1 Rigging Design Guide MyTiCon Timber Connectors by MyTiCon Timber Connectors May, 2018

2 The information contained in this document is for general information purposes. We suggest that all rigging and panel material handling procedures conducted with the system outlined in this document are to be approved by a qualified design professional familiar with the governing site conditions and the conditions of the system. While we aim to keep the information provided in this document complete, accurate, up to date and in accordance with applicable design standards, we can not make warranties of any kind. Images and drawings provided are for reference only and can not be applicable to all conditions that may occur on site. Any reliance you place on such information is therefore strictly at your own risk. In no event will we assume liability for any loss or damage including and without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of profits arising out of, or in connection with the use of the system. Through the use of the document and system you are able to derive other uses which are outside of our control. The inclusion of the system or the implied use of the document to other applications is outside of our responsibility. Copyright 2018 by MyTiCon Timber Connectors All rights reserved. This document or any portion thereof may not be reproduced or used in any manner whatsoever without the expressed written permission of the publisher. 2

3 TABLE OF CONTENTS RIGGING DEVICES... 6 Yoke Dimension Specifications... 7 NOTES TO THE DESIGNER... 9 PREPARING A RIGGING PLAN DETERMINING THE FACTORED TOTAL LOAD (P)...11 Factored Total Load (P) Equation...11 Dynamic Acceleration Factor (K v )...11 Optional Safety Factor (K OS )...11 CALCULATING THE CAPACITY OF THE ANCHORS (Z ) Capacity of the Anchors (Z ) Equation Sling Angle Reduction Factor (R AR ) Load Spreader Reduction Factor (R LS ) Load Duration Reduction Factor (R D ) Screw Selection Guide REFERENCE RIGGING CAPACITY PER ANCHOR (Z) Floor/Roof CLT Panel Rigging Wall CLT Panel Rigging Glulam Beam Rigging SLING INSTALLATION Sling Angle Load Spreading END AND EDGE DISTANCE REQUIREMENTS Floor/Roof CLT Panel Rigging Wall CLT Panel Rigging Glulam Beam Rigging RECOMMENDED WORKFLOW CHECK LIST

4 Build Strong, Build Sustainable, Build The Future MyTiCon is a specialty supplier of connection systems for modern mass-timber and heavy-timber applications in commercial, industrial and residential projects. We are proud to be working with the most innovative partners on cutting-edge projects across North America. Are you working on a mass-timber project, looking to connect heavy timbers or use a timber-concrete composite CLT floor? We have the right solution for you. We believe in the connection technologies we offer. We dedicate our team of product consultants and timber engineers to support you and your projects. Our specialists operate coast to coast in all time zones. We speak English, French and German. Our goal is to see the mass-timber industry thrive and help to maintain a low carbon footprint through our support, our innovative research and cost-effective approaches. 4

5 Main and 49 th Ave Main Street Punjabi Market in Vancouver is one of the first CLT hybrid structures in North America, combining conventional stick frame wall elements and CLT floor elements. 5

6 RIGGING DEVICES Different rigging systems are available designed for a diversity of mass timber elements, in most rigging scenarios. Safe rigging is achieved using code-approved, high-strength fasteners used in combination with lab-tested rigging devices called yokes. By selecting the appropriate yoke, and adjusting fastener size, mass timber elements of all weights, types, and dimensions can be rigged. Yoke 1T The Yoke 1T system is designed and tested for lightto-medium weight CLT panels and glulam elements using ½ Kombi screws. Through a variety of screw lengths, reference rigging capacities of up to 1,500 lbs. per yoke can be achieved. Yoke 5T The Yoke 5T system is designed and tested for heavy CLT panels and glulam elements using ½ Kombi screws. Through a variety of screw lengths, reference rigging capacities of up to 5,500 lbs. per yoke can be achieved. Yoke XL The Yoke XL system uses smaller diameter fasteners with appropriate spacing requirements to lift CLT panels on the narrow edge. Yoke XL anchors also provide a solution for flat panel rigging by using a greater number of fasteners to achieve adequate screw anchorage in 3-ply panels. This system is compatible with the 3/8 Ecofast capable of rigging 3-1/8 (78 mm) thick panels and VG CSK (fully threaded) fasteners, with a maximum reference rigging capacities of 7,800 lbs. per yoke. 6

7 Yoke Dimension Specifications The following page presents the different yoke dimension specifications. 3-7/8 9/ /16 3-1/2 1/2 Figure /16 Yoke 1T anchor specifications 1-9/16 2-3/8 7/8 1-9/ /16 2-1/2 7-1/2 1-11/16 1/2 Figure /2 Yoke 5T anchor specifications 1-3/16 1-3/ / /16 2-3/8 2-15/16 7/8 1-3/16 1-3/16 3-9/ /16 5/8 Figure /16 Yoke XL anchor specifications 7

8 TESTED PRODUCT All products listed in this design guide have undergone comprehensive testing up to ultimate failure of the system using North American timber species. Picture provided by BYU RIGGING HAZARDS In order to ensure safe rigging operation, special attention should be given to the following points: Factored load of the rigged element (P) Maximum anchor capacity (Z ) Maximum capacity of slings, ropes, connection points and other hardware (Please refer to your respective rigging equipment provider). In order to ensure stable rigging with appropriate load sharing, the center of gravity shall be determined and pick points shall be chosen accordingly. All rigging shall be done by qualified personnel only. Before each lift, all hardware shall be checked for possible defects, material fatigue or abrasion. 8

9 NOTES TO THE DESIGNER 1. All rigging elements shall be approved by a licensed design professional. It is the responsibility of the rigger to ensure proper work safety environment and verify the condition of the equipment. All suggestions and details shown are to be treated as general and can not be assumed to be valid for all construction requirements & specific site conditions. 2. In this guide, the term yoke refers only to the yoke itself, while the term anchor refers to the yokes and the screws as a system. The capacity of the yoke represents the upper limit in terms of capacity per anchor, while the reference lifting capacity (Z) takes into account the capacity of the screws. 3. Rigging capacity: The total capacity of the anchors (Z ), resolved into the vertical components, must be greater than the factored total load (P) of the rigged element. To ensure full connection capacities, fasteners should penetrate panel plies to the largest extent possible, with a minimum of three plies penetrated. 4. Anchor placement: End and edge distance requirements must be respected, (see p.20 for more details). Additional moment equilibrium calculations are required to determine the proportion of the factored total load shared by each anchor for situations where anchors are not spaced equidistant around the center of gravity. The placement of the anchors should not exceed the maximum span of the lifted element. 5. Rigging slings and load spreader: Slings must lift elements at a minimum angle of 60 measured between the sling and the panel surface (β). Otherwise, the capacity of the anchors shall be adjusted with the appropriate sling angle reduction factor (R AR ) given in Table 3. Sling angles should not exceed 30 measured between the sling and the vertical (λ) to avoid excessive forces in the slings. A load spreader/compensation system shall be used for lifts using more than two anchors. Otherwise, the capacity of the anchors shall be adjusted with the appropriate load spreader reduction factor (R LS ). 6. Rigging condition requirements: Before each lift, check to see that the sling is properly attached. The load line should be brought over the element s center of gravity before the lift. No object or person can be present on the panels when rigged (no live load). Suspended loads should be securely slung and properly balanced before they are set in motion. Keep the load under control at all times. The use of taglines is recommended to prevent uncontrolled motion. Loads must be safely landed and properly blocked before being unhooked and unslung. 7. To ensure safety and proper capacity, the fasteners used for panel rigging should only be used once. Proper inspection should be performed frequently to ensure the structural integrity of the devices. If any damage or failure is noticed, stop using the device immediately. 8. The maximum installation torque of the screws is as follows: Table 1, Fastener Torsional Strength Screw diameter 3/8 [10 mm] 1/2 [12 mm] Maximum torque 26.6 lbs ft 38.6 lbs ft 9

10 PREPARING A RIGGING PLAN The procedure proposed below contains the steps recommended for the licenced design professional to prepare a rigging plan. Step 1) Determine the type of rigging and the assigned specific gravity based on wood species. Step 2) Step 3) Step 4) Step 5) Determine the factored total load (P) based on weight of the panel and rigging conditions (p.11). Determine the minimum reference rigging capacity per anchor (Z) required based on: Anchor capacity calculation, (p.12) Recommended fastener length, (p.13). Reference rigging capacity per anchor, (p.14 - p.17). Verify the sling angle relative to the element surface (β), and the effective number of anchors, (p.12). Determine the sling angle relative to the vertical (λ). Determine the pick points, considering even load sharing as well as edge and end distance requirements, (p.20). Type of Rigging The type of rigging is divided into three different categories depending on what type of engineered wood product is rigged and the orientation of the element. Floor or Roof CLT Panel Wall CLT Panel Glulam Beam Assigned Specific Gravities (G) Reference rigging capacities are calibrated to lift elements made of S-P-F or D.fir wood. The assigned specific gravities are as follows: S-P-F Douglas Fir G = 0.42 G = 0.49 Note: As per NDS 2018, section 12, Table A. All connection design must meet all relevant requirements of the Notes to the Designer section. 10

11 DETERMINING THE FACTORED TOTAL LOAD (P) Determining the factored total load (P) of the rigged element is essential. Actual loads must be factored up. The proposed method incorporates a dynamic acceleration factor and an optional safety factor considering the rigging scenario. In all the cases, the factored total loads (P) shall be specified and approved by a licensed design professional. The proposed method is presented below: P = p K v K OS p K v K OS Unfactored weight [lbs] Dynamic acceleration factor Optional safety factor For rigging mat rigging: K OS = 1 For open space rigging: K OS = 1.2 For tight space rigging: K OS = 1.3 The unfactored weight of the elements (p) is usually provided on shop drawings or manufacturer s specifications. Table 2 presents recommended dynamic acceleration factors (K v ) subject to approval by the licensed design professional. Table 2, Proposed Dynamic Acceleration Factors, K v Crane Type Dynamic Acceleration Factor, K v Fixed crane 1.1 to 1.3 Mobile crane 1.3 to 1.4 Bridge crane 1.2 to 1.6 Rigging and moving on flat terrain 2.0 to 2.5 Rigging and moving on rough terrain 3.0 to 4.0 Source: Pfeifer, Snaam, Halfen, Peikko, Arteon In cases where information on weight is not provided, a calculation based on the dimensions and the wood species may be done to estimate the unfactored weight in lbs.: h b l Element thickness [in.] Element width [ft.] Element length [ft.] p = (h b l) G C G Assigned specific gravities; 0.42 or 0.49 C Unit conversion factor [1] : 5.98 [1] The unit conversion factor contains adjustments from oven dry to standard dry service condition moisture content. 11

12 CALCULATING THE CAPACITY OF THE ANCHORS (Z ) Z = Z n R AR R LS R D Z n R AR Reference rigging capacity per anchor (provided in design tables) Number of anchors used Sling angle (β) reduction factor: All sling angles are 60 to the panel surface: R AR = 1.0 One or more sling angle is <60 to the panel surface: Table 3, Reduction factor for sling angle <60 β R AR R LS R D Load spreader reduction factor: If n = 2: R LR = 1.0 If n = 4, with adequate load spreader/compensation device: R LR = 1.0 If n = 4, without adequate load spreader/conpensation device: R LR = 0.5 Load duration reduction factor: Short term rigging (<10 min): R D = 1.0 Long term rigging (>10 min): R D = 0.78 λ c λ d β c β d λ a β a λ b βb 12

13 Screw Selection Guide Fastener length is often limited by the thickness of the rigged panel element. While it is recommended that the screws should penetrate as many plies as possible, a minimum clearance of 3/8 is recommended to avoid through penetration. The following table provides suggested fastener lengths for most common North American CLT thicknesses. Table 4, ASSY Screw Length Suggestion According to Panel Thickness Number of Plies 3-ply 5-ply 7-ply CLT Type Thickness Yoke Type Yoke 1T Yoke 5T Yoke XL in. [mm] Screw in. [mm] Screw in. [mm] Screw in. [mm] 3-1/8 [78] 3-3/8 [87] 3-1/2 [89] 4 [100] 4-1/8 [105] Kombi 1/2 x 3-1/8 [12x80] Kombi 1/2 x 3-1/8 [12x80] Kombi 1/2 x 4 [12x100] Kombi 1/2 x 4 [12x100] 4-3/4 [120] Kombi 1/2 x 4-3/4 [12x120] Kombi 1/2 x 4-3/4 [12x120] 4 [100] Kombi 1/2 x 4 [12x100] Kombi 1/2 x 4 [12x100] 4-3/4 [120] 5-1/8 [131] 5-1/2 [139] 5-5/8 [143] 6-1/4 [160] 6-7/8 [175] 7-1/8 [180] 7-7/8 [200] Kombi 1/2 x 4-3/4 [12x120] Kombi 1/2 x 4-3/4 [12x120] Ecofast 3/8 x 3-1/8 [10x80] VG CSK 3/8 x 4 [10x100] VG CSK 3/8 x 4 [10x100] Kombi 1/2 x 6-1/4 [12x160] Kombi 1/2 x 6-1/4 [12x160] VG CSK 3/8 x 6-1/4 [10x160] 4-3/8 [111] Kombi 1/2 x 4 [12x100] Kombi 1/2 x 4 [12x100] VG CSK 3/8 x 4 [10x100] 7-1/2 [191] 7-3/4 [197] 8-3/8 [213] 8-5/8 [220] 9-5/8 [245] Kombi 1/2 x 6-1/4 [12x160] Kombi 1/2 x 6-1/4 [12x160] VG CSK 3/8 x 6-1/4 [10x160] Note: Fastener lengths are suggestions only and can be adapted to fit certain site conditions and rigging needs. The thread length on the fastener determines the capacity of each system. Kombi 1/2 x 6-1/4 Kombi 1/2 x 4-3/4 Kombi 1/2 x 4 VG CSK 3/8 x 6-1/4 VG CSK 3/8 x 4 Ecofast 3/8 x 3-1/8 Kombi 1/2 x 3-1/8 13

14 REFERENCE RIGGING CAPACITY PER ANCHOR (Z) Floor/Roof CLT Panel Rigging Table 5, Reference Rigging Capacity for Flat CLT Panel Rigging using Yoke 1T (Z) Rigging Device Yoke 1T Notes: See notes under table 6 Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /8 [78] 1/2 x 3-1/8 1,150 4 [100] 1/2 x 4 1,150 Kombi 4-3/4 [120] 1/2 x 4-3/4 1, /4 [160] 1/2 x 6-1/4 1, /8 [78] 1/2 x 3-1/8 1,400 4 [100] 1/2 x 4 1,400 Kombi 4-3/4 [120] 1/2 x 4-3/4 1, /4 [160] 1/2 x 6-1/4 1,500 Table 6, Reference Rigging Capacity for Flat CLT Panel Rigging using Yoke 5T (Z) Rigging Device Yoke 5T Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /8 [78] 1/2 x 3-1/8 2,000 4 [100] 1/2 x 4 2,000 Kombi 4-3/4 [120] 1/2 x 4-3/4 2, /4 [160] 1/2 x 6-1/4 5, /8 [78] 1/2 x 3-1/8 2,200 4 [100] 1/2 x 4 2,200 Kombi 4-3/4 [120] 1/2 x 4-3/4 3, /4 [160] 1/2 x 6-1/4 5,500 Notes: 1. Reference rigging capacities (Z) listed are only valid for allowable stress design in USA. 2. Reference rigging capacities (Z) listed need to be factored with appropriate reduction factors (R AR ; R LS ; R D ) given on page Reference rigging capacities (Z) listed are valid for a minimum sling angle to the panel (β) of Reference rigging capacities (Z) listed are only valid with listed ASSY screws. 5. The resistance of ASSY screws can only be assured for a single use. New screws are to be used for each lift. 6. The right ASSY screw length should be chosen to penetrate panel plies to the largest extent possible, refer to p The maximum installation torque of ASSY screws shall not exceed the fastener torsional strength given in Table 1. 14

15 Floor/Roof CLT Panel Rigging Table 7, Reference Rigging Capacity for Flat CLT Panel Rigging using Yoke XL (Z) Rigging Device Yoke XL ; 4 screws Rigging Device Yoke XL ; 8 screws Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /8 [78] Ecofast 3/8 x 3-1/8 1,600 4 [100] 3/8 x 4 2,500 VG CSK 6-1/4 [160] 3/8 x 6-1/4 4, /8 [78] Ecofast 3/8 x 3-1/8 1,800 4 [100] 3/8 x 4 2,800 VG CSK 6-1/4 [160] 3/8 x 6-1/4 5,000 Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /8 [78] Ecofast 3/8 x 3-1/8 3,100 4 [100] 3/8 x 4 4,800 VG CSK 6-1/4 [160] 3/8 x 6-1/4 7, /8 [78] Ecofast 3/8 x 3-1/8 3,400 4 [100] 3/8 x 4 5,400 VG CSK 6-1/4 [160] 3/8 x 6-1/4 7,500 Rigging Device Yoke XL ; 12 screws Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /8 [78] Ecofast 3/8 x 3-1/8 4,700 4 [100] 3/8 x 4 7,400 VG CSK 6-1/4 [160] 3/8 x 6-1/4 7, /8 [78] Ecofast 3/8 x 3-1/8 5,200 4 [100] 3/8 x 4 7,600 VG CSK 6-1/4 [160] 3/8 x 6-1/4 7,800 Notes: 1. Reference rigging capacities (Z) listed are only valid for allowable stress design in USA. 2. Reference rigging capacities (Z) listed need to be factored with appropriate reduction factors (R AR ; R LS ; R D ) given on page Reference rigging capacities (Z) listed are valid for a minimum sling angle to the panel (β) of Reference rigging capacities (Z) listed are only valid with listed ASSY screws. 5. The resistance of ASSY screws can only be assured for a single use. New screws are to be used for each lift. 6. The right ASSY screw length should be chosen to penetrate panel plies to the largest extent possible, refer to p The maximum installation torque of ASSY screws shall not exceed the fastener torsional strength given in Table 1. 15

16 Wall CLT Panel Rigging Table 8, Reference Rigging Capacity for Wall CLT Panel Rigging using Yoke XL (Z) Rigging Device Yoke XL ; 12 screws Specific Gravity Min Panel Thickness Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /2 [87] VG CSK 3/8 x 6-1/4 1, /2 [87] VG CSL 3/8 x 6-1/4 1,100 Notes: 1. Reference rigging capacities (Z) listed are only valid for allowable stress design in USA. 2. Reference rigging capacities (Z) listed account for tilting up the panel during the rigging process. 3. Reference rigging capacities (Z) listed are only valid with listed ASSY screws. 4. The capacity of the anchors (Z ) must be greater than half the factored total load (1/2 P) as shown below. 5. The resistance of ASSY screws can only be assured for a single use. New screws are to be used for each lift. 6. The maximum installation torque of ASSY screws shall not exceed the fastener torsional strength given in Table If splitting is observed, immediately stop the rigging operations and contact a licensed design professional. Z ½ P ½ P Tabulated reference rigging capacities in the wall CLT panel rigging section are designed to allow the panel to be tilted up, as shown below. 16

17 Glulam Beam Rigging Table 9, Reference Rigging Capacity for Glulam Beam Rigging using Yoke 1T (Z) Lifting Device Specific Gravity Min Beam Width Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs. Yoke 1T 1/2 x 4-3/4 1, /8 [78] Kombi 1/2 x 6-1/4 1,500 1/2 x 4-3/4 1, /8 [78] Kombi 1/2 x 6-1/4 1,500 Notes: See notes under table 10 Table 10, Reference Rigging Capacity for Glulam Beam Rigging using Yoke XL (Z) Lifting Device Yoke XL ; 4 screws Rigging Device Yoke XL ; 8 screws Specific Gravity Min Beam Width Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /2 [87] VG CSK /2 [87] VG CSK Specific Gravity Min Beam Width 3/8 x 4 2,500 3/8 x 6-1/4 4,500 3/8 x 4 2,800 3/8 x 6-1/4 5,000 Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /2 [87] VG CSK /2 [87] VG CSK 3/8 x 4 4,800 3/8 x 6-1/4 7,200 3/8 x 4 5,400 3/8 x 6-1/4 7,500 Rigging Device Yoke XL ; 12 screws Specific Gravity Min Beam Width Fastener Designation Reference Rigging Capacity (Z) G in. [mm] in. lbs /2 [87] VG CSK /2 [87] VG CSK 3/8 x 4 7,400 3/8 x 6-1/4 7,800 3/8 x 4 7,600 3/8 x 6-1/4 7,800 Notes: 1. Reference rigging capacities (Z) listed are only valid for allowable stress design in USA. 2. Reference rigging capacities (Z) listed need to be factored with appropriate reduction factors (R AR ; R LS ; R D ) given on page Reference rigging capacities (Z) listed are valid for a minimum sling angle to the panel (β) of Reference rigging capacities (Z) listed are only valid with listed ASSY screws. 5. The resistance of ASSY screws can only be assured for a single use. New screws are to be used for each lift. 6. The right ASSY screw length should be chosen to penetrate glulam plies to the largest extent possible, refer to p The maximum installation torque of ASSY screws shall not exceed the fastener torsional strength given in Table 1. 17

18 SLING INSTALLATION Sling Angle Tabulated reference rigging capacities (Z) are valid for rigging scenarios with a minimum sling angle (β) measured between the sling and the panel surface of 60. For cases where the sling angle is less than 60, an appropriate reduction factor (R AR ) needs to be applied. Additionally, the angle (λ) measured between the vertical and the sling, must be smaller than 30 to avoid excessive forces in the slings. S λ β Did you know? If S is greater than L, then the angle (λ) measured between the vertical and the sling is smaller than 30. L Special attention to angles must be given for angled panel rigging scenarios. For cases where one of the sling angles (β) is less than 60, an appropriate reduction factor (R AR ) needs to be applied to the capacity of the anchors (Z ). The following figures demonstrate an example of a rigging scenario with a panel angled by 15. S β λ L 15 18

19 Load Spreading When using more than two anchors, it is important to ensure that uneven load sharing does not occur. Without an adequate load spreader/compensation system, only two slings may carry the entire load, with the remaining slings hanging slack. In such cases, a reduction factor R LS = 0.5 needs to be considered. When using load spreader/compensation devices as seen below, even load share may be assumed. For CLT wall panel rigging, load spreaders can be used to further stabilize the load while increasing the sling angle (β). 19

20 END AND EDGE DISTANCE REQUIREMENTS Certain end and edge distance requirements have to be followed when installing Yokes to avoid splitting of the wood. Rigging devices should always be placed in symmetrical manner and in line (parallel) with the sling to promote even load sharing, while stabilizing the rigged material. Floor/Roof CLT Panel Rigging Provided requirements are a minimum and can be adjusted to specific site conditions. Anchors should be placed in accordance with allowable panel span in order to avoid excessive bending during lifting. 10-5/8 5-7/8 5-7/8 5-7/8 10-5/8 10-5/8 20

21 Wall CLT Panel Rigging For wall panel rigging in the narrow edge of the CLT the specifically designed Yoke XL (which uses smaller diameter fasteners) can be used. The reduced edge distance requirements below are a minimum, and apply to the Yoke XL only. 10-5/8 1-1/4 Glulam Beam Rigging When rigging glulam beams, the minimum end and edge distances are as follows: 10-5/8 10-5/8 3-5/16 2 Did you know? For repetitive lifts, a jig can be made to assure correct and efficient placement and even load share between the rigging hardware. 21

22 RECOMMENDED WORKFLOW The high level of prefabrication of mass timber building elements means that installation can be fast and efficient. Trucks are generally loaded in the correct sequence, meaning every panel element is delivered in place just in time. Therefore, it is crucial to keep up with a similarly efficient material workflow on site by steadily unloading truck beds and maximizing crane efficiency. It is usually recommended to use 4 sets of rigging hardware: while one set is installed on the panel on the truck bed (1), one is used for rigging a panel into place (2), another one is demounted from a readily installed panel (3), and the other set is transported back to the truck (4). With this circular workflow, delays on site can be minimized

23 CHECK LIST Material Weight: Is the material weight given (and is it correct)? Is the load factored up with correct adjustment factors? Dynamic acceleration factor (refer to respective standards) Optional safety factor Rigging Hardware: Is the capacity per anchor enough to lift the material? Is the angle (β) measured between the sling and the panel surface greater than 60? Is the angle (λ) measured between the vertical and the sling smaller than 30? Is the load rating of the slings greater than the angled force component? Is the correct fastener length used? Is the fastener new? Fasteners should only be used for one rigging application! Device Placement: Are end and edge distance requirements satisfied? Is even load sharing between the anchors assured? Is the center of gravity below the upper pick point of the crane? Rigging: Is all rigging hardware installed properly and double checked? Is the surrounding area clear and safe? Is the rigging element secured with tag lines? Does the current wind condition allow for safe rigging? Is the intended location prepared to accept the rigged material? Releasing: Is the panel fully secured with no load on the rigging slings anymore? Are used fasteners disposed of correctly to avoid reuse for rigging applications? 23

24 We strive to provide sustainable, high-quality masstimber and heavy-timber connection solutions to a rapidly evolving and thriving industry. We drive innovation through certified research and development and contribute our part to the education of young talent and experienced professionals. Please contact our team to arrange a free Remote Learning Session on Modern Timber Connection Systems at: education@myticon.com For all our technical resources, visit: Contact Us info@myticon.com Technical Support support@myticon.com MyTiCon Timber Connectors , 124th Street, Surrey, BC, Canada, V3W 9G2 WOOD you like to CONNECT?

Canadian li ing device design for Cross Laminated Timber (CLT)

Canadian li ing device design for Cross Laminated Timber (CLT) Canadian li ing device design for Cross Laminated Timber (CLT) For detailed informa on please visit our web site www.my-!-con.com Contact: email: sales@my- -con.com Phone - Western Canada: 604-349-8426

More information

APA Performance Rated Rim Boards

APA Performance Rated Rim Boards D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top

More information

THE ENGINEERED WOOD ASSOCIATION

THE ENGINEERED WOOD ASSOCIATION D A T A F I L E APA Performance Rated Rim Boards A rim board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top

More information

Connection Design Examples

Connection Design Examples Connection Design Examples Using the 2015 NDS (DES345) Lori Koch, P.E. Manager, Educational Outreach American Wood Council Adam Robertson, M.A.Sc., P.Eng. Manager, Codes and Standards Canadian Wood Council

More information

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to

More information

Glulam Connection Details

Glulam Connection Details T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED

More information

American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/

American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/ American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO 80112 Phone: 303/792-9559 Fax: 303/792-0669 404.1. SCOPE STANDARD FOR RADIALLY REINFORCING CURVED GLUED LAMINATED

More information

CLT Cross Laminated Timber

CLT Cross Laminated Timber CLT Cross Laminated Timber Connections Date: 21.08.2014 Disclaimer The below presented structural analysis is an exemplified calculation. This calculation is solely a proposal for a design approach. This

More information

TEST SERIES TO EVALUATE THE STRUCTURAL BEHAVIOUR OF ISOBOARD OVER RAFTER SYSTEM

TEST SERIES TO EVALUATE THE STRUCTURAL BEHAVIOUR OF ISOBOARD OVER RAFTER SYSTEM TEST SERIES TO EVALUATE THE STRUCTURAL BEHAVIOUR OF ISOBOARD OVER RAFTER SYSTEM J A Wium Institute of Structural Engineering 19 November 2007 ISI2007-3 TEST SERIES TO EVALUATE THE STRUCTURAL BEHAVIOUR

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

EWP Product Guide. For Use With Products Manufactured by THF23140 LSSH179 SKH1720L

EWP Product Guide. For Use With Products Manufactured by THF23140 LSSH179 SKH1720L EWP Product Guide www.connectors.com For Use With Products Manufactured by THF23140 LSSH179 SKH1720L Lumberton Largo Montgomery Houston Rancho Cucamonga Livermore Thornhill, Ontario 1018-071 2 General

More information

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Project Number ME086-05 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com January

More information

Connections in CLT Assemblies

Connections in CLT Assemblies Creating forest sector solutions www.fpinnovations.ca Connections in CLT Assemblies Cross Laminated Timber Symposium Vancouver, BC February 8-9, 2011 M. Mohammad Building Systems Wood Products Division

More information

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products March 2002 2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS The 2001 Edition of the National Design Specification

More information

Series 7650 Installation Instructions Sliding Glass Door

Series 7650 Installation Instructions Sliding Glass Door Series 7650 Installation Instructions Sliding Glass Door Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration products are removed

More information

Featuring TJ Rim Board and TimberStrand LSL

Featuring TJ Rim Board and TimberStrand LSL #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load

More information

RIGGING MANUAL English

RIGGING MANUAL English KH7 RIGGING MANUAL English TABLE of CONTENTS SYMBOLS... 3 1. INTRODUCTION... 4 2. system components... 4 3. SAFETY information... 5 4. Product overview... 6 5. suspending a cluster... 8 6. stacking kh7

More information

PART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS

PART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS PART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS A - INTRODUCTION This report addresses engineered design for unblocked wood structural panel (plywood or OSB) roof diaphragms with either continuous

More information

Slide 1. Slide 2. Slide 3. The Knack. Background Information

Slide 1. Slide 2. Slide 3. The Knack. Background Information Slide 1 Prepared by: Ian Humphrey, P. Eng. Paul Henderson, P. Eng. Slide 2 The Knack Slide 3 Background Information Began my career in the lifting industry in 1994 as a draftsman and returned to school

More information

FASTENERS C O M P AT I B L E W I T H F E R O T I E S Y S T E M S. Which FERO Tie Systems Require Fasteners?

FASTENERS C O M P AT I B L E W I T H F E R O T I E S Y S T E M S. Which FERO Tie Systems Require Fasteners? FASTENERS C O M P AT I B L E W I T H F E R O T I E S Y S T E M S Which FERO Tie Systems Require Fasteners? Structural Actions: Fastener,, or Both? With the exception of FERO tie systems that are directly

More information

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Introduction Your new Model T28000 Heavy-Duty

More information

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

Connectors for Cold-Formed Steel Curtain-Wall Construction

Connectors for Cold-Formed Steel Curtain-Wall Construction The expiration date of this document has been extended until 2/3/3. Introducing Connectors for Cold-Formed Steel Curtain-Wall Construction Code Listed: IAPMO ES ER-238 (800) 999-5099 www.strongtie.com

More information

Connection and performance of two-way CLT plates

Connection and performance of two-way CLT plates Connection and performance of two-way CLT plates by Chao (Tom) Zhang George Lee Dr. Frank Lam Prepared for Forestry Innovation Investment 1130 W Pender St, Vancouver BC V6E 4A4 Timber Engineering and Applied

More information

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load capacity of 2x

More information

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration

More information

VERSA-LAM. An Introduction to VERSA-LAM Products

VERSA-LAM. An Introduction to VERSA-LAM Products 44 VERSA-LAM An Introduction to VERSA-LAM Products VERSA-LAM is one of the strongest and stiffest engineered wood products approved in the UK. 241 302 356 406 VERSA-LAM products are excellent as floor

More information

Pryda Timber Connectors

Pryda Timber Connectors Pryda Timber Connectors Pryda Lintel Guide Engineered Steel Wall Lintels March 2014 ESSENTIAL NOTES PRYDA PRODUCT GUIDES INTRODUCTION The information in this Product Guide is provided for use in Australia

More information

15 Planer Stand. Model Due to continuing improvements, actual product may differ slightly from the product described herein.

15 Planer Stand. Model Due to continuing improvements, actual product may differ slightly from the product described herein. 15 Planer Stand Model 96316 Assembly And Operation Instructions Due to continuing improvements, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd., Camarillo,

More information

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials... 30a Renewable Chase Bibra Lake WA 6163 Tel: (08) 9494 2211 Fax: (08) 9494 2202 Email: info@sipsindustries.com.au Web: www.sipsindustries.com.au Installation Guide Please read before installing SIPs Kit.

More information

SECTION ROUGH CARPENTRY

SECTION ROUGH CARPENTRY SECTION 06 10 00- ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Contracting Requirements and Division 1 Specification Sections, apply

More information

EWP Product Guide. For Use With Products Manufactured by.

EWP Product Guide. For Use With Products Manufactured by. EWP Product Guide For Use With Products Manufactured by www.connectors.com THFI5 LSSH179 SKH170L Corona Westampton Largo Montgomery Humble Tracy Thornhill, Ontario Phoenix 318-15 318 integrity_ewp 0315.indd

More information

CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES

CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES CAMSPAN GALLERY CONVEYORS INSTALLATION & ERECTION GUIDELINES JANUARY, 1998 Cambelt International Corporation 2820 West 1100 South Salt Lake City, Utah 84104 Phone(801) 972-5511 Fax(801) 972-5522 www.cambelt.com

More information

TK 422 PORTABLE BRAKE

TK 422 PORTABLE BRAKE 1 TIN KNOCKER TK 422 PORTABLE BRAKE INSTRUCTIONS & PARTS DIAGRAM TAAG MACHINERY CO. (Master Distributor) 1257-B Activity Dr. Vista, Ca 92081 Tel: (800) 640-0746 Fax: (760) 727-9948 Website: www.tinknocker.com

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

Connection Philosophy. p NDS Chapter-by-chapter description Changes from previous editions Examples. Part 1: Member Design Webinar.

Connection Philosophy. p NDS Chapter-by-chapter description Changes from previous editions Examples. Part 1: Member Design Webinar. Outline ASD and LRFD with the 2005 NDS Part 2 Connection Design Presented by: John Buddy Showalter, P.E. Vice President, Technology Transfer Connection philosophy p NDS Chapter-by-chapter description Changes

More information

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax: 6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01

More information

I SERIES IVY1122 IVY1152 IVY1153. BalancePoint Flyware For Point Source and Subwoofer loudspeakers models IP8, IP6, IS8, and IS6

I SERIES IVY1122 IVY1152 IVY1153. BalancePoint Flyware For Point Source and Subwoofer loudspeakers models IP8, IP6, IS8, and IS6 I SERIES BalancePoint Flyware For Point Source and Subwoofer loudspeakers models IP8, IP6, IS8, and IS6 IVY1122 IVY1152 IVY1153 Vertical Yokes for IP6/8-1122, IP6/8-1152, IP8-1153 The BalancePoint Flyware

More information

STRUCTURAL ATTACHMENTS

STRUCTURAL ATTACHMENTS Brace Structural Attachment Selection Procedure ) Determine structure to be attached to from the following: A) Concrete B) Wood Beam C) Structural Steel 2) Reference structure connection type from Appendix

More information

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO SUMMERHOUSE PERGOLA MODEL NO. 088-1759-2 INSTRUCTIONS Toll-free: 1-888-670-6684 IMPORTANT: Please read this manual carefully before beginning assembly of this product. Keep this manual for future reference.

More information

Joint Evaluation Report

Joint Evaluation Report 0 Joint Evaluation Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 ESR-2909 Reissued 09/2017 This report is subject to renewal 09/2019. DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES SECTION:

More information

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year. ICC-ES Evaluation Report ESR-2648 Reissued June 1, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

Safety clamps, inc. Operation, Maintenance and Repair Manual for. Model HBC. Home of the big Bite Lifting Clamp

Safety clamps, inc. Operation, Maintenance and Repair Manual for. Model HBC. Home of the big Bite Lifting Clamp Safety clamps, inc. Home of the big Bite Lifting Clamp Operation, Maintenance and Repair Manual for Model HBC Products manufactured by Safety Clamps, Inc. meet and/or exceed ANSI/ASME B30.20 standards

More information

Shrinker and stretcher

Shrinker and stretcher Shrinker and stretcher Model 96465 Assembly And Operation Instructions Due to continuing improvements, actual product may differ slightly from the product described herein 3491 Mission Oaks Blvd, Camarillo,

More information

Overdriven Nails in Structural Sheathings. Overview Revised 3/22/2017

Overdriven Nails in Structural Sheathings. Overview Revised 3/22/2017 Overdriven Nails in Structural Sheathings Overview Revised 3/22/2017 SBCA has been the voice of the structural building components industry since 1983, providing educational programs and technical information,

More information

SDWH TIMBER-HEX Screw

SDWH TIMBER-HEX Screw Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections, Including Ledgers Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable

More information

Load Tables, Technical Data and Installation Instructions

Load Tables, Technical Data and Installation Instructions W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

Unirac Installation Manual

Unirac Installation Manual Tile Roof Hook Universal Mount Unirac R Pub 090727-1ii June 2009 A HILTI GROUP COMPANY Unirac welcomes input concerning the accuracy and user-friendliness of this publication. Please write to publications@unirac.com.

More information

Pole Mount Installation Guide

Pole Mount Installation Guide Pole Mount Installation Guide (No Fine Adjustment) 495R Billerica Ave. North Billerica, MA 01862 USA Tel (978)459-8800 fax (978)459-3310 / 8814 Email: sales@radiowaves.com www.radiowaves.com IMPORTANT!

More information

Backer Block (both sides) of web with single RFPI Joist. (12) - 10d. Backer Block. each side. 2 min. 2 min.

Backer Block (both sides) of web with single RFPI Joist. (12) - 10d. Backer Block. each side. 2 min. 2 min. EWP Product Guide For Use With Products Manufactured by www.connectors.com THF30 LSSH179 SKH170L Corona Westampton Largo Montgomery Humble Livermore Thornhill, Ontario 1018- General Notes Follow these

More information

Owner s Manual & Safety Instructions

Owner s Manual & Safety Instructions Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s

More information

For Use With Products Manufactured by

For Use With Products Manufactured by 1 EWP PRODUCT GUIDE For Use With Products Manufactured by SKH34R- LSSH179 THF1795 THO17118 Westampton Largo Montgomery Humble Corona Livermore Thornhill, Ontario 945-131 GENERAL NOTES Follow these instructions

More information

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.

More information

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013. ICC-ES Evaluation Report ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

KEEP YOUR RESOURCE MOVING.

KEEP YOUR RESOURCE MOVING. LINER BOLTS KEEP YOUR RESOURCE MOVING. COLUMBUS McKINNON CORPORATION Leading the Industry Downtime in the grinding mill operation is caused by one of two things: regularly scheduled maintenance or unscheduled

More information

Installation Instructions for OPGW Bolted Dead End

Installation Instructions for OPGW Bolted Dead End INS-ACA015 OPGW Bolted Dead End Procedure 1. Disassemble dead end. Remove one bolt from the same side of each keeper. Loosen other bolts to permit conductor to be placed in the conductor groove. If keepers

More information

Glulam Curved Members. Glulam Design. General Glulam Design. General Glulam Beams are Designed in the SAME Manner as Solid Sawn Beams

Glulam Curved Members. Glulam Design. General Glulam Design. General Glulam Beams are Designed in the SAME Manner as Solid Sawn Beams Glulam Curved Members Glulam Design General Glulam Beams are Designed in the SAME Manner as Solid Sawn Beams There is an Additional Adjustment Factor, C v, the Volume Factor C v and C L (Lateral Stability

More information

Nailed Structural-Use Panel and Lumber Beams

Nailed Structural-Use Panel and Lumber Beams D A T A F I L E Nailed Structural-Use Panel and Lumber Beams When roof load or span requirements are too great to allow use of commonly available dimension lumber or timbers, a box beam constructed of

More information

INSTALLATION MANUAL SONANCE SOUNDBARS SB46 M AND SB46 L. Introduction. Box Contents. Wall Mount Installations

INSTALLATION MANUAL SONANCE SOUNDBARS SB46 M AND SB46 L. Introduction. Box Contents. Wall Mount Installations INSTALLATION MANUAL SONANCE SOUNDBARS SB46 M AND SB46 L Introduction Thank you for purchasing the Sonance Soundbar SB46 M or SB46 L. When properly installed your new Soundbar will give you years of entertainment

More information

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Introduction This guide specification is intended to stress the necessary precautions and requirements for receipt, storage,

More information

Planishing hammer stand For use with SKU Planishing hammer

Planishing hammer stand For use with SKU Planishing hammer Planishing hammer stand For use with SKU 94847 Planishing hammer Model 96300 Assembly And Operation Instructions Please Note: Planishing Hammer not included with Stand. Due to continuing improvements,

More information

nineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

nineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631 APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS FALL 2016 lecture nineteen wood construction and design Wood Construction 1 Timber Construction all-wood framing systems

More information

STABILITY. SECURITY. INTEGRITY.

STABILITY. SECURITY. INTEGRITY. MODEL 150 HELICAL ANCHOR SYSTEM PN #MBHAT STABILITY. SECURITY. INTEGRITY. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO

More information

AST-2446 INSTALLATION INSTRUCTIONS

AST-2446 INSTALLATION INSTRUCTIONS AST-2446 Suspension Adapter AST-2446 INSTALLATION INSTRUCTIONS Single Stud Installation Step 1. Secure the ceiling plate to the ceiling structure (see WARNING). Step 2. Use suitable hardware (commercially

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO MEDICAL EQUIPMENT SUPPORTS SECTION 05600 1. GENERAL

More information

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER: DEWALT EVALUATION SUBJECT:

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER: DEWALT EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3042 Reissued 09/2018 This report is subject to renewal 09/2019. DIVISION: 06 00

More information

WOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6

WOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6 Chapter 6 WOODEN BUILDINGS 6.1 INTRODUCTION Wood has higher strength per unit weight and is, therefore, very suitable for earthquake resistant construction. But heavy cladding walls could impose high lateral

More information

Pega 357 with Fanuc 04PC User Pre-installation Guide

Pega 357 with Fanuc 04PC User Pre-installation Guide Pega 357 with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 03/02/2001 Revision

More information

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years. ICC-ES Evaluation Report www.icc-es.org (800) -6587 (56) 699-05 ESR-0 Reissued March, 0 This report is subject to renewal in two years. A Subsidiary of the International Code Council DIVISION: 06 00 00

More information

MANUAL METAL SHRINKER/STRETCHER

MANUAL METAL SHRINKER/STRETCHER MANUAL METAL SHRINKER/STRETCHER Model 95062 ASSEMBLY AND OPERATING INSTRUCTIONS Due to continuing improvements, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd.,

More information

m A D e f o R b u i L D i n g L i f t i n g S y S t e m S C e - m A R K e D

m A D e f o R b u i L D i n g L i f t i n g S y S t e m S C e - m A R K e D M a d e f o r b u i l d i n g b u i l t f o r l i v i n g Lif t ing Sys tem s CE - MARKED I M P R I N T KLH Massivholz GmbH Publisher and responsible for content: KLH Massivholz GmbH Version: 01/2013,

More information

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed

More information

Installation Guide (888)

Installation Guide (888) BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 4G 5-7/16 Wide Plank Dims: 192 L x 5-7/16 W x 13/16 H BAMDECK 4G WIDE 8-1/4 Wide Plank Dims: 96 L x 8-1/4 W x 13/16 H BAMDECK

More information

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Guide A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Details A B C D F E A Masonry Wall Connection Details Blockwork

More information

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas. Description The following pages show the steps required to assembly and fit the antenna mount to a vertical tower pipe of diameter 48 to 115 mm (1.9 to 4.5"). This mount provides ±20 azimuth or ±15 elevation

More information

Instruction Sheet REB SERIES. Rotating Sliding Base REB18

Instruction Sheet REB SERIES. Rotating Sliding Base REB18 Instruction Sheet REB SERIES Rotating Sliding Base REB14 REB18 THANK YOU Thank you for purchasing the REB Series Rotating Sliding Base. Please read these instructions thoroughly before installing this

More information

Connectors for Cold-Formed Steel Curtain-Wall Construction

Connectors for Cold-Formed Steel Curtain-Wall Construction Introducing Connectors for Cold-Formed Steel Curtain-Wall Construction Code Listed: IAPMO ES ER-238 (800) 999-5099 www.strongtie.com Our Newest Product Line for Cold-Formed Steel Framing Simpson Strong

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CREATING POSITIVE CUSTOMER EXPERIENCES INSTALLATION INSTRUCTIONS PDS-PLUS Universal Projector Mount Model: NORTH AMERICA 3130 East Miraloma Avenue Anaheim, CA 92806 USA USA and Canada Phone: 1.800.368.9700

More information

Your Performance Partner

Your Performance Partner Assembly Instructions Attic Storage System Your Performance Partner CONTENTS Safety Precautions.................................. 2 Warranty.......................................... 2 Important User Information............................

More information

ICBO ES ER-5598 n HUD MR 1310 DSA PA-123 n LAC RR25448 n CCMC R. Limit States Design

ICBO ES ER-5598 n HUD MR 1310 DSA PA-123 n LAC RR25448 n CCMC R. Limit States Design beams, Columns & Headers ICBO ES ER-5598 n HUD MR 1310 DSA PA-123 n LAC RR25448 n CCMC 13006-R Limit States Design P h o e n i x B u i l d i n g C o m p o n e n t s 2 Manufacturing WOOD The miracle Material

More information

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...

More information

ESR-1254 * DELETED BY CITY OF LOS ANGELES. Reissued April 1, 2006 This report is subject to re-examination in one year.

ESR-1254 * DELETED BY CITY OF LOS ANGELES.   Reissued April 1, 2006 This report is subject to re-examination in one year. ESR-1254 Reissued April 1, 2006 This report is subject to re-examination in one year. www.icc-es.org Business/Regional Office 5360 Workman Mill Road, Whittier, California 90601 (562) 699-0543 Regional

More information

By SP Partners, LLC. INSTALLATION GUIDE. ProTech

By SP Partners, LLC.   INSTALLATION GUIDE. ProTech By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE ProTech By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE ProTech IMPORTANT - READ THIS FIRST Inspect stair for any damage

More information

Floating Lake Truss Dock Instructions

Floating Lake Truss Dock Instructions Table of Contents Floating Lake Truss Dock Instructions 1. Dock Assembly and Set-Up 1.1 Installing Dock Floats 1.2 Positioning Quick Clips 1.3 Installing Anchor Posts 1.4 Installing Docks into the Water

More information

European Technical Assessment ETA-13/0029 of 11/07/2017

European Technical Assessment ETA-13/0029 of 11/07/2017 ETA-Danmark A/S Göteborg Plads 1 DK-2150 Nordhavn Tel. +45 72 24 59 00 Fax +45 72 24 59 04 Internet www.etadanmark.dk Authorised and notified according to Article 29 of the Regulation (EU) No 305/2011

More information

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26 ROBOT KR 350 Installation, Connection, Exchange 1of 26 e Copyright KUKA Roboter GmbH This documentation or excerpts therefrom may not be reproduced or disclosed to third parties without the express permission

More information

FOLIO COUNTERTOP LAVATORY

FOLIO COUNTERTOP LAVATORY FOLIO COUNTERTOP LAVATORY 1. BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences.

More information

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply

More information

XL MAX. Suspension System Data Center Ceiling Solutions. Assembly and Installation Instructions

XL MAX. Suspension System Data Center Ceiling Solutions. Assembly and Installation Instructions PRELUDE Top Lock XL MAX (4) #8 x 1/" Long Main Beam Sharp Point Truss Head Screws Suspension System Data Center Ceiling Solutions Assembly and Installation Instructions SYSTEM OVERVIEW The Prelude XL Max

More information

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending 48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending 1 Table of Contents Table of Contents PAGES Installation Support 3 Safety

More information

Originally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019

Originally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019 SUNMODO CORPORATION 14800 NE 65 th Street Vancouver, WA 98682 SUNMODO EZ ROOF MOUNT L-FOOT KITS FOR SHINGLE ROOFS CSI Section: 06 25 23 Wood, Plastic, and Composite Fastenings 07 71 00-Roof Specialties

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) 141 E 1450 Rd. Lawrence, KS 66044 (75) 594-5696 Perma-Column Installation Instructions i Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete

More information

INSTRUCTION BOOK FOR. Da-Snap Screen

INSTRUCTION BOOK FOR. Da-Snap Screen INSTRUCTION BOOK FOR Da-Snap Screen Included Hardware Large Wall Bracket (47" Long) Installation screws not included Quantities vary by screen size: Screens 80" and smaller viewing width = 1 Screens over

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

Designed for Building Designed for Living

Designed for Building Designed for Living Designed for Building Designed for iving decorative hardware Add Beauty and Strength to Your Custom Outdoor iving Structures ith Outdoor Accents, a new line of decorative timber connectors and fasteners

More information

Installation Guide (888)

Installation Guide (888) BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 3G 5-7/16 Wide Plank Dims: 96 L x 5-7/16 W x 13/16 H BAMDECK 3G 16FT. 5-7/16 Wide Plank Dims: 192 L x 5-1/2 W x 13/16 H

More information

ESR-3042* Reissued August 1, 2012 This report is subject to renewal September 1, 2014.

ESR-3042* Reissued August 1, 2012 This report is subject to renewal September 1, 2014. ICC-ES Evaluation Report www.icc-es.org (800) -687 (6) 699-0 ESR-0* Reissued August, 0 This report is subject to renewal September, 0. A Subsidiary of the International Code Council DIVISION: 06 00 00

More information