Children's Center Noise Monitoring Monday, June 17, 2013

Size: px
Start display at page:

Download "Children's Center Noise Monitoring Monday, June 17, 2013"

Transcription

1 Monday, June 17, 2013

2 Tuesday, June 18, 2013

3 Wednesday, June 19, 2013

4 Thursday, June 20, 2013

5 Friday, June 21, 2013

6 Saturday, June 22, 2013

7 Sunday, June 23, 2013

8 Monday, June 24, 2013

9 Tuesday, June 25, 2013

10 Wednesday, June 26, 2013

11 Thursday, June 27, 2013

12 Friday, June 28, 2013

13 Saturday, June 29, 2013

14 Sunday, June 30, 2013

15 P. (206) F. (206) Etruria St, Suite Seattle, WA Memo To: Troy Stahlecker, University of Washington, Project Manager From: Justin Puggioni, SSA Acoustics, Technician Date: July 8, 2013 Re: UW Lander Hall Construction Noise Monitoring: Week -41 SSA Acoustics, LLP Dear Troy, This memo addresses the noise impact from the UW Lander Hall project construction activity to the UW Children s Center. This memo summarizes our current observations and data collected for the two week period between June 17, 2013 and June 30, The results include two long term measurements: one taken at the edge of the play area under the cover of the overhanging roof in the middle of the play area, and the other on the inside of the Children s Center in the commons area near the exterior window to the east. The results are limited to data recorded during the Children s Center hours of operation, which are 7:00 a.m. to 6:00 p.m. The Lander Hall and Children s Center sites both fall under Major Institution (MI) zoning. This type of zoning differs to sub zonings for noise compliance purposes. Both sites are considered commercial. The noise limits below are summarized from section Please refer to the exact noise ordinance for more complete information. Seattle Noise Ordinance: Chapter III Environmental Sound Levels Exterior Sound Level Limits The limit for a commercial noise source to a commercial receiver is dba (Leq) at the property line. During a measurement interval, the Lmax may exceed the Leq by no more than 15 dba Sound Created by Construction and Maintenance Equipment The exterior sound level limits established in Section , as measured from the property line of the real property of another person or at a distance of feet from the construction noise source, whichever is greater, may be exceeded during the following times by the following: Within Commercial zones, between 7 a.m. and 7 p.m. on weekdays, limits may be exceeded by 25 dba for equipment on construction sites. Therefore, the ordinance requires that construction noise not exceed Leq dba at the Children s Center property lines, since the property line is approximately feet from the Lander Hall site, and noise level is limited at the property line or any person on the property at feet, whichever is greater. The code does not specify a different Lmax limit for construction activity. However, we assume that the Lmax limit increases with the Leq for construction activity.

16 Page 2 of 3 Since our outdoor monitor is placed adjacent to the playground and not at the north property line, we will establish an equivalent noise limit that factors in the increased noise reduction from the increased distance. We calculate that construction noise will only be 6 dba louder at the north property line of the Children s Center given the increase in proximity. Therefore, construction noise will not exceed the dba noise limit at the property line if it does not exceed 79 dba at the play area monitor location. These limits are shown as dotted lines on our data charts. Given that the Children s Center is simply classified as a commercial property, the noise ordinance does not factor in any additional level of sensitivity for a day care. Therefore, we recommend setting a goal of dba for construction noise at the outdoor play area in order to achieve an acceptable noise environment for children. This was also established as our goal for the previous year of noise monitoring for the UW ECC project. Site Observation: We visited the site at 10:00 a.m. on June 30, At this time, there was little to no noise from construction activity inside the center. A noise level of 59 dba was measured with a handheld sound level inside the commons area for a short duration. The main source of noise was from children and staff members. We also documented the exterior noise level of the Children s Center play area, which was 64 dba for a short duration. At this time there was audible construction activity.

17 Page 3 of 3 Data Summary: After reviewing the outdoor noise data, the Lmax noise limit was exceeded four times on June 17 between 11am-12pm, June 20 at 9am, June 20 between 11am-12pm and June 27 between 11am and 12pm at the play area during the two week period. The recorded Lmax noise levels during this time is most likely from noise sources generated in the play area. The Leq limit was not exceeded at any time within the monitoring period. Interior noise levels seem to be driven by interior noise sources and activity within the Children s Center. Though some construction noise will be audible at times; it is having very little effect on the measured interior noise levels. This concludes our findings based on the data collected for weeks -41. The measured results are attached in the charts with this memo. Please contact us if you have any questions or require additional information. Sincerely, SSA Acoustics, LLP Justin Puggioni Technician

Children's Center Noise Monitoring Monday, January 14, 2013

Children's Center Noise Monitoring Monday, January 14, 2013 Monday, January 14, 2013 Tuesday, January 15, 2013 Wednesday, January 16, 2013 Thursday, January 17, 2013 Friday, January 18, 2013 Saturday, January 19, 2013 Sunday, January 20, 2013 Monday, January 21,

More information

Children's Center Noise Monitoring Monday, December 31, 2012

Children's Center Noise Monitoring Monday, December 31, 2012 Monday, December 31, 2012 No data from this monitor due to faulty battery. Tuesday, January 01, 2013 No data from this monitor due to faulty battery. Wednesday, January 02, 2013 No data from this monitordue

More information

Children's Center Noise Monitoring Monday, October 08, 2012

Children's Center Noise Monitoring Monday, October 08, 2012 Monday, October 08, 2012 Tuesday, October 09, 2012 Wednesday, October 10, 2012 Thursday, October 11, 2012 Friday, October 12, 2012 Monday, October 15, 2012 Tuesday, October 16, 2012 Wednesday, October

More information

Bancroft & Piedmont Cellular Facility

Bancroft & Piedmont Cellular Facility Page 1 of 19 Environmental Noise Analysis Bancroft & Piedmont Cellular Facility Berkeley, California BAC Job # 2015-177 Prepared For: Complete Wireless Consulting Attn: Ms. Kim Le 2009 V Street Sacramento,

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JUNE 30, 2014 JULY 06, 2014)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JUNE 30, 2014 JULY 06, 2014) ARTHUR KILL 3 US Army Corps of NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JUNE 30, 2014 JULY 06, 2014) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW JERSEY SITE # NAK-3

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014) ARTHUR KILL 3 US Army Corps of NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW JERSEY SITE

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF APRIL 29, 2013 MAY 05, 2013)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF APRIL 29, 2013 MAY 05, 2013) ARTHUR KILL 3 US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF APRIL 29, 2013 MAY 05, 2013) SITE NAK-1 DUARTE MARTI SCHOOL, FRONT STREET, ELIZABETH, NEW JERSEY

More information

UC Berkeley Northside Relocation Cellular Facility

UC Berkeley Northside Relocation Cellular Facility Page 1 of 19 Environmental Noise Analysis UC Berkeley Northside Relocation Cellular Facility Berkeley, California BAC Job # 2015-290 Prepared For: Complete Wireless Consulting Attn: Kim Le 2009 V Street

More information

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013) ARTHUR KILL 3 US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW

More information

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg. August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community

More information

Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study

Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study Page 1 of 8 WI #16 130 December 21, 2016 Alex Popov Liquid Entertainment 2367 Telegraph Avenue Berkeley, California Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study Dear Alex,

More information

Background Ambient Noise Study Rosemont Copper

Background Ambient Noise Study Rosemont Copper Background Ambient Noise Study Rosemont Copper Prepared for: Rosemont Copper 40 Cherry Creek South Drive, Ste. 10 Denver, Colorado 246 (3) 0-0138 Fax (3) 0-0135 Prepared by: 31 West Ina Road Tucson, Arizona

More information

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Raging River Quarry Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Introduction The Raging River Quarry operates in unincorporated King County, near Fall City, Washington. King

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc.

More information

PRACTICAL METHODOLOGY FOR FAST ENVIRONMENTAL FIELD MEASUREMENTS

PRACTICAL METHODOLOGY FOR FAST ENVIRONMENTAL FIELD MEASUREMENTS PRACTICAL METHODOLOGY FOR FAST ENVIRONMENTAL FIELD MEASUREMENTS PACS REFERENCE: 43.50.Sr Rodrigues, Rui M. G. C.; Carvalho, António P. O. University of Porto, Faculty of Engineering, Laboratory of Acoustics,

More information

Noise Mitigation Study Pilot Program Summary Report Contract No

Noise Mitigation Study Pilot Program Summary Report Contract No Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009

More information

Technical Report NOISE MONITORING PROGRAM

Technical Report NOISE MONITORING PROGRAM 1 Technical Report NOISE MONITORING PROGRAM This Technical Report presents the results of a noise monitoring program conducted around Louisville International Airport (the Airport) between June 2, and

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1 Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC Final Report Rev 1 Noise Impact Assessment RWDI # 1502274 SUBMITTED TO Paul Dufault Project Manager Metro Vancouver 4330

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc. May 2017

More information

If the pink gorilla eats watermelon every night, how much watermelons does he eat? One Stop Teacher Shop. Resources. Make Homework Interesting!

If the pink gorilla eats watermelon every night, how much watermelons does he eat? One Stop Teacher Shop. Resources. Make Homework Interesting! Resources Make Homework Interesting! Name: Date: Four in a Row: Reading Homework FICTION Each week you will select four boxes in a row for your reading homework. The row can be horizontal, vertical, or

More information

DOWNWIND LEG NOISE MONITORING SUMMARY REPORT

DOWNWIND LEG NOISE MONITORING SUMMARY REPORT Tel: 43-232-6771 Fax: 43-232-6762 RWDI AIR Inc. #1, 736-8 th Avenue S.W. Calgary, Alberta, Canada T2P 1H4 Email: solutions@rwdi.com DOWNWIND LEG NOISE MONITORING SUMMARY REPORT Introduction This report

More information

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station 3. NOISE 3.1 Monitoring Requirements According to the requirements in the Construction EM&A Manual for Lamma Extension, the baseline levels at the monitoring locations have to be determined prior to the

More information

THE INDIAN INSTITUTE OF ARCHITECTS PROGRAMME FOR PART I EXAMINATION OF JUNE-2017 (EXAMINATION SCHEME )

THE INDIAN INSTITUTE OF ARCHITECTS PROGRAMME FOR PART I EXAMINATION OF JUNE-2017 (EXAMINATION SCHEME ) THE INDIAN INSTITUTE OF ARCHITECTS PROGRAMME FOR PART I EXAMINATION OF JUNE-2017 (EXAMINATION SCHEME - 2014) 22-06-2017 THURSDAY ARCHITECTURAL DESIGN-I 10-30 A.M. TO 4-30 23-06-2017 FRIDAY HISTORY OF ARCHITECTURE-I

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Subject: Ambient Noise Measurement, Creekside Park Project, Monte Rio, California

Subject: Ambient Noise Measurement, Creekside Park Project, Monte Rio, California 22 December 2011 11215-00.01810 Laura Saunders, AICP Prunuske Chatham, Inc. 400 Morris Street, Suite G Sebastopol, CA 95472 Subject: Ambient Noise Measurement, Creekside Park Project, Monte Rio, California

More information

Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises)

Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises) Assessing Entertainment Noise. Using EPA s N-2 Policy (Control of Music Noise from Public Premises) Noise Limits & Levels for Indoor Venues Indoor Venues 14. The noise limits for indoor venues are: (a)

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

EMPLOYEE SELF SERVICE (ESS) The University of Wisconsin-Eau Claire Human Resource s Department

EMPLOYEE SELF SERVICE (ESS) The University of Wisconsin-Eau Claire Human Resource s Department EMPLOYEE SELF SERVICE (ESS) The University of Wisconsin-Eau Claire Human Resource s Department REFERENCE GUIDE FOR REQUESTING ABSENCES AND ENTERING TIME QUESTIONS? Call or e-mail Human Resources 715-836-2513

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Appendix D: Preliminary Noise Evaluation

Appendix D: Preliminary Noise Evaluation Appendix D: Preliminary Noise Evaluation Acoustics The study of sound and its properties is known as acoustics. By considering basic physical properties of sound and the acoustic environment, the potential

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Single Table Satellites & Mega Satellites Schedule Day Date Buy-In Time Mega Satellites 8:20pm $100 w/2 Opt. $20 AO

Single Table Satellites & Mega Satellites Schedule Day Date Buy-In Time Mega Satellites 8:20pm $100 w/2 Opt. $20 AO & Mega Satellites Schedule Day Date Buy-In Time Mega Satellites 8:20pm $100 w/2 Opt. $20 AO Friday 7/13 $65 11am-6pm On Demand! 8:20pm $100 w/2 Opt. $20 AO Saturday 7/14 $65 1pm-6pm On Demand! 5pm $100

More information

EXHIBITOR MANUAL North Carolina State Fairgrounds

EXHIBITOR MANUAL North Carolina State Fairgrounds EXHIBITOR MANUAL North Carolina State Fairgrounds September 22-24th, 2017 This Exhibitor Manual has been compiled to help you and your staff with complete details about all phases of the exhibition process

More information

The following is the summary of Keane Acoustics acoustical study for the City of St. Petersburg.

The following is the summary of Keane Acoustics acoustical study for the City of St. Petersburg. November 23, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics acoustical

More information

Swan DH Noise Impact Assessment Report

Swan DH Noise Impact Assessment Report Swan 4-64 6-1 3DH Noise Impact Assessment Report April 9, 2018 Prepared for: ConocoPhillips 34501 East Quincy Avenue Watkins, Colorado 80137 Prepared by: Behrens and Associates, Inc. 13806 Inglewood Avenue

More information

Appendix B: Noise Study

Appendix B: Noise Study Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared

More information

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during

More information

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night

Average Leq Ambient Noise levels db(a) Day Evening Night Day Evening Night Baseline As part of CYP s Construction Environmental Management Plan (CEMP), baseline noise monitoring is required to help form the project criteria for noise guideline targets for construction works during

More information

PROPOSED MARYWOOD DEVELOPMENT

PROPOSED MARYWOOD DEVELOPMENT ACOUSTICAL ANALYSIS PROPOSED MARYWOOD DEVELOPMENT CITY OF ORANGE, CALIFORNIA PREPARED FOR VCS Environmental 30900 RANCH VIEJO ROAD, SUITE 100 SAN JUAN CAPISTRANO, CALIFORNIA 92675 PREPARED BY A/E Tech

More information

SPRING. FALL There will be no classes Wyndham Championship Week (August 13-19) CAMPS. Visit us online at: Summer. Winter

SPRING. FALL There will be no classes Wyndham Championship Week (August 13-19) CAMPS. Visit us online at: Summer. Winter PLAYer Session 1: Mondays (April 9 - May 14) or Wednesdays (April 11 - May 16) PLAYer Session 2: Mondays (May 21 June 25 Makeup) or Wednesdays (May 23 June 27) Par Session 1: Mondays (April 9 - May 14)

More information

Trig Identities Packet

Trig Identities Packet Advanced Math Name Trig Identities Packet = = = = = = = = cos 2 θ + sin 2 θ = sin 2 θ = cos 2 θ cos 2 θ = sin 2 θ + tan 2 θ = sec 2 θ tan 2 θ = sec 2 θ tan 2 θ = sec 2 θ + cot 2 θ = csc 2 θ cot 2 θ = csc

More information

Pick 3 Lottery 7 DAY NUMBERS-18. Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork

Pick 3 Lottery 7 DAY NUMBERS-18. Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork 1 Pick 3 Lottery 7 DAY NUMBERS-18 Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork There were 47 Summary Report hits in Book 18. I thought it would be very interesting to see where these hits

More information

Staff Application Form

Staff Application Form Staff Application Form Personal Details: Name Date / / Address. Phone (HM) Phone (Cell).... Email address. Date of Birth / / Age.. Medical: Please circle or fill out the following questions: Health : Excellent

More information

Year 5 Block 2 Assessment

Year 5 Block 2 Assessment www.11plusguide.com Year 5 Block 2 Assessment 5 Section A Read and Respond Name: Date: Key Objectives Assessed Question Multiplying and dividing by 10 and 100 10 Ordering positive and negative integers

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1 Designation: E 1014 84 (Reapproved 1995) e1 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM

More information

Doug Casebeer Associate Director Artistic Director of Ceramics ext. 238

Doug Casebeer Associate Director Artistic Director of Ceramics ext. 238 Faculty Name: Anne Currier and Giselle Hicks Workshop Title: Ceramic Sculpture: transforming source Dates: August 20 31, 2018 Workshop #: C1217-18 Skill Level: ll - lll Meeting Time: Please see the attached

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

Techniques for the Control of Steady State Voltage in MV and LV Networks

Techniques for the Control of Steady State Voltage in MV and LV Networks Techniques for the Control of Steady State Voltage in MV and LV Networks by Dr Robert Barr, Electric Power Consulting Pty Ltd Prof. Vic Gosbell, University of Wollongong Mr Chis Halliday, Electrical Consulting

More information

Cleveland Poker Open. Main Event will include MSPT LIVE Reporting

Cleveland Poker Open. Main Event will include MSPT LIVE Reporting JACK Cleveland Casino - Cleveland, OH January 19-28, 2018 Players must have a players club card and valid ID to register and play. Cleveland Poker Open Main Event will include MSPT LIVE Reporting Amount

More information

PA3 Part 2: BLM List. Workbook 3 - Patterns & Algebra, Part 2 1 BLACKLINE MASTERS

PA3 Part 2: BLM List. Workbook 3 - Patterns & Algebra, Part 2 1 BLACKLINE MASTERS PA Part : BLM List Calendars Colouring Exercise Hanji Puzzles Hundreds Charts 8 Mini Sudoku 9 Sudoku The Real Thing Sudoku Warm Up Venn Diagram BLACKLINE MASTERS Workbook - Patterns & Algebra, Part Calendars

More information

FOURTH GRADE MATH PRACTICE TEST 4

FOURTH GRADE MATH PRACTICE TEST 4 1. The shaded portion of the model shown below represents a decimal number. How is the decimal number written in words? 3. The chalkboard in Mr. Down s classroom has a width of 10 feet. The chalkboard

More information

THE GAME EXPERIENCE SUMMER PROGRAM. Design, Animate, and Play Your Own Video Game!

THE GAME EXPERIENCE SUMMER PROGRAM. Design, Animate, and Play Your Own Video Game! 20 14 SUMMER PROGRAM THE GAME EXPERIENCE Education Game Design and Animation, Develop Your Own Game, Industry Guest Lectures, Game Studio Tours Program Overview University of Washington, Exclusive Industry

More information

APPENDIX G-4 NOISE MONITORING REPORT

APPENDIX G-4 NOISE MONITORING REPORT APPENDIX G-4 NOISE MONITORING REPORT TETRA TECH, INC. 820 Mililani Street, Suite 700 Honolulu, Hawai i 96813 Telephone (808) 533-3366 FAX (808) 533-3360 February 22, 2005 Uyen Tran Contract Monitor US

More information

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT 865522 RODEO STATION Kleinfelder Section Table of Contents 1.0 Introduction... 4 2.0 Noise Measurement Procedure... 4 3.0 Noise

More information

CHAPTER 3 NOISE FUNDAMENTALS

CHAPTER 3 NOISE FUNDAMENTALS CHAPTER 3 NOISE FUNDAMENTALS While a great deal is known about aircraft noise, the methods used to calculate noise exposure can be difficult to understand. Determining aircraft noise impacts involves logarithmic

More information

RAMSEY PLANNING BOARD MINUTES OF MEETING HELD ON SEPTEMBER 5, 2017

RAMSEY PLANNING BOARD MINUTES OF MEETING HELD ON SEPTEMBER 5, 2017 REGULAR MEETING RAMSEY PLANNING BOARD MINUTES OF MEETING HELD ON SEPTEMBER 5, 2017 Chairman Weber called the regular meeting of the Ramsey Planning Board to order at 7:30 p.m. PLEDGE OF ALLEGIANCE Mr.

More information

Booth Construction. Installation & Dismantle. AAO 2016 Exhibit Prospectus

Booth Construction. Installation & Dismantle. AAO 2016 Exhibit Prospectus Installation & Dismantle Exhibit Installation Installation days and hours are as follows: Tuesday, October 11 (for Targeted Exhibitors) 7:30 AM 7:00 PM Wednesday, October 12 and Thursday, October 13 7:30

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Pre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S

Pre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S Pre-Construction Sound Study Substation DRAFT January 2011 D A T A AN AL Y S IS S OL U T I ON S TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 SOUND LEVEL MONITORING...1 3.0 SOUND MODELING...4 3.1 Modeling

More information

INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2)

INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2) INSTALLATION & PROGRAMMING MANUAL PROGRAMMABLE TIMER (MODEL LP-2) Copyright Lencore Acoustics Corp. All rights reserved. April 2000 CONTENTS Introduction 3 Display 3 Keyboard 4 Installation 4 Set Up 4

More information

SEPT. 5-9, 2018 EQUI-FAIR and the SHOPS

SEPT. 5-9, 2018 EQUI-FAIR and the SHOPS SEPT. 5-9, 2018 The Spruce Meadows Masters attracts athletes and fans from around the world. The average attendance on market (5) days during the Masters Tournament in 2017 was 225,595. 174 booths available

More information

The fraction 2 is read two thirds. Model each fraction shown in problems 1 and 2. Then draw a picture of each fraction.

The fraction 2 is read two thirds. Model each fraction shown in problems 1 and 2. Then draw a picture of each fraction. Modeling Fractions Lesson 1 1 The denominator of a fraction shows how many equal parts make the whole. The numerator of a fraction shows how many parts we are describing. We can use models to illustrate

More information

Doug Casebeer Associate Director Artistic Director of Ceramics ext. 238

Doug Casebeer Associate Director Artistic Director of Ceramics ext. 238 5263 Owl Creek Road andersonranch.org Post Office Box 5598 Snowmass Village, CO 81615 phone 970/923-3181 fax 970/923-3871 Faculty Name: Mark Pharis Workshop Title: Studio Intensive: Designing Pottery Forms

More information

EPT 2018 MONTE CARLO TOURNAMENT SCHEDULE

EPT 2018 MONTE CARLO TOURNAMENT SCHEDULE EPT 2018 MONTE CARLO TOURNAMENT SCHEDULE April 24 - Tuesday 18:00 #1 NL Hold'em - 8 Handed - Single Re-Entry - Day 1 10,300 50,000 2018-04-24 19:30 20:00 #2 NL Hold'em - 1,100 Cash Qualifier - Unlimited

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Mr. John S. Davis, Complainant, vs. Southern California Edison Company (U 338-E, Defendant. Case No. C.12-02-021 (Filed February 29, 2012

More information

Main Event will include LIVE Reporting and LIVE Final Table Broadcast with Hole Cards

Main Event will include LIVE Reporting and LIVE Final Table Broadcast with Hole Cards Event Schedule FireKeepers Casino - Battle Creek, MI May -0, 08 Players must have a players club card and valid ID to register and play. Main Event will include LIVE Reporting and LIVE Final Table Broadcast

More information

Core Learning Standards for Mathematics Grade 6

Core Learning Standards for Mathematics Grade 6 Core Learning Standards for Mathematics Grade 6 Write and evaluate numerical expressions involving whole-number exponents. Write, read, and evaluate expressions; identify parts of an expression using mathematical

More information

Patterns and Sequences

Patterns and Sequences Practice A Patterns and Sequences Choose the sequence that matches each pattern. 1. Start with 12; subtract 2. A 2, 4, 6, 8, 10, 12, B 12, 11, 10, 9, 8, 7, C 12, 14, 16, 18, 20, D 12, 10, 8, 6, 4, 2, 3.

More information

FireKeepers Casino - Battle Creek, MI October 7-15, 2017

FireKeepers Casino - Battle Creek, MI October 7-15, 2017 FireKeepers Casino - Battle Creek, MI October 7-5, 07 The +0 is an optional dealer appreciation add-on ---,000 chips in Satellite, 5,000 chips in Main Event Day Event Location Rounds Time Friday, August

More information

Daily Communication Log. A helpful communication resource for host families and au pairs

Daily Communication Log. A helpful communication resource for host families and au pairs Daily Communication Log A helpful communication resource for host families and au pairs Dear host family, It s no secret that the most important aspect of a successful program experience is good communication

More information

Exhibit Display Rules and Regulations

Exhibit Display Rules and Regulations Exhibit Display Rules and Regulations TCEA Exhibit Display Rules and Regulations function on the principle that all exhibitors should be given an equal opportunity to present their product in the most

More information

Ridgeview Middle School. Summer Math Packet Incoming Grade 6

Ridgeview Middle School. Summer Math Packet Incoming Grade 6 Ridgeview Middle School Summer Math Packet Incoming Grade 6 Dear Ridgeview Student and Parent, The purpose of this packet is to provide a review of objectives that were taught the previous school year

More information

Temporary Sign Permit

Temporary Sign Permit 36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 228 586-727-2489 Fax Temporary Sign Permit Application and Regulations Page 1 Updated: 15OCT15 Temporary

More information

GRADE 1 SUPPLEMENT. Set C5 Geometry: 3-D Shapes Around Us Calendar Pattern. Includes. Skills & Concepts. January Calendar Pattern C5.

GRADE 1 SUPPLEMENT. Set C5 Geometry: 3-D Shapes Around Us Calendar Pattern. Includes. Skills & Concepts. January Calendar Pattern C5. GRADE 1 SUPPLEMENT Set C5 Geometry: 3-D Shapes Around Us Calendar Pattern Includes January Calendar Pattern C5.1 Skills & Concepts H identify, name, and describe 3-D objects in everyday situations H identify,

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

NATIONAL ABORIGINAL HOCKEY CHAMPIONSHIPS 2019 WHITEHORSE 10 TEAM FORMAT

NATIONAL ABORIGINAL HOCKEY CHAMPIONSHIPS 2019 WHITEHORSE 10 TEAM FORMAT NATIONAL ABORIGINAL HOCKEY CHAMPIONSHIPS 2019 WHITEHORSE 10 TEAM FORMAT FEMALE DIVISION POOL A POOL B MANITOBA (1) ONTARIO SOUTH (2) BRITISH COLUMBIA (4) SASKATCHEWAN (3) EASTERN DOOR & NORTH (5) ONTARIO

More information

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) JUNE 2017 NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) List of contents 1 Executive

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

WesPac Pittsburg Energy Infrastructure Project. Noise Assessment Report

WesPac Pittsburg Energy Infrastructure Project. Noise Assessment Report WesPac Pittsburg Energy Infrastructure Project Noise Assessment Report Prepared for WesPac Energy Pittsburg LLC And Oiltanking North America LLC Prepared by TRC 1200 Wall Street West, 2 nd Floor Lyndhurst,

More information

OSHTEMO CHARTER TOWNSHIP PLANNING COMMISSION MINUTES OF A MEETING HELD APRIL 24, 2014

OSHTEMO CHARTER TOWNSHIP PLANNING COMMISSION MINUTES OF A MEETING HELD APRIL 24, 2014 OSHTEMO CHARTER TOWNSHIP PLANNING COMMISSION MINUTES OF A MEETING HELD APRIL 24, 2014 Agenda PUBLIC HEARING: REVIEW OF SPECIAL EXCEPTION USE REQUEST FROM KZOO MI CROSS FITNESS INC. FOR ESTABLISHMENT OF

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

G r a d e. 2 M a t h e M a t i c s. Blackline Masters

G r a d e. 2 M a t h e M a t i c s. Blackline Masters G r a d e 2 M a t h e M a t i c s Blackline Masters BLM K 4.1 Assessment Checklist Student s Name Comments BLM 2.N.1.1 Eyes and Fingers BLM 2.N.1.2 Ten-Strips BLM 2.N.1.2 Ten-Strips (continued) BLM 2.N.1.3

More information

the Ultimate planner for the the creative business owner

the Ultimate planner for the the creative business owner the Ultimate planner for the the creative business owner cannot live in chaos Welcome to the Business Planner. This planner is designed for the creative entrepreneur using social media to grow their business.

More information

time management and beating procrastination work book

time management and beating procrastination work book To get year-round tips from presenters and access to loads of resources follow us on Twitter: @ukelevate time management and beating procrastination work book The 4 Elements of Time Management 1. 2. 3.

More information

UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018

UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018 UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018 Please note that for all ARCOM submittals, the following must be included in your application, record and presentation files/folders: Dimensioned details

More information

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study Project Number 11-107 Douglas P. Koehn, M.S. Senior Consultant 12040 SOUTH LAKES DRIVE, SUITE 104, RESTON, VIRGINIA

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

Vintage Christmas Redwork #12612 / 37 Designs

Vintage Christmas Redwork #12612 / 37 Designs 12612-01 Sunday 1,776 St. 12612-02 Monday 1,782 St. 12612-03 Tuesday 1,783 St. 12612-04 Wednesday 1,899 St. 12612-05 Thursday 1,883 St. 12612-06 Friday 1,786 St. 12612-07 Saturday 1,848 St. 12612-08 Poinsettia

More information

Standard Operating Procedure for Ceramics Area Tyler School of Art Jan 19, 2009

Standard Operating Procedure for Ceramics Area Tyler School of Art Jan 19, 2009 Standard Operating Procedure for Ceramics Area Tyler School of Art Jan 19, 2009 The following guidelines determine the proper use and access to all Ceramics Area spaces. The spaces outlined in this policy

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Advice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations

Advice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations January 4, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice No. 17-001 Rule 8 Metering and Schedule 300 Charges

More information

Prefabricated Elements Case Study

Prefabricated Elements Case Study Prefabricated Elements Case Study Final Report June 2007 Sponsored by the Smart Work Zone Deployment Initiative a Federal Highway Administration pooled fund study and the Midwest Transportation Consortium

More information

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) DECEMBER 2017 NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR) List of contents 1 Executive

More information

Titan Products RDU-4/TS & RDU-4/5B Time Scheduling Room Display Units

Titan Products RDU-4/TS & RDU-4/5B Time Scheduling Room Display Units Titan Products RDU-4/TS & RDU-4/5B Time Scheduling Room Display Units 1 Time Scheduling RDU-4/TS - Description of Control Operation The temperature control and time scheduling for the building space is

More information

LOCATIONS: Getting your UN ID for the 71 st Session of the General Assembly S D

LOCATIONS: Getting your UN ID for the 71 st Session of the General Assembly S D LOCATIONS: Getting your UN ID for the 71 st Session of the General Assembly DELEGATES: YOU CAN GET YOUR ID CARD AT: United Nations Pass and ID Office at 320 East 45 th Street (between 1 st and 2 nd Avenues)

More information

Paperblanks Dayplanner Attributes

Paperblanks Dayplanner Attributes Paperblanks Dayplanner Attributes Every Dayplanner is handbound to our exacting standards Two ribbon page markers Acid-free sustainable forest paper (which will last for centuries) Memento pouch European-made

More information

Rosa Parks Middle School Summer Math Packet Incoming C2.0 IM

Rosa Parks Middle School Summer Math Packet Incoming C2.0 IM Rosa Parks Middle School Summer Math Packet Incoming C2.0 IM Student Name: Teacher Name: Date: Dear Student and Parent, The purpose of this packet is to provide a review of objectives that were taught

More information