1 ET 51 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker can exercise their discretion and decide on the overall accuracy of any answer that is presented in the candidate s own words. 3. Symbols and terms - alternatives Power W or P Voltage V or E or U Phase Active Question 1 (a) To determine whether the fault rating of the protection devices is adequate to safely interrupt a circuit. To find the prospective short circuit current level of the installation. (2 marks) (b) (i) Insulation resistance test (i) and (ii) are interchangeable 1 MΩ or 10,000Ω (ii) Earth leakage test 5 ma (c) No. It does not operate on residual pulsating (1½ marks) direct current. (d) (i) No effect. (ii) The power dissipated drops 10% The power dissipated drops 195W (e) 235 x 12 = 2820VA = 2115 W 2820 VA =

2 Question 1 (f) The main fuse may not operate due to the high impedance of the earth fault loop. Any metal not normally live could be live at up to 230V. The main switch does not isolate the installation. Internal components of equipment are live with control switch in the off position. Fire hazard at a high-resistance joint (g) (i) To ensure the device can safely clear the prospective short-circuit current. To ensure the protective device will operate in the required time (2 marks) (ii) (h) (i) An HRC fuse An ACB The maximum value of torque the motor can produce. (ii) 1500 rpm (i) Any TWO of: A touch voltage hazard between conductive parts and the mass of earth. Protective devices may not operate under fault conditions. Fire hazard at any high resistance joint in the main neutral. Over or under voltage could damage equipment particularly on three phase installations. (2 marks) (j) A thermistor detects a rise in temperature in the motor windings. The change in resistance operates the thermistor monitoring relay which opens the motor control circuit. 2

3 Question 2 (a) (i) An excessive current will flow 0n all phases * The HRC fuses will operate (blow). * The thermal overload will open the control circuit (ii) A sustained high current will flow on all phases * The HRC fuses will operate (blow). * The thermal overload will open the control circuit (iii) A sustained high current will flow on two phases * The HRC fuses will operate (blow). * The thermal overload will open the control circuit (b) (i) The thermal overload device would operate Within 2.5 to 3.5 minutes. (ii) The HRC fuses would operate Within about 0.2s (iii) The 50A fuse with 75A flowing will operate in about 10 minutes. The 50A fuse with 150A flowing will operate in about in 0.2s. 3

4 Question 3 (a) Star point earthed No marks can be For each switchboard - an earthing conductor connected to the earth bar. awarded for part (a), if there are any of the following hazards: For each switchboard - an MEN link between the neutral bar and earth bar. For each switchboard a neutral conductor between the neutral bar and the distribution neutral. A phase connected to a neutral bar No MEN link in either switchboard. No main earth on either switchboard The star point of the transformer is not earthed (b) The protective earthing conductor of the socket outlet final subcircuit The earth bar. MEN link and neutral bar The main neutral conductor The distribution neutral conductor to the star point of the transformer The transformer winding The distribution phase conductor The main phase conductor The main switch The final subcircuit protective device The phase conductor of the socket outlet final subcircuit (c) It is part that has the lowest impedance. 4

5 Question 4 (a) No marks can be awarded for part (a), if E N L L L there are any of the following hazards: Tripping Device Test button A short circuit No test resistance. The socket outlet is not earthed The test button circuit is connected to the supply side of the tripping device Test resistance Sensing coil/toroid Three-phase socket Correctly connected phases, neutral (1½ marks) and earth. Correctly connected test button and resistance Correctly connected sensing coil/toroid Correctly connected tripping circuit Correctly connected socket Working circuit (1½ marks) (b) It is the current imbalance required to trip the RCD It is the rated residual current of the device (c) * There is an imbalance between the neutral current and phase 5

6 Question 4 current * There is earth leakage current in the circuit Greater than the residual tripping current of the RCCB (d) RCBO Residual Circuit Breaker with overload (overcurrent) protection SRCD Socket Residual Current Device 6

7 Question 5 (a) (i) It shows that when the fault current rises The time taken for a fuse to blow shortens (ii) 25A fuse 50A fault current - would operate in about 60 seconds. 25A fuse - 200A fault current - would operate in about 0.08 seconds. (iii) 20 x 1.5 = 30A (iv) 1000 seconds (v) 90A (b) This is the maximum fault current the fuse can safely interrupt. (c) This is the time it takes to interrupt the flow of current and extinguish the arc. It is the sum of the pre-arc time and the arc time (d) This is the maximum current that the fuse is designed to carry continuously 7

8 Question 6 (a) V s = N s x V p Use of 230V in N p calculations is acceptable = 1 x = V (b) V 1 = V ph x 3 Use of 400V in calculations is acceptable = x 3 = 398.6V (c) kva = V 1 x I L x = x x = kva (d) I L = VA (V 1 x 3) = (398.6 x 3) = A (e) Regulation % = VNL VFL x 100 VNL = x = 3.48% 8

9 Question 7 (a) Load 2 VAr = kva 2 - P 2 = = VAr Load 3 VAr = kva 2 - P 2 = = VAr (b) Horizontal Vertical Watts (P) Var (Q) Load Load Load Totals Total VA kva = P 2 + VAr 2 = = = kva (c) Pf = W VA = =

10 Question 8 (a) (i) The motor is connected in delta with a line voltage of 400V (ii) L1 L2 L3 U V W W1 U1 V1 Correctly connected windings Links connected to achieve a delta configuration Links connected to achieve a three-phase supply (b) (i) To prevent the hoist starting if two phases on the supply were reversed. (ii) The hoist will go up if the down control is operated and will go down when the up control is operated. The upper and lower limits on the hoist become ineffective. (2 marks) (c) The thermal overload protects against a sustained current rise. In excess of overload current settings. The thermistor protects against excessive temperature rise in the motor. Regardless of whether the current rises. (d) (i) As the temperature (of a motor) increases the resistance of the thermistor falls. (ii) As the temperature (of a motor) increases the resistance of the thermistor rises. 10

11 Question 9 (a) kva = V L x I L x = 400 x 142 x = kva (red phase) (b) The transformer is 100kVA (c) I PH = kva V L x 3 = 100, x 3 = A (d) I L = kva V L primary x 3 = 100, ,000 x 3 = 5.24A (e) (i) A tap-changer (ii) On the high-voltage side The current switched by the tap-changer is small. (1½ marks) 11

FINAL - ET 60 - Electrician Theory Examination Marking Schedule

FINAL - ET 60 - Electrician Theory Examination Marking Schedule FINAL - ET 60 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions.

More information

ELECTRICIAN S THEORY EXAMINATION 15 November 2014 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 15 November 2014 QUESTION AND ANSWER BOOKLET Candidate Code No. ET51 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 15 November 2014 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

ET 40 - Electrician Theory Examination Marking Schedule

ET 40 - Electrician Theory Examination Marking Schedule ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

ET 61 - Electrician Theory Examination Marking Schedule

ET 61 - Electrician Theory Examination Marking Schedule ET 61 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET Candidate Code No. ET37 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

FINAL - EST Electrical Service Technician Answer Schedule

FINAL - EST Electrical Service Technician Answer Schedule FINAL - EST 2069 - Electrical Service Technician Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions.

More information

EAS Electrical Appliance Serviceperson Answer Schedule

EAS Electrical Appliance Serviceperson Answer Schedule EAS 1083- Electrical Appliance Serviceperson Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions.

More information

ELECTRICIAN S THEORY EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET Candidate Code No. ET 60 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET Candidate Code No. ET43 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (2 marks) EA 2

FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (2 marks) EA 2 FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination

More information

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks)

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks) EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE Notes: 1. (1mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination

More information

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA) ER 87 Electrician Regulations Answer Schedule Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The

More information

, Power Industries and Communications Industry Training Board

, Power Industries and Communications Industry Training Board , Power Industries and Communications Industry Training Board Suite 3 Level 22185 187 Boundary Boundary Rd Rd North Melbourne VIC 3051 Phone VIC 3051 (03) 9654 1299 Phone (03) 9654 1299 Facsimile (03)

More information

Unit 27 Three-Phase Circuits

Unit 27 Three-Phase Circuits Unit 27 Three-Phase Circuits Objectives: Discuss the differences between threephase and single-phase voltages. Discuss the characteristics of delta and wye connections. Compute voltage and current values

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes FINAL - ER 70 Electrician Regulations Answer Schedule Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions.

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Given Names: Date: Time: Location: Assessment Time (includes reading and preparation time): At the end of this time you will be asked to stop.

More information

TN, TT & IT Earthing Arrangements

TN, TT & IT Earthing Arrangements TN, TT & IT Earthing Arrangements In IT and TN-C networks, residual current devices are far less likely to detect an insulation fault. In a TN-C system, they would also be very vulnerable to unwanted triggering

More information

Module Title: Electrical Installation II Laboratory Sheet:

Module Title: Electrical Installation II Laboratory Sheet: Vocational Training Council Hong Kong Institute of Vocational Education Department of Engineering Module Title: Electrical Installation II Laboratory Sheet: Student name: Course / Year: Subject: Date:

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

Chapter 6. WIRING SYSTEMS Safe Electrical Design

Chapter 6. WIRING SYSTEMS Safe Electrical Design Chapter 6 WIRING SYSTEMS Safe Electrical Design Topic 6-3 CABLE SELECTION BASED ON CURRENT CARRYING CAPACITY REQUIREMENTS INSTALLATION CONDITIONS Current carrying capacity (CCC) is the maximum continuous

More information

Residual current circuit breakers (RCCBs)

Residual current circuit breakers (RCCBs) Residual current circuit breakers (RCCBs) Description Automatically trips in event of earth leakage fault Provides protection against direct & indirect contact with live parts Technical data IS 12640-1,

More information

Residual Current Operated Circuit-Breakers (RCCBs)

Residual Current Operated Circuit-Breakers (RCCBs) Product Overview Residual Current Operated Circuit-Breakers (RCCBs) Residual current operated circuit-breakers Number of poles Rated current A Rated residual current ma MW Auxiliary contacts can be mounted

More information

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01 TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY Test Code: 5171 Version: 01 Specific Competencies and Skills Tested in this Assessment: OSHA Regulations and Electrical Safety Practices

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE Experiment 45 Three-Phase Circuits OBJECTIVE To study the relationship between voltage and current in three-phase circuits. To learn how to make delta and wye connections. To calculate the power in three-phase

More information

FIB / FIC. r with Overcurrent Protection (RCBO) Doepke. » effi cient. » reliable. » fl exible. » future-oriented

FIB / FIC. r with Overcurrent Protection (RCBO) Doepke. » effi cient. » reliable. » fl exible. » future-oriented Doepke The experts in residual current protection technology Residual Current Circuit-Breakers it- r with Overcurrent Protection (RCBO) FIB / FIC» effi cient» reliable» fl exible» future-oriented Doepke

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions 1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution

More information

7 o/c4 - To meet the requirements of BS 7671, all fault current protective devices without back-up protection on the supply side must be capable of:

7 o/c4 - To meet the requirements of BS 7671, all fault current protective devices without back-up protection on the supply side must be capable of: 1 PAPER 5 Sample Questions A- C&G 2382 17th Edition Paper A 1 o/c1 BS 7671 does not apply to a equipment of aircraft b photovoltaic systems c marinas d fairgrounds. 2 o/c1 Where protection for persons

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations. Earth Fault Loop Impedance Tests

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations. Earth Fault Loop Impedance Tests C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Earth Fault Loop Impedance Tests 1 Revision Inspections are made to verify that the installed

More information

Residual Current Operated Circuit-Breakers (RCCBs)

Residual Current Operated Circuit-Breakers (RCCBs) Product overview Residual Current Operated C ircuit-breakers (RCCBs) Number of poles Rated fault current I n ma Rated current I n A MW Auxiliary switches can be mounted (Type A) (Type B) 5SM1and 5SM3 RCCBs

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

CURRENT FUTURE REGULATIONS PROPOSALS

CURRENT FUTURE REGULATIONS PROPOSALS CURRENT REGULATIONS BS7671 FUTURE PROPOSALS BS7671 AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co.uk CONTENTS. INTRODUCTION. CURRENT REGULATIONS. WHAT IT SAYS ABOUT

More information

Electrical Protection System Design and Operation

Electrical Protection System Design and Operation ELEC9713 Industrial and Commercial Power Systems Electrical Protection System Design and Operation 1. Function of Electrical Protection Systems The three primary aims of overcurrent electrical protection

More information

INSTRUCTION MANUAL DIGITAL PSC-LOOP TESTER MODEL 4118A KYORITSU ELECTRICAL INSTRUMENTS WORKS,LTD.

INSTRUCTION MANUAL DIGITAL PSC-LOOP TESTER MODEL 4118A KYORITSU ELECTRICAL INSTRUMENTS WORKS,LTD. INSTRUCTION MANUAL DIGITAL PSC-LOOP TESTER MODEL 4118A KYORITSU ELECTRICAL INSTRUMENTS WORKS,LTD. CONTENTS 1. SAFE TESTING... 1 2. PROCEDURE OF REMOVING COVER... 4 3. FEATURES... 5 3.1 Instrument Layout...

More information

POWER AMPLIFIERS 4 QUADRANTS 3x500 VA to 3x1500 VA - THREE-PHASES

POWER AMPLIFIERS 4 QUADRANTS 3x500 VA to 3x1500 VA - THREE-PHASES PERFORMANCES High accuracy High stability Fast transients High inrush current facilities Wide bandwidth Very low distortion Quadrant change without transition Very low output impedance Low noise RS232

More information

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS Juan Manuel Gers, PhD Protection coordination principles Relay coordination is the process of selecting settings that will assure that the relays

More information

# - - Internal * On Line Examination

# - - Internal * On Line Examination COURSE NAME : ELECTRICAL ENGINEERING GROUP COURSE CODE : EE/EP SEMESTER : FIFTH SUBJECT TITLE : SWITCHGEAR and PROTECTION SUBJECT CODE : Teaching and Examination Scheme: Teaching Scheme TH TU PR PAPER

More information

ELECTRICAL POWER TRANSMISSION TRAINER

ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering

More information

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math Chapter 1 Electrical Theory and Code Questions 1 Unit 1 Electrician s Math and Basic Electrical Formulas 3 Part A Electrician s Math 3 1 1 Fractions 3 1 2 Kilo 4 1 3 Knowing Your Answer 4 1 4 Multiplier

More information

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books.

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books. City & Guilds Fundamental Inspection & Testing 30 Question Test Sheet (2392-10 Paper No1.) NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes

More information

Circuit Analyzer MS5908A. Operation S Manual MS5908A TEST. ma VA ms Hz% 12 A 15 A 20 A HOLD ms VA. V Vd Z RCD GFCI

Circuit Analyzer MS5908A. Operation S Manual MS5908A TEST. ma VA ms Hz% 12 A 15 A 20 A HOLD ms VA. V Vd Z RCD GFCI Circuit Analyzer Operation S Manual MS5908A L - N L - E N - E Peak Z - L Z - N Z - E ASCC AC TEST N[] [] L E ma VA ms Hz% 12 A 15 A 20 A HOLD ms VA Ω% V Vd Z RCD GFCI MS5908A General Instructions This

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. 2) The model answer and the answer written by candidate

More information

Variable Transformers Product Design & Engineering Data

Variable Transformers Product Design & Engineering Data Variable Transformers Product Design & Engineering Data Product Design & Engineering Data Type 1010B Cutaway General Information STACO ENERGY PRODUCTS CO. is a leading manufacturer of variable transformers,

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2394 EXAM PAPER 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2. There are various documents that are relevant to the Inspection and

More information

L O V A G. T E S T I N S T R U C T I O N I E C / E N E d C O N D I T I O N S F O R T E S T I N G

L O V A G. T E S T I N S T R U C T I O N I E C / E N E d C O N D I T I O N S F O R T E S T I N G LTI IEC/EN 60947-4-1 Ed.3.1 L O V A G T E S T I N S T R U C T I O N I E C / E N 6 0 9 4 7-4 - 1 E d. 3. 1 C O N D I T I O N S F O R T E S T I N G C O N T A C T O R S A N D M O T O R - S T A R T E R S This

More information

17TH EDITION BS TH EDITION BS7671 HOW THIS AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co.

17TH EDITION BS TH EDITION BS7671 HOW THIS AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co. BS7671 BS7671 AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co.uk CONTENTS. INTRODUCTION. CHAPTER 31. WHAT IT SAYS ABOUT DIVISION OF THE INSTALLATION. INTRODUCTION

More information

Page 13-2 Page Page 13-7

Page 13-2 Page Page 13-7 Page -2 Page -6 MINIATURE CIRCUIT BREAKERS UP TO 63A 1P, 1P+N, 2P, 3P and 4P versions IEC rated current In: 1-63A IEC short-circuit capacity Icn: 10kA (6kA for 1P+N) Trip characteristic curve: Type B,

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016.

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016. Title Grounding System Introduction Date October, 2016 Related Products Key words All industrial automation products Grounding, Earthing, TN, TT, IT, Introduction The automation industry of today has adopted

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

Capacitor Switching Contactors

Capacitor Switching Contactors Capacitor Switching D385E51 Technical catalogues and news under: www.benedict.at Motor-Starter Mini- Overload Relays Capacitor Switching Motor-Starters Modular Circuit Breakers M4-32T... up to 32A M4-32R..

More information

Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection)

Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection) Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection) FIGURE 1.2 Fig.1 Earth fault loop path. Figure 1 shows the earth fault system which provides

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

thepower to protect  the power to protect i-gard LITERATURE Low and medium voltage thepower to protect i-gard LITERATURE Low and medium voltage distribution systems Arc Flash Hazards and High Resistance Grounding Grounding of Standby and Emergency Power Systems Neutral Grounding Resistors

More information

technical information

technical information technical information protection devices 192 circuit protection principle 194 circuit breakers characteristics 200 moulded case circuit breakers (MCCB) 205 prospective fault current 208 selectivity and

More information

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011 NATIONAL RULES FOR ELECTRICAL INSTALLATIONS Fourth Edition ET 101:2008 Extracts from Amendment No.1:2011 22 June 2011 Page vi: Insert after 1 st Paragraph: Section 710: Medical Locations was prepared by

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

PROTECTION AGAINST FAULT CURRENT

PROTECTION AGAINST FAULT CURRENT PROTECTION AGAINST FAULT CURRENT Short-circuit current the short-circuit current that could flow during fault is known as the prospective short-circuit current (PSCC), and any device installed to protect

More information

Auto Diagnosis Test #2 Review

Auto Diagnosis Test #2 Review Auto Diagnosis Test #2 Review Your own hand written notes may be used for the 1 st 10 minutes of the test For the Most Effective Personal Review, Look Over the On Line Study Guide Multimedia Based on Chapters

More information

Transformer Protection Principles

Transformer Protection Principles Transformer Protection Principles 1. Introduction Transformers are a critical and expensive component of the power system. Due to the long lead time for repair of and replacement of transformers, a major

More information

MASTECH MS5908. Circuit Analyzer

MASTECH MS5908. Circuit Analyzer MASTECH MS5908 Circuit Analyzer Operation Manual 2 General Instructions This circuit analyzer is a special test device designed for AC low-voltage distribution line quick fault location. With simple operation,

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

Fuseless Capacitor Bank Protection

Fuseless Capacitor Bank Protection Fuseless Bank Protection Minnesota Power Systems Conference St. Paul, MN. November 2, 1999 by: Tom Ernst, Minnesota Power Other Papers of Interest Presented at Western Protective Relay Conference, Oct.

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Phase rotation and verification of voltage drop 1 Outcomes of this Session describe how to assess

More information

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012 SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM Unit Objectives Describe the structure of an atom. Identify atoms with a positive charge and atoms with a negative charge. Explain

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

Single-Phase Transformation Review

Single-Phase Transformation Review Single-Phase Transformation Review S T U D E N T M A N U A L March 2, 2005 2 STUDENT TRAINING MANUAL Prerequisites: None Objectives: Given the Construction Standards manual and a formula sheet, you will

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

650 PHOENIX CONTACT Courtesy of Power/mation Energy Lane, Saint Paul, MN

650 PHOENIX CONTACT Courtesy of Power/mation Energy Lane, Saint Paul, MN 650 PHOENIX CONTACT Monitoring relays, timer relays, function blocks The requirements pertaining to safety and system availability are constantly increasing regardless of the industry. Processes are becoming

More information

Circuits and Circuit Elements

Circuits and Circuit Elements Circuits and Circuit Elements Schematic Diagrams A diagram that depicts the construction of an electrical apparatus is called a schematic diagram These diagrams use symbols to represent the bulb, battery,

More information

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Adam T. Powell, PE President Emerald Engineering, Inc. Jeffrey L. Small, Sr. Senior

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

returned to your distributor for attention. 14. Do not operate the function switch while the instrument is connected to a circuit.

returned to your distributor for attention. 14. Do not operate the function switch while the instrument is connected to a circuit. 1. This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions. KYORITSU will not accept liability for any damage or injury caused by misuse

More information

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet... INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...xv UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

Functional Range. IWE - Earth Fault Relay. C&S Protection & Control Ltd.

Functional Range. IWE - Earth Fault Relay. C&S Protection & Control Ltd. Functional Range - Earth Fault Relay C&S Protection & Control Ltd. 2 Contents Page No. 1. Application 2. Operating Principle. Current Transformer Connections 5. Connections, Contact Arrangement and Setting

More information

To Float or Not to Float? Analysis of a floating vs. grounded output Associated Power Technologies

To Float or Not to Float? Analysis of a floating vs. grounded output Associated Power Technologies To Float or Not to Float? Analysis of a floating vs. grounded output Associated Power Technologies Introduction In electrical circuits, voltage is always measured between two points: a point of high potential

More information

COPYTRACER Anti-counterfeit registration number

COPYTRACER Anti-counterfeit registration number COPYTRACER Anti-counterfeit registration number Bottom clamp Environment friendly 36 New top clamp for all tools Technical labelling area Integrated label holder DX 3 The Next Step. Presenting, DX 3, an

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson...

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson... TECHNICAL REPORT APPLICATION GUIDE TITLE: Current Transformer Requirements for VA TECH Reyrolle ACP Relays PREPARED BY:- A Allen... APPROVED :- B Watson... REPORT NO:- 990/TIR/005/02 DATE :- 24 Jan 2000

More information

Burdens & Current Transformer Requirements of MiCOM Relays. Application Notes B&CT/EN AP/B11. www. ElectricalPartManuals. com

Burdens & Current Transformer Requirements of MiCOM Relays. Application Notes B&CT/EN AP/B11. www. ElectricalPartManuals. com Burdens & Current Transformer Requirements of MiCOM Relays Application Notes B&CT/EN AP/B11 Application Notes B&CT/EN AP/B11 Burdens & CT Req. of MiCOM Relays Page 1/46 CONTENTS 1. ABBREVIATIONS & SYMBOLS

More information

Frequently Asked Question on Isolated Power Supply(IPS)

Frequently Asked Question on Isolated Power Supply(IPS) Frequently Asked Question on Isolated Power Supply(IPS) Q: What is an IPS? A: IPS is called as Isolated Power Supply or System and is used in a Hospital to ensure safe power supply to OT Operation Theaters

More information

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash

More information

Chapter F Protection against electric shocks

Chapter F Protection against electric shocks Chapter F Protection against electric shocks 1 2 3 4 5 6 7 8 Contents General 1.1 Electric shock F2 1.2 Protection against electric shock F3 1.3 Direct and indirect contact F3 Protection against direct

More information

Generator Protection GENERATOR CONTROL AND PROTECTION

Generator Protection GENERATOR CONTROL AND PROTECTION Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate knowledge of theory for registration of electrical installers

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate knowledge of theory for registration of electrical installers Page 1 of 8 Title Demonstrate knowledge of theory for registration of electrical installers Level 3 Credits 3 Purpose This unit standard covers the theory assessment required for registration as an electrical

More information

NATIONAL SENIOR CERTIFICATE GRADE 12

NATIONAL SENIOR CERTIFICATE GRADE 12 NATIONAL SENIOR CERTIFICATE GRADE 12 ELECTRICAL TECHNOLOGY NOVEMBER 2008 MEMORANDUM This memorandum consists of 12 pages. Electrical Technology 2 DoE/November 2008 QUESTION 1: TECHNOLOGY, SOCIETY AND THE

More information

QUICK SETUP GUIDE SECULIFE IP

QUICK SETUP GUIDE SECULIFE IP QUICK SETUP GUIDE SECULIFE IP The SECULIFE IP is capable of executing all measurements for testing the effectiveness of safety measures in electrical systems as required by IEC 60364-4 / VDE 0100-600,

More information

PROTECTION of electricity distribution networks

PROTECTION of electricity distribution networks PROTECTION of electricity distribution networks Juan M. Gers and Edward J. Holmes The Institution of Electrical Engineers Contents Preface and acknowledgments x 1 Introduction 1 1.1 Basic principles of

More information

120/240 Watt AC-DC Front End with PFC W Series Convert Select 120 Convert Select 240

120/240 Watt AC-DC Front End with PFC W Series Convert Select 120 Convert Select 240 Industrial Environment AC-DC Converters >100 Watt W Series 120/240 Watt AC-DC Front End with PFC W Series Convert Select 120 Convert Select 240 Rugged 35 mm DIN-rail snap-fit design 3000 V AC input to

More information

MFT1700 series. Multifunction testers. User manual

MFT1700 series. Multifunction testers. User manual M MFT1700 series Multifunction testers User manual 1 Contents SAFETY WARNINGS...3 1. Introduction...4 2. Overview...4 2.1 Front panel and controls...6 2.2 Waste electrical and electronic equipment...6

More information