Muswellbrook Coal Company

Size: px
Start display at page:

Download "Muswellbrook Coal Company"

Transcription

1 Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal

2 Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared for Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 Prepared by Global Acoustics Pty Ltd PO Box 3115 Thornton NSW 2322 Prepared: Ryan Bruniges QA Review: Robert Kirwan Scientist (Acoustics) Acoustics Engineer Global Acoustics Pty Ltd ~ Environmental noise modeling and impact assessment ~ Sound power testing ~ Noise control advice ~ Noise and vibration monitoring ~ OHS noise monitoring and advice ~ Expert evidence in Land and Environment and Compensation Courts ~ Architectural acoustics ~ Blasting assessments and monitoring ~ Noise management plans (NMP) ~ Sound level meter and noise logger sales and hire Page i

3 EXECUTIVE SUMMARY Global Acoustics was engaged to conduct a noise survey around Muswellbrook Coal, an open cut coal mine near Muswellbrook, NSW. Development consent was issued to Muswellbrook Coal Company in September 03 (DA 5/02) to extend the former Open Cut No. 1. Condition 6.4 of the consent details the noise requirements. The purpose of the survey is to quantify and describe the acoustic environment around the site and compare results with these limits. Environmental noise monitoring described in this report was undertaken on 27 and 28 June 12; there were 6 monitoring locations. Attended monitoring was conducted in accordance with the Office of Environment and Heritage (OEH, formerly the Department of Environment, Climate Change and Water) Industrial Noise Policy (INP) guidelines and Australian Standard AS 10 Acoustics, Description and Measurement of Environmental Noise. The duration of each night measurement was 15 minutes. MCC complied with the relevant limits during the June 12 survey, with the exception of R15. During the first night measurement on the 27/28 June 12, MCC exceeded the L Aeq,15min impact assessment criterion at R15. A rear dump truck engine/exhaust/fan continuum from MCC was regularly audible throughout the measurement with frequent transmission noise surges and impact noises. These sources were responsible for the MCC L Aeq,15min of 37 db. The OCE was contacted following this measurement and was notified that levels were exceeding relevant criterion. He advised that a number of rear dump trucks would be relocated to a different haul route and that levels should improve shortly. This exceedance of the L Aeq impact assessment criterion is not considered significant as Chapter 11 of the OEH Industrial Noise Policy deems a development to be in noncompliance only when the monitored noise level is more than 2 db above the statutory noise limit specified in the consent or licence condition. Wind speed and/or temperature inversion conditions resulted in development consent criteria not always being applicable, as indicated in the Table 4.2 and Table 4.3. Global Acoustics Pty Ltd Page ii

4 Table of Contents 1 INTRODUCTION Background Monitoring Locations Terminology CONSENTS AND CRITERIA Development Consent Development Consent Environment Protection Licence Noise Management Plan Project Specific Criteria METHODOLOGY Attended Noise Monitoring RESULTS Attended Noise Monitoring DISCUSSION Noted Noise Sources R7, Day Measurement R7, Day Measurement R7, Evening R7, Night Measurement R7, Night Measurement R13, Day Measurement R13, Day Measurement R13, Evening R13, Night Measurement R13, Night Measurement R15, Day Measurement R15, Day Measurement R15, Evening R15, Night Measurement R15, Night Measurement R16, Day Measurement R16, Day Measurement R16, Evening R16, Night Measurement R16, Night Measurement R17, Day Measurement Page iii

5 R17, Day Measurement R17, Evening R17, Night Measurement R17, Night Measurement R, Day Measurement R, Day Measurement R, Evening R, Night Measurement R, Night Measurement SUMMARY...43 Appendices A. DEVELOPMENT CONSENT...A.1 B. CALIBRATION CERTIFICATES... B.1 Page iv

6 1 INTRODUCTION 1.1 Background Muswellbrook Coal Company (MCC) engaged Global Acoustics, to conduct a noise survey around its operations, an open cut mine northeast of Muswellbrook. Environmental noise monitoring described in this report was undertaken on 27 and 28 June 12; there were 6 monitoring locations. Figure 1 shows the monitoring locations and Figures 2 and 3 show the location of major plant items in operation during the day and night attended monitoring periods. The purpose of the survey is to quantify and describe the acoustic environment around the site and compare results with specified limits. 1.2 Monitoring Locations Monitoring locations during this survey are detailed in Table 1.1 and shown on Figure 1. Table 1.1 MONITORING LOCATIONS Descriptor Owner Monitoring Location R7 NA Entrance gate to Transgrid yard R13 McMaster 1 Sandy Creek Road R15* Collins 71 Queen Street, Muswellbrook R16 Tuckey Queen street, Muswellbrook R17 Colvin 42 Queen street, Muswellbrook R Gordon 90 Muscle Creek Road Note: * Denotes Muswellbrook Coal real time noise monitoring station near this location. Page 1

7 Figure 1 Monitoring Sites 2

8 Figure 2 Muswellbrook Coal Plant Locations Pit No. 1 Extension, 27/28 June 12 - All Shifts 3

9 Figure 3 Muswellbrook Coal Plant Locations No. 2 Pit, 27/28 June 12 - All Shifts Report 4Template_11 Page 4

10 1.3 Terminology Some definitions of terminology, which may be used in this report, are provided in Table 1.2. Table 1.2 TERMINOLOGY Descriptor L A L A10 L A90 L Aeq L pk SPL SEL Hertz (Hz) ABL RBL Definition The A-weighted root mean squared (RMS) noise level at any instant The noise level which is exceeded for 10 per cent of the time, which is approximately the average of the maximum noise levels The level exceeded for 90 per cent of the time, which is approximately the average of the minimum noise levels. The L A90 level is often referred to as the background noise level and is commonly used to determine noise criteria for assessment purposes The average noise energy during a measurement period The unweighted peak noise level at any instant Noise level measurement units are decibels (db). The A weighting scale is used to describe human response to noise Sound pressure level (SPL), fluctuations in pressure measured as 10 times a logarithmic scale, the reference pressure being micropascals Sound exposure level (SEL), the A-weighted noise energy during a measurement period normalised to one second Cycles per second, the frequency of fluctuations in pressure, sound is usually a combination of many frequencies together Assessment background level (ABL), the 10th percentile background noise level for a single period (day, evening or night) of a 24 hour monitoring period Rating background level (RBL), the background noise level for a period (day, evening or night) determined from ABL data 1 Page 1

11 2 CONSENTS AND CRITERIA 2.1 Development Consent A development consent and licence apply to the Muswellbrook Coal operation. The noise sections of the consent and licence are reproduced in Appendix A Development Consent MCC obtained development consent in September 03 (DA 5/02) to extend the former Open Cut No. 1. Condition 6.4 of the consent details the noise requirements Environment Protection Licence On 12 August 04 Muswellbrook Coal Company Ltd was issued with a variation to Environment Protection Licence No. 6 for coal mining. Section 6.1 of the licence details the noise requirements Noise Management Plan A Noise Management Plan (NMP) was prepared for MCC in February 05. Section 4.6 provides details on the noise-monitoring program. 2.2 Project Specific Criteria Noise criteria and land acquisition criteria are detailed in Table 2.1 and Table 2.2. Table 2.1 MCC NOISE CRITERIA Day Evening Night Descriptor Monitoring Location L Aeq,15 min L Aeq,15 min L Aeq,15 min L A1,1 min R7 Gate to Transgrid yard R13 1 Sandy Creek Rd 51 R15 71 Queen St 46 R16 Queen St 46 R17 42 Queen St 46 R 90 Muscle Creek Rd The noise criteria in Table 2.1 apply under meteorological conditions of: Wind speed up to 3 meters per second at 10 metres above ground level; and Temperature inversion conditions of up to 3 degrees Celsius per metres. 2 Page 2

12 Table 2.2 MCC LAND ACQUISITION CRITERIA Day Evening Night Descriptor Monitoring Location L Aeq(15 min) L Aeq(15 min) L Aeq(15 min) R7 Gate to Transgrid yard R13 1 Sandy Creek Rd R15 71 Queen St R16 Queen St R17 42 Queen St R 90 Muscle Creek Rd Page 3

13 3 METHODOLOGY 3.1 Attended Noise Monitoring Attended monitoring was conducted at six sites in accordance with the Office of Environment and Heritage (OEH, formerly the Department of Environment, Climate Change and Water) Industrial Noise Policy (INP) guidelines and Australian Standard AS 10 Acoustics, Description and Measurement of Environmental Noise. Atmospheric condition measurement was also undertaken. A measurement of L A1,1 minute corresponds to the highest noise level generated for 0.6 second during one minute. In practical terms this is the highest noise level emitted from the MCC noise source during the entire measurement period (i.e. the highest level of the worst minute during the 15-minute measurement). As indicated in Section (b) and (c) of the consent, the L A1,1 minute measurement should be undertaken at 1 metre from the dwelling façade and the L Aeq,15 minute measurement within metres of the dwelling. However, the direct measurement of noise at 1 metre from the façade is not practical during monitoring for this project. In most cases, monitoring near the residence is impractical due to barking dogs or issues with obtaining access. In all cases, measurements for this survey were undertaken at a suitable and representative location. The duration of each night measurement was 15 minutes. During this survey attended monitoring was undertaken over 24 hours during the day, evening and night periods. Monitoring was carried out once at each location during the evening period and twice per location during the day and night periods. Attended monitoring is preferred to the use of noise loggers when determining compliance with prescribed limits; it allows an accurate determination of the contribution, if any, to measured noise levels by the source of interest (in this case MCC). The terms Inaudible (IA), Not Measurable (NM), less than db (< db) or less than db (< db) are used in this report. When site noise is noted as IA then there was no site noise at the monitoring location. However, if site noise is noted as NM, < db or < db, this means some noise was audible but could not be quantified. This means that noise from the site was either very low, or, being masked by other noise that was relatively loud. In the former case (very low site levels) we consider it not necessary to attempt to accurately quantify site noise as it would be significantly less than any criterion and most unlikely to cause annoyance (and in many cases, to be even noticed). 4 Page 4

14 If site noise were NM due to masking then we would employ methods as per the Industrial Noise Policy (e.g. measure closer and back calculate) to determine a value for reporting if deemed necessary. All site NM in this report are due to low absolute values. The equipment detailed in Table 3.1 was used to measure environmental noise levels. Table 3.1 ATTENDED NOISE MONITORING EQUIPMENT Model Serial Number Calibration Due Date Rion NA-28 sound level analyser /05/13 Rion NC-73 calibrator /02/14 Calibration certificates are provided in Appendix B. 5 Page 5

15 4 RESULTS 4.1 Attended Noise Monitoring Overall noise levels measured at each location during attended measurement are provided in Table 4.1. Table 4.1 MEASURED NOISE LEVELS - JUNE 12 Location Date And Time L A1 db L A10 db L Aeq db L A90 db R7 27/06/12 14: R7 27/06/12 17: R7 27/06/12 18: R7 27/06/12 22: R7 28/06/12 00: R13 27/06/12 14: R13 27/06/12 16: R13 27/06/12 18: R13 27/06/12 22: R13 28/06/12 00: R15 27/06/12 13: R15 27/06/12 16: R15 27/06/12 19: R15 27/06/12 23: R15 28/06/12 01: R16 27/06/12 13: R16 27/06/12 15: R16 27/06/12 19: R16 27/06/12 23: R16 28/06/12 01: R17 27/06/12 12: R17 27/06/12 15: R17 27/06/12 18: R17 27/06/12 22: R17 28/06/12 01: R 27/06/12 12: R 27/06/12 15: R 27/06/12 : R 28/06/12 00: R 28/06/12 02: Note: Noise levels in this table are not necessarily the result of activities at MCC. 6 Page 6

16 Table 4.2 and Table 4.3 detail L Aeq,15 minute and L A1,1 minute noise levels from MCC in the absence of other noise sources. Criteria are then applied if weather conditions are in accordance with the mine s development consent. Discussion as to the noise sources responsible for these measured levels is provided in Chapter 5 of this report. Table 4.2 L Aeq db GENERATED BY MCC - JUNE 12 Location Date And Time Wind Speed m/s 1 VTG o C per m 2 Criterion db Criterion Applies? 3,7 MCC L Aeq db 4,5 Exceedance 6,8 R7 27/06/12 14: N < NA R7 27/06/12 17: N 32 NA R7 27/06/12 18: Y Nil R7 27/06/12 22: Y 33 Nil R7 28/06/12 00: Y 26 Nil R13 27/06/12 14: N IA NA R13 27/06/12 16: N NM NA R13 27/06/12 18: Y 31 Nil R13 27/06/12 22: N 39 NA R13 28/06/12 00: Y 31 Nil R15 27/06/12 13: N < NA R15 27/06/12 16: N NM NA R15 27/06/12 19: Y 34 Nil R15 27/06/12 23: Y 37 2 R15 28/06/12 01: Y Nil R16 27/06/12 13: N IA NA R16 27/06/12 15: N IA NA R16 27/06/12 19: Y < Nil R16 27/06/12 23: Y 34 Nil R16 28/06/12 01: Y 33 Nil R17 27/06/12 12: N IA NA R17 27/06/12 15: N IA NA R17 27/06/12 18: Y IA Nil R17 27/06/12 22: N NA R17 28/06/12 01: Y < Nil 7 Page 7

17 Table 4.2 L Aeq db GENERATED BY MCC - JUNE 12 Location Date And Time Wind Speed m/s 1 VTG o C per m 2 Criterion db Criterion Applies? 3,7 MCC L Aeq db 4,5 Exceedance 6,8 R 27/06/12 12: N IA NA R 27/06/12 15: N IA NA R 27/06/12 : N IA NA R 28/06/12 00: Y IA Nil R 28/06/12 02: Y IA Nil Notes: 1. Wind speed in metres per second, data from MCC open cut meteorological station; 2. VTG - Vertical temperature gradient in degrees Celsius per metres altitude, data from MCC open cut meteorological station; 3. Noise emission limits apply for winds up to 3 metres per second (at a height of 10 metres above ground level) and vertical temperature gradients of up to 3 degrees/m; 4. These are results for MCC in the absence of all other noise sources; 5. NM denotes audible but not measurable, IA denotes inaudible; 6. Bolded results in red are those greater than the relevant criterion (if applicable); 7. Y denotes Yes, N denotes No; and 8. NA in exceedance column means atmospheric conditions outside conditions specified in development consent and so criterion is not applicable. 8 Page 8

18 Table 4.3 L A1 (1 min) db GENRATED BY MCC - JUNE 12 Location Date And Time Wind Speed m/s 1 Night-Time VTG o C per m 2 Criterion db Criterion Applies? 3,7 MCC L A1,1min db 4,5 Exceedance 6,8 R7 27/06/12 22: Y 43 Nil R7 28/06/12 00: Y Nil R13 27/06/12 22: N 48 NA R13 28/06/12 00: Y Nil R15 27/06/12 23: Y 46 Nil R15 28/06/12 01: Y 41 Nil R16 27/06/12 23: Y 39 Nil R16 28/06/12 01: Y Nil R17 27/06/12 22: N 41 NA R17 28/06/12 01: Y 28 Nil R 28/06/12 00: Y IA Nil R 28/06/12 02: Y IA Nil Notes: 1. Wind speed in metres per second, data from MCC open cut meteorological station; 2. VTG - Vertical temperature gradient in degrees Celsius per metres altitude, data from MCC open cut meteorological station; 3. Noise emission limits apply for winds up to 3 metres per second (at a height of 10 metres above ground level) and vertical temperature gradients of up to 3 degrees/m; 4. These are results for MCC in the absence of all other noise sources; 5. NM denotes audible but not measurable, IA denotes inaudible; 6. Bolded results in red are those greater than the relevant criterion (if applicable); 7. Y denotes Yes, N denotes No; and 8. NA in exceedance column means atmospheric conditions outside conditions specified in development consent and so criterion is not applicable. 9 Page 9

19 Atmospheric condition data measured at each location are shown in Table 4.4. Table 4.4 MEASURED ATMOSPHERIC CONDITIONS Location Date And Time Temperature degrees C Wind Speed m/sec Wind Direction Cloud Cover 1/8s R7 27/06/12 14: R7 27/06/12 17: R7 27/06/12 18: R7 27/06/12 22: R7 28/06/12 00: R13 27/06/12 14: R13 27/06/12 16: R13 27/06/12 18: R13 27/06/12 22: R13 28/06/12 00: R15 27/06/12 13: R15 27/06/12 16: R15 27/06/12 19: R15 27/06/12 23: R15 28/06/12 01: R16 27/06/12 13: R16 27/06/12 15: R16 27/06/12 19: R16 27/06/12 23: R16 28/06/12 01: R17 27/06/12 12: R17 27/06/12 15: R17 27/06/12 18: R17 27/06/12 22: R17 28/06/12 01: R 27/06/12 12: R 27/06/12 15: R 27/06/12 : R 28/06/12 00: R 28/06/12 02: Notes: 1. Wind speed and direction measured at 1.8 metres; and 2. NA is not available. 10 Page 10

20 5 DISCUSSION 5.1 Noted Noise Sources Table 4.1, Table 4.2 and Table 4.3 present data gathered during attended monitoring. These noise levels are the result of many sounds reaching the sound level meter microphone during monitoring. Received levels from various noise sources were noted during attended monitoring and particular attention was paid to the extent of MCC s contribution, if any, to measured levels. At each receptor location, MCC s L Aeq,15 minute and L A1,1 minute (in the absence of any other noise) was, where possible, measured directly, or, determined by frequency analysis. From these observations summaries have been derived for each location. The following chapter sections provide these summaries. Statistical 1/3 octave band analysis of environmental noise was undertaken, and Figures 5 to 34 display the frequency ranges for various noise sources at each location for L A1, L A10, L A90, and L Aeq. These figures also provide, graphically, statistical information for these noise levels. An example is provided as Figure 5 where it can be seen that frogs and insects are generating noise at frequencies above Hz; mining noise is at frequencies less than Hz (this is typical). Adding levels at frequencies that relate to mining only allows separate statistical results to be calculated. This analysis cannot always be performed if there are significant levels of other noise at the same frequencies as mining; this can be dogs, cows, or, most commonly, road traffic. It should be noted that the method of summing statistical values up to a cutoff frequency can overstate the L A1 result by a small margin but is entirely accurate for L Aeq. 11 Page 11

21 Environmental Noise Levels March 04, 06 hours TotL1 TotL10 TotLeq TotL90 L1 L10 Leq L90 LA1 39 db LA10 37 db LAeq db LA90 32 db Mine dragline fans, bucket noise, rear dump truck engine and transmission noise Insects LA10 34 db LAeq 32 db Frogs Figure 4 Sample Graph 12 Page 12

22 5.1.1 R7, Day Measurement 1 Environmental Noise Levels At R7 27 Jun 12, 1431 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise Road traffic tyre noise and breeze in the foliage Birds LA1: 52 db LA10: 44 db LAeq: 41 db LA90: db LAeq: < db in report Figure 5 Environmental Noise Levels, R7 Gate to Transgrid yard Rear dump truck engine and transmission noise were regularly audible throughout the measurement at low levels, resulting in the MCC only of L Aeq of less than db. Breeze in foliage and road traffic tyre noise primarily responsible for the L A90, L A10 and L Aeq. Road traffic engine noise and birds were responsible for the L A1 and contributed to the L Aeq. A bat and a plane were also audible. 13 Page 13

23 5.1.2 R7, Day Measurement 2 Environmental Noise Levels At R7 27 Jun 12, 1711 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and MCC continuum Road traffic tyre noise Frogs LA1: db LA10: 46 db LAeq: 44 db LA90: 33 db LAeq: 32 db in report Figure 6 Environmental Noise Levels, R7 Gate to Transgrid yard An engine continuum was audible from MCC throughout the measurement and generated a MCC only L Aeq of 32dB. Road traffic tyre and engine noise were responsible for the L A1, L A10 and L Aeq and contributed to the L A90. Frogs were audible at times and contributed to the L A1, L A10 and L Aeq. Birds and breeze in the foliage were also audible. 14 Page 14

24 5.1.3 R7, Evening Environmental Noise Levels At R7 27 Jun 12, 1 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Frogs LA1: 46 db LA10: 44 db LAeq: 41 db LA90: 31 db LAeq: db MCC continuum in report Figure 7 Environmental Noise Levels, R7 Gate to Transgrid yard A low-level engine continuum was audible throughout the measurement. Rear dump truck (RDT) engine and transmission surges were regularly audible. These sources generated a MCC only of L Aeq of db. Frogs were primarily responsible for all measured levels. A substation continuum, breeze in foliage, distant road traffic and a dog were audible at low levels. 15 Page 15

25 5.1.4 R7, Night Measurement 1 Environmental Noise Levels At R7 27 Jun 12, 20 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Frogs LA1: 46 db LA10: 43 db LAeq: db LA90: db LA1,1min: 43 db LAeq: 33 db MCC continuum Dogs in report Figure 8 Environmental Noise Levels, R7 Gate to Transgrid yard An RDT engine/fan continuum with regular transmission surges was audible from MCC through out the measurement. These sources were responsible for the MCC only L Aeq,15min of 33 db and L A1,1min of 43 db. Frogs were primarily responsible for all measured noise levels. Dogs, birds, distant road traffic and breeze on the microphone and in the foliage were also audible. 16 Page 16

26 5.1.5 R7, Night Measurement 2 Environmental Noise Levels At R7 28 Jun 12, 00 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Frogs LA1: 47 db LA10: db LAeq: db LA90: 27 db LA1,1min: db LAeq: 26 db MCC and substation continuum in report Figure 9 Environmental Noise Levels, R7 Gate to Transgrid yard RDT engine and transmission noise was regularly audible from MCC and generated a MCC only L Aeq,15min of 26 db and an L A1,1min of db. Frogs were responsible for measured noise levels. A substation continuum and breeze in the foliage and on the microphone were audible. 17 Page 17

27 5.1.6 R13, Day Measurement 1 Environmental Noise Levels At R13 27 Jun 12, 19 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Aeroplane noise and quarry continuum Breeze in the foliage and road traffic tyre noise Birds LA1: 57 db LA10: 51 db LAeq: 48 db LA90: 42 db LAeq: Inaudible in report Figure 10 Environmental Noise Levels, R13 - McMaster MCC was inaudible. Road traffic, breeze in the foliage and noise from a nearby quarry were primarily responsible for the L A90, L A10 and L Aeq. An aeroplane and birds contributed to the measured L A1. 18 Page 18

28 5.1.7 R13, Day Measurement 2 Environmental Noise Levels At R13 27 Jun 12, 16 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 quarry continuum Road traffic tyre noise Birds LA1: 61 db LA10: 51 db LAeq: 49 db LA90: 39 db LAeq: Not Measurable in report Figure 11 Environmental Noise Levels, R13 - McMaster Engine noise from MCC was audible regularly at low levels throughout the measurement. Road traffic tyre and engine noise and noise from a nearby quarry were primarily responsible for all measured levels. Birds contributed to the L A1 and L Aeq. Breeze in the foliage was also audible. 19 Page 19

29 5.1.8 R13, Evening Environmental Noise Levels At R13 27 Jun 12, 1824 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 LA1: 43 db LA10: 38 db LAeq: db LA90: db LAeq: 31 db MCC continuum Birds in report Figure 12 Environmental Noise Levels, R13 - McMaster An engine continuum was audible throughout the measurement. RDT engine and fan surges were regularly audible. These sources generated the MCC L Aeq,15min of 31 db. Birds were primarily responsible for all measured levels. Distant tyre noise and breeze in the foliage were also noted. Page

30 5.1.9 R13, Night Measurement 1 Environmental Noise Levels At R13 27 Jun 12, 22 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 MCC continuum Breeze in the foliage Frogs and insects LA1: db LA10: 42 db LAeq: db LA90: 36 db LA1,1min: 48 db LAeq: 39 db in report Figure 13 Environmental Noise Levels, R13 - McMaster An engine/exhaust/fan continuum from an excavator and RDT s operating at MCC were responsible for the site only L Aeq,15min of 39 db and L A1,1min of 48 db. Frogs and insects contributed to all measured noise levels. Road traffic tyre noise and breeze in the foliage were also noted. 21 Page 21

31 R13, Night Measurement 2 Environmental Noise Levels At R13 28 Jun 12, 0054 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 MCC RDT transmission noise LA1: 41 db LA10: 36 db LAeq: 34 db LA90: 28 db LA1,1min: db LAeq: 31 db MCC continuum MCC continuum Frogs and insects in report Figure 14 Environmental Noise Levels, R13 - McMaster A rear dump truck engine/exhaust continuum and transmission noise surges from MCC were responsible for the MCC L Aeq,15min of 31 db. RDT transmission noise surges were responsible for the MCC L A1,1min of db. Impact noises were also noted three times and reverse alarms once. Frogs and insects contributed to all measured levels. Road traffic and breeze in the foliage were noted. 22 Page 22

32 R15, Day Measurement 1 Environmental Noise Levels At R15 27 Jun 12, 1313 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and MCC engine continuum Road traffic tyre noise and breeze in the foliage Birds LA1: db LA10: 46 db LAeq: 44 db LA90: 38 db LAeq: < db in report Figure 15 Environmental Noise Levels, R15 - Collins An engine continuum from MCC was regularly audible and generated an MCC L Aeq,15min of less than db. Dozer track noise was noted on three occasions. Road traffic noise and breeze in foliage were primarily responsible for measured levels. Birds and breeze on the microphone contributed to the L A1, L A10 and L Aeq. A residential door banging was also noted. 23 Page 23

33 R15, Day Measurement 2 Environmental Noise Levels At R15 27 Jun 12, 1614 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic and dirt bike engine noise Road traffic tyre noise LA1: 57 db LA10: 51 db LAeq: 47 db LA90: 39 db LAeq: Not Measurable in report Figure 16 Environmental Noise Levels, R15 Collins Engine noise, reverse beeps and dozer tracks from MCC were all briefly audible at low levels. Road traffic tyre and engine noise, dirt bike engine noise and breeze in the foliage were responsible for all measured noise levels. Birds were also noted. 24 Page 24

34 R15, Evening Environmental Noise Levels At R15 27 Jun 12, 1947 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and MCC continuum Road traffic tyre noise and dogs LA1: 61 db LA10: 52 db LAeq: 48 db LA90: 33 db LAeq: 34 db in report Figure 17 Environmental Noise Levels, R15 - Collins A RDT engine/exhaust/fan continuum from MCC with regular surges was responsible for the MCC L Aeq,15min of 34 db. Impact noises were noted on two occasions. Road traffic tyre and engine noise were primarily responsible for all measured noise levels. Dogs contributed to the measured L A1 and L Aeq. Breeze in the foliage, sprinklers and an aeroplane were audible. Page

35 R15, Night Measurement 1 Environmental Noise Levels At R15 27 Jun 12, 2324 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 MCC continuum LA1: 42 db LA10: db LAeq: 37 db LA90: 34 db LA1,1min: 46 db LAeq: 37 db in report Figure 18 Environmental Noise Levels, R15 - Collins A RDT engine/exhaust/fan continuum from MCC was regularly audible throughout the measurement with frequent transmission noise surges and impact noises. These sources were responsible for the MCC L Aeq,15min of 37 db. A RDT engine/exhaust surge generated the MCC L A1,1min of 46 db. Distant road traffic and breeze on the microphone and in the foliage were also noted. 26 Page 26

36 R15, Night Measurement 2 Environmental Noise Levels At R15 28 Jun 12, 0122 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 LA1: 43 db LA10: 39 db LAeq: 36 db LA90: 32 db LA1,1min: 41 db LAeq: db MCC continuum and train noise in report Birds Figure 19 Environmental Noise Levels, R15 - Collins Rear dump truck engine/exhaust/fan/transmission surges were regularly audible for the first 10 minutes of the measurement. For the last 5 minutes of the measurement the RDT noise became a continuum. These sources generated a MCC L Aeq,15min of db and MCC L A1,1min of 41 db. A train and road traffic tyre noise contributed to the measured L Aeq. Birds were a minor contributor to the L A1. Breeze in the foliage and on the microphone were also noted. 27 Page 27

37 R16, Day Measurement 1 Environmental Noise Levels At R16 27 Jun 12, 1337 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Aeroplane and road traffic engine noise Road traffic tyre noise and breeze in the foliage LA1: 62 db LA10: 51 db LAeq: 49 db LA90: 37 db LAeq: Inaudible in report Figure Environmental Noise Levels, R16 - Tuckey MCC was inaudible. A combination of road traffic, breeze in the foliage and an aeroplane were primarily responsible for all measured levels. A lawnmower, birds, work in a garage and music were audible at times. 28 Page 28

38 R16, Day Measurement 2 Environmental Noise Levels At R16 27 Jun 12, 12 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic and dirt bike engine noise Road traffic tyre noise and dogs Birds LA1: 62 db LA10: 56 db LAeq: 52 db LA90: 38 db LAeq: Inaudible in report Figure 21 Environmental Noise Levels, R16 - Tuckey MCC was inaudible. Road traffic tyre and engine noise was primarily responsible for all measured levels. Dogs, dirt bike engine noise and birds contributed to the measured L A1. Breeze in the foliage, an aeroplane, reverse beeps, a hose and music were audible at times. 29 Page 29

39 R16, Evening Environmental Noise Levels At R16 27 Jun 12, 1926 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise Road traffic tyre noise and electrical compound continuum LA1: db LA10: 46 db LAeq: 44 db LA90: 39 db LAeq: < db in report Figure 22 Environmental Noise Levels, R16 - Tuckey Engine and transmission noise from RDT at MCC were frequently audible throughout the measurement and were responsible for the MCC L Aeq,15min of less than db. Road traffic noise was primarily responsible for all measured levels. A continuum from an electrical compound generated the L A90. Dogs, breeze in the foliage and an aeroplane were audible. Page

40 R16, Night Measurement 1 Environmental Noise Levels At R16 27 Jun 12, 26 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 LA1: 43 db LA10: 39 db LAeq: 37 db LA90: 34 db LA1,1min: 39 db LAeq: 34 db MCC continuum and train noise Electrical compound continuum in report Figure 23 Environmental Noise Levels, R16 - Tuckey A RDT engine/transmission continuum with frequent surges was audible from MCC for the majority of the measurement and generated the MCC L Aeq,15min of 34 db and L A1,1min of 39 db. An impact noise was noted on one occasion. A nearby electrical compound contributed to all measured levels. A train contributed to the measured L A1, L A10 and L Aeq. Dogs, distant road traffic and breeze in the foliage were also noted. 31 Page 31

41 5.1. R16, Night Measurement 2 Environmental Noise Levels At R16 28 Jun 12, 0141 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 LA1: 43 db LA10: 37 db LAeq: db LA90: 32 db LA1,1min: db LAeq: 32 db MCC continuum MCC continuum and road traffic tyre noise Electrical compound continuum in report Figure 24 Environmental Noise Levels, R16 - Tuckey RDT engine and transmission noise were regularly audible and generated the MCC L Aeq,15min of 32 db and L A1, 1min of db. A nearby electrical compound contributed to all measured levels. contributed to the L A1 and L Aeq. Road traffic noise Dogs and breeze in the foliage also noted. 32 Page 32

42 R17, Day Measurement 1 Environmental Noise Levels At R17 27 Jun 12, 13 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and industrial area continuum Road traffic tyre noise LA1: 64 db LA10: 53 db LAeq: 51 db LA90: 43 db LAeq: Inaudible in report Figure Environmental Noise Levels, R17 Colvin MCC was inaudible. Road traffic noise and an industrial area continuum were responsible for all measured levels. Dogs, breeze in the foliage and on the microphone, birds and voices were also audible. 33 Page 33

43 R17, Day Measurement 2 Environmental Noise Levels At R17 27 Jun 12, 1533 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and industrial area continuum Road traffic tyre noise LA1: 77 db LA10: 64 db LAeq: 64 db LA90: 46 db LAeq: Inaudible in report Figure 26 Environmental Noise Levels, R17 Colvin MCC was inaudible. Road traffic tyre and engine noise was responsible for measured levels Breeze in the foliage, Dirt bike engine noise, dogs, a resident hammering and an industrial area continuum were regularly audible. 34 Page 34

44 R17, Evening Environmental Noise Levels At R17 27 Jun 12, 1854 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic engine noise and industrial area continuum Road traffic tyre noise LA1: 56 db LA10: 46 db LAeq: 43 db LA90: 31 db LAeq: Inaudible in report Figure 27 Environmental Noise Levels, R17 Colvin MCC was inaudible. Road traffic tyre and engine noise was responsible for measured levels. A continuum from a nearby industrial area, an aeroplane, breeze in the foliage, dogs, birds and insects were all regularly audible. Page

45 R17, Night Measurement 1 Environmental Noise Levels At R17 27 Jun 12, 2248 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 MCC continuum, industrial area continuum and train noise LA1: 46 db LA10: 41 db LAeq: 38 db LA90: 33 db LA1,1min: 41 db LAeq: db in report Figure 28 Environmental Noise Levels, R17 Colvin A RDT engine continuum with regular engine and transmission surges was audible from MCC and generated the MCC L Aeq,15min of db and MCC L Aeq,15min of 41 db. A train was responsible for the measured L A1 and L A10 and contributed to the L Aeq. An industrial area continuum was a minor contributor to all measured levels. An aeroplane, dogs, breeze in the foliage and distant traffic were all noted. 36 Page 36

46 5.1. R17, Night Measurement 2 Environmental Noise Levels At R17 28 Jun 12, 0159 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Train and road traffic tyre noise LA1: 46 db LA10: 42 db LAeq: 39 db LA90: 33 db LA1,1min: 28 db LAeq: < db MCC continuum and road traffic engine noise in report Figure 29 Environmental Noise Levels, R17 Colvin RDT engine, exhaust and transmission noise were regularly audible and generated the MCC L Aeq,15min of less than db and L A1,1min of 28 db. Road traffic tyre and engine noise and a train combined to generate all measured levels. 37 Page 37

47 R, Day Measurement 1 Environmental Noise Levels At R 27 Jun 12, 12 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic tyre noise LA1: 51 db LA10: 49 db LAeq: 46 db LA90: 42 db LAeq: Inaudible Distant aeroplane noise in report Figure Environmental Noise Levels, R - Gordon MCC was inaudible. Road traffic noise was primarily responsible for all measured levels. An aeroplane was a minor contributor to the measured L A1, L A10 and L Aeq. Birds and breeze in the foliage and on the microphone were noted. 38 Page 38

48 R, Day Measurement 2 Environmental Noise Levels At R 27 Jun 12, 16 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic tyre noise LA1: 52 db LA10: 49 db LAeq: 46 db LA90: 41 db LAeq: Inaudible Aeroplane noise in report Figure 31 Environmental Noise Levels, R - Gordon MCC was inaudible. Road traffic tyre noise generated measured levels. A train was a minor contributor to the measured L A1. A plane, birds and breeze in the foliage were also noted. 39 Page 39

49 R, Evening Environmental Noise Levels At R 27 Jun 12, hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic tyre noise LA1: 52 db LA10: 48 db LAeq: 43 db LA90: 33 db LAeq: Inaudible Road traffic engine noise in report Figure 32 Environmental Noise Levels, R - Gordon MCC was inaudible. Road traffic tyre and engine noise was responsible for measured levels. Dogs, an aeroplane and breeze in the foliage were all noted. Page

50 R, Night Measurement 1 Environmental Noise Levels At R 28 Jun 12, 0007 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Road traffic and train noise Frogs LA1: db LA10: 41 db LAeq: 37 db LA90: 29 db LA1,1min: Inaudible LAeq: Inaudible in report Figure 33 Environmental Noise Levels, R - Gordon MCC was inaudible. Road traffic tyre noise and a train were responsible for all measured levels. Frogs were a minor contributor to all measured levels. Breeze in foliage was noted. 41 Page 41

51 5.1. R, Night Measurement 2 Environmental Noise Levels At R 28 Jun 12, 0222 hours LA1 LA10 LAeq LA90 LA1 LA10 LAeq LA90 Train and road traffic tyre noise LA1: 51 db LA10: 44 db LAeq: 43 db LA90: 26 db LA1,1min: Inaudible LAeq: Inaudible Road traffic engine noise in report Figure 34 Environmental Noise Levels, R - Gordon MCC was inaudible. Road traffic tyre and engine noise and a train were responsible for all measured levels. Frogs were noted. 42 Page 42

52 6 SUMMARY A noise survey was conducted around Muswellbrook Coal operations on 27 and 28 June 12. The purpose of the survey is to quantify and describe the acoustic environment around the site and compare the results with development consent conditions for the extension of MCC's No. 1 Opencut operations. Wind speed and/or temperature inversion conditions resulted in development consent criteria not always being applicable, as indicated in Table 4.2 and Table 4.3. MCC complied with the relevant limits during the June 12 survey, with the exception of R15. During the first night measurement on the 27/28 June 12, MCC exceeded the L Aeq,15min impact assessment criterion at R15. A rear dump truck engine/exhaust/fan continuum from MCC was regularly audible throughout the measurement with frequent transmission noise surges and impact noises. These sources were responsible for the MCC L Aeq,15min of 37 db. The OCE was contacted following this measurement and was notified that levels were exceeding relevant criterion. He advised that a number of rear dump trucks would be relocated to a different haul route and that levels should improve shortly. This exceedance of the L Aeq impact assessment criterion is not considered significant as Chapter 11 of the OEH Industrial Noise Policy deems a development to be in noncompliance only when the monitored noise level is more than 2 db above the statutory noise limit specified in the consent or licence condition. Global Acoustics Pty Ltd 43 Page 43

53 A P P E N D I X A. D EV ELOPMENT CONSENT A.1 Page A.1

54 A development consent and licence apply to the MCC operation. The noise sections are reproduced below. A.1 MCC Development Consent Noise Criteria EPA GTA Noise generated at the premises must not exceed the noise limits presented in Table 6 below: Table 6 Noise Limits () Location Day Evening Night L Aeq(15 minute) L Aeq(15 minute) L Aeq(15 minute) L (1 minute) R7 Watts R13 McMaster 51 R15 Collins 46 R16 Tuckey 46 R17 Colvin 46 R Gordon Note: The EPA has advised that in order to prevent exceedences of the project specific noise levels during adverse meteorological conditions, especially at the R13 location, the saddle between the existing overburden dumps on the northern side of the No. 1 open-cut has to increase in height from RL5 to no greater than RL Noise Acquisition Criteria The acquisition zone for noise is defined by predicted or demonstrated exceedence of the noise levels shown in Table 7 below: Table 7 Acquisition Noise Limits () Location Day Evening Night L Aeq(15 minute) L Aeq(15 minute) L Aeq(15 minute) R7 Watts R13 McMaster R15 Collins R16 Tuckey R17 Colvin R Gordon A.2 Page A.2

55 6.4.3 Interpretation of Noise Levels (a) For the purposes of condition and 6.4.2: * Day is defined as the period from 7am to 6pm Monday to Saturday and 8am to 6pm Sundays and Public Holidays; * Evening is defined as the period from 6pm to 10pm; and * Night is defined as the period from 10pm to 7am Monday to Saturday and 10pm to 8am Sundays and Public Holidays (b) Noise from the Project is to be measured within the residential boundary, or within m of the dwelling (rural stations) where the dwelling is more than m from the boundary to determine compliance with the LAeq(15 minutes) noise limit in Condition Where it can be demonstrated that direct measurement of noise from the project is impractical, the EPA may accept alternative means of determining compliance. See chapter 11 of the NSW Industrial Noise Policy. The modification factors presented in Section 4 of the NSW Industrial Noise Policy shall also be applied to the measured noise level where practical. (c) Noise from the project is to be measured at 1m (unless otherwise agreed with the property owner) from the dwelling façade, to determine compliance with the LA1(1 minute) noise limits in Condition (d) The noise emission limits identified in Condition apply under meteorological conditions of: * Wind speed up to 3 m/s at 10 metres above ground level * Temperature inversion conditions of up to 3 degreesc/m. (e) The loading of large rocks onto mine trucks is to be undertaken outside the night time period Request for independent monitoring and acquisition (a) Monitoring and Management In the event that a landowner or occupier of a non-mined owned property considers that noise from the Project is in excess of the noise level criteria as set out in Condition and MSC is satisfied that an investigation is required, the Applicant shall upon the receipt of a written request from MSC: (i) consult with the landowner or occupants affected to determine their concerns; (ii) make arrangements for, and bear the costs of, following consultation as far as reasonably practicable with other mine operations in the vicinity where necessary, appropriate independent noise investigations in accordance with the Noise Management Plan to the satisfaction of MSC, to quantify the impact and determine the source of the effect and the contribution of the Project to the effect; (iii) modify the mining activity in accordance with a noise reduction plan prepared as part of the Noise Management Plan, if exceedence are demonstrated by the investigation to result in part from the mine related activity. This shall include: * introduction of additional controls, either on noise emission from individual sources on the site or on site operations or modify operations, to ensure that the noise criteria in Condition is achieved as far as possible, or; * seek agreement of the landowner, and in the case of the cumulative impacts the other relevant mines/industrial operations, to undertake noise mitigation measures A.3 Page A.3

56 at the dwelling to achieve a level which is at least 10 below the relevant external noise criterion; and * seek agreement of the landowner, and in the case of cumulative impacts with the other relevant mines/ industrial operations in the area and the landowner, to provide such other forms of benefit or amelioration of the impacts of noise as may be agreed between the parties as providing acceptable compensation for the noise levels experienced. (iv) conduct follow up investigations to the satisfaction of MSC, where necessary. If necessary, the follow up investigation should be conducted 3 months after the initial investigation to give MCC time to implement the recommended noise control. (b) Acquisition (i) If the independent noise investigation(s) in sub clause (a) above confirm that the noise acquisition criteria of condition is being exceeded by the Project alone, and the measures in Condition do not reduce the levels below this criteria, the Applicant shall at the written request of the landowner acquire the relevant property. Acquisition shall be in accordance with the procedures set out in condition (ii) If the independent noise investigations in Condition confirm that the noise acquisition criteria is being exceeded as a result of cumulative impacts, including a contribution from the Project, the Applicant shall enter into consultation with neighbouring mines for the purchase of the affected property in accordance with the Condition Should the Applicant not be able to formulate a joint acquisition agreement with neighbouring mines in accordance with Condition 11.1 the Applicant shall at the written request of the owner acquire the relevant property. Acquisition shall be in accordance with the procedures set out in Condition 11.1 (c) If continued complaints and noise investigation confirm that the noise criteria is being exceeded as a result of the contribution from the Project, but are less than the noise acquisition criteria, the Applicant shall negotiate with the landowner until a resolution to the satisfaction of MSC is reached. (d) If a landowner disputes any noise mitigation or other measures proposed by the Applicant in accordance with sub-clause (a) above, the matter shall be referred by either the Applicant or landowner to MSC. If the matter cannot be resolved within 21 days, the matter shall be referred to the Independent Dispute Resolution Process. (e) Further independent investigations shall cease if MSC is satisfied that the relevant criterion in Condition (a) is not being exceeded and are unlikely to be exceeded in the future. A.1.1 Environment Protection Licence On 12 August 04 Muswellbrook Coal Company Ltd was issued with a variation to Environment Protection Licence No. 6 for coal mining. Section 6.1 of the licence details the noise requirements and are reproduced below. A.4 Page A.4

57 L6 Noise Limits L6.1 Noise from the premises must not exceed the noise limits presented in the table below: Location Day Evening Night L Aeq(15 minute) L Aeq(15 minute) L Aeq(15 minute) L (1 minute) R7 (RG&GA Watts) R13 (McMaster) 51 R15 (Collins) 46 R16 (Tuckey) 46 R17 (Colvin) 46 R (Gordon) Where LAeq means the equivalent continuous noise level the level of noise equivalent to the energy-average of noise levels occurring over a measurement period. L6.2 For the purposes of condition L6.1: Day is defined as the period from 7am to 6pm Monday to Saturday and 8am to 6pm Sundays and Public Holidays; Evening is defined as the period 6pm to 10pm; and Night is defined as the period from 10pm to 7am Monday to Saturday and 10pm to 8am Sundays and Public Holidays. L6.3 Noise from the premises is to be measured within the residential boundary, or within m of the dwelling (rural situations) where the dwelling is more that m from the boundary to determine compliance with the LAeq(15 minute) noise limits in condition L6.1. Where it can be demonstrated that direct measurement of noise from the premises is impractical, the EPA may accept alternative means of determining compliance. L6.4 Noise from the premises is to be measured at 1m from the dwelling façade to determine compliance with the LA1( noise limits in condition L6.1. A.5 Page A.5

58 Appendix B. CALIBRATION CERTIFICATES B.1 Page B.1

59 B.2 Page B.2

60 B.3 Page B.3

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Reference:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Prepared for Castlereagh Coal Page i Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Reference: Report date: 28 June

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Reference:

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring Quarter 4 2009 Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 4, 2009 Environmental Noise Monitoring Reference: 09244_R01.doc

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Rix's Creek Coal Mine

Rix's Creek Coal Mine Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Prepared for Rix's Creek Pty Ltd Page i Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Reference: Report date: 5

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Prepared by on behalf of Mackas Sand Pty Ltd Project

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO. 01127-E VERSION A APRIL 2017 PREPARED FOR HANSON CONSTRUCTION MATERIALS PTY LTD LOT 151 PEATS RIDGE ROAD CALGA NSW 2250 DOCUMENT CONTROL Version

More information

Compliance Noise Survey & Assessment

Compliance Noise Survey & Assessment John Trotter Compliance Noise Survey & Assessment Duralie Coal October 2009 Issued October 2009 Vipac Engineers & Scientists Ltd Hunter Valley / Newcastle, NSW REPORT NO: 29N-09-0002-TRP-470219-0 PREPARED

More information

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2. Bloomfield Colliery Quarterly Noise Monitoring and Compliance Assessment September 2015 Report Number Q59 630.01053-R2 15 October 2015 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version:

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870 ENVIRONMENTAL NOISE MONITORING QUARTER 1, 2018 s PO Box 995 Parkes NSW 2870 Job No: J38252 Report issued: 25 June 2018 ESP ENVIRONMENTAL & SAFETY PROFESSIONALS A division of Enviro-Net Australia Pty. Ltd.

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

Roche Ireland Limited

Roche Ireland Limited Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No.

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2014 Reference: 233710 Prepared for: EnergyAustralia NSW Revision: 2 25 March 2014 Mt Piper Power Station

More information

Engineering a Sustainable Future for Our Environment

Engineering a Sustainable Future for Our Environment NOISE COMPLIANCE REPORT FOR MULTIQUIP AGGREGATES 5152 OALLEN FORD ROAD, BUNGONIA Prepared for: Alexander Cox, Environmental Officer Multiquip Aggregates Prepared by: Peter Gangemi, Acoustic Engineer R

More information

Offaly County Council

Offaly County Council Derryclure Landfill Facility, Derryclure, Co. Offaly Annual Monitoring Report Waste Licence Reg. No. W0029-04 Report Date: th October 15 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

STRATFORD MINING COMPLEX

STRATFORD MINING COMPLEX STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: 630.11771-R10 Version No: v1.0 PREPARED BY SLR Consulting Australia Pty Ltd ABN 29 001 584 612 10 Kings

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

Status: Rev: Comments Date: Author: Reviewer:

Status: Rev: Comments Date: Author: Reviewer: PAKENHAM EAST PRECINCT STRUCTURE PLAN CITY GATE NOISE ASSESSMENT Rp 002 R03 20171135 28 May 2018 Marshall Day Acoustics Pty Ltd ABN: 53 470 077 191 6 Gipps Street Collingwood VIC 3066 Australia T: +613

More information

Assessing the accuracy of directional real-time noise monitoring systems

Assessing the accuracy of directional real-time noise monitoring systems Proceedings of ACOUSTICS 2016 9-11 November 2016, Brisbane, Australia Assessing the accuracy of directional real-time noise monitoring systems Jesse Tribby 1 1 Global Acoustics Pty Ltd, Thornton, NSW,

More information

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016.

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016. Duralie Coal Ltd PO Box 168, GLOUCESTER NSW 2422 www.duraliecoal.com.au Version: v1.1 Page 2 PREPARED BY: ABN 29 001 584 612 10 Kings Road New Lambton NSW 2305 Australia (PO Box 447 New Lambton NSW 2305

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2016 Reference: 246493-002 Prepared for: EnergyAustralia NSW Revision: 3 26 April 2016 Document Control Record

More information

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-B BASELINE NOISE SURVEY 20-B BASELINE NOISE SURVEY Noise Sensitive Receptors A desk-based study and site walkover

More information

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting KEYSBROOK ENVIRONMENTAL NOISE COMPLIANCE REPORTING Q1 2016 MZI RESOURCES LTD 1370900-5-100-Rev2-18.Feb.2016 www.svt.com.au Perth Brisbane Kuala Lumpur Bangkok Noise Vibration Corrosion Safety Reliability

More information

STRATFORD MINING COMPLEX

STRATFORD MINING COMPLEX STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: 630.11771-R06 Version No: v0.1 PREPARED BY SLR Consulting Australia Pty Ltd ABN 29 001 584 612 10 Kings

More information

Noise Monitoring Program. for the. Integra North Open Cut Coal Mine

Noise Monitoring Program. for the. Integra North Open Cut Coal Mine . Integra Coal Operations Pty Ltd ABN: 96 118 030 998 Noise Monitoring Program for the Integra North Open Cut Coal Mine Including a Noise Management Protocol Integra Coal Operations Pty Ltd ABN: 96 118

More information

Statement of Evidence of N I Hegley

Statement of Evidence of N I Hegley IN THE MATTER AND IN THE MATTER of the Resource Management Act 1991 of Notices of Requirement to enable the construction, operation and maintenance of the City Rail Link. Statement of Evidence of N I Hegley

More information

McGill Environmental Ltd.

McGill Environmental Ltd. McGill Environmental Ltd. Coom, Glenville, Co. Cork Environmental Noise Survey Report Date: 7 th October 2016 For inspection purposes only. KD Environmental Ltd. 1 Swiftbrook Glen, Virginia, Co. Cavan

More information

Template Planning Condition on Amplitude Modulation Noise Guidance Notes

Template Planning Condition on Amplitude Modulation Noise Guidance Notes www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction

More information

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015 SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r02 2014432SY 23 October 2015 4/46 Balfour St Chippendale NSW 2008 T: +612 9282 9422 Fax: +612 9281 3611 www.marshallday.com

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate Noise Management Plan Date November 2014 Issue No 1 TABLE OF CONTENTS 1. Introduction/Purpose 2. Responsibility and Authority 3. Noise Monitoring 4.

More information

Environmental Management System

Environmental Management System Printed Date: PORT KEMBLA COAL TERMINAL HSEC Noise Management Plan Printed By: Management Plan MP.HS.387 Status:Approved Version:7.0 Doc ID:387 Page 1 of 38 Environmental Management System Noise Management

More information

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate Noise Management Plan Date 31/7/15 Issue No 2e DRAFT TABLE OF CONTENTS 1. Policy Statement 2. Introduction/Purpose 3. Responsibility and Authority

More information

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018 1/8 Project Title Client Document Reference No. Laing O Rourke Project No. Noise Monitoring Sydney Metro City and Southwest LOR-NCW-Noise Monitoring WE08_ OOHW P1-6 - 250818_260818.docx K38 Document Date

More information

Assessment of rail noise based on generic shape of the pass-by time history

Assessment of rail noise based on generic shape of the pass-by time history Proceedings of Acoustics 23 Victor Harbor 7-2 November 23, Victor Harbor, Australia Assessment of rail noise based on generic shape of the pass-by time history Valeri V. enchine, Jonathan Song Science

More information

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW Postal Address P.O. Box 432 Gladesville N.S.W. 1675 AUSTRALIA A.C.N. 068 727 195 A.B.N. 19 068 727 195 Telephone: 02 9879 4544 Fax: 02 9879 4810 Email: AtkinsAcoustics@bigpond.com.au Atkins Acoustics and

More information

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1 Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC Final Report Rev 1 Noise Impact Assessment RWDI # 1502274 SUBMITTED TO Paul Dufault Project Manager Metro Vancouver 4330

More information

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary Sheringham Shoal Cawston, Norfolk Substation Noise Assessment Summary Document title: Substation Noise Assessment Summary Status: Final Date: 13 March 2015 Project name: Sheringham Shoal, Cawston, Norfolk

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times 765 kv Substation Acoustic Noise Impact Study by Predictive Software and

More information

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES Jeffrey Parnell NSW Department of Planning and Environment Sydney NSW, Australia Email: jeff.parnell@planning.nsw.gov.au Abstract The NSW Department of Planning

More information

Bancroft & Piedmont Cellular Facility

Bancroft & Piedmont Cellular Facility Page 1 of 19 Environmental Noise Analysis Bancroft & Piedmont Cellular Facility Berkeley, California BAC Job # 2015-177 Prepared For: Complete Wireless Consulting Attn: Ms. Kim Le 2009 V Street Sacramento,

More information

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Proceedings of Acoustics 2012 - Fremantle Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Jingnan Guo, John Macpherson and Peter Popoff-Asotoff Noise Regulation Branch,

More information

UC Berkeley Northside Relocation Cellular Facility

UC Berkeley Northside Relocation Cellular Facility Page 1 of 19 Environmental Noise Analysis UC Berkeley Northside Relocation Cellular Facility Berkeley, California BAC Job # 2015-290 Prepared For: Complete Wireless Consulting Attn: Kim Le 2009 V Street

More information

Noise results for PF Formation- September 2017

Noise results for PF Formation- September 2017 Location 1. Toratola Property Hitchcock Road Applicable Measurement Date/Time Criterion Level description [db] Noise results for PF Formation- September 2017 Measured Noise Level LAeq [db] Measured L1

More information

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Raging River Quarry Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Introduction The Raging River Quarry operates in unincorporated King County, near Fall City, Washington. King

More information

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Date: 09 March 2016 REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Client: Edinburgh Limited Report Author:... Dr R. Peters Principal Consultant

More information

R e p o r t th A u g u s t

R e p o r t th A u g u s t N o ise Mon it o r ing R e p o r t L e g a c y W a y T u n n e l M o n i t o r i n g P o s t C o m m is s i o n ing T es ts V e n ti la t ion S t a c ks Jun e 20 1 6 R e p o r t 3557 4 th A u g u s t 2

More information

REVISED NOISE IMPACT STUDY

REVISED NOISE IMPACT STUDY REVISED NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Integral DX Engineering Ltd. Page 2 of 24 TABLE OF CONTENTS 1.0 INTRODUCTION

More information

ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE

ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE ECOACCESS GUIDELINE FOR THE ASSESSMENT OF LOW FREQUENCY NOISE Cedric Roberts Environmental Operations, Integrated Assessment, Queensland Environmental Protection Agency, 160 Ann Street, Brisbane, Queensland,

More information

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS PORT OF NAPIER WHARF 6 FUTURE PORT NOISE MAPS (2026) Rp 004 r02 2015784A 20 September 2016 84 Symonds Street PO Box 5811 Wellesley Street Auckland

More information

Protocol for Ambient Level Noise Monitoring

Protocol for Ambient Level Noise Monitoring July 2015 Protocol for Ambient Level Noise Monitoring L pressure =10.log [10 (Lp/10) - 10 (LpBackground/10) ] L pressure = 10.log [10 (Lp/10) - 10 (LpBackground/10) ] CENTRAL POLLUTION CONTROL BOARD P

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia ICSV14 Cairns Australia 9-12 July, 2007 ACOUSTIC BARRIER FOR TRANSFORMER NOISE Ruisen Ming SVT Engineering Consultants, Leederville, WA 6007, Australia Roy.Ming@svt.com.au Abstract In this paper, an acoustic

More information

APPENDIX F BASELINE NOISE REPORT

APPENDIX F BASELINE NOISE REPORT APPENDIX F BASELINE NOISE REPORT APPENDIX F BASELINE NOISE REPORT F BASELINE NOISE REPORT Contents Summary A Baseline Noise Report was prepared for Damhead Creek 2. This is presented in this Appendix

More information

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study Project Number 11-107 Douglas P. Koehn, M.S. Senior Consultant 12040 SOUTH LAKES DRIVE, SUITE 104, RESTON, VIRGINIA

More information

Noise Study for Proposed Mavis Tire

Noise Study for Proposed Mavis Tire Noise Study for Proposed Mavis Tire Hyde Park, New York April 4, 2017 Prepared For: Town of Hyde Park Planning Board 4383 Albany Post Road Hyde Park, NY 12538 Prepared By: Novus Engineering, P.C. 25 Delaware

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare Bray (Co. Wicklow) 01 276 1428 Lisburn (Co. Antrim) 028 9262 6733 Birmingham (U.K.) 0121 673 1804 Blackrock (Co.Cork) 021 4536155 Noise Monitoring Report 2017 For Schloetter (Ireland) Ltd. Naas Enterprise

More information