CONTRACTOR QUALITY CONTROL REPORT (ATTACH ADDITIONAL SHEETS IF NECESSARY)

Size: px
Start display at page:

Download "CONTRACTOR QUALITY CONTROL REPORT (ATTACH ADDITIONAL SHEETS IF NECESSARY)"

Transcription

1 CONTRACTOR QUALITY CONTROL REPORT (ATTACH ADDITIONAL SHEETS IF NECESSARY) PHASE CONTRACT NO N D-1781/004 CONTRACT TITLE Repair FRC Building /OCT/10 REPORT NO #1 PREPARATORY INITIAL WAS PREPARATORY PHASE WORK PREFORMED TODAY? YES X NO IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST. Definable Feature of Work Index # 1251 Replace VAV Units ( ) 2500 Ductwork/Air distribution ( , , ) 1600 Water Piping Systems ( ) WAS INITIAL PHASE WORK PREFORMED TODAY? YES NO X IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST. Definable Feature of Work Index # WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE? YES NO WORK COMPLIES WITH SAFETY REQUIREMENTS? YES NO Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present FOLLOW-UP REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) Description REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST) Description REMARKS (Also Explain Any Follow-Up Phase Checklist Item From Above That Was Answered "NO"), Manuf. Rep On-Site, etc. Description AUTHORIZED QC MANAGER AT SITE Clint Taylor 28/OCT/10 GOVERNMENT QUALITY ASSURANCE REPORT QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT Description GOVERNMENT QUALITY ASSURANCE MANAGER 4296/2 (9/98) SHEET 1 OF 1

2 PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) SPEC SECTION OCT 10 CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX # N D-1781/004 Air Terminal Units Enter Sched Act ID Here Enter Index# Here PERSONNEL PRESENT GOVERNMENT REP NOTIFIED 48 HOURS IN ADVANCE: YES X NO NAME Attached list POSITION COMPANY/GOVERNMENT REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? Approved as noted (#4.3) YES X NO IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? SUBMITTALS ARE ALL MATERIALS ON HAND? YES NO X IF NO, WHAT ITEMS ARE MISSING? Will come from shop CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS: Upon arrival MATERIAL STORAGE ARE MATERIALS STORED PROPERLY? YES NO IF NO, WHAT ACTION IS TAKEN? N/A REVIEW EACH PARAGRAPH OF SPECIFICATIONS. John Strickland will go over specification noting all requirements. SPECIFICATIONS DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. CLARIFY ANY DIFFERENCES. Ceiling tile will be removed, existing duct will be opened, existing unit will be removed, the new unit will be installed (with transitions if necessary). The setting of the unit will be in the open position until controls are completed. ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. PRELIMINARY WORK & PERMITS IF NOT, WHAT ACTION IS TAKEN? N/A 4296/2B (9/98) SHEET 1 OF 3

3 IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY WHOM. Leak test and operational test. WHEN REQUIRED? TESTING WHERE REQUIRED? REVIEW TESTING PLAN. HAS TEST FACILITIES BEEN APPROVED? ACTIVITY HAZARD ANALYSIS APPROVED? YES X NO SAFETY REVIEW APPLICABLE PORTION OF EM Bill Klima will speak on this. MEETING COMMENTS NAVY/ROICC COMMENTS DURING MEETING. Brian wants Maintenance Manuals in electronic form. OTHER ITEMS OR REMARKS OTHER ITEMS OR REMARKS: Working off ladders is possible for majority of work. While working in corridors or larger work areas, mark the work area with cones and caution tape. If unforeseen condition occurs while working, we may have to shut down corridor and mark area with danger tape. In the case of heavy traffic and conditions of unusual high risk, it will be the discretion of the Site and Health Safety Officer to use a hall/corridor monitor. All existing VAV boxes are pneumatically operated, therefore LOTO is not required for their removal. Slone will locate VAV boxes and remove ceiling tiles. WW Gay to provide protection to all surrounding areas that might be affected in their work areas. The Government will be responsible for clearing desk and shelves of computers, etc. Lt. Ellerbe will be kept informed of ongoing work and future work areas. Clint Taylor 28 OCT /2B (9/98) SHEET 2 OF 3

4 PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) SPEC SECTION OCT 10 CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX # N D-1781/004 Metal Ducts 001 PERSONNEL PRESENT GOVERNMENT REP NOTIFIED 48 HOURS IN ADVANCE: YES X NO NAME Attached list POSITION COMPANY/GOVERNMENT REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? Approved (#28) YES X NO IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? SUBMITTALS ARE ALL MATERIALS ON HAND? YES NO X IF NO, WHAT ITEMS ARE MISSING? Materials will come from shop CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS: Upon arrival MATERIAL STORAGE ARE MATERIALS STORED PROPERLY? YES NO IF NO, WHAT ACTION IS TAKEN? N/A REVIEW EACH PARAGRAPH OF SPECIFICATIONS. John Strickland will review specifications noting all requirements. SPECIFICATIONS DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. CLARIFY ANY DIFFERENCES. Secure area where work is performed with cones and taping. Transition duct from new units to attach to existing ductwork. ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. PRELIMINARY WORK & PERMITS IF NOT, WHAT ACTION IS TAKEN? N/A 4296/2B (9/98) SHEET 1 OF 2

5 IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY WHOM. N/A WHEN REQUIRED? TESTING WHERE REQUIRED? REVIEW TESTING PLAN. HAS TEST FACILITIES BEEN APPROVED? ACTIVITY HAZARD ANALYSIS APPROVED? YES X NO SAFETY REVIEW APPLICABLE PORTION OF EM Bill Klima will speak on this. NAVY/ROICC COMMENTS DURING MEETING. OTHER ITEMS OR REMARKS MEETING COMMENTS OTHER ITEMS OR REMARKS: Comments from Air Terminal Unit Preparatory Check List will apply to this section. Clint Taylor 28 OCT 10 QC MANAGER 4296/2B (9/98) SHEET 2 OF 2

6 PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) SPEC SECTION OCT 10 CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX # N D-1781/004 Diffusers, Registers, and Grills PERSONNEL PRESENT GOVERNMENT REP NOTIFIED 48 HOURS IN ADVANCE: YES X NO NAME Attached list POSITION COMPANY/GOVERNMENT REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? YES NO X IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? Submittal is with Engineer. His approval will be shortly and we will submit to owner. SUBMITTALS ARE ALL MATERIALS ON HAND? YES NO X IF NO, WHAT ITEMS ARE MISSING? Items coming from shop. CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS: Upon arrival MATERIAL STORAGE ARE MATERIALS STORED PROPERLY? YES NO IF NO, WHAT ACTION IS TAKEN? N/A REVIEW EACH PARAGRAPH OF SPECIFICATIONS. John will review specifications SPECIFICATIONS DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. CLARIFY ANY DIFFERENCES. Secure area where work is performed. Install grills. ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. PRELIMINARY WORK & PERMITS IF NOT, WHAT ACTION IS TAKEN? N/A 4296/2B (9/98) SHEET 1 OF 2

7 IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY WHOM. N/A WHEN REQUIRED? TESTING WHERE REQUIRED? REVIEW TESTING PLAN. HAS TEST FACILITIES BEEN APPROVED? ACTIVITY HAZARD ANALYSIS APPROVED? YES NO SAFETY REVIEW APPLICABLE PORTION OF EM Bill Klima will speak on this MEETING COMMENTS NAVY/ROICC COMMENTS DURING MEETING. Lt. Ellerbe said white would be acceptable for color of grille/diffuser. OTHER ITEMS OR REMARKS OTHER ITEMS OR REMARKS: Comments from Air Terminal Unit Preparatory Check List will apply to this section. Clint Taylor 28 OCT /2B (9/98) SHEET 2 OF 2

8 PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) SPEC SECTION OCT 10 CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX # N D-1781/004 Thermal Insulation for Mechanical Systems 001 PERSONNEL PRESENT GOVERNMENT REP NOTIFIED 48 HOURS IN ADVANCE: YES NO NAME Attached list POSITION COMPANY/GOVERNMENT REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? Approved (#8) YES X NO IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? SUBMITTALS ARE ALL MATERIALS ON HAND? YES NO X IF NO, WHAT ITEMS ARE MISSING? Materials will come from shop CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS: Upon arrival MATERIAL STORAGE ARE MATERIALS STORED PROPERLY? YES NO IF NO, WHAT ACTION IS TAKEN? N/A REVIEW EACH PARAGRAPH OF SPECIFICATIONS. John Strickland will review specifications. SPECIFICATIONS DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. CLARIFY ANY DIFFERENCES. Secure area where work is performed with cones and taping. Insulate ductwork. ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. PRELIMINARY WORK & PERMITS IF NOT, WHAT ACTION IS TAKEN? N/A 4296/2B (9/98) SHEET 1 OF 2

9 IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY WHOM. N/A WHEN REQUIRED? TESTING WHERE REQUIRED? REVIEW TESTING PLAN. HAS TEST FACILITIES BEEN APPROVED? ACTIVITY HAZARD ANALYSIS APPROVED? YES X NO SAFETY REVIEW APPLICABLE PORTION OF EM Bill Klima will speak on this. NAVY/ROICC COMMENTS DURING MEETING. OTHER ITEMS OR REMARKS MEETING COMMENTS OTHER ITEMS OR REMARKS: Comments from Air Terminal Unit Preparatory Check List will apply to this section. Register Insulation is the subcontractor. Clint Taylor 28 OCT 10 QC MANAGER 4296/2B (9/98) SHEET 2 OF 2

10 PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) SPEC SECTION OCT 10 CONTRACT NO DEFINABLE FEATURE OF WORK SCHEDULE ACT NO. INDEX # N D-1781/004 Water Piping Systems 1600 PERSONNEL PRESENT GOVERNMENT REP 48 HOURS IN ADVANCE: YES X NOTIFIED NO NAME POSITION COMPANY/GOVERNMENT Attached list REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? YES NO X IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? Pumps have been approved (#11 & #26). Remaining items are being processed. SUBMITTALS ARE ALL MATERIALS ON HAND? YES NO X IF NO, WHAT ITEMS ARE MISSING? Will come from shop as required CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) COMMENTS: Upon arrival MATERIAL STORAGE ARE MATERIALS STORED PROPERLY? YES NO IF NO, WHAT ACTION IS TAKEN? N/A REVIEW EACH PARAGRAPH OF SPECIFICATIONS. John Strickland will go through specification SPECIFICATIONS DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. Proper pipe supports will be installed as required. Piping will be cut as accurately as possible, cleaning all cuts. Any welding or brazing by certified personnel. Government will receive full instruction in adjustment, operation, and maintenance with pertinent safety requirements of chilled and condenser water piping.. CLARIFY ANY DIFFERENCES. ENSURE PRELIMINARY WORK IS CORRECT AND PERMITS ARE ON FILE. PRELIMINARY WORK & PERMITS IF NOT, WHAT ACTION IS TAKEN? Permits will be obtained for all required welding and brazing. 4296/2B (9/98) SHEET 1 OF 2

11 IDENTIFY TEST TO BE PERFORMED, FREQUENCY, AND BY WHOM. Pressure tests of piping system will be performed with all results prepared for the owner. WHEN REQUIRED? TESTING WHERE REQUIRED? REVIEW TESTING PLAN. HAS TEST FACILITIES BEEN APPROVED? ACTIVITY HAZARD ANALYSIS APPROVED? YES NO X SAFETY REVIEW APPLICABLE PORTION OF EM Bill Klima to speak on this MEETING COMMENTS NAVY/ROICC COMMENTS DURING MEETING. Cindy Dean ( ) w/fire Dept. for Permits. OTHER ITEMS OR REMARKS OTHER ITEMS OR REMARKS: Check for smoke in area of work with regards to smoke alarms. QC MANAGER Clint Taylor 28 OCT /2B (9/98) SHEET 2 OF 2

12 SLONE ASSOCIATES. INC. SIGN-IN SHEET- MEETING TYPE/NAME Project: NS Mayport - Repair FRC Building 1553 Meeting Date/ Time: 10/28/2010/ 1:00/pm Facilitator: USN/Clint Taylor- QC-Slone Place/Room: Slone Job Trailer Preparatory Meetings- HVAC - Print Name Title Company Office Phone Cell Lt: A,(fT. ifou 'I el0t~ gii';)(" tf$-s ~\c-0 : \ct qcy_ '270 ~20'')bO.~ ~.> rf;~f/"f'1h-vvij,u M/t-! fo~'i r; (00 'y() :J C<.4.j.l-..O,\v euer»: Q 1)e<..I/V.I-..," 2.d... d 1. ~~<..'-11/1.-<. \-. \ F~'YJ~< (ro'(j ",-to; {\-~~~ s9i - i I&'2 ~~\\~I:"'''''~< s,~'4..~ v: A.:2\ C{...z...3S '+ ~02..~b ~ \('C'.:::d.c,.\.\~ ~SG.-Lw ~ ~\~.~~\t~~~c.kb:.q <:\ \/'v'w.ci fl'h.. JDI-lN 8USH.LL SuP!' '-J.lW ~ fit? fyl EC W, "3' ia 2'31-909, J~w s ~u...@..wvj~ry)c...~~ LriJtL- -JrI0111 ;r} f;t2.elt'l/pj tj, \,J, GlrlflGL-!l. 35.r.J,./;16 } '15 c1liy!1;f:;i;){j)~jwl6 UIY\ -:5, ~,W\ tj.1p.~ '3CJ cf"" 17lS-.:ne\..'"s VI IJ.J It1 I:. c,.., ";:1~k"'~ ''is-vi 7-1i JIU ~,M 4CI/lJ1j) ::z;.;5~ -- wlj{jqy ~-mz- 59/"'/l.5'jJ.Jrl1t:,~ e. 'ijwj>rtc cp~, kirk.81t1""~.5 SU-fJT. tv LJt:11J-11 33'l-'U v «r g-;))7j v ):::6a.-rYlI!-s;9 t.uu-'c1 Me... '" ~ t V'A ij\ 'f 5ttt> ~"11& I -.. -t m5'j--oj1fj!~ (0 f Ff}JlfPJ...- 1J!JBI< 5'(0/\16 9J{)cf 1~f\ 73 L/_5~l?H) '1';)'1 'foy 1- '." ( ~h\ '\ -SU~ SLnv...eAss ~+r-.2~-«;)2.b..-x.;.~'> (~I\ PC( <USo:..(' 0, f0.:",. 't>.\"~ ~ CI>tJGE"" t=w'v'3r::v\ ~c:. G~~( :.~ IEP- f Ar-oL-( l4ci ~"'-~: ~ ~~~\ ~f 13~\\\(\,~A ~.J\b' ~t.n'l~~~~ \... ('{)AI~ r~l111j i-- ' fill irj AI,,~IL 1S't2f 115f hv,', t..a /'If. Ilv {16J. I e--e. Ill' I J r - 8-J/:3. If-'\- ~l 0\1\ L f(-'l t>-ii.f't o\~6~~6v.t~~c.(fou ~He..»eo~~ ~ ~e(;\'( ()fwf qo~.,,'fl <td'l'si3 ~ \~J\lE.:ts".,~ 61){~l.f Qk'\ :.. ~ C\lfllCle.~~t;()c. C.CM 9~+ 19~ "- (\ IJ-i- I~'<u.iL &. c. c;5 L Oi'l1J' 2.4'7- ~-/t.!a z..lhi44-l c...tci.t,~!'@.$'l ~1Y"" ~ ~~, (j \ V)'\.~ I I

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

Ductwork Construction Checklist

Ductwork Construction Checklist Ductwork Construction Checklist Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

DESIGN CHECKLIST INTRODUCTION

DESIGN CHECKLIST INTRODUCTION INTRODUCTION 1 The checklist is intended to serve as a convenient guide in design development as well as the final checking of plans and specifications for construction projects. Its main usefulness for

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SEI Certification Program Manual

SEI Certification Program Manual Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing

More information

FAST TRACK WORKSHOP OBJECTIVES

FAST TRACK WORKSHOP OBJECTIVES 1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

(AMMA) American Maritime Modernization Association

(AMMA) American Maritime Modernization Association (AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT

More information

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

SECTION SUBMITTALS

SECTION SUBMITTALS SECTION 01300 SUBMITTALS PART 1- GENERAL 1.01 SCOPE OF WORK A. This Section specifies the general methods and requirements of submissions applicable to Shop Drawings, Product Data, Samples and Operations

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section Editing (date): Marie-Clémence DEGALLAIX (30/05/2016) Checking (date): Jean FOURCROY (02/06/2016)

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2311

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM Page 1 of 7 1. SCOPE LOCKOUT / TAGOUT PROGRAM This Program outlines the purpose, rules, responsibilities and techniques to be followed by all University of Pittsburgh employees to guard against the unexpected

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

ARMED SERVICES BOARD OF CONTRACT APPEALS

ARMED SERVICES BOARD OF CONTRACT APPEALS ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -- ) ) M. A. Mortenson Company ) ASBCA No. 53431 ) Under Contract No. DACA85-94-C-0031 ) APPEARANCES FOR THE APPELLANT: Robert H. Crick, Esq. John H.

More information

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT. Dr. Checks Comment Responses Review: 100% Building Package B Review Project: (G168476) Ft. Gillem, Enclave Force Protection Latest Update: 03-03-2010 8:30 am 1. 3079320 We will coordinate and add to the

More information

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG) GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

UTSA Facilities Condition Assessment. Out Brief August XX, 2009 UTSA Facilities Condition Assessment Out Brief August XX, 2009 Agenda Opening Remarks FCA Results Summary by Category Example Deficiencies FCA Results Summary by Building Proposed Project List Potential

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks. Scope of Services Project Understanding The City of Sparks (City) has also requested the HDR Engineering, Inc. (HDR) provided limited shop drawing review and periodic observation during construction and

More information

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES) Reference: Denver Fire Code Sections 510 Approved: Manuel Almagure Division Chief, Fire Prevention Division Number: 510-1 Effective Date: February 1, 2018 Page 1 of 8 This Policy 510-1 provides additional

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

ENTRY-LEVEL INDUSTRIAL MECHANIC

ENTRY-LEVEL INDUSTRIAL MECHANIC ENTRY-LEVEL INDUSTRIAL MECHANIC Definition: An entry-level industrial mechanics technician fabricates/repairs machinery, troubleshoots, installs, inspects, and maintains industrial equipment using mechanical,

More information

Section Project Closeout

Section Project Closeout Section 01700 - Project Closeout PART 1 GENERAL A. STIPULATIONS The section Special Requirements forms a part of this section by this reference thereto and shall have the same force and effect as if printed

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2825

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820 Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant

More information

MECHANICAL GENERAL REQUIREMENTS SECTION B. The requirements of this SECTION apply to all work of this DIVISION.

MECHANICAL GENERAL REQUIREMENTS SECTION B. The requirements of this SECTION apply to all work of this DIVISION. MECHANICAL GENERAL REQUIREMENTS SECTION 15010 PART 1 GENERAL 1.1 DESCRIPTION A. Comply with the requirements of DIVISION 1. B. The requirements of this SECTION apply to all work of this DIVISION. C. Provide

More information

SECTION BASIC MECHANICAL REQUIREMENTS GENERAL BASIC MECHANICAL REQUIREMENTS PART RELATED DOCUMENTS

SECTION BASIC MECHANICAL REQUIREMENTS GENERAL BASIC MECHANICAL REQUIREMENTS PART RELATED DOCUMENTS SECTION 15010 - BASIC MECHANICAL REQUIREMENTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Requirements of the Contract Forms, Conditions of the Contract, Specifications, Drawings, and

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the New Kensington High School (CAPA) ULCS# 5520 Building

More information

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION PERMITS AND INSPECTIONS FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number of

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information