1 John Trotter Compliance Noise Survey & Assessment Duralie Coal October 2009 Issued October 2009 Vipac Engineers & Scientists Ltd Hunter Valley / Newcastle, NSW

2 REPORT NO: 29N TRP PREPARED FOR: P.O. Box 168 Gloucester NSW 2422 DOCUMENT CONTROL Compliance Noise Survey & Assessment Duralie Coal PREPARED BY: Vipac Engineers & Scientists Ltd Shop 5 Shopping Village, Laycock Street CAREY BAY NSW 2283 AUSTRALIA huntervalley@vipac.com.au Contact: John Trotter Phone: Phone: Fax : Fax : AUTHOR: REVIEWED/APPROVED BY: Simon RITCHIE Date: 30 th October 2009 Project Engineer REVISION HISTORY: Paul Stokes Date: 30 th October 2009 Reviewing Engineer Revision No. Date Issued Reason/Comments 0 30 th October 2009 Initial Issue DISTRIBUTION: Copy No._2_ KEYWORDS: Location 1 Project 2 UNCONTROLLED COPY Client pdf format 3 Client Mining, Noise Survey, Environmental NOTE: This is a controlled document within the document control system. SUPERSEDED and returned to the Vipac QA Representative. If revised, it must be marked Commercial_In_Confidence Issued October 2009 Page 2 of 28

3 EXECUTIVE SUMMARY Vipac Engineers & Scientists Ltd (VIPAC) was engaged to undertake Environmental Compliance Noise Monitoring in the rural environment surrounding the Duralie Coal (DCM) Site, Bucketts Way, Stroud Road NSW. The purpose of the assessment was to conduct ambient noise monitoring in accordance with the Department of Planning (DoP) Development Consent Modification Schedule 3 Condition 2, dated 2006 and the Environmental Protection Authority (EPA), now Department of Environment, Climate Change and Water (DECCW) Environmental Pollution Licence (EP1701), Section L6.1, Noise Limits. The noise monitoring survey commenced at 15:26hrs on Tuesday 20 th October and ended at 01:50hrs on Wednesday 21 st October Day-time Operator Attended Impact Assessment 20 th October 2009 DCM operation (15 minute) noise emissions during the daytime attended noise-monitoring period, under the prevailing weather conditions were as follows: Monitoring Locations Sound Pressure Level Noise Criteria Excursion AAS1 Lyall Nil 0 N2 S Doherty 33 0 AS3 Jensen Nil 0 Evening-time Operator Attended Impact Assessment 20 th October 2009 DCM operation (15 minute) noise emissions during the evening-time attended noise-monitoring period, under the prevailing weather conditions were as follows: Monitoring Locations Sound Pressure Level Noise Criteria Excursion AAS1 Lyall Nil 0 N2 S Doherty < 0 AS3 Jensen Nil 0 Night-time Operator Attended Impact Assessment 20 th /21 st October 2009 DCM operation (15 minute) noise emissions during the nighttime attended noise-monitoring period, under the prevailing weather conditions were as follows: Monitoring Locations Sound Pressure Level Noise Criteria Excursion AAS1 Lyall Nil, < 0, 0 N2 S Doherty 39, 30 See Section 5.6 AS3 Jensen Nil, Nil 0, 0 Commercial_In_Confidence Issued October 2009 Page 3 of 28

4 Assessment of Compliance operating noise emissions were at or below the noise criteria at AS3 and AAS1 monitoring locations during the October 2009 Environmental Noise Level Survey. Noise from the mine at N2 was predicted to have been enhanced due to the effects of temperature inversion and wind enhancement. Sigma-theta data indicated a moderate to strong temperature inversion (G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, it is probable that the recorded 39dB mine contribution at N2 S. Doherty may have been significantly enhanced by weather conditions at the time, particularly as the second night survey measurement at the site yielded significantly reduced mine related noise. As stated in the conditions of consent Schedule 3 note c), the criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria may not be applicable in this case. The nominated monitoring locations represent the closest residences to the mine so that further located properties will receive mine noise levels somewhat lower than those measured, due to distance attenuation under stable atmospheric conditions. Under the prevailing weather conditions and based on the attended monitoring results it is concluded that mine noise emissions did not breach the applicable criteria at any nearby residence during the October 2009 survey. Commercial_In_Confidence Issued October 2009 Page 4 of 28

5 TABLE OF CONTENTS 1. INTRODUCTION DEFINITIONS OF ACOUSTICAL TERMS DURALIE COAL MINE SITE DESCRIPTION DESCRIPTION OF OPERATION METHODOLOGY OPERATOR ATTENDED NOISE SURVEYS INSTRUMENTATION MONITORING LOCATIONS MONITORING WEATHER CRITERIA TEMPERATURE INVERSION CONDITIONS RESULTS DCM PLANT/EQUIPMENT Day Shift DCM Operations Night Shift DCM Operations NOISE SURVEY WEATHER CONDITIONS DAY SURVEY Attended Measurement Results - Day Survey Analysis Day Survey EVENING SURVEY Attended Measurement Results Evening Survey Analysis Evening Survey NIGHT SURVEY Attended Measurement Results Night Survey Analysis Night Survey COMPLIANCE ASSESSMENT DISCUSSION & CONCLUSION APPENDIX A: WEATHER CONDITIONS... APPENDIX B: LOCALITY MAP & SURVEY LOCATIONS Commercial_In_Confidence Issued October 2009 Page 5 of 28

6 LIST OF FIGURES FIGURE 1: DAY SURVEY, AAS1 20 TH OCT FIGURE 2: DAY SURVEY, REFERENCE SITE 20 TH OCT FIGURE 3: DAY SURVEY, N2 20 TH OCT FIGURE 4: DAY SURVEY, AS3 20 TH OCT FIGURE 5: EVENING SURVEY, AS3 20 TH OCT FIGURE 6: EVENING SURVEY, AAS1 20 TH OCT FIGURE 7: EVENING SURVEY, REFERENCE SITE 20 TH OCT FIGURE 8: EVENING SURVEY, N2 20 TH OCT FIGURE 9: NIGHT SURVEY, AS3 22:46HRS 20 TH OCT FIGURE 10: NIGHT SURVEY, AS3 23:02HRS 20 TH OCT FIGURE 11: NIGHT SURVEY, AAS1 23:41HRS 20 TH OCT FIGURE 12: NIGHT SURVEY, AAS1 00:00HRS 21 ST OCT FIGURE 13: NIGHT SURVEY, REFERENCE SITE 00:27HRS 21 ST OCT FIGURE 14: NIGHT SURVEY, N2 01:01HRS 21 ST OCT FIGURE 15: NIGHT SURVEY,N2 01:HRS 21 ST OCT FIGURE 16: WEATHER STATION - WIND SPEED...26 FIGURE 17: WEATHER STATION WIND DIRECTION...27 FIGURE 18: PREDICTED TEMPERATURE INVERSION STRENGTH...27 FIGURE 19: DCM AND SURROUNDS, LOCATION MAP...28 LIST OF TABLES TABLE 1: ACOUSTICAL TERMS AND DEFINITION...7 TABLE 2: MONITORING LOCATIONS...9 TABLE 3: PASQUIL-GIFFORD STABILITY CATEGORIES BASED ON SIGMA-THETA...11 TABLE 4: FREQUENCY OF OCCURRENCE OF STABILITY CLASSES...11 TABLE 5: ATTENDED NOISE MEASUREMENTS & PREVAILING WEATHER CONDITIONS...13 TABLE 6: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS DAYTIME...23 TABLE 7: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS EVENING TIME...23 TABLE 8: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS NIGHT TIME...23 TABLE 9: PERIODIC WEATHER DATA... Commercial_In_Confidence Issued October 2009 Page 6 of 28

7 1. INTRODUCTION Vipac Engineers & Scientists Ltd (VIPAC) was engaged to undertake Environmental Compliance Noise Monitoring in the rural environment surrounding the Duralie Coal (DCM) Site, Buckets Way, Stroud Road NSW. The purpose of the assessment was to conduct ambient noise monitoring in accordance with the Department of Planning (DoP) Development Consent Modification Schedule 3 Condition 2, dated 2006 and the Environmental Protection Authority (EPA), now Department of Environment, Climate Change and Water (DECCW) Environmental Pollution Licence (EP1701), Section L6.1, Noise Limits. The noise monitoring survey commenced at 15:00hrs on Tuesday 20 th October and ended at 01:50hrs on Wednesday 21 st October DEFINITIONS OF ACOUSTICAL TERMS Table 1 provides the definitions of common acoustical terms and is presented as an aid to understanding this report. TABLE 1: ACOUSTICAL TERMS AND DEFINITION Term Lw L P Leq Definition A unit of measurement in decibels (A), of sound pressure level which has its frequency characteristics modified by a filter ("A-weighted") so as to more closely approximate the frequency response of the human ear. Sound Power Level radiated by a noise source per unit time re 1pW. Sound pressure level (SPL) or sound level L p is a logarithmic measure of the rms sound pressure of a sound relative to a reference value. Equivalent Continuous Noise Level - which, lasting for as long as a given noise event has the same amount of acoustic energy as the given event. The noise levels that is equalled or exceeded for 90% of the measurement period. An indicator of the mean minimum noise level, and is used in Australia as the descriptor for background or ambient noise (usually in ). The noise levels that is equalled or exceeded for 10% of the measurement period. is an indicator of the mean maximum noise level, and is generally used in Australia as the descriptor for intrusive noise (usually in ). Commercial_In_Confidence Issued October 2009 Page 7 of 28

8 2. DURALIE COAL MINE 2.1. SITE DESCRIPTION DCM is located east of the Bucketts Way between the villages of Stroud Road and Wards River, NSW DESCRIPTION OF OPERATION The following activities have the potential to generate noise during DCM operations: Operation of mobile equipment (e.g. excavators, loaders, haul trucks, dozers, graders, and water carts) for: Vegetation removal and stripping/stockpiling of soil resources; Open cut development and production; and Haulage of raw coal and mine waste; Operation of fixed plant (e.g. ROM bin, raw coal conveyor, bin loading/unloading, lighting plant and pit pumps); and, Rail transportation of coal on the mining lease. 3. METHODOLOGY Ambient noise level measurements were conducted in accordance with the requirements of the Department of Environment, Climate Change and Water, (DECCW), and as detailed in the Australian Standard AS , "Acoustics - Description and Measurement of Environmental Noise, Part 1 General Procedures" OPERATOR ATTENDED NOISE SURVEYS The operator-attended surveys were conducted at each monitoring location to quantify ambient noise levels and the contributed levels of noise emitted from current Duralie Mining operations. The day, evening and night survey was conducted as follows: Daytime - conducted between 15:26hrs 17:hrs Tuesday 20 th October 2009; Evening - conducted between 18:46hrs 21:05hrs Tuesday 20 th October 2009; Night - conducted between 22:46hrs Tuesday 20 th 01:50hrs Wednesday 21 st October The mine noise contribution can be determined using the following methods: For mine noise emissions that are continuous in nature, the Engineer determines the s noise contribution by noting the instantaneous meter reading when the mine was clearly audible and dominant. When the mine noise emissions are transient or frequency specific, time trace and frequency spectra recordings are analysed by removal of data from extraneous sources to determine the mine s L Aeq contribution. If the above methods are not possible, the mine s contribution can be determined by noting the relative audibility of mining activities at otherwise quiet times and establishing the difference in received sound level between the mine s activities and the background noise level. Commercial_In_Confidence Issued October 2009 Page 8 of 28

9 A scale of audibility is provided to gain a general understanding of the mining operations noise levels received at the nearby residential locations. Clearly Audible: Audible: Faintly Audible: Not Audible: Background noise level ( ) plus 3 and greater. Background noise level ( ) plus/minus 3. Background noise level ( ) minus 3 to 8. Background noise level ( ) minus 8 and less INSTRUMENTATION Attended noise measurements were taken with Brüel & Kjær (B&K) 20 integrating sound level meters, each fitted with a B&K 4189 ½-inch diameter Elect-ret microphone and a windshield. These instruments have performance characteristics within the requirements of Type 1 accuracy in accordance with AS 19 and AS IEC and have the capability to measure steady, fluctuating, intermittent and/or impulsive sound, and to compute and display percentile noise levels for the measuring period. During the attended surveys a B&K 20 instrument was used to record a 1/3-octave time trace of each 15-minute measurement enabling detailed analysis of the acoustic environment. An audio recording function was utilised to enable crosschecking of the sample data where required. Noise levels over the 15-minute periods were calculated and stored in the B&K 20 at the monitoring location during the surveys. The identifiable noise sources and their contributions were ranked in order of prominence MONITORING LOCATIONS Monitoring locations are described in Table 2 below where operator attended noise monitoring was conducted and are shown on the Map of the Area, Appendix B. TABLE 2: MONITORING LOCATIONS Location Resident/ Owner Address AAS1 2 Lyall Off Johnson Creek Road N2 S. Doherty 863 Johnson Creek Road AS3 2 Jensen Duralie Road REF 1 Site W4 Johnson Creek Road Note: 1 Reference Site mine owned dwelling used as additional noise monitoring location. 2 Alternative noise monitoring site MONITORING WEATHER The mine weather station compound is located centrally on the mining lease. Meteorological data from this location is collected by the mine management and provided to Vipac for analysis. Data is presented in fifteen-minute intervals in Appendix A of this report including meteorological parameters such as wind direction, wind speed, temperature, sigma-theta and rainfall. Commercial_In_Confidence Issued October 2009 Page 9 of 28

10 4. CRITERIA The DECCW s Environmental Pollution Licence (EP1701) L6.1 Noise Limits states the following: L6.1 Operational Noise from the premises must not exceed: Noise Limits`1 Location Period Intrusive Criteria Leq(15 minute) SOUTHERN SITE (N1) Boundary of DCM controlled land adjacent to Johnson Creek Road 2 Day, Evening & Night S DOHERTY (N2) Day, Evening & Night AJ & DM HARRISON (N3) 3 Day, Evening & Night Note: 1. The noise emissions identified in L6.1 apply for prevailing meteorological conditions (winds up to 3ms -1 ), except under conditions of temperature inversions. 2. An alternative noise monitoring site AAS1 Lyall, which is the closest non-mine owned dwelling in the vicinity of N1 relative to mine operations (refer to site map in Appendix B). 3. An alternative noise monitoring site AS3 (T. Jensen), which is the closest non-mine owned dwelling in the vicinity of N3 relative to mine operations (refer to site map in Appendix B). Furthermore, DCM obtained approval from Department of Planning for the Duralie Coal extension Section 96(2) Modification Notice of Modification dated 30th July 2006 (DA No. 169/99). The relevant noise criterion is given in Schedule 3 Condition 2 and is reproduced below. SCHEDULE 3 NOISE Noise Impact Assessment Criteria 2. The Applicant shall ensure that the noise generated by the development does not exceed the noise impact assessment criteria in (Extract) Table 2. (EXTRACT) TABLE 2: NOISE IMPACT ASSESSMENT CRITERIA DB(A) Day Evening Night L Aeq (15 minute) L Aeq (15 minute) L Aeq (15 minute) Land Number Woodley Trigg N Relton (old) S Relton (new) Guidice 124 Zulomovski 1 Hare-Scott All other privately owned land excluding the land listed in Table 1 Notes: a) Noise from the development is to be measured at the most affected point or within the residential boundary, or at the most affected point within 30 metres of a dwelling (rural situations) where the dwelling is more than 30 metres from the boundary, to determine compliance with the L Aeq(15 minute) noise limits in the above table. Where it can be demonstrated that direct measurement of noise from the development is impractical, the Department and the DECCW may accept alternative means of determining compliance (see Chapter 11 of the NSW Industrial Noise Policy). The modification factors in Section 4 of the NSW Industrial Noise Policy shall also be applied to the measured noise levels where applicable. b) Noise from the development is to be measured at 1 metre from the dwelling façade to determine compliance with the L A1(1 minute) noise limits in the above table. Where it can be demonstrated that direct measurement of noise from the development is impractical, the Department and the DECCW may accept alternative means of determining compliance (see Chapter 11 of the NSW Industrial Noise Policy). c) The emission limits identified in the above table apply under meteorological conditions of: Wind speeds of up to 3 m/s at 10 metres above ground level: or Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level. Commercial_In_Confidence Issued October 2009 Page 10 of 28

11 4.1. TEMPERATURE INVERSION CONDITIONS Meteorological data provided by Duralie Coal and calculated Pasquil Stability Categories allows for the prediction of wind and temperature profiles to within a moderately narrow range without recourse to actual measurement. The sigma-theta method developed by the US EPA is employed to determine the occurrence of different stability classes and refers to observations of sigma theta, wind speed and time of day. The Pasquil stability method categories may be determined by using a relationship between stability categories and standard deviation of the horizontal wind direction fluctuations and wind speed as shown in Table 3. TABLE 3: PASQUIL-GIFFORD STABILITY CATEGORIES BASED ON SIGMA-THETA Daytime Pasquil Stability Category Standard deviation of the horizontal wind direction fluctuations ( A in degrees) A A 22.5 B 17.5 A < 22.5 C 12.5 A < 17.5 Wind 10m (ms -1 ) < < < Night-time Pasquil Stability Category D 7.5 A < 12.5 Any D E 3.8 A < to 5 E F 2.1 A < to 3 F G A 2.1 < 2 G Note: Daytime stability category is calculated using A only; Nighttime stability category is determined using A and wind speed at 10m. Once the stability category is known the range of possible temperature gradients may be inferred as shown in Table 4 along with estimates of the stability frequency. Stability Class TABLE 4: FREQUENCY OF OCCURRENCE OF STABILITY CLASSES Percentage Frequency 1 Percentage Frequency 2 Range of vertical temperature gradient DT/DZ ( O C/100 m) F E D F E D E D Qualitative Description A 50.0% 0.0% DT/DZ < -1.9 Lapse B 16.7% 0.0% -1.9 DT/DZ < -1.7 Lapse C 12.5% 0.0% -1.7 DT/DZ < -1.5 Lapse D 16.7% 54.3% -1.5 DT/DZ < -0.5 Neutral E 4.2% 14.3% -0.5 DT/DZ < 1.5 Weak Inversion F 0.0% 20.0% 1.5 DT/DZ < 4.0 Moderate Inversion G 0.0% 11.4% 4.0 DT/DZ Strong Inversion Note: 1 Based on daytime data for the measurement period 20 th 21 st Based on evening/night time data for the measurement period 20 th 21 st Based on the information above, moderate to strong inversions occurred approximately 31% of the evening/nighttime and 0% during the daytime survey period. Therefore since significant inversions are predicted to have occurred during the evening and night survey, the noise enhancing effects of temperature inversion should be considered where audible mine noise was recorded during attended monitoring. Commercial_In_Confidence Issued October 2009 Page 11 of 28

12 5. RESULTS DCM supplies information on mining plant and equipment with operating locations. The results of the day, evening, and nighttime operator attended surveys under prevailing weather conditions are presented in the following sections, together with a description of audible sounds and their contribution DCM PLANT/EQUIPMENT DAY SHIFT DCM OPERATIONS DCM operations between 0700hrs and 1730hrs on Tuesday 20 th October 2009 consisted of the following: - Coal Fleet Liebherr Excavator (Ex 5028) 9 hrs RL -20m o Cat 789 Dump Trucks (x3) Tipped at ROM pad Waste Fleet Liebherr Excavator (Ex 5002) 9 hrs RL 60m o Cat 789 Dump Trucks (x2) Tipped at RL m Liebherr Excavator (Ex 5029) 8.2 hrs RL 28m o Cat 789 Dump Trucks (x3) Tipped at RL m Support D10 Dozers (x3): roads, dumps, pit floor, dump profiling 9, 8.9 & 8.5hrs Water Cart: roads, dumps, pit floor 6 hrs 16M Grader: roads, dumps, pit floor 8.5 hrs Drill (x2): Drill Pattern 7.2 & 3.8hrs Processing Train loading 10 to 1137hrs; 13 to 10hrs and 16 to 1737hrs NIGHT SHIFT DCM OPERATIONS DCM operations between 1700hrs Tuesday 20 th October and 0530hrs Wednesday 21 st October 2009 consisted of the following: - Coal Fleet Liebherr Excavator (Ex 5002) 2. hrs RL 60m o Cat 789 Dump Trucks (x3) Tipped at ROM pad Waste Fleet Liebherr Excavator (Ex 5002) 6. hrs RL 60m o Cat 789 Dump Trucks (x3) Tipped at RL m Liebherr Excavator (Ex 5028) 9 hrs RL 34m o Cat 789 Dump Trucks (x2) Tipped at RL<40m or RL m Liebherr Excavator (Ex 5029) 9 hrs RL 28m o Cat 789 Dump Trucks (x3) Tipped at RL m Support D10 Dozers (x3): roads, dumps, pit floor, dump profiling 9, 8.9 & 8.8hrs Water Cart: roads, dumps, pit floor 4 hrs 16M Grader: roads, dumps, pit floor 8.9 hrs Lighting Plant. Train loading 1950 to 2120hrs. Processing Commercial_In_Confidence Issued October 2009 Page 12 of 28

13 5.2. NOISE SURVEY WEATHER CONDITIONS The weather conditions at the time of each attended noise measurement as obtained from the DCM Weather Station are presented in Table 5. TABLE 5: ATTENDED NOISE MEASUREMENTS & PREVAILING WEATHER CONDITIONS Weather Parameter Location Measurement Start Time (hrs) Temp. O C Cloud Cover Wind Speed 1 (ms -1 ) Wind Direction (deg.) Rainfall (mm) Day Survey 20/10/09 AAS1 15: / REF 15: / N2 16: / AS3 17: / Evening Survey20/10/09 AS3 18: / AAS1 19: / REF 20: / N2 20: / Night Survey 20-21/10/09 AS3 22: / AS3 23: / AAS1 23: / AAS1 00: / REF 00: / N2 01: / N2 01: / A complete set of weather data for the survey period obtained from DCM weather station is presented in Appendix A. 1 Note: Wind speed was checked at each location during attended noise monitoring. Noise measurements were only conducted where weather conditions were within acceptable levels at the microphone position Commercial_In_Confidence Issued October 2009 Page 13 of 28

14 5.3.DAY SURVEY ATTENDED MEASUREMENT RESULTS - DAY SURVEY AAS1 Lyall 15-Minute Time Trace 20/10/09 15:26 Nil db FIGURE 1: DAY SURVEY, AAS1 20 TH OCT 09 REF 15-Minute Time Trace 20/10/09 15:49 37 db FIGURE 2: DAY SURVEY, REFERENCE SITE 20 TH OCT 09 Commercial_In_Confidence Issued October 2009 Page 14 of 28

15 N2 S. Doherty 15-Minute Time Trace 20/10/09 16:23 33 db FIGURE 3: DAY SURVEY, N2 20 TH OCT 09 AS3 Jensen 15-Minute Time Trace 20/10/09 17:20 Nil db FIGURE 4: DAY SURVEY, AS3 20 TH OCT 09 Commercial_In_Confidence Issued October 2009 Page 15 of 28

16 ANALYSIS DAY SURVEY Noise from DCM operations was not audible at the AAS1 Lyall and AS3 Jensen monitoring locations during the day survey on the 20 th October. Noise sources recorded during these measurements included turkey farm activities, birds, sheep, dogs, aeroplanes, insects/frogs and road traffic. DCM noise contribution was Nil at these locations during the day survey. DCM operations were measured to be 33dB L Aeq 15-minute during the day survey at N2 S. Doherty on the 20 th October. noise was occasionally noted during times of low background noise and was identified to be a track dozer working high in pit. Other noise sources consisted of road traffic, birds, aeroplanes, cattle and wind in foliage. DCM noise contribution during the day survey on the 20 th October was measured to be: Nil at AAS1 Lyall, Nil at AS3 Jensen, and 33dB L Aeq 15-minute at N2 S. Doherty. Weather conditions during the survey consisted clear skies and light to moderate wind from the south and east EVENING SURVEY ATTENDED MEASUREMENT RESULTS EVENING SURVEY AS3 Jensen 15-Minute Time Trace 20/10/09 18:46 Nil db FIGURE 5: EVENING SURVEY, AS3 20 TH OCT 09 Commercial_In_Confidence Issued October 2009 Page 16 of 28

17 AAS1 Lyall 15-Minute Time Trace 20/10/09 19:44 Nil db FIGURE 6: EVENING SURVEY, AAS1 20 TH OCT 09 REF 15-Minute Time Trace 20/10/09 20:17 33 db FIGURE 7: EVENING SURVEY, REFERENCE SITE 20 TH OCT 09 Commercial_In_Confidence Issued October 2009 Page 17 of 28

18 N2 S. Doherty 15-Minute Time Trace 20/10/09 20:50 < db FIGURE 8: EVENING SURVEY, N2 20 TH OCT ANALYSIS EVENING SURVEY Noise from DCM operations was not audible at the AAS1 Lyall and AS3 Jensen monitoring locations during the evening survey on the 20 th October. Noise sources recorded during these measurements included turkey farm activities, birds, dogs, insects/frogs and road traffic. DCM noise contribution was nil at these locations during the evening survey. DCM operations were measured to be <db L Aeq 15-minute during the evening survey at N2 S. Doherty on the 20 th October. noise was occasionally noted by utilising the SLM s 1/3-octave band frequency filters. Insects and frogs dominated the noise environment at this location. DCM noise contribution during the evening survey on the 20 th October was measured to be: Nil at AAS1 Lyall, Nil at AS3 Jensen, and <db L Aeq 15-minute at N2 S. Doherty. Weather conditions during the survey consisted clear skies and light to moderate shifting winds from the west, south and east. Commercial_In_Confidence Issued October 2009 Page 18 of 28

19 5.5.NIGHT SURVEY ATTENDED MEASUREMENT RESULTS NIGHT SURVEY AS3 Jensen 15-Minute Time Trace 20/10/09 22:46 Nil db FIGURE 9: NIGHT SURVEY, AS3 22:46HRS 20 TH OCT 09 AS3 Jensen 15-Minute Time Trace 20/10/09 23:02 Nil db FIGURE 10: NIGHT SURVEY, AS3 23:02HRS 20 TH OCT 09 Commercial_In_Confidence Issued October 2009 Page 19 of 28

20 AAS1 Lyall 15-Minute Time Trace 20/10/09 23:41 Nil db FIGURE 11: NIGHT SURVEY, AAS1 23:41HRS 20 TH OCT 09 AAS1 Lyall 15-Minute Time Trace 21/10/09 0:00 < db FIGURE 12: NIGHT SURVEY, AAS1 00:00HRS 21 ST OCT 09 Commercial_In_Confidence Issued October 2009 Page 20 of 28

21 REF 15-Minute Time Trace 21/10/09 0:27 43 db FIGURE 13: NIGHT SURVEY, REFERENCE SITE 00:27HRS 21 ST OCT 09 N2 S. Doherty 15-Minute Time Trace 21/10/09 1:01 39 db FIGURE 14: NIGHT SURVEY, N2 01:01HRS 21 ST OCT 09 Commercial_In_Confidence Issued October 2009 Page 21 of 28

22 N2 S. Doherty 15-Minute Time Trace 21/10/09 1: 30 db FIGURE 15: NIGHT SURVEY,N2 01:HRS 21 ST OCT ANALYSIS NIGHT SURVEY Noise from DCM operations was not audible at the AS3 Jensen monitoring location during the night survey on the 20 th /21 st October. Noise sources recorded during these measurements included insects/frogs, aeroplanes and road traffic. DCM noise contribution was nil at this location as identified by both operator attended noise measurements during the night survey. DCM operations were measured to be nil and <db L Aeq 15-minute during the night survey at AAS1 Lyall on the 20 th /21 st October. noise was occasionally noted by utilising the SLM s 1/3-octave band frequency filters. Dogs, farm equipment, a train on the main line, and insects/frogs dominated the noise environment at this location. DCM operations were measured to be 39dB L Aeq 15-minute and 30dB L Aeq 15-minute during the night survey at N2 S. Doherty on the 20 th /21 st October. noise was identified as haul trucks, excavators and track dozers. Other noise sources consisted of insects/frogs, birds and an aeroplane. Sigma-theta data indicated a moderate to strong temperature inversion (G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, it is probable that the recorded 39dB mine contribution at N2 S. Doherty may have been significantly enhanced by weather conditions at the time, particularly as the second night survey measurement at the site yielded significantly reduced mine related noise. As stated in the conditions of consent Schedule 3 note c), the criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria may not be applicable in this case. DCM noise contribution during the night survey on the 20 th /21 st October was measured to be: Nil and <db L Aeq 15-minute at AAS1 Lyall, Nil at AS3 Jensen, and 39dB L Aeq 15-minute and 30dB L Aeq 15-minute at N2 S. Doherty. Weather conditions during the night survey consisted of light shifting winds from the northwest, west and northeast. The westerly winds present during the monitoring survey at the N2 S. Doherty location had the potential to cause significant enhancement of mine noise. Commercial_In_Confidence Issued October 2009 Page 22 of 28

23 5.6. COMPLIANCE ASSESSMENT DCM operation (15 minute) noise emissions during the attended noise-monitoring period, under the prevailing weather conditions were as follows: TABLE 6: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS DAYTIME Sound Pressure Level Noise Criteria Monitoring Locations AAS1 Lyall Nil 0 N2 S Doherty 33 0 AS3 Jensen Nil 0 Excursion As shown in Table 6, the required day noise level (criteria) was not exceeded on any occasion during the day survey. TABLE 7: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS EVENING TIME Sound Pressure Level Noise Criteria Monitoring Locations AAS1 Lyall Nil 0 N2 S Doherty < 0 AS3 Jensen Nil 0 Excursion As shown in Table 7, the required evening noise level (criteria) was not exceeded at any occasion during the evening survey. TABLE 8: RECEIVED NOISE NOISE MONITORING LOCATIONS UNDER PREVAILING WEATHER CONDITIONS NIGHT TIME Sound Pressure Level Noise Criteria Monitoring Locations Excursion AAS1 Lyall Nil, < 0, 0 N2 S Doherty 39, 30 See Comments AS3 Jensen Nil, Nil 0, 0 As shown in Table 8, the required night-time noise level (criteria) was not exceeded at AAS1 or AS3. Sigma-theta data indicated a moderate to strong temperature inversion (G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, it is probable that the recorded 39dB mine contribution at N2 S. Doherty may have been significantly enhanced by weather conditions at the time, particularly as the second night survey measurement at the site yielded significantly reduced mine related noise. As stated in the conditions of consent Schedule 3 note c), the criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria may not be applicable in this case. Commercial_In_Confidence Issued October 2009 Page 23 of 28

24 6. DISCUSSION & CONCLUSION An Environmental Compliance Noise Monitoring Survey has been carried out in the rural environment surrounding the Duralie Coal Site, Stroud Road, NSW. The survey was requested by to ascertain the degree of compliance of noise emissions generated from the operation of Duralie Coal with licence and consent conditions. operating noise emissions were at or below the noise criteria at AS3 and AAS1 monitoring locations during the October 2009 Environmental Noise Level Survey. Noise from the mine at N2 was predicted to have been enhanced due to the effects of temperature inversion and wind enhancement. Sigma-theta data indicated a moderate to strong temperature inversion (G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, it is probable that the recorded 39dB mine contribution at N2 S. Doherty may have been significantly enhanced by weather conditions at the time, particularly as the second night survey measurement at the site yielded significantly reduced mine related noise. As stated in the conditions of consent Schedule 3 note c), the criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria may not be applicable in this case. The nominated monitoring locations represent the closest residences to the mine so that further located properties will receive mine noise levels somewhat lower than those measured, due to distance attenuation under stable atmospheric conditions. Under the prevailing weather conditions and based on the attended monitoring results it is concluded that mine noise emissions did not breach the applicable criteria at any nearby residence during the October 2009 survey. Commercial_In_Confidence Issued October 2009 Page 24 of 28

25 Date Time (Hrs) APPENDIX A: WEATHER CONDITIONS TABLE 9: PERIODIC WEATHER DATA Air Temperature ( o C) Wind Direction ( o Angle) Sigma Theta ( o Angle) Wind Speed (m/s) 20/10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/2009 0: Rain (mm) Commercial_In_Confidence Issued October 2009 Page of 28

26 Date Time (Hrs) (CONTINUED ) TABLE 9: PERIODIC WEATHER DATA Air Temperature ( o C) Wind Direction ( o Angle) Sigma Theta ( o Angle) Wind Speed (m/s) 21/10/2009 0: /10/2009 0: /10/2009 0: /10/2009 1: /10/2009 1: /10/2009 1: /10/2009 1: /10/2009 2: /10/2009 2: /10/2009 2: /10/2009 2: Rain (mm) October 2009 Noise Survey - Wind Speed Data Average Wind Speed m/s :00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 Time FIGURE 16: WEATHER STATION - WIND SPEED Commercial_In_Confidence Issued October 2009 Page 26 of 28

27 Wind Rose - 20th-21st October 2009 Dominant Wind Direction at DCM WNW W WSW NNW NW 8 N NNE 6 NE 4 ENE 2 0 E ESE SW SSW S SE SSE Number in Class FIGURE 17: WEATHER STATION WIND DIRECTION (ºC/100m) Predicted Temperature Inversion (Maximum) DCM October 2009 Noise Survey - Temperature Inversion Prediction Moderate to Strong Inversion Lapse/Neutral to Weak Inversion 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 Time (hrs) FIGURE 18: PREDICTED TEMPERATURE INVERSION STRENGTH Commercial_In_Confidence Issued October 2009 Page 27 of 28

28 ` APPENDIX B: LOCALITY MAP & SURVEY LOCATIONS REF FIGURE 19: DCM AND SURROUNDS, LOCATION MAP Commercial_In_Confidence Issued October 2009 Page 28 of 28

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Reference:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Reference:

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Offaly County Council

Offaly County Council Derryclure Landfill Facility, Derryclure, Co. Offaly Annual Monitoring Report Waste Licence Reg. No. W0029-04 Report Date: th October 15 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

Roche Ireland Limited

Roche Ireland Limited Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No.

More information

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO. 01127-E VERSION A APRIL 2017 PREPARED FOR HANSON CONSTRUCTION MATERIALS PTY LTD LOT 151 PEATS RIDGE ROAD CALGA NSW 2250 DOCUMENT CONTROL Version

More information

STRATFORD MINING COMPLEX

STRATFORD MINING COMPLEX STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: 630.11771-R10 Version No: v1.0 PREPARED BY SLR Consulting Australia Pty Ltd ABN 29 001 584 612 10 Kings

More information

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016.

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016. Duralie Coal Ltd PO Box 168, GLOUCESTER NSW 2422 www.duraliecoal.com.au Version: v1.1 Page 2 PREPARED BY: ABN 29 001 584 612 10 Kings Road New Lambton NSW 2305 Australia (PO Box 447 New Lambton NSW 2305

More information

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870 ENVIRONMENTAL NOISE MONITORING QUARTER 1, 2018 s PO Box 995 Parkes NSW 2870 Job No: J38252 Report issued: 25 June 2018 ESP ENVIRONMENTAL & SAFETY PROFESSIONALS A division of Enviro-Net Australia Pty. Ltd.

More information

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Prepared for Castlereagh Coal Page i Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Reference: Report date: 28 June

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2. Bloomfield Colliery Quarterly Noise Monitoring and Compliance Assessment September 2015 Report Number Q59 630.01053-R2 15 October 2015 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version:

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Prepared by on behalf of Mackas Sand Pty Ltd Project

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

STRATFORD MINING COMPLEX

STRATFORD MINING COMPLEX STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: 630.11771-R06 Version No: v0.1 PREPARED BY SLR Consulting Australia Pty Ltd ABN 29 001 584 612 10 Kings

More information

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting KEYSBROOK ENVIRONMENTAL NOISE COMPLIANCE REPORTING Q1 2016 MZI RESOURCES LTD 1370900-5-100-Rev2-18.Feb.2016 www.svt.com.au Perth Brisbane Kuala Lumpur Bangkok Noise Vibration Corrosion Safety Reliability

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2014 Reference: 233710 Prepared for: EnergyAustralia NSW Revision: 2 25 March 2014 Mt Piper Power Station

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES Jeffrey Parnell NSW Department of Planning and Environment Sydney NSW, Australia Email: jeff.parnell@planning.nsw.gov.au Abstract The NSW Department of Planning

More information

McGill Environmental Ltd.

McGill Environmental Ltd. McGill Environmental Ltd. Coom, Glenville, Co. Cork Environmental Noise Survey Report Date: 7 th October 2016 For inspection purposes only. KD Environmental Ltd. 1 Swiftbrook Glen, Virginia, Co. Cavan

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring Quarter 4 2009 Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 4, 2009 Environmental Noise Monitoring Reference: 09244_R01.doc

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2016 Reference: 246493-002 Prepared for: EnergyAustralia NSW Revision: 3 26 April 2016 Document Control Record

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

Assessing the accuracy of directional real-time noise monitoring systems

Assessing the accuracy of directional real-time noise monitoring systems Proceedings of ACOUSTICS 2016 9-11 November 2016, Brisbane, Australia Assessing the accuracy of directional real-time noise monitoring systems Jesse Tribby 1 1 Global Acoustics Pty Ltd, Thornton, NSW,

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW Postal Address P.O. Box 432 Gladesville N.S.W. 1675 AUSTRALIA A.C.N. 068 727 195 A.B.N. 19 068 727 195 Telephone: 02 9879 4544 Fax: 02 9879 4810 Email: AtkinsAcoustics@bigpond.com.au Atkins Acoustics and

More information

R e p o r t th A u g u s t

R e p o r t th A u g u s t N o ise Mon it o r ing R e p o r t L e g a c y W a y T u n n e l M o n i t o r i n g P o s t C o m m is s i o n ing T es ts V e n ti la t ion S t a c ks Jun e 20 1 6 R e p o r t 3557 4 th A u g u s t 2

More information

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations Revision 0 Keystone Project Document # RE-03 [2-4-22-2] ATCO Project # 763000 TransCanada Pipeline Ltd. Keystone Pipeline Project Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian

More information

Engineering a Sustainable Future for Our Environment

Engineering a Sustainable Future for Our Environment NOISE COMPLIANCE REPORT FOR MULTIQUIP AGGREGATES 5152 OALLEN FORD ROAD, BUNGONIA Prepared for: Alexander Cox, Environmental Officer Multiquip Aggregates Prepared by: Peter Gangemi, Acoustic Engineer R

More information

Environmental Management System

Environmental Management System Printed Date: PORT KEMBLA COAL TERMINAL HSEC Noise Management Plan Printed By: Management Plan MP.HS.387 Status:Approved Version:7.0 Doc ID:387 Page 1 of 38 Environmental Management System Noise Management

More information

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016 MALONE O REGAN March 2016 Powerstown Landfill Industrial Emission Licence No. W0025-04 Annual Noise Survey 2015 2B Richview Office Park, Clonskeagh, Dublin 14. Tel: +353 01 2602655 Fax: +353 01 2602660

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

Cymbaluk Noise Complaints

Cymbaluk Noise Complaints Decision 20259-D01-2015 Cymbaluk Noise Complaints December 22, 2015 Alberta Utilities Commission Decision 20259-D01-2015 Cymbaluk Noise Complaints Proceeding 20259 Application 20259-A001 December 22, 2015

More information

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg. August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community

More information

Pipeline Blowdown Noise Levels

Pipeline Blowdown Noise Levels Pipeline Blowdown Noise Levels James Boland 1, Henrik Malker 2, Benjamin Hinze 3 1 SLR Consulting, Acoustics and Vibration, Brisbane, Australia 2 Atkins Global, Acoustics, London, United Kingdom 3 SLR

More information

Assessment of rail noise based on generic shape of the pass-by time history

Assessment of rail noise based on generic shape of the pass-by time history Proceedings of Acoustics 23 Victor Harbor 7-2 November 23, Victor Harbor, Australia Assessment of rail noise based on generic shape of the pass-by time history Valeri V. enchine, Jonathan Song Science

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT AT MURPHY BREWERY. Report Dated: 25 June 15 Greenhills House, Kilmoney, Carrigaline, Co. Cork. Tel: 353 21 437433 http://www.env.ie/ TITLE: Environmental Noise Assessment

More information

Rix's Creek Coal Mine

Rix's Creek Coal Mine Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Prepared for Rix's Creek Pty Ltd Page i Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Reference: Report date: 5

More information

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Raging River Quarry Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Introduction The Raging River Quarry operates in unincorporated King County, near Fall City, Washington. King

More information

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018 1/8 Project Title Client Document Reference No. Laing O Rourke Project No. Noise Monitoring Sydney Metro City and Southwest LOR-NCW-Noise Monitoring WE08_ OOHW P1-6 - 250818_260818.docx K38 Document Date

More information

Environmental Noise Survey For. Vista Coal Project. Prepared for: Coalspur Mines Ltd. Prepared by: S. Bilawchuk, M.Sc., P.Eng.

Environmental Noise Survey For. Vista Coal Project. Prepared for: Coalspur Mines Ltd. Prepared by: S. Bilawchuk, M.Sc., P.Eng. aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Survey For Vista Coal Project Prepared

More information

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015 SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r02 2014432SY 23 October 2015 4/46 Balfour St Chippendale NSW 2008 T: +612 9282 9422 Fax: +612 9281 3611 www.marshallday.com

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-B BASELINE NOISE SURVEY 20-B BASELINE NOISE SURVEY Noise Sensitive Receptors A desk-based study and site walkover

More information

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia ICSV14 Cairns Australia 9-12 July, 2007 ACOUSTIC BARRIER FOR TRANSFORMER NOISE Ruisen Ming SVT Engineering Consultants, Leederville, WA 6007, Australia Roy.Ming@svt.com.au Abstract In this paper, an acoustic

More information

Automated detection and analysis of amplitude modulation at a residence and wind turbine

Automated detection and analysis of amplitude modulation at a residence and wind turbine Proceedings of Acoustics 213 Victor Harbor 17-2 November 213, Victor Harbor, Australia Automated detection and analysis of amplitude at a residence and wind turbine Jonathan Cooper (1) and Tom Evans (1)

More information

Acoustics Technical Note

Acoustics Technical Note Acoustics Technical Note To Ian Roach From Alf Maneylaws Copies to File Date 30/3/11 Subject D123356: Devonport EfW: Analysis of measurement data to support adopted approach to BS4142 assessment. Introduction

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times 765 kv Substation Acoustic Noise Impact Study by Predictive Software and

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

Template Planning Condition on Amplitude Modulation Noise Guidance Notes

Template Planning Condition on Amplitude Modulation Noise Guidance Notes www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013) ARTHUR KILL 3 US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW

More information

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:

More information

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Date: 09 March 2016 REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Client: Edinburgh Limited Report Author:... Dr R. Peters Principal Consultant

More information

Southwood Fibre southern exports environmental noise assessment

Southwood Fibre southern exports environmental noise assessment Van Diemen Consulting Southwood Fibre southern exports environmental noise assessment Report No. 5012_AC_R TARKARRI ENGINEERING PTY LTD PO Box 506 Kings Meadows TAS 7249 September 2017 DOCUMENT CONTROL

More information

Background Ambient Noise Study Rosemont Copper

Background Ambient Noise Study Rosemont Copper Background Ambient Noise Study Rosemont Copper Prepared for: Rosemont Copper 40 Cherry Creek South Drive, Ste. 10 Denver, Colorado 246 (3) 0-0138 Fax (3) 0-0135 Prepared by: 31 West Ina Road Tucson, Arizona

More information

Noise and Ground-Borne Vibration Monitoring

Noise and Ground-Borne Vibration Monitoring 69 Noise and Vibration Study Noise and Ground-Borne Vibration Monitoring Labrador City, Newfoundland Nov, 07 Iron Ore Company of Canada TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 Study Objectives... 2

More information

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare Bray (Co. Wicklow) 01 276 1428 Lisburn (Co. Antrim) 028 9262 6733 Birmingham (U.K.) 0121 673 1804 Blackrock (Co.Cork) 021 4536155 Noise Monitoring Report 2017 For Schloetter (Ireland) Ltd. Naas Enterprise

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014) ARTHUR KILL 3 US Army Corps of NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW JERSEY SITE

More information

Swan DH Noise Impact Assessment Report

Swan DH Noise Impact Assessment Report Swan 4-64 6-1 3DH Noise Impact Assessment Report April 9, 2018 Prepared for: ConocoPhillips 34501 East Quincy Avenue Watkins, Colorado 80137 Prepared by: Behrens and Associates, Inc. 13806 Inglewood Avenue

More information

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1 Designation: E 1014 84 (Reapproved 1995) e1 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM

More information

Noise Monitoring Program. for the. Integra North Open Cut Coal Mine

Noise Monitoring Program. for the. Integra North Open Cut Coal Mine . Integra Coal Operations Pty Ltd ABN: 96 118 030 998 Noise Monitoring Program for the Integra North Open Cut Coal Mine Including a Noise Management Protocol Integra Coal Operations Pty Ltd ABN: 96 118

More information