1 Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during the project delivery of the St Kilda Rd Tram Occupation. A summary of the baseline noise monitoring results is tabulated below in Table 1. Table 1. Baseline Noise Levels The Botanica Monitor Location 400 St Kilda Rd Average L90 Background levels db(a) Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Analysis of monitoring results indicate average noise levels for each period are generally consistent from day to day with only a small amount of variation. RIMG Alternative Accommodation Alternative accommodation will be offered where the total airborne noise level due to Unavoidable Works at night, measured or predicted at a point 1m in front of the exposed windows and doors of any façade of a residence, exceeds whichever is the higher of: 65dB (A); or 10dB (A) above the pre-existing ambient, LAeq, noise level, Between 10pm and 7am on any day of the week on at least: 10 days in any 15 consecutive days; or 40 days in any six consecutive months Baseline ambient Noise Level Limit monitoring at 400 St Kilda Road during night time hours is 59dB(A), indicating an exceedance noise level of greater than LAeq, 60min of 69 db(a). RIMG Acoustic Treatment The RIMG sets out criteria for when offers of acoustic treatment to residences must be considered for Unavoidable Works at night. Offers of acoustic treatment will however only be made where acoustic treatment is deemed to be an effective solution to mitigating airborne noise. Acoustic treatment for residences will be offered where the total airborne noise level due to Metro Tunnel works (pre-existing ambient, LAeq(T), measured over one hour plus airborne noise from Metro Tunnel works) is predicted at a point one metre in front of the most exposed of any windows or doors of a habitable room in any façade of a residence, to exceed whichever is the higher of: 55dB(A); or 5 db(a) above the pre-existing ambient LAeq, noise level THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 1

2 between the hours of 10pm and 7am on any day of the week on at least 40 days in any six consecutive months, excluding any night during which an offer of alternative accommodation has been accepted. Baseline ambient Noise Level Limit monitoring at 400 St Kilda Road during night time hours is 59dB(A), indicating an exceedance noise level of greater than LAeq, 60min of 64 db(a). Results Night (10:00pm to 7:00am) Alternative Accommodation 0 nights where exceedances were >69dB Night (10:00pm to 7:00am) Acoustic Treatment 1 night where exceedances were >64dB Start Time End Time LAeq (db) 1/05/ :00:00 AM 1/05/2018 1:00:00 AM /05/2018 1:00:00 AM 1/05/2018 2:00:00 AM /05/2018 2:00:00 AM 1/05/2018 3:00:00 AM /05/2018 3:00:00 AM 1/05/2018 4:00:00 AM /05/2018 4:00:00 AM 1/05/2018 5:00:00 AM /05/2018 5:00:00 AM 1/05/2018 6:00:00 AM /05/2018 6:00:00 AM 1/05/2018 7:00:00 AM /05/ :00:00 PM 1/05/ :00:00 PM /05/ :00:00 PM 2/05/ :00:00 AM /05/ :00:00 AM 2/05/2018 1:00:00 AM /05/2018 1:00:00 AM 2/05/2018 2:00:00 AM /05/2018 2:00:00 AM 2/05/2018 3:00:00 AM /05/2018 3:00:00 AM 2/05/2018 4:00:00 AM /05/2018 4:00:00 AM 2/05/2018 5:00:00 AM /05/2018 5:00:00 AM 2/05/2018 6:00:00 AM /05/2018 6:00:00 AM 2/05/2018 7:00:00 AM /05/ :00:00 PM 2/05/ :00:00 PM /05/ :00:00 PM 3/05/ :00:00 AM /05/ :00:00 AM 3/05/2018 1:00:00 AM /05/2018 1:00:00 AM 3/05/2018 2:00:00 AM /05/2018 2:00:00 AM 3/05/2018 3:00:00 AM /05/2018 3:00:00 AM 3/05/2018 4:00:00 AM /05/2018 4:00:00 AM 3/05/2018 5:00:00 AM /05/2018 5:00:00 AM 3/05/2018 6:00:00 AM 57.5 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 2

3 3/05/2018 6:00:00 AM 3/05/2018 7:00:00 AM /05/ :00:00 PM 3/05/ :00:00 PM /05/ :00:00 PM 4/05/ :00:00 AM /05/ :00:00 AM 4/05/2018 1:00:00 AM /05/2018 1:00:00 AM 4/05/2018 2:00:00 AM /05/2018 2:00:00 AM 4/05/2018 3:00:00 AM /05/2018 3:00:00 AM 4/05/2018 4:00:00 AM /05/2018 4:00:00 AM 4/05/2018 5:00:00 AM /05/2018 5:00:00 AM 4/05/2018 6:00:00 AM /05/2018 6:00:00 AM 4/05/2018 7:00:00 AM /05/ :00:00 PM 4/05/ :00:00 PM /05/ :00:00 PM 5/05/ :00:00 AM /05/ :00:00 AM 5/05/2018 1:00:00 AM /05/2018 1:00:00 AM 5/05/2018 2:00:00 AM /05/2018 2:00:00 AM 5/05/2018 3:00:00 AM /05/2018 3:00:00 AM 5/05/2018 4:00:00 AM /05/2018 4:00:00 AM 5/05/2018 5:00:00 AM /05/2018 5:00:00 AM 5/05/2018 6:00:00 AM /05/2018 6:00:00 AM 5/05/2018 7:00:00 AM /05/ :00:00 PM 5/05/ :00:00 PM /05/ :00:00 PM 6/05/ :00:00 AM /05/ :00:00 AM 6/05/2018 1:00:00 AM /05/2018 1:00:00 AM 6/05/2018 2:00:00 AM /05/2018 2:00:00 AM 6/05/2018 3:00:00 AM /05/2018 3:00:00 AM 6/05/2018 4:00:00 AM /05/2018 4:00:00 AM 6/05/2018 5:00:00 AM /05/2018 5:00:00 AM 6/05/2018 6:00:00 AM /05/2018 6:00:00 AM 6/05/2018 7:00:00 AM /05/ :00:00 PM 6/05/ :00:00 PM /05/ :00:00 PM 7/05/ :00:00 AM /05/ :00:00 AM 7/05/2018 1:00:00 AM /05/2018 1:00:00 AM 7/05/2018 2:00:00 AM /05/2018 2:00:00 AM 7/05/2018 3:00:00 AM /05/2018 3:00:00 AM 7/05/2018 4:00:00 AM /05/2018 4:00:00 AM 7/05/2018 5:00:00 AM 58.6 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 3

4 7/05/2018 5:00:00 AM 7/05/2018 6:00:00 AM /05/2018 6:00:00 AM 7/05/2018 7:00:00 AM /05/ :00:00 PM 7/05/ :00:00 PM /05/ :00:00 PM 8/05/ :00:00 AM /05/ :00:00 AM 8/05/2018 1:00:00 AM /05/2018 1:00:00 AM 8/05/2018 2:00:00 AM /05/2018 2:00:00 AM 8/05/2018 3:00:00 AM /05/2018 3:00:00 AM 8/05/2018 4:00:00 AM /05/2018 4:00:00 AM 8/05/2018 5:00:00 AM /05/2018 5:00:00 AM 8/05/2018 6:00:00 AM /05/2018 6:00:00 AM 8/05/2018 7:00:00 AM /05/ :00:00 PM 8/05/ :00:00 PM /05/ :00:00 PM 9/05/ :00:00 AM /05/ :00:00 AM 9/05/2018 1:00:00 AM /05/2018 1:00:00 AM 9/05/2018 2:00:00 AM /05/2018 2:00:00 AM 9/05/2018 3:00:00 AM /05/2018 3:00:00 AM 9/05/2018 4:00:00 AM /05/2018 4:00:00 AM 9/05/2018 5:00:00 AM /05/2018 5:00:00 AM 9/05/2018 6:00:00 AM /05/2018 6:00:00 AM 9/05/2018 7:00:00 AM /05/ :00:00 PM 9/05/ :00:00 PM /05/ :00:00 PM 10/05/ :00:00 AM /05/ :00:00 AM 10/05/2018 1:00:00 AM /05/2018 1:00:00 AM 10/05/2018 2:00:00 AM /05/2018 2:00:00 AM 10/05/2018 3:00:00 AM /05/2018 3:00:00 AM 10/05/2018 4:00:00 AM /05/2018 4:00:00 AM 10/05/2018 5:00:00 AM /05/2018 5:00:00 AM 10/05/2018 6:00:00 AM /05/2018 6:00:00 AM 10/05/2018 7:00:00 AM /05/ :00:00 PM 10/05/ :00:00 PM /05/ :00:00 PM 11/05/ :00:00 AM /05/ :00:00 AM 11/05/2018 1:00:00 AM /05/2018 1:00:00 AM 11/05/2018 2:00:00 AM /05/2018 2:00:00 AM 11/05/2018 3:00:00 AM /05/2018 3:00:00 AM 11/05/2018 4:00:00 AM 57.5 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 4

5 11/05/2018 4:00:00 AM 11/05/2018 5:00:00 AM /05/2018 5:00:00 AM 11/05/2018 6:00:00 AM /05/2018 6:00:00 AM 11/05/2018 7:00:00 AM /05/ :00:00 PM 11/05/ :00:00 PM /05/ :00:00 PM 12/05/ :00:00 AM /05/ :00:00 AM 12/05/2018 1:00:00 AM /05/2018 1:00:00 AM 12/05/2018 2:00:00 AM /05/2018 2:00:00 AM 12/05/2018 3:00:00 AM /05/2018 3:00:00 AM 12/05/2018 4:00:00 AM /05/2018 4:00:00 AM 12/05/2018 5:00:00 AM /05/2018 5:00:00 AM 12/05/2018 6:00:00 AM /05/2018 6:00:00 AM 12/05/2018 7:00:00 AM /05/ :00:00 PM 12/05/ :00:00 PM /05/ :00:00 PM 13/05/ :00:00 AM /05/ :00:00 AM 13/05/2018 1:00:00 AM /05/2018 1:00:00 AM 13/05/2018 2:00:00 AM /05/2018 2:00:00 AM 13/05/2018 3:00:00 AM /05/2018 3:00:00 AM 13/05/2018 4:00:00 AM /05/2018 4:00:00 AM 13/05/2018 5:00:00 AM /05/2018 5:00:00 AM 13/05/2018 6:00:00 AM /05/2018 6:00:00 AM 13/05/2018 7:00:00 AM /05/ :00:00 PM 13/05/ :00:00 PM /05/ :00:00 PM 14/05/ :00:00 AM /05/ :00:00 AM 14/05/2018 1:00:00 AM /05/2018 1:00:00 AM 14/05/2018 2:00:00 AM /05/2018 2:00:00 AM 14/05/2018 3:00:00 AM /05/2018 3:00:00 AM 14/05/2018 4:00:00 AM /05/2018 4:00:00 AM 14/05/2018 5:00:00 AM /05/2018 5:00:00 AM 14/05/2018 6:00:00 AM /05/2018 6:00:00 AM 14/05/2018 7:00:00 AM /05/ :00:00 PM 14/05/ :00:00 PM /05/ :00:00 PM 15/05/ :00:00 AM /05/ :00:00 AM 15/05/2018 1:00:00 AM /05/2018 1:00:00 AM 15/05/2018 2:00:00 AM /05/2018 2:00:00 AM 15/05/2018 3:00:00 AM 53.5 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 5

6 15/05/2018 3:00:00 AM 15/05/2018 4:00:00 AM /05/2018 4:00:00 AM 15/05/2018 5:00:00 AM /05/2018 5:00:00 AM 15/05/2018 6:00:00 AM /05/2018 6:00:00 AM 15/05/2018 7:00:00 AM /05/ :00:00 PM 15/05/ :00:00 PM /05/ :00:00 PM 16/05/ :00:00 AM /05/ :00:00 AM 16/05/2018 1:00:00 AM /05/2018 1:00:00 AM 16/05/2018 2:00:00 AM /05/2018 2:00:00 AM 16/05/2018 3:00:00 AM /05/2018 3:00:00 AM 16/05/2018 4:00:00 AM /05/2018 4:00:00 AM 16/05/2018 5:00:00 AM /05/2018 5:00:00 AM 16/05/2018 6:00:00 AM /05/2018 6:00:00 AM 16/05/2018 7:00:00 AM /05/ :00:00 PM 16/05/ :00:00 PM /05/ :00:00 PM 17/05/ :00:00 AM /05/ :00:00 AM 17/05/2018 1:00:00 AM /05/2018 1:00:00 AM 17/05/2018 2:00:00 AM /05/2018 2:00:00 AM 17/05/2018 3:00:00 AM /05/2018 3:00:00 AM 17/05/2018 4:00:00 AM /05/2018 4:00:00 AM 17/05/2018 5:00:00 AM /05/2018 5:00:00 AM 17/05/2018 6:00:00 AM /05/2018 6:00:00 AM 17/05/2018 7:00:00 AM /05/ :00:00 PM 17/05/ :00:00 PM /05/ :00:00 PM 18/05/ :00:00 AM /05/ :00:00 AM 18/05/2018 1:00:00 AM /05/2018 1:00:00 AM 18/05/2018 2:00:00 AM /05/2018 2:00:00 AM 18/05/2018 3:00:00 AM /05/2018 3:00:00 AM 18/05/2018 4:00:00 AM /05/2018 4:00:00 AM 18/05/2018 5:00:00 AM /05/2018 5:00:00 AM 18/05/2018 6:00:00 AM /05/2018 6:00:00 AM 18/05/2018 7:00:00 AM /05/ :00:00 PM 18/05/ :00:00 PM /05/ :00:00 PM 19/05/ :00:00 AM /05/ :00:00 AM 19/05/2018 1:00:00 AM /05/2018 1:00:00 AM 19/05/2018 2:00:00 AM 56.5 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 6

7 19/05/2018 2:00:00 AM 19/05/2018 3:00:00 AM /05/2018 3:00:00 AM 19/05/2018 4:00:00 AM /05/2018 4:00:00 AM 19/05/2018 5:00:00 AM /05/2018 5:00:00 AM 19/05/2018 6:00:00 AM /05/2018 6:00:00 AM 19/05/2018 7:00:00 AM /05/ :00:00 PM 19/05/ :00:00 PM /05/ :00:00 PM 20/05/ :00:00 AM /05/ :00:00 AM 20/05/2018 1:00:00 AM /05/2018 1:00:00 AM 20/05/2018 2:00:00 AM /05/2018 2:00:00 AM 20/05/2018 3:00:00 AM /05/2018 3:00:00 AM 20/05/2018 4:00:00 AM /05/2018 4:00:00 AM 20/05/2018 5:00:00 AM /05/2018 5:00:00 AM 20/05/2018 6:00:00 AM /05/2018 6:00:00 AM 20/05/2018 7:00:00 AM /05/ :00:00 PM 20/05/ :00:00 PM /05/ :00:00 PM 21/05/ :00:00 AM /05/ :00:00 AM 21/05/2018 1:00:00 AM /05/2018 1:00:00 AM 21/05/2018 2:00:00 AM /05/2018 2:00:00 AM 21/05/2018 3:00:00 AM /05/2018 3:00:00 AM 21/05/2018 4:00:00 AM /05/2018 4:00:00 AM 21/05/2018 5:00:00 AM /05/2018 5:00:00 AM 21/05/2018 6:00:00 AM /05/2018 6:00:00 AM 21/05/2018 7:00:00 AM /05/ :00:00 PM 21/05/ :00:00 PM /05/ :00:00 PM 22/05/ :00:00 AM /05/ :00:00 AM 22/05/2018 1:00:00 AM /05/2018 1:00:00 AM 22/05/2018 2:00:00 AM /05/2018 2:00:00 AM 22/05/2018 3:00:00 AM /05/2018 3:00:00 AM 22/05/2018 4:00:00 AM /05/2018 4:00:00 AM 22/05/2018 5:00:00 AM /05/2018 5:00:00 AM 22/05/2018 6:00:00 AM /05/2018 6:00:00 AM 22/05/2018 7:00:00 AM /05/ :00:00 PM 22/05/ :00:00 PM /05/ :00:00 PM 23/05/ :00:00 AM /05/ :00:00 AM 23/05/2018 1:00:00 AM 57.3 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 7

8 23/05/2018 1:00:00 AM 23/05/2018 2:00:00 AM /05/2018 2:00:00 AM 23/05/2018 3:00:00 AM /05/2018 3:00:00 AM 23/05/2018 4:00:00 AM /05/2018 4:00:00 AM 23/05/2018 5:00:00 AM /05/2018 5:00:00 AM 23/05/2018 6:00:00 AM /05/2018 6:00:00 AM 23/05/2018 7:00:00 AM /05/ :00:00 PM 23/05/ :00:00 PM /05/ :00:00 PM 24/05/ :00:00 AM /05/ :00:00 AM 24/05/2018 1:00:00 AM /05/2018 1:00:00 AM 24/05/2018 2:00:00 AM /05/2018 2:00:00 AM 24/05/2018 3:00:00 AM /05/2018 3:00:00 AM 24/05/2018 4:00:00 AM /05/2018 4:00:00 AM 24/05/2018 5:00:00 AM /05/2018 5:00:00 AM 24/05/2018 6:00:00 AM /05/2018 6:00:00 AM 24/05/2018 7:00:00 AM /05/ :00:00 PM 24/05/ :00:00 PM /05/ :00:00 PM 25/05/ :00:00 AM /05/ :00:00 AM 25/05/2018 1:00:00 AM /05/2018 1:00:00 AM 25/05/2018 2:00:00 AM /05/2018 2:00:00 AM 25/05/2018 3:00:00 AM /05/2018 3:00:00 AM 25/05/2018 4:00:00 AM /05/2018 4:00:00 AM 25/05/2018 5:00:00 AM /05/2018 5:00:00 AM 25/05/2018 6:00:00 AM /05/2018 6:00:00 AM 25/05/2018 7:00:00 AM /05/ :00:00 PM 25/05/ :00:00 PM /05/ :00:00 PM 26/05/ :00:00 AM /05/ :00:00 AM 26/05/2018 1:00:00 AM /05/2018 1:00:00 AM 26/05/2018 2:00:00 AM /05/2018 2:00:00 AM 26/05/2018 3:00:00 AM /05/2018 3:00:00 AM 26/05/2018 4:00:00 AM /05/2018 4:00:00 AM 26/05/2018 5:00:00 AM /05/2018 5:00:00 AM 26/05/2018 6:00:00 AM /05/2018 6:00:00 AM 26/05/2018 7:00:00 AM /05/ :00:00 PM 26/05/ :00:00 PM /05/ :00:00 PM 27/05/ :00:00 AM 60.7 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 8

9 27/05/ :00:00 AM 27/05/2018 1:00:00 AM /05/2018 1:00:00 AM 27/05/2018 2:00:00 AM /05/2018 2:00:00 AM 27/05/2018 3:00:00 AM /05/2018 3:00:00 AM 27/05/2018 4:00:00 AM /05/2018 4:00:00 AM 27/05/2018 5:00:00 AM /05/2018 5:00:00 AM 27/05/2018 6:00:00 AM /05/2018 6:00:00 AM 27/05/2018 7:00:00 AM /05/ :00:00 PM 27/05/ :00:00 PM /05/ :00:00 PM 28/05/ :00:00 AM /05/ :00:00 AM 28/05/2018 1:00:00 AM /05/2018 1:00:00 AM 28/05/2018 2:00:00 AM /05/2018 2:00:00 AM 28/05/2018 3:00:00 AM /05/2018 3:00:00 AM 28/05/2018 4:00:00 AM /05/2018 4:00:00 AM 28/05/2018 5:00:00 AM /05/2018 5:00:00 AM 28/05/2018 6:00:00 AM /05/2018 6:00:00 AM 28/05/2018 7:00:00 AM /05/ :00:00 PM 28/05/ :00:00 PM /05/ :00:00 PM 29/05/ :00:00 AM /05/ :00:00 AM 29/05/2018 1:00:00 AM /05/2018 1:00:00 AM 29/05/2018 2:00:00 AM /05/2018 2:00:00 AM 29/05/2018 3:00:00 AM /05/2018 3:00:00 AM 29/05/2018 4:00:00 AM /05/2018 4:00:00 AM 29/05/2018 5:00:00 AM /05/2018 5:00:00 AM 29/05/2018 6:00:00 AM /05/2018 6:00:00 AM 29/05/2018 7:00:00 AM /05/ :00:00 PM 29/05/ :00:00 PM /05/ :00:00 PM 30/05/ :00:00 AM /05/ :00:00 AM 30/05/2018 1:00:00 AM /05/2018 1:00:00 AM 30/05/2018 2:00:00 AM /05/2018 2:00:00 AM 30/05/2018 3:00:00 AM /05/2018 3:00:00 AM 30/05/2018 4:00:00 AM /05/2018 4:00:00 AM 30/05/2018 5:00:00 AM /05/2018 5:00:00 AM 30/05/2018 6:00:00 AM /05/2018 6:00:00 AM 30/05/2018 7:00:00 AM /05/ :00:00 PM 30/05/ :00:00 PM 59.6 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 9

10 30/05/ :00:00 PM 31/05/ :00:00 AM /05/ :00:00 AM 31/05/2018 1:00:00 AM /05/2018 1:00:00 AM 31/05/2018 2:00:00 AM /05/2018 2:00:00 AM 31/05/2018 3:00:00 AM /05/2018 3:00:00 AM 31/05/2018 4:00:00 AM /05/2018 4:00:00 AM 31/05/2018 5:00:00 AM /05/2018 5:00:00 AM 31/05/2018 6:00:00 AM /05/2018 6:00:00 AM 31/05/2018 7:00:00 AM /05/2018 9:00:00 PM 31/05/ :00:00 PM /05/ :00:00 PM 31/05/ :00:00 PM /05/ :00:00 PM 1/06/ :00:00 AM 58.4 THE BOTANICA NOISE RESULTS CROSS YARRA PARTNERSHIP Building Brilliance 10

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station 3. NOISE 3.1 Monitoring Requirements According to the requirements in the Construction EM&A Manual for Lamma Extension, the baseline levels at the monitoring locations have to be determined prior to the

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

Environmental Noise Assessment Cambourne to Cambridge options

Environmental Noise Assessment Cambourne to Cambridge options Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

Statement of Evidence of N I Hegley

Statement of Evidence of N I Hegley IN THE MATTER AND IN THE MATTER of the Resource Management Act 1991 of Notices of Requirement to enable the construction, operation and maintenance of the City Rail Link. Statement of Evidence of N I Hegley

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE

ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE Cedric Roberts Environmental Operations, Integrated Assessment, Queensland Environmental Protection Agency, 160 Ann Street, Brisbane, Queensland,

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

January 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim:

January 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim: January 15, 2016 File: 0890-15A Urban Systems Ltd. 1090 Homer Street Vancouver, BC V6B 2W9 Attention: Tim Stevens Dear Tim: Re: Highway 1 - Admirals McKenzie Interchange Project Baseline Noise Monitoring

More information

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT 865522 RODEO STATION Kleinfelder Section Table of Contents 1.0 Introduction... 4 2.0 Noise Measurement Procedure... 4 3.0 Noise

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Prepared by on behalf of Mackas Sand Pty Ltd Project

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Pre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S

Pre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S Pre-Construction Sound Study Substation DRAFT January 2011 D A T A AN AL Y S IS S OL U T I ON S TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 SOUND LEVEL MONITORING...1 3.0 SOUND MODELING...4 3.1 Modeling

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

APPENDIX G CONSTRUCTION NOISE CONTOURS

APPENDIX G CONSTRUCTION NOISE CONTOURS Technical Report to support Assessment of Environmental Effects (City Rail Link Notice of Requirement): Noise and Vibration Assessment APPENDIX G CONSTRUCTION NOISE CONTOURS Figures 1. Aotea Station: Predicted

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

Children's Center Noise Monitoring Monday, June 17, 2013

Children's Center Noise Monitoring Monday, June 17, 2013 Monday, June 17, 2013 Tuesday, June 18, 2013 Wednesday, June 19, 2013 Thursday, June 20, 2013 Friday, June 21, 2013 Saturday, June 22, 2013 Sunday, June 23, 2013 Monday, June 24, 2013 Tuesday, June 25,

More information

Children's Center Noise Monitoring Monday, October 08, 2012

Children's Center Noise Monitoring Monday, October 08, 2012 Monday, October 08, 2012 Tuesday, October 09, 2012 Wednesday, October 10, 2012 Thursday, October 11, 2012 Friday, October 12, 2012 Monday, October 15, 2012 Tuesday, October 16, 2012 Wednesday, October

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

Bancroft & Piedmont Cellular Facility

Bancroft & Piedmont Cellular Facility Page 1 of 19 Environmental Noise Analysis Bancroft & Piedmont Cellular Facility Berkeley, California BAC Job # 2015-177 Prepared For: Complete Wireless Consulting Attn: Ms. Kim Le 2009 V Street Sacramento,

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc. May 2017

More information

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) JUNE 2017 NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) List of contents 1 Executive

More information

Children's Center Noise Monitoring Monday, January 14, 2013

Children's Center Noise Monitoring Monday, January 14, 2013 Monday, January 14, 2013 Tuesday, January 15, 2013 Wednesday, January 16, 2013 Thursday, January 17, 2013 Friday, January 18, 2013 Saturday, January 19, 2013 Sunday, January 20, 2013 Monday, January 21,

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

Annexure C-L.02 Report Page 2 of 6

Annexure C-L.02 Report Page 2 of 6 Annexure C-L.02 Page 2 of 6 L.02 Ambient Noise Monitoring Results (610.16185 Annexure C L.02) SLR Consulting Australia Pty Ltd Annexure C-L.02 Page 3 of 6 L.02 Ambient Noise Monitoring Results (610.16185

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Noise Mitigation Study Pilot Program Summary Report Contract No

Noise Mitigation Study Pilot Program Summary Report Contract No Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009

More information

Assessment of rail noise based on generic shape of the pass-by time history

Assessment of rail noise based on generic shape of the pass-by time history Proceedings of Acoustics 23 Victor Harbor 7-2 November 23, Victor Harbor, Australia Assessment of rail noise based on generic shape of the pass-by time history Valeri V. enchine, Jonathan Song Science

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc.

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) DECEMBER 2017 NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) List of contents 1 Executive

More information

1 Guidance to protect MoD systems using the 2.3 GHz band

1 Guidance to protect MoD systems using the 2.3 GHz band 1 Guidance to protect MoD systems using the 2.3 GHz band A1.1 Amateurs are required to operate in such a way as to not cause interference to other lawful uses of the spectrum. This includes MoD uses. However

More information

Children's Center Noise Monitoring Monday, December 31, 2012

Children's Center Noise Monitoring Monday, December 31, 2012 Monday, December 31, 2012 No data from this monitor due to faulty battery. Tuesday, January 01, 2013 No data from this monitor due to faulty battery. Wednesday, January 02, 2013 No data from this monitordue

More information

Noise Management Program

Noise Management Program Noise Management Program North Shore Waterfront Liaison Committee November 23, 2017 PRESENTATION Overview of presentation topics: Noise management program overview Monitoring and feedback Noise in Project

More information

Cymbaluk Noise Complaints

Cymbaluk Noise Complaints Decision 20259-D01-2015 Cymbaluk Noise Complaints December 22, 2015 Alberta Utilities Commission Decision 20259-D01-2015 Cymbaluk Noise Complaints Proceeding 20259 Application 20259-A001 December 22, 2015

More information

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW Postal Address P.O. Box 432 Gladesville N.S.W. 1675 AUSTRALIA A.C.N. 068 727 195 A.B.N. 19 068 727 195 Telephone: 02 9879 4544 Fax: 02 9879 4810 Email: AtkinsAcoustics@bigpond.com.au Atkins Acoustics and

More information

Appendix D: Preliminary Noise Evaluation

Appendix D: Preliminary Noise Evaluation Appendix D: Preliminary Noise Evaluation Acoustics The study of sound and its properties is known as acoustics. By considering basic physical properties of sound and the acoustic environment, the potential

More information

Swan DH Noise Impact Assessment Report

Swan DH Noise Impact Assessment Report Swan 4-64 6-1 3DH Noise Impact Assessment Report April 9, 2018 Prepared for: ConocoPhillips 34501 East Quincy Avenue Watkins, Colorado 80137 Prepared by: Behrens and Associates, Inc. 13806 Inglewood Avenue

More information

Noise Assessment for Planning Purposes - as per TAN11

Noise Assessment for Planning Purposes - as per TAN11 Noise Assessment for Planning Purposes - as per TAN11 Report No: 1703035R01A Report Status: Final Report (Amended) Dated: 23 October 2017 Purchase order No: n/a Prepared for: Garep Demirci 73 Spencer David

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT.

THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT. ICSV14 Cairns Australia 9-12 July, 2007 THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT Michael Caley 1 and John Savery 2 1 Senior Consultant, Savery & Associates Pty

More information

Noise and Ground-Borne Vibration Monitoring

Noise and Ground-Borne Vibration Monitoring 69 Noise and Vibration Study Noise and Ground-Borne Vibration Monitoring Labrador City, Newfoundland Nov, 07 Iron Ore Company of Canada TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 Study Objectives... 2

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Protocol for Ambient Level Noise Monitoring

Protocol for Ambient Level Noise Monitoring July 2015 Protocol for Ambient Level Noise Monitoring L pressure =10.log [10 (Lp/10) - 10 (LpBackground/10) ] L pressure = 10.log [10 (Lp/10) - 10 (LpBackground/10) ] CENTRAL POLLUTION CONTROL BOARD P

More information

RESIDENTIAL SUBDIVISION - 67 BRIDGEMAN ROAD AND 217, 223, 237, 241 & 245 GRAHAM ROAD, BRIDGEMAN DOWNS

RESIDENTIAL SUBDIVISION - 67 BRIDGEMAN ROAD AND 217, 223, 237, 241 & 245 GRAHAM ROAD, BRIDGEMAN DOWNS Acoustics Vibration Structural Dynamics RESIDENTIAL SUBDIVISION - 67 BRIDGEMAN ROAD AND 217, 22, 27, 241 & 245 GRAHAM ROAD, BRIDGEMAN DOWNS Traffic Noise Study 24 October 17 Lomandra Park Syndicate Limited,

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

CALGARY SOUTHEAST STONEY TRAIL Detailed Design 17th Avenue SE to Macleod Trail South (Hwy 2A) Calgary, Alberta

CALGARY SOUTHEAST STONEY TRAIL Detailed Design 17th Avenue SE to Macleod Trail South (Hwy 2A) Calgary, Alberta CALGARY SOUTHEAST STONEY TRAIL Detailed Design 17th Avenue SE to Macleod Trail South (Hwy 2A) Calgary, Alberta NOISE REPORT Prepared for: Alberta Infrastructure and Transportation 2 nd Floor, Twin Atria

More information

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) JANUARY 2018 NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) List of contents 1 Executive

More information

Low frequency noise near wind farms and in other environments

Low frequency noise near wind farms and in other environments www.epa.sa.gov.au www.resonateacoustics.com Low frequency noise near wind farms and in other environments Low frequency noise near wind farms and in other environments Page i Low frequency noise near wind

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018 1/8 Project Title Client Document Reference No. Laing O Rourke Project No. Noise Monitoring Sydney Metro City and Southwest LOR-NCW-Noise Monitoring WE08_ OOHW P1-6 - 250818_260818.docx K38 Document Date

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

The following is the summary of Keane Acoustics acoustical study for the City of St. Petersburg.

The following is the summary of Keane Acoustics acoustical study for the City of St. Petersburg. November 23, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics acoustical

More information

UC Berkeley Northside Relocation Cellular Facility

UC Berkeley Northside Relocation Cellular Facility Page 1 of 19 Environmental Noise Analysis UC Berkeley Northside Relocation Cellular Facility Berkeley, California BAC Job # 2015-290 Prepared For: Complete Wireless Consulting Attn: Kim Le 2009 V Street

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study

Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study Page 1 of 8 WI #16 130 December 21, 2016 Alex Popov Liquid Entertainment 2367 Telegraph Avenue Berkeley, California Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study Dear Alex,

More information

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Prepared for Castlereagh Coal Page i Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Reference: Report date: 28 June

More information

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Date: 09 March 2016 REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Client: Edinburgh Limited Report Author:... Dr R. Peters Principal Consultant

More information

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO. 01127-E VERSION A APRIL 2017 PREPARED FOR HANSON CONSTRUCTION MATERIALS PTY LTD LOT 151 PEATS RIDGE ROAD CALGA NSW 2250 DOCUMENT CONTROL Version

More information

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study Project Number 11-107 Douglas P. Koehn, M.S. Senior Consultant 12040 SOUTH LAKES DRIVE, SUITE 104, RESTON, VIRGINIA

More information

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1 Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC Final Report Rev 1 Noise Impact Assessment RWDI # 1502274 SUBMITTED TO Paul Dufault Project Manager Metro Vancouver 4330

More information

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

Noise Study for Proposed Mavis Tire

Noise Study for Proposed Mavis Tire Noise Study for Proposed Mavis Tire Hyde Park, New York April 4, 2017 Prepared For: Town of Hyde Park Planning Board 4383 Albany Post Road Hyde Park, NY 12538 Prepared By: Novus Engineering, P.C. 25 Delaware

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

Proceedings of Meetings on Acoustics

Proceedings of Meetings on Acoustics Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Noise Session 3pNSc: Joint Poster Session on Noise and Architectural

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT AT MURPHY BREWERY. Report Dated: 25 June 15 Greenhills House, Kilmoney, Carrigaline, Co. Cork. Tel: 353 21 437433 http://www.env.ie/ TITLE: Environmental Noise Assessment

More information

Statistical properties of urban noise results of a long term monitoring program

Statistical properties of urban noise results of a long term monitoring program Statistical properties of urban noise results of a long term monitoring program ABSTRACT Jonathan Song (1), Valeri V. Lenchine (1) (1) Science & Information Division, SA Environment Protection Authority,

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:

More information

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Proceedings of Acoustics 2012 - Fremantle Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Jingnan Guo, John Macpherson and Peter Popoff-Asotoff Noise Regulation Branch,

More information

Appendix N. Preliminary Noise Assessment Technical Memorandum

Appendix N. Preliminary Noise Assessment Technical Memorandum Appendix N Preliminary Noise Assessment Technical Memorandum SENES Consultants Limited MEMORANDUM 121 Granton Drive, Unit 12 Richmond Hill, Ontario Canada L4B 3N4 Tel: (905) 764-9380 Fax: (905) 764-9386

More information

Roche Ireland Limited

Roche Ireland Limited Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No.

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information

Noise results for PF Formation- September 2017

Noise results for PF Formation- September 2017 Location 1. Toratola Property Hitchcock Road Applicable Measurement Date/Time Criterion Level description [db] Noise results for PF Formation- September 2017 Measured Noise Level LAeq [db] Measured L1

More information

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford Noise Impact Assessment TECHNICAL REPORT Hydropower Archimedean Screw Noise Impact Assessment Prepared for: The Low Carbon Hub, 23 Park

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

Environmental Noise Propagation

Environmental Noise Propagation Environmental Noise Propagation How loud is a 1-ton truck? That depends very much on how far away you are, and whether you are in front of a barrier or behind it. Many other factors affect the noise level,

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

Background Noise Survey Report SANTA ISABEL WIND FARM PROJECT

Background Noise Survey Report SANTA ISABEL WIND FARM PROJECT Background Noise Survey Report SANTA ISABEL WIND FARM PROJECT OCTOBER 2010 Prepared for: Prepared By: TABLE OF CONTENTS 1 INTRODUCTION... 3 2 METHODOLOGY... 5 2.1 Study Area and Noise Receptors... 5 2.2

More information