Estimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5

Size: px
Start display at page:

Download "Estimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5"

Transcription

1 Estimation of Fault Resistance from Fault Recording Data Daniel Wong & Michael Tong 2014-November-5

2 Agenda Project Background & Introduction Fault Resistance & Effect Estimation Algorithm Estimation Results Conclusion

3 Project Background About AltaLink Canada s only fully independent transmission company Own and operate more than half of Alberta s Transmission Grid Serve 85% of Alberta population Interconnections to BC, Saskatchewan and Montana (US) 12,000 km transmission lines 69kV to 500kV 300 substations More than 20,000 protection relays Own and operate a telecommunication (in-house) system

4 Project Background Line Protection Coverage Impedance Protection - one of the widely used line protections Impedance relay responds to Voltage and Current Line impedance contains reactance and resistance Ground fault impedance contains line impedance and ground fault resistance For correct relay operation, relay setting needs to coverage ground fault resistance The question is how much resistance to cover

5 Project Background AltaLink relay setting guidelines (Pre December 2004) AltaLink in-house guideline (up to December 2004) For transmission lines, impedance protection were applied most of the time For zone 1 impedance setting, it needs to cover 5 Ohms Based on actual operating experience, line protection performance was good No problem was identified with the 5 Ohms coverage

6 Project Background AESO Protection Standard Alberta Interconnected Electric System Protection Standards: Effective: December 1, 2004 Valid for 5 years Expired: December 1, 2009 Document Size: 65 pages

7 Project Background AESO Protection Standard Section 3.6 on Fault Types Protection applied to the Alberta Interconnected Electric System must be capable of detecting: Single line to ground fault with 20 Ohms (tower footing plus arc) impedance Phase to phase to ground fault with 20 Ohms (tower footing plus arc) impedance

8 Project Background ISO (AESO) Rules ISO Rules Section Interconnected Electric System Protection Requirements: Draft rules posted on 2012 August 15 for consultation Final rules posted on 2012 December 31 Effective: 2012 December 31 Expiry: No date declared yet Document size: 12 pages

9 Project Background ISO (AESO) Rules - Section Interconnected Electric System Protection Requirements Ground Fault Resistance Coverage: Single line-to-ground fault with impedance up to 5 Ohms Phase-to-phase-to-ground fault with impedance up to 5 Ohms

10 Project Background Based on protection guidelines, standards and rules, requirements on ground fault resistance coverage changes from 5 to 20 and back to 5 Ohms again No improvement or deterioration in protection performance was observed with these changes No study has been carried out to determine the magnitude of ground fault resistance in the AltaLink system In mid 2012, a study project was initiated with University of Alberta

11 Project Introduction Alberta Power Industry Consortium (APIC) Project (Report No. 2013A-1) Develop an algorithm to estimate the fault resistances from fault data recorded and verify the algorithm through simulation and experimental studies Apply the algorithm to a large number of fault cases with COMTRADE fault files in single phase to ground faults on 2- terminal lines Identify the typical value of the ground fault resistance in AltaLink system in order to assess the Protection Setting Guidelines Department of E&C Engineering, University of Alberta P&C Engineering and System Operations, AltaLink

12 Fault Resistance Single Phase to Ground Fault: Electric arc: Traditionally considered as a resistance Dependent on the arc current/length Value is variable during the fault Tower grounding: Mainly resistive Not dependent on the fault current Value is stable during the fault Objects in the fault path: Usually considered mainly resistive Might be zero or very high Value is unpredictable

13 Fault Resistance Effect Homogeneous System X ZL 1 R f Z (apparent impedance) R

14 Fault Resistance Effect Non-Homogeneous System X ZL 1 ZL X 1 Z(apparent impedance) Z(apparent impedance) R R Overreach Underreach

15 Estimation Algorithm Two stages: Stage 1: Fault location estimation Stage 2: Fault resistance estimation V S mz L F 1 m ZL V R I S I R Relay R F Relay

16 Estimation Algorithm S-End R-End V 1S S V 1R S I 1S I 1R Z 1S mz 1L (1-m)Z 1L Z 1R I 2S + Z 2S mz 2L (1-m)Z 2L Z 2R - V 2F I 2R I 0S I 0R Z 0S mz 0L (1-m)Z 0L Z 0R 3R F I F

17 Estimation Algorithm Stage 1 Fault Location Estimation Two-Ended Negative-Sequence Impedance Method Negate the effect of pre-fault load and fault resistance, zerosequence mutual impedance. No source are involved, calculation is based on Magnitude. Data alignment is not required. I 2S + Z 2S mz 2L (1-m)Z 2L Z 2R - V 2F I 2R 1 V I Z mz 2F 2S 2S 2L V I Z m Z 2F 2R 2R 2L

18 Estimation Algorithm Stage 2 Fault Resistance Estimation V S mz L F 1 m ZL V R I S I R Relay R F Relay For an A-G fault, Voltage and current at end S: V mz I k I R AS L AS r F F I

19 Estimation Results 54 fault cases in AltaLink 240KV and 138KV transmission system. 92% of the faults on the studied lines have a fault resistance of less than 5Ω Average/Median value of the fault resistance in 240KV system < Average/Median value of the fault resistance in 138KV system

20 May-07 Jul-09 Jul-09 Sep-09 Mar-10 Apr-10 May-10 Jun-10 Aug-10 Aug-10 Jan-11 Apr-11 May-11 May-11 May-11 Jul-11 Jul-11 Jul-11 Aug-11 Aug-11 Aug-11 Sep-11 Sep-11 Apr-12 Apr-12 Sep-12 May-13 Feb-08 Mar-08 Jul-08 Aug-08 Mar-09 Sep-09 Jul-10 Sep-10 Feb-11 Apr-11 May-11 May-11 May-11 Jul-11 Jul-11 Apr-12 May-12 Aug-12 Aug-12 Aug-12 Aug-12 Oct-12 Nov-12 Feb-13 Mar-13 Jun-13 Aug-13 Estimation Results (All Fault Cases) KV Line Fault Resistance Level (All Fault Cases) KV Line Fault Resistance Level (All Fault Cases) Estimated Value (Ω) Median Value ( 0.76) Average Value (1.31) Estimated Value (Ω) Median Value (2.33) Average Value (2.84)

21 May-07 Jul-09 Sep-09 Mar-10 Apr-10 May-10 Jun-10 Aug-10 Aug-10 Jan-11 Apr-11 May-11 May-11 May-11 Jul-11 Jul-11 Jul-11 Aug-11 Aug-11 Aug-11 Sep-11 Sep-11 Apr-12 Apr-12 Sep-12 May-13 Feb-08 Mar-08 Jul-08 Aug-08 Mar-09 Sep-09 Jul-10 Sep-10 Feb-11 Apr-11 May-11 May-11 May-11 Jul-11 Jul-11 Apr-12 May-12 Aug-12 Aug-12 Aug-12 Aug-12 Oct-12 Nov-12 Feb-13 Jun-13 Aug-13 Estimation Results (Excluding Outlier) 8 240KV Line Fault Resistance Level (Excluding Outlier) 8 138KV Line Fault Resistance Level (Excluding Outlier) Estimated Value (Ω) Median Value ( 0.72) Average Value (0.87) Estimated Value (Ω) Median Value (2.17) Average Value (2.31)

22 Estimation Results (Pie Chart) Fault Resistance Level (All Fault Cases) Fault Resistance Level (Excluding Outliers) > 5 Ohm 8% > 5 Ohm 4% 2 ~ 5 Ohm 24% 2 ~ 5 Ohm 25% < 2 Ohm 68% < 2 Ohm 71%

23 unknown Tractor unknown lightning Contamination Bird Nest Bird Nest Bird Nest unknown Lightning unknown Lightning CVT failure Lightning Conductor Cross-arm Cross-arm Lightning Contamination Conductor Lightning Conductor Contamination Gravel Truck Lightning Lightning Dump Truck Cross-arm Weather unknown Lightning Contamination unknown unknown unknown Icing unknown Shield Wire Estimation Results (Ω vs. Cause) KV Line Fault Resistance Level (All Fault Cases) KV Line Fault Resistance Level (All Fault Cases) Estimated Value (Ω) Median Value ( 0.76) Average Value (1.31) Estimated Value (Ω) Median Value (2.33) Average Value (2.84)

24 Protection Setting Guidelines Existing Protection Setting Guidelines for Line Protection.. Impedance Zone 1: Generally zone 1 is the zone set to underreach the end of the protected line. Zone 1 reach shall be set to 85% of the actual impedance of the protected line with no intentional tripping delay. Mutual coupling with parallel lines causes overreaching for some faults; the zone 1 reach may be reduced to no less than 60% of the line impedance to allow the two opposite zone 1 reaches to overlap with 15% margin, provided a ground fault with 5 ohms resistance still produces high-speed operation...

25 ISO Rules Part 500 Facilities Section Interconnected Electric System Protection Requirements.. Bulk Transmission Line Ground Fault Resistance Coverage 15 If a bulk transmission line experiences a fault of the following type, then each of the two (2) protection systems for the bulk transmission line must initiate isolation of the fault: (a) single line-to-ground, with a minimum impedance of five (5) ohms; or (b) phase-to-phase-to-ground with a minimum impedance of five (5) ohms....

26 Conclusion (Project Specifics) An off-line method is proposed for estimating the fault resistance in single phase-to-ground faults. The method eliminates the need to synchronize the fault data. The developed program makes it possible to estimate the fault resistances in a large number of fault cases, and to obtain a statistical picture of typical fault resistance values. More than 50 fault events are studied and the estimation result aligns with AltaLink Protection Setting Practice.

27 Conclusion (Application Specific) With the outliers excluded, 96% of the recorded ground fault resistances were less than 5 Ohms The 5 Ohms requirement for ground fault resistance coverage, as stated in the ISO (AESO) Rules is appropriate AltaLink provides 5 Ohms ground fault resistance coverage in full compliance with Rules 502.3

28 Questions

DOUBLE-ENDED FAULT LOCATORS

DOUBLE-ENDED FAULT LOCATORS The InterNational Electrical Testing Association Journal FEATURE END-TO-END TESTING OF DOUBLE-ENDED FAULT LOCATORS BY STEVE TURNER, Beckwith Electric Company, Inc.. www.netaworld.org FOR HIGH VOLTAGE,

More information

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground

More information

Harmonic Distortion Levels Measured at The Enmax Substations

Harmonic Distortion Levels Measured at The Enmax Substations Harmonic Distortion Levels Measured at The Enmax Substations This report documents the findings on the harmonic voltage and current levels at ENMAX Power Corporation (EPC) substations. ENMAX is concerned

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

PQ Data Applications in Con Edison

PQ Data Applications in Con Edison PQ Data Applications in Con Edison John Foglio July 29th, 2014 Power Quality Monitoring System 69 PQ monitors currently installed in our secondary networks 2 Power Quality Monitoring System 135 PQ monitors

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Phase Rolling and the Impacts on Protection

Phase Rolling and the Impacts on Protection Phase Rolling and the Impacts on Protection Denglin (Dennis) Tang Burns & McDonnell 1700 West Loop South, Houston, TX 77027 Office: (713) 622-0227 Fax: (713) 622-0224 dtang@burnsmcd.com Abstract: During

More information

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Distance Protection for Distribution Feeders Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Why use distance protection for distribution feeders? Distance protection is mainly used for protecting

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Recreation Facility Hours

Recreation Facility Hours NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV

More information

Transmission Protection Overview

Transmission Protection Overview Transmission Protection Overview 2017 Hands-On Relay School Daniel Henriod Schweitzer Engineering Laboratories Pullman, WA Transmission Line Protection Objective General knowledge and familiarity with

More information

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes Transmission Line Protection Objective General knowledge and familiarity with transmission protection schemes Transmission Line Protection Topics Primary/backup protection Coordination Communication-based

More information

Transmission Line Fault Location Explained A review of single ended impedance based fault location methods, with real life examples

Transmission Line Fault Location Explained A review of single ended impedance based fault location methods, with real life examples Transmission Line Fault Location Explained A review of single ended impedance based fault location methods, with real life examples Presented at the 2018 Georgia Tech Fault and Disturbance Analysis Conference

More information

Line Impedance Estimation Using SCADA Data

Line Impedance Estimation Using SCADA Data Line Impedance Estimation Using SCADA Data Presenter: Ramiro Da Corte - Power System Engineer Prepared by: James Shen - Principal Engineer, AESO Nov. 5, 214 Background AESO is responsible for grid reliability

More information

Analysis of Phenomena, that Affect the Distance Protection

Analysis of Phenomena, that Affect the Distance Protection Analysis of Phenomena, that Affect the Distance Protection C. Gallego, J. Urresty, and J. Gers, IEEE Abstract--This article presents the impact of changes in distance protection reach and zone changes

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection 133 1. Pilot wire differential relays (Device 87L) The pilot wire differential relay is a high-speed

More information

Performance Evaluation of Mho and Quadrilateral Characteristic Relays on UPFC Incorporated Transmission Line

Performance Evaluation of Mho and Quadrilateral Characteristic Relays on UPFC Incorporated Transmission Line International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 7, Number 8 (2014), pp. 827-835 International Research Publication House http://www.irphouse.com Performance Evaluation

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Breaker Pole Scatter and Its Effect on Quadrilateral Ground Distance Protection

Breaker Pole Scatter and Its Effect on Quadrilateral Ground Distance Protection Breaker Pole Scatter and Its Effect on Quadrilateral Ground Distance Protection James Ryan Florida Power & Light Company Arun Shrestha and Thanh-Xuan Nguyen Schweitzer Engineering Laboratories, Inc. 25

More information

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference

More information

Impedance protection on power transformer.

Impedance protection on power transformer. Impedance protection on power transformer www.siemens.com/siprotec5 SIPROTEC 5 Application Impedance Protection on Power Transformer APN-045, Edition 1 Content 1...3 1.1 Introduction...3 1.2 Application

More information

Use of a Sub Harmonic Protection Relay to Detect SSO Conditions Associated with Type-III Windfarms and Series Compensated Transmission Systems

Use of a Sub Harmonic Protection Relay to Detect SSO Conditions Associated with Type-III Windfarms and Series Compensated Transmission Systems 21, rue d Artois, F-75008 PARIS 095 DUBLIN 2017 http : //www.cigre.org Use of a Sub Harmonic Protection Relay to Detect SSO Conditions Associated with Type-III Windfarms and Series Compensated Transmission

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description

More information

Alberta Interconnected Electric System Protection Standard

Alberta Interconnected Electric System Protection Standard Alberta Interconnected Electric System Protection Standard Revision 0 December 1, 2004 APEGGA Permit to Practice P-08200 Table of Contents Signature Page... 2 Table of Contents... 3 1.0 STAKEHOLDER REVIEW

More information

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

AEP s 765kV Transmission Line Model Validation for Short Circuit and System Studies. T. YANG, Q. QIU, Z. CAMPBELL American Electric Power USA

AEP s 765kV Transmission Line Model Validation for Short Circuit and System Studies. T. YANG, Q. QIU, Z. CAMPBELL American Electric Power USA 1, rue d Artois, F-75008 PARI CIGRE U National Committee http : //www.cigre.org 015 Grid of the Future ymposium AEP s 765kV Transmission Line Model Validation for hort Circuit and ystem tudies T. YANG,

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Demonstration of PFR Improvement September ERCOT Operations Planning

Demonstration of PFR Improvement September ERCOT Operations Planning Demonstration of PFR Improvement September 2017 ERCOT Operations Planning Agenda Overview BAL-001-TRE-1 Standard Applicability to Alternative Resources Ancillary Service Products & Dispatch Improvements

More information

PSCAD Simulation High Resistance Fault in Transmission Line Protection Using Distance Relay

PSCAD Simulation High Resistance Fault in Transmission Line Protection Using Distance Relay PSCAD Simulation High Resistance Fault in Transmission Line Protection Using Distance Relay Anurag Choudhary Department of Electrical and Electronics Engineering College of Engineering Roorkee, Roorkee

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

International Journal of Current Research and Modern Education (IJCRME) ISSN (Online): & Impact Factor: Special Issue, NCFTCCPS -

International Journal of Current Research and Modern Education (IJCRME) ISSN (Online): & Impact Factor: Special Issue, NCFTCCPS - GSM TECHNIQUE USED FOR UNDERGROUND CABLE FAULT DETECTOR AND DISTANCE LOCATOR R. Gunasekaren*, J. Pavalam*, T. Sangamithra*, A. Anitha Rani** & K. Chandrasekar*** * Assistant Professor, Department of Electrical

More information

PRC Disturbance Monitoring and Reporting Requirements

PRC Disturbance Monitoring and Reporting Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Homogenisation of Maximum and Minimum Air Temperatures in Ireland. Mary Curley * and Seamus Walsh

Homogenisation of Maximum and Minimum Air Temperatures in Ireland. Mary Curley * and Seamus Walsh Homogenisation of Maximum and Minimum Air Temperatures in Ireland Mary Curley * and Seamus Walsh Homogenisation of monthly maximum and minimum temperature series HOMER 2.6 Number of stations homogenised

More information

2.495V Programmable Shunt Voltage Reference FEATURES APPLICATION. SMPS Lighting TS431CS RLG. Pin Definition: 1. Reference 2. Cathode 3.

2.495V Programmable Shunt Voltage Reference FEATURES APPLICATION. SMPS Lighting TS431CS RLG. Pin Definition: 1. Reference 2. Cathode 3. GENERAL DESCRIPTION 2.495V Programmable Shunt Voltage Reference series integrated circuits are three-terminal programmable shunt regulator diodes. These monolithic IC voltage references operate as a low

More information

Industrial and Commercial Power Systems Topic 7 EARTHING

Industrial and Commercial Power Systems Topic 7 EARTHING The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 7 EARTHING 1 INTRODUCTION Advantages of earthing (grounding): Limitation

More information

expertmeter High Performance Analyzer PM180 Fault Locator Application Note BB0165 Rev. A2

expertmeter High Performance Analyzer PM180 Fault Locator Application Note BB0165 Rev. A2 expertmeter High Performance Analyzer PM180 Fault Locator Application Note BB0165 Rev. A2 IMPORTANT NOTICE For accurate fault location, the PM180 must be calibrated under version 31.XX.19 or higher. REVISION

More information

National Radio Channels. PPM measurement October 2017

National Radio Channels. PPM measurement October 2017 National Radio Channels PPM measurement October 17 Background This overview describes the development of radio broadcasting at national levels with updated figures from October 17. The Norwegian Media

More information

Implementation and Evaluation a SIMULINK Model of a Distance Relay in MATLAB/SIMULINK

Implementation and Evaluation a SIMULINK Model of a Distance Relay in MATLAB/SIMULINK Implementation and Evaluation a SIMULINK Model of a Distance Relay in MATLAB/SIMULINK Omar G. Mrehel Hassan B. Elfetori AbdAllah O. Hawal Electrical and Electronic Dept. Operation Department Electrical

More information

, ,54 A

, ,54 A AEB5EN2 Ground fault Example Power line 22 kv has the partial capacity to the ground 4,3.0 F/km. Decide whether ground fault currents compensation is required if the line length is 30 km. We calculate

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Impedance-based Fault Location in Transmission Networks: Theory and Application

Impedance-based Fault Location in Transmission Networks: Theory and Application 1 Impedance-based Fault Location in Transmission Networks: Theory and Application Swagata Das, Student Member, IEEE, Surya Santoso, Senior Member, IEEE, Anish Gaikwad, Senior Member, IEEE, and Mahendra

More information

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES IEEE PES Transmission and Distribution Conference_ Chicago April 2008 Dean Sharafi Introduction Electro-magnetic

More information

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013 NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP Embargo until 15.00 hours on 11 th January 2013 Our monthly estimates of GDP suggest that output declined by 0.3 per cent in

More information

Distributed by: www.jameco.com 1-8-831-4242 The content and copyrights of the attached material are the property of its owner. 35mW SURFACE MOUNT ENER DIODE Features Planar Die Construction 35mW Power

More information

Protection Challenges for Transmission Lines with Long Taps

Protection Challenges for Transmission Lines with Long Taps Protection Challenges for Transmission Lines with Long Taps Jenny Patten, Majida Malki, Quanta Technology, Matt Jones, American Transmission Co. Abstract Tapped transmission lines are quite common as they

More information

Distance Protection: Why Have We Started With a Circle, Does It Matter, and What Else Is Out There? What Is a Distance Protection Element?

Distance Protection: Why Have We Started With a Circle, Does It Matter, and What Else Is Out There? What Is a Distance Protection Element? Distance Protection: Why Have We Started With a Circle, Does It Matter, and What Else Is Out There? Edmund O. Schweitzer, III and Bogdan Kasztenny Schweitzer Engineering Laboratories Copyright SEL 2017

More information

System grounding of wind farm medium voltage cable grids

System grounding of wind farm medium voltage cable grids Downloaded from orbit.dtu.dk on: Apr 23, 2018 System grounding of wind farm medium voltage cable grids Hansen, Peter; Østergaard, Jacob; Christiansen, Jan S. Published in: NWPC 2007 Publication date: 2007

More information

An Example Distance Protection Application with Complicating Factors.

An Example Distance Protection Application with Complicating Factors. An Example Distance Protection Application with Complicating Factors. Presented to Western Protective Relay Conference 29 Spoane, Washington, USA Prepared by Yofre Jacome, COES PERU Charles F Henville,

More information

Guide for Calculating Radio Licence Fees

Guide for Calculating Radio Licence Fees Issue 9 June 2014 Spectrum Management and Telecommunications Policy Radiocommunication Information Circular Guide for Calculating Radio Licence Fees Aussi disponible en français CIR-42 Comments and suggestions

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION 23 rd International Conference on Electricity Distribution Lyon, 5-8 June 25 Paper 48 ADVANCED VECT SHIFT ALGITHM F ISLANDING DETECTION Murali KANDAKATLA Hannu LAAKSONEN Sudheer BONELA ABB GISL India ABB

More information

INTERNAL SHORTED PATCH ANTENNA INTEGRATED WITH A SHIELDING METAL CASE FOR UMTS OPER- ATION IN A PDA PHONE

INTERNAL SHORTED PATCH ANTENNA INTEGRATED WITH A SHIELDING METAL CASE FOR UMTS OPER- ATION IN A PDA PHONE Progress In Electromagnetics Research C, Vol. 10, 63 73, 2009 INTERNAL SHORTED PATCH ANTENNA INTEGRATED WITH A SHIELDING METAL CASE FOR UMTS OPER- ATION IN A PDA PHONE Y.-T. Liu Department of Physics R.O.C.

More information

INTEGRATED MANAGEMENT PROGRAM TO REDUCE BIRD STRIKES AT JFK INTERNATIONAL AIRPORT,

INTEGRATED MANAGEMENT PROGRAM TO REDUCE BIRD STRIKES AT JFK INTERNATIONAL AIRPORT, INTEGRATED MANAGEMENT PROGRAM TO REDUCE BIRD STRIKES AT JFK INTERNATIONAL AIRPORT, 1991-2000 Richard A. Dolbeer 1, Scott C. Barras 1 and Richard C. Chipman 2 2 USDA Wildlife Services, New York 1 USDA Wildlife

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

Double Criteria Feeder-Selection Method for Single-Phase Ground Fault of Resonant Grounding System Based on Multi-State Components

Double Criteria Feeder-Selection Method for Single-Phase Ground Fault of Resonant Grounding System Based on Multi-State Components American Journal of Electrical and Electronic Engineering, 207, Vol. 5, No. 4, 44-5 Available online at http://pubs.sciepub.com/ajeee/5/4/4 Science and Education Publishing DOI:0.269/ajeee-5-4-4 Double

More information

An Enhanced Adaptive Algorithm to Mitigate Mis-coordination Problem of the Third Zone of Distance Relays

An Enhanced Adaptive Algorithm to Mitigate Mis-coordination Problem of the Third Zone of Distance Relays An Enhanced Adaptive Algorithm to Mitigate Mis-coordination Problem of the Third one of Distance Relays M. Azari, M. Ojaghi and K. Mazlumi* Electrical Engineering Department University of anjan anjan,

More information

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY Module 11a Initiating Cause Code Form 4.X 1 M11 Initiating and Sustained Cause Codes An Initiating Cause Code that describes the initiating cause of the outage. A Sustained Cause Code that describes the

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

CP CU1. Coupling unit for line and ground testing

CP CU1. Coupling unit for line and ground testing CP CU1 Coupling unit for line and ground testing Line and ground test system CPC 100 The CPC 100 is a multifunctional test set for primary assets. When combined with the CP CU1 it covers the following

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

Transmission Availability Data System Definitions

Transmission Availability Data System Definitions Table of Contents Transmission Availability Data System Definitions February 1, 2018 1 of 31 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) 1MRS752324-MUM Issued: 3/2000 Version: D/23.06.2005 Data subject to change without notice PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) Contents 1. Introduction... 2 1.1

More information

Protection of Extra High Voltage Transmission Line Using Distance Protection

Protection of Extra High Voltage Transmission Line Using Distance Protection Protection of Extra High Voltage Transmission Line Using Distance Protection Ko Ko Aung 1, Soe Soe Ei Aung 2 Department of Electrical Power Engineering Yangon Technological University, Insein Township

More information

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13. Simpson, B., & Vardanega, P. J. (2014). Results of monitoring at the British library excavation. Proceedings of the ICE - Geotechnical Engineering, 167(2), 99-116. DOI: 10.1680/geng.13.00037 Peer reviewed

More information

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays

More information

Adaptive Phase and Ground Quadrilateral Distance Elements

Adaptive Phase and Ground Quadrilateral Distance Elements Adaptive Phase and Ground Quadrilateral Distance Elements Fernando Calero, Armando Guzmán, and Gabriel Benmouyal Schweitzer Engineering Laboratories, Inc. evised edition released November 217 Previously

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

A New Fault Locator for Three-Terminal Transmission Lines Using Two-Terminal Synchronized Voltage and Current Phasors

A New Fault Locator for Three-Terminal Transmission Lines Using Two-Terminal Synchronized Voltage and Current Phasors 452 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 17, NO. 2, APRIL 2002 A New Fault Locator for Three-Terminal Transmission Lines Using Two-Terminal Synchronized Voltage and Current Phasors Ying-Hong Lin,

More information

Using Graphing Skills

Using Graphing Skills Name Class Date Laboratory Skills 8 Using Graphing Skills Introduction Recorded data can be plotted on a graph. A graph is a pictorial representation of information recorded in a data table. It is used

More information

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays are smarter,

More information

European Update. 3 rd December 2015

European Update. 3 rd December 2015 European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 3 rd December 2015 1. General

More information

Modeling and Performance Analysis of Mho-Relay in Matlab

Modeling and Performance Analysis of Mho-Relay in Matlab Modeling and Performance Analysis of Mho-Relay in Matlab Purra Sai Kiran M.Tech Student, Padmasri Dr. B V Raju Institute of Technology, Narsapur, Medak, Telangana. ABSTRACT: This paper describes the opportunity

More information

Bayport Securitisation (RF) Ltd Investor Report February 2013

Bayport Securitisation (RF) Ltd Investor Report February 2013 Bayport Securitisation (RF) Ltd Investor Report February 2013 Financial statistics for the period ended February 2013 Feb 13 Jan 13 Dec 12 Nov 12 Oct 12 Sep 12 Aug 12 Jul 12 Jun 12 May 12 Apr 12 Mar 12

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Bayport Securitisation (RF) Ltd Investor Report May 2013

Bayport Securitisation (RF) Ltd Investor Report May 2013 Bayport Securitisation (RF) Ltd Investor Report May 2013 Financial statistics for the period ended May 2013 May 13 Apr 13 Mar 13 Feb 13 Jan 13 Dec 12 Nov 12 Oct 12 Sep 12 Aug 12 Jul 12 Jun 12 Performance

More information

Preparation of requirements. Part I Notification principles and time schedule

Preparation of requirements. Part I Notification principles and time schedule ASBU ITU Workshop 2004 22 25 November 2004 Damascus, Syria Preparation of requirements for T-DAB T and DVB-T Part I Notification principles and time schedule B. Rackov, Radiocommunication Bureau Notification

More information

Total Marks : 100 READ THE FOLLOWING DIRECTIONS CAREFULLY:

Total Marks : 100 READ THE FOLLOWING DIRECTIONS CAREFULLY: Mathematics Writing Time : 2 Hours Total Marks : 100 READ THE FOLLOWING DIRECTIONS CAREFULLY: 1. Do not write in the first fifteen minutes. This time is to be spent on reading the questions. After having

More information

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Setting and Verification of Generation Protection to Meet NERC Reliability Standards 1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

National Radio Channels. PPM measurement December 2017

National Radio Channels. PPM measurement December 2017 National Radio Channels PPM measurement December 2 Background This overview describes the development of radio broadcasting at national levels with updated figures from December 2. The Norwegian Media

More information

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America RPSEA 09121-3300 3300-05 05 Autonomous Inspection of Subsea Facilities Phase I Final Presentation / Phase II Status Report UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July

More information

EE Lecture 14 Wed Feb 8, 2017

EE Lecture 14 Wed Feb 8, 2017 EE 5223 - Lecture 14 Wed Feb 8, 2017 Ongoing List of Topics: URL: http://www.ece.mtu.edu/faculty/bamork/ee5223/index.htm Labs - EE5224 Lab 3 - begins on Tues Feb 14th Term Project - details posted. Limit

More information

TSC873 NPN Silicon Planar High Voltage Transistor

TSC873 NPN Silicon Planar High Voltage Transistor TO-92 Pin Definition: SOT-223 Pin Definition: PRODUCT SUMMARY 1. Emitter 2. Collector 3. Base 1. Base 2. Collector 3. Emitter BV CBO BV CEO I C V CE(SAT) 600V 400V 1A 0.5V @ I C / I B = 500mA / 100mA Features

More information

AUTOMATIC CALCULATION OF RELAY SETTINGS FOR A BLOCKING PILOT SCHEME

AUTOMATIC CALCULATION OF RELAY SETTINGS FOR A BLOCKING PILOT SCHEME AUTOMATIC CALCULATION OF RELAY SETTINGS FOR A BLOCKING PILOT SCHEME Donald M. MACGREGOR Electrocon Int l, Inc. USA eii@electrocon.com Venkat TIRUPATI Electrocon Int l, Inc. USA eii@electrocon.com Russell

More information

European Workgroup. 7th May 2015

European Workgroup. 7th May 2015 European Workgroup Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 7th May 2015 Code Status

More information

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

New design of distance protection for smart grid applications

New design of distance protection for smart grid applications New design of distance protection for smart grid applications Blumschein Jörg, Dzienis Cezary, Yelgin Yilmaz Siemens AG, Energy Management Division, Berlín, Alemania RESUMEN Este artículo presenta un nuevo

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters

Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters IEEE PES General Meeting June 23-27, 27, 2007, Tampa Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters Juan A. Martinez Univ. Politècnica Catalunya Barcelona, Spain

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions 1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

N-Channel Power MOSFET 100V, 81A, 10mΩ

N-Channel Power MOSFET 100V, 81A, 10mΩ N-Channel Power MOSFET 100V, 81A, 10mΩ FEATURES Advanced Trench Technology 100% avalanche tested APPLICATION Synchronous Rectification in SMPS High Speed Power Switching KEY PERFORMANCE PARAMETERS PARAMETER

More information

Teaching Distance Relay Using Matlab/Simulink Graphical User Interface

Teaching Distance Relay Using Matlab/Simulink Graphical User Interface Available online at www.sciencedirect.com Procedia Engineering 53 ( 2013 ) 264 270 Malaysian Technical Universities Conference on Engineering & Technology 2012, MUCET 2012 Part 1 - Electronic and Electrical

More information

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages Session Four: ractical Insulation Co-ordination Session Four: ractical Insulation Co-ordination for Lightning Induced Overvoltages Jason Mayer Technical Director, Energy Services, Aurecon Introduction

More information

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star. Summary Of Interconnection Technical Guidelines for Renewable Energy Systems 0-100 kw under Standard Offer Contract (Extract from JPS Guide to Interconnection of Distributed Generation) This document is

More information

ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES

ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES N. Perera 1, A. Dasgupta 2, K. Narendra 1, K. Ponram 3, R. Midence 1, A. Oliveira 1 ERLPhase Power Technologies Ltd. 1 74 Scurfield

More information