1 ALBA RF System F. Perez on behalf of the ALBA RF Group ALBA RF System 1/21

2 Synchrotron Light Source in Cerdanyola (Barcelona, Spain) 3 GeV accelerator 30 beamlines (7 on day one) Spanish Government Catalan Government First beam for users 2010 July 27th, 2006: Oficial start of the building work ALBA RF System 2/21

3 General Layout Booster RF Plant (1 Tx / cavity) Storage Ring RF Plants (2 Tx / cavity) RF Lab (1 Tx / cavity) ALBA RF System 3/21

4 SR RF TRANSMITTER Tube type Number Power Combination IOT 6 x 2 IOTs 2 x 80 kw CaCo RF Voltage 3600 kv Beam current 400 ma Losses (inc. IDs) 1300 kev/turn Beam power 520 kw ALBA RF System 4/21

5 SR RF Layout Load Circulator WR1800 CaCo WATRAX DAMPY cavities RF Tx ALBA RF System 5/21

6 Booster RF At 3 GeV RF Voltage 900 kv Beam current 2 ma Losses (inc. IDs) 627 kev/turn Beam power 1.3 kw TRANSMITTER Tube type 1 IOT Power 80 kw ALBA RF System 6/21

7 RF Lab Up to 80 kw In Spring 2007 installed provisionally in University Campus In Autum 2008 will be transllated to the new bulding ALBA RF System 7/21

8 Storage ring cavities : DAMPY Nose cones cavity with ferrite loaded dampers. The contract was signed in April 2006 with ACCEL for 7 identical pieces including girders, dampers, input windows and tuners. The CELLS prototype delivery is scheduled for January ALBA RF System 8/21

9 Dampy : modifications 2 spacers have been added to the girder to support the ridged waveguides. The wedges on which ferrite tiles are brazed can be taken apart without removing the whole damper. Vacuum gauge and a sapphire window at the end of one waveguide ALBA RF System 9/21

10 Booster cavity 5 cells cavity operating in π mode very similar to PETRA cavities. The contract was signed in April with ACCEL. The design report was approved in September Delivery is scheduled for January ALBA RF System 10/21

11 RF Transmitter awarded to Thomson : IOT Cabinet Delivery and installation of 14 transmitters (80 kw cw): IOT HVPS SSA Aux. PS Control system Kick-off meeting by next weeks with Thomson 1 st unit by May 2007 for the RF High Power Lab Following units from mid 2008 ALBA RF System 11/21

12 WG Systems Tendering done in 3 batches: BATCH 1 : Standard Waveguide lines (WR1800) Straights, Bends, bellows, bidirectional couplers, transitions BATCH 2 : Circulators BATCH 3 : Dry Loads 3 Companies in the tendering: AFT Ferrite Inc. MEGA Industries 2. Ferrite Inc. 1. MEGA Industries 3. AFT Decision to be validated ALBA RF System 12/21

13 Low Level RF Analogue Prototype I/Q Modulation / Demodulation Industrial PC GUI Ethernet Computer PCI bus PCI DAQ boards DAC DAC DAC DAC ADC Interlock Low-level electronics Cos?, Sin? FF set Reg. gain FB set Probe signal RF out I-Q mod AD8345 I+ I- Q+ I Q [2x2] Rotation Matrix I Q e I e Q I+ I- Q+ I-Q dem AD8348 Pre amplifier Q- Single-ended to Differential AD8132 Phase Shifter AD835 Regulator and Feed-forward AD835 Differential to Single-ended AD8130 Differential to Single-ended AD8130 Q- P probe 500 MHz 500 MHz MO Frequency doubler FD MHz Power Amplifier Cavity ALBA RF System 13/21

14 LLRF Analog prototype The ALLRF prototype has been successfully tested with a mock-up cavity. The measured group delay of the low-level electronics is 500 ns. The noise level is better than what we had specified (i.e. 1% and 1 ). A LLRF bandwidth of 1 MHz and a dynamic range of >23 db have been achieved. ALBA RF System 14/21

15 Low Level RF Digital Prototype DSP Digital Board Analog Front End IF Cav 12.5MHz ADC 50MHz FPGA I Control IF DAC 50MHz Analog Front End 500MHz Down Conversion IF FW 12.5MHz ADC 50MHz Digital IQ Demodulation and Control Loops Q Control IF DAC 50MHz Up Conversion 512.5MHz 50MHz Digital Timing System 50MHz 512.5MHz Analog Timing System RF Forward Signal (500MHz) RF Voltage Cavity Signal (500MHz) CAVITY Amplifier RF Control Signal (500MHz) Tuning Control Loop ALBA RF System 15/21

16 Analog Front Ends and Timing System -Up/Down conversion from RF to IF: Mixers and low pass filters from Mini-Circuits -Digital clocks for ADCs and DACs: Clock synchronizer board from Texas Instruments -Reference Signal (RF MHz) for down and up conversion. Outputs: 100MHz Ref Signal IF MHz 50MHz (ADCs&DACs Clk) RF Cav 25MHz 12.5MHz Hybrid Splitter IF 0º IF 90º Mixer Mixer LP LP IF Cav IF Fw Input External Reference (10MHz) RF Clock 500MHz RF Fw ALBA RF System 16/21

17 IQ Control Loops: Amplitude 200 Amplitude 117 Amplitude mv mv t(s) x Amplitude Reference Least Square Approx t(s) x Am plitude Error 2 2 Amplitude = I + Q ± 1.2mV Total Amplitude Stability = = 0.63% mv t(s) x 10-3 ALBA RF System 17/21

18 IQ Control Loops: Delay and Phase IRef IRef mv 69 mv t(s) x µs I Signal Reference Least Square Approx t(s) x 10-4 Group Delay: Around 2.5-3µs IQ Angle IQ Angle t(s) t(s) Phase Stability: ±0.2 at top of the ramp ±3 at bottom of the ramp ALBA RF System 18/21

19 Analog/Digital LLRF comparison - Performance Group delay Bandwidth Ripple removal up to Phase stability Amplitude stability Dynamic range ALLRF 500 ns 1 MHz 30 khz ±0.5 ±0.5 % 23 db DLLRF 3 µs - 2 khz ±0.2 ±0.75 % 20 db The stability, speed and dynamic range of the DLLRF is supposed to improve after analogue front end improvements. ALBA RF System 19/21

20 Summary 1) SR Dampy Cavity: 1st unit in January ) Booster Cavity: 1st unit in January ) RF Transmitter: 1st unit in May ) Waveguide: Awarding in the following weeks 5) LLRF: Prototypes ready Tests at ELETTRA with cavity next week 6) RF Lab: Foreseen for May 2007 ALBA RF System 20/21

21 The RF Group Francis Perez Paco Sanchez Michel Langlois Hooman Hassanzadegan Angela Salom Marc Cornelis (support Eng. Div.) Roberto Ranz (support Comp. Div.) ALBA RF System 21/21

DEVELOPMENT OF A DLLRF USING COMERCIAL UTCA PLATFORM

DEVELOPMENT OF A DLLRF USING COMERCIAL UTCA PLATFORM ACDIV-2017-11 May 2017 DEVELOPMENT OF A DLLRF USING COMERCIAL UTCA PLATFORM A. Salom, E. Morales, F. Pérez - ALBA Synchrotron Abstract The Digital LLRF of ALBA has been implemented using commercial cpci

More information

Design and performance of LLRF system for CSNS/RCS *

Design and performance of LLRF system for CSNS/RCS * Design and performance of LLRF system for CSNS/RCS * LI Xiao 1) SUN Hong LONG Wei ZHAO Fa-Cheng ZHANG Chun-Lin Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049, China Abstract:

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

RF Upgrade at DELTA. P. Hartmann DELTA, TU Dortmund

RF Upgrade at DELTA. P. Hartmann DELTA, TU Dortmund RF Upgrade at DELTA P. Hartmann DELTA, TU Dortmund DELTA parameters: Personnel: Beam energy: 550 MeV 1.5 GeV Beam current: 130mA @ 1.5GeV Beam lifetime: 12h @ 130 ma Availability: 95 % Operational: 3000

More information

ESS-Bilbao Contribution to ESS Warm LINAC High Power RF Systems

ESS-Bilbao Contribution to ESS Warm LINAC High Power RF Systems ESS-Bilbao Contribution to ESS Warm LINAC High Power RF Systems Arash Kaftoosian RF Group www.essbilbao.org On behalf of: Pedro Gonzalez Ibon Bustinduy RF Project Leader MEBT Project Leader ESS-Bilbao

More information

PLS-II SUPERCONDUCTING RF SYSTEM*

PLS-II SUPERCONDUCTING RF SYSTEM* PLS-II SUPERCONDUCTING RF SYSTEM* Sun An, Y.U. Sohn, H.S. Kang, M.H. Chun, I.S. Park, I.H. Yu, K.H. Park, H.G. Kim, M.H. Jung, Y.D. Joo, C.D. Park, K.R. Kim and S.H. Nam Pohang Accelerator Laboratory,

More information

The BESSY Higher Order Mode Damped Cavity - Further Improvements -

The BESSY Higher Order Mode Damped Cavity - Further Improvements - The BESSY Higher Order Mode Damped Cavity - Further Improvements - Ernst Weihreter Reminder of Technical Problems Solutions Conclusions BESSY HOM Damped Cavity Project collaboration: (EC funded) - BESSY

More information

Introduction to Synchrotron Radio Frequency System

Introduction to Synchrotron Radio Frequency System 3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications September 14-16, 2013 Introduction to Synchrotron Radio Frequency System Khorshid Sarhadi Head of ILSF RF Group 15 Sep. 2013 1 Outline

More information

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source.

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source. Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source. I.K. Sedlyarov V.S. Arbuzov, E.I Gorniker, A.A. Kondakov, S.A. Krutikhin, G.Ya. Kurkin, I.V.Kuptsov, V.N. Osipov, V.M. Petrov,

More information

Borut Baricevic. Libera LLRF. 17 September 2009

Borut Baricevic. Libera LLRF. 17 September 2009 Borut Baricevic Libera LLRF borut.baricevic@i-tech.si 17 September 2009 Outline Libera LLRF introduction Libera LLRF system topology Signal processing structure GUI and signal acquisition RF system diagnostics

More information

Digital Low Level RF for SESAME

Digital Low Level RF for SESAME Technical Sector Synchrotron-light for Experimental Science And Applications in the Middle East Subject : RF More specified area: Digital Low Level RF Date: 6/23/2010 Total Number of Pages: 11 Document

More information

Uppsala, June 17 th - 19 th, 2013

Uppsala, June 17 th - 19 th, 2013 TIARA Workshop on RF Power Generation for Accelerators Uppsala, June 17 th - 19 th, 2013 Massamba DIOP, R. LOPES, P. MARCHAND, F. RIBEIRO SSA operation at SOLEIL BOOSTER 35 kw STORAGE RING 180 kw SOLEIL

More information

FLASH rf gun. beam generated within the (1.3 GHz) RF gun by a laser. filling time: typical 55 μs. flat top time: up to 800 μs

FLASH rf gun. beam generated within the (1.3 GHz) RF gun by a laser. filling time: typical 55 μs. flat top time: up to 800 μs The gun RF control at FLASH (and PITZ) Elmar Vogel in collaboration with Waldemar Koprek and Piotr Pucyk th FLASH Seminar at December 19 2006 FLASH rf gun beam generated within the (1.3 GHz) RF gun by

More information

The HPRF system for a new 6 GeV synchrotron light source in Beijing

The HPRF system for a new 6 GeV synchrotron light source in Beijing 中国科学院高能物理研究所 INSTITUTE OF HIGH ENERGY PHYSICS CHINESE ACADEMY OF SCIENCES The HPRF system for a new 6 GeV synchrotron light source in Beijing (RF group, IHEP) The HEPS HPRF team Power coupler & power source

More information

Tutorial on Design of RF system for Indus Accelerator. Maherdra Lad Head, Radio Frequency Systems Division RRCAT, Indore

Tutorial on Design of RF system for Indus Accelerator. Maherdra Lad Head, Radio Frequency Systems Division RRCAT, Indore Tutorial on Design of RF system for Indus Accelerator Maherdra Lad Head, Radio Frequency Systems Division RRCAT, Indore Basic principle of RF Acceleration RF Power Amplifier The RF source supplies power

More information

R.Bachimanchi, IPAC, May 2015, Richmond, VA

R.Bachimanchi, IPAC, May 2015, Richmond, VA 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

Digital Signal Processing in RF Applications

Digital Signal Processing in RF Applications Digital Signal Processing in RF Applications Part II Thomas Schilcher Outline 1. signal conditioning / down conversion 2. detection of amp./phase by digital I/Q sampling I/Q sampling non I/Q sampling digital

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 2 MAX IV 3 GeV Storage Ring 2.6. The Radio Frequency System MAX IV Facility CHAPTER 2.6. THE RADIO FREQUENCY SYSTEM 1(15) 2.6. The Radio Frequency System 2.6. The Radio Frequency

More information

Resonator System for the BEST 70MeV Cyclotron

Resonator System for the BEST 70MeV Cyclotron Resonator System for the BEST 70MeV Cyclotron 20 nd International Conference on Cyclotrons and their Applications Vancouver, Canada, September 16-20, 2013 Vasile Sabaiduc, Dipl. Eng. Accelerator Technology

More information

Amplitude and Phase Stability of Analog Components for the LLRF System of the PEFP Accelerator

Amplitude and Phase Stability of Analog Components for the LLRF System of the PEFP Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 766770 Amplitude and Phase Stability of Analog Components for the LLRF System of the PEFP Accelerator Kyung-Tae Seol, Hyeok-Jung

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

J. Jacob: Status of the ESRF RF upgrade

J. Jacob: Status of the ESRF RF upgrade 17th ESLS RF Meeting 2013 HZB BESSY 18th 19th September Status of the ESRF RF upgrade J. Jacob J.-M. Mercier V. Serrière M. Langlois G. Gautier [CINEL] 1 RF upgrade phase 1 until 2015 - reminder Replacement

More information

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

MAX II RF system 100 MHz technology Lars Malmgren 10th ESLS RF Meeting Dortmund September 27-28, 2006

MAX II RF system 100 MHz technology Lars Malmgren 10th ESLS RF Meeting Dortmund September 27-28, 2006 MAX II RF system 1 MHz technology Lars Malmgren 1th ESLS RF Meeting Dortmund September 27-28, 26 Facts and figures MAX-II Frequency [MHz] Harmonic number No of cavity cells No of transmitters Cell radius

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark

Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark What is ISA? ISA operates and develops the storage ring ASTRID and related facilities ISA staff assist internal

More information

A Synchrotron Phase Detector for the Fermilab Booster

A Synchrotron Phase Detector for the Fermilab Booster FERMILAB-TM-2234 A Synchrotron Phase Detector for the Fermilab Booster Xi Yang and Rene Padilla Fermi National Accelerator Laboratory Box 5, Batavia IL 651 Abstract A synchrotron phase detector is diagnostic

More information

INTRODUCTION TO RADIOFREQUENCY SYSTEMS FOR PARTICLE ACCELERATORS

INTRODUCTION TO RADIOFREQUENCY SYSTEMS FOR PARTICLE ACCELERATORS INTRODUCTION TO RADIOFREQUENCY SYSTEMS FOR PARTICLE ACCELERATORS Elettra-Sincrotrone Trieste S.C.p.A, Italy 39 th International Nathiagali Summer College 4 th 9 th August 2014 2 OVERVIEW Introduction Building

More information

ESRF RF System Status Operation & Upgrade

ESRF RF System Status Operation & Upgrade 14 th ESLS RF Meeting 2010 ELETTRA, 29 th 30 th September ESRF RF System Status Operation & Upgrade Jörn Jacob, ESRF on behalf of the colleagues of the RF Group and many other ESRF Groups 14th ESLS RF,

More information

Predictions of LER-HER limits

Predictions of LER-HER limits Predictions of LER-HER limits PEP-II High Current Performance T. Mastorides, C. Rivetta, J.D. Fox, D. Van Winkle Accelerator Technology Research Div., SLAC 2e 34 Meeting, May 2, 27 Contents In this presentation

More information

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii Acceleration of High-Intensity Protons in the J-PARC Synchrotrons KEK/J-PARC M. Yoshii Introduction 1. J-PARC consists of 400 MeV Linac, 3 GeV Rapid Cycling Synchrotron (RCS) and 50 GeV Main synchrotron

More information

Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark. ESLS-RF 22 (8/ ), ASTRID2 RF system 1

Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark. ESLS-RF 22 (8/ ), ASTRID2 RF system 1 Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS-RF 22 (8/11 2018), ASTRID2 RF system 1 ASTRID2 is the new synchrotron light source in Aarhus, Denmark, since 2013

More information

Direct Digital Down/Up Conversion for RF Control of Accelerating Cavities

Direct Digital Down/Up Conversion for RF Control of Accelerating Cavities Direct Digital Down/Up Conversion for RF Control of Accelerating Cavities C. Hovater, T. Allison, R. Bachimanchi, J. Musson and T. Plawski Introduction As digital receiver technology has matured, direct

More information

1.5 GHz Cavity design for the Clic Damping Ring and as Active Third Harmonic cavity for ALBA.

1.5 GHz Cavity design for the Clic Damping Ring and as Active Third Harmonic cavity for ALBA. 1 1.5 GHz Cavity design for the Clic Damping Ring and as Active Third Harmonic cavity for ALBA. Beatriz Bravo Overview 2 1.Introduction 2.Active operation 3.Electromagnetic design 4.Mechanical design Introduction

More information

Superconducting RF System. Heung-Sik Kang

Superconducting RF System. Heung-Sik Kang Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High

More information

FPGA-BASED PULSED-RF PHASE AND AMPLITUDE DETECTOR AT SLRI

FPGA-BASED PULSED-RF PHASE AND AMPLITUDE DETECTOR AT SLRI doi:10.18429/jacow-icalepcs2017- FPGA-BASED PULSED-RF PHASE AND AMPLITUDE DETECTOR AT SLRI R. Rujanakraikarn, Synchrotron Light Research Institute, Nakhon Ratchasima, Thailand Abstract In this paper, the

More information

High power 352 MHz solid state amplifiers developed at the Synchrotron SOLEIL

High power 352 MHz solid state amplifiers developed at the Synchrotron SOLEIL PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 10, 112001 (2007) High power 352 MHz solid state amplifiers developed at the Synchrotron SOLEIL P. Marchand, T. Ruan, F. Ribeiro, and R. Lopes Synchrotron

More information

Slide Title. Bulleted Text

Slide Title. Bulleted Text Slide Title 1 Slide Outline Title Brief view of the C-AD Complex Review of the RHIC LLRF Upgrade Platform Generic Implementation of a Feedback Loop RHIC Bunch by Bunch Longitudinal Damper Cavity Controller

More information

MICROWAVE MICROWAVE TRAINING BENCH COMPONENT SPECIFICATIONS:

MICROWAVE MICROWAVE TRAINING BENCH COMPONENT SPECIFICATIONS: Microwave section consists of Basic Microwave Training Bench, Advance Microwave Training Bench and Microwave Communication Training System. Microwave Training System is used to study all the concepts of

More information

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction Chapter 4 The RF systems and beam feedback 4.1 Introduction The injected beam will be captured, accelerated and stored using a 400 MHz superconducting cavity system, and the longitudinal injection errors

More information

Status of the MAX IV RF systems. PPT-mall 2

Status of the MAX IV RF systems. PPT-mall 2 Status of the MAX IV RF systems PPT-mall 2 Lars Malmgren Med linje On Behalf of the MAX IV RF Group Åke Andersson, Joel Andersson, Richard Grandford, Sven-Olof Heed, Per Lilja, Dionis Kumbaro, Lars Malmgren,

More information

Performance of the Prototype NLC RF Phase and Timing Distribution System *

Performance of the Prototype NLC RF Phase and Timing Distribution System * SLAC PUB 8458 June 2000 Performance of the Prototype NLC RF Phase and Timing Distribution System * Josef Frisch, David G. Brown, Eugene Cisneros Stanford Linear Accelerator Center, Stanford University,

More information

RF System Models and Longitudinal Beam Dynamics

RF System Models and Longitudinal Beam Dynamics RF System Models and Longitudinal Beam Dynamics T. Mastoridis 1, P. Baudrenghien 1, J. Molendijk 1, C. Rivetta 2, J.D. Fox 2 1 BE-RF Group, CERN 2 AARD-Feedback and Dynamics Group, SLAC T. Mastoridis LLRF

More information

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture Konrad Gajewski 10 September 2013, Uppsala Why FREIA? Several circumstances test stand for

More information

Microphonics. T. Powers

Microphonics. T. Powers Microphonics T. Powers What is microphonics? Microphonics is the time domain variation in cavity frequency driven by external vibrational sources. A 1.5 GHz structure 0.5 m long will change in frequency

More information

Baseband simulation model of the vector rf voltage control system for the J-PARC RCS

Baseband simulation model of the vector rf voltage control system for the J-PARC RCS Journal of Physics: Conference Series PAPER OPEN ACCESS Baseband simulation model of the vector rf voltage control system for the J-PARC RCS To cite this article: Fumihiko Tamura et al 2018 J. Phys.: Conf.

More information

PINGER MAGNET SYSTEM FOR THE ALBA SYNCHROTRON LIGHT SOURCE

PINGER MAGNET SYSTEM FOR THE ALBA SYNCHROTRON LIGHT SOURCE ACDIV-2015-03 May, 2015 PINGER MAGNET SYSTEM FOR THE ALBA SYNCHROTRON LIGHT SOURCE M.Pont, N.Ayala, G.Benedetti, M.Carla, Z.Marti, R.Nuñez ALBA Synchrotron, Barcelona, Spain Abstract A pinger magnet system

More information

Performance Evaluation of the Upgraded BAMs at FLASH

Performance Evaluation of the Upgraded BAMs at FLASH Performance Evaluation of the Upgraded BAMs at FLASH with a compact overview of the BAM, the interfacing systems & a short outlook for 2019. Marie K. Czwalinna On behalf of the Special Diagnostics team

More information

Digital LLRF Test on the Renascence Cryomodule

Digital LLRF Test on the Renascence Cryomodule Digital LLRF Test on the Renascence Cryomodule Trent Allison, Rama Bachimanchi, Curt Hovater, John Musson and Tomasz Plawski Introduction The Renascence cryomodule was the first opportunity for testing

More information

Manufacturers of RF and Microwave Components and Assemblies Specialist in RF Filters, Power amplifiers and RF Switches

Manufacturers of RF and Microwave Components and Assemblies Specialist in RF Filters, Power amplifiers and RF Switches Manufacturers of RF and Microwave Components and Assemblies Specialist in RF Filters, Power amplifiers and RF Switches sales@cormic.com www.cormic.com P 724.940.7556 F 724.940.7707 RF & MICROWAVE FILTERS

More information

Solid state RF amplifier development at ESRF

Solid state RF amplifier development at ESRF Solid state RF amplifier development at ESRF Starring: The RF group with special thanks to Pierre Barbier, Philippe Chappelet, Alexandra Flaven-Bois and Denis Vial. Jean-Michel Chaize for advice on the

More information

Scalable Front-End Digital Signal Processing for a Phased Array Radar Demonstrator. International Radar Symposium 2012 Warsaw, 24 May 2012

Scalable Front-End Digital Signal Processing for a Phased Array Radar Demonstrator. International Radar Symposium 2012 Warsaw, 24 May 2012 Scalable Front-End Digital Signal Processing for a Phased Array Radar Demonstrator F. Winterstein, G. Sessler, M. Montagna, M. Mendijur, G. Dauron, PM. Besso International Radar Symposium 2012 Warsaw,

More information

Software Design Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 16, 2009

Software Design Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 16, 2009 Software Design Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 16, 2009 Copyright 2009 by Zheqiao Geng. Any change of this document should be agreed by

More information

Architecture and Performance of the PEP-II Low-Level RF System*

Architecture and Performance of the PEP-II Low-Level RF System* Architecture and Performance of the PEP-II Low-Level System* P. Corredoura Stanford Linear Accelerator Center, Stanford, Ca 9439, USA Abstract Heavy beam loading in the PEP-II B Factory along with large

More information

Advance on High Power Couplers for SC Accelerators

Advance on High Power Couplers for SC Accelerators Advance on High Power Couplers for SC Accelerators Eiji Kako (KEK, Japan) IAS conference at Hong Kong for High Energy Physics, 2017, January 23th Eiji KAKO (KEK, Japan) IAS at Hong Kong, 2017 Jan. 23 1

More information

Superconducting RF cavities activities for the MAX project

Superconducting RF cavities activities for the MAX project 1 Superconducting RF cavities activities for the MAX project OECD-NEA TCADS-2 Workshop Nantes, 22 May 2013 Marouan El Yakoubi, CNRS / IPNO 2 Contents 352 MHz spoke Cryomodule design 700 MHz test area 700

More information

Bunch-by-Bunch Broadband Feedback for the ESRF

Bunch-by-Bunch Broadband Feedback for the ESRF Bunch-by-Bunch Broadband Feedback for the ESRF ESLS RF meeting / Aarhus 21-09-2005 J. Jacob, E. Plouviez, J.-M. Koch, G. Naylor, V. Serrière Goal: Active damping of longitudinal and transverse multibunch

More information

CHAPTER 6 BOOSTER RF SYSTEMS

CHAPTER 6 BOOSTER RF SYSTEMS CHAPTER 6 BOOSTER RF SYSTEMS 6.1 NEW PSB RF CAVITIES H = 1 (0.6 1.8 MHz) The addition of cavities accelerating on RF harmonic h = 1 and supplemented with a h = 2 system, contributed to the reduction of

More information

Digital Self Excited Loop Implementation and Experience. Trent Allison Curt Hovater John Musson Tomasz Plawski

Digital Self Excited Loop Implementation and Experience. Trent Allison Curt Hovater John Musson Tomasz Plawski Digital Self Excited Loop Implementation and Experience Trent Allison Curt Hovater John Musson Tomasz Plawski Overview Why Self Excited Loop? Algorithm Building Blocks Hardware and Sampling Digital Signal

More information

EUROFEL-Report-2006-DS EUROPEAN FEL Design Study

EUROFEL-Report-2006-DS EUROPEAN FEL Design Study EUROFEL-Report-2006-DS3-034 EUROPEAN FEL Design Study Deliverable N : D 3.8 Deliverable Title: RF Amplitude and Phase Detector Task: Author: DS-3 F.Ludwig, M.Hoffmann, M.Felber, Contract N : 011935 P.Strzalkowski,

More information

EMMA the World's First Non-Scaling FFAG Accelerator

EMMA the World's First Non-Scaling FFAG Accelerator EMMA the World's First Non-Scaling FFAG Accelerator Susan Smith STFC Daresbury Laboratory CONTENTS Introduction Contents What are ns-ffags? and Why EMMA? The international collaboration EMMA goals and

More information

Measuring of small AC signals using lock-in amplifiers. Narrow band selective amplifiers + amplitude detector. Lock-in amplifiers

Measuring of small AC signals using lock-in amplifiers. Narrow band selective amplifiers + amplitude detector. Lock-in amplifiers Measuring of small AC signals using lock-in amplifiers. Narrow band selective amplifiers + amplitude detector. Lock-in amplifiers 3/12/2013 Physics 403 Spring 2013 1 Simplified block diagram of a lock-in

More information

C0da-r I&9 Commissioning Experience with the PEP-XI Low-Level RF System*

C0da-r I&9 Commissioning Experience with the PEP-XI Low-Level RF System* Cdar 9733 I&9 Commissioning Experience with the PEPXI LowLevel RF System* # SLACPUB753 f May 1997 (A) P. Corredoura, S. Allison, R. Claus, W. Ross, L. Sapozhnikov, H. D. Schwarz, R. Tighe, C. Yee, C. Ziomek

More information

CORRY MICRONICS, INC. 761 COMMONWEALTH DRIVE SUITE 201 WARRENDALE, PA P F

CORRY MICRONICS, INC. 761 COMMONWEALTH DRIVE SUITE 201 WARRENDALE, PA P F CORRY MICRONICS, INC. 761 COMMONWEALTH DRIVE SUITE 201 WARRENDALE, PA 15086 P 724.940.7556 F 724.940.7707 EMAIL: SALES@CORMIC.COM WWW.CORMIC.COM Manufacturers of RF and Microwave Components and Assemblies

More information

LCLS-II LLRF Prototype Testing and Characterization. Larry Doolittle, Brian Chase, Joshua Einstein-Curtis, Carlos Serrano LLRF 17,

LCLS-II LLRF Prototype Testing and Characterization. Larry Doolittle, Brian Chase, Joshua Einstein-Curtis, Carlos Serrano LLRF 17, LCLS-II LLRF Prototype Testing and Characterization Larry Doolittle, Brian Chase, Joshua Einstein-Curtis, Carlos Serrano LLRF 17, 2017-10-16 Outline A little background on LCLS-II LLRF Design - DSP algorithms

More information

The transition for the Elettra Input Power Coupler to the standard WR1800

The transition for the Elettra Input Power Coupler to the standard WR1800 The transition for the Elettra Input Power Coupler to the standard WR1800 Cristina Pasotti, Mauro Bocciai, Luca Bortolossi, Alessandro Fabris, Marco Ottobretti, Mauro Rinaldi Alessio Turchet Sincrotrone

More information

W-band vector network analyzer based on an audio lock-in amplifier * Abstract

W-band vector network analyzer based on an audio lock-in amplifier * Abstract SLAC PUB 7884 July 1998 W-band vector network analyzer based on an audio lock-in amplifier * R. H. Siemann Stanford Linear Accelerator Center, Stanford University, Stanford CA 94309 Abstract The design

More information

Coaxial tunnel roof feed-through and its cooling. Participants:

Coaxial tunnel roof feed-through and its cooling. Participants: Coaxial tunnel roof feed-through and its cooling Participants: The RF group with special thanks to Pierre Barbier, Vincent Serriere, Philippe Chatain, Claude Rival, Didier Boilot and Bernard Cocat. Perrine

More information

utca for SPS 200MHz Low Level RF Upgrade

utca for SPS 200MHz Low Level RF Upgrade 12th xtca Interest Group Meeting P. Baudrenghien, J. Galindo*, G. Hagmann, G. Kotzian, L. Schmid, A. Spierer CERN BE-RF Today s presentation -LOW LEVEL RF -CERN LLRF PLATFORMS -utca @ CERN-BE -PROOF OF

More information

New apparatus for precise synchronous phase shift measurements in storage rings 1

New apparatus for precise synchronous phase shift measurements in storage rings 1 New apparatus for precise synchronous phase shift measurements in storage rings 1 Boris Podobedov and Robert Siemann Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 Measuring

More information

USER OPERATION AND MAINTENANCE MANUAL

USER OPERATION AND MAINTENANCE MANUAL 46 Robezu str. LV-1004 Riga Latvia Phone: +371-7-065-100, Fax: +371-7-065-102 Mm-wave Division in St. Petersburg, Russia Phone: +7-812-326-5924, Fax: +7-812-326-1060 USER OPERATION AND MAINTENANCE MANUAL

More information

A 4 Channel Waveform Sampling ASIC in 130 nm CMOS

A 4 Channel Waveform Sampling ASIC in 130 nm CMOS A 4 Channel Waveform Sampling ASIC in 130 nm CMOS E. Oberla, H. Grabas, J.F. Genat, H. Frisch Enrico Fermi Institute, University of Chicago K. Nishimura, G. Varner University of Hawai I Large Area Picosecond

More information

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF Project X Cavity RF and mechanical design T. Khabiboulline, FNAL/TD/SRF TTC meeting on CW-SRF, 2013 Project X Cavity RF and mechanical design T 1 High ß Low ß 0.5 HWR SSR1 SSR2 0 1 10 100 1 10 3 1 10 4

More information

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011 Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts

More information

Accelerator Complex U70 of IHEP-Protvino: Status and Upgrade Plans

Accelerator Complex U70 of IHEP-Protvino: Status and Upgrade Plans INSTITUTE FOR HIGH ENERGY PHYSICS () Protvino, Moscow Region, 142281, Russia Accelerator Complex U70 of -Protvino: Status and Upgrade Plans (report 4.1-1) Sergey Ivanov, on behalf of the U70 staff September

More information

Implementing Audio Digital Feedback Loop Using the National Instruments RIO System

Implementing Audio Digital Feedback Loop Using the National Instruments RIO System Implementing Audio Digital Feedback Loop Using the National Instruments RIO System G. Huang, J. M. Byrd LBNL. One cyclotron Rd. Berkeley,CA,94720 Abstract. Development of system for high precision RF distribution

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

RF Locking of Femtosecond Lasers

RF Locking of Femtosecond Lasers RF Locking of Femtosecond Lasers Josef Frisch, Karl Gumerlock, Justin May, Steve Smith SLAC Work supported by DOE contract DE-AC02-76SF00515 1 Overview FEIS 2013 talk discussed general laser locking concepts

More information

Low Level RF. Part 2: Cavity Controller, Problems and Cures CAS RF. P. Baudrenghien CERN-BE-RF. 3. What will go wrong? 4. Power amplifier limits

Low Level RF. Part 2: Cavity Controller, Problems and Cures CAS RF. P. Baudrenghien CERN-BE-RF. 3. What will go wrong? 4. Power amplifier limits Low Level RF Part 2: Cavity Controller, Problems and Cures 3. What will go wrong? 4. Power amplifier limits 5. Beam Loading 6. Longitudinal instabilities in Synchrotrons 7. LLRF Cures CAS RF P. Baudrenghien

More information

Review on Progress in RF Control Systems. Cornell University. Matthias Liepe. M. Liepe, Cornell U. SRF 2005, July 14

Review on Progress in RF Control Systems. Cornell University. Matthias Liepe. M. Liepe, Cornell U. SRF 2005, July 14 Review on Progress in RF Control Systems Matthias Liepe Cornell University 1 Why this Talk? As we all know, superconducting cavities have many nice features one of which is very high field stability. Why?

More information

Status of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities

Status of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities Status of the 1.5 GeV Synchrotron Light Source and Related Accelerator Physics Activities 2006 RuPAC, September 10-14, Novosibirsk Thomas Weis for the machine and accelerator physics group Dortmund University

More information

TestData Summary of 5.2GHz WLAN Direct Conversion RF Transceiver Board

TestData Summary of 5.2GHz WLAN Direct Conversion RF Transceiver Board Page 1 of 16 ========================================================================================= TestData Summary of 5.2GHz WLAN Direct Conversion RF Transceiver Board =========================================================================================

More information

Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System

Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System 15 th ICALEPCS 2015, Melbourne, Australia K. Ha, Y. Tian, L. Yu, W. Cheng, L. Dalesio W. Levine, University of

More information

Linac Coherent Light Source (LCLS) Low Level RF Status LCLS FAC. October 30, 2007

Linac Coherent Light Source (LCLS) Low Level RF Status LCLS FAC. October 30, 2007 Linac Coherent Light Source (LCLS) Low Level RF Status LCLS Emma LCLS RF Gun, L0, and L1 Emma Dual Feed L0A L0B L0A 57MV 19MV/m L0B 72MV 24MV/m Off Axis Injector Vault Injector Transverse Accelerator 55cm

More information

RF Design of Normal Conducting Deflecting Cavity

RF Design of Normal Conducting Deflecting Cavity RF Design of Normal Conducting Deflecting Cavity Valery Dolgashev (SLAC), Geoff Waldschmidt, Ali Nassiri (Argonne National Laboratory, Advanced Photon Source) 48th ICFA Advanced Beam Dynamics Workshop

More information

arxiv: v1 [physics.acc-ph] 23 Mar 2018

arxiv: v1 [physics.acc-ph] 23 Mar 2018 LLRF SYSTEM FOR THE FERMILAB MUON G-2 AND MU2E PROJECTS P. Varghese, B. Chase Fermi National Accelerator Laboratory (FNAL), Batavia, IL 60510, USA arxiv:1803.08968v1 [physics.acc-ph] 23 Mar 2018 Abstract

More information

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti 7/6/2009 1 Outline : Description of the Box cavity Concept. Box Cavity Summary Plans. HFSS Models of orthogonal and

More information

Femtosecond Synchronization of Laser Systems for the LCLS

Femtosecond Synchronization of Laser Systems for the LCLS Femtosecond Synchronization of Laser Systems for the LCLS, Lawrence Doolittle, Gang Huang, John W. Staples, Russell Wilcox (LBNL) John Arthur, Josef Frisch, William White (SLAC) 26 Aug 2010 FEL2010 1 Berkeley

More information

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs

More information

RF Systems I. Erk Jensen, CERN BE-RF

RF Systems I. Erk Jensen, CERN BE-RF RF Systems I Erk Jensen, CERN BE-RF Introduction to Accelerator Physics, Prague, Czech Republic, 31 Aug 12 Sept 2014 Definitions & basic concepts db t-domain vs. ω-domain phasors 8th Sept, 2014 CAS Prague

More information

Beam Instability Investigations at DELTA

Beam Instability Investigations at DELTA 10 th ESLS-RF Meeting, September 27-28, Dortmund Beam Instability Investigations at Thomas Weis for the group Dortmund University Synchrotron Radiation Center Content: Status of the Facility Instability

More information

The Australian Synchrotron. Crowbar Less High Voltage Power Supplies (HVPS) 7th ESLS RF meeting, Oct Karl Zingre RF Engineer

The Australian Synchrotron. Crowbar Less High Voltage Power Supplies (HVPS) 7th ESLS RF meeting, Oct Karl Zingre RF Engineer The Australian Synchrotron Crowbar Less High Voltage Power Supplies (HVPS) 7th ESLS RF meeting, 16-17 Oct. 2003 Karl Zingre RF Engineer www.synchrotron.vic.gov.au Delivery schedule 2003 Construction works

More information

A NEW DIGITAL LOW-LEVEL RF CONTROL SYSTEM FOR CYCLOTRONS

A NEW DIGITAL LOW-LEVEL RF CONTROL SYSTEM FOR CYCLOTRONS A NEW DIGITAL LOW-LEVEL RF CONTROL SYSTEM FOR CYCLOTRONS W. D. Duckitt, J. L. Conradie, M. J. van Niekerk, J. Abraham, ithemba LABS, Somerset West, South Africa T. R. Niesler, Stellenbosch University,

More information

ERLP Status. Mike Dykes

ERLP Status. Mike Dykes ERLP Status Mike Dykes Content ASTeC RF & Diagnostics Group Work of the Group 4GLS ERLP Photo-injector Accelerating Modules Summary High Power RF Engineering Andy Moss SRS Support; DIAMOND; ERLP; MICE;

More information

ANITA ROSS Trigger/Digitizer/DAQ. Gary S. Varner University of Hawai, i, Manoa ANITA Collaboration JPL March 2004

ANITA ROSS Trigger/Digitizer/DAQ. Gary S. Varner University of Hawai, i, Manoa ANITA Collaboration JPL March 2004 ANITA ROSS Trigger/Digitizer/DAQ Gary S. Varner University of Hawai, i, Manoa ANITA Collaboration Meeting @ JPL March 2004 Overview System overview Reiterate, with ROSS simplifications ROSS trigger descope

More information

Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology

Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology 2009 IEEE Nuclear Science Symposium, Orlando, Florida, October 28 th 2009 Jean-Francois Genat On behalf of Mircea Bogdan 1, Henry J. Frisch

More information

Cavity Field Control - RF Field Controller. LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany

Cavity Field Control - RF Field Controller. LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany Cavity Field Control - RF Field Controller LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany Content Introduction to the controller Control scheme selection In-phase and Quadrature (I/Q)

More information

THE ORION PHOTOINJECTOR: STATUS and RESULTS

THE ORION PHOTOINJECTOR: STATUS and RESULTS THE ORION PHOTOINJECTOR: STATUS and RESULTS Dennis T. Palmer SLAC / ARDB ICFA Sardinia 4 July 2002 1. Introduction 2. Beam Dynamics Simulations 3. Photoinjector 1. RF Gun 2. Solenoidal Magnet 3. Diagnostics

More information

Bunch-by-bunch studies at DELTA

Bunch-by-bunch studies at DELTA Bunch-by-bunch studies at DELTA November 17 19, 29 Author: Dmitry Teytelman Revision: 1.2 March 3, 21 Copyright Dimtel, Inc., 21. All rights reserved. Dimtel, Inc. 259 Camden Avenue, Suite 136 San Jose,

More information

Re-commissioning the Recycler Storage Ring at Fermilab

Re-commissioning the Recycler Storage Ring at Fermilab Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on Accelerator Operations The Fermi National Accelerator

More information