Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room.

Size: px
Start display at page:

Download "Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room."

Transcription

1 Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room Author(s): mevatt

2 1. Contents Revision History Purpose Applicable To Scope Definitions Training Safety Personnel, Equipment and Materials Required Procedure South Pedestal Point A Procedure Review Records References AD Docx Page 2 of 16

3 Revision History Rev Date Approved Sections Affected Reason for Change Remarks and/or Change Details - 11/14/2016 Initiated Evatt Name Approved by: SigEng Name, ME Title SigEM Name, EL Maint SigSci Name, SciOps Tammie Lavoie 17 February 2017 Tammie Lavoie, Safety Manager Date 2100-AD Docx Page 3 of 16

4 1. Purpose The purpose of this document is to specify how the two pedestals originally installed to support the FFT Spectrograph Bench in the 4m Coudé room are to be removed. This document also includes instruction about how to remove the 500 lbf crane currently sitting on the Northern pedestal. 2. Applicable To 4m, DESI 3. Scope This document covers the removal of pedestals in 4m Coudé room, removal of 500 lbf crane from northernmost pedestal, and the installation of cover plates over the holes left in the floor. 4. Definitions LCR Large Coudé Room 5. Training Personnel performing this task will variously need to be proficient in: 1. Operating a forklift 2. Using a cutting torch 3. Using standard hand and power tools 6. Safety 1. JHA Form 2. Daily Briefing Form 7. Personnel, Equipment and Materials Required 1. Personnel: This task will take three people dedicated to the job to perform safely, and a four person during some parts of the process (lifting the crane, lifting the pedestals). 2. Equipment: 2.1. Forklift 2.2. Cutting torch EA x 4 foot lifting slings, shackles, and other rigging supplies capable of lifting about 1500 lbs 2100-AD Docx Page 4 of 16

5 EA 1-8 lifting eyes (such as McMaster Carr part number 3013T55 Steel Eyebolt without Shoulder, 1-8 Thread Size, 2-1/2 Thread Length) EA heavy tag lines to control the pedestals as they are cut off and lifted out of their holes in the floor Various standard hand tools including sockets, drives, and wrenches An acetylene torch with gas bottles An arc welding machine set up to weld carbon steel A few 4 x 4 wood pieces to set the crane and the pedestals on as they are removed. 3. Materials 3.1. Precut steel plates for use in covering the holes that will be left when the pedestals have been removed. 8. Procedure South Pedestal Point A Background and Summary There are two steel pedestals located in the Mayall Large Coudé Room (LCR). One of the pedestals is at the south end of the LCR and the other is at the north end of the LCR. The north pedestal has a 500 lbf jib crane mounted on it. On drawing 2100-SOM5947-S-E-19, the south pedestal is called Point A and the north pedestal is called Point B. Refer to Figure 1 to see this naming convention. These two steel pedestals need to be removed from the LCR in order to make room for the DESI Spectrograph Enclosure, to allow more access to certain areas of the room, and to allow more room for maneuvering equipment including the spectrographs themselves into the room. Removal of the pedestals will require that they be torched off below the Main Floor level, and then lifted out from above. The reason for this is that the pedestal bases are much larger than the 3-6 [42 ] x 3-6 [42 ] clear openings constructed around them in the main floor (Figure 2, Figure 3 and Figure 4) AD Docx Page 5 of 16

6 Figure 1. LCR Floor Framing Plan Showing Points A (South) and B (North) Figure 2. Openings in Floor 42 x 42 (Reference Drawing 2100-SOM5947-S-E-9) 2100-AD Docx Page 6 of 16

7 Figure 3. Point A (South) Pedestal Base D1 (48 x 84 ) Figure 4. Point 'B' (North) Pedestal Base D2 (42" x 72") 2100-AD Docx Page 7 of 16

8 Additionally, before removing the Point B north pedestal, the 500 lbf capacity jib crane currently bolted to the top of the pedestal (Figure 5) will have to be removed. Removal of the crane will be detailed in the procedure below. Figure 5. Jib Crane on North Pedestal 2100-AD Docx Page 8 of 16

9 8.1 Procedure for Removal of South Pedestal An elevation view of the south pedestal is shown in Figure 6. To get the pedestal out, we will cut it off below the level of the floor just low enough to allow the installation of a steel cover plate over the hole in the floor. Figure 6. Elevation Views of South Pedestal 1. The portion of the pedestal that will be removed (if it is cut about 10 inches below the floor surface) should weigh about 1000 lbs (Calculated from an incomplete SolidWorks model). 2. Remove the rubber seal and flashing from the floor that surrounds the pedestal. 3. Lower the cutting torch through the Coudé room floor through one of the existing floor penetrations in the Coudé room. 4. Lower the arc welding electrode holder, ground clamp, and leads through the Coudé room floor through one of the existing floor penetrations in the Coudé room. 5. Open the dome floor hatch, referring to procedure 2100-AD Remove at least the center section; measure the forklift that will be used to determine if more need to be removed (JHA-2). 6. Bring a forklift capable of lifting 1500 lbs up from the ground floor onto the main floor and drive it into the LCR to lift the pedestal (JHA-3). Note: If one of the instrument lifts in the Coudé room can be used for this instead of a forklift, that would be acceptable. Check the capacity and stability of any equipment that will be used AD Docx Page 9 of 16

10 7. Drill and tap one ½-13UNC holes through on each side of the pedestal as shown in Figure 7. The hole locations should be about 18 inches directly above the CG of the pedestal after it has been cut off in the location shown. Figure 7. South Pedestal with Floor Level and Lifting Lug Bolt Hole Locations Shown 8. Bolt on the McMaster Carr 2994T42 Pivot Hoist Rings (2500 lbs capacity each) as shown in Figure 8. Use a 3/8 inch hex wrench AD Docx Page 10 of 16

11 Figure 8. Pivot Hoist Ring Installed on South Pedestal 9. Connect two 4 ft lifting straps to the lifting eyes using shackles. 10. Loop both lifting straps over a forklift arm. 11. Tie the two taglines to the pedestal just above the floor on opposite sides of the pedestal. 12. Lift with the forklift until the weight seems to be taken by the forklift (JHA 4). 13. Go below the Coudé room floor into the hammer head and torch cut the pedestal off just below the floor (JHA 5), using the taglines to control the load as it is lifted. 14. Lift the pedestal out of the hole with the forklift, and then take it over where the dome crane can pick it up (JHA 6). 15. Lift the pedestal with the dome crane (5 ton) and move it down to the ground floor onto some waiting 4 x 4 lengths of wood or onto a truck (JHA 7) AD Docx Page 11 of 16

12 16. Install the steel floor plate cover over the hole. Weld the plate into place (JHA 8) as required. Removal of the South Point A Pedestal is now complete. 8.2 Procedure for Removal of North Point B Pedestal An elevation view of the North Pedestal is shown in Figure 10. Similarly to the South Pedestal, to get this pedestal out, it will be cut off below the level of the floor, pulled out, then a steel cover plate will be installed in the floor to cover the hole. The North Pedestal has the added complication of supporting a crane which we will have to move before we can cut the pedestal off to remove it. Figure 9. Crane Dimensions and Weight 2100-AD Docx Page 12 of 16

13 Figure 10. Point 'B' North Pedestal 1. Prepare a place to lay the crane down once it has been removed. 2. Remove the rubber seal and flashing located around the pedestal hole in the floor. 3. Terminate electrical power and remove all conduit, junction boxes, crane hoist assembly, and droplight from arm. 4. Using SKY LIFT scissor lift, position lift perpendicular under center of arm ( I beam) and raise to where the side rails of scissor lift just supports the arm (JHA 9). 5. Remove the six ¾-10 bolts that attach the arm to pedestal and slowly raise arm off pedestal mount. 6. Secure arm and reposition scissor lift as needed and lower with arm secured to side rails. 7. With the lift in the down position the I beam can now be manually transferred off the scissor lift AD Docx Page 13 of 16

14 8. Drill and tap one hole on either side of the pedestal in the approximate location shown in Figure 11. These holes should be about 14 inches directly above the center of mass of the pedestal after it has been cut off at the location shown in Figure 11. Figure 11. North Pedestal B after Crane Has Been Removed 9. Bolt the same hoist rings used for the previous pedestal, McMaster Carr part number 2994T42, to the newly drilled and tapped holes as shown in Figure AD Docx Page 14 of 16

15 Figure 12. North Point B Pedestal Cutoff Location 10. Connect a lifting strap to each hoist ring via a shackle and secure each strap to one of the forklift forks. Lift up with the forks until the weight is taken by the forklift (JHA 10). 11. Tie the two taglines to the pedestal just above the floor on opposite sides of the pedestal. 12. Using a torch, cut the pedestal off about 10 inches below the floor (see Figure 12). Use the two taglines to control the load as it is cut off from its base. See Figure 13 for a view of what the Northern Pedestal looks like from in the hammer head (JHA 11) AD Docx Page 15 of 16

16 Figure 13. Picture of Bottom of North Pedestal 13. Lift the pedestal out of the hole in the floor (JHA 12) and move it using the taglines to control the load (JHA 12) to a location where it can be picked up by the crane and lowered through the hatch to the ground floor (JHA 13). 14. Install a pre-made steel plate over the opening as was done with the cover plate over the South Pedestal floor hole (JHA 14). 9. Procedure Review None 10. Records 1. JHA signature sheet; kept by safety office, scanned and stored \ets_share\safety 2. Fall protection training: kept by Safety Office 3. Rigging, suspended load: kept by Safety office 11. References DOCUMENT NUMBER NA D D SOM5947-S-E SOM5947-S-E-19 DOCUMENT TITLE KPNO Emergency Manual Point A Pedestal Detail (South Pedestal) Point B Pedestal Detail (North Pedestal) Main Floor Framing Plan Optional Hammerhead Framing Plan 2100-AD Docx Page 16 of 16

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo Doc #: 2100-AD-015-0082 Revision: - Declination Work Platform Installation Author(s): Derek Guenther, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope...

More information

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Doc #: 2100-AD-015-0074 Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable

More information

Removal of the F/8 Secondary from the 4M Prime Focus Assembly

Removal of the F/8 Secondary from the 4M Prime Focus Assembly Doc #: 2100-AD-015-0058 Revision: - Removal of the F/8 Secondary from the 4M Prime Focus Assembly Author(s): Will Goble, Matthew Evatt, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0

More information

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam

Doc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam Doc #: 2100 AD 015 0020 Revision: MOSAIC Removal Procedure Author(s): Hillary Mathis, Bill McCollam Contents Contents... 2 Revision History... 3 1. Purpose... 4 2. Applicable To... 4 3. Scope... 4 4. Definitions...

More information

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak

Doc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak Doc #: 3500-AD-015-0019 Revision: Rev WIYN Secondary Lead Screw Cleaning Author(s): Tammie Lavoie, Robert Stupak Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope... 4 4.0

More information

Free Standing Pedestal Mounting Installation Manual

Free Standing Pedestal Mounting Installation Manual Free Standing Pedestal Mounting Installation Manual Articulated Jib Crane KickLIFT Page 1 of 5 INSTALLATION GENERAL INSTALLATION INSTRUCTIONS All AIMCO lift assist equipment and associated tooling is assembled

More information

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

Parts list Instruction guide Warnings Please read carefully before assembling and using product. Parts list Instruction guide Warnings Please read carefully before assembling and using product. Jet Rail XL Part Number 27377 Tools required for assembly Hammer 9/16 Wrench 3/4 Wrench Ratchet 9/16 Socket

More information

8030 Synergy Jeep JK Rear Long Arm Frame Brackets

8030 Synergy Jeep JK Rear Long Arm Frame Brackets General Notes: SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 8030 Synergy Jeep JK Rear Long Arm Frame Brackets These instructions are also available on our website; www.synergymfg.com.

More information

Down Stage Right -Theatrical and Entertainment Rigging Supplies

Down Stage Right -Theatrical and Entertainment Rigging Supplies Shackle Plates There are five uniquely different designs in the Shackle Plates Dynasty. Each one allows you the freedom of choice as you design the rigging requirements of your scenery, as well as meeting

More information

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER: PARTS-1 Model 24562/28562 Crane INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA 50438-0189 641-923-3711 MANUAL PART NUMBER: 99903701 Iowa Mold Tooling Co., Inc. is an Oshkosh Truck

More information

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355 ASSEMBLY AND CARE INSTRUCTIONS VERSION: 8920100 (Revised 06/16) JUST FOR KIDS 355 SALES AND SERVICE spiethamerica.com Canada and International 135 Forestview Road, PO Box 40 Orillia, Ontario, Canada L3V

More information

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd. Sales & Service sasportonline.com SA Sport (Canada) SA Sport (U.S.A.) 135 Forestview Road 7879 Will Rogers Blvd. P.O. Box 40 Fort Worth, Texas Orillia, Ontario USA 76140 Canada L3V 6H9 Telephone: (705)

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

AR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B

AR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B AR-15 Armorer s Essentials Kit Product #156111 Instructions #1025769 Revision: B 1 INDEX 3 AR-15 Adjustable Receiver Link 3 Pivot Pin and Roll Pin Installation Tool 4 Mag well Vise Block 7 Upper Vise Block

More information

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 INSTALLATION GUIDE 2009-2017 PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 Table of Contents Project Overview Forward, Acceptability Criteria, Safety,

More information

KEEP YOUR RESOURCE MOVING.

KEEP YOUR RESOURCE MOVING. LINER BOLTS KEEP YOUR RESOURCE MOVING. COLUMBUS McKINNON CORPORATION Leading the Industry Downtime in the grinding mill operation is caused by one of two things: regularly scheduled maintenance or unscheduled

More information

ETX Powered Loudspeaker Accessories

ETX Powered Loudspeaker Accessories ETX Powered Loudspeaker Accessories ETX-BRKT10, ETX-BRKT12, ETX-BRKT15, ETX-TCA-S, ETX-TCA-L, and ETX-BRKT35 en Installation Guide en 3 Table of contents 1 Safety 4 2 Installation 6 2.1 Wall mount bracket

More information

Warnings. Description. Prior to Installation Tools Needed

Warnings. Description. Prior to Installation Tools Needed Warnings Failure to act in accordance with the following may result in death or personal injury. The JT Strong Arm Stabilizer System is intended to eliminate chassis movement in travel trailers and fifth

More information

Phone #: (360) Online Tech Support: Web:

Phone #: (360) Online Tech Support: Web: Phone #: (360) 734-3482 Online Tech Support: tech-support@shopfox.biz Web: www.shopfox.biz Your new Model D2058A Super-Heavy Duty Mobile Base () is designed to give you a stable and mobile platform upon

More information

US RACK, Inc Falcon Drive, Madera, CA

US RACK, Inc Falcon Drive, Madera, CA US RACK, Inc. - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTRUCTIONS for MOTORCYCLE RACK with Cradling Wheel Chocks WARNING: Do NOT attempt to install or use this rack without following all instructions.

More information

IIHS Side Impact Outrigger

IIHS Side Impact Outrigger IIHS Side Impact Outrigger Assembly Procedure Base Assembly (14.3 lbs) The base assembly consists of a ¼ thick steel plate, a ¼ thick piece of polyethylene, and mounting fixtures for the upper and lower

More information

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop

More information

Swivel Hoist Ring RIGGING ACCESSORIES. Color coded to distinguish between UNC (Red) and Metric (Silver) thread types.

Swivel Hoist Ring RIGGING ACCESSORIES. Color coded to distinguish between UNC (Red) and Metric (Silver) thread types. RIGGING ACCESSORIES Color coded to distinguish between UNC (Red) and Metric (Silver) thread types. Available in UNC and Metric thread sizes. UNC threads available in sizes from 800 pounds to 100,000 pounds,

More information

Spring Loaded All Season Roll-Up Doors

Spring Loaded All Season Roll-Up Doors Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately

More information

12-16 Ft Wide Enclosure Assembly Guide

12-16 Ft Wide Enclosure Assembly Guide www.rmfiberglass.com 12-16 Ft Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Handling and Storage 2 P a g e Handling and Storage: 3 P a g e Before You Begin Contact RM

More information

Upended heavy reels will often arrive damaged. Refuse or receive subject to inspection for hidden damage.

Upended heavy reels will often arrive damaged. Refuse or receive subject to inspection for hidden damage. Recommended Reel Handling Practices How to Handle Cable Reels Recycling/Reel Return Broken Reel Extreme Makeover Program Innovative solution to salvage broken reels with good cable on it. Reels are picked

More information

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification. INSTRUCTION SHEET D2260 HEAVY-DUTY MINI-MOBILE BASE D2057 HEAVY-DUTY MOBILE BASE D2058 SUPER HEAVY-DUTY MOBILE BASE D2259 EXTENSION KIT FOR D2260/D2057 D2246 EXTENSION RAIL KIT FOR D2058 This Shop Fox

More information

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser American Safe Room Explosion Resistant Blast Hatch with Integrated Riser Drawing: ASR-50-RBH Revision: H May 17, 2012 Table of Contents Description... 3 Options... 4 Order form... 5 Option: left or right

More information

Various Bolt Removal Process

Various Bolt Removal Process Various Bolt Removal Process Introduction I have been climbing for over 25 years. The first bolt I placed in 1987 was a 5/16 Rawls carbon steel, split shank, button head in sandstone. Certainly the wrong

More information

Real Life Ninja Starter Pack 1 Assembly Instructions

Real Life Ninja Starter Pack 1 Assembly Instructions Real Life Ninja Starter Pack 1 Assembly Instructions MATERIALS: Warped Wall 3 - Main Sections (Only 2 Sections for 10 Warped Wall) 8 3 deck screws for joining sections inside of Warped Wall 2 Rock Wall

More information

Various Bolt Removal Process

Various Bolt Removal Process Various Bolt Removal Process Introduction I have been climbing close to 30 years. The first bolt I placed in 1987 was a 5/16 Rawls carbon steel, split shank, button head in sandstone. Certainly the wrong

More information

4 DOOR JK ROCK SLIDERS INSTALLATION

4 DOOR JK ROCK SLIDERS INSTALLATION SIGNATURE SERIES 4 DOOR JK ROCK SLIDERS INSTALLATION 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of nuts securing

More information

When considering the permanent location for your SmithyCNC bed mill the following should be taken into consideration:

When considering the permanent location for your SmithyCNC bed mill the following should be taken into consideration: CNC-1240 INSTALLATION & SET-UP SET-UP CLEARANCES & CONDITIONS When considering the permanent location for your SmithyCNC bed mill the following should be taken into consideration: The machine should be

More information

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS Thank you for your purchase of the C4 Fabrication s 5th Gen 4Runner Rock Sliders! This product was carefully crafted to ensure a perfect

More information

PERSONAL RECORD KEEPING

PERSONAL RECORD KEEPING 2 P R O 3 7 0 A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING Tip: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make it easier for you to obtain

More information

INSTALLATION GUIDE. Version 2.0

INSTALLATION GUIDE. Version 2.0 INSTALLATION GUIDE Version 2.0 INTRODUCTION Carefully read these instructions to assure proper installation and performance of the GatorDeck TM. TOOLS NEEDED 1. Calibrated test weights 2. Phillips screwdriver

More information

Mast and Antennas for Field Day & Emergencies

Mast and Antennas for Field Day & Emergencies Mast and Antennas for Field Day & Emergencies John A. Allocca, WB2LUA, July 2005 This is a 27 feet 1.5 diameter portable guyed mast with a 28 feet diameter footprint. It breaks down into four 6 feet sections

More information

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Spring Loaded SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately

More information

#2010 #1795. Frame Rack Dyna Mo Clamps Two pair of jaws with 12 draw bar. Grip surface 9-¼ wide. #1929 #1910

#2010 #1795. Frame Rack Dyna Mo Clamps Two pair of jaws with 12 draw bar. Grip surface 9-¼ wide. #1929 #1910 Mity Bite Clamp Use for one or two-directional pulling. Good for confined areas. Grip 2 wide. Multi Angle Clamp Pulls from any direction with a 180 arc. Makes two-way pulling faster and easier. Bolt stoppers

More information

Factory Assistance: Phone: Fax: Page 1

Factory Assistance: Phone: Fax: Page 1 CABLE RUNWAY ACCESSORIES Radius Drop / Stringer Drop Provides 3 bend radius Radius drop fits 6, 12 and 18 runway made from 1-1/2 x 3/8 tubing Steel construction Includes (3) cable spools, (1) bolt, (1)

More information

Aegis Heavy Capacity 20K Floor Scale

Aegis Heavy Capacity 20K Floor Scale Installation Manual Aegis Heavy Capacity 20K Floor Scale Model(s): PLF-6200-H Series PLF-6200-HQ Series 2002 by Fairbanks Scales Inc. All rights reserved 50224/ SJ4799 Issue 2 08/02 Amendment Record Aegis

More information

Installation Instructions: VIBRATION ISOLATION RAIL (CPR)

Installation Instructions: VIBRATION ISOLATION RAIL (CPR) Table of Contents: 1. Quick Installation Instructions 2. Required Tools 3. Supplied Parts 4. Step by Step Instructions 5. Leveling Instructions Spring Color Key (1 and 2 ) Blue 30 lb Green - 60 lb Red

More information

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE Triner Scale & Mfg. Co., Inc. 8411 Hacks Cross Rd. Olive Branch, MS 38654 Phone: 800-238-0152 Fax: 662-809-2386 Description The Triner Scale Model

More information

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Ford Pick Up Rear leaf Spring Kit Installation Instructions 1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4

More information

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS REIMANN & GEORGER CORPORATION HOISTING PRODUCTS BUFFALO, NY P/N 610096 10/19/05 Read the following instructions thoroughly before starting work to identify

More information

Installation and Leveling Instructions for Micro/Level Wedge Style Isolators

Installation and Leveling Instructions for Micro/Level Wedge Style Isolators Technical Bulletin M/L 685 Installation and Leveling Instructions for Micro/Level Wedge Style Isolators 16WL50-1.25M6 with attachment bolt 16WM40-(1)1.25M6 with attachment bolt 12W with Anti-Skid Pad Vibro/Dynamics

More information

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF DXST4500 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS TECHNICAL

More information

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks Mounting Instructions For DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks WARNING: Because of the possible danger to person(s) or property from accidents which may result from the

More information

LoD Offroad. Jeep JK 2 Door Sliders Installation Instructions

LoD Offroad. Jeep JK 2 Door Sliders Installation Instructions LoD Offroad Jeep JK 2 Door Sliders Installation Instructions 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

Contractors Rack Assembly and Installation Instructions

Contractors Rack Assembly and Installation Instructions Part # 18601 & 16601 Contractors Rack Assembly and Installation Instructions 4751 Littlejohn St. Unit A, Baldwin Park, CA 91706 Page 1 of 12 11/13/08 Thank you for purchasing the Paramount Restyling Contractors

More information

MAKO TM CASH DISPENSER

MAKO TM CASH DISPENSER MAKO TM CASH DISPENSER PEDESTAL INSTALLATION GUIDE VERSION 2.0 TDN 0702-000 2/99 CORPORATE HEADQUARTERS: RMA (RETURN MATERIAL AUTHORIZATION) RETURN ADDRESS: 522 E. Railroad Street 2405 B Street Long Beach,

More information

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake Operating, Servicing, and Safety Manual Model # 2800 48 & 72 Ultimate Box & Pan Brake CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine. 1-800-467-2464

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LARSACC-013 LARSACC-014 LARSD2-08T12BP2C (12-in travel) LARSD2-08T24BP2C (24-in travel) C P I R K 1 ea Ball Screw with

More information

ASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL

ASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL Most Kwik Goal products carry a Lifetime Guarantee. For details or claims, visit kwikgoal.com or contact customer service at 1-800-531-4252. ASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL

More information

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM30 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

RPS. XR Front Drive Updates CORPORATION

RPS. XR Front Drive Updates CORPORATION FACTORY CAT 1. To start a replacement of the XR Front Wheel Drive, make sure the machine is on level ground with the rear wheels chocked and always disconnect the batteries. 2. Locate the Positive and

More information

TRAINING BULLETIN FORCIBLE ENTRY 1 March 15, 1997 FORCIBLE ENTRY TABLE OF CONTENTS. 1. Introduction. 2. Doors-Inward Opening. 3. Doors-Outward Opening

TRAINING BULLETIN FORCIBLE ENTRY 1 March 15, 1997 FORCIBLE ENTRY TABLE OF CONTENTS. 1. Introduction. 2. Doors-Inward Opening. 3. Doors-Outward Opening TRAINING BULLETIN 1 March 15, 1997 TABLE OF CONTENTS 1. Introduction 2. Doors-Inward Opening 3. Doors-Outward Opening 4. Through The Lock Method 5. Padlocks 6. American Lock Series 2000 7. Bars And Sliding

More information

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26 ROBOT KR 350 Installation, Connection, Exchange 1of 26 e Copyright KUKA Roboter GmbH This documentation or excerpts therefrom may not be reproduced or disclosed to third parties without the express permission

More information

IDR assembly instructions:

IDR assembly instructions: IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)

More information

Enclosed Track Aluminum Rail

Enclosed Track Aluminum Rail TM Enclosed Track Aluminum Rail Operation, Installation, and Maintenance Manual For RAIL MODELS: RAD7510, RAD6110, RAD4110 and TR2000 ORIGINAL INSTRUCTIONS THIS MANUAL CONTAINS IMPORTANT INFORMATION REGARDING,

More information

TOOLING COMPONENTS. Clamping Kits Step Blocks & Kits Driver Studs Bolts, Screws Nuts, Washers...

TOOLING COMPONENTS. Clamping Kits Step Blocks & Kits Driver Studs Bolts, Screws Nuts, Washers... TOOLING COMPONENTS Clamping Kits... 2-5 Step Blocks & Kits... 6-7 Driver Studs... 8-12 Bolts, Screws... 13-19 Nuts, Washers... 20-29 Clamps... 30-43 Swivel Screw Clamps... 44-46 Screws... 47-48 Hand Knobs...49

More information

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench. Tools Required 2011-C Ford F250/F350 No Drilling into Vehicle is Required 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench FL277 x 1 Torque Specification: 1/4 Bolts - 6 Ft Lbs.

More information

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER ASSEMBLY OF THE 7180 STRAIGHT SIDE STEEL LADDER TOOLS REQUIRED FOR ASSEMBLY SAFETY GLASSES (2) 1 / 2 WRENCHES OR SOCKETS STEP LADDER OF APPROPRIATE HEIGHT (2) 7 / 16" WRENCHES OR SOCKETS HACKSAW FLAT HEAD

More information

INDEX PAGE RELEASE SECTION NUMBER DATE

INDEX PAGE RELEASE SECTION NUMBER DATE INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001

More information

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered. Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

REV: 1.2 TRAMPOLINE MANUAL

REV: 1.2 TRAMPOLINE MANUAL REV: 1.2 TRAMPOLINE MANUAL TRAMPOLINE PARTS LIST: Item 8FT 10FT 12FT 14FT 16FT A 1 1 1 1 1 B 1 1 1 1 1 C 6 8 12 12 12 E 48 64 72 96 108 F 6 8 12 12 12 G 3 4 6 6 6 H 12 16 24 24 24 I 1 1 1 1 1 DIAGRAMS

More information

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

CART HOIST A. Assembly Instructions. Warning: Failure to follow these warnings and the assembly instructions could result in serious

CART HOIST A. Assembly Instructions. Warning: Failure to follow these warnings and the assembly instructions could result in serious HOIST A Assembly Instructions READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF HOIST A tm This installation guide is for the use of our Hoist A Cart system. Please read all warnings, directions, and watch

More information

MPA-9000 Universal Ceiling Projector Mount Kit

MPA-9000 Universal Ceiling Projector Mount Kit I N S T R U C T I O N M A N U A L Universal Ceiling Projector Mount Kit The Universal Ceiling Projector Mount provides a unique, simplified method of ceiling mounting your inverted projector. This low

More information

Sentinel Electronic Safe Installation Guide

Sentinel Electronic Safe Installation Guide Sentinel Electronic Safe Installation Guide by Rev 07/12/2004 P/N 100020 Table of Contents 1. OVERVIEW...3 2. SAFE INSTALLATION...3 2.1. TOOLS REQUIRED...3 2.2. SELECTING THE MOUNTING LOCATION...3 2.3.

More information

1949 to 1954 Chevrolet Dual Master Cylinder Conversion

1949 to 1954 Chevrolet Dual Master Cylinder Conversion 1949 to 1954 Chevrolet Dual Master Cylinder Conversion This document is a one stop shop to getting your brake system updated on your old Chevy. Whether you re going with a disc conversion or just sticking

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS i Information contained in this document is subject to change without notice and does not represent a

More information

installation guide ICON classic benching

installation guide ICON classic benching installation guide ICON classic benching Index ICON Installation Guide Single Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame...6 Installing optional accessories...7

More information

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC ASSEMBLY INSTRUCTIONS FOR MODEL SH122110GN and SH122110GY Open shipping crate and separate all of the different parts. Count each part and match up with parts list. Shortages or damaged parts should be

More information

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology Youth Explore Trades Skills Make a Safe Description Welding is a vast area in the metalworking field and a widely used joining process for metal. In this activity plan students will learn how to MIG weld

More information

IN-30000_F. Installation Instructions

IN-30000_F. Installation Instructions IN-30000_F Installation Instructions Parts Overview Detail A Detail B Detail C Detail A Detail C Detail B Parts List & Tools PARTS ITEM NO. PART NUMBER DESCRIPTION Qty 1 01-30008-01 P/C,DOUBLE T-SLOT CROSSBAR,

More information

TABLE OF CONTENTS REQUIRED TOOLS

TABLE OF CONTENTS REQUIRED TOOLS TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS

More information

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams

More information

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS General The exact position of the structure has to be established. Please note that the difference in height must not exceed 1.5% in longitudinal

More information

TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions

TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions Before You Begin These installation instructions will lead you through the process of installing

More information

TECHNICAL BULLETIN INSTALLATION INSTRUCTIONS FOR MAST AB-1386/U (NSN ) (EIC: N/A)

TECHNICAL BULLETIN INSTALLATION INSTRUCTIONS FOR MAST AB-1386/U (NSN ) (EIC: N/A) TECHNICAL BULLETIN INSTALLATION INSTRUCTIONS FOR MAST AB-1386/U (NSN 5985-01-381-6341) (EIC: N/A) ON Utility Truck: Cargo/Troop Carrier, 1-1/4 Ton, 4x4, M998 Utility Truck: Cargo/Troop Carrier, 1-1/4 Ton,

More information

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets Rev. 04 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID NET-ACCESS S-Type Network Cabinets -Phillips screwdriver -Flatblade screwdriver -22mm socket wrench -15mm socket wrench

More information

4 DOOR JK ROCK SLIDERS INSTALLATION

4 DOOR JK ROCK SLIDERS INSTALLATION SIGNATURE SERIES 4 DOOR JK ROCK SLIDERS INSTALLATION 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of nuts securing

More information

INSTALLING T400 LOAD SENSORS

INSTALLING T400 LOAD SENSORS INSTALLING T400 LOAD SENSORS The above illustrations represent the proper arrangement of Model T400 Load Sensor kit parts using either the Drill and Tap method or the Weld method. A proper installation

More information

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

PERSONAL RECORD KEEPING

PERSONAL RECORD KEEPING Q47e/Q47ce 2 Q 4 7 e / Q 4 7 c e A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING IMPORTANT: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make

More information

FORM TP m a y /ju n e 2010

FORM TP m a y /ju n e 2010 TEST CODE 01335020 FORM TP 2010089 m a y /ju n e 2010 CARIBBEAN EXAMINATIONS COUNCIL SECONDARY EDUCATION CERTIFICATE EXAMINATION MECHANICAL ENGINEERING TECHNOLOGY Paper 02 - Technical Proficiency 2 j hours

More information

How to Build a Fold- Down Greenhouse

How to Build a Fold- Down Greenhouse How to Build a Fold- Down Greenhouse This simple, inexpensive greenhouse folds down to protect your plants during early frosts and cold snaps, then can be raised up on warmer days. Made with PVC pipe and

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,

More information

E4-WM5-Y542A00 MOUNTING INSTRUCTION

E4-WM5-Y542A00 MOUNTING INSTRUCTION This instruction is for both left front (driver) 41-269282 and right front (passenger) 41-269299 B8 8112 shocks. A step by step process is shown with images of the right front. The left front is a mirror

More information

EKX Full-Range Loudspeaker Accessories

EKX Full-Range Loudspeaker Accessories EKX Full-Range Loudspeaker Accessories EKX-BRKT12, EKX-BRKT15, and EKX-TCA en Installation Note en 3 Table of contents 1 Safety 4 1.1 Safety point 6 2 Installation 7 2.1 Wall mount bracket 7 2.2 Truss

More information

Drill Line Tension Guide User Procedure Manual

Drill Line Tension Guide User Procedure Manual Oilfield Solutions Inc. Drill Line Tension Guide User Procedure Manual Special Instructions I Conditions of Use Reading this user procedure manual prior to use is essential. Slip & Cut, Drill Line Tension

More information