Locker Pedestal Installation Instructions
|
|
- Ruby Short
- 5 years ago
- Views:
Transcription
1 Locker Pedestal Installation Instructions LK-PED-INST-0314r1
2 Parts List Single Pedestal Back to Back Pedestal Horizontal Support Tube TS-169 Post Flange TS-190 Post Cap Fasteners Provided: #8 x ¾ round head self-tapping sheet metal screws 2 per single pedestal; 4 per double pedestal to attach tubing to pedestals. #8 x ¾ round head self-tapping sheet metal screws 2 per pedestal to attach flange to pedestals. #12 x 1 ½ round head sheet metal screws 4 per pedestal to attach flange to floor. Blue plastic anchors 4 per pedestal to attach flange to floor. #8 x 2 ½ round head self-tapping sheet metal screws 1 per locker bank to attach locker to tube. For Wood Seats: 1/4 x 4 carriage bolt, with washer and hex nut 2 per wood seat and locker pedestal connection. Suggested Tools Hammer drill, with 1/4 concrete/masonry bit (for securing to floor). Cordless drill, with 3/16, 1/4, and 3/8 high speed drill bits (for securing tubes and lockers). #2 and #3 Robertson driver bits (used for #8 self-tapping screws and #8 and #12 pan head sheet metal screws). 3 foot level (to level pedestals and lockers). Claw hammer (to install blue plastic plugs). Small right angle grinder or small chop saw (to cut tubes to size). 4 capacity clamps. For Wood Seats: 5/16 high speed drill bit. Ratchet and socket for 1/4 hex nut. Mitre saw. File and wood sander. LK-PED-INST-0314r1 2
3 SINGLE LOCKER PEDESTAL INSTALLATION LK-PED-INST-0314r1 3
4 SINGLE LOCKER PEDESTAL INSTALLATION Refer to illustrations on previous page and locker layout shop drawings. 1. Slide chrome flange over the pedestal legs. The legs of the flange should be positioned so they are parallel to the back wall. 2. Locate position of the pedestals as per locker layout shop drawings. The first pedestal is 2 from the wall. Pedestals will normally be spaced from 36 to 60 apart. DO NOT FASTEN TO FLOOR. 3. Lay the horizontal tubing on the pedestals. The back tube is located 1 from the back edge of the pedestal; the front tube is located 1/2 in from the face of the locker. Clamp tubes to pedestals. 4. Drill hole in top of tube 1/8 larger than head size of screw. Drill 1/8 hole through the tube and top of pedestal. Use 3/4 self-tapping screws to secure the tube to the pedestal. 5. If the locker run (bank) is more than 10 feet, centre the pedestal at the joint of the tubes. Secure tubes to the pedestal in the same manner as step #4. 6. Set pedestal bank assembly in place. Mark hole locations on floor at each chrome flange. Move pedestal bank assembly out of the way so that 1/4 holes can be drilled in the floor and blue plastic anchors inserted. 7. Move the pedestal bank assembly back into position and secure chrome flanges to the floor with 1-1/2 screws. 8. Remove the set screw from the chrome flange. Level the pedestal bank assembly and secure pedestal to flange with #8 x 3/4 self-tapping screws. 9. Once all pedestal bank assemblies are secured, install lockers in usual manner. Secure lockers to wall and also to pedestal bank assembly. Drill hole in bottom of locker (shelf) just behind locker frame with 1/8 drill bit through the bottom of the locker frame and into the top of the tube. Secure with #8 x 2 1/2 pan head sheet metal screw. This will prevent locker movement. 10. After lockers are secured, attach bench material to pedestal extension. 11. Insert plastic end caps into open pedestal and tube ends (we recommend the use of silicone to prevent end caps from being removed). LK-PED-INST-0314r1 4
5 BACK TO BACK LOCKER PEDESTAL INSTALLATION LK-PED-INST-0314r1 5
6 BACK TO BACK LOCKER PEDESTAL INSTALLATION Refer to illustrations on previous page and locker layout shop drawings. 1. Slide chrome flange over the pedestal legs. The legs of the flange should be positioned so they are parallel to the back wall. 2. Locate position of the pedestals as per locker layout shop drawings. The first pedestal is 2 from the wall (or end of horizontal tube). Pedestals will normally be spaced from 36 to 60 apart. DO NOT FASTEN TO FLOOR. 3. Lay the horizontal tubing on the pedestals. The outside tubes are located by subtracting 1/2 from the locker depth, marking that resulting dimension from the centre of the back to back pedestal. Clamp tubes to pedestals. 4. Drill hole in top of tube 1/8 larger than head size of screw. Drill 1/8 hole through the tube and top of pedestal. Use 3/4 self-tapping screws to secure the tube to the pedestal. 5. Once the back to back pedestal assembly has been built with the outside tubes installed, add the centre tubes, located on each side of the centreline of the back to back pedestals. Secure the centre tubes as per step #4. 6. If the locker run (bank) is more than 10 feet, centre the pedestal at the joint of the tubes. Secure tubes to the pedestal in the same manner as step #4. 7. Set pedestal bank assembly in place. Mark hole locations on floor at each chrome flange. Move pedestal bank assembly out of the way so that 1/4 holes can be drilled in the floor and blue plastic anchors inserted. 8. Move the pedestal bank assembly back into position and secure chrome flanges to the floor with 1-1/2 screws. 9. Remove the set screw from the chrome flange. Level the pedestal bank assembly and secure pedestal to flange with #8 x 3/4 self-tapping screws. 10. Once all pedestal bank assemblies are leveled and secured, install lockers starting in the middle of the bank, working toward the ends of the bank. Secure first lockers back to back with large pop rivets supplied through existing holes in the backs of lockers. Once secured to each other, make sure they are centred on the tubes and secure to tubes by drilling hole in bottom of locker (shelf) just behind locker frame with 1/8 drill bit through the bottom of the locker frame and into the top of the tube. Secure with #8 x 2 1/2 pan head sheet metal screw. This will prevent locker movement. 11. After lockers are secured, attach bench material to pedestal extension. 12. Insert plastic end caps into open pedestal and tube ends (we recommend the use of silicone to prevent end caps from being removed). LK-PED-INST-0314r1 6
7 WOOD BENCH SEAT 1. Measure length of bench to be installed and cut wood seat (if required) so they are flush with the end of the locker bank. File or sand any cut edges to a radiused shape. 2. The outer wood seat is to be flush with the locker pedestal tube extensions. 1/2 space is required between the two wood seats. 3. Mark locations of locker pedestals tube extensions onto wood seats. Drill two 5/16 holes in tops of wood seat in each piece. 4. Re-set wood seats on locker pedestal. Clamp in place. 5. With centre punch, mark hole location onto locker pedestal through the pre-drilled holes. 6. Remove the wood seats. Using a 5/16 high speed drill bit, drill holes in the locations marked in the locker pedestals. 7. Re-set the wood seats and attach to the locker pedestals with 1/4 x 4 carriage bolts through the wood seat. Tighten with washer and hex nut. 8. Repeat for all locker banks. For corner installations, mitre the wood seats at 45 degrees. Secure the wood seats by predrilling countersunk holes in the edge and screw the two pieces together with #8 x 2 flat head wood screws (not provided). LK-PED-INST-0314r1 7
Assembly Instructions
Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationTABLE OF CONTENTS REQUIRED TOOLS
TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More information96 (Standard Length)
Setbacks 96 (Standard Length) Bike Files may be lined up end to end to fill the available space. A 36 aisle should be left between the ends of bikes in racks facing one another. 36 aisle 50 Installation
More informationDEPTH-KIT-785 Seat Depth Extension
Parts Required: 2 x Seat Frame Plugs 1.5 or 3 1 x Elevation Rod 18.5 or 20 2 x Attachment Rods 18.5 or 20 3 x Vinyl Straps color and width specific Tools Used: Sissors 2 x ½ Wrench Soft Tip Hammer or Mallet
More informationFranklin Mills Stackable Movable Lateral Instructions
Franklin Mills Stackable Movable Lateral Instructions Table of Contents: Table of contents...1 Tools Required...2 Stationary Shelving Assembly...3-7 Mobile Shelving Assembly...8-16 Rail Assembly...8-11
More informationWorkbench Instructions for Assembly
Workbench Instructions for Assembly Technical Electronic Workstations and Industrial Workbenches Includes: Cabinets Privacy Panels Stringers Bottom Shelves Table of Contents Tools Required for Assembly...
More informationUSSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS
1 OF 17 A 1. PURPOSE: Instructions for in field replacement of 9004 mechanical suspension top pan 2. SCOPE: 9004 mechanical suspension with legacy two point LX back frame and current LX back frame 3. PROCEDURE:
More informationBIKE FILE (301)
B IK E F I L E High Efficiency The Bike File is our most space efficient u-lock compatible product. Sturdy sliding hangers allow nine bikes to be securely stored in an eight-foot section while allowing
More informationπ H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED
π H-4408 1-800-295-5510 uline.com ALUMINUM BLEACHERS 5-ROW x 15' TOOLS NEEDED Square Tape Measure Rivet Gun 3/16" Drill Bit 1/2" Wrench Socket Wrench 1/2" Deep Well Socket #2 Phillips Bit Rubber Mallet
More informationIDR assembly instructions:
IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)
More informationAssembly Instructions
V4-10.15 Assembly Instructions (W x D x H) 1.89m x 1.62m x 1.80m Product Name: Miami Swing Pressure Treated products should not be treated with any other products for the first month. PLEASE KEEP THIS
More informationInstallation Manual for Metal Emperor Lockers
P a g e 1 Table of Contents Page General Notes and Tools Required 2-3 Assemble Shelves with Coat Hooks/Coat Rods 4 Fastening Chart 5 Knock Down Locker Assembly (Banks of Three) 6-12 Appendix A: Dress End
More information12, 14 & 16 Wide Enclosure Assembly Guide
www.rmfiberglass.com 12, 14 & 16 Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Table of Contents 1. Handling and Storage page 3 to 5 2. Parts and Tools List page 7 3.
More informationSentinel Electronic Safe Installation Guide
Sentinel Electronic Safe Installation Guide by Rev 07/12/2004 P/N 100020 Table of Contents 1. OVERVIEW...3 2. SAFE INSTALLATION...3 2.1. TOOLS REQUIRED...3 2.2. SELECTING THE MOUNTING LOCATION...3 2.3.
More informationFLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS
FLOE DOCK FURNITURE ASSEMBLY INSTRUCTIONS KIT P/N 510-00400-02 KIT P/N 510-00405-02 KIT P/N 510-00406-02 KIT P/N 510-00410-02 WARNING IT IS THE INSTALLER S RESPONSIBILITY TO PROPERLY INSTALL this chair
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More information6' Wide Premium Greenhouse Benches
6' Wide Premium Greenhouse Benches Premium Greenhouse Bench with Stationary Top 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 112416S6X08 6' W x 3' H
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationDesk/Wall-Mount Rack
Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware
More informationTOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.
TOOLS REQUIRED FOR ASSEMBLY Rubber Mallet or Plastic Tip Hammer Top Cover Support PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER Back Stop Divider Closed 'L' Upright Slotted Reinforcement Support
More informationTrak-Slider Instructions
Trak-Slider Instructions 1/4-20 x 3/4" Hex Head Bolt 1/4-20 Flanged Hex Nut Gusset 1/4-20 x 1/2" Allen Cap Screw 1/4-20 Nylock Nut Rivet 1/4-20 x 3/8" Pan Head Phillips Machine Screw 1/4 USS Flat Washer
More informationIndependent Containment System (ICS)
Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.
More informationShop Style Miter Saw Stand Kit
Quality Power Tool Accessories OWNER S MANUAL Assembled Unit Shown Without Shelves & Wings Assembled With Shelves & Wings Shop Style Miter Saw Stand Kit Model 2850 IMPORTANT Read and understand all safety
More informationINSTALLATION INSTRUCTIONS KK-K9-F14-K K9 KIT FOR FORD EXPEDITION
INSTALLATION INSTRUCTIONS KK-K9-F14-K-32 32 K9 KIT FOR 2003-2016 FORD EXPEDITION TOOLS REQUIRED: Power Drill Drill Bit Set Standard & Metric Socket Sets Phillips Screw Driver Open End Wrench Set Wire Cutters
More informationINSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger
INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.
More informationThe following instructions will guide you through the installation of your new vinyl railing.
Installation Guide St. James Vinyl T-Rail Tools Required Protective eye glasses 3/8 x 3 Concrete Anchors/Fasteners (for Tape measure concrete installations) Variable speed drill/screwdriver Philips Driver
More informationGearBoss AirPro Locker
Installation and Owner s Instructions GearBoss AirPro Locker Wall Installation Island Installation Contents Important User Information...........................2 General...2 Manufacturer...2 Intended
More informationMelamine Plastic Laminate. Toilet Partition Installation Manual
Melamine Plastic Laminate Toilet Partition Installation Manual PHONE: FAX: 1-866-317-2786 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL THE
More informationINSTALL LOAD BED TRACKS
Universal LOAD BED TRAY & Load BArs TRBU001 / KRLBUNI1 INSTALL TIME: 2.5 Hours READ ME FIRST: Thank you for purchasing a Front Runner Slimline II Load Bed Rack or Load Bar Kit. Your Kit will contain the
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More informationRoll In W/L Dock PAGE 1
Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER
More informationINSTRUCTION BOOKLET #C20
INSTRUCTION BOOKLET #C0 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT IN SEVERE PERSONAL INJURY TO
More informationMONKEY BARS OVERHEAD RACK INSTALLATION
MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE
More informationINSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE
For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT
More informationPAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top
PAK901 4 Drum Roll Top Assembly Instructions Note: 2 people will be required to assemble roll top PLEASE READ ASSEMBLY INSTRUCTIONS CARFULLY Tools required: 5/8 Socket & Ratchet 9/16 Deep Well Socket &
More informationGrade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult
Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult Grade 8 Enriched Math Project INSTRUCTION SHEET FOR CATAPULT Procedures, materials and tools: below is a step-bystep
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationThe following instructions will guide you through the installation of your new vinyl railing stair kit.
Installation Guide Vinyl Standard Stair Railing Tools Required Protective eye glasses Tape measure Variable speed drill/screwdriver Rotary hammer or hammer drill and masonry percussion bit recommended
More informationReal Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions
MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)
More informationhttps://www.wallbedsbywilding.com/wallbed-installation-studio-series/
For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More informationWorktop INDEX eight Capacity Unpacking
Pro.0 Series Warning: Excessive weight hazard! Use two or more people to move, assemble or install cabinets and locker to avoid back injury. Do not leave children unattended near cabinets. High risk of
More informationBSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers
BSM, GSM & GSS Joint Kit Instruction (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers February, 1999 JOINT ASSEMBLY PARTS LIST Item Quantity Description
More informationFor Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED
More informationINSTRUCTION BOOKLET #C0 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationRequired Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench
Thank you for your recent purchase of a Cabinets by Hayley garage cabinet system. You are about to experience the best made cabinets that you can purchase. Cabinets by Hayley are designed for beauty and
More information8 Ft Wide Enclosure Assembly Guide
www.rmfiberglass.com 8 Ft Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Table of Contents 1. Parts and Tools List page 3 2. Hardware page 4 3. Maintenance page 5 4.
More informationINSTALLATION INSTRUCTIONS
NOTE: Bolts should remain hand tight until all bolts are installed. STEP 1 Installing the door base (both sides). 1. Locate the outer, roll cage, mounting bolt (passenger side is shown in the illustration).
More information6' Wide Premium Greenhouse Benches
6' Wide Premium Greenhouse Benches Premium Greenhouse Bench with Rolling Top 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 112416R6X08 6' W x 3' H x 8'
More informationINSTALLATION INSTRUCTIONS K9-C20-32 & K9-C CHEVROLET 4 DOOR TAHOE, GMC YUKON, SUBURBAN and YULON XL
INSTALLATION INSTRUCTIONS K9-C20-32 & K9-C21-32 2007-2014 CHEVROLET 4 DOOR TAHOE, GMC YUKON, SUBURBAN and YULON XL TOOLS REQUIRED: Power drill Drill bit set Standard & metric socket sets Phillips screwdriver
More informationSide Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY
Side Mount BED STYLE: PARK CITY INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT
More informationRange height adjustable assembly
Table of contents Digital handset operation 3 Height adjustable bench kit 4-5 Cable carrier 6 Ganging tray and ganging rail 7 Height adjustable return frame kit 8 Cable entry pole 9 24 and 30 d worksurfaces
More informationSection 3: Understanding Your Shop Drawings Reading Shop Drawing Abbreviations 60" O.A. stands for the overall dimension from the back wall to the front face of achieve your 60" overall you will set the
More informationYour order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.
instructions About Your Order. Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. Check the Order Before the Carrier leaves!
More informationINSTRUCTION BOOKLET #C10 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.
More informationConstable Oak Extension Dining Table
Constable Oak Extension Dining Table Assembly Instructions - Please keep for future reference 176/0325 Dimensions Width - 160/ 200cm Depth - 90cm Height - 75cm Important - Please read these instructions
More informationSteel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)
Steel Solutions USA 602 E. Walnut Street Watseka, IL 60970 p: (888) 875-5004 f: (815) 432-3364 sales@steelsolutionsusa.com Published February 2011 2011 Steel Solutions USA. All rights reserved. version
More informationAssembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly
Assembly Aid Open the box and arrange the pieces similar to what you see here. Assembly instructions as well as the list of tools required for assembly are also in the box. One of the packages contains
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationINSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD
For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD INSTRUCTION BOOKLET #34 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION
More informationStrata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at
1A Watch our assembly videos at www.strataf.com/videos Parts in the Arm Box: Arm - Outside View Arm - Inside View 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 with the Feet attached Back Panel
More informationPremium Single Dutch Doors Assembly & Installation Instructions
Premium Single Dutch Doors Assembly & Installation Instructions Premium Single Dutch Door Instructions General Notes; -Read the entire instructions before you begin. -Wear appropriate safety gear when
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationINSTALLATION GUIDE Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum )
INSTALLATION GUIDE 7115 Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Locker w/ Top Shelf Assembly... 3-5 6-13 Phase
More informationINSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER
ASSEMBLY OF THE 7180 STRAIGHT SIDE STEEL LADDER TOOLS REQUIRED FOR ASSEMBLY SAFETY GLASSES (2) 1 / 2 WRENCHES OR SOCKETS STEP LADDER OF APPROPRIATE HEIGHT (2) 7 / 16" WRENCHES OR SOCKETS HACKSAW FLAT HEAD
More informationSADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.
SAD D L E B U D DY Saddle Up. Designed for trailheads, bike parks and picnic areas, the Saddle Buddy offers a resting place for cyclists noble steeds. The convenient bar allows cyclists to keep their bikes
More informationINSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS
INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS GENERAL INFORMATION: Lattice arbors are designed to be freestanding or attached. They are designed to resist a 10 lb. to 30 lb. per square
More information32 Gallon Perforated Square Receptacle
32 Gallon Perforated Square Receptacle 992-031 24 5/" 24 5/" 39 1/2" 30 1/2" ITEM NO. PART NUMBER DESCRIPTION QTY. 1 653-006 Receptacle Base 1 2 653-045 32 Gallon Perforated Side 4 3 653-011 Arch Lid 1
More information1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60
1: profile cross section FD- profile for sidewalls + backwalls eaves profile curved roof profile Z - profile (alongside frame) L 60 x 60 for backwall Image 2: 1.) Insert feet from below in square tubes
More information955 Industrial St NE, Pine City MN Telephone: / Fax #218 LARGE MULTI-SPEED BLOWER & FILTER BOX KIT
955 Industrial St NE, Pine City MN 55063 Telephone: 320.629.6737 / Fax 320.629.3677 www.dakacorp.com #218 LARGE MULTI-SPEED BLOWER & FILTER BOX KIT INSTALLATION INSTRUCTIONS FOR DAKA FURNACES SECTION 1:
More informationTopo Freestanding Applications - Private Office
4 3 2 Topo Freestanding Applications - Private Office Combo Wrench If you have a problem, question, or request, call your local dealer, or Coalesse at 1.800.627.6770 Or visit our website: www.coalesse.com
More informationFree Standing Frame and Canopy
Patriot Docks Free Standing Frame and Canopy Required Tools: Cordless Drill, 3/8 drill bit, 17mm wrench, 18mm wrench, 6mm hex key (included), 8mm hex key (included) Helpful Tips: Assembling and installing
More informationDekPro Prestige Aluminum Rail System Level Railing Installation Instructions
ing Installation Guide Please read all instructions completely before starting any installation of DekPro Prestige Railing Systems. SAFETY: Always be safe and follow all instructions when using power tools
More informationBulkhead Model Number and
Bulkhead Model Number 96141-3-01 and 96142-3-01 Installing your ProMaster bulkhead is very clear cut following these instructions. Before cutting or drilling in the floor, verify the location of you gas
More information55000/55010 Installation Instructions
A. Install 55015 B. Bolt roof rails, 55020/55025, to front hoop. C. Assemble 55026 D. To install without drilling into bumper. E. If mounting directly to bumper. A. 55015 Installation Instructions 55000/55010
More informationDeck Mount Installation with Bench
Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out
More informationSPEEDFRAME T h e s p e e d y w a y t o b e i n d i v i d u a l
SPEEDFRAME T h e s p e e d y w a y t o b e i n d i v i d u a l T h e a l l p u r p o s e c o n s t r u c t i o n k i t SPEEDFRAME All materials are kept close to hand in this specially designed Speedframe
More informationP a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s
P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s Before You Begin: Professional installation by two-person crew is required for this fixture. Install water supply and drain piping
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355
ASSEMBLY AND CARE INSTRUCTIONS VERSION: 8920100 (Revised 06/16) JUST FOR KIDS 355 SALES AND SERVICE spiethamerica.com Canada and International 135 Forestview Road, PO Box 40 Orillia, Ontario, Canada L3V
More informationPRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS
PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS REIMANN & GEORGER CORPORATION HOISTING PRODUCTS BUFFALO, NY P/N 610096 10/19/05 Read the following instructions thoroughly before starting work to identify
More informationGeiger Rhythm. Right ON SITE. Installation Principles
ROS-GRW Geiger Rhythm Wall 1BGRZ3 Tools Required o Installation drawing of product layout o Cordless drill o #1, #2 & #3 Philips and Robertson Drill bits o Level o Measuring Tape Page 1 ROS-GRW Geiger
More informationINSTALLATION INSTRUCTIONS
Do not attempt to install this product on any vehicle other than the one it is designed for and listed above! Parts List 10 3/8 X 1 1/4 Hex Bolt 10 3/8 Lock Washer 4 3/8 Hex Nut 4 3/8 Flat Washer 2 3169)
More informationPlans & Materials List for Handwashing Station
Plans & Materials List for Handwashing Station Required Tools Arc Welder (mig or stick) Chop or metal band saw Grinder (bench and/or handheld) 3/8" Drill 1/8", 1/4", 5/16" Drill Bits Copper Pipe Cutter
More informationLow Headroom Rear Mount TorqueMaster
Low Headroom Rear Mount Supplemental Instruction Insert This supplemental installation instruction is to be used as a supplement to the main Installation Instruction and Owner s Manual provided with the
More informationGeneral Prisoner Transport Install Instructions PT-2-INST
General Prisoner Transport Install Instructions PT-2-INST 50 or 60 high x 80, 100 & 120 inch long / Double Compartment Inserts Also refer to PT-A-3XX instructions for vehicle specific mounting measurements
More informationmake something original Mobile Workstand Shelf support (2) Caster extension (2) Leveling feet (4) Rigid caster (2)
Mobile Workstand Panel (2) Leg (4) Long frame member (2) Crossmember (6) Shelf (1) Shelf support (2) Caster extension (2) Leveling feet (4) Rigid caster (2) THIS IS NOT THE COMPLETE PLAN: it is merely
More informationInstall Instructions. NewAge Steel Welded Tall Locker
Kit Contains Full Width Adjustable Steel Shelves (4) Height-Adjustable Steel Leveling Legs (4) Aluminum Door Trim (2) 2.5 x ¼ Cabinet Mounting Lag Bolts (4) Large Zinc Plated Mounting Washers (4) 5/8 x
More informationInstallation Instructions
Important 1. Acclimate materials 24 hrs before installation. Maintain temperature controlled environment after installation 2. Install in accordance with manufacturer s installation instructions. Failure
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationTools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for
Arbor Collection / Harvest Collection / Terra Collection Page 1 Please read all instructions completely before starting any part of the installation. Each AZEK and Kit comes complete with all hardware,
More informationWALL MOUNT LOCKER ASSEMBLY. 208 Chestnut St, Reading, PA (610)
WALL MOUNT LOCKER ASSEMBLY 208 Chestnut St, Reading, PA 19602 (610)376-2666 Locker Assembly Wall Mount: locker Installation Introduction: Before beginning, check to ensure the floor is level, and the wall
More informationCNC Router Parts. PRO Series Machine Expansion Instructions
CNC Router Parts Tools List The following tools will be used during assembly of your machine: Metric Ball End Allen Wrench Set - 3mm, 4mm, 5mm, 6mm 6mm Ball-End Hex Driver Attachment for Drill/Impact Driver
More informationDiva Acoustical Ceiling
Installation Instructions Diva Acoustical Ceiling CONTENTS Important User Information...........................2 Safety Precautions.................................3 Required Tools....................................3
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationStainless Steel 95C34 Series
Stainless Steel 95C34 Series Toilet Partition Installation Manual PHONE: FAX: 866-317-2786 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL
More informationK9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS
K9 KIT INSTALLATION INSTRUCTIONS 2005-2011 CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS TOOLS REQUIRED: Power Drill (Cordless preferable) Drill Bit Set Standard Wrench and Socket Set Metric
More information