1 Doc #: 2100-AD Revision: - Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room Author(s): mevatt
2 1. Contents Revision History Purpose Applicable To Scope Definitions Training Safety Personnel, Equipment and Materials Required Procedure South Pedestal Point A Procedure Review Records References AD Docx Page 2 of 16
3 Revision History Rev Date Approved Sections Affected Reason for Change Remarks and/or Change Details - 11/14/2016 Initiated Evatt Name Approved by: SigEng Name, ME Title SigEM Name, EL Maint SigSci Name, SciOps Tammie Lavoie 17 February 2017 Tammie Lavoie, Safety Manager Date 2100-AD Docx Page 3 of 16
4 1. Purpose The purpose of this document is to specify how the two pedestals originally installed to support the FFT Spectrograph Bench in the 4m Coudé room are to be removed. This document also includes instruction about how to remove the 500 lbf crane currently sitting on the Northern pedestal. 2. Applicable To 4m, DESI 3. Scope This document covers the removal of pedestals in 4m Coudé room, removal of 500 lbf crane from northernmost pedestal, and the installation of cover plates over the holes left in the floor. 4. Definitions LCR Large Coudé Room 5. Training Personnel performing this task will variously need to be proficient in: 1. Operating a forklift 2. Using a cutting torch 3. Using standard hand and power tools 6. Safety 1. JHA Form 2. Daily Briefing Form 7. Personnel, Equipment and Materials Required 1. Personnel: This task will take three people dedicated to the job to perform safely, and a four person during some parts of the process (lifting the crane, lifting the pedestals). 2. Equipment: 2.1. Forklift 2.2. Cutting torch EA x 4 foot lifting slings, shackles, and other rigging supplies capable of lifting about 1500 lbs 2100-AD Docx Page 4 of 16
5 EA 1-8 lifting eyes (such as McMaster Carr part number 3013T55 Steel Eyebolt without Shoulder, 1-8 Thread Size, 2-1/2 Thread Length) EA heavy tag lines to control the pedestals as they are cut off and lifted out of their holes in the floor Various standard hand tools including sockets, drives, and wrenches An acetylene torch with gas bottles An arc welding machine set up to weld carbon steel A few 4 x 4 wood pieces to set the crane and the pedestals on as they are removed. 3. Materials 3.1. Precut steel plates for use in covering the holes that will be left when the pedestals have been removed. 8. Procedure South Pedestal Point A Background and Summary There are two steel pedestals located in the Mayall Large Coudé Room (LCR). One of the pedestals is at the south end of the LCR and the other is at the north end of the LCR. The north pedestal has a 500 lbf jib crane mounted on it. On drawing 2100-SOM5947-S-E-19, the south pedestal is called Point A and the north pedestal is called Point B. Refer to Figure 1 to see this naming convention. These two steel pedestals need to be removed from the LCR in order to make room for the DESI Spectrograph Enclosure, to allow more access to certain areas of the room, and to allow more room for maneuvering equipment including the spectrographs themselves into the room. Removal of the pedestals will require that they be torched off below the Main Floor level, and then lifted out from above. The reason for this is that the pedestal bases are much larger than the 3-6 [42 ] x 3-6 [42 ] clear openings constructed around them in the main floor (Figure 2, Figure 3 and Figure 4) AD Docx Page 5 of 16
6 Figure 1. LCR Floor Framing Plan Showing Points A (South) and B (North) Figure 2. Openings in Floor 42 x 42 (Reference Drawing 2100-SOM5947-S-E-9) 2100-AD Docx Page 6 of 16
7 Figure 3. Point A (South) Pedestal Base D1 (48 x 84 ) Figure 4. Point 'B' (North) Pedestal Base D2 (42" x 72") 2100-AD Docx Page 7 of 16
8 Additionally, before removing the Point B north pedestal, the 500 lbf capacity jib crane currently bolted to the top of the pedestal (Figure 5) will have to be removed. Removal of the crane will be detailed in the procedure below. Figure 5. Jib Crane on North Pedestal 2100-AD Docx Page 8 of 16
9 8.1 Procedure for Removal of South Pedestal An elevation view of the south pedestal is shown in Figure 6. To get the pedestal out, we will cut it off below the level of the floor just low enough to allow the installation of a steel cover plate over the hole in the floor. Figure 6. Elevation Views of South Pedestal 1. The portion of the pedestal that will be removed (if it is cut about 10 inches below the floor surface) should weigh about 1000 lbs (Calculated from an incomplete SolidWorks model). 2. Remove the rubber seal and flashing from the floor that surrounds the pedestal. 3. Lower the cutting torch through the Coudé room floor through one of the existing floor penetrations in the Coudé room. 4. Lower the arc welding electrode holder, ground clamp, and leads through the Coudé room floor through one of the existing floor penetrations in the Coudé room. 5. Open the dome floor hatch, referring to procedure 2100-AD Remove at least the center section; measure the forklift that will be used to determine if more need to be removed (JHA-2). 6. Bring a forklift capable of lifting 1500 lbs up from the ground floor onto the main floor and drive it into the LCR to lift the pedestal (JHA-3). Note: If one of the instrument lifts in the Coudé room can be used for this instead of a forklift, that would be acceptable. Check the capacity and stability of any equipment that will be used AD Docx Page 9 of 16
10 7. Drill and tap one ½-13UNC holes through on each side of the pedestal as shown in Figure 7. The hole locations should be about 18 inches directly above the CG of the pedestal after it has been cut off in the location shown. Figure 7. South Pedestal with Floor Level and Lifting Lug Bolt Hole Locations Shown 8. Bolt on the McMaster Carr 2994T42 Pivot Hoist Rings (2500 lbs capacity each) as shown in Figure 8. Use a 3/8 inch hex wrench AD Docx Page 10 of 16
11 Figure 8. Pivot Hoist Ring Installed on South Pedestal 9. Connect two 4 ft lifting straps to the lifting eyes using shackles. 10. Loop both lifting straps over a forklift arm. 11. Tie the two taglines to the pedestal just above the floor on opposite sides of the pedestal. 12. Lift with the forklift until the weight seems to be taken by the forklift (JHA 4). 13. Go below the Coudé room floor into the hammer head and torch cut the pedestal off just below the floor (JHA 5), using the taglines to control the load as it is lifted. 14. Lift the pedestal out of the hole with the forklift, and then take it over where the dome crane can pick it up (JHA 6). 15. Lift the pedestal with the dome crane (5 ton) and move it down to the ground floor onto some waiting 4 x 4 lengths of wood or onto a truck (JHA 7) AD Docx Page 11 of 16
12 16. Install the steel floor plate cover over the hole. Weld the plate into place (JHA 8) as required. Removal of the South Point A Pedestal is now complete. 8.2 Procedure for Removal of North Point B Pedestal An elevation view of the North Pedestal is shown in Figure 10. Similarly to the South Pedestal, to get this pedestal out, it will be cut off below the level of the floor, pulled out, then a steel cover plate will be installed in the floor to cover the hole. The North Pedestal has the added complication of supporting a crane which we will have to move before we can cut the pedestal off to remove it. Figure 9. Crane Dimensions and Weight 2100-AD Docx Page 12 of 16
13 Figure 10. Point 'B' North Pedestal 1. Prepare a place to lay the crane down once it has been removed. 2. Remove the rubber seal and flashing located around the pedestal hole in the floor. 3. Terminate electrical power and remove all conduit, junction boxes, crane hoist assembly, and droplight from arm. 4. Using SKY LIFT scissor lift, position lift perpendicular under center of arm ( I beam) and raise to where the side rails of scissor lift just supports the arm (JHA 9). 5. Remove the six ¾-10 bolts that attach the arm to pedestal and slowly raise arm off pedestal mount. 6. Secure arm and reposition scissor lift as needed and lower with arm secured to side rails. 7. With the lift in the down position the I beam can now be manually transferred off the scissor lift AD Docx Page 13 of 16
14 8. Drill and tap one hole on either side of the pedestal in the approximate location shown in Figure 11. These holes should be about 14 inches directly above the center of mass of the pedestal after it has been cut off at the location shown in Figure 11. Figure 11. North Pedestal B after Crane Has Been Removed 9. Bolt the same hoist rings used for the previous pedestal, McMaster Carr part number 2994T42, to the newly drilled and tapped holes as shown in Figure AD Docx Page 14 of 16
15 Figure 12. North Point B Pedestal Cutoff Location 10. Connect a lifting strap to each hoist ring via a shackle and secure each strap to one of the forklift forks. Lift up with the forks until the weight is taken by the forklift (JHA 10). 11. Tie the two taglines to the pedestal just above the floor on opposite sides of the pedestal. 12. Using a torch, cut the pedestal off about 10 inches below the floor (see Figure 12). Use the two taglines to control the load as it is cut off from its base. See Figure 13 for a view of what the Northern Pedestal looks like from in the hammer head (JHA 11) AD Docx Page 15 of 16
16 Figure 13. Picture of Bottom of North Pedestal 13. Lift the pedestal out of the hole in the floor (JHA 12) and move it using the taglines to control the load (JHA 12) to a location where it can be picked up by the crane and lowered through the hatch to the ground floor (JHA 13). 14. Install a pre-made steel plate over the opening as was done with the cover plate over the South Pedestal floor hole (JHA 14). 9. Procedure Review None 10. Records 1. JHA signature sheet; kept by safety office, scanned and stored \ets_share\safety 2. Fall protection training: kept by Safety Office 3. Rigging, suspended load: kept by Safety office 11. References DOCUMENT NUMBER NA D D SOM5947-S-E SOM5947-S-E-19 DOCUMENT TITLE KPNO Emergency Manual Point A Pedestal Detail (South Pedestal) Point B Pedestal Detail (North Pedestal) Main Floor Framing Plan Optional Hammerhead Framing Plan 2100-AD Docx Page 16 of 16
Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo
Doc #: 2100-AD-015-0082 Revision: - Declination Work Platform Installation Author(s): Derek Guenther, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope...
More informationDoc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie
Doc #: 2100-AD-015-0074 Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable
More informationRemoval of the F/8 Secondary from the 4M Prime Focus Assembly
Doc #: 2100-AD-015-0058 Revision: - Removal of the F/8 Secondary from the 4M Prime Focus Assembly Author(s): Will Goble, Matthew Evatt, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0
More informationDoc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam
Doc #: 2100 AD 015 0020 Revision: MOSAIC Removal Procedure Author(s): Hillary Mathis, Bill McCollam Contents Contents... 2 Revision History... 3 1. Purpose... 4 2. Applicable To... 4 3. Scope... 4 4. Definitions...
More informationDoc #: 3500-AD Revision: Rev. WIYN Secondary Lead Screw Cleaning. Author(s): Tammie Lavoie, Robert Stupak
Doc #: 3500-AD-015-0019 Revision: Rev WIYN Secondary Lead Screw Cleaning Author(s): Tammie Lavoie, Robert Stupak Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope... 4 4.0
More informationFree Standing Pedestal Mounting Installation Manual
Free Standing Pedestal Mounting Installation Manual Articulated Jib Crane KickLIFT Page 1 of 5 INSTALLATION GENERAL INSTALLATION INSTRUCTIONS All AIMCO lift assist equipment and associated tooling is assembled
More informationParts list Instruction guide Warnings Please read carefully before assembling and using product.
Parts list Instruction guide Warnings Please read carefully before assembling and using product. Jet Rail XL Part Number 27377 Tools required for assembly Hammer 9/16 Wrench 3/4 Wrench Ratchet 9/16 Socket
More information8030 Synergy Jeep JK Rear Long Arm Frame Brackets
General Notes: SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 8030 Synergy Jeep JK Rear Long Arm Frame Brackets These instructions are also available on our website; www.synergymfg.com.
More informationDown Stage Right -Theatrical and Entertainment Rigging Supplies
Shackle Plates There are five uniquely different designs in the Shackle Plates Dynasty. Each one allows you the freedom of choice as you design the rigging requirements of your scenery, as well as meeting
More informationINSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:
PARTS-1 Model 24562/28562 Crane INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA 50438-0189 641-923-3711 MANUAL PART NUMBER: 99903701 Iowa Mold Tooling Co., Inc. is an Oshkosh Truck
More informationASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355
ASSEMBLY AND CARE INSTRUCTIONS VERSION: 8920100 (Revised 06/16) JUST FOR KIDS 355 SALES AND SERVICE spiethamerica.com Canada and International 135 Forestview Road, PO Box 40 Orillia, Ontario, Canada L3V
More informationSales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.
Sales & Service sasportonline.com SA Sport (Canada) SA Sport (U.S.A.) 135 Forestview Road 7879 Will Rogers Blvd. P.O. Box 40 Fort Worth, Texas Orillia, Ontario USA 76140 Canada L3V 6H9 Telephone: (705)
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationAR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B
AR-15 Armorer s Essentials Kit Product #156111 Instructions #1025769 Revision: B 1 INDEX 3 AR-15 Adjustable Receiver Link 3 Pivot Pin and Roll Pin Installation Tool 4 Mag well Vise Block 7 Upper Vise Block
More informationINSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975
INSTALLATION GUIDE 2009-2017 PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 Table of Contents Project Overview Forward, Acceptability Criteria, Safety,
More informationKEEP YOUR RESOURCE MOVING.
LINER BOLTS KEEP YOUR RESOURCE MOVING. COLUMBUS McKINNON CORPORATION Leading the Industry Downtime in the grinding mill operation is caused by one of two things: regularly scheduled maintenance or unscheduled
More informationETX Powered Loudspeaker Accessories
ETX Powered Loudspeaker Accessories ETX-BRKT10, ETX-BRKT12, ETX-BRKT15, ETX-TCA-S, ETX-TCA-L, and ETX-BRKT35 en Installation Guide en 3 Table of contents 1 Safety 4 2 Installation 6 2.1 Wall mount bracket
More informationWarnings. Description. Prior to Installation Tools Needed
Warnings Failure to act in accordance with the following may result in death or personal injury. The JT Strong Arm Stabilizer System is intended to eliminate chassis movement in travel trailers and fifth
More informationPhone #: (360) Online Tech Support: Web:
Phone #: (360) 734-3482 Online Tech Support: tech-support@shopfox.biz Web: www.shopfox.biz Your new Model D2058A Super-Heavy Duty Mobile Base () is designed to give you a stable and mobile platform upon
More informationUS RACK, Inc Falcon Drive, Madera, CA
US RACK, Inc. - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTRUCTIONS for MOTORCYCLE RACK with Cradling Wheel Chocks WARNING: Do NOT attempt to install or use this rack without following all instructions.
More informationIIHS Side Impact Outrigger
IIHS Side Impact Outrigger Assembly Procedure Base Assembly (14.3 lbs) The base assembly consists of a ¼ thick steel plate, a ¼ thick piece of polyethylene, and mounting fixtures for the upper and lower
More informationIntroduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions
Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop
More informationSwivel Hoist Ring RIGGING ACCESSORIES. Color coded to distinguish between UNC (Red) and Metric (Silver) thread types.
RIGGING ACCESSORIES Color coded to distinguish between UNC (Red) and Metric (Silver) thread types. Available in UNC and Metric thread sizes. UNC threads available in sizes from 800 pounds to 100,000 pounds,
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More information12-16 Ft Wide Enclosure Assembly Guide
www.rmfiberglass.com 12-16 Ft Wide Enclosure Assembly Guide RM Products Ltd 1-800-363-0867 www.rmfiberglass.com Handling and Storage 2 P a g e Handling and Storage: 3 P a g e Before You Begin Contact RM
More informationUpended heavy reels will often arrive damaged. Refuse or receive subject to inspection for hidden damage.
Recommended Reel Handling Practices How to Handle Cable Reels Recycling/Reel Return Broken Reel Extreme Makeover Program Innovative solution to salvage broken reels with good cable on it. Reels are picked
More informationINSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.
INSTRUCTION SHEET D2260 HEAVY-DUTY MINI-MOBILE BASE D2057 HEAVY-DUTY MOBILE BASE D2058 SUPER HEAVY-DUTY MOBILE BASE D2259 EXTENSION KIT FOR D2260/D2057 D2246 EXTENSION RAIL KIT FOR D2058 This Shop Fox
More informationAmerican Safe Room. Explosion Resistant Blast Hatch with Integrated Riser
American Safe Room Explosion Resistant Blast Hatch with Integrated Riser Drawing: ASR-50-RBH Revision: H May 17, 2012 Table of Contents Description... 3 Options... 4 Order form... 5 Option: left or right
More informationVarious Bolt Removal Process
Various Bolt Removal Process Introduction I have been climbing for over 25 years. The first bolt I placed in 1987 was a 5/16 Rawls carbon steel, split shank, button head in sandstone. Certainly the wrong
More informationReal Life Ninja Starter Pack 1 Assembly Instructions
Real Life Ninja Starter Pack 1 Assembly Instructions MATERIALS: Warped Wall 3 - Main Sections (Only 2 Sections for 10 Warped Wall) 8 3 deck screws for joining sections inside of Warped Wall 2 Rock Wall
More informationVarious Bolt Removal Process
Various Bolt Removal Process Introduction I have been climbing close to 30 years. The first bolt I placed in 1987 was a 5/16 Rawls carbon steel, split shank, button head in sandstone. Certainly the wrong
More information4 DOOR JK ROCK SLIDERS INSTALLATION
SIGNATURE SERIES 4 DOOR JK ROCK SLIDERS INSTALLATION 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of nuts securing
More informationWhen considering the permanent location for your SmithyCNC bed mill the following should be taken into consideration:
CNC-1240 INSTALLATION & SET-UP SET-UP CLEARANCES & CONDITIONS When considering the permanent location for your SmithyCNC bed mill the following should be taken into consideration: The machine should be
More informationC4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS
C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS Thank you for your purchase of the C4 Fabrication s 5th Gen 4Runner Rock Sliders! This product was carefully crafted to ensure a perfect
More informationPERSONAL RECORD KEEPING
2 P R O 3 7 0 A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING Tip: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make it easier for you to obtain
More informationINSTALLATION GUIDE. Version 2.0
INSTALLATION GUIDE Version 2.0 INTRODUCTION Carefully read these instructions to assure proper installation and performance of the GatorDeck TM. TOOLS NEEDED 1. Calibrated test weights 2. Phillips screwdriver
More informationMast and Antennas for Field Day & Emergencies
Mast and Antennas for Field Day & Emergencies John A. Allocca, WB2LUA, July 2005 This is a 27 feet 1.5 diameter portable guyed mast with a 28 feet diameter footprint. It breaks down into four 6 feet sections
More informationSpring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST
Spring Loaded SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More information#2010 #1795. Frame Rack Dyna Mo Clamps Two pair of jaws with 12 draw bar. Grip surface 9-¼ wide. #1929 #1910
Mity Bite Clamp Use for one or two-directional pulling. Good for confined areas. Grip 2 wide. Multi Angle Clamp Pulls from any direction with a 180 arc. Makes two-way pulling faster and easier. Bolt stoppers
More informationFactory Assistance: Phone: Fax: Page 1
CABLE RUNWAY ACCESSORIES Radius Drop / Stringer Drop Provides 3 bend radius Radius drop fits 6, 12 and 18 runway made from 1-1/2 x 3/8 tubing Steel construction Includes (3) cable spools, (1) bolt, (1)
More informationAegis Heavy Capacity 20K Floor Scale
Installation Manual Aegis Heavy Capacity 20K Floor Scale Model(s): PLF-6200-H Series PLF-6200-HQ Series 2002 by Fairbanks Scales Inc. All rights reserved 50224/ SJ4799 Issue 2 08/02 Amendment Record Aegis
More informationInstallation Instructions: VIBRATION ISOLATION RAIL (CPR)
Table of Contents: 1. Quick Installation Instructions 2. Required Tools 3. Supplied Parts 4. Step by Step Instructions 5. Leveling Instructions Spring Color Key (1 and 2 ) Blue 30 lb Green - 60 lb Red
More informationTS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE
TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE Triner Scale & Mfg. Co., Inc. 8411 Hacks Cross Rd. Olive Branch, MS 38654 Phone: 800-238-0152 Fax: 662-809-2386 Description The Triner Scale Model
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationPRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS
PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS REIMANN & GEORGER CORPORATION HOISTING PRODUCTS BUFFALO, NY P/N 610096 10/19/05 Read the following instructions thoroughly before starting work to identify
More informationInstallation and Leveling Instructions for Micro/Level Wedge Style Isolators
Technical Bulletin M/L 685 Installation and Leveling Instructions for Micro/Level Wedge Style Isolators 16WL50-1.25M6 with attachment bolt 16WM40-(1)1.25M6 with attachment bolt 12W with Anti-Skid Pad Vibro/Dynamics
More informationTITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF
TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF DXST4500 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS TECHNICAL
More informationMM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationDODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks
Mounting Instructions For DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks WARNING: Because of the possible danger to person(s) or property from accidents which may result from the
More informationLoD Offroad. Jeep JK 2 Door Sliders Installation Instructions
LoD Offroad Jeep JK 2 Door Sliders Installation Instructions 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of
More informationCSS Central Mount System
CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning
More informationContractors Rack Assembly and Installation Instructions
Part # 18601 & 16601 Contractors Rack Assembly and Installation Instructions 4751 Littlejohn St. Unit A, Baldwin Park, CA 91706 Page 1 of 12 11/13/08 Thank you for purchasing the Paramount Restyling Contractors
More informationMAKO TM CASH DISPENSER
MAKO TM CASH DISPENSER PEDESTAL INSTALLATION GUIDE VERSION 2.0 TDN 0702-000 2/99 CORPORATE HEADQUARTERS: RMA (RETURN MATERIAL AUTHORIZATION) RETURN ADDRESS: 522 E. Railroad Street 2405 B Street Long Beach,
More informationOperating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake
Operating, Servicing, and Safety Manual Model # 2800 48 & 72 Ultimate Box & Pan Brake CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine. 1-800-467-2464
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationPage 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications
R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LARSACC-013 LARSACC-014 LARSD2-08T12BP2C (12-in travel) LARSD2-08T24BP2C (24-in travel) C P I R K 1 ea Ball Screw with
More informationASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL
Most Kwik Goal products carry a Lifetime Guarantee. For details or claims, visit kwikgoal.com or contact customer service at 1-800-531-4252. ASSEMBLY INSTRUCTIONS FOR 2B3004 DELUXE EURO CLUB SOCCER GOAL
More informationMM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM30 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationINSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete
More informationRPS. XR Front Drive Updates CORPORATION
FACTORY CAT 1. To start a replacement of the XR Front Wheel Drive, make sure the machine is on level ground with the rear wheels chocked and always disconnect the batteries. 2. Locate the Positive and
More informationTRAINING BULLETIN FORCIBLE ENTRY 1 March 15, 1997 FORCIBLE ENTRY TABLE OF CONTENTS. 1. Introduction. 2. Doors-Inward Opening. 3. Doors-Outward Opening
TRAINING BULLETIN 1 March 15, 1997 TABLE OF CONTENTS 1. Introduction 2. Doors-Inward Opening 3. Doors-Outward Opening 4. Through The Lock Method 5. Padlocks 6. American Lock Series 2000 7. Bars And Sliding
More informationROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26
ROBOT KR 350 Installation, Connection, Exchange 1of 26 e Copyright KUKA Roboter GmbH This documentation or excerpts therefrom may not be reproduced or disclosed to third parties without the express permission
More informationIDR assembly instructions:
IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)
More informationEnclosed Track Aluminum Rail
TM Enclosed Track Aluminum Rail Operation, Installation, and Maintenance Manual For RAIL MODELS: RAD7510, RAD6110, RAD4110 and TR2000 ORIGINAL INSTRUCTIONS THIS MANUAL CONTAINS IMPORTANT INFORMATION REGARDING,
More informationTOOLING COMPONENTS. Clamping Kits Step Blocks & Kits Driver Studs Bolts, Screws Nuts, Washers...
TOOLING COMPONENTS Clamping Kits... 2-5 Step Blocks & Kits... 6-7 Driver Studs... 8-12 Bolts, Screws... 13-19 Nuts, Washers... 20-29 Clamps... 30-43 Swivel Screw Clamps... 44-46 Screws... 47-48 Hand Knobs...49
More informationIN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.
Tools Required 2011-C Ford F250/F350 No Drilling into Vehicle is Required 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench FL277 x 1 Torque Specification: 1/4 Bolts - 6 Ft Lbs.
More informationINSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER
ASSEMBLY OF THE 7180 STRAIGHT SIDE STEEL LADDER TOOLS REQUIRED FOR ASSEMBLY SAFETY GLASSES (2) 1 / 2 WRENCHES OR SOCKETS STEP LADDER OF APPROPRIATE HEIGHT (2) 7 / 16" WRENCHES OR SOCKETS HACKSAW FLAT HEAD
More informationINDEX PAGE RELEASE SECTION NUMBER DATE
INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationINSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger
INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.
More informationREV: 1.2 TRAMPOLINE MANUAL
REV: 1.2 TRAMPOLINE MANUAL TRAMPOLINE PARTS LIST: Item 8FT 10FT 12FT 14FT 16FT A 1 1 1 1 1 B 1 1 1 1 1 C 6 8 12 12 12 E 48 64 72 96 108 F 6 8 12 12 12 G 3 4 6 6 6 H 12 16 24 24 24 I 1 1 1 1 1 DIAGRAMS
More informationReal Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions
MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationCART HOIST A. Assembly Instructions. Warning: Failure to follow these warnings and the assembly instructions could result in serious
HOIST A Assembly Instructions READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF HOIST A tm This installation guide is for the use of our Hoist A Cart system. Please read all warnings, directions, and watch
More informationMPA-9000 Universal Ceiling Projector Mount Kit
I N S T R U C T I O N M A N U A L Universal Ceiling Projector Mount Kit The Universal Ceiling Projector Mount provides a unique, simplified method of ceiling mounting your inverted projector. This low
More informationSentinel Electronic Safe Installation Guide
Sentinel Electronic Safe Installation Guide by Rev 07/12/2004 P/N 100020 Table of Contents 1. OVERVIEW...3 2. SAFE INSTALLATION...3 2.1. TOOLS REQUIRED...3 2.2. SELECTING THE MOUNTING LOCATION...3 2.3.
More information1949 to 1954 Chevrolet Dual Master Cylinder Conversion
1949 to 1954 Chevrolet Dual Master Cylinder Conversion This document is a one stop shop to getting your brake system updated on your old Chevy. Whether you re going with a disc conversion or just sticking
More informationRBP-1215B-RX DODGE RAM QUAD CAB RX3
RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side
More informationMK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS
MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS i Information contained in this document is subject to change without notice and does not represent a
More informationinstallation guide ICON classic benching
installation guide ICON classic benching Index ICON Installation Guide Single Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame...6 Installing optional accessories...7
More informationOpen shipping crate and separate all of the different parts. Over The Top Shelters LLC
ASSEMBLY INSTRUCTIONS FOR MODEL SH122110GN and SH122110GY Open shipping crate and separate all of the different parts. Count each part and match up with parts list. Shortages or damaged parts should be
More informationMake a Safe. Description. Lesson Objectives. Assumptions. Terminology
Youth Explore Trades Skills Make a Safe Description Welding is a vast area in the metalworking field and a widely used joining process for metal. In this activity plan students will learn how to MIG weld
More informationIN-30000_F. Installation Instructions
IN-30000_F Installation Instructions Parts Overview Detail A Detail B Detail C Detail A Detail C Detail B Parts List & Tools PARTS ITEM NO. PART NUMBER DESCRIPTION Qty 1 01-30008-01 P/C,DOUBLE T-SLOT CROSSBAR,
More informationTABLE OF CONTENTS REQUIRED TOOLS
TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS
More informationPOWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N
POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams
More informationMETHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS
METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS General The exact position of the structure has to be established. Please note that the difference in height must not exceed 1.5% in longitudinal
More informationTERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions
TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions Before You Begin These installation instructions will lead you through the process of installing
More informationTECHNICAL BULLETIN INSTALLATION INSTRUCTIONS FOR MAST AB-1386/U (NSN ) (EIC: N/A)
TECHNICAL BULLETIN INSTALLATION INSTRUCTIONS FOR MAST AB-1386/U (NSN 5985-01-381-6341) (EIC: N/A) ON Utility Truck: Cargo/Troop Carrier, 1-1/4 Ton, 4x4, M998 Utility Truck: Cargo/Troop Carrier, 1-1/4 Ton,
More informationSTOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets
Rev. 04 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID NET-ACCESS S-Type Network Cabinets -Phillips screwdriver -Flatblade screwdriver -22mm socket wrench -15mm socket wrench
More information4 DOOR JK ROCK SLIDERS INSTALLATION
SIGNATURE SERIES 4 DOOR JK ROCK SLIDERS INSTALLATION 1. To remove either the Jeep JK Wrangler Unlimited Rubicon rocker guards or Sahara running boards, use a 10mm wrench to remove the 3 pairs of nuts securing
More informationINSTALLING T400 LOAD SENSORS
INSTALLING T400 LOAD SENSORS The above illustrations represent the proper arrangement of Model T400 Load Sensor kit parts using either the Drill and Tap method or the Weld method. A proper installation
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More informationPERSONAL RECORD KEEPING
Q47e/Q47ce 2 Q 4 7 e / Q 4 7 c e A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING IMPORTANT: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make
More informationFORM TP m a y /ju n e 2010
TEST CODE 01335020 FORM TP 2010089 m a y /ju n e 2010 CARIBBEAN EXAMINATIONS COUNCIL SECONDARY EDUCATION CERTIFICATE EXAMINATION MECHANICAL ENGINEERING TECHNOLOGY Paper 02 - Technical Proficiency 2 j hours
More informationHow to Build a Fold- Down Greenhouse
How to Build a Fold- Down Greenhouse This simple, inexpensive greenhouse folds down to protect your plants during early frosts and cold snaps, then can be raised up on warmer days. Made with PVC pipe and
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationBBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105
BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,
More informationE4-WM5-Y542A00 MOUNTING INSTRUCTION
This instruction is for both left front (driver) 41-269282 and right front (passenger) 41-269299 B8 8112 shocks. A step by step process is shown with images of the right front. The left front is a mirror
More informationEKX Full-Range Loudspeaker Accessories
EKX Full-Range Loudspeaker Accessories EKX-BRKT12, EKX-BRKT15, and EKX-TCA en Installation Note en 3 Table of contents 1 Safety 4 1.1 Safety point 6 2 Installation 7 2.1 Wall mount bracket 7 2.2 Truss
More informationDrill Line Tension Guide User Procedure Manual
Oilfield Solutions Inc. Drill Line Tension Guide User Procedure Manual Special Instructions I Conditions of Use Reading this user procedure manual prior to use is essential. Slip & Cut, Drill Line Tension
More information