Slide 1. Slide 2. Slide 3. The Knack. Background Information

Size: px
Start display at page:

Download "Slide 1. Slide 2. Slide 3. The Knack. Background Information"

Transcription

1 Slide 1 Prepared by: Ian Humphrey, P. Eng. Paul Henderson, P. Eng. Slide 2 The Knack Slide 3 Background Information Began my career in the lifting industry in 1994 as a draftsman and returned to school to graduate from the University of Alberta as a Civil Engineer in Since that time I have worked as a Rigging and Transportation Engineer servicing the heavy lift and heavy haul industry in Western Canada. In 2007, I co-founded 2H Engineering, a firm specializing in engineered rigging, lifting, and transportation plans.

2 Slide 4 Introduction This presentation will identify some common criteria for defining a critical lift. There are several reasons that lifts are categorized as critical and one method to mitigate risk is through the use of an engineered lift plans. This session will address components that should be included in lift plans and the advantages to critical lift planning. Slide 5 Definition of Critical Lift Lifts in congested areas where power lines, structures, and obstructions are present. Lifts where ground is poor and potentially unstable. Lifts with potentially unstable loads (ie offset center of gravity, uneven lift points). Lifts using multiple cranes. Lifts over a defined percentage of crane capacity, often 75%. Lifts with difficult rigging arrangements. Lifting equipment that is irreplaceable, monetary value is high, or hazardous. Lifts where the load cannot be seen by the operator (blind lift). Lifts where the load is transferred between cranes (ie tailing a vessel to vertical). Lifting personnel with a crane (ie manbasket). End users have different criteria for a critical lift and therefore we need to be flexible in the definition, although there is often common ground when defining. Ref: Slide 6 My Critical Lift

3 Slide 7 Critical Lifts by Definition Slide 8 The Law in Alberta See excerpt below from the Alberta OH&S (2009) Code. It is now law in Alberta to produce lift calculations for loads exceeding 75%. This is one important component of the critical lift plan. Ref: Alberta OH&S 2009 Slide 9 Sample Lift Calculation from Alberta OH&S for Mobile Cranes Ref: Alberta OH&S 2009

4 Slide 10 Sample Lift Calculation from Alberta OH&S for Overhead Cranes Ref: Alberta OH&S 2009 Slide 11 Critical Lift Plan Critical lift plans should be prepared by the personnel completing the work, this includes the supervisor, crane operator, or rigger. This is often done thru a critical lift form. It is key that all field personnel completing the work be involved in the plan (ie pre-lift meeting). The next few slides will show a couple of sample critical lift planning forms, used by site personnel to document the lift. Slide 12 Critical Lift Form Sample 1 Ref: Iron Ore Company of Canada

5 Slide 13 Critical Lift Form Sample 2 Ref: Work Place BC Slide 14 Mitigate Risk on Critical Lifts Ways to mitigate risk: All critical lifts should be documented by a critical lift form or an engineered lift plan. Key personnel involved in the lift (ie crane operator, supervisor) should review and approve the documentation. More than one person to approve lift plan. Some owners will have a third party review of the engineered lift plan. Pre lift meeting prior to hoisting. Trial lift or dry run to ensure clearances and radii are acceptable (no load on the hook block). Ensure all crane and rigging inspections are up to date and documented. All crane mechanics and functions are properly working (ie anti-two block, LMI) Slide 15 Engineered Lift Plan An engineered lift plan may be required due to the complexity of the lift. These plans shall be prepared by a qualified engineer with suitable experience. The engineered lift plan should always be reviewed and approved by the field personnel. Five basic areas on an engineered lift plan: 1) Plan view (Crane placement details) 2) Elevation view (boom clearance details) 3) Rigging Details 4) Lift Chart Details 5) Lift Procedure

6 Slide 16 Sample Engineered Lift Plan Slide 17 1) Plan View Plan view should contain the following information: X, Y dimensions for placement of the crane Initial lift & final set position of equipment Footprint of the crane identifying orientation and size of load spreading mats North arrow Swing path (if complicated) Surrounding obstructions Tailswing to show area required for crane Maximum lift radius Minimum lift radius (if required) Slide 18 Sample Plan View

7 Slide 19 2) Elevation View Elevation view should contain the following information: View of the crane lifting at maximum radius View of the crane lifting at minimum radius Maximum equipment height to be lifted Surrounding obstructions Boom clearance to load and adjacent equipment Worst case clearance with load or specify that the load cannot be swung under boom Headroom, distance between hook block and boom tip sheaves, otherwise known as anti-two block Slide 20 Sample Elevation View Slide 21 3) Rigging Details Rigging can be one of the more critical elements on a lift study. Rigging page should contain: Sling lengths and WLL for synthetic and wire rope Identify position of lifting attachments (ie lugs, trunnions, basket hitch, choker hitch) Sling angles Spreader bar length and capacity Size of hook block and required parts of line Total weight of all rigging Identify specific uses on rigging components (ie sling saver shackles on round slings) Note the load distribution for the rigging / cranes if required

8 Slide 22 Sample Rigging Details Slide 23 4) Load Chart (Part A) Load chart shall contain: Configuration of the crane(s) Boom length and sequence Jib length and offset angle All counter weights (ie super lift, central, track) Lift radius Crane capacity Outrigger or track spacing Slide 24 Sample Load Chart (Part A)

9 Slide 25 4) Load Chart (Part B) Load chart shall contain: Load information and crane deductions Weight of load Weight of main hook block Weight of aux block (if installed) Weight of aux head (if installed) Weight of rigging Weight of load line Weight of stowed or erected jib Weight of misc stowed attachments (ie jib lines on Demag crawler, TA or TY bracket on a Liebherr all terrain) Slide 26 Sample Load Chart (Part B) Slide 27 4) Load Chart (Part C) Load chart shall contain: Percentage of crane capacity factoring in weight of load and deductions. Ground bearing pressure (GBP) under the outriggers and tracks of crane. Identify the GBP under the mats or pads and specify sizes. General notes for the engineered lift plan that specify assumptions and identify limitations. It is important for all parties to be aware of the notes.

10 Slide 28 Sample Load Chart (Part C) Slide 29 Sample Load Chart (Part C) Slide 30 5) Lift Procedure All engineered lift plans should contain a lift procedure to clarify execution of the lift. Some procedures can be very simple and straight forward, but can be very detailed if required (often due to space restrictions). Procedures are helpful when placed with the plan view since they complement each other (ie procedure puts in writing what the plan view illustrates).

11 Slide 31 Sample Lift Procedure Slide 32 Engineering Lift Plan Additional Information Additional information may be required due to complexity of the lift. Provide weight distribution for two crane lifts. Details for specialized rigging to be shown (ie tailing frames, snatch blocks, lift links). Identifying items that need to be removed on the equipment for safe lifting (ie platforms). Any load transfer between cranes (ie tailing vessel to vertical). Slide 33 Engineering Lift Plan Additional Information

12 Slide 34 Supplemental Information not Provided on Engineered Lift Plan Lift plan should always be accompanied with a field level risk assessment to determine site specific hazards. Crane and rigging inspections should be current and accessible for personnel performing the lift. Operator and supervisor qualifications to be accessible. Slide 35 Lift Deviation Form Lift deviations can be useful to approve minor changes to the drawing in a timely manner, but you need to make sure it is a viable alternative to revising the drawing. When are they ok, when should the drawing be revised instead? If your in doubt, it is better to revise the drawing. Lift deviation should be approved by all parties, same as the engineered lift plan (operator, supervisor, engineer, and owner). Sketches should be added, if required, to clarify changes. Often, sketches will be less ambiguous than written words. If the lift deviation causes confusion, it would be advisable to revise the engineered lift plan instead. Slide 36 Sample Lift Deviation Form

13 Slide 37 3D Vs 2D Lift Plans Both 3D and 2D engineered lift plans are suitable. There are some minor advantages and disadvantages to both. The key to an engineered lift plan is ensuring that all lift details are presented in a clear and concise manner, this way it avoids any confusion. Slide 38 Critical Lifts Knowing When to Stop All work personnel have the right to refuse any work that is deemed unsafe, this includes hoisting. If there are concerns it might be advantageous to reassess the methodology or equipment utilized. Accidents often happen when there are multiple mistakes. If there is more than one area that is concerning to the group, then it should be reassessed to find a better alternative. Slide 39 Engineered Lift Plan Key to Success Information given by the client can often be minimal. Ensure most up to date information is supplied. Too much information is generally better than not enough. Field personnel to have input and approve final lift plan. Client or end user to approve lift plan. Drawing to be sealed by a qualified professional engineer. Lift plans should be completed numerous days in advance to allow for proper planning. Engineered drawings and critical lift forms are great planning tools, but the operator and supervisor must always be aware of other hazard during the lift, items that may not have been identified in the planning process. Lift drawings should provide all the necessary information required for execution in a clear and concise manner (as stated earlier in presentation). Follow all local, provincial, and national codes on cranes and rigging.

14 Slide 40 Engineered Lift Plan - Conclusion There is inherent risk when using cranes and the use of critical lift forms and engineered lift plans are an excellent way to document and mitigate risks associated with these lifts. For critical lifts to be completed successfully all parties need to be involved in the critical planning, and work together to meet the common end goal of a safe, incident free lift. Slide 41 Critical Lifts Questions? Clarifications?

Mobile Cranes & Multi-Crane Lifts

Mobile Cranes & Multi-Crane Lifts Mobile Cranes & Multi-Crane Lifts Speaker: Jim Worrell, PE Lift-Think, LLC Host: Mike Parnell President/CEO, ITI ASME B30 Vice Chair (Cranes & Rigging) ASME P30 Chair (Lift Planning) The views expressed

More information

Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger.

Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger. TASK: Set up and Operate an Air Tugger 101 AIR TUGGER CHECKLIST following tasks in actual on-the-job situations using air-tugger. Tugger Task 1. Mount tugger Company 2. Unwind wire rope from spool 3. Anchor

More information

Safe work Method Statement

Safe work Method Statement Safe work Method Statement For Federal Safety Commissioner (FSC) approved companies or builders who require a high level of Safe Work Method Statements the attached SWMS is a guide only. As some FSC approved

More information

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

MicroGuard 511 Retrofit

MicroGuard 511 Retrofit MicroGuard 511 Retrofit Rated Capacity Indicator System Calibration Contents Introduction... 1 Preliminary Checks and Measurements... 2 Required Tools... 2 Boom Pivot Dimensions... 2 Winch Dimensions...

More information

Rigging Design Guide. MyTiCon Timber Connectors by MyTiCon Timber Connectors

Rigging Design Guide. MyTiCon Timber Connectors by MyTiCon Timber Connectors Rigging Design Guide MyTiCon Timber Connectors www.myticon.com 1.866.899.4090 info@myticon.com 2018 by MyTiCon Timber Connectors May, 2018 The information contained in this document is for general information

More information

Case Study - Safeguarding. Case Study Safeguarding

Case Study - Safeguarding. Case Study Safeguarding Case Study - Safeguarding Paul Santi Director - Engineering FANUC America Corp. October 14 th 16 th, 2013 ~ Indianapolis, Indiana USA Case Study Safeguarding Professional Background: Mechanical Engineering

More information

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown

More information

McKissick 380 Series Easy Reeve Crane Blocks

McKissick 380 Series Easy Reeve Crane Blocks McKissick 380 Series Easy Reeve Crane Blocks Standard block configurations can be from a single sheave design to a five sheave design. Available from 5 to 80 metric tons. Larger models and configurations

More information

HAWK GLADIATOR MICROWAVE COLLISION PREVENTION SWITCHES

HAWK GLADIATOR MICROWAVE COLLISION PREVENTION SWITCHES HAWK GLADIATOR MICROWAVE COLLISION PREVENTION SWITCHES SET UP PROCEDURE 1 Introduction Hawk Gladiator Microwave Switches can be used to detect & indicate a possible collision and therefore prevent boom

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Understanding your limits

Understanding your limits Understanding your limits 27 th September 2018 Ian Downie Crane & Lifting Manager 1 Subsea 7-2018 The Problem: Engineers, offshore operations teams, ship owners, marine warranty surveyors, clients and

More information

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM.  1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH., 44660 Supplemental insert Copyright 2015 Wayne Dalton, a division of Part

More information

Compliance pack. Table of Contents Version Control General Information Operator s Manual... 4

Compliance pack. Table of Contents Version Control General Information Operator s Manual... 4 Table of Contents Table of Contents... 1 1.0 Version Control... 2 2.0 Introduction... 3 3.0 Purpose... 3 4.0 General Information... 3 5.0 Operator s Manual... 4 6.0 Plant Log Book-Daily Inspection... 4

More information

CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES

CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES JANUARY, 1998 Cambelt International Corporation 2820 West 1100 South Salt Lake City, Utah 84104 Phone(801) 972-5511 Fax(801) 972-5522 www.cambelt.com

More information

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS IMPORTANT INFORMATION Note To Supervisor: Please share this information with your employees and make sure they have received training

More information

RADIO ANTI TWO-BLOCK SYSTEM

RADIO ANTI TWO-BLOCK SYSTEM BB-550 TM RADIO ANTI TWO-BLOCK SYSTEM INSTALLATION MANUAL GREER Company 1918 East Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX (714) 259-7626 BB-550 TM Radio Anti Two-Block System PN W250000

More information

45 YEARS & 5 DIVISIONS STRONG

45 YEARS & 5 DIVISIONS STRONG 2015 WILLISTON BASIN PETROLEUM CONFERENCE CANPOTEX & SASKATCHEWAN POTASH THE BIG BUSINESS OF HOSTING EVENTS SPRING 2015 VOLUME 4 ISSUE 1 Saskatchewan 45 YEARS & 5 DIVISIONS STRONG NORTHERN STRANDS IS GROWING

More information

HD installation guide

HD installation guide JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling

More information

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS General The exact position of the structure has to be established. Please note that the difference in height must not exceed 1.5% in longitudinal

More information

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE DOWELS INTO CONCRETE - Item No. Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE 1.0 SCOPE This Special Provision covers the performance requirements

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

1801 Ratchet Bender For 1-1/4", 1-1/2" Rigid Conduit, IMC and Schedule 40 Pipe

1801 Ratchet Bender For 1-1/4, 1-1/2 Rigid Conduit, IMC and Schedule 40 Pipe INSTRUCTION MANUAL 1801 Ratchet Bender For 1-1/4", 1-1/2" Rigid Conduit, IMC and Schedule 40 Pipe Serial Code RS Read and understand all of the instructions and safety information in this manual before

More information

Model Curriculum. Draughtsman SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

Model Curriculum. Draughtsman SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: Model Curriculum Construction Real Estate and Infrastructure Construction Draughting CON/Q1301 4 2 TABLE OF CONTENTS 1. Curriculum 04 2. Trainer Prerequisites

More information

WARNING. Read and become familiar with this manual BEFORE operating unit.

WARNING. Read and become familiar with this manual BEFORE operating unit. Covered by one or more of the following patents: 3,828,942 5,368,429 5,586,619 5,984,605 7,556,464 7,726,901 Other patents pending. OPERATOR S MANUAL For Model 439 WARNING Read and become familiar with

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring Building Manual for F P McCann `Smoothbore Shaft Linings with EPDM Gaskets (rev 04) (To be read in conjunction with the Segmental Shaft and Tunnel Safety Data Sheet) Segmental ring types provided by F

More information

Developments in Deepwater Handling Systems. Gregor McPherson, Caley Ocean Systems

Developments in Deepwater Handling Systems. Gregor McPherson, Caley Ocean Systems Developments in Deepwater Handling Systems Gregor McPherson, Caley Ocean Systems Caley Ocean Systems Glasgow based, over 45 years experience of building bespoke handling systems for the Offshore industry

More information

Next generation offshore wind tools

Next generation offshore wind tools CORPORATE FOCUS Next generation offshore wind tools Construction of offshore wind farms has advanced rapidly over the last few years and is maturing into a market where subsidy funding is diminishing.

More information

SG4 Shotgun Shoe Group for 555 Series Electric Benders

SG4 Shotgun Shoe Group for 555 Series Electric Benders INSTRUCTION MANUAL SG4 Shotgun Shoe Group for 555 Series Electric Benders Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Chapter 23. Garage Construction

Chapter 23. Garage Construction Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES

More information

TABLE OF CONTENTS Sr no Contents Page No.

TABLE OF CONTENTS Sr no Contents Page No. TABLE OF CONTENTS Sr no Contents Page No. 1. Basic textile terms 1 2. Warping 1 3. Sequence of operations in weaving 2 4. Identification of parts of sectional warping machine 2 5. Objectives of warping

More information

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury. Integrity. Partnership. Quality. COMMERCIAL DOOR INSTALLATION INSTRUCTIONS SERIES 1900, 1950, 2000, 2250, 2500, 2750 Important Notice In the following text, the word: Warning: Indicates that serious injury

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

INSTALLATION LOW HEADROOM EXTENSION. 1 Cutting Vertical Track. 2 Quick Install Jamb Brackets

INSTALLATION LOW HEADROOM EXTENSION.  1 Cutting Vertical Track. 2 Quick Install Jamb Brackets LOW HEADROOM EXTENSION P.O. Box 67, Mt. Hope, OH., 44660 Supplemental insert Copyright 2016 Wayne Dalton, a division of Part No. 333897 REV3 5/03/2016 This supplemental installation instruction is to be

More information

GS550-CSA/ATEX-CE. GS550 for Hazardous Locations. Features: Applications: General Description:

GS550-CSA/ATEX-CE. GS550 for Hazardous Locations. Features: Applications: General Description: Features: All stainless steel enclosure AISI-304 Weather resistant 2x20 characters text display with backlight 16,000 events datalogger USB port for datalogger download or firmware / load charts update

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

Clopay Models 835/837 Sliding Door System Installation Guide

Clopay Models 835/837 Sliding Door System Installation Guide Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

EMB MANUFACTURING INC.

EMB MANUFACTURING INC. TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144

More information

Inspection of aerial platforms in Poland

Inspection of aerial platforms in Poland Inspection of aerial platforms in Poland Europlatform conference Warsaw, 14 September. 2017 Michał Dębski Specialist Office of Technical Inspection Overview UDT introduction & law basics Kinds of technical

More information

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Doc #: 2100-AD-015-0074 Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable

More information

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set # Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #1002493 JET 427 New Sanford Road LaVergne, Tennessee 37086 Part No. M-708482 Ph.: 800-274-6848 Revision C3 02/2014 www.jettools.com

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

installation guide

installation guide JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000

More information

TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE

TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE This application package contains: Page1. 2. 3. 4. 5. 6. 7. Application Process Description Minimum Fire Route Design Requirements Drawing Requirements Sample

More information

SIGNAL SIGHTING - MINIMUM STANDARDS MINIMUM STANDARDS

SIGNAL SIGHTING - MINIMUM STANDARDS MINIMUM STANDARDS SIGNAL SIGHTING - MINIMUM STANDARDS All Signal Sighting Inspections must be carried out by nominated officers of the RTBU Locomotive Division (NSW). In most situations these will be nominated Sub-Divisional

More information

DFTG-1305 Technical Drafting Prof. Francis Ha

DFTG-1305 Technical Drafting Prof. Francis Ha DFTG-1305 Technical Drafting Prof. Francis Ha Session 5 Dimensioning Geisecke s textbook: 14 th Ed. Chapter 10 p. 362 15 th Ed. Chapter 11 p. 502 Update: 17-0508 Dimensioning Part 1 of 2 Dimensioning Summary

More information

Trouble shooting guide for Detecto Mechanical Physicians Balance Beam Scales Models:

Trouble shooting guide for Detecto Mechanical Physicians Balance Beam Scales Models: Trouble shooting guide for Detecto Mechanical Physicians Balance Beam Scales Models: 475-485-4420-4520-495-437-438-439-337-339 Symptom: Cannot balance (Calibrate Zero) using zero balance adjustment Beam

More information

Sheave Blocks. Sheave Block Use and Maintenance. Use and Maintenance. Section 7. Reeving of Sheave Blocks

Sheave Blocks. Sheave Block Use and Maintenance. Use and Maintenance. Section 7. Reeving of Sheave Blocks Use and Maintenance Block Use and Maintenance Load ratings on all SuperLift sheave blocks are applicable to new or as new products only and apply to the maximum load which may be supported by the head

More information

Removal of the F/8 Secondary from the 4M Prime Focus Assembly

Removal of the F/8 Secondary from the 4M Prime Focus Assembly Doc #: 2100-AD-015-0058 Revision: - Removal of the F/8 Secondary from the 4M Prime Focus Assembly Author(s): Will Goble, Matthew Evatt, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0

More information

Inspec on Program Summary

Inspec on Program Summary Inspec on Program Summary Inspec on program includes: Inspec on program includes: Wire Rope Wire Rope Slings Synthe c Web and Rigging Hardware Below-the-Hook Li ing Devices Custom Devices when applicable

More information

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

ANTENNA EXPERTS.   Website:   AP MHz. 2.4 Meters 30dBi. Gain ANTENNA EXPERTS E-mail: info@antennaexperts.in Website: www.antennaexperts.in AP-180030 1700 1900 MHz. 2.4 Meters 30dBi. Gain INSTALLATION MANUAL GRID PARABOLIC ANTENNA NOTICE: Installation, maintenance

More information

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Introduction Your new Model T28000 Heavy-Duty

More information

User Guide for the Alpha Antenna 6 40 or meter OCF Dipole

User Guide for the Alpha Antenna 6 40 or meter OCF Dipole User Guide for the Alpha Antenna 6 40 or 10 80 meter OCF Dipole Manufactured by: Alpha Antenna 1.888.482.3249 Website: http://alphaantenna.com User Guide Version 3.0 March 23, 2018 Page 1 Table of Contents

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Series 1600 WeatherGuard Dock Enclosure

Series 1600 WeatherGuard Dock Enclosure Fairborn USA Inc. 205 Broadview Street Upper Sandusky, OH 43351 1-800-262-1188 Fax 1-419-294-4980 Series 1600 WeatherGuard Dock Enclosure All Models! WARNING Do not install this product unless you read

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

INSTALLATION INSTRUCTIONS ROPE ASSEMBLIES FATZER AG WITH HYEND SOCKETS FOR FROM. Kai-J. Thiem (THK) Martin Bechtold (BEM)

INSTALLATION INSTRUCTIONS ROPE ASSEMBLIES FATZER AG WITH HYEND SOCKETS FOR FROM. Kai-J. Thiem (THK) Martin Bechtold (BEM) INSTALLATION INSTRUCTIONS FOR ROPE ASSEMBLIES WITH HYEND SOCKETS FROM FATZER AG Created Kai-J. Thiem (THK) Checked Martin Bechtold (BEM) Released Kai-J. Thiem (THK) Version 2.0 Date 30.08.2016 Proof of

More information

More Than Four Decades of Safety, Service, Quality

More Than Four Decades of Safety, Service, Quality More Than Four Decades of Safety, Service, Quality Mission Our commitment to safety and service has been the key to our phenomenal success. On behalf of Imperial Crane and the Bohne family, I would like

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

#1 Hollister-Whitney Parkway Fax: FIELD SURVEYS

#1 Hollister-Whitney Parkway Fax: FIELD SURVEYS Fax: 217-222-0493 Quincy, IL 62305 e-mail: layouts@hollisterwhitney.com Phone: 217-222-0466 www.hollisterwhitney.com FIELD SURVEYS BULLETIN 1139_ FIELD SURVEYS_PUR #843_03-03-2017 Fax: 217-222-0493 Quincy,

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

A Multi-user Virtual 3D Training Environment to Advance Collaboration Among Crane Operator and Ground Personnel in Blind Lifts

A Multi-user Virtual 3D Training Environment to Advance Collaboration Among Crane Operator and Ground Personnel in Blind Lifts 2071 A Multi-user Virtual 3D Training Environment to Advance Collaboration Among Crane Operator and Ground Personnel in Blind Lifts Yihai Fang 1 and Jochen Teizer 2 1 Ph.D. Student, School of Civil and

More information

Trade of Metal Fabrication. Module 3: Plate Fabrication Unit 7: Sloping Chute Phase 2

Trade of Metal Fabrication. Module 3: Plate Fabrication Unit 7: Sloping Chute Phase 2 Trade of Metal Fabrication Module 3: Plate Fabrication Unit 7: Sloping Chute Phase 2 Table of Contents List of Figures... 5 List of Tables... 6 Document Release History... 7 Module 3 Plate Fabrication...

More information

Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises

Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises Dimensioning: Basic Topics Summary 2-1) Detailed Drawings 2-2) Learning to Dimension 2-3) Dimension Appearance and Techniques. 2-4) Dimensioning

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Alloy S-320A S-320AN S.C.

Alloy S-320A S-320AN S.C. S-320 EYE HOOK Crosby Eye Hooks All Crosby 320 Eye Hoist Hooks incorporate the following features: The most complete line of Eye hoist hooks. Available in carbon steel and alloy steel. Designed with a

More information

ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)

ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450) ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 www.icc-rsf.com INSTALLATION AND OPERATION INSTRUCTIONS "Model VIP" CHIMNEY TYPE: FACTORY BUILT

More information

Crosby Grade 100 Eye Sling Hooks

Crosby Grade 100 Eye Sling Hooks CHAIN & ACCESSORIES L-1327 Eye Sling Hook Forged Alloy Steel - Quenched and Tempered. Each hook has a Product Identification Code (PIC) for material traceability, along with the size and the name Crosby

More information

94MB Geared Machine Survey Form Motion Control Engineering, Inc. Phone: Fax:

94MB Geared Machine Survey Form Motion Control Engineering, Inc. Phone: Fax: Page 1 of 8 MCE TO COMPLETE THIS INFORMATION Drawing Number: Installation Date: Engineer Name: Delivery Date: Comments: CUSTOMER INFORMATION Customer Name: Job Name: Customer Address: Contact Name: Contact

More information

RIGGING MANUAL English

RIGGING MANUAL English KH7 RIGGING MANUAL English TABLE of CONTENTS SYMBOLS... 3 1. INTRODUCTION... 4 2. system components... 4 3. SAFETY information... 5 4. Product overview... 6 5. suspending a cluster... 8 6. stacking kh7

More information

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo Doc #: 2100-AD-015-0082 Revision: - Declination Work Platform Installation Author(s): Derek Guenther, Miranda Saucedo Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable To... 4 3.0 Scope...

More information

FITTING INSTRUCTIONS FOR THE NOVA LIFT TM FIRST, PLEASE READ THESE INSTRUCTIONS CAREFULLY!

FITTING INSTRUCTIONS FOR THE NOVA LIFT TM FIRST, PLEASE READ THESE INSTRUCTIONS CAREFULLY! Forespar Products Corp. 22322 Gilberto Rancho Santa Margarita, CA 92688 Phone 949-858-8820 Fax 949-858-0505 Email sales at forespar.com www.forespar.com FITTING INSTRUCTIONS FOR THE NOVA LIFT TM FIRST,

More information

Technology Education Grades Civil Engineering and Architecture

Technology Education Grades Civil Engineering and Architecture Technology Education Grades 9-12 Civil Engineering and Architecture 197 Technology Education, Grades 9-12 Civil Engineering and Architecture Grade Level: 11, 12 Prerequisite: Introduction to Engineering

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

855 Smart Bender INSTRUCTION MANUAL. and Optional Deluxe Pendant. Serial No. ZW ZW1999

855 Smart Bender INSTRUCTION MANUAL. and Optional Deluxe Pendant. Serial No. ZW ZW1999 INSTRUCTION MANUAL 855 Smart Bender and 38650 Optional Deluxe Pendant Serial No. ZW0001 - ZW1999 Read and understand all of the instructions and safety information in this manual before operating or servicing

More information

Publication No. W E. Service Manual. Overload Prevention Device AML-LIIA. Model TADANO LTD.

Publication No. W E. Service Manual. Overload Prevention Device AML-LIIA. Model TADANO LTD. Publication No. W301-0151E Service Manual 01 Overload Prevention Device Model AML-LIIA TADANO LTD. Foreword Foreword This service manual (this document) is compiled to provide information on the AML-LIIA

More information

Chapter General. Accessible built-in storage facilities shall comply with Section 905. Chapter 9. Built-in Furnishings and Equipment

Chapter General. Accessible built-in storage facilities shall comply with Section 905. Chapter 9. Built-in Furnishings and Equipment Chapter 9 9-1 12 901.1 Scope. Built-in furnishings and equipment required to be accessible by the scoping provisions adopted by the administrative authority shall comply with the applicable provisions

More information

ACM Installation Instructions. Date: 08/15/18 I Rev #

ACM Installation Instructions. Date: 08/15/18 I Rev # ACM Installation Instructions PN: 45-02-11 Date: 08/15/18 I Rev # Safety Overview: -If required, properly barricade the work area -Follow all required safety precautions, including PPE -Disable any applicable

More information

Reducing Risk and Improving Weather Window in Offshore Lifting Operation

Reducing Risk and Improving Weather Window in Offshore Lifting Operation Reducing Risk and Improving Weather Window in Offshore Lifting Operation Cranemaster Technology Kristian Helland Product Manager Cranemaster Functionality Cranemaster company Main office Stathelle, Norway

More information

TechCon Engineering & Consulting

TechCon Engineering & Consulting Offshore lifting Design & Heavy Lift TechCon Engineering & Consulting is a worldwide company that provides offshore lifting design and heavy lift consulting for any kind of structure or equipment using

More information

LOCOMOTIVE ENGINEERING DEPTT.

LOCOMOTIVE ENGINEERING DEPTT. SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved

More information

Heavy and Medium Duty Fire Doors

Heavy and Medium Duty Fire Doors Heavy and Medium Duty Fire Doors 10 06.06.2011 Add. Section 1.4. JES VK 09 14.12.2009 New doc. Frontpage JES VK 08 29.11.2006 Page 8 and 13 revised JES VK 07 08.11.2006 Page 15 revised JES VK 06 08.03.2005

More information

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,

More information

Pega 357 with Fanuc 04PC User Pre-installation Guide

Pega 357 with Fanuc 04PC User Pre-installation Guide Pega 357 with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 03/02/2001 Revision

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

FOR PROFESSIONAL GARAGE DOOR INSTALLERS Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",

More information

Pega 345 Queen with Fanuc 04PC User Pre-installation Guide

Pega 345 Queen with Fanuc 04PC User Pre-installation Guide Pega 345 Queen with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 02/28/2001

More information

Installation Instructions for OPGW Bolted Dead End

Installation Instructions for OPGW Bolted Dead End INS-ACA015 OPGW Bolted Dead End Procedure 1. Disassemble dead end. Remove one bolt from the same side of each keeper. Loosen other bolts to permit conductor to be placed in the conductor groove. If keepers

More information

Technical Memorandum

Technical Memorandum TM-1005 Rev. 0 24 November 2008 Technical Memorandum Anti-Twist Wire Rope for Support and Lift Cables for LP In-Tank Pumping Systems JC Carter 671 West 17 th Street Costa Mesa, CA 92627-3605 USA Phone:

More information

TOOL DESIGN - MANUFACTURING DESIGN SPECIFICATIONS FOR TOOLING AND EQUIPMENT SECTION H - DIE DESIGN TABLE OF CONTENTS. H.1 General...

TOOL DESIGN - MANUFACTURING DESIGN SPECIFICATIONS FOR TOOLING AND EQUIPMENT SECTION H - DIE DESIGN TABLE OF CONTENTS. H.1 General... TABLE OF CONTENTS H.1 General...Page 2 H.2 General Die Layout...Page 2 H.3 General Die Features...Page 2 H.4 Specific Die Type Features...Page 5 H.5 Special Punches and Die Bushings...Page 6 H.6 Wire E.D.M...Page

More information

Monopile Upending Tool (MP-UT)

Monopile Upending Tool (MP-UT) Monopile Upending Tool (MP-UT) Remotely controlled, safe and efficient upending of large monopiles Application + + Construction of Offshore Wind Farms (OWFs) Monopile Foundations Installation Short Description

More information

Requirement for Holes - Holes for Hanging

Requirement for Holes - Holes for Hanging Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure

More information

SINGLE SLIDE RAIL INSTALLATION INSTRUCTIONS

SINGLE SLIDE RAIL INSTALLATION INSTRUCTIONS SINGLE SLIDE RAIL INSTALLATION INSTRUCTIONS 1 Introduction The Single Slide Rail can be used up to a depth of 4m and a maximum width 5.8m wide. It is best suited for laying longer lengths of pipe and larger

More information

installation guide

installation guide 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000 SHOWN 3000 MODEL A rolling d oor is a la rge heavy obje ct that moves

More information