Industrial and Commercial Power Systems Topic 7 EARTHING

Size: px
Start display at page:

Download "Industrial and Commercial Power Systems Topic 7 EARTHING"

Transcription

1 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 7 EARTHING

2 1 INTRODUCTION Advantages of earthing (grounding): Limitation of touch and step potentials to prevent electric shock Equi-potential bonding of exposed metal conductors to prevent electric shock Limitation of over-voltages on equipment for prevention of damage Fast operation of electrical protection and limitation of earth fault damage

3 General requirements: low impedance path (resistance and reactance) to earth conductor of local supply system and thence to earth of supply at main substation items need earthing (eg metal casings) must be connected to main earth by conductors of low enough impedance to provide equipotential bonding between all equipment items. Avoid earth loops. earth potential rise (EPR) associated with any fault current must be limited to safe levels earth conductors capable of handling fault current without thermal or mechanical damage

4 2 METHODS OF POWER SYSTEM EARTHING

5 Methods of earthing Unearthed system Solidly earthed system Resistance earthed system Reactance earthed system Use of an earthing transformer

6 Advantages of Solidly earthed systems High fault current and fast protection operation Better personnel and equipment safety Earth fault current easy to detect Unearthed systems Line to earth fault will not interrupt supply thus improves reliability Low fault current (limited by capacitance) will not cause damage

7 Disadvantages of Solidly earthed systems Line to earth fault causes loss of supply Line to ground fault current may be high enough to cause damage Unearthed systems Line-line fault current may be low and may not trip protection May have prolonged arc faults Line-line voltage imposed on phase insulation if earth fault occurs Overvoltages may cause increased insulation stress if there is an earth fault Finding faults may be difficult Regular maintenance is required

8 3 PERSONNEL PROTECTION

9 Standards AS/NZS :2002 : Effects of current on human beings and livestock - General aspects In USA and Canada: IEEE Std Dalziel s electrocution equation

10 Dalziel s electrocution equation: Defines a specific energy (I 2 t) as determining factor for potential electrocution (fibrillation). Values based on tests carried out on humans and animals.

11

12

13

14

15

16

17

18 Code of Practice, Electrical Safety Act 2002 IEC approach (also Australia): Special locations: A1 (<67kV) or A2 (>66kV) Frequented locations: B1 (<67kV) or B2 (>66kV) IEEE

19 4 TYPICAL SITUATIONS IN SUBSTATIONS

20 Possible hazardous situations which can occur when there is an earth surface potential rise (EPR) in vicinity of an earth electrode due to fault current flowing to earth through that earth electrode.

21 Step potential : voltage difference between a person's feet when spaced 1m apart. Touch potential: voltage difference between exposed metal object, connected directly to earth electrode, and ground surface potential where feet are placed (usually distance of 1m is used). Grid (mesh) potential: maximum possible touch voltage in an earth grid area. Transferred potential: voltage difference between earth surface potential and exposed metal object connected to remote earth (effectively at true earth potential of zero volts).

22 Potential hazards due to Earth Potential Rise from a fault.

23 5 EARTHING FOR EQUIPMENT PROTECTION - THERMAL EFFECTS

24 earth faults are most common type of electrical fault. heating of fault current cause significant damage. arcing earth fault, or high impedance arcing fault is potentially the most damaging. causes: (i) contaminated insulation (ii) physical damage to insulation, (iii) transient or continuous over-voltages. typical arc voltages in LV systems: ~ 100V. arcing fault currents << bolted-fault current.

25 6 SYSTEMS OF EARTHING IN LOW-VOLTAGE INSTALLATIONS

26

27

28 Direct earthing system: system relies on current flow through the ground thus requires low earth resistivity and good earth electrode. Not always possible. MEN system is preferred as it utilizes supply utilities neutral to provide an additional earth return path.

29 MEN system: earth connections to neutral at consumer s installation and along route to supply substation neutral provides the return path while in direct earth system the metallic path is provided by water pipes, cable sheaths or by special earthing connections if provided balancing of load to utilize phase current cancellation in return neutral to minimize voltage drop

30 neutral conductor must be earthed at substation and at other locations as necessary to ensure that total impedance between neutral and earth does not exceed 10 ohms conductors used to earth neutral conductor of distribution system must have a cross-section area of at least 20% that of the smallest size of neutral used in system

31 CMEN system: Common Multiple Earthed Neutral extension of MEN system high voltage and low voltage equipment is bonded (via a neutral conductor) to a single common earth impedance to ground of this interconnected system of earthing is very low, typically 1 ohm or less.

32 7 TYPES OF EARTHING SYSTEMS IN CONSUMER S INSTALLATIONS

33 TN systems TT systems IT systems TN-C TN-S TN-C-S In practice, only TT and TN systems are commonly used.

34 1st letter (I or T) gives relationship of supply to earth T (terra): direct connection of one point of supply system to earth I (insulation): all live parts of supply isolated from earth or one point connected to earth through an impedance

35 2nd letter (T or N) gives relationship of exposed conductive parts of the general installation to earth T (terra): direct connection of exposed conductive parts to earth, independent of earthing of supply system N (neutral): direct connection of exposed conductive parts to earthed point of supply (neutral point).

36 TN systems: one point directly earthed, exposed conductive parts connected to that point by protective conductor (PE) TN-S system: separate neutral (N) and PE throughout TN-C system: N and PE combined into a single conductor throughout TN-C-S system: N and PE combined into a single conductor in a part of the system

37 TN-S TN-CS TN-C

38 TT system: one point directly earthed, exposed conductive parts connected to earth via separate earth electrode, no direct connection between live parts and earth, exposed conductive parts connected to earth

39 IT system: no direct connection between live parts and earth, exposed conductive parts connected to earth

40 8 EARTHING FOR COMPUTER SYSTEM AND EQUIPMENT

41 Earthing systems for data links

42 9 EARTH RESISTANCE OF BURIED ELECTRODES

43 Earth resistance determined by: shape of electrode(s) extent of electrode(s) electrical resistivity of the soil

44

45

46

47 10 EQUIVALENT HEMISPHERE MODEL OF AN EARTH ELECTRODE

48 most common form of earth electrode is a driven rod or pipe or a complex distributed mesh in the ground. not simple for analytic calculation determine equivalent hemisphere and then used for potential distribution calculations

49 Example:

50 11 USE OF EQUIVALENT HEMISPHERE MODEL TO CALCULATE TOUCH, STEP, TRANSFERRED POTENTIALS

51 V(r) = ground potential w.r.t earth electrode

52

53 12 EARTH RESISTANCE OF CLOSELY-SPACED IDENTICAL ELECTRODES

54 separate earth electrodes buried close to one another earth potential fields around these electrodes when current flows to earth will interact earth resistance of combined system higher than that of parallel combination isolated electrode system

55

56 13 MEASUREMENT OF EARTH RESISTANCE

57 Three-electrode method

58 Fall-of-potential method potential probe remote current probe

59

60 14 EARTH RESISTIVITIES

61 not a good conductor as compared with metals. variable depending upon physical nature and chemical composition heavily influenced by moisture content and dissolved salts.

62 Rule of thumb Mud (compressed coal): Wet soil: Moist soil: Dry soil: Rock: 1 Ωm, 10 Ωm, 100 Ωm, 1000 Ωm, Ωm.

63

64 15 ELECTRIC SHOCK EFFECTS

65 body resistance foot contact resistance ρ = soil resistivity Equivalent circuits for touch and step potentials

66 Assume bare feet or conducting footwear:

67 Tolerable touch and step potentials

68

69 Thank you

70 Unused slides

71 In distribution substations, the buried grid system will determine the earth resistance. The maximum recommended resistance is 5Ω or even 1Ω.

72

73

74

75

76

77

78

79 Step voltage means the prospective or open circuit voltage that may appear between any two points (1 metre apart) on the surface of the ground. Touch voltage means the prospective or open circuit voltage that may appear between any point of contact with conductive parts (that are located within 2.4 metres of the ground) and any point on the surface of the ground with a horizontal distance of one metre from the vertical projection of the point of contact with the conductive part.

80 Transferred earth potential Although a line may be "earthed " there may be a dangerous voltage or potential between the line and the earth point, including a concrete pole or a steel tower, at the work site. For example, where a line is under access at a remote substation, a fault not directly associated with the line under access can cause a dangerous voltage rise on the substation earth grid. That voltage rise is transferred through the line to the work site, where it can create a hazard to workers on the site.

81 In 1924, South Australian James Stobie invented a steel and concrete pole to carry electricity and telephone lines, due to SA s lack of suitable timber. A particular impetus for their invention was the need for a reliable supply of poles for the expansion of electricity into the countryside. Stobie Poles have other advantages too they re termite proof and have a life span of around 50 years. All Stobie Poles end at the SA border, with most other States preferring wooden telegraph poles.

82 Ref: AS : Electromagnetic compatibility

83

84

Earthing of Low Voltage Electrical Systems: Personnel Protection Equipment Protection

Earthing of Low Voltage Electrical Systems: Personnel Protection Equipment Protection ELEC9713 Industrial and Commercial Power Systems Earthing of Low Voltage Electrical Systems: Personnel Protection Equipment Protection 1. Introduction Earthing of electrical equipment and power systems

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

Grounding and Lightning arrestors

Grounding and Lightning arrestors CHAPTER - Four Grounding and Lightning arrestors 4.1. Introduction Electrical connection of neutral point of a supply system or the non current carrying part of electrical equipments to the general mass

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor Safety earthing Sector Energy PTI NC Theodor Connor Copyright Siemens AG 2008. All rights reserved. Content Introduction Theoretical background Soil Analysis Design of earthing system Measurements on earthing

More information

SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING

SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING Y. Rajotte J. Fortin G. Lessard Hydro-Québec, Canada Hydro-Québec, Canada Hydro-Québec, Canada e-mails: rajotte.yves@ireq.ca fortin.jacques@ireq.ca

More information

TN, TT & IT Earthing Arrangements

TN, TT & IT Earthing Arrangements TN, TT & IT Earthing Arrangements In IT and TN-C networks, residual current devices are far less likely to detect an insulation fault. In a TN-C system, they would also be very vulnerable to unwanted triggering

More information

Grounding for Power Quality

Grounding for Power Quality Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

Options to Improve the MEN System into the 21 st Century

Options to Improve the MEN System into the 21 st Century Options to Improve the MEN System into the 21 st Century Chris Halliday Electrical Consulting and Training Pty Ltd, Gladstone NSW, Australia. Email: chris@elect.com.au Web: www.elect.com.au Abstract Network

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016.

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016. Title Grounding System Introduction Date October, 2016 Related Products Key words All industrial automation products Grounding, Earthing, TN, TT, IT, Introduction The automation industry of today has adopted

More information

ABSTRACT 1 INTRODUCTION

ABSTRACT 1 INTRODUCTION ELECTROMAGNETIC ANALYSIS OF WIND TURBINE GROUNDING SYSTEMS Maria Lorentzou*, Ian Cotton**, Nikos Hatziargyriou*, Nick Jenkins** * National Technical University of Athens, 42 Patission Street, 1682 Athens,

More information

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments Thomas Szollossy Senior Technical Support Engineer Power Quality Thailand PQSynergy 2017, Chiang Mai, Thailand Introduction

More information

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

Power Quality. Case Study. Conrad Bottu Laborelec January 2008 Case Study Electromagnetic compatibility (EMC) study Breakdown of low voltage electronic equipment in a 25 kv substation Conrad Bottu Laborelec January 2008 Power Quality Power Quality 1 Introduction Description

More information

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation Marcos Telló Department of Electrical Engineering Pontifical Catholic University of Rio Grande

More information

Single Earthed Neutral and Multi Earthed Neutral. Single Earthed Neutral and Multi Earthed Neutral: Multi Grounded Neutral System (MEN):

Single Earthed Neutral and Multi Earthed Neutral. Single Earthed Neutral and Multi Earthed Neutral: Multi Grounded Neutral System (MEN): Single Earthed Neutral and Multi Earthed Neutral. SEPTEMBER 6, 2011 5 COMMENTS Single Earthed Neutral and Multi Earthed Neutral: In Distribution System Three Phase load is unbalance and non linear so The

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

CROSS-CONNECT CABINET

CROSS-CONNECT CABINET TELEPHONE EXCHANGE FEEDER CABLE CROSS-CONNECT CABINET DISTRIBUTION CABLE CUSTOMERS PREMISES 48Vdc 200 pairs 400 pairs 2000 pairs 50 pairs 15 pairs 7 pairs 1 } Chorus increasingly common roadside electronic

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

High Voltage Pylon earth Measurements. Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy

High Voltage Pylon earth Measurements. Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy High Voltage Pylon earth Measurements Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy Abstract The earth connection of high voltage electrical power line pylons is obviously

More information

A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid

A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid 1 Arpan K. Rathod, 2 Chaitanya H. Madhekar Students Electrical Engineering, VJTI, Mumbai, India

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

LIMITING THE DANGER OF ELECTRIC CURRENT SHOCK IN RELATION TO THE MEAN OF NEUTRAL POINT EARTHING IN THE MV NETWORKS

LIMITING THE DANGER OF ELECTRIC CURRENT SHOCK IN RELATION TO THE MEAN OF NEUTRAL POINT EARTHING IN THE MV NETWORKS LIMITING THE DANGER OF ELECTRIC CURRENT SHOCK IN RELATION TO THE MEAN OF NEUTRAL POINT EARTHING IN THE MV NETWORKS Witold Hoppel, Józef Lorenc!" ph.+48 61 8782279 - FAX + 48 61 8782280 Jerzy Andruszkiewicz

More information

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

A DUMMIES GUIDE TO GROUND FAULT PROTECTION A DUMMIES GUIDE TO GROUND FAULT PROTECTION A DUMMIES GUIDE TO GROUND FAULT PROTECTION What is Grounding? The term grounding is commonly used in the electrical industry to mean both equipment grounding

More information

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models International Journal of Electrical & Computer Sciences IJECS-IJENS Vol:15 No:03 39 Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models Shen-Wen Hsiao, Shen-Jen

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 05 (RIC Standard: EP 12 10 00 11 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

ECE 528 Understanding Power Quality

ECE 528 Understanding Power Quality ECE 528 Understanding Power Quality http://www.ece.uidaho.edu/ee/power/ece528/ Paul Ortmann portmann@uidaho.edu 208-316-1520 (voice) 1 Today Wiring and grounding Why it s important References Terms and

More information

SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS)

SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS) SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS) SLIDE In this video, we will cover a sample exam problem for the Power PE Exam. This exam problem falls under the topic of Protection, which accounts for

More information

AC Voltage- Pipeline Safety and Corrosion MEA 2015

AC Voltage- Pipeline Safety and Corrosion MEA 2015 AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion

More information

Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems

Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems 701880MAC0010.1177/0020294017701880 research-article2017 Contributed Paper Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems

More information

Underground System Design TADP 547

Underground System Design TADP 547 Underground System Design TADP 547 Industry Standards, Specifications and Guides Presentation 6.4 Instructor: Frank Frentzas Industry Organizations Several professional organizations develop standards

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

High Voltage Pylon Earth Measurements

High Voltage Pylon Earth Measurements High Voltage Pylon Earth Measurements Speaker: Gavin van Rooy Authors: Frank Barnes and Gavin van Rooy Tycom (Pty) Ltd PO Box 3546, Randburg, 2125, South Africa E-mail: frank@tycom.co.za Phone: 011 787

More information

The Confusion Surrounding Stray Voltage

The Confusion Surrounding Stray Voltage The Confusion Surrounding Stray Voltage Jim Burke, InfraSource Inc., Fellow, IEEE Abstract While stray voltage has been a concern for farm livestock for many years, it is only within the past few years

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue...

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue... Earthing of Telecom Installations using Single Point Earthing R. Saji Kumar DGM (IT) O/o The Chief General Manager Trivandrum Agenda Reference Documents Earthing Issue & the Problems Earthing Principle

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE

RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE RISK MANAGEMENT IN A LOW VOLTAGE NETWORK ON SAFETY ISSUES FROM ASSET MANAGEMENT PERSPECTIVE Sharmistha BHATTACHARYYA Endinet The Netherlands sharmirb@yahoo.com Thijs van DAEL Endinet The Netherlands thijs.van.dael@endinet.nl

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD GROUNDING RESISTANCE MEASUREMENTS AND IMPROVEMENT

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD GROUNDING RESISTANCE MEASUREMENTS AND IMPROVEMENT SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-III) REV-01 GROUNDING RESISTANCE MEASUREMENTS AND IMPROVEMENT This specification is property of SEC

More information

Chapter 6. WIRING SYSTEMS Safe Electrical Design

Chapter 6. WIRING SYSTEMS Safe Electrical Design Chapter 6 WIRING SYSTEMS Safe Electrical Design Topic 6-3 CABLE SELECTION BASED ON CURRENT CARRYING CAPACITY REQUIREMENTS INSTALLATION CONDITIONS Current carrying capacity (CCC) is the maximum continuous

More information

ET 40 - Electrician Theory Examination Marking Schedule

ET 40 - Electrician Theory Examination Marking Schedule ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION 1 Technical Specification 41-24 Issue 2017 Guidelines for the Design, Installation, Testing and Maintenance of Main Earthing Systems

More information

ENSURING PUBLIC SAFETY THROUGH PROPER EARTHING IN LOW VOLTAGE NETWORKS

ENSURING PUBLIC SAFETY THROUGH PROPER EARTHING IN LOW VOLTAGE NETWORKS ENSURING PUBLIC SAFETY THROUGH PROPER EARTHING IN LOW VOLTAGE NETWORKS Sharmistha BHATTACHARYYA Enexis The Netherlands sharmirb@yahoo.com ABSTRACT Every electrical supply network should provide a proper

More information

LIGHTNING EARTHING SYSTEM : A PRACTICAL GUIDE

LIGHTNING EARTHING SYSTEM : A PRACTICAL GUIDE International Lightning Protection Association 1 st Symposium Valencia Spain 24th 25th of November, 2011 LIGHTNING EARTHING SYSTEM : A PRACTICAL GUIDE Alain Rousseau SEFTIM (France) ABSTRACT To make a

More information

Guidelines for the design, installation, testing and maintenance of main earthing systems in substations

Guidelines for the design, installation, testing and maintenance of main earthing systems in substations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 41-24 Issue 2, November 2018 Guidelines for the design, installation, testing and maintenance of main earthing

More information

Upgrading Your Electrical Distribution System To Resistance Grounding

Upgrading Your Electrical Distribution System To Resistance Grounding Upgrading Your Electrical Distribution System To Resistance Grounding The term grounding is commonly used in the electrical industry to mean both equipment grounding and system grounding. Equipment grounding

More information

Company Directive STANDARD TECHNIQUE: TP21D/2. 11kV, 6.6kV and LV Earthing

Company Directive STANDARD TECHNIQUE: TP21D/2. 11kV, 6.6kV and LV Earthing Company Directive STANDARD TECHNIQUE: TP21D/2 11kV, 6.6kV and LV Earthing Policy Summary This document specifies requirements for earthing 11kV and 6.6kV and LV equipment and systems. NOTE: The current

More information

SCIENCE & TECHNOLOGY

SCIENCE & TECHNOLOGY Pertanika J. Sci. & Technol. 25 (S): 181-188 (2017) SCIENCE & TECHNOLOGY Journal homepage: http://www.pertanika.upm.edu.my/ Analysis of Ground Potential Distribution under Lightning Current Condition Chandima

More information

MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING

MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING J. Ma and F. P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal, Quebec, Canada, H3M 1G4 Tel.:

More information

Attendee Announcements

Attendee Announcements Attendee Announcements Seminar Raffle Be sure to drop your raffle ticket in the drum at today s Keynote located in the Mile High Ballroom. You have a chance to win a $250 American Express Gift Card. One

More information

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Introduction The topic of system grounding is extremely important, as it affects the susceptibility of the system to voltage

More information

EVALUATION OF THE EARTH RESISTANCE VALUE FOR ESE LIGHTNING ARRESTOR TECHNIQUE FOR THE SOLAR PLANTS IN INDIA

EVALUATION OF THE EARTH RESISTANCE VALUE FOR ESE LIGHTNING ARRESTOR TECHNIQUE FOR THE SOLAR PLANTS IN INDIA EVALUATION OF THE EARTH RESISTANCE VALUE FOR ESE LIGHTNING ARRESTOR TECHNIQUE FOR THE SOLAR PLANTS IN INDIA Rajat Verma Project Engineer BHEL EDN, BANGALURU, MYSORE ROAD, KARNATAKA 560024, India ABSTRACT

More information

THE EFFECTS OF INCREASED FAULT CURRENT ON THE EXISTING SUBSTATION GROUNDING SYSTEM a Case Study

THE EFFECTS OF INCREASED FAULT CURRENT ON THE EXISTING SUBSTATION GROUNDING SYSTEM a Case Study THE EFFECTS OF INCREASED FAULT CURRENT ON THE EXISTING SUBSTATION GROUNDING SYSTEM a Case Study Research Project By MOHAU MAPANE 689839 Submitted for the partial fulfilment of the requirements for the

More information

Sizing conductors and selecting protection devices

Sizing conductors and selecting protection devices Sizing conductors and selecting protection devices 04 POWER GUIDE 2009 / BOOK 04 INTRO Careful selection of the sizes of the conductors in wiring systems and the characteristics of protection devices will

More information

Outdoor Installation 2: Lightning Protection and Grounding

Outdoor Installation 2: Lightning Protection and Grounding Outdoor Installation 2: Lightning Protection and Grounding Training materials for wireless trainers This one hour talk covers lightning protection, grounding techniques and problems, and electrolytic incompatibility.

More information

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2394 EXAM PAPER 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2. There are various documents that are relevant to the Inspection and

More information

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU Technology solutions and innovations for developing economies Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

kv AC substation

kv AC substation 132-400 kv AC substation Outdoor AC substations Earthing systems ETS-50-08-01, Rev. 0 technical standard Document no. 13/90592-127 ETS-50-08-01 v. 0 REVISION VIEW Document no.: 13/90592-127 Version Author

More information

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas

More information

Investigation on the Performance of Different Lightning Protection System Designs

Investigation on the Performance of Different Lightning Protection System Designs IX- Investigation on the Performance of Different Lightning Protection System Designs Nicholaos Kokkinos, ELEMKO SA, Ian Cotton, University of Manchester Abstract-- In this paper different lightning protection

More information

EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K.

EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K. EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K. Parsotam (1997) available free from NZCCPTS website (companion paper to Cable Sheath

More information

Residual Current Operated Circuit-Breakers (RCCBs)

Residual Current Operated Circuit-Breakers (RCCBs) Product Overview Residual Current Operated Circuit-Breakers (RCCBs) Residual current operated circuit-breakers Number of poles Rated current A Rated residual current ma MW Auxiliary contacts can be mounted

More information

Grounding and Bonding

Grounding and Bonding Grounding and Bonding 2017 Communications Academy Joe Blaschka Jr., PE Grounding/Bonding What is it? Why do we do it? What does the National Electrical Code say? What about fixed locations? What about

More information

Substation HV Cables. Document Number: 1-11-FR-07

Substation HV Cables. Document Number: 1-11-FR-07 Substation HV Cables Document Number: 1-11-FR-07 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-07 Substation HV Cables Asset Class Strategy Intellectual

More information

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

Neutral Earthing. For permanent or temporary neutral earthing in HV systems Neutral Earthing Resistors RESISTORS For permanent or temporary neutral earthing in HV systems For continuous or temporary low-resistance neutral grounding in medium voltage systems Neutral point connection

More information

Earth Mat Design for a 66kv Substation

Earth Mat Design for a 66kv Substation Earth Mat Design for a 66kv Substation Abija Baby 1, Jeswin James 2, Sharanya Vinod 3, Vyshnavy Sobhan 4, Asst.Pro. Thomas George 5, Dept. of EEE, Mar Baselios Institute of Technology and Science, Nellimatom,

More information

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI Importance of Grounding in Power System Presented by Mr. H Jayakumar Ex- Joint Director CPRI OBJECT OF EARTHING Prime Object of Earthing is to Provide a Zero Potential Surface in and around and under the

More information

Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object

Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object U. S. Gudmundsdottir, C. F. Mieritz Abstract-- When a lightning discharge strikes a tall object, the lightning current

More information

Stray Voltage and Swimming Pools

Stray Voltage and Swimming Pools Stray Voltage and Swimming Pools Marty L. Page, P.E. Southern Company malpage@southernco.com October 19 th 2009 2009 Jodie Lane National Conference for Stray Voltage Detection, Mitigation & Prevention

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

IEEE Southern Alberta Section, Industrial Applications and Power & Energy Chapter Technical Program. Venue: Operator. Speaker Travel: Stantec

IEEE Southern Alberta Section, Industrial Applications and Power & Energy Chapter Technical Program. Venue: Operator. Speaker Travel: Stantec IEEE Southern Alberta Section, Industrial Applications and Power & Energy Chapter Technical Program Venue: Grounding Ark Tsisserev Thank you to our Sponsors! Alberta Electrical System Operator Speaker

More information

UNDERSTANDING. Ground Resistance Testing. Soil Resistivity. Ground Resistance. 3-Point Measurements. 4-Point Measurements. Clamp-On Measurements

UNDERSTANDING. Ground Resistance Testing. Soil Resistivity. Ground Resistance. 3-Point Measurements. 4-Point Measurements. Clamp-On Measurements UNDERSTANDING Ground Resistance Testing Current supply E Ammeter (I) I Voltmeter (E) Ground electrode under test X Auxiliary potential electrode Y Auxiliary current electrode Z R Rx R1 R2 Rn-1 Rn EARTH

More information

Operating Instructions. Earthing System Test Equipment. Off-Frequency Low Current Injector LCI2000C. Tuned Voltmeter TVM1100

Operating Instructions. Earthing System Test Equipment. Off-Frequency Low Current Injector LCI2000C. Tuned Voltmeter TVM1100 Operating Instructions Earthing System Test Equipment Off-Frequency Low Current Injector LCI2000C Tuned Voltmeter TVM1100 Throughout this operating manual the terms; earth, earthing, earth potential rise,

More information

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Short-Circuit Analysis IEC Standard 1996-2009 Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Purpose of Short-Circuit Studies A Short-Circuit Study can be used to determine any or all of

More information

Chapter E LV Distribution

Chapter E LV Distribution Chapter E LV Distribution 1 2 3 Contents Earthing schemes 1.1 Earthing connections E2 1.2 Definition of standardised earthing schemes E3 1.3 Characteristics of TT, TN and IT systems E6 1.4 Selection criteria

More information

Compact Model of a Combined Overhead-Cable Line for Ground Fault Application Transfer Analysis

Compact Model of a Combined Overhead-Cable Line for Ground Fault Application Transfer Analysis Compact Model of a Combined Overhead-Cable Line for Ground Fault Application Transfer Analysis S. MANGIONE Dept. of Electrical, Electronic and Telecommunication Engineering Università degli Studi di alermo

More information

Company Directive STANDARD TECHNIQUE : TP21A/2. Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment

Company Directive STANDARD TECHNIQUE : TP21A/2. Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment Company Directive STANDARD TECHNIQUE : TP21A/2 Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment Policy Summary This document defines safety limits for touch and

More information

Safety through proper system Grounding and Ground Fault Protection

Safety through proper system Grounding and Ground Fault Protection Safety through proper system Grounding and Ground Fault Protection November 4 th, 2015 Presenter: Mr. John Nelson, PE, FIEEE, NEI Electric Power Engineering, Inc. Event to start shortly Scheduled time:

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Investigation of Earth Potential Rise on a typical single phase HV network

Investigation of Earth Potential Rise on a typical single phase HV network Investigation of Earth Potential Rise on a typical single phase HV network A report submitted to the School of Engineering and Energy, Murdoch University in partial fulfilment of the requirements for the

More information

PERFORMANCE ASSESSMENT OF SUBSTATION SITE EARTHING USING FLUKE 1625 GROUND TESTER

PERFORMANCE ASSESSMENT OF SUBSTATION SITE EARTHING USING FLUKE 1625 GROUND TESTER Nigerian Journal of Technology (NIJOTECH) Vol. 32, No. 1, March, 2013, pp. 49 53. Copyright 2013 Faculty of Engineering, University of Nigeria. ISSN 1115-8443 PERFORMANCE ASSESSMENT OF SUBSTATION SITE

More information

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books.

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books. City & Guilds Fundamental Inspection & Testing 30 Question Test Sheet (2392-10 Paper No1.) NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes

More information

ModieLoad. Static capacitive load unit 9.8A 240vac single phase. CAUTION: Ensure only Phase to Neutral connection CAT IV 300V

ModieLoad. Static capacitive load unit 9.8A 240vac single phase. CAUTION: Ensure only Phase to Neutral connection CAT IV 300V ModieLoad Static capacitive load unit 9.8A 240vac single phase - No heat dissipation. No air movement initiated. No inrush current issues. No sparking or arcing. Immediately usable for Re-connection. (no

More information

1. Introduction to Power Quality

1. Introduction to Power Quality 1.1. Define the term Quality A Standard IEEE1100 defines power quality (PQ) as the concept of powering and grounding sensitive electronic equipment in a manner suitable for the equipment. A simpler and

More information

Frequently Asked Question on Isolated Power Supply(IPS)

Frequently Asked Question on Isolated Power Supply(IPS) Frequently Asked Question on Isolated Power Supply(IPS) Q: What is an IPS? A: IPS is called as Isolated Power Supply or System and is used in a Hospital to ensure safe power supply to OT Operation Theaters

More information

Earthing for EMC in Installations

Earthing for EMC in Installations Earthing for EMC in Installations Ian McMichael n 1 PQSynergy 2010 Conference Earthing for EMC in Installations Introduction Electromagnetic Compatibility or EMC EMC and installations Standards and References

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Reference Number PDS 04 (RIC Standard: EP SP)

Reference Number PDS 04 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 04 (RIC Standard: EP 12 10 00 10 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

6. Internal lightning protection

6. Internal lightning protection 6. Internal lightning protection 6.1 Equipotential bonding for metal installations Equipotential bonding according to IEC 60364-4- 41 and IEC 60364-5-54 Equipotential bonding is required for all newly