons Learned Paul Brindza Q2Q3D ERR Oct. 12, 2016 9/29/2016 Q2Q3D ERR Review October 12, 2016 1 Outline Q2Q3D Testing Magnet assembly testing Acceptance

More information

Real-time Cooperative Behavior for Tactical Mobile Robot Teams. September 10, 1998 Ronald C. Arkin and Thomas R. Collins Georgia Tech

Real-time Cooperative Behavior for Tactical Mobile Robot Teams. September 10, 1998 Ronald C. Arkin and Thomas R. Collins Georgia Tech Real-time Cooperative Behavior for Tactical Mobile Robot Teams September 10, 1998 Ronald C. Arkin and Thomas R. Collins Georgia Tech Objectives Build upon previous work with multiagent robotic behaviors

More information

A New Cryogenic Test Facility for Large and Heavy Superconducting Magnets

A New Cryogenic Test Facility for Large and Heavy Superconducting Magnets 2LPo2C-08 1 A New Cryogenic Test Facility for Large and Heavy Superconducting Magnets L. Serio, P. Schnizer, M. Arnaud, C. Bertone, E. Blanco, D. Calcoen, M. Charrondiere, E. J. Cho, G.-J. Coelingh, K.

More information

UNC Mod Proposal 373. GSOG suggestions on. Jacopo Vignola. 18 th May 2011 UNC Transmission Workstream

UNC Mod Proposal 373. GSOG suggestions on. Jacopo Vignola. 18 th May 2011 UNC Transmission Workstream GSOG suggestions on UNC Mod Proposal 373 Jacopo Vignola 18 th May 2011 UNC Transmission Workstream Agenda Objectives Current arrangements Concerns Proposal Objectives Map current arrangements What are

More information

Subtracting Rational Numbers

Subtracting Rational Numbers . How can you use what you know about subtracting integers to subtract rational numbers? ACTIVITY: Work with a partner. Use a number line to find the difference. a. Then move unit left to end at. Subtract.

More information

Welcome to the Wonderful World of Cryogenics

Welcome to the Wonderful World of Cryogenics Cryogenics Spring 2011 Phy 4550 (section 1329) Phy 6555C (sections 1339 and 8890) Tuesday/Thursday (5:10 pm to 6:25 pm) Rm 1002 NPB Right after Physics Colloquium Gary G. Ihas ihas@phys.ufl.edu 352-392-9244

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT 21-22 FIRST QUARTER REPORT Active Cable TV Connections AFN Cable connections in the business plan are projected to be 2,44 by July 22. As of October 31, 21, there are 1,895 connections, which means AFN

More information

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER C. Zhang, G.X. Pei for BEPCII Team IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China Abstract BEPCII, the second phase construction

More information

Metrological Telecommunication System Development Project

Metrological Telecommunication System Development Project Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:

More information

AUTOMATIC PID PERFORMANCE MONITORING APPLIED TO LHC CRYOGENICS

AUTOMATIC PID PERFORMANCE MONITORING APPLIED TO LHC CRYOGENICS AUTOMATIC PID PERFORMANCE MONITORING APPLIED TO LHC CRYOGENICS Abstract At CERN, the LHC (Large Hadron Collider) cryogenic system employs about 5000 PID (Proportional Integral Derivative) regulation loops

More information

Software as a Medical Device (SaMD)

Software as a Medical Device (SaMD) Software as a Medical Device () Working Group Status Application of Clinical Evaluation Working Group Chair: Bakul Patel Center for Devices and Radiological Health US Food and Drug Administration NWIE

More information

STRLodgingPerformanceSnapshotAugust2017CYTD

STRLodgingPerformanceSnapshotAugust2017CYTD % Occupancy % Occ ADR % ADR RevPAR % RevPAR County Cityof Downtown MissionValey MissionBay LaJola Pt.LomaPeninsula NorthCoastal(UTC,I-5Cor. NorthInland(I-15Coridor) 78.7% 83.4% 8 78. 8 81. 83.7% 8 79.8%

More information

Status of ATLAS & CMS Experiments

Status of ATLAS & CMS Experiments Status of ATLAS & CMS Experiments Atlas S.C. Magnet system Large Air-Core Toroids for µ Tracking 2Tesla Solenoid for inner Tracking (7*2.5m) ECAL & HCAL outside Solenoid Solenoid integrated in ECAL Barrel

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

Status of the ESS Accelerator Workpackage

Status of the ESS Accelerator Workpackage Status of the ESS Accelerator Workpackage Peter McIntosh STFC Daresbury Laboratory UK ESS Interactions and Opportunities Rutherford Appleton Laboratory 3 Dec 2014 The ESS Linac The European Spallation

More information

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Richard Orren, Global Technical Head, Director Mark Finch, Geotechnical Director Senergy Survey and GeoEngineering

More information

RTÉ Player. July 2014 Review

RTÉ Player. July 2014 Review RTÉ Player July 2014 Review RTÉ Player Summary Month on Month change Streams 4,106,000-18% Unique Browsers (RTÉ.ie/Player) 719,000-16% Average Streams per Browser (RTÉ.ie/Player) 2.2-25% Page Impressions

More information

H2020 calls for proposals and calls for tenders

H2020 calls for proposals and calls for tenders H2020 calls for proposals and calls for tenders Call for proposals for ERC Starting Grant Identifier: ERC-2014-STG Specific programme: EU.1.1. Deadline: Tue, 25 Mar 2014 17:00:00 (Brussels local time)

More information

Special Collections NELSON, HARRY L., 1932-

Special Collections NELSON, HARRY L., 1932- Mathematics Archives - Harry L. Nelson Special Collections NELSON, HARRY L., 1932- Harry L. Nelson fonds. 1960-1986. 1.4 m of textual records. Computer programmer, mathematician and editor Harry L. Nelson

More information

Proposal of test setup

Proposal of test setup Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for

More information

Conceptual Design of the LHC Interaction Region Upgrade Phase-I

Conceptual Design of the LHC Interaction Region Upgrade Phase-I EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1163 Conceptual Design of the LHC Interaction Region Upgrade Phase-I

More information

Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots

Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots LHC Project Note 397 19 March 2007 Richard.Hall-Wilton@cern.ch Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots R.J.Hall-Wilton TS/LEA, D.Macina TS/LEA, V.Talanov TS/LEA Keywords: long

More information