1 Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie

2 Contents Revision History Purpose Applicable To Scope Definitions Training Safety Personnel, Equipment and Materials Required Procedure... 5 Preliminary Steps... 5 Lower Platform Installation... 8 Ladder and Cage Installation Ramp Installation Upper Truss Ring Installation Upper Platform Installation Procedure Review Records References AD Docx Page 2 of 19

3 Revision History Rev Date Approved Sections Affected Reason for Change Remarks and/or Change Details Name -- 2/27/2018 3/16/2018 Initial Release D. Guenther T. Lavoie Approved by: Derek Guenther Name, ME Title SigEM Name, EL Maint SigSci Name, SciOps Tammie Lavoie 19 March 2018 Tammie Lavoie, Safety Manager Date 2100-AD Docx Page 3 of 19

4 1.0 Purpose The purpose of this document is to safely guide all applicable personnel through the installation of the DESI Zenith work platforms. 2.0 Applicable To This procedure is applicable to the Facilities, and Engineering departments, or any additional personnel who will assist in completing these tasks for the Mayall 4 Meter Telescope. This includes members working on the DESI Project. 3.0 Scope This document is a step by step procedure that outlines how to complete the installation of the DESI Zenith work platforms. It is broken down into five sections. 4.0 Definitions The acronyms and definitions referenced in this procedure are listed below. DESI Dark Energy Spectroscopic Instrument ZWP Zenith Work Platforms Truss Clamps Clamps that attach to truss tubes that provide a mounting point for truss spacer tubes and platform rails. 5.0 Training The trainings required for this procedure are listed below. 5.1 Fall Protection 5.2 Lockout/Tagout 5.3 Overhead Crane Operations 5.4 Rigging 5.5 Welding 6.0 Safety The safety documents required for this procedure are listed below. 6.1 Crane Certification(s) 6.2 Cranes SOP (1000-AD ) 6.3 Critical Lift Plan Form(s) 6.4 Daily Briefing Form 6.5 Fall Protection Plan SOP (1000-AD ) 6.6 JHA Form(s) 6.7 Lockout/Tagout SOP (1000-AD ) 6.8 Rescue Plan SOP (1000-AD ) 2100-AD Docx Page 4 of 19

5 6.9 Rigging Certification(s) 7.0 Personnel, Equipment and Materials Required Process # of Personnel Notes P Preliminary Steps 8.1 Lower Platform Installation 8.2 Ladder and Cage Installation 8.3 Ramp Installation 8.4 Upper Truss Installation 8.5 Upper Platform Installation 8 (1) Crane Operator (1) Engineer (3) Maintenance (2) Riggers (1) Welder Equipment/Part/PPE/Tool List Location Notes ᵌ ₄ Plywood 4 Meter/Maint. N/A 2 x 4 x.25 Wall Steel Tubing 4 Meter N/A 5 Ton Overhead Crane 4 Meter N/A 50 Ton Overhead Crane 4 Meter N/A Chain-Fall Come-A-Longs 4 Meter N/A Crane Basket (Man Basket) 4 Meter N/A Eye Protection 4 Meter Face Protection for Welder Fall Protection 4 Meter N/A Genie Boom Lift 4 Meter N/A Handrail Assemblies 4 Meter 2 Hand Protection 4 Meter N/A Hard Hats 4 Meter N/A Man Lift 4 Meter N/A MIG Welder 4 Meter N/A Miscellaneous Carpentry Equipment 4 Meter/Maint. N/A Ramp Ladder 4 Meter With Safety Cage Assembly Safety Shoes N/A Composite or Steel-Toe Slings 4 Meter (2) 5, (1) 6, (1) 20 Taglines 4 Meter Procedure Due to late changes in the vane configuration on the DESI instrument, the following preliminary steps will need to be performed on the structure prior to installation of the upper platform. Preliminary Steps P.1 Obtain 2 of the 2100-ME (UPPER PLATFORM INNER TUBE ASSEMBLY) assemblies. The assemblies can be seen in the Figure 1 below AD Docx Page 5 of 19

6 Figure 1: Center Tube Trimming P.2 Cut both ends off at 9 ¾ as shown above (JHA-1). P.3 Weld in the 2100-ME (TUBE PLUG WITH TAP) with the step facing up and the flat surface flush with the tube end (Figure 2) (JHA-2). Figure 2: Tube Plug P.4 Cut the (4) 9-¾ down to 6 long. Cut the open end of the tube off (Figure 3) (JHA-3). Figure 3: ASK DEREK 2100-AD Docx Page 6 of 19

7 P.5 Locate 2 of the 2100-ME (UPPER PLATFORM LONG SIDE TUBE DEFAULT) and 2 of 2100-ME (UPPER PLATFORM LONG SIDE TUBE LEFT) as shown above. Cut 2 ¾ as measured on the tube. Cut all 4 tubes on the end with the counter bored hole in the plug (step facing down) (Figure 4) (JHA-4). Figure 4: Weldment 2100-ME P.6 Weld the (4) 6 long pieces as shown above to the (4) 47-1/4 long pieces cut off in step P4. Some kick rail may need to be added after the platform is installed (JHA-5). P.7 Weld 2100-ME (BRACING TAB) to 2100-ME (SUPPORT LEG) as shown in the following figure (Figure 5) (JHA-6). Figure 5: ASK DEREK P.8 Mount the tabs 2100-ME (BRACING TAB) on the 4 tubes, 2100-ME (SUPPORT LEG), 2 on the left side as shown and 2 on the right side (JHA-7). Measure from the back of the flange to the front of the tab. The following processes must be completed before the installation of the DESI Zenith work platforms can begin. 8.1 Attach all sixteen of the truss clamps 2100-ME (CLAMP RING ASSEMBLY). 8.2 Use yellow safety paint to paint the ramp ladder with the safety cage assembly, and the ramp stair assembly. These two assemblies must be stored in the Pier (JHA-8) AD Docx Page 7 of 19

8 After completing the above, the remaining processes are as follows. Lower Platform Installation 8.3 Move both the 2100-ME (TUBE ASSEMBLY, LONG) and the 2100-ME (TUBE ASSEMBLY, SHORT) C-Floor (JHA-9). These tube assemblies will be located in the Telescope pier. The lower platform tube assemblies have a 4 wide kick plate welded on them. 8.4 Use the Genie boom lift on the Main Floor to pick up one of the TUBE ASSEMBLY, SHORT (JHA-10). 8.5 The kick plate on 2100-ME (TUBE ASSEMBLY, LONG) as seen in Figure 6 is 73 ½ long and the kick plate on 2100-ME (TUBE ASSEMBLY, SHORT) is 63 5/8 long. Figure 6: Kick Plate Lengths 8.6 Load the first TUBE ASSEMBLY, SHORT on to the Genie lift. Move the Genie lift between the North truss tubes to the South truss tubes (JHA-11). 8.7 Loosely attach the first TUBE ASSEMBLY, SHORT between the two truss clamps. The truss clamp can be clocked to match up with the truss tube. 8.8 Once the TUBE ASSEMBLY, SHORT is attached, measure down from the ends of the horizontal tube to the top of the center section (Figure 7). The dimension to the bottom of the tube should be 159½. Note: A second person may be required down on the center section to ensure the tape measure is roughly vertical. Figure 7: Measurement to the Center Section 2100-AD Docx Page 8 of 19

9 8.9 Once this dimension is adjusted, tighten the clamp screws and the mounting screws Take the Genie boom lift down to the C-Floor and load a TUBE ASSEMBLY, LONG in the basket. Install this on the northwest side of the telescope as described above (JHA-12) Continue installing the TUBE ASSEMBLIES until they are attached all around the telescope Secure and tie the first 2100-ME (H BEAM) to the Genie boom lift (Figure 8). Lift it up between the truss tubes below the tube assemblies (JHA-13). Figure 8: H Beam 8.13 Insert the open ends of the H Beam onto the posts on the tube assembly on the East and West side of the telescope. Install the eight, ᵌ ₈-16 x 1.00 screws and washers, but do not fully tighten them at this point (JHA-14) Lift the first of four 2100-ME (SIDE BRACE) on the Genie boom lift and install it on one of the posts on the North or South tube assemblies (Figure 9). Install the mounting screws, but do not tighten them all the way down. On the hole that overlaps the tube, one.50 long screw will be required, but 1.00 long screws should be used in the other three holes (JHA-15). Figure 9: Support Leg 8.15 Continue installing the other (3) 2100-ME (SUPPORT LEG) until all of the mounting hardware is loosely installed. Hook a ratchet strap over one of the spider veins, and lift until the tubes are roughly level. Tighten all of the mounting hardware (Figure 10) (JHA-16) AD Docx Page 9 of 19

10 Figure 10: Plywood Locations 8.16 The 2 center sheets 2100-ME (PLYWOOD #1) are full 48 x 96. Line up the notches in the 2 sheets to form a hole. The (6) outer sheets need to be cut per ME (PLYWOOD #2), 2100-ME (PLYWOOD #3) and 2100-ME (PLYWOOD #4). All sheets need to be painted on all surfaces with a tan latex paint (JHA-17) In order to lift the plywood place a C clamp on the edge of the sheet and hook a shackle through the clamp and the lifting sling (JHA-18). Safety recommends using an alternative to the C clamp on the edge of the plywood. Possibly use a length of metal attached to the plywood with 4-5 screws and have a lifting ring attached to it. Then you can continue to use a shackle and lifting sling. TLL 8.18 Lift the two center sheets (PLYWOOD # 1), one at a time, by the short edge, up from the C-Floor with the 5 ton crane and lower it between the top ring and the prime focus cage. From the Genie boom lift, position each of the sheets with the long dimension running North and South (JHA-19). Measure to the tube assembly and set the sheets at Using the 5 ton crane, lift the two (PLYWOOD #2) sheets, one at a time. Place them on the North and South end of the platform (JHA-20) Bring the other four sheets (PLYWOOD #3 and #4) up with the Genie boom lift and place them on the East and West side (JHA-21) Secure each sheet to the platform using the self-drilling/self-tapping screws in at least four places on each sheet (JHA-22). Ladder and Cage Installation 8.22 Remove the two handrails on the South side of the center section. Remove the center support for the handrails (JHA-23) Install the first 2100-ME (SUPPORT RING SHORT SECTION). Attach it to the upper South truss tube clamps using 4 long SHCS (Figure 11) (JHA-24). Note: In order to install the short tube, the clamp bolts must be loosened AD Docx Page 10 of 19

11 Figure 11: Set Clamp Height 8.24 Once the SHORT SECTION is installed, measure down from the top ring to the highest point on the truss clamp. The perpendicular distance to the clamp should be set approximately at Install the 2100-ME (SUPPORT RING LONG SECTION) on the East and West side of the SHORT SECTION just installed. The top of the tube should be set to 46-1/2 from the bottom of the top ring. This may require minor adjustment to the clamps just adjusted Continue installing the SUPPORT RING LONG and SHORT SECTION TUBES around the telescope while setting the top of the tubes to 46-1/2 from the top ring Choker the 6 sling to the upper end of 2100-ME (RAMP LADDER W/ SAFETY CAGE) (JHA-25) Lift the RAMP LADDER W/SAFETY CAGE up until the lower end of the ladder is resting on the center section (Figure 12) (JHA-26). Figure 12: Cage Mounting 8.29 Adjust the RAMP LADDER W/SAFETY CAGE until the four bolt holes are lined up with the free end of the bolts that attach the SHORT SECTION to the CLAMP RING ASSEMPLY Install the washers and nuts on the four bolts and lightly tighten the nuts (JHA-27) AD Docx Page 11 of 19

12 8.31 Move the RAMP LADDER W/ SAFETY CAGE plate about 1 from the edge of the center section. Ensure the ladder is roughly plumb, and transfer-punch the location of the mounting holes (Figure 13). Figure 13: Ladder Lower End Location 8.32 With the RAMP LADDER W/ SAFETY CAGE still suspended from the 5 ton dome crane, remove the nuts and washers that are holding the upper end of the cage. Lift the ladder up about 3 and trolley the crane out to move the ladder away from the truss tubes (JHA-28) Drill and tap the holes for ᵌ ₈-16 screws using a magnetic base drill (JHA-29) Trolley the crane to move the RAMP LADDER W/ SAFETY CAGE back over the center section. Install the washers and nuts on the upper cage ring. Leave the nuts loose until the lower mounting bolts are installed (JHA-30) Install and tighten the ladder mounting bolts (JHA-31) Tighten the upper mounting nuts. Ramp Installation 8.37 Install non-slip tape on the top of the steps Open the center hatch on the Main Floor (JHA-32) Lower the hook on the 5 ton dome crane to the Ground Floor (JHA-33) Place the 2100-ME (RAMP STAIR) on two dollies. Roll the assembly under the hatch on the Ground Floor (JHA-34) Choker a 6 sling around the upper end channel on the assembly. Lift the assembly vertically to the Main Floor. Place the back of the assembly on two dollies (JHA-35) Loosely assemble two of the 2100-ME (RAMP STAIR HAND RAIL). The two rail assemblies will be mirror images of each other. Bolt them on either side of the stair ramp assembly using ½-13 SHCS (JHA-36) Once the ½-13 mounting bolts are tightened, tighten all of the set screws in the Hollaender rail system (JHA-37) Remove the RAMP STAIR upper end CAP on the upper end of the ramp (Figure 14) AD Docx Page 12 of 19

13 Figure 14: Ramp Stair Upper End Cap 8.45 Choker the 6 sling on the upper end of the assembly just below the first hand rail. Attach two taglines to either end of the assembly. Lift the RAMP STAIR using the 5 ton dome crane (JHA-38) Position the RAMP STAIR assembly on the South side of the telescope, over the Cassegrain ramp with the upper end on the edge of the center section. Center the upper end over the RAMP LADDER W/ SAFETY CAGE and install the upper end cap (Figure 15). Figure 15: Ramp Stair Position 8.47 The lower end of the RAMP STAIR may have to be on top of the Cass ramp entry platform to clear the Cass ramp handrails. Note: The 2100-ME (RAMP STAIR BOTTOM SUPPORT) may have to be modified to sit on the existing Cassegrain ramp. Upper Truss Ring Installation 8.48 Starting on the South East side of the telescope, next to the already installed SUPPORT RING SHORT SECTION install the 2100-ME (SUPPORT RING LONG SECTION) as seen in Figure AD Docx Page 13 of 19

14 8.49 Measure from the top of the tube to the bottom of the top ring. The perpendicular distance should be set to 46-½. Once both of the ends are set to that distance, tighten the four attaching bolts and the four clamp bolts (Figure 16). Figure 16: Tube Location 8.50 Install the second 2100-ME (SUPPORT RING LONG SECTION) on the West side of the Telescope (JHA-39) Install the next two support ring short sections on the East and West side of the telescope (JHA-40) Install the final two support ring long sections on the Northeast and Northwest side of the telescope (JHA-41) Install the final SUPPORT RING SHORT SECTION to complete the Truss SUPPORT RING (JHA-42). Upper Platform Installation 8.54 Arrange the parts shown on Figure 17 below for 2100-ME (UPPER PLATFORM ASSEMBLY, ZENITH WORK PLATFORMS WITH VANE SPACE). Loosely bolt the ends of the assemblies together with ½-13 socket head cap screws (JHA-43). Figure 17: First and Second Frames 8.55 Place the 2100-ME (CENTER SUPPORT TUBE) on the frame and install the 2 ball lock pins (JHA-44). Using a square set the bar at 90 at both ends. Once the frame is squared up the corner bolts can be tightened AD Docx Page 14 of 19

15 8.56 Build the second frame per the above Figure Build the 3 rd frame per Figure 18 and the above procedure. Figure 18: Third Frame 8.58 Build the 4 th frame per the Figure below (Figure 19). Figure 19: Final Frame 8.59 Choker two 5 slings at the points shown in Figure 11. Attach the 2 slings to a comealong. The come-a-long will be used to control the angle of the assembly. Choker a 20 sling to a point shown in the figure below (Figure 20) (JHA-45). Figure 20: Lifting Upper Platforms 2100-AD Docx Page 15 of 19

16 8.60 Hook the sling and the come-along on the 5 ton crane hook. Lift the assembly with the crane. Adjust the come-along so the side with the two 5 slings is about 2 higher than the 20 sling attachment point (JHA-46) Attach a tagline near the 20 sling. Lift the assembly up and over the top ring. Lower it down between the top ring and the primary focus cage (JHA-47) Attach the outer edge of the platform to the angle on the support ring short section using two ⁵ ₁₆ x ᵌ ₄ screws and washers (Figure 21). The rigging can now be removed (JHA-48). Figure 21: Platform Attaching Screws 8.63 Install the upper platform support leg against the support angle with the ball lock pin (Figure 22). Plumb the leg and attach the lower end to the plywood using ᵌ ₈ x 1 lag screws (JHA-49). Figure 22: Upper Platform Support Leg 8.64 Rig the second upper platform assembly as done above. Lift with the 5 ton dome crane and lower the assembly down on the South side of the telescope. Attach the outer edge to the support ring short section as show in Figure 21 (JHA-50) Attach the upper platform support leg (Figure 22) (JHA-51) Install the remaining two upper platform assemblies as shown above (JHA-52) Install 2100-ME (#1), 2100-ME (#2) and 2100-ME (#3 Trap Door Only) the precut and painted plywood floor panels (Figure 23). Secure the small corner pieces with self-drilling/tapping screws (JHA-53). Figure 23: Plywood Floor 2100-AD Docx Page 16 of 19

17 8.68 Lift the ladder assembly up above the top ring and lower it down through the trap door hole in the upper platform. Place the ladder against the handrails and against the center support assembly (Figure 24). Mark the mounting hole locations and drill and tap for ⁵ ₁₆-₁₈ screws. Use ᵌ ₄ long hex head cap screws (JHA-54). Figure 24: Ladder Installation 8.69 Roughly plumb the ladder and attach the bottom plate to the plywood with two ᵌ ₈ x 1 lag screws (JHA-55) Lay the upper platform door beside the trapdoor hole in the open position (Figure 25). Shim the door panel up with ⅟₄ thick plywood in order to install the hinge in the correct position. Install the hinge with twelve flathead wood screws (JHA-56). ( Is it possible to have the trap door close automatically after you enter through it?(spring closed?) I don t want the door to be left open where someone could accidently step through the opening.)tll Figure 25: Trapdoor 8.71 Once the hinge is installed, apply black and yellow striped safety tape around the trapdoor. In addition, the door itself should be labeled as a trapdoor. (Could also paint it RED)TLL 8.72 Assemble one fourth of the handrails per the upper platform rail assembly. Note: The dimensions on the drawing only need to be approximate. Once the rails are 2100-AD Docx Page 17 of 19

18 mounted, the dimensions will be adjusted. Lift the rail assembly up to the East side of the upper platform Place the center two mounts about ᵌ ₄ from the kick rail. Roughly center the handrail in the North and South direction. Screw the mounts down using the ᵌ ₈ x 1 lag screws (JHA-57) Loosen the set screws on the two vertical tubes and rotate the end tubes out to where the mounts are about ᵌ ₄ from the kick rails. Screw the outer mounts down. Tighten all of the set screws on the rail (JHA-58) Assemble the remaining handrails and lift them up to the upper platform as described above. Mount them to the plywood as described above (JHA-59). 9.0 Procedure Review This procedure must be reviewed by employees under the following terms: 9.1 Initially 9.2 When there is a change in the job process(es) 9.3 When there is a change in a worker s status, or job title 9.4 When governing authorities (such as OSHA) make changes 9.5 Every three years, at a minimum 10.0 Records The records that must be kept on file by the supervisor are listed below. Training records must be available and maintained for a minimum of five years Daily Briefing Form Signature Page(s) 10.2 JHA Signature Page(s) 10.3 Personnel Training Records: Fall Protection Lockout/Tagout Overhead Crane Rigging Welding 11.0 References DOCUMENT NUMBER 2100-ME ME ME ME DOCUMENT TITLE CLAMP RING TUBE ASSEMBLY, LONG TUBE ASSEMBLY, SHORT H BEAM ASSEMBLY 2100-ME SUPPORT LEG 2100-ME PLYWOOD # ME PLYWOOD # AD Docx Page 18 of 19

19 2100-ME PLYWOOD # ME PLYWOOD # ME UPPER PLATFORM 2100-ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME ME UPPER PLATFORM INNER TUBE TUBE PLUG WITH TAP CENTER SUPPORT UPPER PLATFORM LONG SIDE TUBE UPPER PLATFORM SHORT SIDE TUBE UPPER PLATFORM OUTER TUBE CENTER SUPPORT TUBE UPPER PLATFORM W/ TRAP DOOR RAMP LADDER W/ SAFETY CAGE SUPPORT RING SHORT SECTION SUPPORT RING LONG SECTION RAMP STAIR RAMP STAIR HAND RAIL RAMP STAIR BOTTOM SUPPORT UPPER PLATFORM W/ VANE SPACE UPPER PLATFORM INNER TUBE UPPER PLATFORM LONG SIDE TUBE UPPER PLATFORM SHORT SIDE TUBE BRACING TAB 2100-AD Docx Page 19 of 19

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo Doc #: 2100-AD-015-0082 Revision: - Declination Work Platform Installation Author(s): Derek Guenther, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope...

More information

Removal of the F/8 Secondary from the 4M Prime Focus Assembly

Removal of the F/8 Secondary from the 4M Prime Focus Assembly Doc #: 2100-AD-015-0058 Revision: - Removal of the F/8 Secondary from the 4M Prime Focus Assembly Author(s): Will Goble, Matthew Evatt, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0

More information

Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room.

Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room. Doc #: 2100-AD-015-0051 Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room Author(s): mevatt 1. Contents Revision History... 3 1. Purpose... 4 2. Applicable To...

More information

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam Doc #: 2100 AD 015 0020 Revision: MOSAIC Removal Procedure Author(s): Hillary Mathis, Bill McCollam Contents Contents... 2 Revision History... 3 1. Purpose... 4 2. Applicable To... 4 3. Scope... 4 4. Definitions...

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

OXYGEN INSTALLATION. Revision date

OXYGEN INSTALLATION. Revision date 12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex

More information

WPS crew Doors Installation instructions

WPS crew Doors Installation instructions WPS-132-133 crew Doors Installation instructions ORDER OF INSTALLATION FOR A COMPLETE ENCLOSURE OF A CREW WPS (Weather Protection System) IS AS FOLLOWS: 1. Heater 2. Rear Thresholds - Right Hand & Left

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

Gared Pro-S Portable Backstop

Gared Pro-S Portable Backstop Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION

More information

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual This manual is for various mounting types and plain and trussed track profiles. ISO 9001:2008 Registered Manual 103-0075

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS For Wallbed models: Do-It-Yourself BOOKLET #C90 WARNING! ALL MURPY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION

More information

SINGLE TRACK BYPASS (patent pending) barn door hardware

SINGLE TRACK BYPASS (patent pending) barn door hardware SINGLE TRACK BYPASS (patent pending) barn door hardware Installation Manual What is included in your kit: Part number Part name Quantity 1 Inner door hanger 2 2 Outer door hanger 2 3 5/16 x 1.5 lag bolts

More information

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak Doc #: 3500-AD-015-0019 Revision: Rev WIYN Secondary Lead Screw Cleaning Author(s): Tammie Lavoie, Robert Stupak Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope... 4 4.0

More information

2-PIECE STAIRWAY ASSEMBLY

2-PIECE STAIRWAY ASSEMBLY REVISED 2/12/15 2-PIECE STAIRWAY ASSEMBLY STEP 1: LAY OUT THE RIGHT AND LEFT SIDE TOP AND BOTTOM RISER PANELS AS SHOWN IN FIGURE 1. BOLT THE SPLICE PLATE (#15114C for OSHA F SERIES; #15412C for BOCA U

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS LAMINATED P LASTIC TOILET PArTITIONS 1540 ClassicSeries with Options IMPORTANT: Storage and Handling Information on last page. For faster, easier installation, please review these

More information

Installation for Full Size Polaris Ranger Crew Doors

Installation for Full Size Polaris Ranger Crew Doors Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench Thank you for your recent purchase of a Cabinets by Hayley garage cabinet system. You are about to experience the best made cabinets that you can purchase. Cabinets by Hayley are designed for beauty and

More information

Installation Instructions

Installation Instructions Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic

More information

Low Headroom Rear Mount TorqueMaster

Low Headroom Rear Mount TorqueMaster Low Headroom Rear Mount Supplemental Instruction Insert This supplemental installation instruction is to be used as a supplement to the main Installation Instruction and Owner s Manual provided with the

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION Soild Phenolic Series contents page 1080 DuraLineSeries...2-21 1180 DuraLineSeries...2-21 2080 DuraLineSeries Maximum Privacy...22-41 2180 DuraLineSeries Maximum Privacy...22-41

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS COMPACT LAMINATE TOILET PARTITIONS 1080 DuraLineSeries 1180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information

More information

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics

More information

INSTRUCTION BOOKLET #C20

INSTRUCTION BOOKLET #C20 INSTRUCTION BOOKLET #C0 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT IN SEVERE PERSONAL INJURY TO

More information

INSTALLATION STEPS MAXIMUS-3.COM

INSTALLATION STEPS MAXIMUS-3.COM JK WRANGLER MAXIMUS-3 JK ROOF RACK/PLATFORM MAXIMUS-3 RHINO RACK ROOF PLATFORM/RACK IS NOT COMPATIBLE WITH JK 2-DOORS. THIS PRODUCT IS NOT DESIGNED TO WORK WITH JK SOFT TOP ROOF. INSTALLATION GUIDES Please

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY HIGH PRESSURE LAMINATE (HPL) TOILET PARTITIONS 2030 TrimLineSeries 2040 DesignerSeries IMPORTANT: Storage and Handling Information on last page. Review these instructions

More information

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)

More information

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY COMPACT LAMINATE TOILET PARTITIONS 2080 DuraLineSeries 2180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and

More information

Installation Instructions

Installation Instructions Contents Page General Information and Installer Tips.......... 2 Panels & Posts............................. 3 Enclosure Description..................... 4 Hinge Door Hardware................... 4-5 Step-by-Step

More information

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. instructions About Your Order. Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. Check the Order Before the Carrier leaves!

More information

Spring Loaded All Season Roll-Up Doors

Spring Loaded All Season Roll-Up Doors Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.

More information

User Instructions Multiline Otter Scoreboard Caddy Assembly

User Instructions Multiline Otter Scoreboard Caddy Assembly List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)

More information

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job

More information

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems

More information

Installation Instructions

Installation Instructions by Plato Woodwork Installation Instructions Plato Woodwork, Inc. 200 Third Street SW P.O. Box 98 Plato, MN 55370 www.platowoodwork.com 800.328.5924 SECTION GUIDE GETTING STARTED PAGE # Installation Methods...

More information

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE T F W 604.549.979 604.549.9555 fluxwerx.com INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE fixture housing endcap kit optic kit join kit notch 2 cross section notch 4 cross section 4 4" 4-11/2" 4 /8 (111)

More information

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD INSTRUCTION BOOKLET #34 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION

More information

SIGNATURE FRONT BUMPER INSTALL

SIGNATURE FRONT BUMPER INSTALL SIGNATURE FRONT BUMPER INSTALL JL **PLEASE READ THROUGH THE INSTRUCTIONS BEFORE BEGINNING ANY PART OF THE INSTALLATION PROCESS** 1. You can now remove the trim strip (2 vertical clips, 4 horizontal, 2

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLine Series 1180 DuraLine Series Class-A Fire Rated IMPORTANT: Review these instructions thoroughly prior to installation. FLOOR ANCHORED

More information

Warnings. Description. Prior to Installation Tools Needed

Warnings. Description. Prior to Installation Tools Needed Warnings Failure to act in accordance with the following may result in death or personal injury. The JT Strong Arm Stabilizer System is intended to eliminate chassis movement in travel trailers and fifth

More information

PORCH-LOC INSTALLATION INSTRUCTIONS

PORCH-LOC INSTALLATION INSTRUCTIONS PORCH-LOC INSTALLATION INSTRUCTIONS 2017 HB&G Building Products, Inc. Porch-Loc Installation Instructions NOTE: DISCARD THE INSTALLATION INSTRUCTIONS AND HARDWARE THAT CAME IN YOUR PERMAPOST PACKAGING

More information

Spiral Slide

Spiral Slide IMPORTANT Page 1 PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.

More information

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT

More information

A MULTI-PURPOSE LOFT THAT CAN BE USED FOR SLEEPING, STORAGE, AND FREEING UP SPACE (Supports 200 lbs max) DIFFICULTY: 6/10

A MULTI-PURPOSE LOFT THAT CAN BE USED FOR SLEEPING, STORAGE, AND FREEING UP SPACE (Supports 200 lbs max) DIFFICULTY: 6/10 A MULTI-PURPOSE LOFT THAT CAN BE USED FOR SLEEPING, STORAGE, AND FREEING UP SPACE (Supports 200 lbs max) DIFFICULTY: 6/10 CAUTION The instructions are only a guide, and should be followed by individuals

More information

FALSE CAR & INT. Installation and Service Manual

FALSE CAR & INT. Installation and Service Manual FALSE CAR Installation and Service Manual 6200 Brent Drive Toledo, Ohio 1 Table of Contents Overview... 3 General Warnings... 4 Description of Equipment and Intended Use... 5 Personal Protective Equipment...

More information

Installation Instructions Kit, Base Rail Bracket Part # 31413

Installation Instructions Kit, Base Rail Bracket Part # 31413 Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating and

More information

Calf-Tel Pen System Assembly Instructions

Calf-Tel Pen System Assembly Instructions Calf-Tel Pen System Assembly Instructions (Instructions work for 4, 6, and the 7 Pen Systems) 1 ASSEMBLY OF PEN FRONT AND WALLS START THE ASSEMBLY BY LINING UP THE TWO UNI-DIRECTIONAL ARROWS IN THE TOP,

More information

Steel Frame Assembly

Steel Frame Assembly Steel Frame Assembly The Alpha Steel Frame is adaptable as vertical or horizontal bed. Note: A leg connector rod extension bar is required for a horizontal bed. Hardware Card #3 is used for Steel Frame

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION Plastic Laminate Series contents page 1030 TrimLineSeries...2-21 1040 DesigerSeries...2-21 Urinal Screens, Benches, Shower Seats...22-31 2030 TrimLineSeries Maximum Privacy...32-47

More information

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required: DESTROYER FRONT BUMPER INSTALL JL STEP 1 : GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... Tools Required: - Utility knife - 11/16 Deep socket - Ratchet - 11/16 Crescent wrench - Ratchet Extension - 1/4 socket

More information

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S) Form 0905-0 Instructions and Parts List TM- Mini Castle (modified) MARTIN SAFETY SYSTEM NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post

More information

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS FOR MODELS MFD. SINCE 10/17 For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Rails Rollers Reversible

More information

Locker Pedestal Installation Instructions

Locker Pedestal Installation Instructions Locker Pedestal Installation Instructions LK-PED-INST-0314r1 Parts List Single Pedestal Back to Back Pedestal Horizontal Support Tube TS-169 Post Flange TS-190 Post Cap Fasteners Provided: #8 x ¾ round

More information

Straight Stringer Installation Instructions

Straight Stringer Installation Instructions Straight Stringer Installation Instructions Floor-to-Wall Installation F L I G H T P L A N Unpack: What s included? Your Stringer Tread Screws (8) per tread (1) Torque Wrench (1) Socket (for the brackets

More information

Modular XP Ramp Assembly Manual

Modular XP Ramp Assembly Manual Modular XP Manual 1 Contents Overview... 2-5 Section 1: 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...

More information

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page LOFT DOOR HANGER Page 1 Specifications 2 7/16" 3/8" 1-1/2 1-3/4 Ø3 3 7/8" 11-1/16 Page 2 Parts and Tools Tools Needed Tape Measure Pencil Drill with 1/8, 1/4 and 3/8 bits, 1 spade bit and Phillips bit

More information

Gared Pro Portable Backstop

Gared Pro Portable Backstop Models: 5016, 5017, & 5018 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units PUBLICATION NO. 551754436 SAVE THESE

More information

For additional assistance call

For additional assistance call The following pages will help guide you through the process of assembling your new 48 custom prize wheel. Choose an assembly area with plenty of room to lay your pieces on the floor and also a bench or

More information

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER: PARTS-1 Model 24562/28562 Crane INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA 50438-0189 641-923-3711 MANUAL PART NUMBER: 99903701 Iowa Mold Tooling Co., Inc. is an Oshkosh Truck

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

TABLE OF CONTENTS REQUIRED TOOLS

TABLE OF CONTENTS REQUIRED TOOLS TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS

More information

Installation Instructions

Installation Instructions Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors

More information

Installation of Balustrade Systems

Installation of Balustrade Systems Installation of Balustrade Systems IMPORTANT: Be sure to mark the center point of each newel post's location prior to installation to insure proper spacing. All product interfaces must use PL Premium Adhesive

More information

Modular XP Ramp Assembly Manual

Modular XP Ramp Assembly Manual Modular XP Manual 1 Contents Overview... 2-5 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...

More information

ALL SEASON PATIO COVER

ALL SEASON PATIO COVER ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the

More information

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419) 125 TAYLOR PARKWAY ARCHBOLD, OH 43502 PHONE: (419) 445-8915 FAX: (419) 445-0367 www.biljax.com Multi-Stage ST-8100 SERIES ASSEMBLY INSTRUCTIONS ALL DRAWINGS ARE FOR ILLUSTRATION ONLY. PRINTED IN U.S.A.

More information

Precision Steel Car s 100 T Steel Coil Car

Precision Steel Car s 100 T Steel Coil Car Precision Steel Car s 100 T Steel Coil Car Precision Steel Car www.precisionsteelcar.com info@precisionsteelcar.com Paul Vernon: (513) 571-5739 Revised 4/30/2009 Contents of Kit Main Tube Side Frame 2

More information

Installation Instructions for the AlphaDeck Staging System

Installation Instructions for the AlphaDeck Staging System Installation Instructions for the AlphaDeck Staging System Step 1 - Preparation A. Before setting up your system, determine the location where the stage will be installed and locate all the parts you will

More information

In the box: Figure 1: Instructions, 1-channel, 2 retainers, 2 adjustable tubes, 1 chrome ring, and hardware. Channel

In the box: Figure 1: Instructions, 1-channel, 2 retainers, 2 adjustable tubes, 1 chrome ring, and hardware. Channel 1 P a g e Thunder Mounts Garage Systems The Overhead Garage Mount Solution The World s Leader of Multi-fit Overhead Garage Mount Safety and Technology. Overhead Garage Door Opener Mounting Instructions.

More information

installation guide

installation guide JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16 Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete

More information

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM.  1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH., 44660 Supplemental insert Copyright 2015 Wayne Dalton, a division of Part

More information

Installation Manual for Metal Toilet Partitions Standard Series

Installation Manual for Metal Toilet Partitions Standard Series For Video instructions http://www.hadrian-inc.com/tech-data/installation/toilet-partitions.aspx P a g e 1 Table of Contents Page General Notes and Tools Required 3 STEP 1: Establish Floor Bracket Locations

More information

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts USER GROUP: 2-12 RECOMMENDED CREW: 2 people TOOLS REQUIRED: T-30 TORX tool (supplied by manufacturer) T-45 TORX tool (supplied by manufacturer)

More information

WireCrafters, LLC. General Information

WireCrafters, LLC. General Information WireCrafters, LLC. General Information 6208 Strawberry Lane 502/363-6691 www.wirecrafters.com Louisville, Kentucky 40214 502/361-3857 FAX 1-800-626-1816 The following General Installation Instructions

More information

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE Triner Scale & Mfg. Co., Inc. 8411 Hacks Cross Rd. Olive Branch, MS 38654 Phone: 800-238-0152 Fax: 662-809-2386 Description The Triner Scale Model

More information

MPA-9000 Universal Ceiling Projector Mount Kit

MPA-9000 Universal Ceiling Projector Mount Kit I N S T R U C T I O N M A N U A L Universal Ceiling Projector Mount Kit The Universal Ceiling Projector Mount provides a unique, simplified method of ceiling mounting your inverted projector. This low

More information

Shed Assembly Instructions

Shed Assembly Instructions Shed Kit Contents The shed kit includes all the parts needed to assemble your shed except for tools and fasteners such as screws and nails. The various pieces are pre-cut and many are marked to indicate

More information

Applied ATTENTION! LA12-25 LINE ARRAY TOWER INSTRUCTIONS lb WEIGHT LIMIT

Applied ATTENTION! LA12-25 LINE ARRAY TOWER INSTRUCTIONS lb WEIGHT LIMIT 1 LA12-25 LINE ARRAY TOWER INSTRUCTIONS ATTENTION! 1500 lb WEIGHT LIMIT INSTRUCTIONS 2 BILL OF GOODS REQUIREMENTS FOR SAFE USE 1) Build tower on flat surface. 2) Thick wood or metal plates under leveling

More information

Baby Grande with Crank, Housing, and Side Rails Installation Instructions

Baby Grande with Crank, Housing, and Side Rails Installation Instructions Baby Grande with Crank, Housing, and Side Rails Installation Instructions Tools Needed Hardware Provided (per shade) Hardware Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil

More information

Installation Manual For ToddPod Outdoor Shower Enclosures

Installation Manual For ToddPod Outdoor Shower Enclosures Installation Manual For ToddPod Outdoor Shower Enclosures Contact us at 888-545-9763 or email us at office@toddpod.com with any questions during the installation process. Our service team is available

More information

HD installation guide

HD installation guide JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: , INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1

More information

For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED

More information

BoardWalk RAMP: Installation and Assembly Instructions

BoardWalk RAMP: Installation and Assembly Instructions BoardWalk RAMP: Installation and Assembly Instructions The BoardWalk RAMP Platform and Handrail System will accommodate curbs 3" - 12" high. Adhering to ADA guidelines of 1:12 rise ratio: The system shown

More information

GIRTS ON BACK OF BUILDING

GIRTS ON BACK OF BUILDING GIRTS ON BACK OF BUILDING ALL GIRTS ARE 1 1/2 SQUARE TUBE. GIRT LENGTHS FOR 12, 20, 24, AND 30 WIDE BUILDINGS: ON 12 WIDE BUILDINGS GIRTS ARE 67 3/4 LONG ON 20 WIDE BUILDINGS GIRTS ARE 56 3/4 LONG ON 24

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Furniture Solutions: 68 Shipstation with Storage Shelf Model Numbers: PB001 (D9001, D9010N, D9021, D9030, D9032/D9033, D9098, RC4054) Introduction This document provides the Pitney

More information