1 Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No. 51/ M21 Report No. 51-M21 PAGE 1 OF 103 Annual Noise Survey EPA Export :03:12:56

2 Summary An annual noise survey was commissioned by Jim Denieffe of Ltd. to monitor compliance with the noise conditions assigned in the Industrial Emissions Licence No. P issued to the facility by the Environmental Protection Agency. Condition 4.7 states that Noise from the installation shall not give rise to sound pressure levels (Leq, 15 minutes) measured at noise sensitive locations of the installation which exceed the limit value(s).. Schedule B.4 of the IE Licence sets a daytime noise emission limit of 55 db(a) and a night-time noise emission limit of 45 db(a). Schedule B.4 also states that There shall be no clearly audible tonal component or impulsive component in the noise emission from the activity at any noise sensitive location. The nearest noise sensitive locations are the houses referenced H1 to H6, which are located to the South, West and North of the facility. Tables 1 below give a count of the number of L(A)eq exceedances per noise sensitive location by time period indicating the compliance status with the IPPC Licence for the facility. Table 1: Showing the number of exceedances per noise sensitive location by monitoring period. Location Period H1 H2 H3 H4 H5 H6 out of 3 Day out of 2 Night Elevated noise levels were recorded at monitoring locations H2, H3, H4, H5 and H6 at both during the daytime and/or night-time survey periods. These elevated noise levels were due to vehicles passing by in close proximity to these monitoring locations and not to activities at the Ltd. facility. A tonal component was detected at noise sensitive monitoring location H3 during the monitoring period. Daytime and night-time boundary noise levels were also measured at 9 site boundary locations to identify any significant changes in noise emissions. Tables 1 below give a count of the number of L(A)eq exceedances per boundary location by time period. No tonal analysis was carried out on the boundary locations. The boundary locations are not subject to the IE Licence conditions for the site. Table 2: Showing the number of exceedances per boundary location by monitoring period. Location Period B1 B2 B3 B4 B5 B6 B7 B B9 out of 3 Day out of 2 Night Note: these boundary locations were not assessed for tonal components Report No. 51-M21 PAGE 2 OF 103 Annual Noise Survey EPA Export :03:12:56

3 Contents 1.0 Introduction Duration and Measurements of Surveying... 4 Description of Measurement Parameters Weather Conditions during Survey Periods Activities on Site - Day and Night Location and Description of Monitoring Points Methodology Equipment Survey Results /3 Octave Measurements Interference Noise Sources Discussion of Results Report No. 51-M21 PAGE 3 OF 103 Annual Noise Survey EPA Export :03:12:56

4 1.0 Introduction Under the EPA IE Licence P , annual monitoring at identified noise monitoring locations in the vicinity of Ltd. site is required. Schedule B.4 of the IE Licence sets a daytime noise emission limits of 55dB L(A) eq, and a night-time noise emission limit of 45dB L(A) eq, in addition it states that There shall be no clearly audible tonal component or impulsive component in the noise emission from the activity at any noise sensitive location. Nine site boundary locations and six noise-sensitive locations were surveyed between the 24 th and 27 th October for daytime and night-time noise levels. The boundary locations are not subject to the IE Licence Noise Limits for the facility. Activities at the Ltd facility between the 24 th and 27 th October were being carried out as normal. Adrian Gaughan (Environmental Scientist) of Fitz Scientific carried out the environmental noise survey. 2.0 Duration and Measurements of Surveying The recommended minimum survey durations were carried out as per the Environmental Protection Agency s Guidance Note for Noise (NG4), which specifies daytime noise periods as being between 07:00 to 19:00 hrs and night-time noise periods between 23:00 to 07:00 hrs. The guidance document specifies 3 sampling periods for daytime monitoring and 2 sampling periods for night-time monitoring, at each noise monitoring location. The following measurements were carried out at each monitoring location: Day-time and Night-time Broadband measurements L(A) eq, L(A) 10, L(A) 90, L(A) 50, L(A) 1 and L(A) 99 over a 15-minute period at site Boundary Locations and 30-minute periods at Noise Sensitive Locations. Day-time and Night-time 1:3 Octave measurements over a 15-minute period at site Boundary Locations and 30-minute periods at Noise Sensitive Locations. Description of Measurement Parameters L Aeq,T : This is the equivalent continuous sound level. It is a type of average and is used to describe a fluctuating noise in terms of a single noise level over the sample period (T).The closer the L Aeq value is to either the L AF10 or L AF90 value indicates the relative impact of the intermittent sources and their contribution. The relative spread between the values determines the impact of intermittent sources, such as traffic, on the background. L AF10 : Refers to those A-weighted noise levels in the top 10 percentile of the sampling interval; it is the level which is exceeded for 10% of the measurement period. It is used to determine the intermittent high noise level features of locally generated noise and usually gives an indicator of the level of road traffic. Measured using the Fast time weighting. L AF90 : Refers to those A-weighted noise levels in the lower 90 percentile of the sampling interval; it is the level which is exceeded for 90% of the measurement period. It will therefore exclude the intermittent features of traffic and is used to describe a background level. Measured using the Fast time weighting. Impulsive: A noise that is of short duration (typically less than one second), the sound pressure level of which is significantly higher than the background. Report No. 51-M21 PAGE 4 OF 103 Annual Noise Survey EPA Export :03:12:56

5 Tonal: Sounds which cover a range of only a few Hz which contains a clearly audible tone, i.e. distinguishable, discrete or continuous noise (whine, hiss, screech, or hum etc.) are referred to as being tonal. The simplified methodology for the objective identification of tones that is advocated in Annex D of ISO :07(E) is adopted. This methodology requires that for a prominent, discrete tone to be identified as present, the time-average sound pressure level in the onethird-octave band of interest should exceed the time-average sound pressure levels of both adjacent one-third-octave bands by some constant level difference. The appropriate level differences vary with frequency. They should be greater than or equal to the following values in both adjacent one-third-octave bands: 15dB in low-frequency one-third-octave bands (25Hz to Hz); db in middle-frequency bands (1Hz to 0Hz), and; 5dB in high-frequency bands (Hz to 10,000Hz). Care should be taken to ensure that any tones identified in the low frequency range of 25Hz to Hz are of a magnitude greater than the threshold of hearing at that frequency. Plant Specific Noise Levels: To determine the plant specific noise levels, the following method is followed: Description of noise Plant noise dominating, no other significant noise sources Intermittent interfering noise (e.g. traffic, birds, wind), with underlying plant noise audible Plant barely audible (i.e. not immediately noticeable, unless actively listening) Noise parameter best representing specific noise from plant LAeq LA90 if plant noise is steady and clearly audible in lulls in the interfering noise Or LA50 if plant noise is slowly varying and clearly audible, with occasional interference from other noise sources <LA90 (up to 5 db lower) Not Detectable (ND) Plant not audible <<LA90 (more than 5 db lower than LA90) The plant specific noise is established during the survey by correlating the live sound level meter readings with the audible sounds, as described above. The plant specific noise is verified by examining the profile of logged noise levels. 3.0 Weather Conditions during Survey Periods Weather conditions for the noise monitoring on the 24 th and 25 th of October were generally overcast and foggy with periods of light drizzle on the 25 th. Wind speeds were low (<5 m/sec) for most of the monitoring, with intermittent gusts (<7 m/s). Weather conditions during the night-time/early hours of the 24/25 th October were cool and dry. Wind speeds were measured below 5 m/sec for the monitoring period with occasional gusts. Weather conditions for the 26 th & 27 th of October were generally overcast and cool with occasional periods of light rain/mist. Wind speeds were low (<5 m/sec) for most of the monitoring, with occasional gusts. Report No. 51-M21 PAGE 5 OF 103 Annual Noise Survey EPA Export :03:12:56

6 Wind speed and temperature at the microphone was measured using a Skywatch hand-held anemometer. Detailed weather conditions for each monitoring period are included in Sections 9 of this Report. 4.0 Activities on Site - Day and Night Activities at the Ltd. facility continued as normal during the noise survey. Ltd. operates on a 24-hour basis and noise emissions are steady throughout the day and night. The most audible noise both day and night on site was plant process noise and fan type noise. Activities at the facility continued as normal at night. Most noise from the facility during the night-time session arose from plant noise. Noise at noise-sensitive locations arose mainly from vehicle movements on public roads. 5.0 Location and Description of Monitoring Points Environmental noise monitoring was carried out at nine boundary locations (B1-B9) and six Noise Sensitive Locations (H1-H6). The monitoring locations are all shown in Appendix A. Table 3: Showing the location and description of the Boundary monitoring points Location B1 B2 B3 B4 B5 B6 B7 B B9 Description of location This monitoring point was located at the car park entrance to the Graveyard. The monitor was located on flat hard ground approximately 10m from the site boundary. The intervening ground conditions between the source and the location can be described as % hard surface. The monitor was positioned facing the Ltd. facility. This monitoring point was located at the entrance to the facility, just beside the Roche sign. The monitor was positioned facing the facility on flat hard ground. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located between the training centre and the O4 labs and along the western boundary of the facility. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the western boundary of the facility, near the Quay Road gate of the facility. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the north-western corner of the facility, just beside the large Roche signboard facing the facility. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the northern site boundary of the facility, facing the main plant building. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the northern-eastern corner of the site, in the north corner of the effluent plant. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the eastern site boundary of the facility, near the tank farm. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This monitoring point was located along the south-eastern site boundary of the facility, on an embankment in the landscaped area towards the east of the plant. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. Report No. 51-M21 PAGE 6 OF 103 Annual Noise Survey EPA Export :03:12:56

7 Table 4: Showing the location and description of the Noise Sensitive Locations Location H1 H2 H3 H4 H5 H6 Description of location This noise-sensitive monitoring point was located towards the south of the facility, in the vicinity of a residential estate on Clare Hill, across the road from the site Main Entrance. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This noise-sensitive monitoring point was located towards the south-west of the facility, in the vicinity of a bungalow on Clare Hill (beside Greenlawn). The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This noise-sensitive monitoring point was located towards the south-west of the facility, in the vicinity of a dwellings located to the rear of houses on Patrick Street. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This noise-sensitive monitoring point was located towards the north-west of the facility, in the vicinity of dwellings along Quay Road. The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This noise-sensitive monitoring point was located towards the north of the facility, in the vicinity of a dwelling (Hilltop Cottage on Old N1 Road, on right-hand side in direction of Shannon). The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. This noise-sensitive monitoring point was located towards the north-west of the facility, in the vicinity of a dwelling (Cottage on Old N1, on left-hand side in direction of Shannon). The monitor was positioned on flat hard ground facing the facility. The intervening ground conditions between the source and the location can be described as % hard surface. 6.0 Methodology The noise survey was carried out in accordance with ISO 1996/1/2/3 - Acoustics -Description and Measurement of. Reference was also made to the guidance document issued by the EPA Guidance Note for Noise: Licence Applications, Surveys and Assessments in Relation to Scheduled Activities (NG4). Measurements were conducted in free-field conditions. Broadband measurements were analysed for 30-minute intervals at the noise sensitive locations and 15-minute intervals at the boundary locations. Daytime and Night-time measurement range was set at 30-90dB. 1:3 Octave measurements were conducted simultaneously during daytime and night-time surveys. A weighting frequency weightings were applied to all measurements, with the analyser set on fast response. 7.0 Equipment A Cirrus Optimus Green Sound Level Meter (Serial No. G071536) was used to carry out the noise measurements. The microphone was fixed to a tripod ~1.3 metres above the ground level and the microphone was protected using a windshield. All monitoring was conducted at least 3.5 metres away from reflective surfaces..0 was carried out on-site using a Cirrus Acoustic Calibrator (Serial No ) at 93.7 dba. The meter was calibrated before and after the environmental monitoring survey. The calibration details for each location are displayed in the Measurement Summary Report s (Appendix B). For the relevant equipment calibration certificates please see Appendix C. Report No. 51-M21 PAGE 7 OF 103 Annual Noise Survey EPA Export :03:12:56

8 9.0 Survey Results Table 5: Showing the noise monitoring results for boundary location B1 Period: Day-time Night-time Round: Date: 24-Oct- 25-Oct- 25-Oct- 25-Oct- 25-Oct- Start Time: 15:4 12:49 :46 23:00 23:15 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): N SE SE S S Rainfall: Comments The facility s operations were audible at this location (extraction fans). Intermittent engine noise & beeping sounds from machinery and cars onsite and construction noises. Interference noise includes birds singing and trees rustling. Traffic noise was generated from the nearby public road (Clare Hill Rd). Facility noise audible (extraction fans & noise from the stacks). Interference noises include trees rustling & distant traffic noise. Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:56

9 Table 6: Showing the noise monitoring results for boundary location B2 Period: Day-time Night-time Round: Date: 24-Oct- 25-Oct- 25-Oct- 25-Oct- 26-Oct- Start Time: :05 13:0 17:03 23:33 00:03 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): NW SE SE S S Rainfall: Low Low Med Comments The facility s operations were audible at this location (extraction fans). Traffic noise was generated from the car park area and at the main entrance area (engine noise). Beeping sounds from machinery onsite. Interference noise includes birds singing, plane passing overhead, dog(s) barking and trees rustling. Traffic noise was generated from the Clare Hill Rd. road. Facility noise audible. Interference noise include; traffic from near housing estates & distant dog barking Report No. 51-M21 PAGE 9 OF 103 Annual Noise Survey EPA Export :03:12:56

10 Table 7: Showing the noise monitoring results for boundary location B3 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 25-Oct- 25-Oct- Start Time: 12:42 13:2 15:59 00:44 03:07 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): N N N N N Rainfall: Comments The facility s operations were audible from this location (fan noise). Nearby office doors opening/closing. Vehicles/ machinery operating onsite. Interference noise includes birds singing, and trees rustling. Facility noise audible (Fan extraction noise). Doors from the nearby offices opening/ closing. Report No. 51-M21 PAGE 10 OF 103 Annual Noise Survey EPA Export :03:12:56

11 Table : Showing the noise monitoring results for boundary location B4 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 25-Oct- 25-Oct- Start Time: 12:25 13:45 15:43 00:27 02:50 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): NE N S N NW Rainfall: Comments Onsite noise audible were from facility operations, traffic (machinery & cars), and doors opening/ closing. Interference noise includes birds singing, low level traffic noise from public road, dog(s) barking, trees rustling and chainsaw noise (1 st round). Low-level facility noise audible. (Extraction fans & pump type noise). Interference noises include passing traffic from a northwesterly direction. Report No. 51-M21 PAGE 11 OF 103 Annual Noise Survey EPA Export :03:12:56

12 Table 9: Showing the noise monitoring results for boundary location B5 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 25-Oct- 25-Oct- Start Time: 12:0 14:02 15:26 00:11 02:34 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): NE N S N N Rainfall: Comments Low-level noise was audible from facility operations. Traffic noise (cars leaving car park nearby). Interference noise includes birds singing, low level traffic noise from public road and trees rustling. Low-level facility noise audible (extraction fan type noise). Interference noises include passing traffic from a north westerly direction, dog(s) barking and trees rustling. Report No. 51-M21 PAGE 12 OF 103 Annual Noise Survey EPA Export :03:12:56

13 Table 10: Showing the noise monitoring results for boundary location B6 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 24-Oct- 25-Oct- Start Time: 11:49 14: 15:0 23:53 02: Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): N N S N N Rainfall: Comments Low-level noise was audible from facility operations. Noise was also generated from the construction area onsite (machinery noises and hammering noise) Interference noise includes birds singing, low level traffic noise from public road, dog(s) barking, people walking on walkway (offsite) and trees rustling. Running water noise from the river Fergus. Low-level facility noise audible. Interference noises include passing traffic from a northerly direction and trees rustling. Running water noise from the river Fergus. Report No. 51-M21 PAGE 13 OF 103 Annual Noise Survey EPA Export :03:12:56

14 Table 11: Showing the noise monitoring results for boundary location B7 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 24-Oct- 25-Oct- Start Time: 11:32 14:37 14:50 23:35 01:59 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): NE NE S N NW Rainfall: Comments The facility operations were audible from this location (Waste Water Treatment Plant area). Noise generated from the use of the onsite waste/ recycling area. Onsite machinery noise was audible. Intermittent clicking noises, gas pressure release noises and pump noises. Noise was also generated from the construction area onsite. Interference noise includes birds singing, low level traffic noise from public road and trees rustling. Facility noise audible (Waste Water Treatment Plant area & extraction fans). Intermittent clicking noises and gas pressure release noises. Interference noises include passing traffic from a northeasterly direction and trees rustling. Report No. 51-M21 PAGE 14 OF 103 Annual Noise Survey EPA Export :03:12:56

15 Table 12: Showing the noise monitoring results for boundary location B Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 24-Oct- 25-Oct- Start Time: 11:15 14:55 14:33 23:1 01:42 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): NE NE NE NW NW Rainfall: Comments The facility operations were audible from this location. Noise was generated from machinery traffic at contractors yard (machinery noise). Running water noise from near the onsite discharge point. Intermittent gas pressure release noise generated nearby stack area and gas area. Interference noise includes birds singing, low level traffic noise from public road and trees rustling. Facility noise audible (extraction fans). Running water noise from near the onsite discharge point. Intermittent gas pressure release noise generated nearby stack area and gas area. Report No. 51-M21 PAGE 15 OF 103 Annual Noise Survey EPA Export :03:12:56

16 Table 13: Showing the noise monitoring results for boundary location B9 Period: Day-time Night-time Round: Date: 24-Oct- 24-Oct- 25-Oct- 24-Oct- 25-Oct- Start Time: 10:56 15:13 14:14 23:00 01:23 Duration: 15 minutes 15 minutes 15 minutes 15 minutes 15 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): Rainfall/ Precipitation: Comments NW N E N NW The facility operations were audible from this location (hum noise). Noise was generated from construction activities (contractors yard). Interference noise includes birds singing, low level traffic noise from public road and trees rustling. Low-level facility noise audible. Interference noises include passing traffic from a northeasterly direction and a running water noise. Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:56

17 Table 14: Showing the noise monitoring results for noise sensitive location H1 Period: Day-time Night-time Round: Date: 25-Oct- 26-Oct- 26-Oct- 26-Oct- 26-Oct- Start Time: 12:15 11:10 12:54 00:32 01:02 Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): SE SE SE S S Rainfall: - Low Low - Med Low Low Comments Low-level noise arising from the facility (extraction fans) and the traffic using the entrance of the site. Interference noise includes cars entering/ exiting housing estate and using Clare Hill Road. Also dog(s) barking, people talking, birds singing and trees rustling. Facility noise audible (hum noise/ extraction fans). Interference noises include passing traffic from a northerly direction and people talking (SW direction). Report No. 51-M21 PAGE 17 OF 103 Annual Noise Survey EPA Export :03:12:56

18 Table 15: Showing the noise monitoring results for noise sensitive location H2 Period: Day-time Night-time Round: Date: 25-Oct- 26-Oct- 26-Oct- 26-Oct- 26-Oct- Start Time: 11:42 11:44 13:30 01:39 02:09 Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq L(A) L(A)90 41 L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): S S S S S Rainfall: - Low Low - Med Low - Comments Low-level noise audible from facility operations. Interference noise was generated from the Clare Hill Rd. and cars entering/ exiting the housing estate (Cluain Ard). In addition noise was generated from birds singing and trees rustling. Low-level Facility noise audible. Interference noises include passing traffic on Clare Hill Rd, Clearcastle town and entrance to Cluain Ard. People talking in the housing estate & dog(s) barking. Report No. 51-M21 PAGE 1 OF 103 Annual Noise Survey EPA Export :03:12:56

19 Table : Showing the noise monitoring results for noise sensitive location H3 Period: Day-time Night-time Round: 1* Date: 25-Oct- 26-Oct- 26-Oct- 26-Oct- 26-Oct- Start Time: 11:07 12:19 14:06 23:00 23:30 Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq 75 (70+5) L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): E S S S S Rainfall: - Low - Med Low - - Comments Low-level noise audible from facility operations. Interference noise includes dog(s) barking, birds singing and passing traffic on Patrick Street, cars entering/ exiting the nearby houses and kids playing. Low-level facility noise audible. Interference noises include a dog(s) barking and infrequent passing traffic on Patrick St. *Tonal component detected Report No. 51-M21 PAGE 19 OF 103 Annual Noise Survey EPA Export :03:12:56

20 Table 17: Showing the noise monitoring results for noise sensitive location H4 Period: Day-time Night-time Round: Date: 26-Oct- 27-Oct- 27-Oct- 26-Oct- 26-Oct- Start Time: 15:10 13:14 13:45 02:46 03:17 Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): W W W S S Rainfall: Low Comments Low-level noise audible from facility. Interference noise includes people walking and passing traffic on the Quay Road. Machinery noise (construction activity at house nearby). Also noise was generated from planes passing overhead, train beeping, trees rustling and birds singing. Low level facility noise audible (hum noise). Interference noises include passing traffic from a northeasterly direction. Cars turning near sampling point. Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:56

21 Table 1: Showing the noise monitoring results for noise sensitive location H5 Period: Day-time Night-time Round: Date: 26-Oct- 27-Oct- 27-Oct- 27-Oct- 27-Oct- Start Time: :22 11:00 11:31 00:05 00: Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): SW SW SW SW SW Rainfall: Low Comments Noise generated from the facility was not plainly audible from this location. Interference noise includes; frequent passing of traffic on the R45 road, cyclists, train engine, beeping noises, birds singing, dog(s) barking and trees rustling. Low-level facility noise audible. Interference noise includes; passing of traffic on the R45 road. In addition low-level noise was generated from trees rustling and from farm animals (cows) in field nearby. Report No. 51-M21 PAGE 21 OF 103 Annual Noise Survey EPA Export :03:12:56

22 Table 19: Showing the noise monitoring results for noise sensitive location H6 Period: Day-time Night-time Round: Date: 26-Oct- 27-Oct- 27-Oct- 27-Oct- 27-Oct- Start Time: 15:46 12:05 12:3 01:14 01:44 Duration: 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes L(A)eq L(A) L(A) L(A)max Weather conditions Wind Speed (M/sec): Wind Direction: Temperature ( C): SW SW SW SW SW Rainfall: Low Comments Noise generated from the facility was not plainly audible from this location. Interference noise includes; frequent passing of traffic on the R45 road. In addition noise was generated from birds singing, plane passing overhead, train and trees rustling. Low-level facility noise audible. Interference noise includes; passing of traffic on the R45 road. In addition noise was generated from trees rustling. Report No. 51-M21 PAGE 22 OF 103 Annual Noise Survey EPA Export :03:12:57

23 10.0 1/3 Octave Measurements One tonal component was detected during the monitoring period. The tonal component was detected at monitoring location H3. Table shows the details of the tonal component. The boundary noise monitoring locations (B1 to B9) were not assessed for tonal components. Table : Showing the tonal analysis for Boundary location B7 Monitoring Location Period Date Start Time H3 Day-time 25 th Oct - 11:07 Tonal Analysis Frequency Weighting A Suspected 1/3 Octave Band Frequency of Tone, Hz 0 Magnitude of Tone, db Leq 66 Is the magnitude greater than the threshold of hearing? Yes Level Change from Preceding 1/3 Octave Band, db Leq 5 Level Change from Following 1/3 Octave Band, db Leq 7 Are the level changes in both bands greater than or equal to the high-frequency (Hz to 10,000Hz) constant of 5 db? Yes Conclusion Tone Present The 1/3 Octave spectra for each monitoring location is included in the Appendix of this Report. Report No. 51-M21 PAGE 23 OF 103 Annual Noise Survey EPA Export :03:12:57

24 EPA Export :03:12:57

25 Appendix A: Showing a map of the noise monitoring locations Report No. 51-M21 PAGE 25 OF 103 Annual Noise Survey EPA Export :03:12:57

26 Appendix B: Sound Level Meter & Acoustic Calibrator Certificate Report No. 51-M21 PAGE 26 OF 103 Annual Noise Survey EPA Export :03:12:57

27 Report No. 51-M21 PAGE 27 OF 103 Annual Noise Survey EPA Export :03:12:57

28 Appendix C: Survey Data (boundary & noise sensitive locations) Report No. 51-M21 PAGE 2 OF 103 Annual Noise Survey EPA Export :03:12:57

29 Name Roche Irl Ltd - B1 - Day-time (551) Time 24/10/ 15:4:26 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 4.3 db LAE 77.7 db LAFMax 71.5 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 44.5 db k k Report No. 51-M21 PAGE 29 OF 103 Annual Noise Survey EPA Export :03:12:57

30 Name Roche Irl Ltd - B1 - Day-time (571) Time 25/10/ 12:49:19 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 49.1 db LAE 7.6 db LAFMax 62.4 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 41.5 db k k Report No. 51-M21 PAGE 30 OF 103 Annual Noise Survey EPA Export :03:12:57

31 Name Roche Irl Ltd - B1 - Day-time (51) Time 25/10/ :46:12 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 42.4 db LAE 71.9 db LAFMax 57.7 db LAeq1 4.1 db LAeq db LAeq db LAeq db LAeq90.7 db LAeq95.4 db 39.9 db k k Report No. 51-M21 PAGE 31 OF 103 Annual Noise Survey EPA Export :03:12:57

32 Name Roche Irl Ltd - B1 - Night-time (53) Time 25/10/ 23:00:02 Person Duration 00:15:00 25/10/ 22: db After 26/10/ 00: db LAeq 41.1 db LAE 70.6 db LAFMax 51.3 db LAeq db LAeq db LAeq db LAeq50.9 db LAeq db LAeq db 3.9 db k k Report No. 51-M21 PAGE 32 OF 103 Annual Noise Survey EPA Export :03:12:57

33 Name Roche Irl Ltd - B1 - Night-time (54) Time 25/10/ 23:15:5 Person Duration 00:15:00 25/10/ 22: db After 26/10/ 00: db LAeq 41.3 db LAE 70. db LAFMax 52.5 db LAeq db LAeq5 42. db LAeq db LAeq db LAeq db LAeq db 39.0 db k k Report No. 51-M21 PAGE 33 OF 103 Annual Noise Survey EPA Export :03:12:57

34 Name Roche Irl Ltd - B2 - Day-time (552) Time 24/10/ :05:4 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 56.0 db LAE 5.5 db LAFMax 7.3 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 50.5 db k k Report No. 51-M21 PAGE 34 OF 103 Annual Noise Survey EPA Export :03:12:57

35 Name Roche Irl Ltd - B2 - Day-time (573) Time 25/10/ 13:0: Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 56.7 db LAE 6.2 db LAFMax 75.1 db LAeq db LAeq5.1 db LAeq10.0 db LAeq db LAeq db LAeq db 4.7 db k k Report No. 51-M21 PAGE 35 OF 103 Annual Noise Survey EPA Export :03:12:57

36 Name Roche Irl Ltd - B2 - Day-time (52) Time 25/10/ 17:03:30 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 59.7 db LAE 9.2 db LAFMax 72.4 db LAeq db LAeq db LAeq10.5 db LAeq db LAeq db LAeq db 50.9 db k k Report No. 51-M21 PAGE 36 OF 103 Annual Noise Survey EPA Export :03:12:57

37 Name Roche Irl Ltd - B2 - Night-time (55) Time 25/10/ 23:33:52 Person Duration 00:15:00 25/10/ 22: db After 26/10/ 00: db LAeq 52.2 db LAE 1.7 db LAFMax 59.1 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 50.7 db k k Report No. 51-M21 PAGE 37 OF 103 Annual Noise Survey EPA Export :03:12:57

38 Name Roche Irl Ltd - B2 - Night-time (56) Time 26/10/ 00:03:46 Person Duration 00:15:00 25/10/ 22: db After 26/10/ 00: db LAeq 55.0 db LAE 4.5 db LAFMax 5.6 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 53.3 db k k Report No. 51-M21 PAGE 3 OF 103 Annual Noise Survey EPA Export :03:12:57

39 Name Roche Irl Ltd - B3 - Day-time (543) Time 24/10/ 12:42:06 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 53.4 db LAE 2.9 db LAFMax 6.1 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 51. db k k Report No. 51-M21 PAGE 39 OF 103 Annual Noise Survey EPA Export :03:12:57

40 Name Roche Irl Ltd - B3 - Day-time (544) Time 24/10/ 13:2:19 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 54.3 db LAE 3. db LAFMax 61.4 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 52.5 db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:57

41 Name Roche Irl Ltd - B3 - Day-time (5) Time 25/10/ 15:59:27 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 53.7 db LAE 3.2 db LAFMax 61.4 db LAeq db LAeq5 54. db LAeq db LAeq db LAeq db LAeq db 52.2 db k k Report No. 51-M21 PAGE 41 OF 103 Annual Noise Survey EPA Export :03:12:57

42 Name Roche Irl Ltd - B3 - Night-time (559) Time 25/10/ 00:44:13 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 53.2 db LAE 2.7 db LAFMax.1 db LAeq1 54. db LAeq db LAeq db LAeq db LAeq db LAeq db 51.6 db k k Report No. 51-M21 PAGE 42 OF 103 Annual Noise Survey EPA Export :03:12:57

43 Name Roche Irl Ltd - B3 - Night-time (566) Time 25/10/ 03:07:0 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 54.4 db LAE 3.9 db LAFMax 62.2 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 53.1 db k k Report No. 51-M21 PAGE 43 OF 103 Annual Noise Survey EPA Export :03:12:57

44 Name Roche Irl Ltd - B4 - Day-time (542) Time 24/10/ 12:25:34 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 53.0 db LAE 2.5 db LAFMax 6.4 db LAeq1 61. db LAeq db LAeq db LAeq db LAeq db LAeq db 46. db k k Report No. 51-M21 PAGE 44 OF 103 Annual Noise Survey EPA Export :03:12:57

45 Name Roche Irl Ltd - B4 - Day-time (545) Time 24/10/ 13:45:27 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 4.6 db LAE 7.1 db LAFMax 65. db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 44.9 db k k Report No. 51-M21 PAGE 45 OF 103 Annual Noise Survey EPA Export :03:12:57

46 Name Roche Irl Ltd - B4 - Day-time (579) Time 25/10/ 15:43:00 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 47.3 db LAE 76. db LAFMax.6 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 44.4 db k k Report No. 51-M21 PAGE 46 OF 103 Annual Noise Survey EPA Export :03:12:57

47 Name Roche Irl Ltd - B4 - Night-time (55) Time 25/10/ 00:27:46 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 46.0 db LAE 75.5 db LAFMax 53.7 db LAeq db LAeq5 4.1 db LAeq db LAeq db LAeq db LAeq db 43.7 db k k Report No. 51-M21 PAGE 47 OF 103 Annual Noise Survey EPA Export :03:12:57

48 Name Roche Irl Ltd - B4 - Night-time (565) Time 25/10/ 02:50:50 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 45.4 db LAE 74.9 db LAFMax 53.1 db LAeq1 4.4 db LAeq5 46. db LAeq db LAeq db LAeq db LAeq db 43.5 db k k Report No. 51-M21 PAGE 4 OF 103 Annual Noise Survey EPA Export :03:12:57

49 Name Roche Irl Ltd - B5 - Day-time (541) Time 24/10/ 12:0:06 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 61.5 db LAE 91.0 db LAFMax 74.5 db LAeq db LAeq5 6.6 db LAeq db LAeq db LAeq db LAeq db 49.4 db k k Report No. 51-M21 PAGE 49 OF 103 Annual Noise Survey EPA Export :03:12:57

50 Name Roche Irl Ltd - B5 - Day-time (546) Time 24/10/ 14:02:04 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 51.9 db LAE 1.4 db LAFMax 67.5 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 46.7 db k k Report No. 51-M21 PAGE 50 OF 103 Annual Noise Survey EPA Export :03:12:57

51 Name Roche Irl Ltd - B5 - Day-time (57) Time 25/10/ 15:26: Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 4. db LAE 7.3 db LAFMax 55.2 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 46.4 db k k Report No. 51-M21 PAGE 51 OF 103 Annual Noise Survey EPA Export :03:12:57

52 Name Roche Irl Ltd - B5 - Night-time (557) Time 25/10/ 00:11:02 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 4.1 db LAE 77.6 db LAFMax 56.5 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 45.9 db k k Report No. 51-M21 PAGE 52 OF 103 Annual Noise Survey EPA Export :03:12:57

53 Name Roche Irl Ltd - B5 - Night-time (564) Time 25/10/ 02:34:26 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 46.6 db LAE 76.1 db LAFMax 52. db LAeq1 4.7 db LAeq db LAeq db LAeq db LAeq db LAeq db 44.9 db k k Report No. 51-M21 PAGE 53 OF 103 Annual Noise Survey EPA Export :03:12:57

54 Name Roche Irl Ltd - B6 - Day-time (5) Time 24/10/ 11:49:49 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 49.6 db LAE 79.1 db LAFMax 6.9 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 41.9 db k k Report No. 51-M21 PAGE 54 OF 103 Annual Noise Survey EPA Export :03:12:57

55 Name Roche Irl Ltd - B6 - Day-time (547) Time 24/10/ 14::34 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 49.6 db LAE 79.1 db LAFMax 55. db LAeq db LAeq5 52. db LAeq db LAeq50 4. db LAeq db LAeq db 43.9 db k k Report No. 51-M21 PAGE 55 OF 103 Annual Noise Survey EPA Export :03:12:57

56 Name Roche Irl Ltd - B6 - Day-time (577) Time 25/10/ 15:0:03 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 43.5 db LAE 73.0 db LAFMax 5.5 db LAeq db LAeq db LAeq db LAeq db LAeq90.9 db LAeq95.5 db 39.9 db k k Report No. 51-M21 PAGE 56 OF 103 Annual Noise Survey EPA Export :03:12:57

57 Name Roche Irl Ltd - B6 - Night-time (556) Time 24/10/ 23:53:29 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 43. db LAE 73.3 db LAFMax 53.6 db LAeq1 4.7 db LAeq db LAeq db LAeq db LAeq90.5 db LAeq95.1 db 39.3 db k k Report No. 51-M21 PAGE 57 OF 103 Annual Noise Survey EPA Export :03:12:57

58 Name Roche Irl Ltd - B6 - Night-time (5) Time 25/10/ 02::55 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 42.0 db LAE 71.5 db LAFMax 52.7 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq95 3. db 3.0 db k k Report No. 51-M21 PAGE 5 OF 103 Annual Noise Survey EPA Export :03:12:57

59 Name Roche Irl Ltd - B7 - Day-time (539) Time 24/10/ 11:32:35 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 59.1 db LAE.5 db LAFMax 1.5 db LAeq db LAeq5.6 db LAeq db LAeq db LAeq db LAeq db 46.2 db k k Report No. 51-M21 PAGE 59 OF 103 Annual Noise Survey EPA Export :03:12:57

60 Name Roche Irl Ltd - B7 - Day-time (54) Time 24/10/ 14:37:52 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 46. db LAE 76.3 db LAFMax 59. db LAeq db LAeq5 4.2 db LAeq db LAeq db LAeq db LAeq db 44.7 db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:57

61 Name Roche Irl Ltd - B7 - Day-time (576) Time 25/10/ 14:50:45 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 47.2 db LAE 76.7 db LAFMax 64.7 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 44.5 db k k Report No. 51-M21 PAGE 61 OF 103 Annual Noise Survey EPA Export :03:12:57

62 Name Roche Irl Ltd - B7 - Night-time (555) Time 24/10/ 23:35:50 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 4.3 db LAE 77.7 db LAFMax 53.6 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 46.2 db k k Report No. 51-M21 PAGE 62 OF 103 Annual Noise Survey EPA Export :03:12:57

63 Name Roche Irl Ltd - B7 - Night-time (562) Time 25/10/ 01:59:36 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 47.3 db LAE 76. db LAFMax 56.6 db LAeq db LAeq5 4.7 db LAeq db LAeq db LAeq db LAeq db 45.3 db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:57

64 Name Roche Irl Ltd - B - Day-time (53) Time 24/10/ 11:15:04 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 52. db LAE 2.3 db LAFMax 72.1 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 46.7 db k k Report No. 51-M21 PAGE 64 OF 103 Annual Noise Survey EPA Export :03:12:57

65 Name Roche Irl Ltd - B - Day-time (549) Time 24/10/ 14:55:14 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 49.2 db LAE 7.7 db LAFMax 71. db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 46.4 db k k Report No. 51-M21 PAGE 65 OF 103 Annual Noise Survey EPA Export :03:12:57

66 Name Roche Irl Ltd - B - Day-time (575) Time 25/10/ 14:33:01 Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 49.7 db LAE 79.2 db LAFMax 6. db LAeq1.6 db LAeq db LAeq db LAeq db LAeq db LAeq db 45.4 db k k Report No. 51-M21 PAGE 66 OF 103 Annual Noise Survey EPA Export :03:12:57

67 Name Roche Irl Ltd - B - Night-time (554) Time 24/10/ 23:1:34 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 49.4 db LAE 7.9 db LAFMax 67.7 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 47.7 db k k Report No. 51-M21 PAGE 67 OF 103 Annual Noise Survey EPA Export :03:12:57

68 Name Roche Irl Ltd - B - Night-time (561) Time 25/10/ 01:42:25 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 4.4 db LAE 77.9 db LAFMax 61.6 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 47.0 db k k Report No. 51-M21 PAGE 6 OF 103 Annual Noise Survey EPA Export :03:12:57

69 Name Roche Irl Ltd - B9 - Day-time (537) Time 24/10/ 10:56:31 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 53.3 db LAE 2. db LAFMax.6 db LAeq1 5.6 db LAeq db LAeq db LAeq db LAeq db LAeq db 42. db k k Report No. 51-M21 PAGE 69 OF 103 Annual Noise Survey EPA Export :03:12:57

70 Name Roche Irl Ltd - B9 - Day-time (550) Time 24/10/ 15:13:54 Person Duration 00:15:00 24/10/ 10: db After 24/10/ 22: 0.05 db LAeq 47.4 db LAE 76.9 db LAFMax 69.5 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 42. db k k Report No. 51-M21 PAGE 70 OF 103 Annual Noise Survey EPA Export :03:12:57

71 Name Roche Irl Ltd - B9 - Day-time (574) Time 25/10/ 14:14: Person Duration 00:15:00 25/10/ 11: db After 25/10/ 22: db LAeq 43.1 db LAE 72.6 db LAFMax.1 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 3.7 db k k Report No. 51-M21 PAGE 71 OF 103 Annual Noise Survey EPA Export :03:12:57

72 Name Roche Irl Ltd - B9 - Night-time (553) Time 24/10/ 23:00:06 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 45.6 db LAE 75.1 db LAFMax 50.9 db LAeq1 4.2 db LAeq db LAeq db LAeq db LAeq db LAeq db 43.3 db k k Report No. 51-M21 PAGE 72 OF 103 Annual Noise Survey EPA Export :03:12:57

73 Name Roche Irl Ltd - B9 - Night-time (5) Time 25/10/ 01:23:53 Person Duration 00:15:00 24/10/ 22: 0.05 db After 25/10/ 03: db LAeq 46.6 db LAE 76.0 db LAFMax 73.6 db LAeq db LAeq5 4.1 db LAeq db LAeq db LAeq db LAeq db 43.2 db k k Report No. 51-M21 PAGE 73 OF 103 Annual Noise Survey EPA Export :03:12:57

74 Name Roche Irl Ltd - H1 - Day-time (570) Time 25/10/ 12:15:59 Person Duration 00:30:00 25/10/ 11: db After 25/10/ 22: db LAeq 4.1 db LAE.7 db LAFMax 70.2 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq95.5 db 39.1 db k k Report No. 51-M21 PAGE 74 OF 103 Annual Noise Survey EPA Export :03:12:57

75 Name Roche Irl Ltd - H1 - Day-time (593) Time 26/10/ 11:10:17 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 49.5 db LAE 2.1 db LAFMax 72.6 db LAeq1.3 db LAeq db LAeq db LAeq50. db LAeq db LAeq db 35.3 db k k Report No. 51-M21 PAGE 75 OF 103 Annual Noise Survey EPA Export :03:12:57

76 Name Roche Irl Ltd - H1 - Day-time (596) Time 26/10/ 12:54:4 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 4.9 db LAE 1.5 db LAFMax 65.4 db LAeq1 5.2 db LAeq db LAeq db LAeq db LAeq90.9 db LAeq95.4 db 39.5 db k k Report No. 51-M21 PAGE 76 OF 103 Annual Noise Survey EPA Export :03:12:57

77 Name Roche Irl Ltd - H1 - Night-time (57) Time 26/10/ 00:32:34 Person Duration 00:30:00 26/10/ 00: db After 26/10/ 01: db LAeq 41.1 db LAE 73.7 db LAFMax.5 db LAeq db LAeq db LAeq db LAeq50.7 db LAeq db LAeq95 3. db 3.1 db k k Report No. 51-M21 PAGE 77 OF 103 Annual Noise Survey EPA Export :03:12:57

78 Name Roche Irl Ltd - H1 - Night-time (5) Time 26/10/ 01:02:41 Person Duration 00:30:00 26/10/ 00: db After 26/10/ 01: db LAeq.6 db LAE 73.2 db LAFMax 53.2 db LAeq db LAeq db LAeq db LAeq50.3 db LAeq90 3. db LAeq db 37.7 db k k Report No. 51-M21 PAGE 7 OF 103 Annual Noise Survey EPA Export :03:12:57

79 Name Roche Irl Ltd - H2 - Day-time (569) Time 25/10/ 11:42:44 Person Duration 00:30:00 25/10/ 11: db After 25/10/ 22: db LAeq 5.3 db LAE 90.9 db LAFMax 1.7 db LAeq db LAeq5.9 db LAeq db LAeq db LAeq90.2 db LAeq db 3. db k k Report No. 51-M21 PAGE 79 OF 103 Annual Noise Survey EPA Export :03:12:57

80 Name Roche Irl Ltd - H2 - Day-time (594) Time 26/10/ 11:44: Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq.9 db LAE 93.5 db LAFMax 3.2 db LAeq db LAeq db LAeq db LAeq db LAeq90.4 db LAeq db 39.1 db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:57

81 Name Roche Irl Ltd - H2 - Day-time (597) Time 26/10/ 13:30:30 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq.6 db LAE 93.2 db LAFMax 79.1 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq95.5 db 39.7 db k k Report No. 51-M21 PAGE 1 OF 103 Annual Noise Survey EPA Export :03:12:5

82 Name Roche Irl Ltd - H2 - Night-time (59) Time 26/10/ 01:39:3 Person Duration 00:30:00 26/10/ 01: db After 26/10/ 02: db LAeq 41.6 db LAE 74.2 db LAFMax 57.1 db LAeq db LAeq db LAeq db LAeq db LAeq90.1 db LAeq db 39.2 db k k Report No. 51-M21 PAGE 2 OF 103 Annual Noise Survey EPA Export :03:12:5

83 Name Roche Irl Ltd - H2 - Night-time (590) Time 26/10/ 02:09:45 Person Duration 00:30:00 26/10/ 01: db After 26/10/ 02: db LAeq 41.2 db LAE 73. db LAFMax 59.0 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 39.1 db k k Report No. 51-M21 PAGE 3 OF 103 Annual Noise Survey EPA Export :03:12:5

84 Name Roche Irl Ltd - H3 - Day-time (56) Time 25/10/ 11:07:34 Person Duration 00:30:00 25/10/ 11: db After 25/10/ 22: db LAeq 69.5 db LAE db LAFMax 7.9 db LAeq1 4.3 db LAeq db LAeq db LAeq db LAeq90.1 db LAeq db 39.0 db k k Report No. 51-M21 PAGE 4 OF 103 Annual Noise Survey EPA Export :03:12:5

85 Name Roche Irl Ltd - H3 - Day-time (595) Time 26/10/ 12:19:31 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq.2 db LAE 92. db LAFMax.7 db LAeq db LAeq db LAeq10.0 db LAeq db LAeq db LAeq db 41.0 db k k Report No. 51-M21 PAGE 5 OF 103 Annual Noise Survey EPA Export :03:12:5

86 Name Roche Irl Ltd - H3 - Day-time (59) Time 26/10/ 14:06:12 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 61. db LAE 94.4 db LAFMax 2.7 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 41.1 db k k Report No. 51-M21 PAGE 6 OF 103 Annual Noise Survey EPA Export :03:12:5

87 Name Roche Irl Ltd - H3 - Night-time (2) Time 26/10/ 23:00:02 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq 51.3 db LAE 3.9 db LAFMax 74.1 db LAeq1 64. db LAeq db LAeq db LAeq db LAeq90.5 db LAeq95.0 db 39.0 db k k Report No. 51-M21 PAGE 7 OF 103 Annual Noise Survey EPA Export :03:12:5

88 Name Roche Irl Ltd - H3 - Night-time (3) Time 26/10/ 23:30:11 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq 51.7 db LAE 4.3 db LAFMax 77.2 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 35. db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:5

89 Name Roche Irl Ltd - H4 - Day-time (599) Time 26/10/ 15:10:31 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 55.5 db LAE.1 db LAFMax 2.0 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db 43.0 db k k Report No. 51-M21 PAGE 9 OF 103 Annual Noise Survey EPA Export :03:12:5

90 Name Roche Irl Ltd - H4 - Day-time (612) Time 27/10/ 13:14:03 Person Duration 00:30:00 27/10/ 11: db After LAeq 51.3 db LAE 3.9 db LAFMax 76.3 db LAeq1.1 db LAeq db LAeq db LAeq db LAeq db LAeq db 41.4 db k k Report No. 51-M21 PAGE 90 OF 103 Annual Noise Survey EPA Export :03:12:5

91 Name Roche Irl Ltd - H4 - Day-time (613) Time 27/10/ 13:45:1 Person Duration 00:30:00 27/10/ 11: db After LAeq 55.5 db LAE.1 db LAFMax 1.0 db LAeq db LAeq5 5.5 db LAeq db LAeq db LAeq db LAeq db 41.1 db k k Report No. 51-M21 PAGE 91 OF 103 Annual Noise Survey EPA Export :03:12:5

92 Name Roche Irl Ltd - H4 - Night-time (591) Time 26/10/ 02:46:59 Person Duration 00:30:00 26/10/ 02: db After 26/10/ 11: db LAeq 42.6 db LAE 75.1 db LAFMax 45.4 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq db.5 db k k Report No. 51-M21 PAGE 92 OF 103 Annual Noise Survey EPA Export :03:12:5

93 Name Roche Irl Ltd - H4 - Night-time (592) Time 26/10/ 03:17:05 Person Duration 00:30:00 26/10/ 02: db After 26/10/ 11: db LAeq 42.2 db LAE 74. db LAFMax 51.7 db LAeq db LAeq db LAeq db LAeq db LAeq db LAeq95.7 db.2 db k k Report No. 51-M21 PAGE 93 OF 103 Annual Noise Survey EPA Export :03:12:5

94 Name Roche Irl Ltd - H5 - Day-time (1) Time 26/10/ :22:30 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 73.2 db LAE 105. db LAFMax.1 db LAeq1 3.7 db LAeq5 79. db LAeq db LAeq db LAeq db LAeq db 45.7 db k k Report No. 51-M21 PAGE 94 OF 103 Annual Noise Survey EPA Export :03:12:5

95 Name Roche Irl Ltd - H5 - Day-time () Time 27/10/ 11:00:51 Person Duration 00:30:00 27/10/ 11: db After LAeq 72.2 db LAE 104. db LAFMax 92.3 db LAeq1 4.6 db LAeq5 7. db LAeq db LAeq db LAeq db LAeq db.9 db k k Report No. 51-M21 PAGE 95 OF 103 Annual Noise Survey EPA Export :03:12:5

96 Name Roche Irl Ltd - H5 - Day-time (9) Time 27/10/ 11:31:1 Person Duration 00:30:00 27/10/ 11: db After LAeq 72.7 db LAE db LAFMax 92.9 db LAeq1 5.1 db LAeq5 7.7 db LAeq db LAeq db LAeq db LAeq db.3 db k k Report No. 51-M21 PAGE 96 OF 103 Annual Noise Survey EPA Export :03:12:5

97 Name Roche Irl Ltd - H5 - Night-time (4) Time 27/10/ 00:05:36 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq 62.3 db LAE 94.9 db LAFMax 5.7 db LAeq db LAeq db LAeq10.7 db LAeq db LAeq db LAeq db 34.1 db k k Report No. 51-M21 PAGE 97 OF 103 Annual Noise Survey EPA Export :03:12:5

98 Name Roche Irl Ltd - H5 - Night-time (5) Time 27/10/ 00::10 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq. db LAE 93.4 db LAFMax 7.4 db LAeq db LAeq5.6 db LAeq db LAeq db LAeq db LAeq db 34.3 db k k Report No. 51-M21 PAGE 9 OF 103 Annual Noise Survey EPA Export :03:12:5

99 Name Roche Irl Ltd - H6 - Day-time (0) Time 26/10/ 15:46:56 Person Duration 00:30:00 26/10/ 11: db After 26/10/ 22: db LAeq 75.6 db LAE 10.2 db LAFMax 91.3 db LAeq1 7.0 db LAeq5 3.1 db LAeq db LAeq db LAeq db LAeq db 45.6 db k k Report No. 51-M21 PAGE 99 OF 103 Annual Noise Survey EPA Export :03:12:5

100 Name Roche Irl Ltd - H6 - Day-time (610) Time 27/10/ 12:05:32 Person Duration 00:30:00 27/10/ 11: db After LAeq 73.4 db LAE db LAFMax 9.9 db LAeq1 5.4 db LAeq5. db LAeq db LAeq db LAeq db LAeq db 42.4 db k k Report No. 51-M21 PAGE OF 103 Annual Noise Survey EPA Export :03:12:5

101 Name Roche Irl Ltd - H6 - Day-time (611) Time 27/10/ 12:3:19 Person Duration 00:30:00 27/10/ 11: db After LAeq 72.9 db LAE db LAFMax 9.7 db LAeq1 5.3 db LAeq5.2 db LAeq db LAeq50.7 db LAeq db LAeq db 43.6 db k k Report No. 51-M21 PAGE 101 OF 103 Annual Noise Survey EPA Export :03:12:5

102 Name Roche Irl Ltd - H6 - Night-time (6) Time 27/10/ 01:14:30 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq 62.2 db LAE 94. db LAFMax 90.3 db LAeq db LAeq db LAeq10.9 db LAeq db LAeq db LAeq db 34.4 db k k Report No. 51-M21 PAGE 102 OF 103 Annual Noise Survey EPA Export :03:12:5

103 Name Roche Irl Ltd - H6 - Night-time (7) Time 27/10/ 01:44:52 Person Duration 00:30:00 26/10/ 22: db After 27/10/ 11: db LAeq 57.9 db LAE 90.5 db LAFMax 9.2 db LAeq db LAeq db LAeq10.1 db LAeq db LAeq db LAeq db 34.3 db k k Report No. 51-M21 PAGE 103 OF 103 Annual Noise Survey EPA Export :03:12:5

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

Offaly County Council

Offaly County Council Derryclure Landfill Facility, Derryclure, Co. Offaly Annual Monitoring Report Waste Licence Reg. No. W0029-04 Report Date: th October 15 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

McGill Environmental Ltd.

McGill Environmental Ltd. McGill Environmental Ltd. Coom, Glenville, Co. Cork Environmental Noise Survey Report Date: 7 th October 2016 For inspection purposes only. KD Environmental Ltd. 1 Swiftbrook Glen, Virginia, Co. Cavan

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare Bray (Co. Wicklow) 01 276 1428 Lisburn (Co. Antrim) 028 9262 6733 Birmingham (U.K.) 0121 673 1804 Blackrock (Co.Cork) 021 4536155 Noise Monitoring Report 2017 For Schloetter (Ireland) Ltd. Naas Enterprise

More information

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016 MALONE O REGAN March 2016 Powerstown Landfill Industrial Emission Licence No. W0025-04 Annual Noise Survey 2015 2B Richview Office Park, Clonskeagh, Dublin 14. Tel: +353 01 2602655 Fax: +353 01 2602660

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT AT MURPHY BREWERY. Report Dated: 25 June 15 Greenhills House, Kilmoney, Carrigaline, Co. Cork. Tel: 353 21 437433 http://www.env.ie/ TITLE: Environmental Noise Assessment

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

Acoustics Technical Note

Acoustics Technical Note Acoustics Technical Note To Ian Roach From Alf Maneylaws Copies to File Date 30/3/11 Subject D123356: Devonport EfW: Analysis of measurement data to support adopted approach to BS4142 assessment. Introduction

More information

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-B BASELINE NOISE SURVEY 20-B BASELINE NOISE SURVEY Noise Sensitive Receptors A desk-based study and site walkover

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870 ENVIRONMENTAL NOISE MONITORING QUARTER 1, 2018 s PO Box 995 Parkes NSW 2870 Job No: J38252 Report issued: 25 June 2018 ESP ENVIRONMENTAL & SAFETY PROFESSIONALS A division of Enviro-Net Australia Pty. Ltd.

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Noise Assessment for Planning Purposes - as per TAN11

Noise Assessment for Planning Purposes - as per TAN11 Noise Assessment for Planning Purposes - as per TAN11 Report No: 1703035R01A Report Status: Final Report (Amended) Dated: 23 October 2017 Purchase order No: n/a Prepared for: Garep Demirci 73 Spencer David

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times 765 kv Substation Acoustic Noise Impact Study by Predictive Software and

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary Sheringham Shoal Cawston, Norfolk Substation Noise Assessment Summary Document title: Substation Noise Assessment Summary Status: Final Date: 13 March 2015 Project name: Sheringham Shoal, Cawston, Norfolk

More information

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE On behalf of: ITV plc Report No. 22396.01v1 October 2014 ITV CORONATION

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting KEYSBROOK ENVIRONMENTAL NOISE COMPLIANCE REPORTING Q1 2016 MZI RESOURCES LTD 1370900-5-100-Rev2-18.Feb.2016 www.svt.com.au Perth Brisbane Kuala Lumpur Bangkok Noise Vibration Corrosion Safety Reliability

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1 Designation: E 1014 84 (Reapproved 1995) e1 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM

More information

Pipeline Blowdown Noise Levels

Pipeline Blowdown Noise Levels Pipeline Blowdown Noise Levels James Boland 1, Henrik Malker 2, Benjamin Hinze 3 1 SLR Consulting, Acoustics and Vibration, Brisbane, Australia 2 Atkins Global, Acoustics, London, United Kingdom 3 SLR

More information

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations Revision 0 Keystone Project Document # RE-03 [2-4-22-2] ATCO Project # 763000 TransCanada Pipeline Ltd. Keystone Pipeline Project Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 1996-2 Second edition 2007-03-15 Acoustics Description, measurement and assessment of environmental noise Part 2: Determination of environmental noise levels Acoustique Description,

More information

Compliance Noise Survey & Assessment

Compliance Noise Survey & Assessment John Trotter Compliance Noise Survey & Assessment Duralie Coal October 2009 Issued October 2009 Vipac Engineers & Scientists Ltd Hunter Valley / Newcastle, NSW REPORT NO: 29N-09-0002-TRP-470219-0 PREPARED

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO. 01127-E VERSION A APRIL 2017 PREPARED FOR HANSON CONSTRUCTION MATERIALS PTY LTD LOT 151 PEATS RIDGE ROAD CALGA NSW 2250 DOCUMENT CONTROL Version

More information

Methods for rating and assessing industrial and commercial sound

Methods for rating and assessing industrial and commercial sound BS 4142:2014 BSI Standards Publication Methods for rating and assessing industrial and commercial sound BS 4142:2014 BRITISH STANDARD Publishing and copyright information The BSI copyright notice displayed

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Prepared for Castlereagh Coal Page i Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Reference: Report date: 28 June

More information

SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011

SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011 Date: 9 June 2012 Ref: SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant Approved by

More information

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg. August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community

More information

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2. Bloomfield Colliery Quarterly Noise Monitoring and Compliance Assessment September 2015 Report Number Q59 630.01053-R2 15 October 2015 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version:

More information

SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011

SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011 Date: 24 June 2012 Ref: 00148/Felbridge/002/rp SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Reference:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Reference:

More information

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Date: 09 March 2016 REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Client: Edinburgh Limited Report Author:... Dr R. Peters Principal Consultant

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Project Survey Report Plotting of Noise Isopleth Maps of Robinson Lake Natural Gas Plant

Project Survey Report Plotting of Noise Isopleth Maps of Robinson Lake Natural Gas Plant HAGEMEYER NORTH AMERICA - Technical Services. 6825 West Sam Houston Parkway North, Houston, Texas 77041 OFFICE 713.896.0193 FAX 713.896.6006 WWW.HAGEMEYERNA.COM April 2 nd, 2013 Mr. Justin Clock Health

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

November 12, Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8

November 12, Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8 November 12, 2009 Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8 Re: Summer 2009 Acoustic Audit and Intermediate Verification Measurements Amaranth Transformer Station,

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared

More information

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate Noise Management Plan Date November 2014 Issue No 1 TABLE OF CONTENTS 1. Introduction/Purpose 2. Responsibility and Authority 3. Noise Monitoring 4.

More information

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station 3. NOISE 3.1 Monitoring Requirements According to the requirements in the Construction EM&A Manual for Lamma Extension, the baseline levels at the monitoring locations have to be determined prior to the

More information

Annexure C-L.02 Report Page 2 of 6

Annexure C-L.02 Report Page 2 of 6 Annexure C-L.02 Page 2 of 6 L.02 Ambient Noise Monitoring Results (610.16185 Annexure C L.02) SLR Consulting Australia Pty Ltd Annexure C-L.02 Page 3 of 6 L.02 Ambient Noise Monitoring Results (610.16185

More information

Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises)

Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises) Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises) Noise Limits & Levels for Indoor Venues Indoor Venues 14. The noise limits for indoor venues are: (a)

More information

Protocol for Ambient Level Noise Monitoring

Protocol for Ambient Level Noise Monitoring July 2015 Protocol for Ambient Level Noise Monitoring L pressure =10.log [10 (Lp/10) - 10 (LpBackground/10) ] L pressure = 10.log [10 (Lp/10) - 10 (LpBackground/10) ] CENTRAL POLLUTION CONTROL BOARD P

More information

Public Hearing on Revisions to Lincoln County Zoning Ordinance

Public Hearing on Revisions to Lincoln County Zoning Ordinance November 21, 2016 William G. Beck Bill.Beck@woodsfuller.com Extension 601 Lincoln County Commission 104 N. Main Street Canton, SD 57013 Lincoln County State s Attorney s Office 104 N. Main Street, Suite

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

Noise and Ground-Borne Vibration Monitoring

Noise and Ground-Borne Vibration Monitoring 69 Noise and Vibration Study Noise and Ground-Borne Vibration Monitoring Labrador City, Newfoundland Nov, 07 Iron Ore Company of Canada TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 Study Objectives... 2

More information

Cymbaluk Noise Complaints

Cymbaluk Noise Complaints Decision 20259-D01-2015 Cymbaluk Noise Complaints December 22, 2015 Alberta Utilities Commission Decision 20259-D01-2015 Cymbaluk Noise Complaints Proceeding 20259 Application 20259-A001 December 22, 2015

More information

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate Noise Management Plan Date 31/7/15 Issue No 2e DRAFT TABLE OF CONTENTS 1. Policy Statement 2. Introduction/Purpose 3. Responsibility and Authority

More information

Sound Reflection from a Motorway Barrier

Sound Reflection from a Motorway Barrier Auckland Christchurch Kuala Lumpur Melbourne Sydney Wellington www.marshallday.com Sound Reflection from a Motorway Barrier Christopher W Day Paper revised June 2005 chrisday@marshallday.co.nz Abstract

More information

Environmental Noise Assessment Cambourne to Cambridge options

Environmental Noise Assessment Cambourne to Cambridge options Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED

More information

REPORT OF NOISE MONITORING AT HAYWARDS HEATH OCTOBER 2011 TO NOVEMBER 2012

REPORT OF NOISE MONITORING AT HAYWARDS HEATH OCTOBER 2011 TO NOVEMBER 2012 Date: 25 July 2013 Ref: REPORT OF NOISE MONITORING AT HAYWARDS HEATH OCTOBER 2011 TO NOVEMBER 2012 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant Approved by :. A.V.H.

More information

Template Planning Condition on Amplitude Modulation Noise Guidance Notes

Template Planning Condition on Amplitude Modulation Noise Guidance Notes www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction

More information

NOISE IMPACT STUDY FOR THE SOUTH PIER IMPROVEMENT PROJECT BROOKLYN, NEW YORK. April 2008

NOISE IMPACT STUDY FOR THE SOUTH PIER IMPROVEMENT PROJECT BROOKLYN, NEW YORK. April 2008 NOISE IMPACT STUDY FOR THE SOUTH PIER IMPROVEMENT PROJECT BROOKLYN, NEW YORK April 2008 NOISE IMPACT STUDY FOR THE SOUTH PIER IMPROVEMENT PROJECT BROOKLYN, NEW YORK Prepared for: ESS Group, Inc. 401 Wampanoag

More information

R e p o r t th A u g u s t

R e p o r t th A u g u s t N o ise Mon it o r ing R e p o r t L e g a c y W a y T u n n e l M o n i t o r i n g P o s t C o m m is s i o n ing T es ts V e n ti la t ion S t a c ks Jun e 20 1 6 R e p o r t 3557 4 th A u g u s t 2

More information

Noise results for PF Formation- September 2017

Noise results for PF Formation- September 2017 Location 1. Toratola Property Hitchcock Road Applicable Measurement Date/Time Criterion Level description [db] Noise results for PF Formation- September 2017 Measured Noise Level LAeq [db] Measured L1

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

REPORT OF NOISE MONITORING AT LEIGH SEPTEMBER 2011 TO NOVEMBER 2012

REPORT OF NOISE MONITORING AT LEIGH SEPTEMBER 2011 TO NOVEMBER 2012 Date: 25 July 2013 Ref: REPORT OF NOISE MONITORING AT LEIGH SEPTEMBER 2011 TO NOVEMBER 2012 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant Approved by :. A.V.H. Holdich

More information

Noise Study for Proposed Mavis Tire

Noise Study for Proposed Mavis Tire Noise Study for Proposed Mavis Tire Hyde Park, New York April 4, 2017 Prepared For: Town of Hyde Park Planning Board 4383 Albany Post Road Hyde Park, NY 12538 Prepared By: Novus Engineering, P.C. 25 Delaware

More information

Measuring procedures for the environmental parameters: Acoustic comfort

Measuring procedures for the environmental parameters: Acoustic comfort Measuring procedures for the environmental parameters: Acoustic comfort Abstract Measuring procedures for selected environmental parameters related to acoustic comfort are shown here. All protocols are

More information

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia ICSV14 Cairns Australia 9-12 July, 2007 ACOUSTIC BARRIER FOR TRANSFORMER NOISE Ruisen Ming SVT Engineering Consultants, Leederville, WA 6007, Australia Roy.Ming@svt.com.au Abstract In this paper, an acoustic

More information

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:

More information

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016.

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016. Duralie Coal Ltd PO Box 168, GLOUCESTER NSW 2422 www.duraliecoal.com.au Version: v1.1 Page 2 PREPARED BY: ABN 29 001 584 612 10 Kings Road New Lambton NSW 2305 Australia (PO Box 447 New Lambton NSW 2305

More information

Appendix D: Preliminary Noise Evaluation

Appendix D: Preliminary Noise Evaluation Appendix D: Preliminary Noise Evaluation Acoustics The study of sound and its properties is known as acoustics. By considering basic physical properties of sound and the acoustic environment, the potential

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

Fundamentals of Environmental Noise Monitoring CENAC

Fundamentals of Environmental Noise Monitoring CENAC Fundamentals of Environmental Noise Monitoring CENAC Dr. Colin Novak Akoustik Engineering Limited April 03, 2013 Akoustik Engineering Limited Akoustik Engineering Limited is the sales and technical representative

More information

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford Noise Impact Assessment TECHNICAL REPORT Hydropower Archimedean Screw Noise Impact Assessment Prepared for: The Low Carbon Hub, 23 Park

More information