1 Module 11a Initiating Cause Code Form 4.X 1
2 M11 Initiating and Sustained Cause Codes An Initiating Cause Code that describes the initiating cause of the outage. A Sustained Cause Code that describes the cause that contributed to the longest duration of the outage. 2
3 Resources Reminder aspx 3
4 M11a Which Cause Code to Pick When analyzing event Examine each Element independently Ask Why did the interrupting device operate? Weather, excluding lightning Lightning Environmental Fire Contamination Foreign interference Vandalism, terrorism, malicious acts Vegetation 4 Human error Failed AC Substation equipment Failed Protection System equipment Failed AC Circuit equipment Failed DC Circuit equipment Failed AC/DC Terminal equipment Power system condition Unknown Other
5 M11a Example 1 A lightning strike on an AC Circuit. What is the Initiating Cause Code? A. Lightning B. Failed AC Circuit equipment C. Weather, excl. lightning D. Foreign interference Line A-B Station B 5
6 M11a Example 2 Ownership Change A lightning strike on an AC Circuit. What is the Initiating Cause Code? A. Lightning B. Failed Protection System equipment C. Foreign interference D. Other Line A-B Station B Standard Power Ownership Change Big 3 Electric Company 6
7 M11a Example 3 Customer Tap Fault A lightning strike on a circuit tap. What is the Initiating Cause Code? A. Lightning B. Power System Condition C. Foreign interference D. Environmental Line A-B Station B Standard Electric LOAD Ownership Change 7
8 M11a Example 4a A lightning strike on an AC Circuit Ask yourself, why did the breaker at Terminal X open? It opened because What is the Initiating Cause Code for Line A-X? A. Fire B. Lightning C. Failed AC Circuit Equipment D. Not TADS Reportable Station B Terminal X 8
9 M11a Example 4b A lightning strike on an AC Circuit Ask yourself, why did the breaker at Terminal X open? It opened because What is the Initiating Cause Code for Line X-B? A. Not TADS Reportable B. Failed Protection System Equipment C. Lightning D. Other Station B Terminal X 9
10 M11a Example 5a Underbuilt A sleeve failure occurs on an Line #1 and the conductor breaks and falls into underbuilt Line #2. What is the Initiating Cause Code for Line #1? A. Failed AC Circuit Equipment B. Not TADS Reportable C. Lightning D. Other Line #1 Station B Line #2 (Underbuilt) 10
11 M11a Example 5b Underbuilt A sleeve failure occurs on an Line #1 and the conductor breaks and falls into underbuilt Line #2. What is the Initiating Cause Code for Line #2? A. Foreign interference B. Lightning C. AC Circuit Equipment D. Not TADS reportable Line #1 Station B Line #2 (Underbuilt) 11
12 M11a Example 6a Underbuilt Line #1 (161-kV) was interrupted for 4 minutes during a storm with very high winds due to a Distributor s underbuilt conductor blowing into a guy wire. The guy wire was burned in two upon contact with the 13kv underbuilt. The wind blew the upper section of the lose guy wire into the 161KV TL causing the line to operate to lock out causing a four minute TL outage. What is the Initiating Cause Code for Line #1? A. Failed AC Circuit Equipment B. Other C. Weather, excl. lightning D. Foreign interference Line #1 Line #2 (Underbuilt) Station B 12
13 M11a Example 6b Underbuilt Line #1 (161-kV) was interrupted for 4 minutes during a storm with very high winds due to a Distributor s underbuilt conductor blowing into a guy wire. The guy wire was burned in two upon contact with the 13kv underbuilt. The wind blew the upper section of the lose guy wire into the 161KV TL causing the line to operate to lock out causing a four minute TL outage. What is the Initiating Cause Code for Line #2? A. Foreign interference B. Lightning C. Not TADS reportable D. Other Line #1 Line #2 (Underbuilt) Station B 13
14 M11a Example 7a Lines de-energized by fault on another line Lightning struck Line A-C and because of configuration, other lines became de-energized even though their breakers didn t operate: What is the Initiating Cause Code for Line A-C? A. Failed AC Circuit Equipment B. Lightning C. Unknown D. Power System Condition Line A-C TL-1 TL-2 TL-3 TL-4 Fault caused lines to become Deenergized due to abnormal system configuration Power System Condition Station C Automatic Outages caused by power system conditions such as instability, overload trip, out-of-step, abnormal voltage, abnormal frequency, or unique system configurations (e.g., an abnormal terminal configuration due to existing condition with one breaker already out of service). 14
15 Lightning struck Line A-C and because of configuration, other lines became de-energized even though their breakers didn t operate: What is the Initiating Cause Code for Line TL-1, TL-2, TL-3, and TL-4? Line A-C M11a Example 7b Lines de-energized by fault on another line TL-1 TL-2 TL-3 TL-4 Fault caused lines to become Deenergized due to abnormal system configuration A. Power System Condition B. Other C. Failed Protection System Equipment D. Lightning Power System Condition Station C Automatic Outages caused by power system conditions such as instability, overload trip, out-of-step, abnormal voltage, abnormal frequency, or unique system configurations (e.g., an abnormal terminal configuration due to existing condition with one breaker already out of service). 15
16 M11a Example 8a Breaker fails to clear fault Lightning struck Line A-C and a breaker failed to open due to breaker issue. What is the Initiating Cause Code for Line A-C? TL-1 A. Lightning B. Failed Protection System Equipment C. Failed AC Circuit Equipment D. Failed Substation Equipment TL-2 Line A-C TL-3 Failed to open for fault due to breaker issue Station C TL-4 16
17 M11a Example 8b Breaker fails to clear fault Lightning struck Line A-C and a breaker failed to open due to breaker issue. What is the Initiating Cause Code for TL-1, TL-2, TL-3? TL-1 A. Other B. Lightning C. Weather, excl. lightning D. Failed Substation Equipment TL-2 Line A-C TL-3 Failed to open for fault due to breaker issue Station C TL-4 17
18 M11a Example 9 Potential Transformer A Potential Transformer catastrophically fails causing bus fault. What is the Initiating Cause Code for all lines? TL-1 A. Failed AC Circuit Equipment B. Failed Protection System Equipment C. Failed AC Substation Equipment D. Power System Condition TL-2 Line A-C TL-3 TL-4 Station C 18
19 M11a Example 10 Potential Transformer Failed line capacitor voltage transformer (CCVT or CVT) secondary fails causing voltage loss to relay What is the Initiating Cause Code for all lines? TL-1 A. Failed AC Circuit Equipment B. Failed Protection System Equipment C. Failed AC Substation Equipment D. Power System Condition TL-2 Station D Line D-E TL-3 TL-4 Station E 19
20 M11a Example 11 Non-BES Faults Lightning strikes 69-kV bus What is the Initiating Cause Code for all lines? TL-1 A. Lightning B. Other C. Failed AC Substation Equipment D. Foreign interference TL-2 Line A-C 230-kV TL-3 69-kV TL-4 Station C 20
21 M11a Example 12 Non-BES Faults Breaker fails to clear fault on 69-kV system Again, ask yourself why did the breaker for the Element open? What is the Initiating Cause Code for Line D-E? A. Other B. Failed AC Circuit Equipment C. Failed AC Substation Equipment D. Failed Protection System Equipment TL-1 TL-2 Station D Line D-E 230-kV TL-3 69-kV TL-4 Station E 21
22 M11a Vegetation (Exceptions) Vegetation Exceptions (as contained in FAC-003-1) Outside the right of way that result from natural disasters. Examples include: Human or Animal activity. Examples include: Earthquakes Fires Tornados Hurricanes Landslides Wind shear Major storms as defined either by the TO or an applicable regulatory body Ice storms Floods Logging Animal severing tree Vehicle contact with tree Arboricultural activities Horticultural activities Agricultural activities Removal or digging of vegetation Outages that fall under the exclusions should be reported under another Cause Code and not the Vegetation Cause Code. 22
23 M11a Human Error: Automatic Outage Interruptions with Faults Examples Human Error: Automatic Outages caused by any incorrect action traceable to employees and/or contractors for companies operating, maintaining, and/or providing assistance to the Transmission Owner will be identified and reported in this category. Line A-B Station B Human Error Automatic Outage Examples 23 Electrician hangs ground on wrong (energized) line. Contractor cuts tree into energized line. Company or contractor bucket-truck contacts line. Not Human Error Examples Employee flying a kite on his day off and it contacts 230-kV line is NOT Human Error (Foreign Interference). Customer or distribution company bucket truck contacts line (Foreign Interference).
24 M11a Human Error: Automatic Outage Protection System; No Fault Examples Line A-B has lightning strike and the Line B-C relay overtrips for fault on another line due to: Wrong settings, Wiring error, or Switch in wrong position Line A-B would have an initiating cause of Lightning and Line B-C would have an initiating cause of Human Error Line A-B Line B-C Station B Station C 24
25 M11a Human Error: Operational Outage These are reported on Form 6.1 (or 6.3): During planned switching, electrician operates wrong handle. Work plan was wrong Electrician didn t correctly follow work plan Someone bumps a relay in the switch house During relay testing, accidently trips line Dispatcher remotely opens wrong breaker Electrician shorts out wiring behind panel while working 25
TADS Data Reporting Training TADS Data Reporting Training November, 2017
TADS Data Reporting Training 2017 TADS Data Reporting Training November, 2017 Agenda Day 1 Day 2 What is TADS TADS Mechanics Accessing the portal Checklist Inventory Outage and Event report Lunch Coding
More informationModule 10. Initiation Code RELIABILITY ACCOUNTABILITY
Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated
More informationModule 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY
Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground
More informationTransmission Availability Data System Definitions
Table of Contents Transmission Availability Data System Definitions February 1, 2018 1 of 31 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents
More informationTransmission Availability Data Systems Frequently Asked Questions
Transmission Availability Data Systems Frequently Asked Questions March 2016 NERC Report Title Report Date I Table of Contents Preface... iii Executive Summary... iv Chapter 1 TADS Inventory Related Questions...1
More informationTransmission Availability Data System 2008 Automatic Outage Metrics and Data Report Region: RFC
Transmission Availability Data System 2008 Automatic Outage Metrics and Data Report Region: RFC Table of Contents 1 Introduction...1 1.1 Contributors and Acknowledgements... 1 1.2 TADS History... 1 1.3
More informationTransmission Availability Data System Automatic Outage Metrics and Data. Region: RFC 2009 Report
Transmission Availability Data System Automatic Outage Metrics and Data Region: RFC 2009 Report Table of Contents 1 Introduction... 1 1.1 Contributors and Acknowledgements...1 1.2 TADS History...1 1.3
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationLeslie J. Anderson Supervising Attorney Public Service Commission of West Virginia 201 Brooks St. PO Box 812 Charleston, WV Dear Ms.
J 5001 NASA Boulevard Fairmonl, WV 26554 Gary A. Jack Senior Cornorale Counsel VIA EMAIL AND FEDEX OVERNIGHT Leslie J. Anderson Supervising Attorney Public Service Commission of West Virginia 201 Brooks
More informationCircuit Breaker Based Feeder Pillar
IJIRST International Journal for Innovative Research in Science & Technology Volume Issue 09 February 06 ISSN (online): 349-600 Circuit Breaker Based Feeder Pillar Neha A. Ninave Nikita M. Nimbulkar Minal
More informationPower Quality Basics. Presented by. Scott Peele PE
Power Quality Basics Presented by Scott Peele PE PQ Basics Terms and Definitions Surge, Sag, Swell, Momentary, etc. Measurements Causes of Events Possible Mitigation PQ Tool Questions Power Quality Measurement
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationUtility System Lightning Protection
Utility System Lightning Protection Many power quality problems stem from lightning. Not only can the high-voltage impulses damage load equipment, but the temporary fault that follows a lightning strike
More informationDP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation
DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase
More informationMOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE
MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer
More informationELECTRIC TRANSMISSION (ET) Guideline G0104
ELECTRIC TRANSMISSION (ET) ISSUING DEPARTMENT: ETM x ETEC ETPO ETTS EFFECTIVE DATE: 06-01-1997 DEPARTMENTS AFFECTED: ETM ETEC ETPO x ETTS REVIEW DATE: 01-01-1998 DEPARTMENT GROUP: ALL All All x All P E
More informationATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0
ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2014-03-31 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding
More informationOnline Assessment of Capacitor Banks Using Circuit Health Monitoring Technology
Online Assessment of Capacitor Banks Using Circuit Health Monitoring Technology Jeffrey Wischkaemper (Presenter) B. Don Russell Carl L. Benner Karthick Muthu Manivannan Texas A&M University College Station,
More informationPower Quality Overview
Power Quality Overview James Brackett P.E. Colorado Springs Utility, GE, Retired What I will present today Introduction and thank you PQ overview Cause of PQ problems How Smart Grid, DER, VVAR and AMI
More informationDOUBLE-ENDED FAULT LOCATORS
The InterNational Electrical Testing Association Journal FEATURE END-TO-END TESTING OF DOUBLE-ENDED FAULT LOCATORS BY STEVE TURNER, Beckwith Electric Company, Inc.. www.netaworld.org FOR HIGH VOLTAGE,
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationAdaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers
Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers 70 th Annual Conference for Protective Relay Engineers Siemens AG 2017 All rights reserved. siemens.com/energy-management
More informationSingle Line Diagram of Substations
Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are
More informationDigital Fault Recorder Deployment at HVDC Converter Stations
Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationWires Down Improvement Program at Pacific Gas and Electric
Wires Down Improvement Program at Pacific Gas and Electric Scott Hayes, Damon Thayer, Shawn Holder and Emili Scaief Pacific Gas and Electric Presented at the Western Protective Relay Conference 2015 Abstract
More informationPJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016
PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6
More informationSection 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services
Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services Introduction The term power quality may take on any one of several definitions. The strict definition of power quality
More informationChristopher Substation
Lessons Learned Relay work is hard and stressful, somedays you are the hero.other days you are the goat. Here are some true stories from the field that demonstrate some hero, but mostly goat. Lessons Learned
More informationUPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS
UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka,
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18 LIVE LINE PERMITS, ASSURANCE OF NO RECLOSE PERMITS AND CAUTION TAGS Supersedes OO 1T-18 issued 13 October 2010 Review Year: 2019 Original signed by:
More informationElectrical Arc Hazards
Arc Flash Analysis 1996-2009 ETAP Workshop Operation Notes Technology, 1996-2009 Inc. Operation Workshop Technology, Notes: Arc Inc. Flash Analysis Slide 1 Electrical Arc Hazards Electrical Arcs can occur
More informationUnit 2. Single Line Diagram of Substations
Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission
More informationFuseless Capacitor Bank Protection
Fuseless Bank Protection Minnesota Power Systems Conference St. Paul, MN. November 2, 1999 by: Tom Ernst, Minnesota Power Other Papers of Interest Presented at Western Protective Relay Conference, Oct.
More informationPOWER QUALITY A N D Y O U R B U S I N E S S THE CENTRE FOR ENERGY ADVANCEMENT THROUGH TECHNOLOGICAL I NNOVATION
POWER QUALITY A N D Y O U R B U S I N E S S A SUMMARY OF THE POWER QUALITY REPORT PUBLISHED BY THE CENTRE FOR ENERGY ADVANCEMENT THROUGH TECHNOLOGICAL I NNOVATION H YDRO ONE NETWORKS INC SEPTEMBER 2014
More informationOutage Data File Format for the ISO. Availability Performance Monitoring System
Outage Data File Format for the ISO Availability Performance Monitoring System Summary Outage Data Detailed Outage Data MCC Original Issued on 4/15/99 Page 2-1 of 2-12 TABLE OF CONTENTS 2.1 Purpose 2.1
More informationTransmission Availability Data System (TADS) DATA REPORTING INSTRUCTION MANUAL
Transmission Availability Data System (TADS) DATA REPORTING INSTRUCTION MANUAL Version History Version History Version Date October 17, 2007 November 20, 2007 New Major Changes P. 4. Table 1.5, third row
More informationApplication of DFA Technology for Improved Reliability and Operations
Application of DFA Technology for Improved Reliability and Operations IEEE/IAS Rural Electric Power Conference Columbus, Ohio, 24 April 2017 Robert A. Peterson, P.E., Director Control Center and Emergency
More informationAt generating sites with 1200MW or greater of installed generating capacity.
A. Introduction 1. 2. Number: 3. Purpose: To provide FRCC requirements for installation of Disturbance Monitoring Equipment (DME) and reporting of Disturbance data to facilitate analyses of events and
More informationET 51 - Electrician Theory Examination Marking Schedule
ET 51 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker
More informationTransmission Availability Data System (TADS) Data Reporting Instruction Manual
Version History Transmission Availability Data System (TADS) Data Reporting Instruction Manual August 8, 2013 For Calendar Year 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationThe Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.
The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why
More informationPhase Rolling and the Impacts on Protection
Phase Rolling and the Impacts on Protection Denglin (Dennis) Tang Burns & McDonnell 1700 West Loop South, Houston, TX 77027 Office: (713) 622-0227 Fax: (713) 622-0224 dtang@burnsmcd.com Abstract: During
More informationOvervoltage and undervoltage. Dr Audih 1
Overvoltage and undervoltage Dr Audih 1 A Overvoltage is defined as an increase in the r.m.s. value of the voltage up to a level between 1.1 pu to 1.8 pu at power frequency for periods ranging from a half
More informationGridLiance Reliability Criteria
GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances
More informationUse of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment
Use of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment 71st Annual Conference for Protective Relay Engineers Texas A&M University College Station, Texas USA 26-29 March 2018
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationPOWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS
POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS Juan Manuel Gers, PhD Protection coordination principles Relay coordination is the process of selecting settings that will assure that the relays
More informationOPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS
OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED
More informationEstimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5
Estimation of Fault Resistance from Fault Recording Data Daniel Wong & Michael Tong 2014-November-5 Agenda Project Background & Introduction Fault Resistance & Effect Estimation Algorithm Estimation Results
More informationRelay Communication Misoperations. Southwest Power Pool System Protection and Control Working Group
Relay Communication Misoperations Southwest Power Pool System Protection and Control Working Group Relay Misoperations The fundamental objective of power system protection schemes is to quickly provide
More informationSUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha
SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha EE2402 - PROTECTION & SWITCHGEAR SYLLABUS ELECTRIC POWER SYSTEM Electricity is generated at a power plant (1), voltage
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationANALYSIS OF A FLASHOVER OPERATION ON TWO 138KV TRANSMISSION LINES
ANALYSIS OF A FLASHOVER OPERATION ON TWO 138KV TRANSMISSION LINES Authors: Joe Perez, P.E.: SynchroGrid, College Station, Texas Hung Ming Chou, SynchroGrid, College Station, Texas Mike McMillan, Bryan
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL
More informationA Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several
More informationINTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout
Substation Subgroup Members: Please update the sections below you volunteered to review using the track changes option or highlight your changes. Once done, email your updated document to Scott Herb (SEHerb@pplweb.com)
More informationBED INTERCONNECTION TECHNICAL REQUIREMENTS
BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2
More informationINTEGRATED TRANSMISSION PLAN Glossary
INTEGRATED TRANSMISSION PLAN Glossary SEPTEMBER 2017 GLOSSARY Term AC ACM asset health and asset health index (AHI) automatic underfrequency load shedding (AUFLS) availability bus cable capacitor bank
More informationElectric Power Quality: Voltage Sags Momentary Interruptions
Slide 1 Electric Power Quality: Voltage Sags Momentary Interruptions Ward Jewell Wichita State University ward.jewell@wichita.edu Slide 2 Power Quality Events Voltage sags Outages/interruptions Voltage
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationModelling Parameters. Affect on DER Impact Study Results
Modelling Parameters Affect on DER Impact Study Results Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration
More informationProtection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin
Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad
More informationAdvanced Monitoring Tools to Improve Distribution System Visibility and Reduce Faults and Outages
Advanced Monitoring Tools to Improve Distribution System Visibility and Reduce Faults and Outages Presented to the 70th Annual Conference for Protective Relay Engineers Texas A&M University, College Station,
More informationUtility Interconnection and System Protection
Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing
More informationGeneration Interconnection Requirements at Voltages 34.5 kv and Below
Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent
More informationPLAN... RESPOND... RESTORE! Utility Automation & Information Technology... Automation Rising
Automation Rising Q U A R T E R LY First Quarter 2013 The Digital Magazine of Automation & Information Technology for Electric, Gas and Water Utilities Utility Automation & Information Technology... PLAN...
More informationUnit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21
Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive
More informationThree Phase Fault Analysis with Auto Reset for Temporary Fault and Trip for Permanent Fault
RESEARCH ARTICLE OPEN ACCESS Three Phase Fault Analysis with Auto Reset for Temporary Fault and Trip for Permanent Fault Sathish Bakanagari 1, A. Mahesh Kumar 2, M. Cheenya 3 12 (Asst.prof in EEE Department)
More informationTransmission System Phase Backup Protection
Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need
More information69 kv to 500 kv INTERCONNECTION REQUIREMENTS FOR TRANSMISSION FACILITIES
69 kv to 500 kv INTERCONNECTION REQUIREMENTS FOR TRANSMISSION FACILITIES Revision: 0.1 10 September 2013 Interconnection Requirements For Transmission Facilities Revision History R 0 April 2008 Initial
More information10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY
9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor
More informationPreface...x Chapter 1 Electrical Fundamentals
Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5
More informationDevelopment of a Prototype of a GSM based Underground Cable Fault Detector
Development of a Prototype of a GSM based Underground Cable Fault Detector Shreya Pal 1, Shubham Verma 2, Shashank Shakher Yadav 3, Dinesh Kumar 4, Amanpreet Kaur 5 1,2,3 Department of Electronics and
More informationResearch on State Estimation and Information Processing Method for Intelligent Substation
, pp.89-93 http://dx.doi.org/10.14257/astl.2015.83.17 Research on State Estimation and Information Processing Method for Intelligent Substation Tongwei Yu 1, Xingchao Yang 2 1 Electric Power Research Institute,
More informationGROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER
GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or
More informationHamdy Faramawy Senior Application Specialist ABB Sweden
Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy
More informationTEAMS Competition 2014
TEAMS Competition 2014 Engineering Digital Relays for Smart Electrical Grids Introduction W hen people talk about the national power grid, they are actually describing three power grids that are connected
More informationPower System Fundamentals
Power System Fundamentals Relay Applications PJM State & Member Training Dept. Objectives At the end of this presentation the Student will be able to: Describe the purpose of protective relays Identify
More informationDraft Kenya Standard for Balloting Not to be Cited as Kenya Standard
KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions
More informationEvent Analysis Tutorial
1 Event Analysis Tutorial Part 1: Problem Statements David Costello, Schweitzer Engineering Laboratories, Inc. Abstract Event reports have been an invaluable feature in microprocessor-based relays since
More informationAutomated Phase Identification System for Power Distribution Systems
Automated Phase Identification System for Power Distribution Systems A Revised Final Report Submitted to Dr. Miu and the Senior Design Project Committee of the Electrical and Computer Engineering Department
More informationOPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS
OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND
More informationDesigning For a Critical Load using a Spot Network
This is a photographic template your photograph should fit precisely within this rectangle. Designing For a Critical Load using a Spot Network Tony Oruga, P.E. Product and Sales Manager Network Protectors
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationTTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line
TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions
More informationIn-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC
In-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC60099-5 Overview of presentation Motivation for condition monitoring of metal oxide surge arresters (MOSA) The Surge
More informationBruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc.
Bruce L. Graves A Defining a Power System A power system is an assembly of generators, transformers, power lines, fuses, circuit breakers, protective devices, cables, and associated apparatus used to generate
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationMidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides
More informationGround Fault Detection using Zigzag Grounding Transformer in Ungrounded System
Ground Fault Detection using Zigzag Grounding Transformer in Ungrounded System Dhruvita Mandaliya 1, Ajay M. Patel 2, Tarang Thakkar 3 1 PG Student, Electrical Engineering Department, Birla Vishvakarma
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities
More informationSubstation Testing and Commissioning: Power Transformer Through Fault Test
1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of
More informationHam Radio Safety In & Out Of The Shack
Ham Radio Safety In & Out Of The Shack Areas of Discussion Electrical Safety AC Power Grounding Antenna Safety Mobile Installations Electrical Safety AC Safety Grounding Most ham stations DO NOT require
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationEH2741 Communication and Control in Electric Power Systems Lecture 2
KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationE N G I N E E R I N G M A N U A L
1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn
More information