TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018

Size: px
Start display at page:

Download "TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018"

Transcription

1 TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018

2

3

4 1. SOUTH SHORE

5 SCHEDULE End of June 2018 Temporary reconfiguration of Highway 10 (Sherbrooke direction) Deflection to maintain two lanes per direction Access lanes Corridor Existing lanes New access lanes Future Du Quartier Station

6 SCHEDULE End of June 2018 Closure of the Des Prairies Boulevard exit ramp Alternate route using the Dix-30 exit

7 Pelletier Blvd. Taschereau Blvd. Milan Blvd. End of June 2018 Maintenance of preferred bus accesses Small stretch of reserved lane removed Panama terminal Chevrier terminal Temporary terminal Lapinière Blvd. To Champlain Bridge To South Shore Leduc Blvd.

8 2. ÉDOUARD- MONTPETIT

9 REM WORK Summer 2018 Marie-Victorin entrance will close June 16 Two access will be maintained to reach Édouard-Montpetit station

10 REM WORK Station Édouard-Montpetit Station located 70 metres beneath Mount Royal Technical characteristics Depth of the station: 70 metres 20 floors second deepest station in North America High capacity elevators (5000 people/hour), high frequency and high speed, providing platform access in 20 seconds Access by elevator in 20 seconds Excavation of approx. 25,000 to 30,000 m 3 of rock Excavation methods used will be similar to those used to dig an underground mine

11 REM WORK Correlation with the tunnel and metro Metro tunnel REM entrance Mount Royal Tunnel

12 REM WORK Perspectives underground station * Preliminary station design final design is still under development

13 REM WORK Anticipated work sequence Work carried out in different phases: 1. June 16, 2018: entrance facing the Marie-Victorin Pavilion closes 2. July 2018: public utilities on Vincent D Indy are relocated 3. End of July 2018: preparatory work 4. August 2018: shaft excavation begins 5. Fall 2019: station construction (main shaft) and tunnel excavation 6. Winter 2020: station construction (platform and mezzanine)

14 3. DEUX-MONTAGNES LINE

15 April 2018 Work mainly done on weekends (Friday night to Monday morning) Alternative service for some stations (Friday evening to Monday morning)

16 June 2018 Work during the week south segment closed off Changes to the Deux-Montagnes and Mascouche schedules Deux-Montagnes: two departures in the morning and one departure in the evening removed (mostly from or to the stations on the Island of Montréal) Construction of south portions Construction of Station A40 Construction of south portions of Station Canora and Station Mont-Royal Construction of Station Édouard-Montpetit and Station McGill

17 June 25, 2018 Work during the week south segment closed off Nature of the work Construction of the future Station Mont-Royal and Station Canora: Construction of retaining walls Demolition of existing platforms Removal of rails on a portion of the segment Hydraulic jacking Construction of foundations Erection of the structure on the south side of the stations

18 REM WORK Station Mont-Royal Phase 1 Summer 2018 Phase 2 Spring 2019 REM station

19 REM WORK Station Canora Phase 1 Summer 2018 Phase 2 Spring 2019 REM station

20 Example of station interior railway is very close to the future station REM WORK

21 PUBLIC TRANSIT MEASURES

22 ARTM MITIGATION MEASURES Service measures (June to August 2018) Objectives: Means: - Improve the capacity of the existing transport offer - Make customers aware of the importance of planning their trips - Added departure from shuttle 400 to Montmorency station - Addition of a departure on each of the existing lines serving the stations - STM : 64 South, 117 South, 121 West, 171 West et 468 East lines - STL : 26, 76 and 402 lines

23 ARTM MITIGATION MEASURES Pricing measures (June and July 2018) Objectives: - Inform customers of train service changes - Inform customers of other public transit options - Allow customers to try other public transit options Trial OPUS (10 transit fares TRAM 8) Assistance at train station Roxboro-Pierrefonds Canora June, 19 and 20, 8 a.m. to 9 a.m. Roxboro-Pierrefonds Canora June, 25 to 29, 8 a.m. to 9 a.m. July 2 to 6, 8 a.m. to 9 a.m. Central Station June,19 and 20, 4 p.m. to 5 p.m. Central Station Canora June, 25 to 29, 4 p.m. to 5 p.m. July, 2 to 6, 4 p.m. to 5 p.m.

24 SCHEDULE

Réseau électrique métropolitain (REM)

Réseau électrique métropolitain (REM) Réseau électrique métropolitain (REM) Technical briefing Project update November 2016 0 cdpqinfra.com AFTER 15 MONTHS OF WORK 1 > Review of all studies carried out in the past for two separate projects

More information

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger PIARC WG5 Complex Underground Road Networks Part A Case Studies - appendices Appendix 3.1 - CANADA / Québec Montréal tunnels Ville-Marie & Viger 1. SUMMARY The Ville-Marie and Viger tunnel complex is part

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018 Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018 1 Agenda Environmental Updates UCLA Station Advance Utility Relocation VA Station Advance Utility Relocation Underground

More information

CLINTON CLOSURE DETOURS

CLINTON CLOSURE DETOURS S W Princen Ave Southbound Hwy off ramp at Shields Ave Ave: Exit Southbound Hwy at Shields, proceed south on Marks Ave Ave Southbound Hwy on ramp at Shields Ave from Ave: Ave Marks Ave north. Proceed north

More information

Phase 2 Silver Line Update

Phase 2 Silver Line Update Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017 Safety Since Notice to Proceed: Manpower Hours: 3,280,898

More information

CTA Blue Line Forest Park Branch Feasibility/Vision Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

Tabriz Urban Railway Organization. An Introduction to Tabriz Metro Line 3 Project

Tabriz Urban Railway Organization. An Introduction to Tabriz Metro Line 3 Project An Introduction to Tabriz Metro Line 3 Project 1 TABLE OF CONTENT 1. INTRODUCTION... 3 2. TRAFFIC INFORMATION...6 3. REGIONAL GEOLOGY...10 3.1 Geotechnical conditions...11 4. STATIONS...12 4.1 Preliminary

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

Moorhead / Dilworth Fixed Route Expansion Study

Moorhead / Dilworth Fixed Route Expansion Study Moorhead / Dilworth Fixed Route Expansion Study Prepared for: MATBUS Prepared by: Fargo Moorhead Metropolitan Council of Governments April 2014 Introduction With growth in southeast Moorhead and Dilworth,

More information

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its

More information

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference Campus Circulation Improvements Thursday, March 17, 2016 Pre-Proposal Conference Meeting Agenda Part I: General, Part II: Submittal, Part III: Project I. General Welcome Introductions Questions: efrere@uncc.edu

More information

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018 Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018 1 Agenda Westwood/UCLA Map and Schedule Advance Utility Relocation Bus Stop Relocations Westwood/VA Hospital Map Advance

More information

3.3.3 Station Locations

3.3.3 Station Locations 3.3.3 Station Locations JICA Study Team will propose the station locations based on the following basic conditions: Distance between stations will be around 1 km in terms of train operation and passenger

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Drawbridge Operation Regulation; Oakland Inner Harbor, ACTION: Notice of deviation from drawbridge regulation.

Drawbridge Operation Regulation; Oakland Inner Harbor, ACTION: Notice of deviation from drawbridge regulation. This document is scheduled to be published in the Federal Register on 03/06/2015 and available online at http://federalregister.gov/a/2015-05231, and on FDsys.gov 9110-04-P DEPARTMENT OF HOMELAND SECURITY

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project

More information

Effective. November 5, New York City Transit. Subway Timetable. New: Weekend Route Change

Effective. November 5, New York City Transit. Subway Timetable. New: Weekend Route Change Effective November, 017 New York City Transit Subway Timetable New: Weekend Route Change On Weekdays, most trains operate between either Dyre Av or 38 St-Nereid Av, Bronx, and Flatbush Av-Brooklyn College,

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

Amajor transportation infrastructure undertaking, billed

Amajor transportation infrastructure undertaking, billed PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is

More information

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Four Case Studies Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due

More information

adopted in Hong Kong

adopted in Hong Kong Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

ZOO INTERCHANGE PROJECT

ZOO INTERCHANGE PROJECT ZOO ITERCHAGE PROJECT GET AROUD GUIDE winter 0/0 - summer 0 TAKE A LOOK ISIDE FOR CLOSURE IFORMATIO, ALTERATE ROUTES, TRASPORTATIO OPTIOS, HOW TO STAY COECTED TO THE ZOO ITERCHAGE PROJECT AD MUCH MORE!

More information

Appendix B: Transportation B-10 Toll Plaza Analysis

Appendix B: Transportation B-10 Toll Plaza Analysis Appendix B: Transportation B-10 Toll Plaza Analysis TRAFFIC-DESIGN STUDIES TZB TOLL PLAZA ANALYSES STUDY ASSUMPTIONS Study Goal: Provide assessment of current design concept for toll plaza operations under

More information

RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8)

RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8) Rec. ITU-R M.1310 1 RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8) Rec. ITU-R M.1310 (1997) Summary This Recommendation

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Wednesday, February 8, 2012 Holiday Inn 30 Washington Street, Somerville, MA 6:30 pm 8:30pm #1 June 22 nd and

More information

Montreal, a candidate for Session #33

Montreal, a candidate for Session #33 IEEE 802.16 Presentation Submission Template (Rev. 8.3) Document Number: IEEE C802.26-04/05 Montreal, a candidate for Session #33 Date Submitted: 2004-03-17 Source: François (Frank) M. Draper Voice: (514)

More information

2018 ART CONTEST. The aim of the contest is to promote the talent of amateur and professional artists who reside on the Island of Montreal.

2018 ART CONTEST. The aim of the contest is to promote the talent of amateur and professional artists who reside on the Island of Montreal. 2018 ART CONTEST The aim of the contest is to promote the talent of amateur and professional artists who reside on the Island of Montreal. Prizes will be awarded at an Award Ceremony on June 14th, 2018

More information

The Big Train Project Status Report (Part 94)

The Big Train Project Status Report (Part 94) The Big Train Project Status Report (Part 94) Like last month, this month s report will be a look back at the history of one of the scenes on the EnterTRAINment Junction (EJ) layout, showing how it has

More information

The Bulletin Kaikoura earthquake update

The Bulletin Kaikoura earthquake update Issue no. 49 19 January 2018 The Bulletin Kaikoura earthquake update SIGN UP To receive weekly updates online here bit.ly/nctirbulletinsignup bit.ly/nctirbulletinsignup OUR 2018 AGENDA We are back working

More information

Deacon Corp. Three Week Schedule

Deacon Corp. Three Week Schedule Procurement / submittals X X Union Holiday VAV & valves delivered X X X X X X X X X CA Mechanical FCU's delivered X X X X X X X X X CA Mechanical CMU X X X X X X X X X X Amato Masonry Scaffolding X X X

More information

Practical INFOS To come to help in Paris Update (Brigitte)

Practical INFOS To come to help in Paris Update (Brigitte) Practical information s about being a volunteer with Utopia 56, in Paris. Our new adress to come to help in Paris: 56 boulevard NEY (very close to the camp (Métro Porte de la Chapelle). NO MORE HELP FROM

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011 I-405 Sepulveda Pass Improvements Project Community Advisory Committee April 28, 2011 1 Major Issues Wilshire Loops (GSA, VA) Mulholland Dr Bridge demolition Completing south side of Sunset Bl Bridge 2

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

LINTER group - PARTNER COMPANIES

LINTER group - PARTNER COMPANIES 1 LINTER group - PARTNER COMPANIES TRANSPORTATION SYSTEMS, EQUIPMENT FOR MINERAL PROCESSING ELEMENTS OF TRANSPORTATION SYSTEMS MINING SERVICES Mining MINING SERVICES DESIGN ENGINEERING INTERNATIONAL COMMERCE

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence

More information

Residential Room Additions

Residential Room Additions Residential Room Additions The purpose of this information sheet is to provide information regarding building code and permit processing requirements for RESIDENTIAL ROOM ADDITION(S) in the City of Poway.

More information

Up to 100,000 SF contiguous near Marché Central

Up to 100,000 SF contiguous near Marché Central FOR LEASE > OFFICE SPACE Up to 100,000 SF contiguous near Marché Central 9300-9340, St-Laurent Blvd., Montréal, Qc Opportunity of RETAIL SPACE on the corner of a busy street NEW: 7 minutes by bus to Henri-Bourassa

More information

9-11 Commission to Address Emergency Preparedness

9-11 Commission to Address Emergency Preparedness MEDIA ADVISORY 9-11 Commission to Address Emergency Preparedness November 10, 2003 The National Commission on Terrorist Attacks Upon the United States (also known as the 9-11 Commission) will hold its

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

Planarization & Routing Guide

Planarization & Routing Guide Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager

More information

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE Dennis Gratton Manager, Rail planning, Rail Implementation Office & Annie Hillis Public Art Coordinator, Rail Implementation Office November 7, 2013 OVERVIEW

More information

The Bulletin Kaikoura earthquake update

The Bulletin Kaikoura earthquake update Issue no. 33 08 September 2017 The Bulletin Kaikoura earthquake update SIGN UP To receive weekly updates online here bit.ly/nctirbulletinsignup bit.ly/nctirbulletinsignup MILESTONE: RAIL RAIL FREIGHT SERVICES

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways. WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016 Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum

More information

Aloha Swim Center. Summer Splash Swim Team

Aloha Swim Center. Summer Splash Swim Team Aloha Swim Center 18650 SW Kinnaman Road, Aloha, 97078 503-629-6311 TriMet Routes #52, #57, #88 Aquatic Facility Supervisor: Brian Powers Summer Term: June 20 - Sept. 5, 2016 Office Hours: Schedule subject

More information

A. INTRODUCTION PRINCIPAL CONCLUSIONS

A. INTRODUCTION PRINCIPAL CONCLUSIONS Chapter 16: Traffic and Parking A. INTRODUCTION This chapter examines the potential traffic and parking impacts of the proposed development of the Fresh Kills Park project. The analysis of the proposed

More information

The Bulletin Kaikoura earthquake update

The Bulletin Kaikoura earthquake update Issue no. 43 16 November 2017 The Bulletin Kaikoura earthquake update SIGN UP To receive weekly updates online here bit.ly/nctirbulletinsignup bit.ly/nctirbulletinsignup THE COMMUNITY RECONNECTED WITH

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

NO CONCRETE, NO PROBLEM ENVIRONMENTALLY SENSITIVE BRIDGE CONSTRUCTION IN TEMAGAMI p5

NO CONCRETE, NO PROBLEM ENVIRONMENTALLY SENSITIVE BRIDGE CONSTRUCTION IN TEMAGAMI p5 The Newsletter of EBS Geostructural Inc. ebsgeo.com Geostructural Engineering Outlook / FALL 2016 NO CONCRETE, NO PROBLEM ENVIRONMENTALLY SENSITIVE BRIDGE CONSTRUCTION IN TEMAGAMI p5 PROFILE INDUSTRY NEWS

More information

SPRING. FALL There will be no classes Wyndham Championship Week (August 13-19) CAMPS. Visit us online at: Summer. Winter

SPRING. FALL There will be no classes Wyndham Championship Week (August 13-19) CAMPS. Visit us online at: Summer. Winter PLAYer Session 1: Mondays (April 9 - May 14) or Wednesdays (April 11 - May 16) PLAYer Session 2: Mondays (May 21 June 25 Makeup) or Wednesdays (May 23 June 27) Par Session 1: Mondays (April 9 - May 14)

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

How will city infrastructure and sensors be made smart?

How will city infrastructure and sensors be made smart? How will city infrastructure and sensors be made smart? Professor Robert Mair This essay has been commissioned as part of the UK government s Foresight Future of Cities project. The views expressed do

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, TriMet Route #56

Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, TriMet Route #56 Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, 97008 503-629-6314 TriMet Route #56 Aquatic Facility Supervisor: Heath Wright Feb. 8 - Mar. 27, 2016 Mar. 28 - June 19, 2016 Office Hours: Monday-Thursday

More information

New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013

New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013 New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013 N H H S M E R I D E N S T A T I O N 1 Program Goals: NHHS Rail Program Recap Enhanced regional rail service that accommodates

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1 REGIONAL TRANSIT AUTHORITY RESOLUTION NO. 98-1 BACKGROUND AND COMMENTS Meeting: PGA Committee Board of Directors Date: 1/16/98 1/22/98 Agenda Item: No. 4 No. 7C-1 Staff Contact: Barbara Dougherty, Communications

More information

3-15 TRAFFIC AND TRANSPORTATION

3-15 TRAFFIC AND TRANSPORTATION 3-15 TRAFFIC AND TRANSPORTATION Changes Since the Draft EIS/EIR Subsequent to the release of the Draft EIS/EIR in April 2004, the Gold Line Phase II project has undergone several updates: Name Change:

More information

Compliance with this acceptable construction practice satisfies Performance Requirement P2.5.2 for balustrades or other barriers.

Compliance with this acceptable construction practice satisfies Performance Requirement P2.5.2 for balustrades or other barriers. Page 1 of 5 PART 3.9 SAFE MOVEMENT AND ACCESS 2010 Edition PART 3.9.2 BALUSTRADES Acceptable construction practice 3.9.2.1 Application Compliance with this acceptable construction practice satisfies Performance

More information

Safety (OSHA 10 hour)

Safety (OSHA 10 hour) Construction Technology Core and Sustainable Construction Subject Code: 178000 Students will learn principles in basic safety (10-hr OSHA), construction math, hand and power tool are and operation, blueprint

More information

MONTHLY MEETING I. APPROVAL OF MINUTES

MONTHLY MEETING I. APPROVAL OF MINUTES MINUTES OF MEETING OF THE ARCHITECTURAL AND HISTORIC REVIEW BOARD OF THE VILLAGE OF SAGAPONACK IN THE TOWN OF SOUTHAMPTON, COUNTY OF SUFFOLK AND STATE OF NEW YORK A regular monthly meeting of the Architectural

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during

More information

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during

More information

LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS

LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS Project Introduction Address: Chuck Noll Way & West General Robinson Street Zoning

More information

Summer Systematics Institute 2018 Schedule of Activities

Summer Systematics Institute 2018 Schedule of Activities Summer Systematics Institute 2018 Schedule of Activities Monday, June 18 June 19 WEEK ONE: JUNE 18 22, 2018 9am 12pm Welcome & Program Overview Boardroom HR Processing, Security, Employee Badge Photos

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

City of St. Petersburg Planning & Visioning Commission October 11, 2011

City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Speakers Bureau City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Project Purpose A study identifying transit options

More information

THE TRANSPORTATION ISSUE

THE TRANSPORTATION ISSUE Precast Pavement Perfection // Banking on Precast // California s Precast Express WINTER 2018 THE TRANSPORTATION ISSUE Banking on Precast A variety of precast concrete products will offer the new Bonner

More information

WEST CHAPEL STREET WEEKDAY SERVICE. Bus Schedule Effective August 27, Routes. Ella Grasso Boulevard. F6 Ansonia-Seymour (255)

WEST CHAPEL STREET WEEKDAY SERVICE. Bus Schedule Effective August 27, Routes. Ella Grasso Boulevard. F6 Ansonia-Seymour (255) West Chapel/ 34 Timepoints 1 2 3 4 5 6 7 8 9 10 11 Chapel & Temple Chapel & Beers (F5, F6) (F5, F6) & Plainfield (F6) Orange B3 4:55................ 5:20.. F5 5:25 5:30 5:35................ B3 X5:50................

More information

Using Hop Fastpass on LIFT

Using Hop Fastpass on LIFT Using Hop Fastpass on LIFT LIFT Using Hop on LIFT at a Glance Get your personalized LIFT Hop card Register your LIFT Hop card See page 2 for more information If you have an Honored Citizen Hop card, have

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

Design and Market Influences. Famous Designers

Design and Market Influences. Famous Designers Design and Market Influences Famous Designers Students should develop an understanding of the broad perspectives of the design world. They should understand the role designers play in Graphic Products.

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Noise monitoring report

Noise monitoring report Noise monitoring report January - June 2018 Contents Executive summary 3 Introduction 4 General Statistics 5 Noise Monitoring Statistics 8 NMT 1: Bay Lane 10 NMT 2: St. Doolaghs 14 NMT 4: Feltrim 18 NMT

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 This independent report of findings, including data entry and analysis of all the consultation

More information

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect.

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect. OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN 106-2018 with immediate effect. OAN REF:- 114/2018 DATE OF ISSUE:- 13/11/2018 EFFECTIVE DATE:- 13/11/2018 MANUAL REFERENCE(S):-

More information

The Edward V. Lofstrom Collection M/A

The Edward V. Lofstrom Collection M/A The Edward V. Lofstrom Collection M/A 1994.29.01-02 Finding aid prepared by Benjamin C. Skinner This finding aid was produced using the Archivists' Toolkit August 01, 2015 Describing Archives: A Content

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation.

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation. Allowable Lane Closure Hours for the State Highway System in Hampton Roads District Virginia Department of Transportation June 06 Allowable Lane Closure Hours Hampton Roads District Revisions Date Description

More information

SANTA MONICA BOULEVARD BEVERLY HILLS OWNER: 9908 SANTA MONICA BLVD., LLC SAN VICENTE BLVD. SUITE 550

SANTA MONICA BOULEVARD BEVERLY HILLS OWNER: 9908 SANTA MONICA BLVD., LLC SAN VICENTE BLVD. SUITE 550 BEVERLY HILLS OWNER: 777 SAN VICENTE BLVD. 550 SHEET INDEX: A-000.00 A-00.00 A-00.00 A-003.00 A-004.00 A-005.00 A-006.00 A-007.00 A-080.00 A-090.00 A-00.00 A-0.00 A-0.00 A-30.00 A-40.00 A-50.00 A-00.00

More information

CIRCULAR No2e/ CATEGORY: TECHNICAL ISSUES & TECHNICAL DATA FILES

CIRCULAR No2e/ CATEGORY: TECHNICAL ISSUES & TECHNICAL DATA FILES CIRCULAR No2e/23-11-2012 CATEGORY: TECHNICAL ISSUES & TECHNICAL DATA FILES Announcement: Twenty one (21) complementary files - as requested by participants - are available for downloading at the section

More information

Chapter 4. Accessible Routes

Chapter 4. Accessible Routes ICC/ANSI A117.1-2003 401 General 401.1 Scope. Accessible routes required by the scoping provisions adopted by the administrative authority shall comply with the applicable provisions of Chapter 4. 402

More information

FOCUS. Highlights. September 2 No Meeting Labor Day. September 16 Competition. October 7 Jack MacRae Mammals of the Region

FOCUS. Highlights. September 2 No Meeting Labor Day. September 16 Competition. October 7 Jack MacRae Mammals of the Region FOCUS Newsletter of the Mayslake Nature Study and Photography Club Hosted by the Forest Preserve District of DuPage County Visit our website at www.naturecameraclub.com Highlights September 2 No Meeting

More information