Removal of the F/8 Secondary from the 4M Prime Focus Assembly

Size: px
Start display at page:

Download "Removal of the F/8 Secondary from the 4M Prime Focus Assembly"

Transcription

1 Doc #: 2100-AD Revision: - Removal of the F/8 Secondary from the 4M Prime Focus Assembly Author(s): Will Goble, Matthew Evatt, Miranda Saucedo

2 Contents Revision History Purpose Applicable To Scope Definitions Training Safety Personnel, Equipment and Materials Required Procedure Procedure Review Records References AD Docx Page 2 of 15

3 Revision History Rev Date Approved Sections Affected Reason for Change Remarks and/or Change Details Name -- 08/23/17 Initial release t. lavoie Approved by: Matt Evatt Name, ME Title SigEM Name, EL Maint SigSci Name, SciOps Tammie Lavoie 19 September 2017 Tammie Lavoie, Safety Manager Date 2100-AD Docx Page 3 of 15

4 1.0 Purpose The purpose of this document is to safely guide all applicable personnel through the removal of the F/8 secondary mirror from the prime focus assembly of the 4 Meter Mayall Telescope. 2.0 Applicable To This procedure is applicable to the Facilities, EM, and Engineering departments, or any additional personnel who will assist in completing these tasks for the Mayall 4 Meter Telescope. 3.0 Scope This document is a step by step procedure that outlines how to complete the removal of the F/8 secondary mirror from the prime focus assembly. 4.0 Definitions The acronyms referenced in this procedure are listed below. PF Prime Focus PFA Prime Focus Assembly PFC Prime Focus Cage 5.0 Training The trainings required for this procedure are listed below. 5.1 Lockout/Tagout 5.2 Overhead Crane Operations 5.3 Rigging 2100-AD Docx Page 4 of 15

5 6.0 Safety The safety documents required for this procedure are listed below. 6.1 Daily Briefing Form 6.2 JHA Form 6.3 Lockout/Tagout Standard Operating Policy (1000-AD ) 6.4 Lockout/Tagout Standard Operating Procedure (2100-AD ) 6.5 Cranes SOP (1000-AD ) 7.0 Personnel, Equipment and Materials Required Process # of Personnel Notes Removal of the F/8 Secondary 6 (1)-Electrical Maintenance (2)-Mechanical Maintenance (1)-Overhead Crane Operator (1)-Previous Participant (1)-Qualified Rigger Equipment/Part/Tool List Location Notes 3 Ton Dome Jib Crane 4 Meter N/A 5 Ton Dome Crane 4 Meter N/A F/8 Depth Micrometer Tool 4 Meter N/A F/8 Dummy Mirror and Cell 4 Meter N/A F/8 Mirror and Cell Removal Fixture 4 Meter N/A F/8 Mirror Band 4 Meter N/A F/8 Mirror Box 3 rd Floor, 4 Meter N/A F/8 Mirror Cover Rigging 4 Meter Strap and Clamp F/8 Mirror Removal Table 4 Meter N/A K&E Alignment Scope 4 Meter N/A K&E Scope Mount 4 Meter Blue, Adjustable K&E Scope to 4M Guider/Rotator Mounting Adapter 4 Meter White Wire Rope Sling 4 Meter Used for Main Floor Hatch SE Annex Stay Bar 4 Meter Console Floor to Top Ring 2100-AD Docx Page 5 of 15

6 8.0 Procedure The following processes must be completed before the removal of the F/8 secondary from the 4M prime focus assembly can begin. 8.1 Ensure the telescope is at Zenith (JHA-1). 8.2 Remove the Cassegrain Instrument (JHA-1). Note: This step is performed by the Instrumentation Group. The removal procedures for this step will depend on if KOSMOS or NEWFIRM is on the instrument. Refer to the KOSMOS Removal Procedure (2100-AD ) and its corresponding JHA (2100-AD JHA), or refer to the NEWFIRM Removal Procedure (2100-AD ) and its corresponding JHA (2100-AD JHA). 8.3 If NEWFIRM was on the telescope, install the guider (JHA-1). 8.4 Install the K&E alignment telescope adapter on the Cass guider using the blue K&E mount and the white adapter plate (Figure 1) (JHA-1). Figure 1: K&E Alignment Scope Mounted 8.5 Balance the telescope (JHA-1). Note: Refer to the 4 Meter Balancing Telescope Procedure (2100-AD ). 8.6 Stage the F/8 dummy (Figure 2), F/8 cell and mirror removal fixture (Figure 3), F/8 mirror removal table (Figure 4), and the F/8 mirror box (Figure 5) on the Ground Floor (JHA-1) AD Docx Page 6 of 15

7 Figure 2: F/8 Dummy Mirror and Dummy Cell Assembly Figure 3: F/8 Cell and Mirror Removal Fixture (Come-A-Long for Tilting) Figure 4: F/8 Mirror Removal Table 2100-AD Docx Page 7 of 15

8 Figure 5: F/8 Mirror Box 8.7 Ensure the telescope is at prime focus, with the PF corrector facing the primary mirror (JHA-1). If it is not, perform a major flip so the F/8 is facing away from the primary mirror. Note: If Mosaic is installed, follow the Secondary Major Flip F/8 to Prime Focus Procedure (2100-AD ) and the corresponding JHA (2100-AD JHA). If Mosaic is not installed, follow the Secondary Major Flip F/8 to Prime Focus (No Instrument) Procedure (2100-AD ) and the corresponding JHA (2100-AD JHA). 8.8 Lockout the telescope (JHA-1). Note: Refer to the Lockout Tagout Standard Operating Policy (1000-AD ) and the Lockout Tagout Standard Operating Procedure (2100- AD ). 8.9 Ensure the SE annex stay bar is installed from the flip (JHA-1). Note: If it is not, install it Open the hatch (JHA-1). Note: Refer to the 4 Meter Main Floor Hatch Removal Procedure (2100-AD ) and the corresponding JHA (2100-AD JHA). After completing the above, the remaining processes are as follows Rig the F/8 mirror cover (Figure 6) (JHA-2) AD Docx Page 8 of 15

9 Figure 6: F/8 Mirror Cover Rigged for Removal 8.12 Remove the F/8 mirror cover and fly it down to the Ground Floor so that it can be taken away for long-term storage during the DESI project (Figure 7) (JHA-3). Figure 7: 4M F/8 Mirror Cover on Telescope 8.13 Lift the F/8 cell and mirror removal fixture to the Console Floor (Figure 3) (JHA-4). Place the spreader bar on a cart Use the depth micrometer tool to measure the tilt of the mirror cell relative to the prime focus cage (Figure 8) AD Docx Page 9 of 15

10 Figure 8: F/8 Depth Micrometer Tool 8.15 Verify the position of the match marks for rotation. Remove the previous marks if they are not suitable Remove the panel cover from the inside of the PF cage to access the translation screws (JHA-5). Back off two of the translation screws; record which screws and how much each was turned Disconnect the electrical wiring and all other services going between the F/8 cell and mirror, and the PFA (JHA-6) Rig the mirror removal fixture to the 3 ton jib crane (Figure 9) (JHA-7). The chain hoist is used to adjust the angle of the fixture. Figure 9: F/8 Mirror Removal Fixture Rigged 2100-AD Docx Page 10 of 15

11 8.19 Connect the removal fixture to the F/8 mirror cell (Figures 10 and 11) (JHA-8). Figure 10: Install the Removal Fixture on F/8 Mirror Cell Figure 11: Install the Removal Fixture on F/8 Mirror Cell 8.20 Unbolt the F/8 from the prime focus cage (JHA-9) Lift the F/8 and move it to the Console Floor (Figure 12) (JHA-10). Note: WHY TO CONSOLE FLOOR? WHY NOT ALL THE WAY DOWN? 2100-AD Docx Page 11 of 15

12 Figure 12: Moving the F/8 Mirror and Cell on Fixture to C-Floor 8.22 Fly the F/8 cell down to the Ground Floor and set it with the fixture down and the cell up (Figure 13) (JHA-11). Figure 13: F/8 Cell, Mirror, and Fixture on Ground Floor 2100-AD Docx Page 12 of 15

13 8.23 Prepare the mirror for removal from the cell Lift the fixture and the cell/mirror assembly, and adjust the rigging so that the mirror is facing up (Figure 14) (JHA-12). Figure 14: F/8 Mirror and Cell Rotated so Mirror is Facing Up 8.25 Lift and install the F/8 dummy on the prime focus cage (JHA-13). Note: DO WE REALLY NEED TO INSTALL THE F8 DUMMY? 8.26 Close the hatches Remove the SE annex stay bar (JHA-14). Note: Refer to the 4M SE Annex Stay Bar Installation and Removal Procedure (2100-AD ) and the corresponding JHA (2100-AD JHA) Unlock the telescope. Note: Refer to the Lockout Tagout Standard Operating Policy (1000-AD ) and the Lockout Tagout Standard Operating Procedure (2100-AD ) Check the telescope balance Remove the mirror from the cell (JHA-15) Raise the mirror removal table to the upper limit Remove the three mirror removal plugs. Note: Refer to A Rest the mirror and cell on the removal table AD Docx Page 13 of 15

14 Ensure the mirror access ports are centered over the jacks Remove the mirror retainer. Note: Refer to D Cut the seal retaining cable and discard Remove the vacuum seal and save for a template. Note: Refer to C Lower the removal table and push the mirror out of the vacuum cell Use the 50 mirror band to move the mirror to a wash table Hand-wash the mirror Take Minolta measurements Open the F/8 Mirror Box and prepare it to receive the F/8 mirror Use the 50 mirror band to move the F/8 mirror to the F/8 mirror box, and package the mirror for long-term storage (JHA-16) Move the F/8 mirror box, with the mirror inside, to the Third Floor of the Mayall telescope for storage (JHA-17). There are not any processes that must be completed after the removal of the F/8 secondary from the 4M prime focus assembly. 9.0 Procedure Review This procedure must be reviewed by employees under the following terms: 9.1 Initially 9.2 When there is a change in the job process(es) 9.3 When there is a change in a worker s status, or job title 9.4 When governing authorities (such as OSHA) make changes 9.5 Every three years, at a minimum 2100-AD Docx Page 14 of 15

15 10.0 Records The records that must be kept on file by the supervisor are listed below. Training records must be available and maintained for a minimum of five years Daily Briefing Form Signature Page(s) 10.2 JHA Signature Page(s) 10.3 Personnel Training Records: Lockout/Tagout Overhead Crane Operations Rigging 11.0 References DOCUMENT NUMBER 1000-AD AD AD AD AD JHA 2100-AD AD AD AD JHA 2100-AD AD JHA 2100-AD AD JHA 2100-AD JHA 2100-AD AD AD DOCUMENT TITLE Lockout/Tagout Standard Operating Policy Cranes SOP 4 Meter Telescope Balancing Procedure Secondary Major Flip F/8 to Prime Focus (No Instrument) Secondary Major Flip F/8 to Prime Focus (No Instrument) JHA NEWFIRM Removal Procedure NEWFIRM Removal Procedure JHA 4 Meter Rotator/Guider Installation Procedure 4 Meter Rotator/Guider Installation JHA KOSMOS Removal Procedure KOSMOS Removal Procedure JHA 4 Meter Main Floor Hatch Removal Procedure 4 Meter Main Floor Hatch Removal JHA Removal of the F/8 Secondary from the 4M Prime Focus Assembly Lockout/Tagout Standard Operating Procedure 4M SE Annex Stay Bar Installation and Removal Procedure 4M SE Annex Stay Bar Installation and Removal JHA 2100-AD Docx Page 15 of 15

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Doc #: 2100-AD-015-0074 Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable

More information

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam Doc #: 2100 AD 015 0020 Revision: MOSAIC Removal Procedure Author(s): Hillary Mathis, Bill McCollam Contents Contents... 2 Revision History... 3 1. Purpose... 4 2. Applicable To... 4 3. Scope... 4 4. Definitions...

More information

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo Doc #: 2100-AD-015-0082 Revision: - Declination Work Platform Installation Author(s): Derek Guenther, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope...

More information

Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room.

Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room. Doc #: 2100-AD-015-0051 Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room Author(s): mevatt 1. Contents Revision History... 3 1. Purpose... 4 2. Applicable To...

More information

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak Doc #: 3500-AD-015-0019 Revision: Rev WIYN Secondary Lead Screw Cleaning Author(s): Tammie Lavoie, Robert Stupak Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope... 4 4.0

More information

Proposed Delay Line Tools Jigs and Handling Procedures Ver 1.0 INT-406-VEN-0119.doc. MRO Delay Line

Proposed Delay Line Tools Jigs and Handling Procedures Ver 1.0 INT-406-VEN-0119.doc. MRO Delay Line MRO Delay Line Proposed Delay Line Tools, Jigs and Handling Procedures Document No. INT-406-VEN-0119 The Cambridge Delay Line Team rev 1.0 30 Jan 2008 Cavendish Laboratory JJ Thomson Avenue Cambridge CB3

More information

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF Model 423-17 Brisket Scissor EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page Model 423--17... 4037003 Air Filter / Regulator / Lubricator 3022003 Air Hose Assembly... 3059018 Balancer...

More information

RADIO ANTI TWO-BLOCK SYSTEM

RADIO ANTI TWO-BLOCK SYSTEM BB-550 TM RADIO ANTI TWO-BLOCK SYSTEM INSTALLATION MANUAL GREER Company 1918 East Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX (714) 259-7626 BB-550 TM Radio Anti Two-Block System PN W250000

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM Page 1 of 7 1. SCOPE LOCKOUT / TAGOUT PROGRAM This Program outlines the purpose, rules, responsibilities and techniques to be followed by all University of Pittsburgh employees to guard against the unexpected

More information

DRAWINGS LIST TERMINAL TABLE TENSION GUARDRAIL X-TENSION G END OF CONTENTS

DRAWINGS LIST TERMINAL TABLE TENSION GUARDRAIL X-TENSION G END OF CONTENTS X-TSION G TSION GUARDRAIL D TERMINAL TABLE OF CONTTS DRAWINGS AND CHECK LIST Drawings and Check List 2 Tools 9 Installation 10 Foundations 32 Maintenance 33 REV DATE ISSUE COMMTS 05 17-06-10 Technical

More information

JARVIS. Model H080 Carcass Splitting Band Saw

JARVIS. Model H080 Carcass Splitting Band Saw Carcass Splitting Band Saw EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page... See Table 1, Page 4 Balancer... 4042042 Band Saw Blade... 1023099 Notice to Employer and Safety Director... 2

More information

PORTABLE PULLER 55 Ton Capacity

PORTABLE PULLER 55 Ton Capacity SPX Corporation 5885 11th Street Rockford, IL 61109-3699 USA Internet Address: http://www.powerteam.com Tech. Services: (800) 477-8326 Fax: (800) 765-8326 Order Entry: (800) 541-1418 Fax: (800) 288-7031

More information

Instrument Change Checklist ISIS

Instrument Change Checklist ISIS Instrument Change Checklist ISIS Renee Pit 2nd Nov 2009 Juerg Rey, 3/08/2015 Carlos Martin 18/08/2015 Revision 2.0 Description : WHT Cassegrain Spectrograph Location : WHT Cassegrain Focus Weight : 1500

More information

OAK GROVE PLANT MAINTENANCE SECTION-MECHANICAL

OAK GROVE PLANT MAINTENANCE SECTION-MECHANICAL UNIT 1 PULVERIZER SYSTEM SEMI-ANNUAL INSPECTION OG-MSM-229 EFFECTIVE DATE: PREPARED BY (Print): TOM PERSON 8/31/21 EXT: 6395 TECHNICAL REVIEW BY (Print): EXT: APPROVED BY: DATE: OG-MSM-229 PAGE 2 OF 24

More information

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 6010-34 Inspection 3. Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 3. If spring test equipment is available, check the tension of each spring according to the specifications

More information

Procedure title: Drawbar tension removing and upper cover removal

Procedure title: Drawbar tension removing and upper cover removal DISASSEMBLY PROCEUDRES: Procedure title: Drawbar tension removing and upper cover removal Procedure: page #1 1. Assemble tensioning units and sling spreader. See pictures (QA assembly notes log book page

More information

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More 2017 ELECTRICAL SAFETY SERVICES Arc Flash Electrical Maintenance Lockout/Tagout And More ABOUT LEWELLYN TECHNOLOGY Improving workplace safety since 1993 Daryn Lewellyn founded Lewellyn Technology more

More information

Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A. Renewal Parts

Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A. Renewal Parts Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A Renewal Parts Warning: To avoid hazards of electrical shock, remove all power before proceeding. Auxiliary contacts commonly control

More information

Lubricating Cleaning Unjamming machines and equipment PPT-SM-LOTO

Lubricating Cleaning Unjamming machines and equipment PPT-SM-LOTO Lockout/Tagout Lockout and tagout procedures should be used to safeguard workers from the unexpected startup or release of stored energy during service or maintenance activities like Lubricating Cleaning

More information

Compliance pack. Table of Contents Version Control General Information Operator s Manual... 4

Compliance pack. Table of Contents Version Control General Information Operator s Manual... 4 Table of Contents Table of Contents... 1 1.0 Version Control... 2 2.0 Introduction... 3 3.0 Purpose... 3 4.0 General Information... 3 5.0 Operator s Manual... 4 6.0 Plant Log Book-Daily Inspection... 4

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS TreadClimber INSTALLATION INSTRUCTIONS STAR TRAC FITNESS 1 of 14 635-4175 Rev: B NOTICE Installation of this product requires that 2 or more people are available to safely perform certain steps outlined

More information

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks Mounting Instructions For DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks WARNING: Because of the possible danger to person(s) or property from accidents which may result from the

More information

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics

More information

Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger.

Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger. TASK: Set up and Operate an Air Tugger 101 AIR TUGGER CHECKLIST following tasks in actual on-the-job situations using air-tugger. Tugger Task 1. Mount tugger Company 2. Unwind wire rope from spool 3. Anchor

More information

Eric B. Burgh University of Wisconsin. 1. Scope

Eric B. Burgh University of Wisconsin. 1. Scope Southern African Large Telescope Prime Focus Imaging Spectrograph Optical Integration and Testing Plan Document Number: SALT-3160BP0001 Revision 5.0 2007 July 3 Eric B. Burgh University of Wisconsin 1.

More information

JARVIS. Model Buster IV Forequarter Beef Splitting Band Saw Installation Instructions... 9 TABLE OF EQUIPMENT

JARVIS. Model Buster IV Forequarter Beef Splitting Band Saw Installation Instructions... 9 TABLE OF EQUIPMENT Beef Splitting Band Saw EQUIPMENT SELECTION............. Ordering No. TABLE OF CONTENTS......................... Page Buster IV Forequarter Saw.... 4006058 Spring Balancer............. 4042023 Blade......................

More information

1. Description This section describes the procedures to install the GNIRS onto a side looking port on the Gemini 8M telescope.

1. Description This section describes the procedures to install the GNIRS onto a side looking port on the Gemini 8M telescope. 4.3 Instrument Installation & Removal 4.3.1. Installing Instrument on Side Looking Port 1. Description This section describes the procedures to install the GNIRS onto a side looking port on the Gemini

More information

Application Guidelines

Application Guidelines Reg No 4-8721 Rev1 Date: 2006-12-27. Sign: KN Application Guidelines Rubber Foot Type 52-02 Height Adjustable Rubber Foot Type 52-10, 52-15 Basic function The basic function of the rubber element is to

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

Installation Instructions

Installation Instructions Installation Instructions For 4 foot / 1.2m Diameter Ultra-high Performance Antenna Model ADxxG-4-T2 Before Installation, please read the instructions carefully. This instruction guide covers the installation

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic

More information

Issue 1.0. Date 2 th June Signature and Date. Document Prepared By: Document Approved By: Document Released By: Signature and Date

Issue 1.0. Date 2 th June Signature and Date. Document Prepared By: Document Approved By: Document Released By: Signature and Date Document Title Document Number Deliverable Items List 1.1D070G Issue 1.0 Date 2 th June 2004 Document Prepared By: Document Approved By: Document Released By: David Lunney Mark Casali David Lunney Signature

More information

Slide 1. Slide 2. Slide 3. The Knack. Background Information

Slide 1. Slide 2. Slide 3. The Knack. Background Information Slide 1 Prepared by: Ian Humphrey, P. Eng. Paul Henderson, P. Eng. Slide 2 The Knack Slide 3 Background Information Began my career in the lifting industry in 1994 as a draftsman and returned to school

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 17096 First edition 2015-08-01 Cranes Safety Load lifting attachments Appareils de levage à charge suspendue Sécurité Accessoires de préhension Reference number ISO 17096:2015(E)

More information

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas. Description The following pages show the steps required to assembly and fit the antenna mount to a vertical tower pipe of diameter 48 to 115 mm (1.9 to 4.5"). This mount provides ±20 azimuth or ±15 elevation

More information

Policy Sponsor: Assistant Vice President Facilities Management. Responsible Unit: Trade Services

Policy Sponsor: Assistant Vice President Facilities Management. Responsible Unit: Trade Services Safe Work Instructions for Powered Mitre Cut Hack Saw (Mitercut Model 220M) Policy Sponsor: Assistant Vice President Facilities Management Responsible Unit: Trade Services Approval Date: November 2016

More information

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled

More information

User Manual and Specifications for LC-40w Projector. LTBLtech. Loss Prevention for the 21 st Century

User Manual and Specifications for LC-40w Projector. LTBLtech. Loss Prevention for the 21 st Century User Manual and Specifications for LC-40w Projector LTBLtech Loss Prevention for the 21 st Century 1 Thank you for your purchase of the LC-40w LightCop Projector. Before installing and using your LC-40w

More information

ULTRA CUTTER MINI SAW

ULTRA CUTTER MINI SAW ULTRA CUTTER MINI SAW OPERATORS INSTRUCTION MANUAL Per OSHA 1926.503 it is the machine owner s responsibility to ensure that all workers using this Ultra Cutter Mini Saw are thoroughly trained in its use

More information

INSTALLATION GUIDE. Version 2.0

INSTALLATION GUIDE. Version 2.0 INSTALLATION GUIDE Version 2.0 INTRODUCTION Carefully read these instructions to assure proper installation and performance of the GatorDeck TM. TOOLS NEEDED 1. Calibrated test weights 2. Phillips screwdriver

More information

Bead Roller Operating, Servicing, and Safety Instruction Manual

Bead Roller Operating, Servicing, and Safety Instruction Manual Bead Roller Operating, Servicing, and Safety Instruction Manual CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine. 1-800-67-26 10 Cooperative Way

More information

Motorized Tower Raising System Manual

Motorized Tower Raising System Manual Motorized Tower Raising System Manual Introduction and Safety Guidelines Important! Read through the manual in its entirety prior to assembly and installation of the motorized tower raising system. WARNING:

More information

More Than Four Decades of Safety, Service, Quality

More Than Four Decades of Safety, Service, Quality More Than Four Decades of Safety, Service, Quality Mission Our commitment to safety and service has been the key to our phenomenal success. On behalf of Imperial Crane and the Bohne family, I would like

More information

LCD DISPLAY MOUNT

LCD DISPLAY MOUNT I N S T A L L A T I O N M A N U A L 38-804769-01 LCD DISPLAY MOUNT WWW.CHRISTIEDIGITAL.COM Contents - Assembly drawing - Securing the bottom wall plate - Fine tune adjustments - Marking the top plate mounting

More information

JARVIS. Model Buster V Loin Drop Beef Loin Dropping Saw

JARVIS. Model Buster V Loin Drop Beef Loin Dropping Saw Beef Loin Dropping Saw EQUIPMENT SELECTION... Buster V Loin Drop Saw Ordering No. 230V, 60Hz Model... 4006051 460V, 60Hz Model... 4006060 575V, 60Hz Model... 4006087 Spring Balancer... 4042038 Blade (133

More information

Replacing the build plate clamps

Replacing the build plate clamps Repair manual Replacing the build plate clamps Instructions The build plate clamps hold the glass plate in place on the heated bed. There are two fixed in place at the back of the heated bed and two at

More information

INSTRUCTIONS FOR THE COMMISSIONING AND MAINTENANCE OF DIGITAL GENERATOR PROTECTION 3 I - PRINCIPLES AND APPLICATIONS 4 on 5 6 7 Figure 5 - Inverse time curve (N1) 8 9 1 0 1 1 1 2 1 3 All relays are delivered

More information

INSTALLER S GUIDE CAUTION BDS-0050: SWING MOUNTED ASSISTANT VAC PAC FOR BEL-50 AND BEL-20N DENTAL CHAIRS BDS-0050

INSTALLER S GUIDE CAUTION BDS-0050: SWING MOUNTED ASSISTANT VAC PAC FOR BEL-50 AND BEL-20N DENTAL CHAIRS BDS-0050 INSTALLER S GUIDE BDS-0050: SWING MOUNTED ASSISTANT VAC PAC FOR BEL-50 AND BEL-0N DENTAL CHAIRS Location for all the incoming utilities should be in accordance with the cabinet installation instructions.

More information

INSTALLATION MANUAL FLAT LCD DISPLAY MOUNT MODEL

INSTALLATION MANUAL FLAT LCD DISPLAY MOUNT MODEL INSTALLATION MANUAL FLAT LCD DISPLAY MOUNT MODEL CMK Ceiling WARNING! The wall, floor or ceiling should be capable of supporting a weight of at least five (5) times the monitor s weight. If it cannot,

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Certified Precision Sheet Metal Operator Level I

Certified Precision Sheet Metal Operator Level I Certified Precision Sheet Metal Operator Level I 13 Sections Total of 136 tasks/skills/knowledge areas Section B. Metals, Metallurgy, and Metal Working Processes Section C. Paperwork and Documentation

More information

Arc Trainer Main Frame Assembly

Arc Trainer Main Frame Assembly Arc Trainer Main Frame Assembly Kit No. 610AK019-4 Kit No. 630AK019-4 NOTE: This instruction sheet describes how to replace the main frame assembly in the Arc Trainer 610A. Tools Required 3/16 Allen wrench

More information

LIGHT FIXTURES MUST BE COMPLETELY INSTALLED PRIOR TO CEILING CONSTRUCTION

LIGHT FIXTURES MUST BE COMPLETELY INSTALLED PRIOR TO CEILING CONSTRUCTION CAUTION: BEFORE BEGINNING INSTALLATION REVIEW LAYOUT DRAWINGS, AND SHIPMENT. MAKE SURE ALL LIGHT S AND MATERIALS ARE ON SITE AND READILY ACCESSIBLE. IF ANY ICON MATERIALS ARE MISSING, CONTACT ICON INTERNATIONAL

More information

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury. Integrity. Partnership. Quality. COMMERCIAL DOOR INSTALLATION INSTRUCTIONS SERIES 1900, 1950, 2000, 2250, 2500, 2750 Important Notice In the following text, the word: Warning: Indicates that serious injury

More information

Instruction Sheet Tool Kit [ ] (for SL Series 110 Jack Connectors)

Instruction Sheet Tool Kit [ ] (for SL Series 110 Jack Connectors) Instruction Sheet Tool Kit 1725150 [ ] (for SL Series 110 Jack Connectors) 26 FEB 04 PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools.

More information

Installation Instructions

Installation Instructions Installation Instructions Feed Installation for 0.6m(2ft) Spread Spectrum Antennas Bulletin 239851 Revision F Antenna Assembly Sequence P2F/HP2F/PX2F/ HPX2F antenna 1 2 3 1a 1 Apply conductive grease (5)

More information

NOV 16 Rev L

NOV 16 Rev L Terminating Modules 856196-[ ] for Use with Modular Plug Dual Terminators 1320840-[ ] Instruction Sheet 408-9743 17 NOV 16 Rev L Modular Plug Dual Terminator Automatic Circuit Tester (Terminators 1320840-1

More information

Mounting a BalanceBox 400 to a brick wall

Mounting a BalanceBox 400 to a brick wall Unpack the BalanceBox 400 and remove the Wall frame cover and its bag of screws. Slide the cover out at the top. NOTE: the cover is NOT included with the BalanceBox 400H LOCK SCREW HOLE MOBILE STAND MOUNTING

More information

ULTRA CUTTER PRO OPERATORS INSTRUCTION MANUAL. This manual covers all models 9, 11 and 13 HP

ULTRA CUTTER PRO OPERATORS INSTRUCTION MANUAL. This manual covers all models 9, 11 and 13 HP ULTRA CUTTER PRO OPERATORS INSTRUCTION MANUAL This manual covers all models 9, 11 and 13 HP Per OSHA 1926.503 it is the machine owner s responsibility to ensure that all workers using this Ultra Cutter

More information

Version: 1.0 Revised: 6/8/2011. CBU Assembly Instructions Manual

Version: 1.0 Revised: 6/8/2011. CBU Assembly Instructions Manual CBU Assembly Instructions Manual Contents 1 General... 3 2 Package... 4 2.1 Packing order... 4 2.2 Unpacking... 5 3 Assembly of the body... 6 3.1 General... 6 3.2 Mounting base drilling chart... 8 3.3

More information

RAIL 4 INSTALLATION INSTRUCTIONS. RM4DOD Recessed GENERAL SAFETY INSTRUCTIONS: NOTE:

RAIL 4 INSTALLATION INSTRUCTIONS. RM4DOD Recessed GENERAL SAFETY INSTRUCTIONS: NOTE: INSTALLATION INSTRUCTIONS RAIL 4 RM4DOD Recessed NOTE: The following instructions provide general guidelines for product installation. For additional information consult the applicable electrical codes

More information

EF-Series EuroFrame Gen 2 Cabinet System User Manual

EF-Series EuroFrame Gen 2 Cabinet System User Manual EF-Series EuroFrame Gen 2 Cabinet System User Manual www.chatsworth.com +44 1628 524-834 (UK) 2017 Chatsworth Products, Inc. All rights reserved. Chatsworth Products, Clik-Nut, CPI, CPI Passive Cooling,

More information

Power Verification in Racks B and B950-02

Power Verification in Racks B and B950-02 Table of Contents 1.0 Introduction... 1 2.0 Accountability... 1 3.0 Hazards Internal to this Rack... 2 4.0 External Hazards Due to Sources in this Rack... 2 5.0 Battery Charger 120 VAC Verification...

More information

GF-Series GlobalFrame

GF-Series GlobalFrame GF- Series GlobalFrame GF-Series GlobalFrame Gen 2 Cabinet System User s Manual 2013 Chatsworth Products, Inc. All rights reserved. CPI, CPI Passive Cooling, MegaFrame, Saf-T-Grip, Seismic Frame, SlimFrame,

More information

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance IOM 004 Effective 3/29/04 Rev A MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance Contents Batten Arrangements...3 Slip-On Battens...4 Ceiling Opening...5 Installation...5 Hanger Bracket

More information

N-Series TeraFrame Gen 3 Cabinet System User s Manual

N-Series TeraFrame Gen 3 Cabinet System User s Manual N-Series TeraFrame N-Series TeraFrame Gen 3 Cabinet System User s Manual techsupport@chatsworth.com www.chatsworth.com 2014 Chatsworth Products, Inc. All rights reserved. Chatsworth Products, CPI, CPI

More information

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE T F W 604.549.979 604.549.9555 fluxwerx.com INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE fixture housing endcap kit optic kit join kit notch 2 cross section notch 4 cross section 4 4" 4-11/2" 4 /8 (111)

More information

Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC

Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC This Manual is Bookmarked Operating Instructions Parts Manual Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC WHM TOOL GROUP 2420 Vantage Drive Elgin, Illinois 60123 Ph.: 800-274-6848 www.wmhtoolgroup.com

More information

Universal flat-panel mount

Universal flat-panel mount I N S T A L L A T I O N M A N U A L Universal flat-panel mount www.christiedigital.com PM 2004/ REV 02 Contents - Assembly drawing - Fine tune tilt adjustments - Parts list - Installing the adapter plate

More information

Application Tooling Specification Sheet

Application Tooling Specification Sheet FineAdjust Applicator FEATURES Application Tooling Specification Sheet Order No. 63901-9400 Directly adapts to most automatic wire processing machines Quick punch removal with the push of a button for

More information

Problem/Procedure Description. Requirements. Problem/Procedure Solution. How-To Document. Updated on: 11/13/2008 By:Christopher Ware

Problem/Procedure Description. Requirements. Problem/Procedure Solution. How-To Document. Updated on: 11/13/2008 By:Christopher Ware Problem/Procedure Description Performing maintenance on 95s, 95sII and H100 Requirements Ball Bearing Grease (LPKF P/N 106976) Tri-Flow Teflon lubricant aerosol. 3-in-1 Multi-purpose Oil Electronic Component

More information

Model 204B-EM Elbow Mandrels Rev TABLE OF CONTENTS

Model 204B-EM Elbow Mandrels Rev TABLE OF CONTENTS 92-0697 Rev. 970131 Model 204B-EM Elbow Mandrels TABLE OF CONTENTS CUSTOMER MESSAGE Inside Front Cover SAFETY PRECAUTIONS 3 GENERAL DESCRIPTION 6 MAINTENANCE 7 OPERATION 8 TROUBLE SHOOTING 11 ACCESSORIES

More information

P /8 Ring Diameter 90. Trim Ring Mounting Holes P /8. 393/16 Ring Diameter. Stud Minimum

P /8 Ring Diameter 90. Trim Ring Mounting Holes P /8. 393/16 Ring Diameter. Stud Minimum PARTS LIST VARIABLE Top Over Head Support Bracket 1 872070 P4000-SMR Over Head Joiner Bracket 1 VARIABLE Bottom Over Head Bracket 1 79741 P4000-SMR 4 Angled Leg 4 100-00230-14 1/4-20 x 31/2 RD. HD. MS.

More information

Low-Voltage Power Distribution and Electrical Installation Technology

Low-Voltage Power Distribution and Electrical Installation Technology Busbar trunking system Installation Manual 06/2011 Low-Voltage Power Distribution and Electrical Installation Technology Answers for infrastructure. SIVACON 8PS - Installation with LX system Low-voltage

More information

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5. June 2015 Table of Contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4 Safety Statements 4 Parts Identification 5 Preparation 7 Soil Conditions 7 Tools Required 7

More information

MAINTENANCE MANUAL SPEAKER/MICROPHONE 344A4189P23 EARPHONE 19B802884P3

MAINTENANCE MANUAL SPEAKER/MICROPHONE 344A4189P23 EARPHONE 19B802884P3 ERICSSONZM MAINTENANCE MANUAL SPEAKER/MICROPHONE 344A4189 EARPHONE 19B802884P1-P3 LBI-39060A TABLE OF CONTENTS Page DESCRIPTION...1 MAINTENANCE...2 Back Cover, All Versions...2 Front Cover, All Versions...2

More information

Next generation offshore wind tools

Next generation offshore wind tools CORPORATE FOCUS Next generation offshore wind tools Construction of offshore wind farms has advanced rapidly over the last few years and is maturing into a market where subsidy funding is diminishing.

More information

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H USER S MANUAL Horizontal inclinometer system Model TES-AN-25H Doc. # WI 6002.82 Rev. 01 Printed May 2011 System description & method statement for installing ABS casing (Model TES-AN-25H horizontal inclinometer

More information

Applied ATTENTION! LA12-25 LINE ARRAY TOWER INSTRUCTIONS lb WEIGHT LIMIT

Applied ATTENTION! LA12-25 LINE ARRAY TOWER INSTRUCTIONS lb WEIGHT LIMIT 1 LA12-25 LINE ARRAY TOWER INSTRUCTIONS ATTENTION! 1500 lb WEIGHT LIMIT INSTRUCTIONS 2 BILL OF GOODS REQUIREMENTS FOR SAFE USE 1) Build tower on flat surface. 2) Thick wood or metal plates under leveling

More information

Senior Swing. Caution

Senior Swing. Caution *740132* 740132 2800 Overhead Concealed Series 9500 Surface Applied Series Senior Swing Installation Instructions Caution LCN Senior Swing The Senior Swing Power Operator System is a low energy product

More information

Specification

Specification Previous Edition Specification 2018-06 Class: Executing guidelines Class No.:62 Tapped holes for push-in connections JED system Voss Company 388 Abbreviated Title 2016-04 Tapped h.push-in con. Voss 852

More information

JARVIS. Model25CL-4,5,6 Hock Cutter and Loin Dropper. 25CL--5 Front Legs and Horns. 25CL--4 Hind Legs and Horns. 25CL--6 Loins

JARVIS. Model25CL-4,5,6 Hock Cutter and Loin Dropper. 25CL--5 Front Legs and Horns. 25CL--4 Hind Legs and Horns. 25CL--6 Loins Model25CL-4,5,6 Hock Cutter and Loin Dropper 25CL--4 Hind Legs and Horns 25CL--5 Front Legs and Horns 25CL--6 Loins EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page 25CL--4... 4025007 25CL--5...

More information

R145 RADIO ATB SYSTEM

R145 RADIO ATB SYSTEM 55M0145GSE Rev. B R145 RADIO ATB SYSTEM Installation and Operation Manual Ref: VH oct 2005 Wylie Systems (Rayco Technology Group) 1020 9th Avenue SW Suite 124 Bessemer, AL USA 35022 Crane Warning Systems

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

KEEP YOUR RESOURCE MOVING.

KEEP YOUR RESOURCE MOVING. LINER BOLTS KEEP YOUR RESOURCE MOVING. COLUMBUS McKINNON CORPORATION Leading the Industry Downtime in the grinding mill operation is caused by one of two things: regularly scheduled maintenance or unscheduled

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual

MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Operator Owner's Before you begin, please read this ENTIRE instruction manual. One- Piece

More information

LPK1550 Hydraulic Crimping Tool 15-ton

LPK1550 Hydraulic Crimping Tool 15-ton SERVICE MANUAL LPK1550 Hydraulic Crimping Tool 15-ton Serial Code FYF Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register

More information

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11 Mighty Mo GX Series Cabinet Installation Guide OR-71601787 Safety and Warning ATTENTION The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating

More information

Preference Collection and Treatment Console INSTALLATION GUIDE

Preference Collection and Treatment Console INSTALLATION GUIDE Preference Collection 5580.69 and 5580.96 Treatment Console INSTALLATION GUIDE WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious

More information

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied.

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied. BASIN WASTE FLIP TOP SLOTTED CHROME 20003000018 WASTE SHELL SILICONE WASHER BASIN When fitting the waste, ensure the slotted side faces the overflow channel. SILICONE WASHER * FIXING NUT (OPTION 1) 37.5

More information

Round or Square Type IC Wall Wash Housing with Lamp for Flangeless Trims

Round or Square Type IC Wall Wash Housing with Lamp for Flangeless Trims Installation Instructions for 90ELED-WIC Round or Square Type IC Wall Wash Housing with Lamp for Flangeless Trims LED E_L_-L_WI. LED - ROUND/ SQUARE FLANGELESS GENERAL PRODUCT I NFORMATION: This product

More information

Fresenius Medical Care North America Service Bulletin

Fresenius Medical Care North America Service Bulletin Fresenius Medical Care North America Service Bulletin Equipment: Bulletin: Subject: 2008K@Home Hemodialysis Machines 15-HOM-001 Rev A Optional Shunt Box Ferrite Core Installation (Update) 1.0 PURPOSE To

More information

SERVICE BULLETIN TRANSMITTAL SHEET HC-SB De-ice - Wire Harness Replacement

SERVICE BULLETIN TRANSMITTAL SHEET HC-SB De-ice - Wire Harness Replacement TRANSMITTAL SHEET April 27, 2017 This page transmits a revision to Service Bulletin. Original Issue, dated Revision 1, dated Apr 27/17 Propeller assemblies that have previously complied with the terminating

More information

JARVIS. Model BR-3 Blade Reconditioner ... EQUIPMENT TABLE OF

JARVIS. Model BR-3 Blade Reconditioner ... EQUIPMENT TABLE OF - Model BR-3 Blade Reconditioner EQUIPMENT SELECTION.......... Ordering No. TABLE OF CONTENTS............................ Page Model BR-3 (100 mm Blade) 115V/60Hz............ 4011003 220V/50Hz............

More information

M302RM OPERATING MANUAL

M302RM OPERATING MANUAL M302RM OPERATING MANUAL The Model 302RM is a Linear, high voltage, differential amplifier designed to drive a capacitive load such as Conoptics 350, 360, 370 series E.O. modulators. The amplifier is DC

More information

OPERATOR S MANUAL WARNING. Read and become familiar with this manual BEFORE operating unit.

OPERATOR S MANUAL WARNING. Read and become familiar with this manual BEFORE operating unit. OPERATOR S MANUAL For Models 350 & 210 Model 350 Model 210 WARNING Read and become familiar with this manual BEFORE operating unit. Before operating this equipment, thoroughly read this set of instructions,

More information

Credentialing Achievement Record

Credentialing Achievement Record Credentialing Achievement Record CNC Lathe Operator Level I National Institute for Metalworking Skills 10565 Fairfax Boulevard, Suite 203 Fairfax, VA 2203 FAX: 703-352-4991 http://nims-skills.org Level

More information

Electrical Power Distribution Low-Voltage Systems SIVACON 8PS busbar trunking systems Installing with LI system

Electrical Power Distribution Low-Voltage Systems SIVACON 8PS busbar trunking systems Installing with LI system Introduction 1 Application planning 2 Electrical Power Distribution Low-Voltage Systems SIVACON 8PS busbar trunking systems Installation Manual Installation 3 Commissioning 4 Service and maintenance 5

More information

MAINTENANCE MANUAL SPEAKER/MICROPHONE KRY /33 EARPHONE RLD /4

MAINTENANCE MANUAL SPEAKER/MICROPHONE KRY /33 EARPHONE RLD /4 MAINTENANCE MANUAL SPEAKER/MICROPHONE KRY 101 1617 EARPHONE RLD 541 07 TABLE OF CONTENTS Page DESCRIPTION................................................... 1 MAINTENANCE..................................................

More information